Anda di halaman 1dari 4

KETERANGAN

= SAKELAR TUNGGAL

= SAKELAR GANDA

= STOP KONTAK

= STOP KONTAK AC/WH

WH
= OUTLET TV

AC

AC
AC
WH = WATER HEATER

AC
WH WH AC AC
AC = AIR CONDITIONER

AC

AC
= EXHAUST

WH = LIGHT
WH

= MCB BOX

AC = KWH
AC

AC
AC

AC
AC
AC

AC

AC
WH WH WH
AC

AC
AC

UNIVERSITAS HASANUDDIN
AC

FAKULTAS TEKNIK

AC
DEPARTEMEN ARSITEKTUR
AC

AC
WH

SDP SDP MATA KULIAH


LVMDP

UTILITAS BANGUNAN

DOSEN

DR. ENG. ROSADY MULYADI, ST., MT.


DR. IR. HJ. NURUL NADJMI, ST., MT.
AC

AC
TUGAS
WH WH
ANALISA SISTEM ELEKTRIKAL
PADA GEDUNG
AC

AC
AC AC
AC

AC AC

GAMBAR
AC
AC

AC
DENAH INSTALASI LISTRIK

WH
WH
WH

MAHASISWA/STAMBUK/KELAS
MUHAMMAD ARYA ADNAN
D051211004
DENAH INSTALASI LISTRIK LANTAI 1 DENAH INSTALASI LISTRIK LANTAI 2 - 4 UTILITAS BANGUNAN B
NOMOR LEMBAR JUMLAH LEMBAR

1 4
KETERANGAN
= SAKELAR TUNGGAL

= SAKELAR GANDA

= STOP KONTAK

= STOP KONTAK AC/WH

= OUTLET TV

WH = WATER HEATER

AC = AIR CONDITIONER

= EXHAUST

= LIGHT

= MCB

= KWH

WH

WH
UNIVERSITAS HASANUDDIN
FAKULTAS TEKNIK
DEPARTEMEN ARSITEKTUR
AC AC AC MATA KULIAH
AC
UTILITAS BANGUNAN

DOSEN

DR. ENG. ROSADY MULYADI, ST., MT.


DR. IR. HJ. NURUL NADJMI, ST., MT.

TUGAS
AC
ANALISA SISTEM ELEKTRIKAL
PADA GEDUNG

GAMBAR
DENAH INSTALASI LISTRIK UNIT TIPE 2 BR DENAH INSTALASI LISTRIK UNIT TIPE 1 BR DENAH INSTALASI LISTRIK
PER UNIT

MAHASISWA/STAMBUK/KELAS
MUHAMMAD ARYA ADNAN
D051211004
UTILITAS BANGUNAN B
NOMOR LEMBAR JUMLAH LEMBAR

2 4
KETERANGAN

GROUPING 1
GROUPING 1 7 UNIT
5 UNIT GROUPING 2
GROUPING 2 7 UNIT
5 UNIT GROUPING 3
SDP TIPE 1 BR GROUPING 3
TIPE 2 BR 2 UNIT KORIDOR, RUANG PANEL 9 UNIT
KWH MCB BOX 2 UNIT KWH MCB BOX KWH MCB BOX
GROUPING 4
4 UNIT GROUPING 4 3 UNIT 1 UNIT
1 UNIT WH
GROUPING 5
1 UNIT WH
LANTAI 4

GROUPING 1
7 UNIT
GROUPING 1
5 UNIT GROUPING 2
UNIVERSITAS HASANUDDIN
7 UNIT
GROUPING 2
5 UNIT GROUPING 3 FAKULTAS TEKNIK
SDP TIPE 1 BR GROUPING 3
TIPE 2 BR 2 UNIT KORIDOR, RUANG PANEL 9 UNIT
4 UNIT
KWH MCB BOX 2 UNIT
3 UNIT
KWH MCB BOX
GROUPING 4
1 UNIT
KWH MCB BOX
DEPARTEMEN ARSITEKTUR
GROUPING 4
1 UNIT WH
GROUPING 5
1 UNIT WH
LANTAI 3 MATA KULIAH

