Anda di halaman 1dari 22

PROJECT : RENOVASI RUMAH

PEKERJAAN : TAMBAH LANTAI & KOLAM RENANG


OWNER : IBU RIVIA
LOKASI : CIPADU TANGERANG

NO ITEM TOTAL PRICE

I PERSIAPAN Rp 29,500,000.00
II BONGKARAN Rp 15,269,000.00
III PEKERJAAN GALIAN TANAH Rp 589,162.50
IV PEKERJAAN BARU LANTAI 1
A PEKERJAAN STRUKTUR & LANTAI Rp 49,759,450.00
B PEKERJAAN TANGGA Rp 32,518,600.00
C PEKERJAAN ME Rp 21,510,000.00
D PEKERJAAN SANITARY Rp 2,255,000.00
E PEKERJAAN TAMBAH DINDING Rp 29,178,900.00
F PEKERJAAN DINDING & PLAFOND Rp 47,150,900.00
G PEKERJAAN PINTU DAN JENDELA Rp 48,602,250.00

V PEKERJAAN BARU LANTAI 2


A STRUKTUR Rp 115,106,400.00

VI PEKERJAAN DINDING LANTAI 2


A PEKERJAAN DINDING Rp 86,501,800.00
B FINISHING DINDING KOLAM RENANG Rp 19,569,600.00

VII PEKERJAAN PLAFOND LANTAI 2 Rp 19,471,200.00


VIII PEKERJAAN FAÇADE Rp 24,700,000.00
IX PEKERJAAN KOLAM RENANG
A PEKERJAAN PERSIAPAN Rp 593,400.00
B PEKERJAAN STRUKTUR Rp 120,881,416.00
C PEKERJAAN LAPISAN KOLAM RENANG Rp 8,820,000.00
D FINISHING & ME Rp 39,720,000.00
E TANGGA & MESIN Rp 56,300,000.00
F PEKERJAAN BAK KONTROL Rp 11,032,400.00

X PEKERJAAN PINTU, & JENDELA LANTAI 2 Rp 21,016,300.00


XI PEKERJAAN ATAP LANTAI 2 Rp 44,870,842.00
XII PEKERJAAN LAPIS LANTAI & KERAMIK LANTAI 2 Rp 38,020,650.00
XIII ME LANTAI 2 Rp 22,275,000.00
XIV PEKERJAAN SANITAIR LANTAI 2 Rp 20,590,000.00
XV PEKERJAAN PENGECATAN LANTAI 2 Rp 15,419,700.00
XVI LAIN - LAIN Rp 20,000,000.00
XVII PEKERJAAN CANOPY BAJA Rp 15,347,600.00
TOTAL Rp 976,569,570.50
ROUNDING Rp 980,000,000.00
GRAND TOTAL DAN DISCOUNT Rp 921,200,000.00
Terbilang : "SEMBILAN RATUS DUA PULUH SATU JUTA DUA RATUS RIBU RUPIAH"

NOTE :
a. Term Of Payment
- Down Payment 30 %
- Progres payment on 2 week

Jakarta, 15 Februari 2018


PT. BINTORO BANGUN INDONESIA

Eddy Jajang
Marketing Manager
PROJECT : RENOVASI RUMAH
PEKERJAAN : TAMBAH LANTAI & KOLAM RENANG
OWNER : IBU RIVIA
LOKASI : CIPADU

NO PEKERJAAN DIMENSI & SPESIFIKASI VOLUME

1 2 3 4
I PERSIAPAN
Persiapan 6.00 ls
Biaya Penginapan Tukang 6.00 ls
Operasional dan Akomodasi 6.00 ls
Buangan Puing 1.00 ls
Pembuatan Pagar seng 1.00 ls
Sub Total
II BONGKARAN
Dinding Kamar Anak 6.90 m2
Dinding Wardrobe & Gudang 4.00 m2
Dinding Ruang Tengah 1.00 m2
Dinding Kamar Tengah 1.00 m2
Dinding Area Void 3.70 m2
Pintu Jendela Ruang Tengah 3.00 unit
Pintu Wardrobe & Gudang 2.00 unit
Pintu kamar mandi 1.00 unit
Pintu kamar Anak 1.00 unit
jendela kamar depan 2.00 unit
Jendela Wardrobe 1.00 unit
Keramik Kamar Mandi 2.52 m2
Taman 6.25 m2
Atap 74.81 m2
sopy sopy 38.40 m2
Dak void taman 30.00 m2
Teras 6.80 m2
Bongkaran Listrik 1.00 ls
Sub Total
III PEKERJAAN GALIAN TANAH
Galian Tanah Pondasi Footplate 90x90x150cm 7.29 m3
urugan tanah 1.82 m3
Galian Carport 0.67 m3
Sub Total
IV PEKERJAAN BARU LANTAI 1
LANTAI 1
A PEKERJAAN STRUKTUR & LANTAI
Pondasi Footplate PC2 90x90x22cm 1.43 m3
Pondasi Footplate PC3 90x90x22cm 0.36 m3
Kolom Struktur k-250 K2 15x35cm 0.58 m2
Kolom Struktur k-250 K3 15x30cm 3.71 m2
Kolom Praktis KP 15x15cm 1.71 m3
Screeding Lantai 6.25 m2
Keramik lantai 40x40cm 6.45 m2
Keramik Musolla Granite tile Garuda 60x60cm 5.00 m2
Keramik Kamar Mandi Serat Lurus 30x30cm 2.52 m2
Carport Baru k-175 Tanpa Tulangan t=18cm 3.20 m3
Sub Total
B PEKERJAAN TANGGA
Lantai Keramik Tangga 10.40 m2
Partisi Tangga Kisi kisi conwood 12.40 m2
Railling Tangga 304 full Railling Stainless 6.30 m1
Pondasi Tangga k-250 1.2x0.45x0.5m 0.27 m3
Plat Tangga k-250 t=15cm 1.08 m3
Anak Tangga k-250 t=20cm 1.39 m3
Balok Tangga LT2 k-250 20x40cm 0.32 m3
Sub Total
C PEKERJAAN ME
Stop Kontak Broco 9.00 titik
Saklar single Broco 4.00 titik
Saklar Ganda Broco 10.00 titik
Lampu Downlight Broco 41.00 titik
Stop Kontak AC Broco 1.00 Titik
Sub Total
D PEKERJAAN SANITARY
Instalasi Air Bersih rucika/setara 1.00 Titik
Instalasi Air Kotor rucika/setara 1.00 Titik
keran air Onda 4.00 unit
Floor Drain Onda 3.00 bh
Sub Total
E PEKERJAAN TAMBAH DINDING
Dinding hebel 7.5cm 57.78 m2
Plesteran Adukan Semen & Pasir 115.56 m2
Acian Mortar 115.56 m2
Cat vinilex/setara 115.56 m2
Sub Total
F PEKERJAAN DINDING & PLAFOND
Penebalan dinding Jendela ruang makan dalam tebal 20cm 0.184 m3
Penebalan dinding Jendela ruang makan luar tebal 5 cm 0.046 m3
Penebalan dinding Jendela Dapur Luar tebal 10 cm 0.092 m3
Pasangan Dinding Hebel 7.5cm 32.8 m2
Plesteran Dinding Adukan Semen & Pasir 65.6 m2
Acian Mortar 65.6 m2
Pengecatan vinilex/setara 65.6 m2
Plafond Gypsum Rangka hollow Gypsum board t=7 mm 122.54 m2
Pengecatan plafond vinilex/setara 122.54 m2
Partisi Musolla Kisi kisi conwood 9.15 m2
.
G PEKERJAAN PINTU DAN JENDELA
Pintu 150x230cm, Jendela 120x230cm P1 Kusen Almunium 3" Pollywood Jendela Kaca 5mm 2.00 set
Pintu 90x230cm P2 Kusen Almunium 3" 2.00 unit
Pintu Kamar Mandi 70x200cm P3 Pintu Pvc 1.00 unit
Jendela rg Makan 60x160cm J1 Kusen Almunium 3" 5mm 2.00 unit
Jendela 4 Daun 240x230cm Kamar depan J4 Kusen Almunium 3" 5mm 2.00 set
Jendela Dapur 60x130cm J5 Kusen Almunium 3" 5mm 1.00 unit
Sub Total
Pintu Kamar ART Plywood kusen almunium 3" 1.00 unit
Pintu Kamar Mandi pvc 1.00 unit
Pintu Masuk Utama 2 daun + jendela Pintu Kaca Kusen Almunium 3" 1.00 set
Jendela Kamar Depan 230x60cm 1.00 set
Jendela Dapur 130x60cm 1.00 unit
Jendela Ruang Makan 150x60cm 2.00 unit
Sub Total
V PEKERJAAN BARU LANTAI 2
A STRUKTUR
Kolom Struktur k-250 K1 30x30cm 0.86 m2
Kolom Struktur k-250 K2 15x35cm 0.34 m2
Kolom Struktur k-250 K3 15x30cm 1.58 m2
Kolom Praktis KP 15x15cm 0.72 m3
Balok Struktur k-250 B3 15x30cm 4.80 m3
Pelat Lantai Ø 10 mm - 15 cm K250 t=12m 12.27 m3
Ring Balok k-250 15x30cm 1.85 m3
Ring Balok k-250 15x25cm 1.55 m3
Sub Total
VI PEKERJAAN DINDING LANTAI 2
A PEKERJAAN DINDING
Pasangan Dinding Hebel 7.5cm 224.68 m2
Plesteran Dinding Adukan Semen & Pasir 449.36 m2
Acian Mortar 449.36 m2
Sub Total
B FINISHING DINDING KOLAM RENANG
Railing Kolam Renang 304 full Railling Stainless 7.50 m1
pasangan batu Alam Batu Alam Palimanan 18.81 m2
Pasangan Bata expose tempel Bata Tempel Homogen Bevel Putih 11.88 m2
Sub Total
VII PEKERJAAN PLAFOND LANTAI 2
1 Plafond Gypsum Rangka hollow Gypsum Board 92.72 m2
2 Pengecatan Plafond vinilex/setara 92.72 m2
Sub Total
VIII PEKERJAAN FAÇADE
Tampak Area Balkon dinding lapis conwood Conwood Wall Decorative Panel (600x1200mm) 5.92 m2
Topian Beton t=10cm 0.81 m3
Kisi kisi hollow motif kayu 4x8cm 22.20 m2
Pasangan Batu Alam Batu Alam Andesit Bintik Bakar 15.60 m2
Sub Total
IX PEKERJAAN KOLAM RENANG
A PEKERJAAN PERSIAPAN
Galian Tanah pondasi 150x150x150cm 12.96 m3
urugan tanah 3.24 m3
galian sloof 20x40cm 1.68 m3
Sub Total
B PEKERJAAN STRUKTUR
Pondasi Footplate k-250 PC4 150x150x32cm 1.44 m3
Pondasi Footplate k-250 PC5 150x150x32cm 2.16 m3
Pondasi Footplate k-250 PC6 150x150x32cm 0.72 m3
Kolom Struktur k-300 K1 30x30cm 3.02 m3
Sloof k-300 SL1 20x40cm 0.62 m3
Balok Struktur k-300 B1 30x50cm 3.78 m3
Balok Struktur k-300 B2 25x40cm 0.66 m3
Balok Struktur k-300 B3 15x30cm 0.58 m3
Balok Praktis k-300 Bp 18x18cm 0.56 m3
Plat Lantai Untuk Ruang Mesin k-300 t=18cm 0.86 m3
Plat Beton k-300 t=18cm 7.48 m3
bekisting kolam renang plywood 12mm 36.00 m2
Sub Total

