No. Date Time No.

1 14-Nov-22 13.30 s.d. 14.15 1


2
3
2 15-Nov-22 8.15 s.d. 9.30 1
3 16-Nov-22 14.50 s.d. 15.15 1
13.50 s.d. 14.45 2
10.30 s.d. 11.00 3
4 17-Nov-22 11.00 s.d. 11.30 1

09.30 s.d. 10.50 2


3

Pedestal pre-cast L1

L2

L3

L4

L5

L6

L7

Total
Total L
Description Qty. Unit
Visual inspeksi Post Panel (Dirkeet Building) 36 nos
Visual inspeksi Post Panel + anchor (Dirkeet Building) 12 nos
Visual inspeksi Precast Panel (Area G Green Fence) 170 nos
Visual inspeksi Precast Panel (Area G Green Fence) 250 nos
Visual inspeksi Precast Panel (Area F Green Fence) 250 nos
Visual inspeksi Instalasi pre-cast panel di area H 25 segment
Inspeksi elevasi top LC (1 nos) dan top sand (2 nos) 3 nos
Visual inspeksi Precast Panel (Area Direksi Keet Building) 240 nos

Joint Inspeksi Rebar dan Dimensi Pedestal Area Direksi Keet) 33 nos
Joint Inspeksi Rebar dan Dimensi Pondasi outrigger Area Direksi Keet 36 nos

111226
2500
44.4904
39900
2500
15.96
39900
2500
15.96
60525
2500
24.21
8575
2500
4.43
13575
2500
6.43
7550
2500
3.02
115
116
281.251
Remarks
Beberapa post panel yang pecah atau cacat agar diperbaiki
Beberapa post panel yang pecah atau cacat agar diperbaiki
Beberapa panel precast yang pecah atau cacat agar diperbaiki
Beberapa panel precast yang pecah atau cacat agar diperbaiki
Beberapa panel precast yang pecah atau cacat agar diperbaiki
Beberapa panel precast yang pecah atau cacat agar diperbaiki
Top elevasi LC dan sand masih masuk toleransi (+5mm)
Sebagian besar panel precast ditemukan pecah atau cacat dan
agar diperbaiki