Sengkang besi ( diameter 6 mm ) untuk Satu kolom, sloof, ring balk beton type I =
Jumlah sengkang = 3 m / 0.20 m = 15 bh
Sengkang = 15 bh x {( 0.11 m x 4 bh ) + ( 2 bh x 5 x 0.08 m )} x 0.225 kg / m =
= 15 x ( 0.44 + 0.8 ) x 0.225 =
= 15 x 1.24 x 0.225 = 4.185 kg
1 m³ = 4.185 kg / 0.0675 m³ = 62 kg
Jadi kebutuhan besi untuk 1m³ kolom, sloof, ring balk beton praktis = 109.688 kg + 62 kg = 171.69 kg
8
stngah Btg
Besi 10/Btg sd 7.398 kg 3.699
Besi 12/Btg sd 10.65312 kg 5.32656
0.2496825
0.1198476
5 cm x 300 cm ) =
= 171.69 kg
DAFTAR SURVEY HARGA SATUAN UPAH DAN BAHAN
Nama Toko Bangunan/ Suplayer :..........................................................
Tanggal Dilaksanakan Survey:
( ................................................... )
Survey mninimal di 3 (tiga) Toko yang Berbeda, disertai Cap/Stempel Toko Bangunan
No. Uraian Satuan Harga (Rp)
I UPAH
1 Tukang HOK 70,000
2 Pekerja HOK 60,000
3 Operator
4 Ongkos Pasang
5 Mandor HOK 75,000
II BAHAN
A PASANGAN m³
1 Pasir Urug m³
2 Pasir Pasang m³ 100,000
3 Pasir Beton m³ 125,000
4 Sirtu m³
5 Batu Kali m³
6 Batu Belah 10/15 m³ 167,500
7 Batu Pecah 5/7 m³
8 Batu Pecah 3/5 m³
9 Batu Pecah Mesin 2/3 m³ 212,500
10 Batu Pecah Mesin 1/2 m³ 175,000
11 Aspal Bitument Kg
12 Kalsit kg
13 Bata Merah bh 650
14 Paving Block Natural 8 cm m²
15 Paving Block Warna 8 cm m²
16 Paving Block Natural 6 cm m²
17 Paving Block Warna 6 cm m²
18 Semen 50 kg (Tiga Roda) Zak 69,000
19 Semen 50 kg Zak 69,000
20 Semen Warna
B KAYU DAN BAMBU
1 Kaso 5x7x3 m³ 500,000
2 Kaso Btg Btg 17,500
3 Kaso (Layeus) Btg 3,500
4 Papan 2x20x2 m³ 500,000
5 Papan Albasia 2x20x2 lbr 12,500
6 Kayu Albasia Balok 6/12 m³ 1,500,000
7 Kayu Albasia m³
8 Balok Albasia 6/12 Btg 32,000
9 Reng Btg 3,500
10 Bambu D 5 - 8
11 Bambu D 8 -1 0
12 Bambu D 10 - 15
13 Bambu Bilik (Giribig)
14 Bambu Bilik (Anyam Halus)
C KAYU LAPIS, CALSIBOARD, GYPSUM
1 Particle Board 12 mm
2 Block Board 12 mm
3 Multiplex 12 mm
4 Multiplex 9 mm lbr 115,000
5 Multiplex 6 mm
6 Triplex 3 mm lbr 45,000
7 CalsiBoard 3 mm lbr 52,000
8 Gypsum 6 mm
9 Eternit 60 x 90
D PAKU, MUR & BAUT
1 Paku Usuk/ Reng Kg 13,000
2 Paku 1 -3 Kg
3 Paku 5 - 7 Kg 13,000
4 Paku 8 - 12 Kg 12,000
5 Paku Calsiboard Kg 20,000
6 Mur Baut 10
7 Mur Baut 12
8 Mur Baut 14
9 Akur
10 Angkur Baut
11 Strip Plat
E LOGAM & BAHAN JADINYA
1 Besi Beton Polos 6" (kurus) Kg 20,000
2 Besi Beton Polos 8" (kurus) Kg 30,000
3 Besi Beton Polos 10" (kurus) Kg 52,000
4 Besi Beton Polos 12" (kurus) Btg
5 Besi Beton Polos 6" (Full) Btg 20,000
6 Besi Beton Polos 8" (Full) Btg 38,000
7 Besi Beton Polos 10" (Full) Btg 60,000
8 Besi Beton Polos 12" (Full) Btg 75,000
9 Besi Beton Ulir 12" Btg
10 Besi Beton Ulir 13" Btg
11 Seng BJLS 0.30 L60 Btg
12 Seng BJLS 0.30 L90 Btg
13 Kawat Beton Kg 16,000
14 Kawat Bendrat Kg 17,500
F PENUTUP ATAP
1 Genteng Palentong Bh 1,500
2 Genteng Morando Bh 2,500
3 Bubungan (Palentong)
4 Bubungan (Morando)
5 Seng Gelombang Besar
6 Seng Gelombang Kecil
7 Timber
G FINISHING CAT
1 Menie Kg 17,000
2 Cat Tembok Kg 7,500
3 Cat Kayu Kg 46,000
4 Cat Tembok (Aqua Proof)
5 Plamir
