A.PEKERJAAN PERSIAPAN
1 Galian Tanah
- Pondasi Teras
- Footplat
1.2 1 4 6
engukuran dan Pemasangan 1 m' Bouwplank 6 M'
1 Beton bertulang
FOOTPLAT
- PLAT
- KOLOM FOOTPLAT
S LOOF
- UTAMA
- TERAS SAMPING DAN DEPAN
KOLOM
- UTAMA LT_1
- TERAS
BALOK INDUK
- Panjang 103
- Pendek 7.5
BALOK ANAK
- 29
PELAT
Lantai 2
KOLOM
- UTAMA LT_2
BALOK LATEI
TOTAL BALOK LATEI 50
RING BALOK
LT_2 50
TALANG BETON
TB 50
TANGGA
PONDASI FOOTPLATE
TELAPAK
DIMENSI VOLUME KET
Panjang Lebar Tinggi Tebal n (jumlah)
5 6 7 8 9 10 =….x… 11
rugan Peninggian Lantai 54.17 M3
1 1 0.2 20 4
0.3 0.3 0.8 20 1.44
12 9 0.12 12.96
14.5 1.5 0.12 2.61
1 1 0.2 1 0.2
GAMBAR Keliling
2 3 4
KOLOM 1
PLAT LANTAI 4.91
PLAT BORDES 2
- KOLOM FOOTPLAT 1.20
SLOOF
- UTAMA
- TERAS SAMPING DAN DEPAN
- BALOK LATEI
- TALANG BETON
- TANGGA
PONDASI FOOTPLATE
TELAPAK
KOLOM
PLAT LANTAI
PLAT BORDES
KOLOM
- LT_1
- TERAS
- LT_1
PELAT LANTAI 2
- A
- B
Panjang Lebar Tinggi Tebal n (jumlah)
5 6 7 8 9 10 =….x… 11
1 0.3 1.1 1 0.33
4.91 1 0.12 1 0.59
2 0.65 0.12 1 0.16
0.8 20 19.2
1 0.2 4 0.8
1 0.3 1.1 2 2.86
4.91 1 0.12 6.09
2 0.65 0.12 0.16
TOTAL 186.6
Jumlah x pemakaian 3 x
1 m2 bekisting sloof 62.2 M2
LEBAR SISI TINGGI
0.25 4 3.3 20 66
0.3 4 4.3 2 10.32
0.25 4 3.8 20 76
TOTAL 152.32
Jumlah x pemakaian 3 x
1 m2 bekisting untuk Kolom 50.77 M2
12 9 108
14.5 1.5 21.75
GAMBAR Keliling
2 3 4
- SAMPING 50.00
BALOK INDUK
- Panjang 103
- Pendek 7.5
Jumlah x pemakaian 4 x
1 m2 bekisting untuk Balok 24.56 M2
- PLAT ATAS 2.26
- PLAT BAWAH 2.26
Berat Besi
koefisien
Ø 10 1.05
- KOLOM FOOTPLAT
Berat Besi
koefisien
Ø 12 1.05
- SLOOF
UTAMA 75.5
TERAS SAMPING DAN DEPAN 25.5
Ø
Panjang Lebar Tinggi Tebal n (jumlah)
5 6 7 8 9 10 =….x… 11
0.12 6
TOTAL 135.75
Jumlah x pemakaian 1 x
1 m2 bekisting untuk lantai 135.75 M2
7 20 316.4
7 20 316.4
Ø Berat perm' panjang 632.8 m'
10 0.6168 632.8 390.3 Kg
berat total keb.berat Berat panjang panjang total perlonjor
perm'
390.3 409.82 0.6168 664.44 56 ljr
jumlah besi
6 0.8 20 96
Ø Berat perm' panjang 96 m'
12 0.89 96 85.26 Kg
berat total keb.berat Berat panjang panjang total perlonjor
perm'
jumlah besi
75.5 6 1 453
25.5 6 1 153
Ø Berat perm' panjang 606 m'
No ITEM PEKERJAAN SKET GAMBAR
Keliling
1 2 3 4
Berat Besi
koefisien
Ø 10 1.05
- BALOK LATEI
Berat Besi
koefisien
Ø 8 1.05
- TALANG BETON
TUL.POKOK
panjang tul.pokok
TUL.PENGIKAT 0.92
Berat Besi
koefisien
Ø 6 1.05
- TANGGA
FOOTPLATE
TELAPAK MELINTANG 2.26
TELAPAK MEMANJANG 2.26
KOLOM
panjang tul.pokok
TUL.PENGIKAT 2.6
PELAT LANTAI
Hitung B.Memanjang 9.82
Hitung B.Melintang 2.24
PELAT Bordes
Hitung B.Memanjang 1.12
Hitung B.Melintang 1.12
DIMENSI VOLUME KET
Panjang Lebar Tinggi Tebal n (jumlah)
5 6 7 8 9 10 =….x… 11
10 0.6168 606 373.77 Kg
berat total keb.berat Berat panjang panjang
perm' total perlonjor
373.77 392.46 0.6168 636.3 12 54 ljr
50 4 1 200
Ø Berat perm' panjang 200 m'
8 0.3947 200 78.95 Kg
berat total keb.berat Berat panjang panjang
perm' total perlonjor
78.95 82.9 0.3947 210 12 18 ljr
50 7 1 350
jang tul.pokok jarak beugel Jumlah beugel
7 1 15.82
7 1 15.82
1 8 1 8
jang tul.pokok jarak beugel Jumlah beugel
1 0.2 6 15.6
1 0.15 8 78.56
4.91 0.15 34 76.16
