Page 1
rekap
NPV IRR PI
(484,950,896) Err:523 (0.38)
10,735,887 Err:523 0.28
(343,358) 17.62% (0.00)
Page 2
Investasi
biaya operasional
itik ekor 300 500,000
pakan kg 1440 8,640,000 90,135.19
bbm genset liter 10 80,000
bbm motor liter 30 240,000 58.357530529
listrik kwh 20 200,000 4.8631275441
upah tenaga kerja org/hari 1 1,500,000
atk paket 1 50,000
obat paket 0.08333 83,333
biaya tdk terduga paket 1 1,000,000
sewa lahan 250,000
total biaya operasional 12,543,333 x12 150,520,000
Page 4
ayam
7 Cash flow (77,022,061) (55,775,253)
Df 18.00%
NPV (484,950,895.71)
IRR Err:523
PI (0.38)
perhitungan IRR
tahun proceed 18% pv of proceed
2006 (77,022,061) 0.8475 (65,276,197)
2007 (55,775,253) 0.7182 (40,057,787)
2008 (98,173,005) 0.6086 (59,748,091)
2009 (141,167,153) 0.5158 (72,814,017)
2010 (184,876,975) 0.4371 (80,809,726)
2011 216,448,489 0.3704 80,172,520
pv of proceed (238,533,298)
pv of investment 1,293,000,000
NPV (1,531,533,298)
Page 5
ayam
13,249
biaya operasional
tahun
2008 2009 2010 2011
79,494,000 86,118,500 92,743,000 99,367,500
476,964,000 516,711,000 556,458,000 596,205,000
1,311,651 1,573,981 1,888,777 2,266,533
1,152,000 1,382,400 1,658,880 1,990,656
1,728,000 2,073,600 2,488,320 2,985,984
13,833,600 16,600,320 19,920,384 23,904,461
1,512,000 1,814,400 2,177,280 2,612,736
1,512,000 1,814,400 2,177,280 2,612,736
577,507,251 628,088,601 679,511,921 731,945,606
Page 6
ayam
(98,173,005) (141,167,153) (184,876,975) 108,224,245
-294.759124355743
307 hari/30 = 10 bulan 25 hari
RR
36% pv of proceed
0.7353 (56,634,322)
0.5407 (30,157,679)
0.3975 (39,023,770)
0.2923 (41,263,159)
0.2149 (39,730,062)
0.158 34,198,861
(172,610,130)
1,293,000,000
(1,465,610,130)
Page 7
ayam
kebutuhan BBM
minyak tanah solar pelumas total
3,600,000 5,880,000 1,000,000 10,480,000
2009 2010
- -
6,000,000 6,000,000
200,000 200,000
100,000,000 100,000,000
120,000,000 120,000,000
4,000,000 4,000,000
1,000,000 1,000,000
2,000,000 2,000,000
200,000 200,000
233,400,000 233,400,000
total
2,031,071,700
3,624,269,597
(1,615,790,203)
Page 8
ayam
(448,790,203)
Page 9
ikan
asumsi:
biaya operasional naik 10% per tahun dan harga konstan
baseline produksi budidaya air tenang/deras ( agustus 2006) 2,000
harga jual per kg 10,000
estimasi penjualan ikan
tahun populasi exp demand demand estimasi sales
2,006 2,000 45% 900 9,000,000
2,007 2,000 50% 1,000 10,000,000
2,008 2,000 55% 1,100 11,000,000
2,009 2,000 60% 1,200 12,000,000
2,010 2,000 75% 1,500 15,000,000
2,011 2,000 80% 1,600 16,000,000
total 7,300 73,000,000
Page 10
ikan
proceed tahun 2007 2,437,000
sisa 34,313,000
proceed tahun 2008 2,733,650
sisa 31,579,350
2009 2,960,303
sisa 28,619,048
2010 4,805,553 59.214222715956
sisa 23,813,495
2011 4,825,900
sisa pp 23,813,495 x 360 hari = 253 hari/30 =
4,825,900
maka, payback period ikan mas air darat adalah 5 tahun 8 bulan 4 hari
perhitungan npv
tahun proceed df 18% pv of proceed
2006 2,250,000 0.8475 1,906,875.00
2007 2,437,000 0.7182 1,750,253.40
2008 2,733,650 0.6086 1,663,699.39
2009 2,960,303 0.5158 1,526,924.03
2010 4,805,553 0.4371 2,100,507.05
2011 4,825,900 0.3704 1,787,513.49
pv of proceed 10,735,772
pv of investment 39,000,000
NPV (28,264,228)
perhitungan IRR
tahun proceed df 18% pv of proceed df 36%
2006 2,250,000 0.8475 1,906,875 0.7353
2007 2,437,000 0.7182 1,750,253 0.5407
2008 2,733,650 0.6086 1,663,699 0.3975
2009 2,960,303 0.5158 1,526,924 0.2923
2010 4,805,553 0.4371 2,100,507 0.2149
2011 4,825,900 0.3704 1,787,513 0.158
pv of proceed 10,735,772