6 Amplas Halus lbr 3,500
7 Amplas Kasar Lbr 3,500
8 Koas Kecil Bh 2,000
9 Koas Sedang Bh 7,000
10 Koas Besar Bh 7,500
11 Sirlak
12 Plitur
13 Lem Kayu
14 Tiner
15 Minyak Cat
H KACA
1 Kaca Polos 3 mm
2 Kaca Polos 5 mm
I KUNCI
1 Handel Pintu Bh 30,000
2 Engsel Pintu Bh 16,000
3 Grendel 5cm
4 Tarikan Pintu
5 Kait Angin Bh 5,000
6 Engsel Jendela
7 Rooster Kayu
J LANTAI
1 Keramik 30x30 (putih) m² 43,000
2 Keramik 40x40 (putih)
3 Keramik 20x25 (putih)
4 Keramik 20x20 (putih)
5 Keramik 15x15 (putih)
6 Keramik 30x30 (Warna)
7 Keramik 40x40 (Warna)
8 Keramik 20x25 (Warna)
9 Keramik 20x20 (Warna)
10 Keramik 15x15 (Warna)
11 Rooster Keramik
K SANITAIR
1 Kloset Jongkok
2 Kran Air
3 Drain Bak Air
4 Drain Lantai
L PIPA & AKSESORIS
1 Pipa Galvanis 2
2 Pipa PVC D 6"
3 Keni L D6"
4 Keni T D6"
5 Pipa PVC D 4"
6 Keni L D4"
7 Keni T D4"
8 Pipa PVC D 3"
9 Keni L D3"
10 Keni T D3"
11 Pipa PVC D 2"
12 Keni L D2"
13 Keni T D2"
14 Pipa PVC D 1 1/2"
15 Keni L D 1 1/2"
16 Keni T D 1 1/2"
17 Pipa PVC D 1"
18 Keni L D 1"
19 Keni T D 1"
20 Pipa PVC D 1/2"
21 Keni L D 1/2"
22 Keni T D 1/2"
23 Pipa PVC D 3/4"
24 Keni L D 3/4"
25 Keni T D 3/4"
M BUIS BETON
1 Buis Beton U 20 Bh 25,000
2 Buis Beton U 50 Bh 50,000
3 Buis Beton D 20
4 Buis Beton D 30
5 Buis Beton D 40
6 Buis Beton D 50
7 Buis Beton D 60
N ALAT
1 Ember
2 Rol Cat
3 Cangkul
4 Sekop
5 Gergaji Besi
6 Sendok Semen
7 Sirkam
8 Sewa Molen
95.2380952380952 1,666,667
125 1,562,500
46.2962962962963 1,481,481
7,510 2.66328
5333.33333333333
PERHITUNGAN VOLUME/KUANTITAS PEKERJAAN
6 6
1.2
1.6
0,5
12 m
A.022 1 M3 ADUKAN BETON 1PC:2PS:3KR + PAS. RANGKA B m³ 12.00 0.90 0.20 2.16
1M
Ø 10
( ………………………………………. ) ( …………………………………. )
RENCANA ANGGARAN BIAYA (RAB)
DESA CINAMBO KECAMATAN BANTARUJEG
TAHUN ANGGARAN 2021
No.RAB : 006
Bidang : Pelaksanaan Pemb. Desa
Kegiatan : Plat Beton Dusun Sukalaya
Waktu Pelaksanaan : 10 Hari kerja
Lokasi : Dusun Sukalaya
Volume : 12 x 1 m
Jumlah Biaya
Komponen/Bentuk Kontribusi
NO Satuan Volume Harga Satuan
Swadaya Masyarakat Dari DD
A. TENAGA KERJA :
1 Tukang HOK 69.00 110,000 7,590,000
2 Pekerja HOK 25.00 90,000 2,214,000
Sub Total 9,804,000
B. BAHAN BANGUNAN :
1 Kaso 5x7x3 m³ 0.10 2,761,300 276,130
2 Papan 2x20x2 m³ 2,761,300 -
3 Paku 5 - 7 Kg 8.00 15,400 123,200
4 Batu Belah 10/15 m³ 12.00 231,900 2,782,800
5 Semen 50 kg Zak 45.00 66,200 2,979,000
6 Pasir Pasang m³ 5.00 248,500 1,242,500
7 Batu Pecah Mesin 2/3 m³ 1.80 386,500 695,700
8 Pasir Beton m³ 1.00 331,300 331,300
9 Multiplex 9 mm lbr 8.00 140,000 1,120,000
10 Besi Beton Polos 12" (Full) Kg 140.00 22,000 3,080,000
11 Besi Beton Polos 10" (Full) Kg 100.00 22,000 2,200,000
12 Kawat Beton Kg 2.00 27,600 55,200
Sub Total 14,885,830
C. ALAT :
1 Pengki bh 5.00 16,500 82,500
2 Ember bh 10.00 8,900 89,000
3 Meteran bh 1.00 27,600 27,600
4 Sekop bh 1.00 88,300 88,300
5 Palu bh 1.00 71,700 71,700
6 Cangkul bh 2.00 82,800 165,600
7 Benang bh 2.00 5,500 11,000
Cinambo,.....Januari 2021
Mengetahui,
Kepala Desa Cinambo Pelaksana Kegiatan
Mengetahui,
Kepala UPT Pemeliharaan Kebinamargaan
Bangunan dan Tata Ruang Wilayah Bantarujeg