NO. Item Description MERK Qty UOM UPAH MATERIAL TOTAL UPAH TOTAL MATERIAL
PEKERJAAN PERBAIKAN JEMBATAN #2 ROW 38 DIANTARA A2,B,E & F
I PEKERJAAN PERSIAPAN
1Gudang material di lokasi proyek 1.00 ls
2Air kerja dan listrik kerja 1.00 ls
3Pengukuran, bouwplank dan uitzet 1.00 ls
4Keamanan 1.00 ls
5Pembersihan akhir 1.00 ls
Rp - Rp -
II. PEKERJAAN AMBUTMENT & PLAT JEMBATAN
1.Bobok kepala tiang pancang 26.00 bh
2.Pekerjaan ambutment 98 cm x 140 cm (Kiri & Kanan)
Bekisting multiplek 9 mm Multiplek 9 mm + kaso 70.99 m2
Besi D16 Master steel / setara 1,567.76 kg
Besi D13 Master steel / setara 2,228.64 kg
Beton K-350 Adhimix K-350 31.02 m3
Lantai kerja t=5 cm Sitemix K-B0 1.89 m3
Pasir urug t=10 cm Pasir Urug 3.78 m3
3.Balok beton jembatan 0.30x0.6 (B1) p=6.4 m
Bekisting multiplek 12 mm Multiplek 12 mm + kaso 23.76 m2
Besi D19 Master steel / setara 770.26 kg
Besi D13 Master steel / setara 57.66 kg
Besi Ø 10 Master steel / setara 265.36 kg
Beton K-350 Adhimix K-350 2.30 m3
Beton deking t=5 cm 80.00 bh
Rubber bearing uk 50x30x5 cm 8.00 bh
4.Balok beton tumpuan jembatan 0.30x0.6 (B1) p=13.5 m
Multiplek 12 mm +
Bekisting multiplek 12 mm 8.46 m2
kaso+bambu/steger
Besi D19 Master steel / setara 762.86 kg
Besi D13 Master steel / setara 58.97 kg
Besi Ø 10 Master steel / setara 279.87 kg
Beton K-350 Adhimix K-350 2.43 m3
Beton deking t=5 cm 80.00 bh
Rubber bearing uk 50x30x5 cm 20.00 bh
5.Plat beton jembatan 0.3x6.4x13.5
Multiplek 12 mm +
Bekisting multiplek 12 mm 122.38 m2
kaso+bambu/steger
Perancah scaffolding 101.76 m2
Besi D19 Master steel / setara 2,937.18 kg
Besi D16 Master steel / setara 1,560.79 kg
Besi sayap Ø 10 Master steel / setara 110.57 kg
Beton K-350 Adhimix K-350 25.92 m3
Beton sayap K-350 Adhimix K-350 3.46 m3
Beton deking t=5 cm 300.000 bh
Styrofoam 1.00 ls
Sealant + curring jembatan beton Non Wouven 1.00 ls
Pasang kansteen tepi jembatan Kansteen BY OWNER 12.80 m'
Rp - Rp -
Sub Total Rp - Rp -
Rp -
Dibulatkan Rp -
Ppn 10% Rp -
Total Price Rp -
CATATAN BETON MENGIKUTI HARGA MOU ANTARA MARUNDA CENTER DENGAN ADHIMIX (TERLAMPIR HARGA DI EMAIL)
1. HARGA BETON B0-1 FA SLUMP 12 +/- 2/2 HARGA RP 525.000
2. HARGA BETON K350 FA SLUMP 12 +/- 2/2 HARGA RP 670.000
PEKERJAAN BONGKAR JEMBATAN #2 ROW 38 DIANTARA A2,B,E & F
NO. Item Description MERK Qty UOM Unit Price Extended Price
PEKERJAAN BONGKAR JEMBATAN #2 ROW 38 DIANTARA A2,B,E & F
I PEKERJAAN PEMANCANGAN
1Mob Demob & transportasi 1.00 ls Rp -
2Pembersihan Akhir 1.00 ls Rp -
Rp -
Sub Total Rp -
Ppn 10% Rp -
Total Price Rp -
PEKERJAAN PEMANCANGAN JEMBATAN #2 ROW 38 DIANTARA A2,B,E & F
NO. Item Description MERK Qty UOM Unit Price Extended Price
PEKERJAAN PEMANCANGAN JEMBATAN #2 ROW 38 DIANTARA A2,B,E & F
I PEKERJAAN PEMANCANGAN
1Mob Demob & transportasi 1.00 ls Rp -
2Pemancangan tiang pancang 25x25 kedalaman 27 m' 702.00 ls Rp -
Rp -
Sub Total Rp -
Ppn 10% Rp -
Total Price Rp -