1 0.15 8 8.96
1 0.15 8 8.96
No ITEM PEKERJAAN SKET GAMBAR
Keliling
1 2 3 4
Berat Besi
koefisien
Ø 8 1.05
- KOLOM
LT_1
Teras
LT_2
Berat Besi
koefisien
1.05
PELAT LANTAI TUMPUAN panjang tul.pokok
Berat Besi
koefisien
Ø 8 1.05
PELAT LANTAI LAPANGAN panjang tul.pokok
3.3 6 20 396
4.3 6 2 51.6
3.8 6 20 456
Ø Berat perm' panjang 903.6 m'
12 0.89 903.6 802.55 Kg
keb.berat Berat panjang panjang
berat total perm' total perlonjor
802.55 842.68 0.8882 948.78 12 80 ljr
panjang tul.pokok jarak beugel Jumlah beugel
Berat Besi
koefisien
Ø 10 1.05
- BALOK INDUK
Panjang 103
Pendek 7.5
- BALOK ANAK 29
Berat Besi
koefisien
Ø 12 1.05
KOLOM
- LT_1 0.73
- LT_2 0.73
Berat Besi
koefisien
Ø 8 1.05
panjang tul.pokok
DIMENSI VOLUME KET
Panjang Lebar Tinggi Tebal n (jumlah)
5 6 7 8 9 10 =….x… 11
2.7 0.25 12 23.76
2.7 0.25 12 28.8
Ø Berat perm panjang 1,865.29 m'
10 0.6168 1865.29 1,150.48 Kg
berat total keb.berat Berat panjang panjang
perm' total perlonjor
1,150.48 1208 0.6168 1,958.55 12 164 ljr
6 618
4 30
6 174
Berat Besi
koefisien
Ø 6 1.05
panjang tul.pokok
- BALOK INDUK
Panjang 0.79
Pendek 0.39
- BALOK ANAK 0.63
Berat Besi
koefisien
Ø 8 1.05
1 PASANG KUSEN
Pintu single
Kusen 4.76
Pintu Kupu-kupu
Kusen 5.66
Jendela Double
Kusen 5
Jendela Single
Kusen 3.3
E.Pekerjaan Dinding
1 Pas.Dinding Lantai 1
Memanjang Luar
DIMENSI VOLUME KET
Panjang Lebar Tinggi Tebal n (jumlah)
5 6 7 8 9 10 =….x… 11
0.06 34 9.83
0.06 2 0.34
14.5 3 2 87 m2
No ITEM PEKERJAAN SKET GAMBAR
Keliling
1 2 3 4
Memanjang Dalam
Melintang Luar
Melintang Dalam
Pagar
Pas.Dinding Lantai 2
Memanjang Luar
Melintang Luar
Bukaan Dinding
Pintu Single
Pintu Kupu-kupu
Jendela Double
Jendela Single
Roster
1 m2 plesteran 1 PC : 6 PP, t
3 Pengecatan Dinding
F.Pekerjaan Lantai
1 Patlah Lantai 1
0.9 2 6 10.8 m2
1.8 2 1 3.6 m2
1 1 34 34 m2
0.6 1 2 1.2 m2
1 0.5 59 29.5 m2
79.1 m2
Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) 679.6 m2
1 0.5 59 29.5 m2
Teras
1 RANGKA PLAPON
LT_2
TERAS
1 m2 rangka langit-langit (6
2 PENUTUP PLAPON
LT_2
TERAS
1 m2 langit-langit ukuran (1
3 PENGECATAN PLAPON
LT_2
TERAS
1 m² Pengecat an Plapon Baru ( 1 Plamir, 1
G.Pekerjaan Atap
4.91 1 4.91
3.3 1 3.3
1 1 1
6.48 1.5 9.72
1.3 1 2 2.6
1.86 1.38 2.57
sudut/kemiringan
14.5 10.5 22 164.21
No ITEM PEKERJAAN SKET GAMBAR
Keliling
1 2 3 4
Teras
Lampu
Saklar
Stop Kontak
DIMENSI VOLUME KET
Panjang Lebar Tinggi Tebal n (jumlah)
5 6 7 8 9 10 =….x… 11
2.25 4.9 30 12.73
a b c d e f g=exf h I=exh
A.PEKERJAAN PERSIAPAN
1 Pembersihan 1 m2 44.72
m² Lapangan dan
Perataan Tanah
Pekerja OH 0.1 4.47 60,000 6,000
j=gxh
268,300
268,300
100,000
1,900
26,100
36,000
42,000
206,000
SNI 2008
871,200
871,200
SNI 2008
403,200
414,100
201,900
216,000
126,000
1,361,200
SNI 2008
6,499,800
812,400
7,312,200
SNI 2008
22,395,400
3,060,600
7,934,900
4,051,600
787,800
38,230,300
SNI 2008
3,043,900
300,400
1,940,600
1,132,000
6,416,900
SNI 2008
2,208,600
326,900
874,300
1,586,600
2,010,600
1,172,800
8,179,800
SNI 2008
1,068,200
158,100
422,800
491,100
No Pekerjaan Bahan/Upah/Alat Sat Index Volume Volume Kebutuhan B/U/A
Harga Satuan Harga Satuan
(B/U/A) Pekerjaan B/U/A (Rp.) Pekerjaan Rp.
