Anda di halaman 1dari 30

REKAPITULASI

REKAPITULASI RENCANA ANGGARAN BIAYA


INTEGRATED OF AGRICULTUR WORKSHOP
PROVINSI PAPUA PEGUNUNGAN

Biaya Satuan
No Uraian No
(Rp)
1
I PENGADAAN MESIN PERTANIAN & PETERNAKAN 1,884,500,000 2
II PEMBANGUNAN SARANA DAN PRASARANA PENDUKUNG 33,437,100,000 3
III PERALATAN PENDUKUNG KERJA 195,300,000 4
IV LAIN-LAIN PENGELUARAN 1,872,000,000 5
SUB TOTAL INVESTASI 37,388,900,000 6
1 BIAYA PRODUKSI TANAMAN BAWANG 285,900,000
2 BIAYA PRODUKSI TANAMAN CABAI 239,755,000
3 BIAYA PRODUKSI TOMAT 140,700,000
4 BIAYA PRODUKSI KENTANG 123,245,000 No

5 BIAYA PRODUKSI KELADI 161,800,000 1


6 BIAYA PRODUKSI JAGUNG 88,135,000 2
SUB TOTAL BIAYA PRODUKSI TANAMAN 1,039,535,000 3
1 BIAYA PRODUKSI TERNAK BABI 1,897,500,000 4
2 BIAYA PRODUKSI TERNAK AYAM PETELUR 12,964,400,000 5
3 BIAYA PRODUKSI TERNAK SAPI 1,456,000,000 6
4 BIAYA PRODUKSI TERNAK KAMBING 228,000,000 7
SUB TOTAL BIAYA PRODUKSI PETERNAKAN 16,545,900,000 8
REKAPITULASI 54,974,335,000 9
ESTIMASI HASIL TANAMAN PRODUK PERTA
PROVINSI PAPUA PEGUNUNGAN
INTEGRATED OF AGRICULTUR WORKSH

Waktu
Jenis Produk Satuan Nilai Produksi Target Produksi Satuan
Panen

Tanaman Bawang 65 HST 285,900,000 19,000 Kg


Cabe Merah 160 HST 239,755,000 8,000 Kg
Tomat 75 - 100 HST 140,700,000 25,000 Kg
Jagung 170 HST 88,135,000 8,000 Kg
Keladi 12 s.d 16 bulan 161,800,000 85,000 kg
Kentang 90 HST
DAFTAR PENYUSUTAN INVENTARIS BARANG

Total Nilai Umur Pakai /


Jenis Barang Unit Nilai Perolehan Nilai Residu
Perolehan bulan
Traktor Set 2 785,000,000 1,570,000,000 150,000,000 120
Mesin Pipil Jagung 2 18,000,000 36,000,000 5,000,000 60
Mesin Tepung 2 37,000,000 74,000,000 8,500,000 60
Mesin Potong Rumput 4 5,000,000 20,000,000 1,000,000 36
Knapssack Sprayer 10 1,700,000 17,000,000 500,000 24
Droper Pupuk Cair 10 1,000,000 10,000,000 500,000 36
Kereta Sorong 10 1,750,000 17,500,000 500,000 24
Mesin Pencacah / Tresseir 2 70,000,000 140,000,000 20,000,000 60
Mesin Penetas Telur Ayam 10 35,000,000 350,000,000 10,000,000 60
AN PRODUK PERTANIAN
A PEGUNUNGAN
RICULTUR WORKSHOP

Harga Pokok
Nilai Hasil Profit Lama Produksi
Penjualan
Penjualan
25,000 475,000,000 189,100,000 1 x masa tanam
40,000 320,000,000 80,245,000 Perminggu utk waktu 3 s/d 5 bulan
10,000 250,000,000 109,300,000 Panen per minggu dgn masa 2 s.d 3 bulan
7,000 56,000,000 (32,135,000) 1 x masa tanam
5,000 425,000,000 263,200,000 1 x masa tanam

Nilai
Penyusutan
11,833,333
516,667
1,091,667
527,778
687,500
263,889
708,333
2,000,000
5,666,667
TIME LINE KEGIATAN KAWASAN PER
PROVINSI PAPUA PEGUNU
TAHUN 2023

Target Waktu /
No Tahapan Kegiatan Agustus September
1 2 3 4 1 2 3 4
1 Penyusunan Program Kerja

Rapat Koordinasi tentang Pelaksanaan Program


2 bersama OPD
Pembahasan dan Pengesahan Rencana Kegiatan
3
Anggaran Program
4 Konsolidasi dengan kelompok tani

5 Survey Lokasi Kegiatan dan bahan baku organik

6 Pengolahan Lahan

7 Pengadaan dan Pengolahan Pupuk Organik

8 Pembuatan Kandang Ternak (infrastruktur) lain

9 Pembuatan Irigasi Pertanian (Springkel Water)

10 Pengadaan bibit /benih tanaman & Ternak

11 Pengadaan Alsintan

12 Proses Penanaman

13 Proses Perawatan dan Pemeliharaan Tanaman


AN KAWASAN PERTANIAN TERPADU
NSI PAPUA PEGUNUNGAN
TAHUN 2023

Target Waktu / Bulan


Oktober Nopember Desember Keterangan
1 2 3 4 1 2 3 4 1 2 3 4
Tim Ahli Bid Ekonomi