pv of investment 39,000,000
NPV (28,264,228)
18% + -7.037 18
18% + -127
18% + 8% = 26%
Page 11
ikan
tahun
2009 2010 2011
5,093,550 5,348,228 5,615,639
1,597,200 1,756,920 1,932,612
2,073,600 2,488,320 2,985,984
1,728,000 2,073,600 2,488,320
1,036,800 1,244,160 1,492,992
8,764,350 9,593,468 10,534,235
dalam rupiah)
2009 2010 2011 total
12,000,000 15,000,000 16,000,000 73,000,000
8,764,350 9,593,468 10,534,235 50,903,052
1,400,000 1,400,000 1,200,000
1,835,650 4,006,533 4,265,765
275,348 600,980 639,865
1,560,303 3,405,553 3,625,900 11,812,405
2,960,303 4,805,553 4,825,900 20,012,405
Page 12
ikan
8 bulan 4 hari
pv of proceed
1,654,425
1,317,686
1,086,626
865,296
1,032,713
762,492
6,719,239
39,000,000
(32,280,761)
Page 13
kompos
asumsi:
biaya operasional naik 10% per tahun dan harga konstan
baseline luas lahan palawija ( 2004) 221,000
harga jual per kg 750
estimasi penjualan pupuk kompos
tahun luas lahan (m2) Estimasi harga exp demand demand
2,006 221,000 750 15% 33,150
2,007 221,000 787.5 25% 55,250
2,008 221,000 826.875 35% 77,350
2,009 221,000 868.21875 45% 99,450
2,010 221,000 911.6296875 55% 121,550
2,011 221,000 957.211171875 65% 143,650
total 530,400
Page 14
kompos
proyeksi laporan rugi laba (dalam rupiah)
no komponen 2006 2007 2008
1 Penghasilan 24,862,500 43,509,375 63,958,781
2 biaya operasional 49,578,263 52,736,089 62,188,838
3 penyusutan 5,228,667 5,228,667 5,128,667
4 Laba sebelum pajak (29,944,430) (14,455,381) (3,358,724)
5 pajak penghasilan - - -
6 laba setelah pajak (29,944,430) (14,455,381) (3,358,724)
7 Cash flow (24,715,763) (9,226,714) 1,769,943
Df 18.00%
NPV (343,358)
IRR 17.62%
PI (0.0021)
perhitungan npv
tahun proceed df 18% pv of proceed
2006 (24,715,763) 0.8475 (20,946,609)
2007 (9,226,714) 0.7182 (6,626,626)
2008 1,769,943 0.6086 1,077,187
2009 11,671,500 0.5158 6,020,160
2010 21,004,234 0.4371 9,180,951
2011 29,560,849 0.3704 10,949,338
pv of proceed (345,599)
pv of investment 161,360,000
NPV (161,705,599)
perhitungan IRR
tahun proceed df 18% pv of proceed df 36%
2006 (24,715,763) 0.8475 (20,946,609) 0.7353
2007 (9,226,714) 0.7182 (6,626,626) 0.5407
2008 1,769,943 0.6086 1,077,187 0.3975
2009 11,671,500 0.5158 6,020,160 0.2923
2010 21,004,234 0.4371 9,180,951 0.2149
2011 29,560,849 0.3704 10,949,338 0.158
pv of proceed (345,599)
pv of investment (6,626,626)
NPV 6,281,027
Page 15
kompos
tahun
2009 2010 2011
5,772,950 6,061,597 6,364,677
441,227 485,349 533,884
164,093 196,911 236,293
54,432,000 65,318,400 78,382,080
10,661,943 12,794,332 15,353,198
1,397,004 1,466,854 1,540,197
606,375 636,694 668,528
73,475,590 86,960,136 103,078,857
Page 16
kompos
dalam rupiah)
2009 2010 2011 total
86,344,355 110,808,589 137,503,385 466,986,984
73,475,590 86,960,136 103,078,857 428,017,774
4,887,000 4,887,000 2,000,000
7,981,764 18,961,452 32,424,528
1,197,265 2,844,218 4,863,679
6,784,500 16,117,234 27,560,849 2,704,049
11,671,500 21,004,234 29,560,849 30,064,049
6 bulan 7 hari
pv of proceed
(18,173,500)
(4,988,884)
703,552
3,411,579
4,513,810
4,670,614
(9,862,829)
(6,626,626)
(3,236,203)
Page 17
kompos
gaji karyawan
jabatan jumlah gaji/bln/org total
teknisi 1 750,000 9,000,000
mandor 1 500,000 6,000,000
karyawan 5 350,000 21,000,000
total 7 1,600,000 36,000,000
biaya transport
jenis biaya/unit total biaya
sampah 45000 4,244,774.63
pupuk 75 2,486,250.00
total 45075 6,731,024.63
biaya BBM/solar
kg ppk/ltr kbthn BBM harga/liter total
120.866666667 274.27 4200 1,151,930.50
2011
2,000,000
2,000,000
Page 18