Lembar Ke Dari
combi, minibus)
Sepeda Motor
Truk 4 Sumbu
Truk 6 Sumbu
penumpang
Bus Besar
Bus Kecil
Roda)
Roda)
Waktu
06-07 76 15 15 0 0 2 3 0 0 0 1 0 0
07-08 149 21 16 0 0 1 2 1 0 0 0 0 0
08-09 180 33 21 0 0 4 10 2 0 0 0 0 0
09-10 174 35 24 0 0 3 1 0 0 0 0 0 0
10-11 160 36 25 0 0 2 0 0 0 0 0 0 0
11-12 162 35 22 0 0 4 1 1 0 0 0 0 0
12-13 161 36 27 2 1 2 3 0 0 0 0 0 0
13-14 150 35 20 0 0 1 8 1 0 0 0 0 0
14-15 159 61 39 0 1 0 11 0 0 0 0 0 0
15-16 157 40 14 0 0 9 0 2 0 0 0 0 0
16-17 178 42 19 0 0 4 14 0 0 0 0 0 0
17-18 150 45 18 0 0 8 7 0 0 0 0 0 0
18-19 120 30 20 1 0 4 1 0 0 0 0 0 0
19-20 178 24 11 0 1 0 4 2 0 0 2 0 0
20-21 126 23 6 1 0 0 5 2 0 0 0 0 0
21-22 70 19 4 0 0 0 1 1 0 0 0 0 0
22-23
23-24
00-01
01-02
02-03
03-04
04-05
05-06
Total 2350 530 301 4 3 44 71 12 0 0 0 0 0
Pd T-19-2004-B
Formulir himpunan untuk ruas jalan
(Normatif)
MUKIMAN DAN PRASARANA WILAYAH
0
2
1
0
1
2
6
0
3
1
0
0
6
5
0
2
29
Pd T-19-2004-B
Lembar Ke Dari
combi, minibus)
Sepeda Motor
Truk 4 Sumbu
Truk 6 Sumbu
penumpang
Bus Besar
Bus Kecil
Roda)
Roda)
Waktu
06-07 64 15 15 0 0 0 4 0 1 0 0 0 0
07-08 125 28 19 0 0 0 7 0 2 0 0 0 0
08-09 153 37 23 0 0 0 11 0 4 0 0 0 0
09-10 148 41 25 0 0 0 9 0 1 0 0 0 0
10-11 136 40 24 0 0 0 12 0 3 0 0 0 0
11-12 134 42 25 0 0 0 11 0 0 0 0 0 0
12-13 133 46 30 0 1 0 15 0 1 0 0 0 0
13-14 125 40 20 0 0 0 14 0 1 0 0 0 0
14-15 160 47 29 0 0 0 13 0 2 0 0 0 0
15-16 140 51 18 0 1 0 14 0 1 0 0 0 0
16-17 134 55 20 0 0 0 15 0 2 0 0 0 0
17-18 115 45 24 1 0 0 5 0 4 0 0 0 0
18-19 146 47 13 0 1 2 4 0 0 0 0 0 0
19-20 120 34 19 0 0 0 13 0 6 0 0 0 0
20-21 101 35 10 0 0 0 11 0 3 0 0 0 0
21-22 69 30 9 0 0 0 8 0 2 0 0 0 0
22-23
23-24
00-01
01-02
02-03
03-04
04-05
05-06
Total 2003 633 323 1 3 2 166 0 33 0 0 0 0
Pd T-19-2004-B
BINA MARGA
Kendaraan Tidak
Bermotor
0
1
0
1
2
5
7
0
0
2
0
3
8
0
1
2
32
REKAPITULASI TRAFFIC COUNTING
PEKERJAAN PERENCANAAN DED LINTAS DIAGONAL PROVINSI SUMATERA UTARA
No Ruas : 070.11.k
Nama Ruas : Jln. Sisingamangaraja (Tarutung)
No Jenis Kendaraan LHR g (%) VDF
1 Sepeda Motor 4353
2 Pick up dan Mobil penumpang 1163
3 Angkutan (opelet, combi, minibus) 624
4 Bus Kecil 5
5 Bus Besar 6
6 Truk Ringan 2 Sumbu (4 Roda) 46
7 Truk Ringan 2 Sumbu (6 Roda) 237
8 Truk 3 Sumbu (Single) 12
9 Truk 3 Sumbu (Tandem) 33
10 Truk 4 Sumbu 0
11 Truk 5 sumbu (Tandem) 0
Pd T-19-2004-B
Lampiran B.1 Formulir himpunan untuk ruas jalan
(Normatif)
DEPARTEMEN PEMUKIMAN DAN PRASARANA WILAYAH