Direncankan tgl 22 Agustus 2023

23 s/d 28 Agutus 2023

29 Agustus 2023

30 s.d 31 Agustus 2023

1 September 2023

30 Hari (1 bulan)

60 hari (2 bulan )

Launching penanaman perdana

Perawatan dab Panen Perdana


PERALATAN DAN SARANA PENDUKUNG
INTEGRATED OF AGRICULTUR WORKSHOP
PROVINSI PAPUA PEGUNUNGAN

Biaya Satuan Nilai


No Uraian Volume Satuan
(Rp) (Rp)
I PENGADAAN MESIN PERTANIAN & PETERNAKAN
1. Traktor Set 2 unit 785,000,000 1,570,000,000
2. Mesin Pipil Jagung 2 unit 18,000,000 36,000,000
3. Mesin Tepung 2 unit 37,000,000 74,000,000
4. Mesin Potong Rumput 4 unit 5,000,000 20,000,000
5. Knapssack Sprayer Elektrik 10 unit 1,700,000 17,000,000
6. Droper Pupuk Cair 10 unit 1,000,000 10,000,000
7. Kereta Sorong 10 Unit 1,750,000 17,500,000
8. Mesin Pencacah / Tresseir 2 unit 70,000,000 140,000,000
Sub Total 1,884,500,000
II PEMBANGUNAN SARANA DAN PRASARANA PENDUKUNG
Pembangungan Jalan
a. Main Road (Lebar 6 meter) 4,000.00 meter -
b. Branch Road ( Lebar 3 meter) 8,000.00 meter -
c. Drainase ( 1 m x 0.5 m) 12,000.00 meter -
d. Irigasi Teknis/Pompanisasi 20 unit 156,855,000 3,137,100,000
Pembangunan Kandang Ayam Petelur 10.000 ekor (1500 M²) 1 Paket Unit 6,585,000,000 6,585,000,000
Pembangunan Kandang Babi 500 ekor ( 2000 M²) 1 Paket Unit 8,759,750,000 8,759,750,000
Pembangunan Kandang Sapi 100 ekor (1000 M²) 1 Paket Unit 4,409,750,000 4,409,750,000
Pembangunan Kandang Kambing 100 ekor (600 M²) 1 Paket Unit 2,669,750,000 2,669,750,000
Pembangunan Pabrikasi Pupuk Cair 1 Paket Unit 4,106,750,000 4,106,750,000
Jumlah I 33,437,100,000
III PERALATAN PENDUKUNG KERJA
1. Laptop 5 unit 23,000,000 115,000,000
2. Printer 2 unit 3,500,000 7,000,000
3. Alat Tulis Kantor 1 paket 20,000,000 20,000,000
4. PH Meter Air 5 unit 2,500,000 12,500,000
5. PH Meter Tanah 5 unit 1,500,000 7,500,000
6. Cangkul 20 pcs 250,000 5,000,000
7. Parang Potong 20 pcs 200,000 4,000,000
8. Ambrometer 1 unit 5,300,000 5,300,000
9. Garpu Tanah 10 pcs 250,000 2,500,000
10. Sarung Tangan 10 lusin 150,000 1,500,000
11. Sekop 10 pcs 250,000 2,500,000
12. Radio Komunikasi 5 unit 2,500,000 12,500,000
Jumlah II 195,300,000
IV LAIN-LAIN PENGELUARAN
1. Insentif Komunikasi 5 org x 12 bln 12,000,000 60,000,000
2. Uji Analisa Tanah, Air, Daun dll 1 paket 300,000,000 300,000,000
3. Penyusunan Laporan Periodik 4 bulan 15,000,000 60,000,000
4. Pengadaan Kenderaan Roda 4 Doubel Cabin 2 unit 670,000,000 1,340,000,000
5. Pengadaan Kenderaan Roda 2 Jenis Trail 2 unit 56,000,000 112,000,000
Jumlah III 1,872,000,000
V TOTAL BIAYA (I + II + III +IV) 37,388,900,000

Wamena, 10 Agustus 2023


Disusun Oleh
TIM AHLI
GUBERNUR PAPUA PEGUNUNGAN
BIDANG EKONOMI, SUMBER DAYA ALAM DAN LINGKUNGAN HIDUP

M U J I A N T O, SE
KETUA

BUDI HARTONO, S.E ENMO SURANTA TARIGAN, S.P


ANGGOTA ANGGOTA

ADI SYAHPUTRA PURBA, S.P JABAT SUMBADHA, S.P, S.H, M.H, M.P
ANGGOTA ANGGOTA
PEMBANGUNAN SARANA
PEMBUATAN PUPUK ORGANIK CAIR
PROVINSI PAPUA PEGUNUNGAN

Biaya Satuan Nilai


No Uraian Volume Satuan
(Rp) (Rp)
i SARANA PEMBANGUNAN
1. Bangunan Produksi POC 600 m2 4,500,000 2,700,000,000
2. Drum Plastik capacity 200 liter 25 pcs 450,000 11,250,000
3. Selang 0,5 inch 100 meter 25,000 2,500,000
4. Mes Halus 20 meter 100,000 2,000,000
5. Jerigen capacity 5 liter 100 pcs 50,000 5,000,000
6. Ember Plastik 20 pcs 50,000 1,000,000
7. Water Pump 1 unit 4,000,000 4,000,000
8. Instalasi Air 1 paket 5,000,000 5,000,000
9. Instalasi Listrik 1 paket 6,000,000 6,000,000
10. Pembangunan Green House 384 m2 2,500,000 960,000,000
Jumlah I 3,696,750,000
II LAIN-LAIN PENGELUARAN
1. Sewa Lahan 1 Ha 10,000,000 10,000,000
2. Uji Laboratorium dan Sertifikasi 1 paket 300,000,000 300,000,000
3. Lain - Lain 1 paket 100,000,000 100,000,000
Jumlah II 410,000,000