C PEKERJAAN LAPISAN KOLAM RENANG


waterproof 36.00 m2
Screed + pasir 36.00 m2
Sub Total
D FINISHING & ME
Keramik Mozaik 36.00 m2
Instalasi Electrical Standart 1.00 ls
Lampu kolam Astral 4.00 titik
Sub Total
E TANGGA & MESIN
Tangga Kolam Renang 304 Full Stainless 1.00 bh
Mesin Filter + Instalasi Hayward 3/4 HP 1.00 Unit
Mesin Pompa + Instalasi Hayward 3/4 HP 1.00 Unit
Chlorine defire 1.00 unit
Guter 22.00 m2
Instalasi Plumbing Pipa Wave 36.00 m1
Instalasi Jet Nozzles Hayward 4.00 unit
Instalasi Floordrain Hayward 1.5" 1.00 unit
Saluran + Instalasi Pembuangan Air Skimmer Hayward 2.00 unit
Sub Total
F PEKERJAAN BAK KONTROL
Beton Bak Kontrol t=18 180x100x100cm 1.33 m3
Penutup Bak Kontrol 1.80 m2
waterproof 7.40 m2
Sub Total
X PEKERJAAN PINTU, & JENDELA LANTAI 2
Pintu Geser 90x230cm+jendela 60x230cm P4 Kusen Almunium 3" daun kaca Jendela Kaca 5mm 2.00 set
Pintu Geser 90x230cm P5 Kusen Almunium 3" daun Kaca 5mm 1.00 unit
Pintu Geser 60x230cm+jendela 60x230cm P6 Kusen Almunium 3" daun Kaca 5mm 1.00 unit
Jendela mati 120x230cm J2 Kusen Almunium 3" daun Kaca 5mm 1.00 set
Jendela mati 120x230cm J3 Kusen Almunium 3" daun Kaca 5mm 1.00 set
Bouvenlight kamar ART 20x40cm BV1 Kusen Almunium 3" Kaca 5mm 1.00 unit
Bouvlight Kamar Anak BV2 Kusen Almunium 3" kaca 5mm 3.00 bh
Bouvenlight kamar Mandi 20x40cm BV1 Kusen Almunium 3" Kaca 5mm 1.00 unit

Sub Total
XI PEKERJAAN ATAP LANTAI 2
Rangka Baja Ringan C 75 tebal 0.75 mm 22.19 m2
Penutup Atap Genteng 22.19 m2
Nok genteng 24.60 m1
Lisplank GRC 43.40 m1
Dak Beton t=10cm 0.83 m3
Talang Beton t=10cm 3.17 m3
Sky Light Tangga Kaca Temperred 8mm 4.85 m2
Rangka Skyligth Tangga Rangka Hollow 4.85 m2
Skylight Kamar Mandi Kaca Temperred 8mm 1.16 m2
Rangka Skylight Kamar Mandi Rangka Hollow 1.16 m2