a b c d e f g=exf h I=exh
j=gxh
972,400
567,200
3,679,800
SNI 2008
5,302,700
874,200
2,337,600
2,715,000
5,375,700
19,741,000
46,484,700
1,295,800
2,134,200
2,489,900
52,404,600
SNI 2008
45,905,000
35,600
69,900
743,700
2,603,200
49,357,400
SNI 2008
19,383,700
476,700
1,448,300
5,069,200
26,377,900
SNI 2008
2,422,500
22,700
265,100
2,710,300
SNI 2008
15,460,900
4,170,000
2,497,500
SNI 2008
6,116,400
2,378,600
30,623,400
SNI 2008
4,426,600
2,752,300
12,232,800
7,135,800
SNI 2008
26,547,500
1,902,800
2,650,400
6,891,100
815,500
2,997,000
15,256,800
5,310,000
478,600
154,800
531,000
309,700
6,784,100
No Pekerjaan Bahan/Upah/Alat Sat Index Volume Volume Kebutuhan B/U/A
Harga Satuan Harga Satuan
(B/U/A) Pekerjaan B/U/A (Rp.) Pekerjaan Rp.
a b c d e f g=exf h I=exh
PEKERJAAN LANTAI
1 1 m2 Lantai bata m2 152.25
merah tebal 1/2 bata,
campuran
Bata merah Buah 50 7,612.50 650 32,500
j=gxh
SNI 2008
4,948,100
1,868,400
1,119,000
SNI 2008
2,740,500
1,065,700
11,741,700
18,650,400
4,235,600
SNI 2008
1,977,900
647,500
4,395,300
2,563,900
32,470,600
1,393,100
SNI 2008
348,300
162,600
53,200
361,400
SNI 2008
210,800
2,529,400
657,100
1,959,300
3,428,700
12,975,700
3,979,800
HSPK
78,800 KAB.KED
979,600
1,142,900
6,181,100
SNI 2008
457,100
636,700
1,655,600
195,900
720,000 HSPK
3,665,300 KAB.KED
34,838,900
KAB.KED
1,238,500
4,246,400
40,323,800
27,706,900
5,327,700
995,700
1,707,000
35,737,300
348,600
1,002,400
217,000
18,200
No Pekerjaan Bahan/Upah/Alat Sat Index Volume Volume Kebutuhan B/U/A
Harga Satuan Harga Satuan
(B/U/A) Pekerjaan B/U/A (Rp.) Pekerjaan Rp.
a b c d e f g=exf h I=exh
TOTAL
zak
1 Portland Cement 649.79
2 Besi Beton 5335.71 kg
Kg
8 Paku 151.14
9 Plamir 84.29 Kg
14 Roster 590 bh
M2
17 Rangka Atap 194.63
18 Genteng 502.62 Lembar
25 Tanah urug 65 m3
ljr
26 Kayu papan 603.75
27 Kayu Papan 3 ljr
m2
35 Kaca Polos 27.78
36 Triplek 1.2x2.4 73.88 Lbr
38 Prasasti 0 buah
40 Kabel 172 M1
Buah
42 Isolator 116
43 T Doos Pvc 43 Buah
46 Lampu 18 w 29 buah
47 Pekerja 961.82 OH
48 Tukang 614.09 OH
Total Biaya Rp. Keteran
gan
j=gxh
196,000
800
1,783,000
HSPK
KAB.KED
1,160,000
2,076,400
449,500
37,700
1,116,500
374,100
1,015,000 HSPK
KAB.KED
522,000
6,751,200
198,800
196,000
800
395,600
450,883,400
No. Uraian Pekerjaan Volume SatuanHarga Satuan Pekerjaan Rp.