III Biaya Sarana Produksi (I+II) 4,106,750,000.00

Biaya Satuan Nilai


No Uraian Volume Satuan
(Rp) (Rp)
TENAGA KERJA DAN BAHAN
1. Persiapan
a. Sewa Pick Up @ 12 bulan 1 bulan 15,000,000 15,000,000
b. Mengumpulkan bahan dasar MOL 20 HOK 150,000 3,000,000
2. Persiapan Wadah 5 HOK 150,000 750,000
3. Prosesing Bahan MOL 20 HOK 150,000 3,000,000
4. Bahan Cair MOL 5000 liter 5,000 25,000,000
5. Bahan Padat dan Organik Lainya 2500 kg 6,000 15,000,000
6. Packaging 5000 pcs 10,000 50,000,000
Jumlah I 111,750,000
Biaya Produksi 111,750,000.00
Produksi 5,000 liter
Harga Jual 1 liter 30,000 30,000
Nilai Produksi 5,000 liter 30,000 150,000,000
Pendapatan Usaha Tani 38,250,000
(Nilai Produksi - Biaya Produksi)
BEP 22,350
R/C Rasio 1.30

Wamena, 10 Agustus 2023


Disusun Oleh
TIM AHLI
GUBERNUR PAPUA PEGUNUNGAN
BIDANG EKONOMI, SUMBER DAYA ALAM DAN LINGKUNGAN HIDUP

M U J I A N T O, SE
KETUA

BUDI HARTONO, S.E ENMO SURANTA TARIGAN, S.P


ANGGOTA ANGGOTA

ADI SYAHPUTRA PURBA, S.P JABAT SUMBADHA, S.P, S.H, M.H, M.P
ANGGOTA ANGGOTA
ANALISA USAHA TANI (1 HA)
BUDIDAYA BAWANG MERAH VARIETAS SOLOK (S.S SAKATO)
PROVINSI PAPUA PEGUNUNGAN

Biaya Satuan Nilai


No Uraian Volume Satuan
(Rp) (Rp)
I TENAGA KERJA
1. Pengolahan Tanah
a. Biaya transport
b. Membuat Bedengan 60 HOK 150,000 9,000,000
2. Tanam 40 HOK 150,000 6,000,000
3. Memupuk 20 HOK 150,000 3,000,000
4. Menyiang 20 HOK 150,000 3,000,000
5. Pengendalian Hama Penyakit 20 HOK 150,000 3,000,000
6. Penyiraman 40 HOK 150,000 6,000,000
7. Panen dan Pasca Panen
a. Memanen 30 HOK 150,000 4,500,000
b. Mengangkut 10 HOK 150,000 1,500,000
c. Mengeringkan 10 HOK 150,000 1,500,000
d. Menyimpan 10 HOK 150,000 1,500,000
Jumlah I 39,000,000

1 SARANA PRODUKSI
1. Bibit ( Varietas Solok ) 1,000 Kg 150,000 150,000,000
2. Pupuk
- Organik Padat 5,000 kg 11,000 55,000,000
- Organik Cair 150 kg 85,000 12,750,000
- Dolomit 1,500 kg 2,000 3,000,000
- Pestsida Botani 50 ltr 75,000 3,750,000
3. Pestisida
- Insektisida Nabati 5 Ltr 180,000 900,000
- Fungisida Nabati 5 Ltr 180,000 900,000
4. Mulsa (120 cm x 500 m) 20 Rol 480,000 9,600,000
Jumlah II 235,900,000

III LAIN-LAIN PENGELUARAN


1. Sewa Lahan 1 Ha 10,000,000 10,000,000
2. Pajak Lahan/Biaya air 1 Ha 1,000,000 1,000,000
Jumlah III 11,000,000

IV Biaya Produksi (I+II+III) 285,900,000


V Produksi 19,000 kg
VI Harga Jual 1 kg 25,000 25,000
VII Nilai Produksi 19,000 kg 25,000 475,000,000
VIII Pendapatan Usaha Tani 189,100,000
(Nilai Produksi - Biaya Produksi)
IX BEP 15,047
X R/C Rasio 1.30

Wamena, 10 Agustus 2023


Disusun Oleh
TIM AHLI
GUBERNUR PAPUA PEGUNUNGAN
BIDANG EKONOMI, SUMBER DAYA ALAM DAN LINGKUNGAN HIDUP

M U J I A N T O, SE
KETUA

BUDI HARTONO, S.E ENMO SURANTA TARIGAN, S.P


ANGGOTA ANGGOTA

ADI SYAHPUTRA PURBA, S.P JABAT SUMBADHA, S.P, S.H, M.H, M.P
ANGGOTA ANGGOTA
ANALISA USAHA TANI (1 HA)
BUDIDAYA CABAI MERAH (Capsicum Annum L)
PROVINSI PAPUA PEGUNUNGAN