GROUPING 1
7 UNIT
UTILITAS BANGUNAN
GROUPING 1
5 UNIT GROUPING 2
GROUPING 2 7 UNIT
5 UNIT
SDP TIPE 1 BR
KWH MCB BOX GROUPING 3
2 UNIT
TIPE 2 BR
KWH MCB BOX
GROUPING 3
2 UNIT KORIDOR, RUANG PANEL
KWH MCB BOX
9 UNIT DOSEN
GROUPING 4
4 UNIT GROUPING 4 3 UNIT 1 UNIT
1 UNIT WH
GROUPING 5
1 UNIT WH DR. ENG. ROSADY MULYADI, ST., MT.
LANTAI 2
DR. IR. HJ. NURUL NADJMI, ST., MT.

GROUPING 1
7 UNIT
TUGAS
GROUPING 1
5 UNIT GROUPING 2
7 UNIT
PLN GROUPING 2
5 UNIT GROUPING 3
GROUPING 1
7 UNIT ANALISA SISTEM ELEKTRIKAL
MVMDP TRAFO LVMDP SDP TIPE 1 BR GROUPING 3
TIPE 2 BR 2 UNIT KORIDOR, LOBBY, RUANG PANEL GROUPING 2

4 UNIT
KWH MCB BOX 2 UNIT
3 UNIT
KWH MCB BOX
GROUPING 4
1 UNIT
KWH MCB BOX 17 UNIT PADA GEDUNG
GROUPING 4
1 UNIT WH
GROUPING 5
1 UNIT WH
LANTAI 1 GAMBAR

SKEMA INSTALASI LISTRIK

SKEMA INSTALASI LISTRIK MAHASISWA/STAMBUK/KELAS


MUHAMMAD ARYA ADNAN
D051211004
UTILITAS BANGUNAN B
NOMOR LEMBAR JUMLAH LEMBAR

3 4
KETERANGAN

KEBUTUHAN LISTRIK UNIT TIPE 2 BR


AC WH
GROUPING
LIGHT STOP KONTAK OUTLET TV AIR CONDITIONER EXHAUST WATER HEATER TOTAL
MCB
7 W - 15 W 200 W 50 W 400 W - 800 W 50 W - 200 W 400 W - 800 W
1 5 2 250 W

2 6 1 1250 W

3 2 900 W

4 1 700 W

5 1 800 W

JUMLAH 3900 W

FAKTOR KESEREMPAKAN 70% 2730 W UNIVERSITAS HASANUDDIN


FAKULTAS TEKNIK
KONVERSI KE VA /0.8 3412 VA
DEPARTEMEN ARSITEKTUR

KWH YANG TERPASANG = 3500 VA MATA KULIAH

UTILITAS BANGUNAN

KEBUTUHAN LISTRIK UNIT TIPE 1 BR DOSEN

DR. ENG. ROSADY MULYADI, ST., MT.


AC WH DR. IR. HJ. NURUL NADJMI, ST., MT.
GROUPING
LIGHT STOP KONTAK OUTLET TV AIR CONDITIONER EXHAUST WATER HEATER TOTAL
MCB
7 W - 15 W 200 W 50 W 400 W - 800 W 50 W - 200 W 400 W - 800 W TUGAS
1 3 2 230 W ANALISA SISTEM ELEKTRIKAL
PADA GEDUNG
2 4 1 850 W
GAMBAR
3 2 900 W
PERHITUNGAN KEBUTUHAN
4 1 800 W
LISTRIK
JUMLAH 2780 W MAHASISWA/STAMBUK/KELAS
FAKTOR KESEREMPAKAN 70% 1946 W MUHAMMAD ARYA ADNAN
D051211004
KONVERSI KE VA /0.8 2432 VA UTILITAS BANGUNAN B
NOMOR LEMBAR JUMLAH LEMBAR
KWH YANG TERPASANG = 3500 VA

4 4

Anda mungkin juga menyukai