Sub Total
XII PEKERJAAN LAPIS LANTAI & KERAMIK LANTAI 2
Granite tile Garuda 60x60cm 32.18 m2
Lantai Kamar Roman Granit dBalsa Rosato GT612204R 15x60cm 11.70 m2
Pasangan Keramik Balkon Keramik 40x40 8.84 m2
screeding Lantai 60.47 m2
Keramik Deck Kolam Renang Motif Kayu Roman Granit dBalsa Rosato GT612204R 15x60cm 21.41 m2
Steping stone 1.75 m2
rumput sintetis 2.50 m2
Keramil Lantai Kamar Mandi Granite tile Garuda 60x60cm 6.60 m2
Keramik dinding kamar mandi Granite tile Garuda 60x60cm 9.60 m2
Sub Total
XIII ME LANTAI 2
Instalasi listrik Kabel Suprime/setara 1.00 titik
Stop Kontak Broco 6.00 titik
Saklar single Broco 6.00 titik
Saklar Ganda Broco 4.00 titik
Lampu Downlight Broco 32.00 titik
Stop Kontak AC Broco 3.00 titik
Instalasi TV Broco 1.00 titik
Instalasi Lampu Tempel Lampu Tempel LED 2 arah Outdoor 3.00 titik
Sub Total
XIV PEKERJAAN SANITAIR LANTAI 2
Instalasi Air Bersih rucika/setara 3.00 titik
Instalasi Air Kotor rucika/setara 2.00 titik
Instalasi Air Bekas & Hujan Kolam rucika/setara 2.00 titik
Instalasi Hujan, Dak rucika/setara 1.00 titik
Box Shower Full Kaca Temperred tinggi 2m 1.00 unit
closet duduk TOTO CW 660 PJ / SW 660 J/setara 1.00 bh
headshower Flusso 226 set kran shower Tiang silver/setara 1.00 bh
jet washer Washer/ setara 1.00 bh
kran air Onda 1.00 bh
Roofdrain Onda 16.00 bh
floordrain Onda 1.00 bh
wastafel TOTO LW 899CJ/setara 1.00 bh
Pool Shower Washer/ setara 1.00 bh
Sub Total
XV PEKERJAAN PENGECATAN LANTAI 2
1 Cat dinding Interior vinilex/setara 239.37 m2
2 Cat dinding eksterior vinilex/setara 103.29 m2
Sub Total
XVI LAIN - LAIN
torent 3000 liter 1.00 unit
Mesin Pompa 1.00 unit
Sumur Dalam asumsi 20 meter + Pompa + Pipa 20.00 m1

XVII PEKERJAAN CANOPY BAJA


Pekerjaan Canopy Carport 1 penutup polycarbonate rangka hollow 13.69 m2
Pekerjaan Canopy Carport 2 penutup polycarbonate rangka hollow 11.47 m2
Sub Total
TOTAL
Riview By,

PROJECT : RENOVASI RUMAH


PEKERJAAN : TAMBAH LANTAI & KOLAM RENANG
OWNER : IBU RIVIA
LOKASI : CIPADU

NO PEKERJAAN DIMENSI & SPESIFIKASI VOLUME

1 2 3 4 ###
I PERSIAPAN
Persiapan 6.00 ###
ls
Biaya Penginapan Tukang 6.00 ###
ls
Operasional dan Akomodasi 6.00 ###
ls
Buangan Puing 1.00 ###
ls
Pembuatan Pagar seng 1.00 ###
ls
Sub Total ###
II BONGKARAN
Dinding Kamar Anak 6.90 ###
m2
Dinding Wardrobe & Gudang 4.00 ###
m2
Dinding Ruang Tengah 1.00 ###
m2
Dinding Kamar Tengah 1.00 ###
m2
Dinding Area Void 3.70 ###
m2
Pintu Jendela Ruang Tengah 3.00 ###
unit
Pintu Wardrobe & Gudang 2.00 ###
unit
Pintu kamar mandi 1.00 ###
unit
Pintu kamar Anak 1.00 ###
unit
jendela kamar depan 2.00 ###
unit
Jendela Wardrobe 1.00 ###
unit
Keramik Kamar Mandi 2.52 ###
m2
Taman 6.25 ###
m2
Atap 74.81 ###
m2
sopy sopy 38.40 ###
m2
Dak void taman 30.00 ###
m2
Teras 6.80 ###
m2
Bongkaran Listrik 1.00 ###
ls
Sub Total ###
III PEKERJAAN GALIAN TANAH
Galian Tanah Pondasi Footplate 90x90x150cm 7.29 m3###
urugan tanah 1.82 m3###
Galian Carport 0.67 m3###
Sub Total ###
IV PEKERJAAN BARU LANTAI 1
LANTAI 1
A PEKERJAAN STRUKTUR & LANTAI
Pondasi Footplate PC1 90x90x22cm 1.25 m3###
Kayu kelas III 0.32 m3
Paku 5 cm – 12 cm 3.20 kg
Minyak bekisting 1.60 Liter
Besi ulir 12 mm 9.00 Batang
Kawat beton 2.25 kg
Portland cement 336.00 kg
Pasir beton 0.54
Kerikil 0.81 m3
Kayu kelas II balok 0.12 m3
Plywood 9 mm 2.80 lembar
Dolken kayu galam,(8-10) cm, panjang 4 m 32.00 batang

Pondasi Footplate PC2 90x90x22cm 1.43 m3###


Kayu kelas III 0.32 m3
Paku 5 cm – 12 cm 3.20 kg
Minyak bekisting 1.60 Liter
Besi ulir 12 mm 10.00 Batang
Kawat beton 2.25 kg
Portland cement 336.00 kg
Pasir beton 0.54
Kerikil 0.81 m3
Kayu kelas II balok 0.12 m3
Plywood 9 mm 2.80 lembar
Dolken kayu galam,(8-10) cm, panjang 4 m 32.00 batang

Pondasi Footplate PC3 90x90x22cm 0.36 m3###


Kayu kelas III 0.32 m3
Paku 5 cm – 12 cm 3.20 kg
Minyak bekisting 1.60 Liter
Besi ulir 12 mm 3.00 Batang
Kawat beton 2.25 kg
Portland cement 336.00 kg
Pasir beton 0.54
Kerikil 0.81 m3
Kayu kelas II balok 0.12 m3
Plywood 9 mm 2.80 lembar
Dolken kayu galam,(8-10) cm, panjang 4 m 32.00 batang

Kolom Struktur k-250 K2 15x35cm 0.58 m2###


Kayu kelas III 0.40 m3
Paku 5 cm – 12 cm 4.00 kg
Minyak bekisting 2.00 Liter
Besi ulir 12 mm 10.00 batang
Besi ulir 10 mm 3.00 batang
Kawat beton 4.50 kg
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.15 m3
Plywood 9 mm 3.50 lembar
Dolken kayu galam,(8-10) cm, panjang 4 m 20.00 batang

Kolom Struktur k-250 K3 15x30cm 3.71 m2###


Kayu kelas III 0.40 m3
Paku 5 cm – 12 cm 4.00 kg
Minyak bekisting 2.00 Liter
Besi ulir 12 mm 55.00 batang
Besi ulir 10 mm 41.00 batang
Kawat beton 4.50 kg
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.15 m3
Plywood 9 mm 3.50 lembar
Dolken kayu galam,(8-10) cm, panjang 4 m 20.00 batang

Kolom Praktis KP 15x15cm 1.71 m3###


Kayu kelas III 0.40 m3
Paku 5 cm – 12 cm 4.00 kg
Minyak bekisting 2.00 Liter
Besi polos 10 mm 26.00 batang
Besi polos 8 mm 25.00 batang
Kawat beton 4.50 kg
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.15 m3
Plywood 9 mm 3.50 lembar
Dolken kayu galam,(8-10) cm, panjang 4 m 20.00 batang

Screeding Lantai 6.25 m2###


Portland Cement 7.78 kg
Pasir pasang 0.02 m3

Keramik lantai 40x40cm 6.45 m2###


keramik 40x40 6.25 Buah
Portland Cement 10.00 kg
Pasir Pasang 0.05 m3
Semen Warna 1.50 kg

Keramik Musolla Granite tile Garuda 60x60cm 5.00 m2###


Granite tile 60x60 2.78 Buah
Portland Cement 10.00 kg
Pasir Pasang 0.05 m3
Semen Warna 1.50 kg

Keramik Kamar Mandi Serat Lurus 30x30cm 2.52 m2###


keramik 30x30 11.11 Buah
Portland Cement 10.00 kg
Pasir Pasang 0.05 m3
Semen Warna 1.50 kg

Carport Baru k-175 Tanpa Tulangan t=18cm 3.20 m3


Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3

Sub Total ###


B PEKERJAAN TANGGA
Lantai Keramik Tangga 10.40 m2###
keramik 40x40 6.25 Buah
Portland Cement 10.00 kg
Pasir Pasang 0.05 m3
Semen Warna 1.50 kg

