Anda di halaman 1dari 5

Proyek Pengembangan

Pos Lintas Batas Negara (PLBN)


MONITORING HARIAN Terpadu Yetetkun
24 OKTOBER 2021 Kabupaten Boven Digoel – Provinsi Papua
KEMENTERIAN
PEKERJAAN UMUM DAN
PERUMAHAN RAKYAT
PENGEMBANGAN

25 FEBRUARI 2020 – 15 MARET 2022


POS LINTAS BATAS NEGARA
HK.02.03/PBL/PPPWI-PAPUA/10 TERPADU YETETKUN
Distrik Ninati, Kabupaten Boven Digoel, Provinsi Papua

APBN TA. 2020 – 2022


Rp 105.353.354.777,-

750 HARI
Finishing dinding - Bangunan Inti Rangka plafond - Wisma

Lansir dan install saluran 60 x 60 – Bangunan Inti Lansir material struktur baja - Mess
LAPORAN Pengguna Jasa Management Konsultan Penyedia Jasa

CUACA BULAN
OKTOBER
Proyek : Proyek Pengembangan Pos Lintas Batas Negara (PLBN) Terpadu Periode
Lokasi : YETETKUN , BOVEN DIGOEL
........ 2020
T.A : 2020
Waktu ( Jam ) Keterangan
Tgl
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Hujan Gerimis Berawan Cerah

1 1 1 1 1 1 1 1 3 3 2 - 7 15
2 3 3 2 2 1 - 21
3 2 2 2 2 2 - 5 - 19
4 3 3 2 2 2 2 - 20
5 - - - 24
6 - - - 24
7 - - - 24
8 2 2 2 2 3 3 3 3 3 3 3 7 4 - 13
9 - - - 24
10 - - - 24
11 1 1 1 1 3 3 1 1 3 3 3 5 - 6 13
12 1 1 1 1 1 3 3 2 - 5 17
13 2 2 2 1 1 1 1 1 3 3 3 3 3 5 3 5 11
14 1 1 1 2 2 2 - 3 3 18
15 - - - 24
16 1 1 - - 2 22
17 3 3 3 3 1 1 1 1 1 1 1 1 1 4 - 9 11
18 3 1 3 3 3 4 - 1 19
19 - - - 24
20 2 2 2 - 3 - 21
21 - - - 24
22 3 3 3 3 3 3 3 3 8 - - 16
23 - - - 24
24 1 1 3 3 3 3 2 4 1 2 17
25 - - - 24
26 - - - 24
27 - - - 24
28 - - - 24
29 - - - 24
30 - - - 24
31 - - - 24
Jumlah ( Jam ) 45 22 40 637

Keterangan Kejadian Alam Keterangan

Cerah Gempa Bumi

1 Berawan Banjir

2 Gerimis

3 Hujan
MONITORING LAPORAN HARIAN - PLBN YETETKUN, KAB. BOVEN DIGOEL
NILAI KONTRAK : Rp 105 353 354 778
MASA KONTRAK : 25 FEBRUARI 2020 - 18 AGUSTUS 2021 ( 540 HARI KALENDER )
PEROLEHAN PU S/D BULAN LALU : Rp 51 947 768 397
BK S/D BULAN LALU : Rp 67 980 943 671
TARGET PU BULAN INI : Rp 13 062 843 524