Biaya Satuan Nilai


No Uraian Volume Satuan
(Rp) (Rp)
I TENAGA KERJA
1. Pengolahan Tanah
a. Biaya transport
b. Membuat Bedengan 60 HOK 150,000 9,000,000
2. Pembibitan 10 HOK 150,000 1,500,000
3. Tanam 40 HOK 150,000 6,000,000
4. Memupuk 20 HOK 150,000 3,000,000
5. Menyiang 10 HOK 150,000 1,500,000
6. Pengendalian Hama Penyakit 20 HOK 150,000 3,000,000
7. Penyiraman 30 HOK 150,000 4,500,000
8. Panen dan Pasca Panen
a. Panen Ke-1 10 HOK 150,000 1,500,000
b. Panen Ke-2 15 HOK 150,000 2,250,000
c. Panen Ke-3 20 HOK 150,000 3,000,000
d. Panen Ke 4-14 30 HOK 150,000 49,500,000
Jumlah I 84,750,000

1 SARANA PRODUKSI
1. Bibit (benih pertiwi) 15 Bungkus 195,000 2,925,000
2. Tray Semai 132 pcs 15,000 1,980,000
3. Tongkat/bambu 23,800 Batang 2,000 11,900,000
4. Tali Plastik 10 gulung 30,000 300,000
5. Mulsa Plastik (spek 120 cm x 500 cm ) 20 roll 480,000 9,600,000
6. Pupuk
- Organik Padat 5,000 kg 11,000 55,000,000
- Organik Cair 500 kg 85,000 42,500,000
- Dolomit 4,000 kg 2,000 8,000,000
- Pestsida Botani 500 ltr 20,000 10,000,000
7. Pestisida
- Insektisida Nabati 5 Ltr 180,000 900,000
- Fungisida Nabati 5 Ltr 180,000 900,000
Jumlah II 144,005,000

III LAIN-LAIN PENGELUARAN


1. Sewa Lahan 1 Ha 10,000,000 10,000,000
2. Pajak Lahan/Biaya air 1 Ha 1,000,000 1,000,000
Jumlah III 11,000,000
IV Biaya Produksi (I+II+III) 239,755,000
V Produksi 8,000 kg
VI Harga Jual 1 kg 40,000 40,000
VII Nilai Produksi 8,000 kg 40,000 320,000,000
VIII Pendapatan Usaha Tani 80,245,000
(Nilai Produksi - Biaya Produksi)
IX BEP
X R/C Rasio

Catatan :
untuk dataran tinggi tanaman cabe akan mulai panen pertama pada 160 hst atau 4 bulan , dimana cabai dapat
dilakukan pemananen setiap minggunya dengan capaian maks 8.000 kg.

Wamena, 10 Agustus 2023


Disusun Oleh
TIM AHLI
GUBERNUR PAPUA PEGUNUNGAN
BIDANG EKONOMI, SUMBER DAYA ALAM DAN LINGKUNGAN HIDUP

MUJIANTO, SE
KETUA

BUDI HARTONO, S.E ENMO SURANTA TARIGAN, S.P


ANGGOTA ANGGOTA
ADI SYAHPUTRA PURBA, S.P JABAT SUMBADHA, S.P, S.H, M.H, M.P
ANGGOTA ANGGOTA
ANALISA USAHA TANI (1 HA)
BUDIDAYA TOMAT
PROVINSI PAPUA PEGUNUNGAN

Biaya Satuan Nilai


No Uraian Volume Satuan
(Rp) (Rp)
I TENAGA KERJA
1. Pengolahan Tanah
a. Biaya transport
b. Membuat Bedengan 60 HOK 150,000 9,000,000
2. Pembibitan 10 HOK 150,000 1,500,000
3. Penanaman 40 HOK 150,000 6,000,000
4. Pemupukan 20 HOK 150,000 3,000,000
5. penyiangan 10 HOK 150,000 1,500,000
6. Pengendalian Hama Penyakit 20 HOK 150,000 3,000,000
7. Penyiraman 20 HOK 150,000 3,000,000
8. Panen dan Pasca Panen
a. Panen & Pengangkutan 30 HOK 150,000 4,500,000
Jumlah I 31,500,000

1 SARANA PRODUKSI
1. Benih Tomat 20 Bungkus 135,000 2,700,000
2. Tray Semai 150 pcs 15,000 2,250,000
3. Tongkat/bambu 25,000 Batang 2,000 12,500,000
4. Tali pelastik 15 gulung 30,000 450,000
5. Mulsa Plastik (spek 120 cm x 500 cm ) 25 roll 480,000 12,000,000
6. Pupuk
- Organik Padat 3,000 kg 11,000 33,000,000
- Organik Cair 300 kg 85,000 25,500,000
- Dolomit 2,000 kg 2,000 4,000,000
- Pestsida Botani 200 ltr 20,000 4,000,000
7. Pestisida
- Insektisida Nabati 5 Ltr 180,000 900,000
- Fungisida Nabati 5 Ltr 180,000 900,000
Jumlah II 98,200,000
III LAIN-LAIN PENGELUARAN
1. Sewa Lahan 1 Tahun 10,000,000 10,000,000
2. Pajak Lahan/Biaya air 1 Tahun 1,000,000 1,000,000
Jumlah III 11,000,000
IV Biaya Produksi (I+II+III) 140,700,000
V Produksi 25,000 kg
VI Harga Jual 1 kg 10,000 10,000
VII Nilai Produksi 25,000 kg 10,000 250,000,000
VIII Pendapatan Usaha Tani 109,300,000
(Nilai Produksi - Biaya Produksi)
IX BEP
X R/C Rasio