Partisi Tangga Kisi kisi conwood 12.40 m2###


Railling Tangga 304 full Railling Stainless 6.30 m1###
Pondasi Tangga k-250 1.2x0.45x0.5m 0.27 m3###
Kayu kelas III 0.32 m3
Paku 5 cm – 12 cm 3.20 kg
Minyak bekisting 1.60 Liter
Besi beton 12 mm 210.00 kg
Kawat beton 3.00 kg
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.14 m3
Plywood 9 mm 2.80 lembar

Plat Tangga k-250 t=15cm 1.08 m3###


Kayu kelas III 0.32 m3
Paku 5 cm – 12 cm 3.20 kg
Minyak bekisting 1.60 Liter
Besi ulir 10 mm 32.00 batang
Kawat beton 3.00 kg
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.14 m3
Plywood 9 mm 2.80 lembar

Anak Tangga k-250 t=20cm 1.39 m3###


Kayu kelas III 0.32 m3
Paku 5 cm – 12 cm 3.20 kg
Minyak bekisting 1.60 Liter
Besi ulir 10 mm 15.00 batang
Kawat beton 3.00 kg
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.14 m3
Plywood 9 mm 2.80 lembar

Balok Tangga LT2 k-250 20x40cm 0.32 m3


Kayu kelas III 0.32 m3
Paku 5 cm – 12 cm 3.20 kg
Minyak bekisting 1.60 Liter
Besi ulir 12 mm 2.00 batang
Besi ulir 10 mm 3.00 batang
Kawat beton 3.00 kg
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.14 m3
Plywood 9 mm 2.80 lembar
Dolken kayu galam,(8-10) cm, panjang 4 m 16.00 batang
###
Sub Total ###
C PEKERJAAN ME
Stop Kontak Broco 9.00 titik
###
Kabel NYM 3x2,5 mm² 10.00 m'
Conduit pipa PVC dia ⅝" C 12.00 m'
Tee dos 1.00 bh
Inbow doos 1.00 bh
Sock 3.00 bh
Klem conduit 9.00 bh
Lastdop 3.00 bh
Elbow 2.00 bh
Paku, sekrup, fisher (10% harga conduit) 10.00 %
Stop kontak 1.00 bh

Saklar single Broco 4.00 titik


###
Kabel NYM 3x2,5 mm² 10.00 m'
Conduit pipa PVC dia ⅝" C 12.00 m'
Tee dos 1.00 bh
Inbow doos 1.00 bh
Sock 3.00 bh
Klem conduit 9.00 bh
Lastdop 3.00 bh
Elbow 2.00 bh
Paku, sekrup, fisher (10% harga conduit) 10.00 %
Saklar 1.00 bh

Saklar Ganda Broco 10.00 titik


###
Kabel NYM 3x2,5 mm² 12.00 m'
Conduit pipa PVC dia ⅝" C 12.00 m'
Tee dos 1.00 bh
Inbow doos 1.00 bh
Sock 3.00 bh
Klem conduit 9.00 bh
Lastdop 3.00 bh
Elbow 2.00 bh
Paku, sekrup, fisher (10% harga conduit) 10.00 %
Saklar Ganda 1.00 bh

Lampu Downlight Broco 41.00 titik


###
Kabel NYM 2x2,5 mm² 12.00 m'
Conduit pipa PVC dia ⅝" C 12.00 m'
Tee dos 1.00 bh
Inbow doos 1.00 bh
Sock 3.00 bh
Klem conduit 9.00 bh
Lastdop 3.00 bh
Flexible pipe 1.00 m'
Elbow 2.00 bh
Paku, sekrup, fisher (10% harga conduit) 10.00 %
Fitting lampu Downlight 1.00 bh

Stop Kontak AC Broco 1.00 Titik


###
Kabel NYM 3x2,5 mm² 12.00 m'
Conduit pipa PVC dia ⅝" C 12.00 m'
Tee dos 1.00 bh
Inbow doos 1.00 bh
Sock 3.00 bh
Klem conduit 9.00 bh
Lastdop 3.00 bh
Elbow 2.00 bh
Paku, sekrup, fisher (10% harga conduit) 10.00 %
Stop Kontak AC 1.00 bh

Sub Total ###


D PEKERJAAN SANITARY
Instalasi Air Bersih rucika/setara 1.00 Titik
###
Pipa PVC 3/4" 37.7 37.70 m

Instalasi Air Kotor rucika/setara 1.00 Titik


###
Pipa PVC 4" 19 19.00 m

keran air Onda 4.00 unit###


Kran air 1.00 bh
Seal tape 0.25 bh

Floor Drain Onda 3.00 ###


bh
Sub Total ###
E PEKERJAAN TAMBAH DINDING
Dinding hebel 7.5cm 57.78 m2###
Bata Ringan 0.08 M3
Perekat Bata Ringan 0.08 sak
Alat Bantu 1.00 Ls

Plesteran Adukan Semen & Pasir 115.56 m2###


Portland Cement 6.24 kg
Pasir pasang 0.02 m3

Acian Mortar 115.56 m2###


Portland Cement 3.25 kg

Cat vinilex/setara 115.56 m2


Cat Alkali Resisting Primer 1 lapis 0.14 Liter
Cat Vinilex 2 lapis 0.20 Liter
Amplas 0.30 M2
Alat Bantu 1.00 Ls
###
Sub Total ###
F PEKERJAAN DINDING & PLAFOND
Penebalan dinding Jendela ruang makan dalam tebal 20cm 0.184 m3###
Portland Cement 0.5 kg
Pasir pasang 1 m3

Penebalan dinding Jendela ruang makan luar tebal 5 cm 0.046 m3###


Portland Cement 0.5 kg
Pasir pasang 1 m3
Penebalan dinding Jendela Dapur Luar tebal 10 cm 0.092 m3###
Portland Cement 0.5 kg
Pasir pasang 1 m3

Pasangan Dinding Hebel 7.5cm 32.8 m2###


Bata Ringan 0.075 m3
Perekat Bata Ringan 0.079 sak

Plesteran Dinding Adukan Semen & Pasir 65.6 m2###


Portland Cement 6.24 kg
Pasir pasang 0.024 m3

Acian Mortar 65.6 m2###


Portland Cement 3.25 kg

Pengecatan vinilex/setara 65.6 m2###


Cat Alkali Resisting Primer 1 lapis 0.143 Liter
Cat Vinilex 2 lapis 0.2 Liter
Amplas 0.3 M2

Plafond Gypsum Rangka hollow Gypsum board t=7 mm 122.54 m2###


Gypsum board 0.84 Lembar
Besi hollow 40x40 mm 1.65 m'
Besi hollow 20x20 mm 0.17 btg
Paku skrup 30 bh

Pengecatan plafond vinilex/setara 122.54 m2###


Cat Alkali Resisting Primer 1 Lapis 0.143 Liter
Cat Vinilex 2 Lapis 0.2 Liter
Amplas 0.3 M3
Alat Bantu 1 Ls

