A PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi m2
2 Pengukuran dan Pemasangan bouwplank m1
JUMLAH A
B PEKERJAAN STRUKTUR
I PEKERJAAN PONDASI
1 Poer Pelat Tipe PC-1 1 1 0.3
- Galian tanah pondasi m3
- Urugan tanah kembali m3
- Urugan pasir bawah pondasi, t = 10 cm m3
- Lantai kerja, t = 5 cm m3
- Beton K-225 m3
- Besi kg
- Bekisting m2
2 Poer Pelat Tipe PC-2 0.8 0.8 0.3
- Galian tanah pondasi m3
- Urugan tanah kembali m3
- Urugan pasir bawah pondasi, t = 5 cm m3
- Lantai kerja, t = 5 cm m3
- Beton K-225 m3
- Besi kg
- Bekisting m2
3 Pondasi batu gunung m'
- Galian tanah pondasi m3
- Urugan tanah kembali m3
- Urugan pasir bawah pondasi, t = 5 cm m3
- Pasangan batu kosong, t = 15 cm m3
- Pasangan pondasi batu gunung 1 : 5 m3
#REF! Sloof 20x25 m'
- Beton 1 : 2 : 3 m3
- Besi kg
- Bekisting m2
#REF! Sloof 15x20 m'
- Beton 1 : 2 : 3 m3
- Besi kg
- Bekisting m2
II PEKERJAAN STRUKTUR
1 Kolom KL-1 ( 20x40 )
- Beton 1 : 2 : 3 m3
- Besi kg
- Bekisting m2
2 Kolom KL-2 (40x40 )
- Beton 1 : 2 : 3 m3
- Besi kg
- Bekisting m2
3 Balok BL-1 ( 20x25 ) elv. +3.50
- Beton 1 : 2 : 3 m3
- Besi kg
- Bekisting m2
4 Balok BL-1 ( 20x25 ) elv. +6.30
- Beton 1 : 2 : 3 m3
- Besi kg
- Bekisting m2
5 Ring Balk RB ( 15x20)
- Beton 1 : 2 : 3 m3
- Besi kg
- Bekisting m2
C PEKERJAAN ARSITEKTUR
I PEKERJAAN LANTAI
1 Urugan tanah peninggian lantai m3
2 Urugan pasir bawah lantai, t = 5 cm m3
3 Cor Lantai
- Beton 1 : 2 : 3 m3
- Besi kg
4 Lantai cor Teras m3
5 Keramik lantai 40x40 m2
6 Keramik lantai 20x20 Km/Wc m2
II PEKERJAAN DINDING
1 Dinding pasangan bata 1 : 4 m2
2 Plesteran aci dinding 1 : 4 m2
3 Cat dinding luar m2
4 Cat dinding dalam m2
5 Keramik dinding 20x25 m2
6 Dinding arsitek semen plester motif tali air m2
7 Dinding batu alam candi sisir m2
8 Kanopi dinding atas jendela finish cat m'
9 Profilan kolom m'
V PEKERJAAN SANITAIR
1 Klosed jongkok setara Toto bh
2 Bak mandi bh
3 Floor drain bh
4 Kran air bh
JUMLAH E
JUMLAH TOTAL
N BIAYA
UMAH SAKIT MOJOKERTO
RUMAH SAKIT MOJOKERTO
SAKIT
JUMLAH A 8,600,000.00
26.00
37.44 31,600.00 1,183,104.00
22.98 15,000.00 344,760.00
3.74 230,000.00 861,120.00
1.87 890,000.00 1,666,080.00
7.80 890,000.00 6,942,000.00
745.06 13,909.00 10,362,983.90
31.20 90,000.00 2,808,000.00
4.00
4.00 31,600.00 126,400.00
2.46 15,000.00 36,960.00
0.40 230,000.00 92,000.00
0.20 890,000.00 178,000.00
0.77 890,000.00 683,520.00
79.60 13,909.00 1,107,156.40
3.84 90,000.00 345,600.00
###
121.50 31,600.00 3,839,400.00
40.50 15,000.00 607,500.00
6.08 230,000.00 1,397,250.00
18.23 904,434.00 16,483,309.65
53.46 1,250,000.00 66,825,000.00
98.00
4.90 1,043,635.00 5,113,811.50
908.95 13,909.00 12,642,557.73
49.00 95,900.00 4,699,100.00
23.50
0.71 1,043,635.00 735,762.68
151.56 13,909.00 2,108,075.86
9.40 95,900.00 901,460.00
26.00
15.18 1,043,635.00 15,846,553.84
### 13,909.00 41,524,081.60
227.76 95,900.00 21,842,184.00
4.00
2.88 1,043,635.00 3,005,668.80
329.77 13,909.00 4,586,743.11
28.80 95,900.00 2,761,920.00
84.00
4.20 1,043,635.00 4,383,267.00
779.24 13,909.00 10,838,449.16
58.80 95,900.00 5,638,920.00
84.00
4.20 1,043,635.00 4,383,267.00
779.24 13,909.00 10,838,449.16
58.80 95,900.00 5,638,920.00
72.00
2.16 1,043,635.00 2,254,251.60
434.02 13,909.00 6,036,728.54
39.60 95,900.00 3,797,640.00
###
300.00 123,000.00 36,900,000.00
16.15 230,000.00 3,714,500.00
32.30 1,043,635.00 33,709,410.50
776.18 13,909.00 10,795,818.08
0.90 1,043,635.00 939,271.50
200.00 154,000.00 30,800,000.00
16.00 107,000.00 1,712,000.00
JUMLAH E 24,641,344.40
808,218,843.68