B PEKERJAAN BETON
1 Sloof type B1 uk. 150 x 300
- Beton m3
- Besi beton Ø 8 kg
- Besi beton D13 kg
- Bekisting m2
- Stek angkur D10 - 300 ttk
2 Plat Lantai t = 10 cm
- Beton m3
- Wiremesh M8 - 1 lapis m2
- Bekisting m2
- Lantai Kerja t = 5 cm m2
- Stek angkur D10 - 300 ttk
6 Plat Dak t = 10 cm
- Beton m3
- Wiremesh M8 - 2 lapis m2
- Bekisting m2
E PEKERJAAN PLAFOND
1 Perapihan sisi bawah dak m2
F PEKERJAAN PENGECATAN
1 Pengecatan Dinding Exterior m2
2 Pengecatan Dinding Interior m2
3 Pengecatan Plafond m2
H PEKERJAAN TALANG
1 Roof Drain Ø 6" bh
2 Down Pipa Ø 6" m1
I PEKERJAAN ELEKTRIKAL
1 Instalasi Penerangan ttk
2 Instalasi Saklar tunggal ttk
3 Instalasi Saklar Ganda ttk
3 Instalasi Stopkontak ttk
4 MCB 10A pcs
5 Panel box MCB unit
6 Pengadaan dan pemasangan armature :
- Titik Lampu ttk
- Saklar tunggal ttk
- Saklar ganda ttk
- Stopkontak ttk
7 Grounding
- Arde/Grounding Max. 2 ohm Ground rood 5/8" & kabel BC 70 mm ttk
- Bak kontrol 40x40x40 cm unit
TOTAL - I
B PEKERJAAN BETON
1 Pit Kabel
- Beton m3
- Besi beton Ø 8 kg
- Bekisting m2
- Lantai Kerja t = 5 cm m2
C PEKERJAAN TUTUP
1 Tutup Pit Kabel
- UNP 100x50x5 kg
- Dudukan tutup L 40x40x4 kg
- Rangka tutup L 40x40x4 kg
- Plat Bordes 3 mm kg
- Zinchromate + cat finish kg
TOTAL - II
C PEKERJAAN TUTUP
1 Tutup Pit Kabel cor beton
- Wiremesh M10 - 2 lapis m2
- Floordeck T. 0.75 mm m2
- Beton K350 T.20 cm m3
- Finish hairline permukaan jalan m2
TOTAL - III
B PEKERJAAN BETON
1 Pit Kabel
- Beton m3
- Besi beton Ø 8 kg
- Bekisting m2
- Lantai Kerja t = 5 cm m2
C PEKERJAAN TUTUP
1 Tutup Pit Kabel (Ruang Panel & Ruang Trafo)
- UNP 100x50x5 kg
- Dudukan tutup L 40x40x4 kg
- Rangka tutup L 40x40x4 kg
- Plat Bordes 3 mm kg
- Zinchromate + cat finish kg
TOTAL - IV
TOTAL - V
TOTAL - VI
HARGA SATUAN JUMLAH HARGA
VOL
Rp. Rp.
1.93 -
0.54 -
70.62 -
84.03 -
7.12 -
64.00 -
1.28 -
12.83 -
3.66 -
12.83 -
86.00 -
0.54 -
25.06 -
61.57 -
10.88 -
16.00 -
0.17 -
22.12 -
26.00 -
3.08 -
0.48 -
76.56 -
99.01 -
9.72 -
2.91 -
29.12 -
29.12 -
0.55 -
21.63 -
37.57 -
17.05 -
32.36 -
50.04 -
0.45 -
100.08 -
100.08 -
1.93 -
41.08 -
77.37 -
50.04 -
41.08 -
1.00 -
5.00 -
1.00 -
2.00 -
13.20 -
4.00 -
1.00 -
2.00 -
1.00 -
1.00 -
1.00 -
4.00 -
1.00 -
2.00 -
1.00 -
1.00 -
1.00 -
6.89 -
4.89 -
4.89 -
0.69 -
2.77 -
129.02 -
41.55 -
6.89 -
28.20 -
43.19 -
85.80 -
136.05 -
293.24 -
7.08 -
6.91 -
6.91 -
0.69 -
2.56 -
119.37 -
37.37 -
6.91 -
6.91 -
6.91 -
1.38 -
6.91 -
6.98 -
6.98 -
6.98 -
0.70 -
2.69 -
125.41 -
39.84 -
6.98 -
28.20 -
47.47 -
80.08 -
126.98 -
282.73 -
25.40 -
1.27 -
3.81 -
25.40 -
25.40 -
25.40 -
11.66 -
1.28 -
103.04 -
8.52 -
58.32 -
116.64 -
116.64 -
27.60 -
2.00 BY OTHER -
1.00 BY OTHER -
0.36 -
14.78 -
5.25 -
5.25 -
10.00 -
2.00 -
1.00 -
2.00 -
1.00 -
1.00 -
10.00 -
2.00 -
1.00 -
2.00 -
116.64 -
36.00 -
JUMLAH HARGA
NO REKAPITULASI
Rp.
TOTAL -
PEMBULATAN -
PPH 11 % -
Ppn 4 % -
Grand Total -