Partisi Musolla Kisi kisi conwood 9.15 m2###


. ###
G PEKERJAAN PINTU DAN JENDELA
Pintu 150x230cm, Jendela 120x230cm P1 Kusen Almunium 3" Pollywood Jendela Kaca 5mm 2.00 ###
set
Pintu 90x230cm P2 Kusen Almunium 3" 2.00 ###
unit
Pintu Kamar Mandi 70x200cm P3 Pintu Pvc 1.00 ###
unit
Jendela rg Makan 60x160cm J1 Kusen Almunium 3" 5mm 2.00 ###
unit
Jendela 4 Daun 240x230cm Kamar depan J4 Kusen Almunium 3" 5mm 2.00 ###
set
Jendela Dapur 60x130cm J5 Kusen Almunium 3" 5mm 1.00 ###
unit
Sub Total ###
Pintu Kamar ART Plywood kusen almunium 3" 1.00 unit###
Pintu Kamar Mandi pvc 1.00 unit###
Pintu Masuk Utama 2 daun + jendela Pintu Kaca Kusen Almunium 3" 1.00 set###
Jendela Kamar Depan 230x60cm 1.00 set###
Jendela Dapur 130x60cm 1.00 unit###
Jendela Ruang Makan 150x60cm 2.00 unit###
Sub Total ###
V PEKERJAAN BARU LANTAI 2
A STRUKTUR
Kolom Struktur k-250 K1 30x30cm 0.86 m2###
Kayu kelas III 0.40 m3
Paku 5 cm – 12 cm 4.00 kg
Minyak bekisting 2.00 Liter
Besi ulir 8 mm 8.00 batang
Besi ulir 19 mm 7.00 batang
Kawat beton 4.50 kg
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.15 m3
Plywood 9 mm 3.50 lembar
Dolken kayu galam,(8-10) cm, panjang 4 m 20.00 batang

Kolom Struktur k-250 K2 15x35cm 0.34 m2###


Kayu kelas III 0.40 m3
Paku 5 cm – 12 cm 4.00 kg
Minyak bekisting 2.00 Liter
Besi ulir 10 mm 4.00 batang
Besi ulir 12 mm 6.00 batang
Kawat beton 4.50 kg
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.15 m3
Plywood 9 mm 3.50 lembar
Dolken kayu galam,(8-10) cm, panjang 4 m 20.00 batang

Kolom Struktur k-250 K3 15x30cm 1.58 m2###


Kayu kelas III 0.40 m3
Paku 5 cm – 12 cm 4.00 kg
Minyak bekisting 2.00 liter
Besi ulir 10 mm 18.00 batang
Besi ulir 12 mm 24.00 batang
Kawat beton 4.50 kg
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.15 m3
Plywood 9 mm 3.50 lembar
Dolken kayu galam,(8-10) cm, panjang 4 m 20.00 batang

Kolom Praktis KP 15x15cm 0.72 m3###


Kayu kelas III 0.40 m3
Paku 5 cm – 12 cm 4.00 kg
Minyak bekisting 2.00 Liter
Besi polos 10 mm 11.00 batang
Besi polos 8 mm 11.00 batang
Kawat beton 4.50 kg
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.15 m3
Plywood 9 mm 3.50 lembar
Dolken kayu galam,(8-10) cm, panjang 4 m 20.00 batang

Balok Struktur k-250 B3 15x30cm 4.80 m3###


Kayu kelas III 0.32 m3
Paku 5 cm – 12 cm 3.20 kg
Minyak bekisting 1.60 Liter
Besi ulir 12 mm 53.50 batang
Besi ulir 10 mm 50.00 batang
Kawat beton 3.00 kg
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.14 m3
Plywood 9 mm 2.80 lembar
Dolken kayu galam,(8-10) cm, panjang 4 m 16.00 batang

Pelat Lantai Ø 10 mm - 15 cm K250 t=12m 102.28 m2###


Bondek 1.00 m2
Wiremesh 0.09 lbr
Paku 1 cm - 3 cm 0.10 0.1
Beton Mix K-225 0.13 m3
Kayu kelas II balok 0.00 m3
Scaffolding 1.00 m2

Ring Balok k-250 15x30cm 1.85 m3###


Kayu kelas III 0.32 m3
Paku 5 cm – 12 cm 3.20 kg
Minyak bekisting 1.60 Liter
Besi ulir 12 mm 14.00 batang
Besi ulir 10 mm 4.00 batang
Kawat beton 3.00 kg
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.14 m3
Plywood 9 mm 2.80 lembar
Dolken kayu galam,(8-10) cm, panjang 4 m 16.00 batang

Ring Balok k-250 15x25cm 1.55 m3


Kayu kelas III 0.32 m3
Paku 5 cm – 12 cm 3.20 kg
Minyak bekisting 1.60 Liter
Besi ulir 12 mm 14.00 batang
Besi ulir 10 mm 4.00 batang
Kawat beton 3.00 kg
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.14 m3
Plywood 9 mm 2.80 lembar
###
Sub Total Dolken kayu galam,(8-10) cm, panjang 4 m 16.00 batang
###
VI
A
PEKERJAAN DINDING LANTAI 2 ###
PEKERJAAN DINDING
Pasangan Dinding Hebel 7.5cm 224.68 m2
Bata Ringan 0.075 M3
Perekat Bata Ringan 0.079 sak###

Plesteran Dinding Adukan Semen & Pasir 449.36 m2


Portland Cement 6.24 kg
Pasir pasang 0.02 m3

Acian Mortar 449.36 m2###


Sub Total Portland Cement 3.25 kg###
B
###
FINISHING DINDING KOLAM RENANG
Railing Kolam Renang 304 full Railling Stainless 7.50 ###
m1

pasangan batu Alam Batu Alam Palimanan 18.81 m2


Batu Alam 12.5 buah
Portland Cement 10 kg
Pasir pasang 0.045 m3

Pasangan Bata expose tempel Bata Tempel Homogen Bevel Putih 11.88 m2
Bata expose 140 bh
Portland Cement 10 kg
Sub Total Pasir pasang 0.045 m3###
VII
###
PEKERJAAN PLAFOND LANTAI 2
Plafond Gypsum Rangka hollow Gypsum Board 92.72 m2
Besi hollow 40x40 mm 0.50 btg
Besi hollow 20x20 mm 0.17 btg
Gypsum board 0.35 lbr
Paku skrup 9.00 bh
Compound 0.06 zak
Textile tape 0.12 roll
Amplas 0.30 lbr

Pengecatan Plafond vinilex/setara 92.72 m2


Cat Alkali Resisting Primer 1 Lapis 0.14 Liter
Cat Vinilex 2 Lapis 0.20 Liter###
Sub Total Amplas 0.30 M3###
VIII
###
PEKERJAAN FAÇADE ###
Tampak Area Balkon dinding lapis conwood Conwood Wall Decorative Panel (600x1200mm) 5.92 m2
Topian Beton t=10cm 0.81 m3
Kayu kelas III 0.32 m3
Paku 5 cm – 12 cm 3.20 kg
Minyak bekisting 1.60 Liter
Besi polos 10 mm 157.50 kg
Kawat beton 2.25 kg
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.12 m3
Plywood 9 mm 2.80 lembar
Dolken kayu galam,(8-10) cm, panjang 4 m 32.00 batang###

Kisi kisi hollow motif kayu 4x8cm 22.20 m2

Pasangan Batu Alam Batu Alam Andesit Bintik Bakar 15.60 m2


Batu Alam 12.50 buah
Portland Cement 10.00 kg###
Sub Total Pasir pasang 0.05 m3###
IX
A
PEKERJAAN KOLAM RENANG ###
PEKERJAAN PERSIAPAN ###
Galian Tanah pondasi 150x150x150cm 12.96 m3###
Sub Total urugan tanah 3.24 m3###
B galian sloof 20x40cm 1.68 m3
###
PEKERJAAN STRUKTUR
Pondasi Footplate k-250 PC4 150x150x32cm 1.44 m3
Kayu kelas III 0.32 m3
Paku 5 cm – 12 cm 3.20 kg
Minyak bekisting 1.60 Liter
Besi ulir 19 mm 4.00 Batang
Kawat beton 2.25 kg
Portland cement 336.00 kg
Pasir beton 0.54
Kerikil 0.81 m3
Kayu kelas II balok 0.12 m3
Plywood 9 mm 2.80 lembar
###