Wamena, 10 Agustus 2023


Disusun Oleh
TIM AHLI
GUBERNUR PAPUA PEGUNUNGAN
BIDANG EKONOMI, SUMBER DAYA ALAM DAN LINGKUNGAN HIDUP

MUJIANTO, SE
KETUA

BUDI HARTONO, S.E ENMO SURANTA TARIGAN, S.P


ANGGOTA ANGGOTA

ADI SYAHPUTRA PURBA, S.P JABAT SUMBADHA, S.P, S.H, M.H, M.P
ANGGOTA ANGGOTA
ANALISA USAHA TANI (1 HA)
BUDIDAYA JAGUNG ( Zea mays L.)
PROVINSI PAPUA PEGUNUNGAN

Biaya Satuan Nilai


No Uraian Volume Satuan
(Rp) (Rp)
I TENAGA KERJA
1. Pengolahan Tanah
a. Biaya transport
3. Tanam 10 HOK 150,000 1,500,000
4. Memupuk 10 HOK 150,000 1,500,000
5. Menyiang 20 HOK 150,000 3,000,000
6. Pengendalian Hama Penyakit 10 HOK 150,000 1,500,000
7. Penyiraman 10 HOK 150,000 1,500,000
8. Panen dan Pasca Panen
a. Panen 15 HOK 150,000 2,250,000
Jumlah I 11,250,000

1 SARANA PRODUKSI
1. Bibit Jagung 25 kg 120,000 3,000,000
2. Pupuk
- Organik Padat 5,000 kg 11,000 55,000,000
- Organik Cair 100 kg 85,000 8,500,000
- Dolomit 1,000 kg 2,000 2,000,000
- Pestsida Botani 15 ltr 75,000 1,125,000
7. Pestisida
- Insektisida Nabati 4 Ltr 180,000 720,000
- Fungisida Nabati 3 Ltr 180,000 540,000

Jumlah II 70,885,000

III LAIN-LAIN PENGELUARAN


1. Sewa Lahan 1 Tahun 5,000,000 5,000,000
2. Pajak Lahan/Biaya air 1 Tahun 1,000,000 1,000,000
Jumlah III 6,000,000
IV Biaya Produksi (I+II+III) 88,135,000
V Produksi 8,000 kg
VI Harga Jual 1 kg 7,000 7,000
VII Nilai Produksi 8,000 kg 7,000 56,000,000
VIII Pendapatan Usaha Tani (32,135,000)
(Nilai Produksi - Biaya Produksi)
IX BEP
X R/C Rasio

Wamena, 10 Agustus 2023


Disusun Oleh
TIM AHLI
GUBERNUR PAPUA PEGUNUNGAN
BIDANG EKONOMI, SUMBER DAYA ALAM DAN LINGKUNGAN HIDUP

MUJIANTO, SE
KETUA

BUDI HARTONO, S.E ENMO SURANTA TARIGAN, S.P


ANGGOTA ANGGOTA

ADI SYAHPUTRA PURBA, S.P JABAT SUMBADHA, S.P, S.H, M.H, M.P
ANGGOTA ANGGOTA
ANALISA USAHA TANI (1 HA)
BUDIDAYA KELADI
PROVINSI PAPUA PEGUNUNGAN

Biaya Satuan Nilai


No Uraian Volume Satuan
(Rp) (Rp)
I TENAGA KERJA
1. Pengolahan Tanah
a. Biaya transport
b. Membuat Bedengan 40 HOK 150,000 6,000,000
2. Pembibitan 10 HOK 150,000 1,500,000
3. Tanam 20 HOK 150,000 3,000,000
4. Memupuk 20 HOK 150,000 3,000,000
5. Menyiang 10 HOK 150,000 1,500,000
6. Pengendalian Hama Penyakit 20 HOK 150,000 3,000,000
7. Penyiraman 20 HOK 150,000 3,000,000
8. Panen dan Pasca Panen
a. Panen Ke-1 10 HOK 150,000 1,500,000
Jumlah I 22,500,000

1 SARANA PRODUKSI
1. Bibit (benih pertiwi) 27,000 umbi 2,000 54,000,000
6. Pupuk
- Organik Padat 3,000 kg 11,000 33,000,000
- Organik Cair 300 kg 85,000 25,500,000
- Dolomit 2,000 kg 2,000 4,000,000
- Pestsida Botani 500 ltr 20,000 10,000,000
7. Pestisida
- Insektisida Nabati 5 Ltr 180,000 900,000
- Fungisida Nabati 5 Ltr 180,000 900,000
Jumlah II 128,300,000
III LAIN-LAIN PENGELUARAN
1. Sewa Lahan 1 Tahun 10,000,000 10,000,000
2. Pajak Lahan/Biaya air 1 Tahun 1,000,000 1,000,000
Jumlah III 11,000,000
IV Biaya Produksi (I+II+III) 161,800,000
V Produksi 9 bulan 85,000 kg
VI Harga Jual 1 kg 5,000 5,000
VII Nilai Produksi 85,000 kg 5,000 425,000,000
VIII Pendapatan Usaha Tani 263,200,000
(Nilai Produksi - Biaya Produksi)
IX BEP
X R/C Rasio