Lembar Ke Dari
combi, minibus)
Sepeda Motor
Truk 4 Sumbu
Truk 6 Sumbu
penumpang
Bus Besar
Bus Kecil
Roda)
Roda)
Waktu
06-07 76 15 15 0 0 2 3 0 0 0 1 0 0
07-08 149 21 16 0 0 1 2 1 0 0 0 0 0
08-09 180 33 21 0 0 4 10 2 0 0 0 0 0
09-10 174 35 24 0 0 3 1 0 0 0 0 0 0
10-11 160 36 25 0 0 2 0 0 0 0 0 0 0
11-12 162 35 22 0 0 4 1 1 0 0 0 0 0
12-13 161 36 27 2 0 2 3 0 0 0 0 0 0
13-14 150 35 20 0 0 1 8 1 0 0 0 0 0
14-15 159 61 39 0 0 0 11 0 0 0 0 0 0
15-16 157 40 14 0 1 9 0 2 0 0 0 0 0
16-17 178 42 19 0 0 4 14 0 0 0 0 0 0
17-18 150 45 18 0 0 8 7 0 0 0 0 0 0
18-19 120 30 20 1 0 4 1 0 0 0 0 0 0
19-20 178 24 11 0 1 0 4 2 0 0 2 0 0
20-21 126 23 6 1 0 0 5 2 0 0 0 0 0
21-22 70 19 4 0 0 0 1 1 0 0 0 0 0
22-23
23-24
00-01
01-02
02-03
03-04
04-05
05-06
Total 2350 530 301 4 2 44 71 12 0 0 0 0 0
Pd T-19-2004-B
Formulir himpunan untuk ruas jalan
(Normatif)
MUKIMAN DAN PRASARANA WILAYAH
0
2
0
0
1
2
6
0
3
0
0
0
6
5
0
2
27
Pd T-19-2004-B
Lembar Ke Dari
combi, minibus)
Sepeda Motor
Truk 4 Sumbu
Truk 6 Sumbu
penumpang
Bus Besar
Bus Kecil
Roda)
Roda)
Waktu
06-07 65 16 16 0 0 0 5 0 2 0 0 0 0
07-08 126 29 20 0 0 0 8 0 4 0 0 0 0
08-09 154 38 24 0 0 0 12 1 3 0 0 0 0
09-10 149 42 26 1 0 0 10 0 2 0 0 0 0
10-11 137 39 23 0 1 0 13 0 2 0 0 0 0
11-12 135 43 26 0 0 0 12 1 0 0 0 0 0
12-13 134 45 29 0 1 0 14 0 1 0 0 0 0
13-14 126 39 21 2 0 0 15 0 2 0 0 0 0
14-15 161 48 30 0 0 0 14 0 2 0 0 0 0
15-16 141 50 19 0 0 0 15 0 1 0 0 0 0
16-17 135 54 21 0 0 0 16 0 2 0 0 0 0
17-18 116 46 25 1 0 0 6 0 3 0 0 0 0
18-19 147 48 14 0 0 2 5 0 0 0 0 0 0
19-20 119 35 20 0 0 0 14 0 5 0 0 0 0
20-21 100 36 11 0 0 0 12 0 2 0 0 0 0
21-22 70 29 8 0 0 0 9 0 1 0 0 0 0
22-23
23-24
00-01
01-02
02-03
03-04
04-05
05-06
Total 2015 637 333 4 2 2 180 2 32 0 0 0 0
Pd T-19-2004-B
BINA MARGA
Kendaraan Tidak
Bermotor
0
1
0
1
2
5
7
1
0
2
0
2
9
0
0
2
32
REKAPITULASI TRAFFIC COUNTING
PEKERJAAN PERENCANAAN DED LINTAS DIAGONAL PROVINSI SUMATERA UTARA
No Ruas : 070.11.k
Nama Ruas : Jln. Sisingamangaraja (Tarutung)
No Jenis Kendaraan LHR g (%) VDF
1 Sepeda Motor 4365
2 Pick up dan Mobil penumpang 1167
3 Angkutan (opelet, combi, minibus) 634
4 Bus Kecil 8
5 Bus Besar 4
6 Truk Ringan 2 Sumbu (4 Roda) 46
7 Truk Ringan 2 Sumbu (6 Roda) 251
8 Truk 3 Sumbu (Single) 14
9 Truk 3 Sumbu (Tandem) 32
10 Truk 4 Sumbu 0
11 Truk 5 sumbu (Tandem) 0
Pd T-19-2004-B
Lampiran B.1 Formulir himpunan untuk ruas jalan
(Normatif)
DEPARTEMEN PEMUKIMAN DAN PRASARANA WILAYAH