Pondasi Footplate k-250 PC5 150x150x32cm 2.16 m3


Kayu kelas III 0.32 m3
Paku 5 cm – 12 cm 3.20 kg
Minyak bekisting 1.60 Liter
Besi ulir 19 mm 6.00 Batang
Kawat beton 2.25 kg
Portland cement 336.00 kg
Pasir beton 0.54
Kerikil 0.81 m3
Kayu kelas II balok 0.12 m3
Plywood 9 mm 2.80 lembar
###

Pondasi Footplate k-250 PC6 150x150x32cm 0.72 m3


Kayu kelas III 0.32 m3
Paku 5 cm – 12 cm 3.20 kg
Minyak bekisting 1.60 Liter
Besi ulir 19 mm 2.00 Batang
Kawat beton 2.25 kg
Portland cement 336.00 kg
Pasir beton 0.54
Kerikil 0.81 m3
Kayu kelas II balok 0.12 m3
Plywood 9 mm 2.80 lembar
###

Kolom Struktur k-300 K1 30x30cm 3.02 m3


Kayu kelas III 0.40 m3
Paku 5 cm – 12 cm 4.00 kg
Minyak bekisting 2.00 Liter
Besi ulir 19 mm 44.80 batang
Besi ulir 10 mm 27.00 batang
Kawat beton 4.50 kg
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.15 m3
Plywood 9 mm 3.50 lembar
Dolken kayu galam,(8-10) cm, panjang 4 m 20.00 batang
###

Sloof k-300 SL1 20x40cm 0.62 m3


Kayu kelas III 0.05 M3
Paku 6cm-12cm 2.00 Kg
Minyak begistig 0.60 Liter
Besi ulir 16 mm 3.00 batang
Besi ulir 13 mm 2.00 batang
Kawat beton(bendrat) 3.00 Kg
Portland Cement 336.00 Kg
Pasir beton 0.54 M3
Kerikil 0.81 M3###

Balok Struktur k-300 B1 30x50cm 3.78 m3


Kayu kelas III 0.32 m3
Paku 5 cm – 12 cm 3.20 kg
Minyak bekisting 1.60 Liter
Besi ulir 16 mm 25.20 batang
Besi ulir 13 mm 9.00 batang
Besi ulir 10 mm 8.00 Batang
Kawat beton 3.00 kg
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.14 m3
Plywood 9 mm 2.80 lembar
Dolken kayu galam,(8-10) cm, panjang 4 m 16.00 batang
###

Balok Struktur k-300 B2 25x40cm 0.66 m3


Kayu kelas III 0.32 m3
Paku 5 cm – 12 cm 3.20 kg
Minyak bekisting 1.60 Liter
Besi ulir 16 mm 3.30 batang
Besi ulir 13 mm 1.10 batang
Besi ulir 10 mm 2.00 Batang
Kawat beton 3.00 kg
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.14 m3
Plywood 9 mm 2.80 lembar
###
Dolken kayu galam,(8-10) cm, panjang 4 m 16.00 batang
Balok Struktur k-300 B3 15x30cm 0.58 m3
Kayu kelas III 0.32 m3
Paku 5 cm – 12 cm 3.20 kg
Minyak bekisting 1.60 Liter
Besi ulir 12 mm 7.00 batang
Besi ulir 10 mm 2.00 Batang
Kawat beton 3.00 kg
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.14 m3
Plywood 9 mm 2.80 lembar
###
Dolken kayu galam,(8-10) cm, panjang 4 m 16.00 batang

Balok Praktis k-300 Bp 18x18cm 0.56 m3


Kayu kelas III 0.40 m3
Paku 5 cm – 12 cm 4.00 kg
Minyak bekisting 2.00 Liter
Besi ulir 12 mm 6.00 Batang
Besi ulir 10 mm 2.00 Batang
Kawat beton 4.50 kg
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.15 m3
Plywood 9 mm 3.50 lembar
###
Dolken kayu galam,(8-10) cm, panjang 4 m 20.00 batang

Plat Lantai Untuk Ruang Mesin k-300 t=18cm 0.86 m3


Kayu kelas III 0.32 m3
Paku 5 cm – 12 cm 3.20 kg
Minyak bekisting 1.60 Liter
Besi Ulir 10 mm 10.00 btang
Kawat beton 2.25 kg
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.12 m3
Plywood 9 mm 2.80 lembar
###
Dolken kayu galam,(8-10) cm, panjang 4 m 32.00 batang

Plat Beton Kolam Renang k-300 t=18cm 7.48 m3


Kayu kelas III 0.32 m3
Paku 5 cm – 12 cm 3.20 kg
Minyak bekisting 1.60 Liter
Besi Ulir 10 mm 113.29 btang
Kawat beton 2.25 kg
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.12 m3
Plywood 9 mm 2.80 lembar
Dolken kayu galam,(8-10) cm, panjang 4 m 32.00 batang

bekisting kolam renang plywood 12mm 36.00 m2


Kayu kelas III 0.04 m3
Paku 5 cm – 12 cm 0.40 kg
Kayu kelas II balok 0.02 m3###
Plywood 12 mm 0.35 lembar
###
Dolken kayu galam,(8-10) cm, panjang 4 m 6.00 batang
Sub Total
###
C
PEKERJAAN LAPISAN KOLAM RENANG
waterproof 36.00 m2
Damdex 1.00 m2
Screed + pasir 36.00 m2###
Portland Cement 7.78 kg###
Pasir pasang 0.02 m3
Sub Total ###
D
FINISHING & ME
Keramik Mozaik 36.00 m2
keramik 30x30 11.87 Buah
Portland Cement 10.00 kg
Pasir Pasang 0.05 m3###
Semen Warna 1.50 kg###
###
Instalasi Electrical Standart 1.00 ls
Sub Total Lampu kolam Astral 4.00 titik###
E ###
TANGGA & MESIN ###
Tangga Kolam Renang 304 Full Stainless 1.00 bh###
Mesin Filter + Instalasi boss 3/4 HP 1.00 Unit###
Mesin Pompa + Instalasi boss 3/4 HP 1.00 Unit###
Chlorine defire 1.00 unit###
Guter 22.00 m2###
Instalasi Plumbing Pipa Wave 36.00 m1###
Instalasi Jet Nozzles Hayward 4.00 unit###
Instalasi Floordrain Hayward 1.5" 1.00 unit
Sub Total Saluran + Instalasi Pembuangan Air Skimmer Hayward 2.00 unit###
F
PEKERJAAN BAK KONTROL
Beton Bak Kontrol t=18 180x100x100cm 1.33 m3
Kayu kelas III 0.32 m3
Paku 5 cm – 12 cm 3.20 kg
Minyak bekisting 1.60 Liter
Besi polos 10 mm 157.50 kg
Kawat beton 2.25 kg
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.12 m3###
Plywood 9 mm 2.80 lembar
###
###
Penutup Bak Kontrol 0.18 m3
Kayu kelas III 0.32 m3
Paku 5 cm – 12 cm 3.20 kg
Minyak bekisting 1.60 Liter
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.12 m3
Plywood 9 mm 2.80 lembar
Sub Total waterproof 7.40 m2###
Aquaproof 1 m2###
X PEKERJAAN PINTU, & JENDELA LANTAI 2 ###
Pintu Geser 90x230cm+jendela 60x230cm P4 Kusen Almunium 3" daun kaca Jendela Kaca 5mm 2.00 ###
set
Pintu Geser 90x230cm P5 Kusen Almunium 3" daun Kaca 5mm 1.00 ###
unit
Pintu Geser 60x230cm+jendela 60x230cm P6 Kusen Almunium 3" daun Kaca 5mm 1.00 ###
unit
Jendela mati 120x230cm J2 Kusen Almunium 3" daun Kaca 5mm 1.00 ###
set
Jendela mati 120x230cm J3 Kusen Almunium 3" daun Kaca 5mm 1.00 ###
set
Bouvenlight kamar ART 20x40cm BV1 Kusen Almunium 3" Kaca 5mm 1.00 unit
Bouvlight Kamar Anak BV2 Kusen Almunium 3" kaca 5mm 3.00 bh
Bouvenlight kamar Mandi 20x40cm BV1 Kusen Almunium 3" Kaca 5mm 1.00 unit
###