Wamena, 10 Agustus 2023


Disusun Oleh
TIM AHLI
GUBERNUR PAPUA PEGUNUNGAN
BIDANG EKONOMI, SUMBER DAYA ALAM DAN LINGKUNGAN HIDUP

MUJIANTO, SE
KETUA

BUDI HARTONO, S.E ENMO SURANTA TARIGAN, S.P


ANGGOTA ANGGOTA

ADI SYAHPUTRA PURBA, S.P JABAT SUMBADHA, S.P, S.H, M.H, M.P
ANGGOTA ANGGOTA
ANALISA USAHA TANI (1 HA)
BUDIDAYA KENTANG ( Solanum Tuberosum)
PROVINSI PAPUA PEGUNUNGAN

Biaya Satuan Nilai


No Uraian Volume Satuan
(Rp) (Rp)
I TENAGA KERJA
1. Pengolahan Tanah
a. Biaya transport
3. Tanam 15 HOK 150,000 2,250,000
4. Memupuk 20 HOK 150,000 3,000,000
5. Menyiang 20 HOK 150,000 3,000,000
6. Pengendalian Hama Penyakit 20 HOK 150,000 3,000,000
7. Penyiraman 10 HOK 150,000 1,500,000
8. Panen dan Pasca Panen
a. Panen 15 HOK 150,000 2,250,000
Jumlah I 15,000,000

1 SARANA PRODUKSI
1. Bibit Kentang 1,900 Kg 20,000 38,000,000
2. Pupuk
- Organik Padat 3,000 kg 11,000 33,000,000
- Organik Cair 200 kg 85,000 17,000,000
- Dolomit 1,000 kg 2,000 2,000,000
- Pestsida Botani 75 ltr 75,000 5,625,000
7. Pestisida
- Insektisida Nabati 5 Ltr 180,000 900,000
- Fungisida Nabati 4 Ltr 180,000 720,000
Jumlah II 97,245,000
III LAIN-LAIN PENGELUARAN
1. Sewa Lahan 1 Tahun 10,000,000 10,000,000
2. Pajak Lahan/Biaya air 1 Tahun 1,000,000 1,000,000
Jumlah III 11,000,000

IV Biaya Produksi (I+II+III) 123,245,000


V Produksi 45,000 kg
VI Harga Jual 1 kg 7,000 7,000
VII Nilai Produksi 45,000 kg 7,000 315,000,000
VIII Pendapatan Usaha Tani 191,755,000
(Nilai Produksi - Biaya Produksi)
IX BEP
X R/C Rasio

Wamena, 10 Agustus 2023


Disusun Oleh
TIM AHLI
GUBERNUR PAPUA PEGUNUNGAN
BIDANG EKONOMI, SUMBER DAYA ALAM DAN LINGKUNGAN HIDUP

MUJIANTO, SE
KETUA

BUDI HARTONO, S.E ENMO SURANTA TARIGAN, S.P


ANGGOTA ANGGOTA

ADI SYAHPUTRA PURBA, S.P JABAT SUMBADHA, S.P, S.H, M.H, M.P
ANGGOTA ANGGOTA
ANALISA USAHA TANI
TERNAK BABI SEBANYAK 100 EKOR/ 6 BULAN
PROVINSI PAPUA PEGUNUNGAN

A. PEMBANGUNAN SARANA TERNAK BABI LUAS 2000 M²


Biaya Satuan
No Uraian Volume Satuan
(Rp)
i SARANA PEMBANGUNAN GEDUNG
1. Bangunan Produksi Ternak 2,000 m2 4,350,000
2. Drum Plastik capacity 200 liter 25 pcs 450,000
3. Selang 0,5 inch 100 meter 25,000
4. Ember Plastik 20 pcs 50,000
5. Water Pump 1 unit 4,000,000
6. Instalasi Air 1 paket 5,000,000
7 Instalasi Listrik 1 paket 6,000,000
Jumlah I
II LAIN-LAIN PENGELUARAN
1. Sewa Lahan 1 Tahun 10,000,000
3. Lain - Lain 1 Tahun 20,000,000
Jumlah II

III Biaya Sarana Produksi (I+II)

B. BIAYA PRODUKSI TERNAK BABI 500 EKOR


Biaya Satuan
No Uraian Volume Satuan
(Rp)
I Biaya Tetap
1. Bibit Babi 500 Ekor 1,000,000
Jumlah I
1 Biaya Tidak Tetap
1. Pakan (pelet 551) 95,000 kg 13,000
2. Tenaga Kerja Perawatan 5 org *150 hari 750 HOK 150,000
3. obat dan vitamin 500 ekor 100,000
Jumlah II
IV Biaya Produksi (I+II+III)
V Produksi 100 kg 500
VI Harga Jual 1 kg 75,000
VII Nilai Produksi 50,000 kg 75,000
VIII Pendapatan Usaha Tani
(Nilai Produksi - Biaya Produksi)
IX BEP
X R/C Rasio