Lembar Ke Dari
combi, minibus)
Sepeda Motor
Truk 4 Sumbu
Truk 6 Sumbu
penumpang
Bus Besar
Bus Kecil
Roda)
Roda)
Waktu
06-07 75 16 16 0 0 2 4 0 0 0 1 0 0
07-08 150 20 15 0 0 1 3 2 0 0 0 0 0
08-09 181 34 20 0 0 4 11 2 0 0 0 0 0
09-10 175 36 25 0 0 3 2 0 0 0 0 0 0
10-11 159 35 26 0 0 2 0 0 0 0 0 0 0
11-12 161 34 23 0 0 4 3 2 0 0 0 0 0
12-13 160 37 28 2 1 2 4 0 0 0 0 0 0
13-14 149 36 21 0 0 1 9 1 0 0 0 0 0
14-15 158 60 38 0 1 0 10 0 0 0 0 0 0
15-16 156 41 13 0 0 8 0 1 0 0 0 0 0
16-17 177 43 20 0 0 5 15 0 0 0 0 0 0
17-18 149 46 17 0 2 7 8 0 0 0 0 0 0
18-19 121 31 19 1 0 5 2 0 0 0 0 0 0
19-20 178 25 10 0 1 0 5 1 0 0 2 0 0
20-21 125 24 5 2 0 0 6 2 0 0 0 0 0
21-22 69 20 3 0 0 0 2 1 0 0 0 0 0
22-23
23-24
00-01
01-02
02-03
03-04
04-05
05-06
Total 2343 538 299 5 5 44 84 12 0 0 0 0 0
Pd T-19-2004-B
Formulir himpunan untuk ruas jalan
(Normatif)
MUKIMAN DAN PRASARANA WILAYAH
0
2
0
0
1
2
6
0
3
0
0
0
6
5
0
2
27
Pd T-19-2004-B
Lembar Ke Dari
combi, minibus)
Sepeda Motor
Truk 4 Sumbu
Truk 6 Sumbu
penumpang
Bus Besar
Bus Kecil
Roda)
Roda)
Waktu
06-07 65 16 14 0 0 0 5 0 2 0 0 0 0
07-08 126 29 18 0 0 0 6 0 1 0 0 0 0
08-09 154 38 24 0 0 0 10 0 5 0 0 0 0
09-10 149 40 16 0 0 0 8 0 2 0 0 0 0
10-11 135 39 23 0 0 0 11 0 4 0 0 0 0
11-12 133 41 26 0 0 0 12 1 0 0 0 0 0
12-13 132 45 31 0 0 0 14 0 2 0 0 0 0
13-14 126 39 21 0 0 0 15 1 2 0 0 0 0
14-15 159 46 28 0 0 0 14 0 3 0 0 0 0
15-16 139 52 17 0 0 0 13 2 2 0 0 0 0
16-17 135 54 21 0 0 0 14 0 2 0 0 0 0
17-18 114 46 25 1 0 0 6 0 5 0 0 0 0
18-19 147 48 14 0 0 1 5 1 0 0 0 0 0
19-20 121 35 20 0 0 0 14 0 5 0 0 0 0
20-21 100 34 11 0 0 0 12 0 2 0 0 0 0
21-22 70 29 8 0 0 0 9 0 1 0 0 0 0
22-23
23-24
00-01
01-02
02-03
03-04
04-05
05-06
Total 2005 631 317 1 0 1 168 5 38 0 0 0 0
Pd T-19-2004-B
BINA MARGA
Kendaraan Tidak
Bermotor
0
1
0
1
2
5
7
0
0
0
0
2
8
0
0
2
28
REKAPITULASI TRAFFIC COUNTING
PEKERJAAN PERENCANAAN DED LINTAS DIAGONAL PROVINSI SUMATERA UTARA
No Ruas : 070.11.k
Nama Ruas : Jln. Sisingamangaraja (Tarutung)
No Jenis Kendaraan LHR g (%) VDF
1 Sepeda Motor 4348
2 Pick up dan Mobil penumpang 1169
3 Angkutan (opelet, combi, minibus) 616
4 Bus Kecil 6
5 Bus Besar 5
6 Truk Ringan 2 Sumbu (4 Roda) 45
7 Truk Ringan 2 Sumbu (6 Roda) 252
8 Truk 3 Sumbu (Single) 17
9 Truk 3 Sumbu (Tandem) 38
10 Truk 4 Sumbu 0
11 Truk 5 sumbu (Tandem) 0
SEI RAKYAT - SEI BEROMBANG
(DAK)
6.00
5.00
4.00
3.00
2.00
1.00
0.00
0+200 L
0+400 L
1+000 L