Sub Total ###

XI PEKERJAAN ATAP LANTAI 2


Rangka Baja Ringan C 75 tebal 0.75 mm 22.19 m2
Main Trus C75-75 2.80 m2
Roof Bottom/Reng R 33-0.45 5.10 M1
Self drilling screw dia 6 x 20 mm (truss Screw) 25.00 BH
Self drilling screw dia 4 x 16 mm (Roof Bottom Screw) 35.00 ###
BH
Dynabol dia 12 x 120 mm 1.00 BH

Penutup Atap Genteng 22.19 m2


Genteng 1.56 ###
bh
Paku 5 cm – 12 cm 0.03 kg

Nok genteng 24.60 m1


Nok / Bubungan Genteng 1.25 ###
Lbr
Paku 1/2" - 1" 0.05 ###
Kg

Lisplank GRC 43.40 m1


GRC 1.00 m1

Dak Beton t=10cm 0.83 m3


Kayu kelas III 0.32 m3
Paku 5 cm – 12 cm 3.20 kg
Minyak bekisting 1.60 Liter
Besi ulir 10 mm 12.60 batang
Kawat beton 2.25 kg
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.12 m3
Plywood 9 mm 2.80 ###
lembar
Dolken kayu galam,(8-10) cm, panjang 4 m 32.00 batang

Talang Beton t=10cm 3.17 m3


Kayu kelas III 0.32 m3
Paku 5 cm – 12 cm 3.20 kg
Minyak bekisting 1.60 Liter
Besi polos 10 mm 48.00 kg
Kawat beton 2.25 kg
Portland cement 336.00 kg
Pasir beton 0.54 m3
Kerikil 0.81 m3
Kayu kelas II balok 0.12 m3
Plywood 9 mm 2.80 ###
lembar
Dolken kayu galam,(8-10) cm, panjang 4 m 32.00 ###
batang
###
Sky Light Tangga Kaca Temperred 8mm 4.85 ###
m2
Rangka Skyligth Tangga Rangka Hollow 4.85 m2
Skylight Kamar Mandi Kaca Temperred 8mm 1.16 ###
m2
Rangka Skylight Kamar Mandi Rangka Hollow 1.16 m2 .
Sub Total ###
XII
PEKERJAAN LAPIS LANTAI & KERAMIK LANTAI 2
Granite tile Garuda 60x60cm 32.18 m2
Granite tile 60x60 2.80 buah
Portland cement 9.60 kg
Pasir pasang 0.05 ###
m3
Semen warna 1.50 kg

Lantai Kamar Roman Granit dBalsa Rosato GT612204R 15x60cm 11.70 m2


Roman Granit dBalsa Rosato GT612204R 15x60cm 11.11 buah
Portland cement 9.60 kg
Pasir pasang 0.05 ###
m3
Semen warna 1.50 kg

Pasangan Keramik Balkon Keramik 40x40 8.84 m2


Keramik 40x40 6.25 buah
Portland cement 9.60 kg
Pasir pasang 0.05 ###
m3
Semen warna 1.50 kg

screeding Lantai 60.47 m2


Portland Cement 7.78 ###
kg
Pasir pasang 0.02 m3

Keramik Deck Kolam Renang Motif Kayu Roman Granit dBalsa Rosato GT612204R 15x60cm 21.41 m2
Keramik Roman Granit dBalsa Rosato GT612204R 15x60cm 11.11 buah
Portland cement 9.60 kg
Pasir pasang 0.05 ###
m3
Semen warna 1.50 ###
kg
###
Steping stone 1.75 m2
rumput sintetis 2.50 m2
Keramil Lantai Kamar Mandi Granite tile Garuda 60x60cm 6.60 m2
Granite tile 60x60 2.80 buah
Portland cement 9.60 kg
Pasir pasang 0.05 m3
Semen warna 1.50 kg

Keramik dinding kamar mandi Granite tile Garuda 60x60cm 9.60 m2


Granite tile 60x60 2.80 buah
Portland cement 9.60 ###
kg
Pasir pasang 0.05 m3
Sub Total Semen warna 1.50 ###
kg
XIII ###
ME LANTAI 2
Instalasi listrik Kabel Suprime/setara 1.00 titik
Stop Kontak Broco 6.00 titik
Kabel NYM 3x2,5 mm² 10.00 m'
Conduit pipa PVC dia ⅝" C 12.00 m'
Tee dos 1.00 bh
Inbow doos 1.00 bh
Sock 3.00 bh
Klem conduit 9.00 bh
Lastdop 3.00 bh
Elbow 2.00 ###
bh
Stop kontak 1.00 bh

Saklar single Broco 6.00 titik


Kabel NYM 3x2,5 mm² 10.00 m'
Conduit pipa PVC dia ⅝" C 12.00 m'
Tee dos 1.00 bh
Inbow doos 1.00 bh
Sock 3.00 bh
Klem conduit 9.00 bh
Lastdop 3.00 bh
Elbow 2.00 ###
bh
Saklar 1.00 bh

Saklar Ganda Broco 4.00 titik


Kabel NYM 3x2,5 mm² 10.00 m'
Conduit pipa PVC dia ⅝" C 12.00 m'
Tee dos 1.00 bh
Inbow doos 1.00 bh
Sock 3.00 bh
Klem conduit 9.00 bh
Lastdop 3.00 bh
Elbow 2.00 ###
bh
Saklar 1.00 bh

Lampu Downlight Broco 32.00 titik


Kabel NYM 2x2,5 mm² 10.00 m'
Conduit pipa PVC dia ⅝" C 12.00 m'
Tee dos 1.00 bh
Inbow doos 1.00 bh
Sock 3.00 bh
Klem conduit 9.00 bh
Lastdop 3.00 bh
Flexible pipe 1.00 m'
Elbow 2.00 ###
bh
Fitting lampu Downlight 1.00 bh

Stop Kontak AC Broco 3.00 titik


Kabel NYM 3x2,5 mm² 10.00 m'
Conduit pipa PVC dia ⅝" C 12.00 m'
Tee dos 1.00 bh
Inbow doos 1.00 bh
Sock 3.00 bh
Klem conduit 9.00 bh
Lastdop 3.00 bh
Elbow 2.00 ###
bh
Stop kontak 1.00 ###
bh
###
Instalasi TV Broco 1.00 titik
Sub Total Instalasi Lampu Tempel Lampu Tempel LED 2 arah Outdoor 3.00 titik
###
XIV
PEKERJAAN SANITAIR LANTAI 2
Instalasi Air Bersih rucika/setara 3.00 titik
###
Pipa PVC 3/4" 10.00 m