Wamena, 10 Agustus 2023


Disusun Oleh
TIM AHLI
GUBERNUR PAPUA PEGUNUNGAN
BIDANG EKONOMI, SUMBER DAYA ALAM DAN LINGKUNGAN HIDUP

MUJIANTO, SE
KETUA

BUDI HARTONO, S.E ENMO SURANTA TARIGAN, S.P


ANGGOTA ANGGOTA

ADI SYAHPUTRA PURBA, S.P JABAT SUMBADHA, S.P, S.H, M.H, M.P
ANGGOTA ANGGOTA
Nilai
(Rp)

8,700,000,000
11,250,000
2,500,000
1,000,000
4,000,000
5,000,000
6,000,000
8,729,750,000

10,000,000
20,000,000
30,000,000

8,759,750,000.00

Nilai
(Rp)

500,000,000
500,000,000

1,235,000,000
112,500,000
50,000,000
1,397,500,000
1,897,500,000
50,000
75,000
3,750,000,000
1,852,500,000
UNGAN HIDUP

MO SURANTA TARIGAN, S.P


ANGGOTA

MBADHA, S.P, S.H, M.H, M.P


ANGGOTA
ANALISA USAHA TANI
TERNAK SAPI SEBANYAK 100 EKOR
PROVINSI PAPUA PEGUNUNGAN

A. PEMBANGUNAN SARANA KANDANG


Biaya Satuan Nilai
No Uraian Volume Satuan
(Rp) (Rp)
SARANA PEMBANGUNAN GEDUNG
1. Bangunan Produksi Sapi 1,000 m2 4,350,000 4,350,000,000
2. Drum Plastik capacity 200 liter 25 pcs 450,000 11,250,000
3. Selang 0,5 inch 100 meter 25,000 2,500,000
4. Ember Plastik 20 pcs 50,000 1,000,000
5. Water Pump 1 unit 4,000,000 4,000,000
6. Instalasi Air 1 paket 5,000,000 5,000,000
7 Instalasi Listrik 1 paket 6,000,000 6,000,000
Jumlah I 4,379,750,000
LAIN-LAIN PENGELUARAN
1. Sewa Lahan 1 Tahun 10,000,000 10,000,000
3. Lain - Lain 1 paket 20,000,000 20,000,000
Jumlah II 30,000,000

Biaya Sarana Produksi (I+II) 4,409,750,000.00

B. BIAYA PRODUKSI PENGEMUKAN TERNAK ( 3 bulan )


Biaya Satuan Nilai
No Uraian Volume Satuan
(Rp) (Rp)
I Biaya Tetap
1. Bibit sapi jantan (250 kg) 100 Ekor 10,000,000 1,000,000,000
Jumlah I 1,000,000,000
1 Biaya Tidak Tetap
1. Rumput gajah 225,000 kg 150 33,750,000
2. Dedak Padi halus 54,000 kg 1,500 81,000,000
3. Garam dapur 9,000 ons 150 1,350,000
4. Kapur 4,500 ons 200 900,000
5. obat dan vitamin 100 ekor 100,000 10,000,000
6. Tenaga Kerja 5 Org * 90 hari 450 HOK 150,000 67,500,000
Jumlah II 194,500,000
IV Biaya Produksi (I+II+III) 1,194,500,000
V Produksi 340 kg 100 34,000
VI Harga Jual 34,000 kg 40,000 1,360,000,000
VII Penjualan Kotoran 600 Ritase 160,000 96,000,000
VII Nilai Produksi 1,456,000,000
VIII Pendapatan Usaha Tani 261,500,000
(Nilai Produksi - Biaya Produksi)
IX BEP
X R/C Rasio
Wamena, 10 Agustus 2023
Disusun Oleh
TIM AHLI
GUBERNUR PAPUA PEGUNUNGAN
BIDANG EKONOMI, SUMBER DAYA ALAM DAN LINGKUNGAN HIDUP

MUJIANTO, SE
KETUA

BUDI HARTONO, S.E ENMO SURANTA TARIGAN, S.P


ANGGOTA ANGGOTA

ADI SYAHPUTRA PURBA, S.P JABAT SUMBADHA, S.P, S.H, M.H, M.P
ANGGOTA ANGGOTA
ANALISA USAHA TANI
TERNAK KAMBING SEBANYAK 100 EKOR
PROVINSI PAPUA PEGUNUNGAN

A. Biaya Sarana Kandang


Biaya Satuan
No Uraian Volume Satuan
(Rp)
SARANA PEMBANGUNAN GEDUNG
1. Bangunan Produksi Kambing 600 m2 4,350,000
2. Drum Plastik capacity 200 liter 25 pcs 450,000
3. Selang 0,5 inch 100 meter 25,000
4. Ember Plastik 20 pcs 50,000
5. Water Pump 1 unit 4,000,000
6. Instalasi Air 1 paket 5,000,000
7 Instalasi Listrik 1 paket 6,000,000
Jumlah I
LAIN-LAIN PENGELUARAN
1. Sewa Lahan 1 Tahun 10,000,000
2. Lain - Lain 1 Tahun 20,000,000
Jumlah II

Biaya Sarana Produksi (I+II)