2021 HARIAN (JUTA) KUMULATIF PROGRESS BULAN INI (JUTA) KUMULATIF PROGRESS SD BULAN INI (JUTA) KENDALA
RENCANA REALISASI DEVIASI RENCANA REALISASI DEVIASI RENCANA REALISASI DEVIASI
BLN TGL BAHAN TENAGA ALAT CUACA DANA LAIN2
PU BK PU BK PU BK PU BK PU BK PU BK BOBOT PU BK PU BK PU BK BOBOT
SEPTEMBER 51 948 67 981 51 948 67 981 - - 49.31%
1 24 58 102 60 79 2 24 58 102 60 79 2 0.10% 51 971 68 039 52 050 68 041 79 2 49.41%    
2 31 83 85 56 54 (27) 55 141 187 116 133 (25) 0.18% 52 003 68 122 52 135 68 097 133 (25) 49.49%    
3 138 179 152 171 14 (8) 193 320 340 287 147 (33) 0.32% 52 141 68 301 52 287 68 268 147 (33) 49.63%    
4 227 294 173 201 (54) (93) 420 614 513 488 93 (125) 0.49% 52 368 68 595 52 460 68 469 93 (125) 49.79%    
5 168 217 176 221 8 4 588 831 689 709 101 (122) 0.65% 52 536 68 812 52 637 68 690 101 (122) 49.96%    
6 217 281 183 228 (34) (53) 805 1 112 872 937 67 (174) 0.83% 52 753 69 093 52 820 68 918 67 (174) 50.14%    
7 178 230 179 190 1 (40) 983 1 342 1 051 1 127 69 (214) 1.00% 52 930 69 323 52 999 69 108 69 (214) 50.31%    
8 197 255 188 210 (10) (45) 1 180 1 597 1 239 1 338 59 (259) 1.18% 53 128 69 578 53 187 69 319 59 (259) 50.48%    
9 257 332 225 245 (32) (87) 1 437 1 929 1 464 1 583 27 (346) 1.39% 53 384 69 910 53 412 69 564 27 (346) 50.70%    
10 206 277 219 235 13 (42) 1 643 2 206 1 683 1 818 40 (388) 1.60% 53 591 70 186 53 631 69 799 40 (388) 50.91%    
O 11 339 454 266 271 (73) (183) 1 982 2 660 1 948 2 089 (33) (571) 1.85% 53 930 70 641 53 896 70 070 (33) (571) 51.16%    
12 250 336 264 265 13 (71) 2 232 2 996 2 212 2 354 (20) (642) 2.10% 54 180 70 976 54 160 70 335 (20) (642) 51.41%    
K 13 324 435 283 271 (41) (163) 2 556 3 430 2 495 2 625 (61) (805) 2.37% 54 504 71 411 54 443 70 606 (61) (805) 51.68%    
T 14 15
265
295
356
395
279
268
272
269
13
(27)
(83)
(126)
2 822
3 116
3 786
4 181
2 774
3 042
2 897
3 166
(48)
(75)
(888)
(1 014)
2.63%
2.89%
54 769
55 064
71 766
72 161
54 722
54 990
70 878
71 147
(48)
(75)
(888)
(1 014)
51.94%
52.20%






O 16 383 514 284 281 (99) (233) 3 499 4 694 3 326 3 447 (174) (1 247) 3.16% 55 447 72 675 55 273 71 428 (174) (1 247) 52.46%   
17 368 306 344 276 (24) (30) 3 867 5 000 3 669 3 723 (198) (1 276) 3.48% 55 815 72 980 55 617 71 704 (198) (1 276) 52.79%    
B 18 604 502 413 361 (191) (141) 4 471 5 501 4 083 4 085 (389) (1 417) 3.88% 56 419 73 482 56 030 72 065 (389) (1 417) 53.18%    
E 19 447 371 182 165 (264) (206) 4 918 5 872 4 265 4 250 (653) (1 623) 4.05% 56 866 73 853 56 213 72 231 (653) (1 623) 53.36%   
20 578 480 164 145 (414) (335) 5 496 6 353 4 429 4 395 (1 067) (1 957) 4.20% 57 444 74 333 56 377 72 376 (1 067) (1 957) 53.51%   
R 21 473 393 273 259 (200) (134) 5 969 6 745 4 702 4 654 (1 267) (2 091) 4.46% 57 916 74 726 56 649 72 635 (1 267) (2 091) 53.77%   
22 525 436 371 303 (154) (133) 6 494 7 182 5 073 4 957 (1 421) (2 224) 4.82% 58 442 75 163 57 021 72 938 (1 421) (2 224) 54.12%   
23 683 567 374 301 (309) (266) 7 177 7 749 5 447 5 258 (1 730) (2 491) 5.17% 59 125 75 730 57 394 73 239 (1 730) (2 491) 54.48%   
24 589 483 351 292 (237) (191) 7 766 8 232 5 798 5 550 (1 968) (2 682) 5.50% 59 713 76 213 57 746 73 531 (1 968) (2 682) 54.81%   
25 967 794
26 715 587
27 925 759
28 757 621
29 841 690
30 673 552
30 420 345
TOTAL 13 063 12 579 5 798 5 550 (1 968) (2 682) - - - - - - - - - - - - - - - - - - - -
1. Pekerjaan timbunan, pemadatan badan jalan dan saluran.
PENJELASAN 2. Lansir material (material alam, semen dan baja profil) dari luar site menuju area pekerjaan.
3. Hujan malam hari.