A PEKERJAAN PERSIAPAN
C PEKERJAAN BETON
D PEKERJAAN DINDING
D PEKERJAAN LANTAI
D PEKERJAAN LANGIT-LANGIT
Jumlah %
Harga
268,320 0.1%
206,032 0.0%
871,200 0.2%
1,361,340 0.3%
7,312,275 1.6%
38,230,493 8.5%
6,417,170 1.4%
8,180,092 1.8%
19,741,104 4.4%
3,680,187 0.8%
52,404,811 11.6%
49,357,568 10.9%
26,378,111 5.8%
2,710,474 0.6%
30,623,456 6.8%
26,547,623 5.9%
15,257,020 3.4%
6,784,263 1.5%
11,741,825 2.6%
32,470,979 7.2%
2,529,648 0.6%
No. Uraian Pekerjaan Volume SatuanHarga Satuan Pekerjaan Rp.
D PEKERJAAN LISTRIK
Jumlah Fisik
Nilai Pembulatan
Nilai RAB
Jumlah %
Harga
12,975,940 2.9%
6,181,265 1.4%
3,665,524 0.8%
40,324,054 8.9%
35,737,493 7.9%
1,783,040 0.4%
6,751,200 1.5%
395,640 0.1%
250,000 0.1%
451,138,146 100.0%
(195,554)
451,333,700
NO Uraian Bahan/Alat/Upah Sat Harga Satuan
full panjang 12 m
full panjang 12 m
full panjang 12 m
full panjang 12 m
plamuur
decolith 5kg (eksterior)
Tiga Roda 50 kg
1.2 x 2.4 m x 9 mm
tebal 0,75 mm
kruing 4m-4/6cm
randu 2m-0.02/0.2cm
vinyl
5mm
ex.broco
NYA 500 Volt 2 x 2,5
mM2
ex.broco
ex.broco
18 W/220 V ex. Philips
No. URAIAN Volume Satu Harga Satuan
an Rp
1 2 3 4 5
1.BAHAN
18 1005 Rp 5,300
19 31399 Rp 650
20 3 Rp 140,000
21 32 Rp 250,000
22 20 Rp 150,000
23 59 Rp 150,000
24 65 Rp 100,000
25 604 Rp 8,700
26 3 Rp 8,700
27 3 Rp 40,000
28 276 Rp 25,000
Jumlah Total
Rp
6=3x5
Rp 38,350,000
Rp 14,023,100
Rp 17,755,200
Rp 11,495,400
Rp 3,212,300
Rp 1,292,000
Rp 2,431,100
Rp 2,352,000
Rp 3,315,000
Rp 8,580,000
Rp 18,660,000
Rp 1,417,000
Rp 5,310,000
Rp 680,000
Rp 3,965,000
Rp 34,905,000
Rp 27,727,800
Rp 5,326,500
Rp 20,409,300
Rp 420,000
Rp 8,000,000
Rp 3,000,000
Rp 8,850,000
Rp 6,500,000
Rp 5,254,800
Rp 26,100
Rp 120,000
Rp 6,900,000
No. URAIAN Volume Satu Harga Satuan
an Rp
1 2 3 4 5
29 Kayu kelas III Balok kayu jati 123 Ljr Ljr Ljr Rp 8,700
Ljr kg m2
Papan kayu jati Lbr
30 Kaso-kaso (4 x 6) cm 58 Batang Rp 791,800
Buah M1
Lonjor
31 Lem kayu Kaca Polos Triplek 80 Buah Rp 240,900
Buah
1.2x2.4 Buah
32 Bambu - 4m 277 Buah Rp 25,000
buah
38 172 Rp 17,900
39 43 Rp 15,500
40 116 Rp 10,000
41 43 Rp 1,300
42 29 Rp 12,900
43 14 Rp 14,200
Sub Total 1)
44 29 Rp 38,500
2.ALAT
Sub Total 2)
3.UPAH
Sub Total 3 )
Terbilang ( empat ratus lima puluh satu juta tiga ratus tiga puluh tiga ribu tujuh ratus rupiah )
Jumlah Total
Rp
6=3x5
Rp 1,070,100
Rp 45,924,400
Rp 19,272,000
Rp 6,925,000
Rp 553,000
Rp 2,441,600
Rp 3,640,800
Rp 3,210,000
Rp 348,600
Rp 3,078,800
Rp 666,500
Rp 1,160,000
Rp 55,900
Rp 374,100
Rp 198,800
Rp 350,313,700
Rp 1,116,500
Rp 250,000
Rp 250,000
Rp 57,720,000
Rp 43,050,000
Rp 100,770,000
Rp 451,333,700