1+600 L
1+800 L
2+200 L
0+000 L
0+600 L
0+800 L
1+200 L
1+400 L
2+000 L
0+100 R
0+300 R
0+700 R
0+900 R
1+100 R
1+500 R
1+700 R
2+100 R
0+500 R
1+300 R
1+900 R
KM
1+300 R
1+400 L
(DAK)
KM
1+500 R
1+600 L
1+700 R
1+900 R
2+000 L
2+100 R
2+200 L
2+300 R
2+400 L
2+500 R
KONTRAKTOR
2+600 L
2+700 R
2+800 L
2+900 R
DCP TEST
PERENCANAAN TEKNIK JALAN
CBR From DCP Test
DCP TEST : Pengujian Kapasitas Daya Dukung CBR
Ruas Jalan : Sei Rakyat - Sei Berombang
Station :
Analis : STA : 0+000 STA : 0+100
ELEVASI : L ELEVASI : R
Nomor Angka DCP Selisih Nomor Angka DCP Selisih
CBR (%) h*cbr^1/3 CBR (%) h*cbr^1/3
Pukulan Penetrasi Pukulan Penetrasi
cm mm mm cm mm mm
1 2 3 4 5 6 1 2 3 4 5 6
0 100 1000 0 100 1000
1 99 990 10 31.7 3.16 1 99 990 10 31.7 3.16
2 95 950 40 5.1 6.90 2 96 960 30 7.5 5.87
3 91.5 915 35 6.1 6.40 3 93 930 30 7.5 5.87
4 87.5 875 40 5.1 6.90 4 90 900 30 7.5 5.87
5 82 820 55 3.4 8.25 5 88 880 20 12.7 4.67
6 77 770 50 3.8 7.82 6 84.5 845 35 6.1 6.40
7 72 720 50 3.8 7.82 7 80 800 45 4.4 7.37
8 67 670 50 3.8 7.82 8 77 770 30 7.5 5.87
9 61 610 60 3.0 8.66 9 73.5 735 35 6.1 6.40
10 56 560 50 3.8 7.82 10 70 700 35 6.1 6.40
11 51 510 50 3.8 7.82 11 66.5 665 35 6.1 6.40
12 47 470 40 5.1 6.90 12 63.7 637 28 8.2 5.64
13 44 440 30 7.5 5.87 13 61 610 27 8.6 5.53
14 41 410 30 7.5 5.87 14 58 580 30 7.5 5.87
15 39 390 20 12.7 4.67 15 55 550 30 7.5 5.87
16 37 370 20 12.7 4.67 16 52.5 525 25 9.5 5.30
17 34.6 346 24 10.0 5.18 17 49 490 35 6.1 6.40
18 33 330 16 17.1 4.12 18 46 460 30 7.5 5.87
19 31 310 20 12.7 4.67 19 42.7 427 33 6.6 6.19
20 29.4 294 16 17.1 4.12 20 38.5 385 42 4.8 7.09
21 27.7 277 17 15.8 4.26 21 34.5 345 40 5.1 6.90
22 26 260 17 15.8 4.26 22 30 300 45 4.4 7.37
23 24 240 20 12.7 4.67 23 26 260 40 5.1 6.90
24 20.4 204 36 5.9 6.50 24 21 210 50 3.8 7.82
25 19.7 197 7 50.6 2.59 25 17 170 40 5.1 6.90
26 18 180 17 15.8 4.26 26 13 130 40 5.1 6.90
27 16.5 165 15 18.6 3.97 27 10 100 30 7.5 5.87
28 15 150 15 18.6 3.97 28 7 70 30 7.5 5.87
29 14 140 10 31.7 3.16 29 5 50 20 12.7 4.67
30 12.5 125 15 18.6 3.97 30 4 40 10 31.7 3.16
31 11 110 15 18.6 3.97 31 2 20 20 12.7 4.67
32 10 100 10 31.7 3.16 32 0 0 20 12.7 4.67
33 9 90 10 31.7 3.16
34 7.5 75 15 18.6 3.97
35 6 60 15 18.6 3.97
36 4 40 20 12.7 4.67
37 2.5 25 15 18.6 3.97
38 0 0 25 9.5 5.30
Konstruksi Existing Type Tebal (cm) Kondisi Konstruksi Existing Type Tebal (cm) Kondisi
Lapisan Permukaan Lapisan Permukaan