B. Biaya Produksi Ternak


Biaya Satuan
No Uraian Volume Satuan
(Rp)
I Biaya Tetap
1. Bibit Kambing 100 Ekor 800,000
Jumlah I
1 Biaya Tidak Tetap
1. Rumput gajah 8,000 kg 150
2. Pakan Konsentrat 400 kg 18,000
3. Pakan Permentasi 1,200 kg 1,300
2. Tenaga Kerja Perawatan 2 Org * 90 hari 180 HOK 150,000
3. obat dan vitamin 100 ekor 60,000
Jumlah II
IV Biaya Produksi (I+II)
V Produksi 30 kg 100
VI Harga Jual 3,000 kg 70,000
Harga Kotoran Kambing 9,000 kg 2,000
VII Nilai Produksi 3,000 kg 70,000
VIII Pendapatan Usaha Tani
(Nilai Produksi - Biaya Produksi)
IX BEP
X R/C Rasio
Wamena, 10 Agustus 2023
Disusun Oleh
TIM AHLI
GUBERNUR PAPUA PEGUNUNGAN
BIDANG EKONOMI, SUMBER DAYA ALAM DAN LINGKUNGAN HIDUP

MUJIANTO, SE
KETUA

BUDI HARTONO, S.E ENMO SURANTA TARIGAN, S.P


ANGGOTA ANGGOTA

ADI SYAHPUTRA PURBA, S.P JABAT SUMBADHA, S.P, S.H, M.H, M.P
ANGGOTA ANGGOTA
Nilai
(Rp)

2,610,000,000
11,250,000
2,500,000
1,000,000
4,000,000
5,000,000
6,000,000
2,639,750,000

10,000,000
20,000,000
30,000,000

2,669,750,000.00

Nilai
(Rp)

80,000,000
80,000,000

1,200,000
7,200,000
1,560,000
27,000,000
6,000,000
42,960,000
122,960,000
3,000
210,000,000
18,000,000
228,000,000
105,040,000
UNGAN HIDUP

MO SURANTA TARIGAN, S.P


ANGGOTA

MBADHA, S.P, S.H, M.H, M.P


ANGGOTA
ANALISA USAHA TANI
TERNAK AYAM PETELUR SEBANYAK 10. 000 EKOR
PROVINSI PAPUA PEGUNUNGAN

A. Biaya Sarana Kandang


Biaya Satuan
No Uraian Volume Satuan
(Rp)
I Biaya Bahan Bangunan & Pendukung
Biaya Pembangunan Gedung 1,500 M² 4,350,000
Sub Total Biaya
II LAIN-LAIN PENGELUARAN
1. Sewa Lahan 2 Tahun 10,000,000
2. Lain - Lain 2 Tahun 20,000,000
Sub Total Biaya
Biaya Sarana Produksi

B. Biaya Produksi Ternak

Biaya Satuan
No Uraian Volume Satuan
(Rp)
I Biaya Produksi
Bibit ayam petelur umur 12 Minggu 10,000 Ekor 40,000
Pakan Ternak 792,000 kg 12,000
Vaksin, vitamin, obat, disinfektan 1 paket 25,000,000
Tenaga Kerja Perawatan 4 org x 1 bulan 96 Bulan 3,000,000
Jumlah I
IV Biaya Produksi
V Produksi Telur per ekor / hari 2 Butir 8,000
VI Harga Jual 10,560,000 butir 1,200
VII Kotoran Ayam @ 20 bulan 132,000 kg 700
VIII Ayam Apkir 10,000 Ekor 20,000
IX Nilai Produksi
X Pendapatan Usaha Tani
XI (Nilai Produksi - Biaya Produksi)
XII BEP
XIII R/C Rasio
OR

Nilai
(Rp)

6,525,000,000
6,525,000,000

20,000,000
40,000,000
60,000,000
6,585,000,000

Nilai
(Rp) 120

400,000,000
9,504,000,000
25,000,000
288,000,000
10,217,000,000
10,217,000,000
16,000
12,672,000,000
92,400,000
200,000,000
12,964,400,000
2,747,400,000
hari 10,000 30 36,000,000

1,000

36,000.00 22 792,000.00
RENCANA ANGGARAN BIAYA
PEMBUATAN SPRINKEL WATER

No Uraian Kebutuhan Vol Satuan Harga Total Nilai

1 Springkel Nozel 300 pcs 30,000 9,000,000

2 Pipa Paralon Pvc 2 inchi 60 btg 135,000 8,100,000

3 Pipa Paralon PVC 3/4 inchi 500 btg 73,000 36,500,000

4 Pipa Paralon PVC 1/2 Inchi 25 btg 47,000 1,175,000

5 Shok "T" 2 inchi 40 pcs 17,000 680,000

6 Shok "T"3/4 inchi 300 Pcs 5,000 1,500,000

7 Shok turunan 2 inchi - 3/4 inchi 50 pcs 5,000 250,000

8 Stop Kran 2 inchi 20 35,000 700,000

9 Stop Kran 3/4 inchi 40 25,000 1,000,000

10 Selotip 50 10,000 500,000

11 Kayu Stand (1,5 m) 300 btg 15,000 4,500,000

12 Kawat 10 kg 20,000 200,000

13 Baby Tank capasitas 5000 liter 4 6,500,000 26,000,000

14 Tower Tank tinggi 5 m 1 20,000,000 20,000,000

15 Water Pump 1 5,000,000 5,000,000

16 Lem Pipa 50 pcs 15,000 750,000

17 Gali Sumur Bor 2 Titik 10,000,000 20,000,000

18 Upah Kerja 300 Titik 70,000 21,000,000

Total Keseluruhan 156,855,000

Anda mungkin juga menyukai