Lapisan Pondasi Atas Lapisan Pondasi Atas
Lapisan Pondasi Bawah Lapisan Pondasi Bawah
PARAMETER DESAIN :
a. Data lalu lintas tahun : 2017
- Sedan, jeep, st. wagon 11 kendaraan
- Pick-up, combi 2 kendaraan
- Truck 2 as (L), micro truck, mobil hantaran 10 kendaraan
- Bus kecil 10 kendaraan
- Bus besar 0 kendaraan
- Truck 2 as (H) 29 kendaraan
- Truck 3 as 0 kendaraan
- Trailer 4 as, truck gandengan 6 kendaraan
- Truck S. Trailer 0 kendaraan
b. Jalan dibuka tahun : 2018
c. Pertumbuhan lalu lintas (i) : 4.40 %
d. Jalur & Koefisien distribusi kendaraan (C) :
- Jumlah jalur 1
- Koefisien distribusi (C), kendaraan ringan 0.50
- Koefisien distribusi (C), kendaraan berat 0.50
e. Umur rencana (UR) 10 tahun
10
f. Faktor Regional (FR) :
- Kelandaian < 6%
- % kendaraan berat > 30 %
- Iklim / curah hujan > 900 mm/th
g. Bahan konstruksi & Koefisien kekuatan relatif :
- Asphalt Wearing Course (AC-WC) : A1 = 0.32
- Asphalt Binder Course (AC-BC) : A2 = 0.32
- Asphalt Base Course (AC-Base) : A2 = 0.32
- Lapis Pondasi Agregat Kelas A : A3 = 0.14
- Lapis Pondasi Agregat Kelas B : A4 0.13
- CBR 6.00
- Daya Dukung Tanah dasar (DDT) 5.05 DDT=4,3 LOG(CBR)+1,7
- Indek Permukaan pada akhir umur rencana (IP) 2.0
- Indek Permukaan pada awal umur rencana (IPo) 3.5 - 3.9
- Faktor Regional (FR) 2.00
Jenis konstruksi Tebal (d) Koef. kekuatan relatif (a) Kondisi (k)
Laston cm 0.32 %
Batu pecah (base) 10.0 cm 0.14 60 %
Sirtu/pitrun (kelas C) 30.0 cm 0.11 80 %
cm %
1 Sepeda Motor
2 Sedan, jeep dan station wagon 1.1 2,3,4 21 21 23 18 24 11 0.0006 0.50 0.80 0.003 0.044 0.00 0.00
3 Opelet, pick-up opelet, suburban, combi dan mini 1.1 2,3,4 4 4 4 3 4 2 0.1083 0.50 0.80 0.078 0.044 0.08 0.09
4 Pick-up, micro truk dan mobil hantaran 1.1 2,3,4 20 20 22 18 24 10 0.3360 0.50 0.80 1.390 0.044 1.45 1.52
5 Bus Kecil 1.1 5a 3 9 3 3 3 1 0.2136 0.50 0.80 0.125 0.044 0.13 0.14
7 Truk Ringan 2 Sumbu 1.1 6a 11 34 12 10 13 8 0.3360 0.50 0.80 1.087 0.044 1.13 1.18
8 Truk Sedang 2 Sumbu 1.2 6b 40 219 43 35 47 29 3.1379 0.50 0.80 36.207 0.044 37.80 39.46
10 Truck Gandengan 1.2.2-2.2 7b 6 33 7 5 7 6 4.0705 0.50 0.80 10.107 0.044 10.55 11.02
HV 57 43
% HV 54.81 63.96
N 12.23
CESAL - 238,417
Keterangan: Vihcle Damage Factor (VDF) berdasar referensi Bina Marga, HUBDAR 2008, WIM survey Cipularang 2002.
Survey dilakukan pada bulan ke- 3 4 Cv = 11.630 Faktor 3 hari( Senin, Selasa, Rabu), N=7x24 jam, Tabel 9
P= 0.918