Instalasi Air Kotor rucika/setara 2.00 titik


###
Pipa PVC 4" 12.00 m

Instalasi Air Bekas & Hujan Kolam rucika/setara 2.00 titik


###
Pipa PVC 4" 12.00 m

Instalasi Hujan, Dak rucika/setara 1.00 titik


###
Pipa PVC 4" 12.00 m
###
###
Box Shower Full Kaca Temperred tinggi 2m 1.00 unit
###
closet duduk TOTO CW 660 PJ / SW 660 J/setara 1.00 bh
###
headshower Flusso 226 set kran shower Tiang silver/setara 1.00 bh
###
jet washer Washer/ setara 1.00 bh
###
kran air Onda 1.00 bh
###
Roofdrain Onda 16.00 bh
###
floordrain Onda 1.00 bh
###
wastafel TOTO LW 899CJ/setara 1.00 bh
Sub Total Pool Shower Washer/ setara 1.00 ###
bh
XV
1 PEKERJAAN PENGECATAN LANTAI 2
Cat dinding Interior vinilex/setara 239.37 m2
Cat Alkali Resisting Primer 1 lapis 0.14 Liter
Cat Vinilex 2 lapis 0.20 Liter
Amplas 0.30 M2
2
Cat dinding eksterior vinilex/setara 103.29 m2
Cat Alkali Resisting Primer 1 lapis 0.14 Liter
Cat Vinilex 2 lapis 0.20 Liter
###
Amplas 0.30 M2
Sub Total ###
XVI ###
LAIN - LAIN ###
torent 3000 liter 1.00 unit
###
Mesin Pompa 1.00 unit
Sumur Dalam asumsi 20 meter + Pompa + Pipa 20.00 ###
m1
XVII ###
PEKERJAAN CANOPY BAJA ###
Pekerjaan Canopy Carport 1 penutup polycarbonate rangka hollow 13.69 m2###
Sub Total Pekerjaan Canopy Carport 2 penutup polycarbonate rangka hollow 11.47 m2###
TOTAL ###
RENCANA ANGGARAN PELAKSANAAN

PROJECT : RENOVASI RUMAH


PEKERJAAN : TAMBAH LANTAI & KOLAM RENANG
LOCATION : CIPADU
OWNER : IBU RIVIA

NO URAIAN PEKERJAAN DIMENSION & SPESIFICATION Satuan Total HARGA SATUAN TOTAL HARGA
I MATERIAL

A Material Alam
Split / Krikil 1:2 m3 58.32 270,000 15,746,352
Pasir beton m3 29.71 270,000 8,022,248
Pasir pasang m3 26.68 270,000 7,204,029

B Material Struktur
Besi ulir 19 mm btg 63.80 250,000 15,950,000
Besi ulir 16 mm btg 101.56 162,000 16,452,072
Besi ulir 13 mm btg 12.10 110,500 1,337,050
Besi polos 12 mm btg 213.50 76,000 16,226,000
Besi Ulir 10 mm btg 349.62 71,000 24,823,198
Besi polos 10 mm btg 74.05 69,500 5,146,776
Besi polos 8 mm btg 36.00 45,500 1,638,000
Kawat beton (bendrat) Kg 158.73 24,900 3,952,345
Kayu kelas III / Kaso 4x6 m3 6.06 1,500,000 9,088,009
Plywood 9 mm lembar 76.52 100,000 7,651,952
Plywood 12 mm lembar 12.60 158,500 1,997,100
Dolken atau bambu batang 606.12 18,000 10,910,160
Paku 5 cm - 12 cm kg 200.00 17,000 3,400,000
Paku sekrup bh 4510.68 400 1,804,272
Bondek 1x4 lbr 25.57 440,000 11,250,250
Wiremesh 2,1 x 5,4 lbr 9.00 880,600 7,925,576
Scaffolding m2 102.28 36,000 3,681,900

C Material Arsitektur
Bata Ringan hebel 7.5 cm M3 23.64 650,000 15,368,925
Bata Expose bh 1663.20 3,500 5,821,200
Perekat Bata Ringan sak 24.91 54,000 1,344,899
Compound Gypsumboard Aplus / eternite / setara 40kg sak 5.56 60,000 333,792
Gypsum board Aplus / eternite / setara Lembar 135.39 52,000 7,040,051
Keramik lantai 40 x 40 Roman Golongan A dos 6.72 110,000 739,063
Granite tile 60 x 60 Granite tile Garuda 60x60cm dos 4.63 252,000 1,166,667
Keramik kamar mandi 30 x 30 Serat Lurus dos 2.55 143,000 364,000
Keramik tangga 40 x 40 Roman Golongan A dos 10.83 110,000 1,191,667
Keramik Mozaik 30 x 30 dus 38.85 80,000 3,107,782
Granite tile 60 x 60 Granite tile Garuda 60x60cm dos 30.03 252,000 7,568,736
Granite tile 15 x 60 Roman Granit dBalsa Rosato GT612204R 15x60cm dos 10.83 223,500 2,421,250
Keramik balkon 40 x 40 Roman Golongan A dos 9.21 110,000 1,012,917
Keramik Deck Kolam Renang Motif Kayu Roman Granit dBalsa Rosato GT612204R 15x60cm dos 19.82 223,500 4,430,681
Keramil Lantai Kamar Mandi Granite tile Garuda 60x60cm dos 6.16 252,000 1,552,320
Keramik dinding kamar mandi Granite tile Garuda 60x60cm dos 8.96 252,000 2,257,920
Portland cement All Merk 40 Kg sak 681.61 42,000 28,627,495
Semen warna kg 226.05 12,000 2,712,600
Railing Kolam 304 full Railling Stainless m' 7.50 650,000 4,875,000
Railing Tangga 304 Full Stainless m' 6.30 650,000 4,095,000
Damdex ltr 36.00 48,000 1,728,000
Tangga Kolam Renang 304 Full Stainless bh 1.00 3,150,000 3,150,000
Mesin Filter + Instalasi Hayward 3/4 HP Unit 1.00 7,590,000 7,590,000
Mesin Pompa + Instalasi Hayward 3/4 HP Unit 1.00 11,730,000 11,730,000
Chlorine defire unit 1.00 3,760,000 3,760,000
Guter m2 22.00 280,000 6,160,000
Saluran + Instalasi Pembuangan Air Skimmer Hayward Unit 2.00 2,240,000 4,480,000
Sky Light Tangga Kaca Tempered 8 mm m2 4.85 385,000 1,866,018
Rangka Skyligth Tangga m2 4.85 550,000 2,665,740
Skylight Kamar Mandi Kaca Tempered 8 mm m2 1.16 385,000 444,675
Rangka Skylight Kamar Mandi m2 1.16 550,000 635,250
Steping Stone buah m2 1.75 655,000 1,146,250
rumput sintetis m2 2.50 160,000 400,000
Partisi Tangga Kisi kisi conwood m2 12.40 440,000 5,456,000

D Material Besi & Atap


Besi hollow 20x40 mm 20x40mm btg 36.59 21,000 768,478
Besi hollow 40x40 mm btg 80.06 24,000 1,921,404
Dynabol dia 12 x 120 mm bh 22.19 4,500 99,855
Genteng lbr 34.67 50,000 1,733,594
Nok genteng lbr 30.75 40,000 1,230,000
Lisplank GRC 4mm m' 43.40 22,500 976,500
Main Trus C75-75 0.75 mm btg 15.00 75,000 1,125,000
Roof Bottom/Reng R 33-0.45 0,45mm btg 18.00 29,000 522,000
Self drilling screw dia 4 x 16 mm (Roof Bottom Screw) BH 776.65 300 232,995
Self drilling screw dia 6 x 20 mm (truss Screw) BH 554.75 300 166,425
Railing kolam renang m 7.50 300,000 2,250,000
Pekerjaan Canopy Carport 1 penutup polycarbonate rangka hollow m2 13.69 488,000 6,680,720
Pekerjaan Canopy Carport 2 penutup polycarbonate rangka hollow m2 11.47 488,000 5,597,360

E Material Elektrik
Lampu Downlight EX Philips bh 73.00 62,000 4,526,000
Fitting lampu downlight bh 73.00 13,000 949,000
Lampu kolam Astral 100 W bh 4.00 650,000 2,600,000
Instalasi Lampu tempel Lampu Tempel LED 2 arah Outdoor bh 3.00 360,000 1,080,000
Saklar Broco / Panasonic bh 14.00 20,000 280,000
Saklar Ganda Broco / Panasonic bh 10.00 20,000 200,000
Stop Kontak Broco / Panasonic bh 15.00 25,000 375,000
Stop Kontak AC bh 4.00 25,000 100,000
Kabel NYM 3x2.5mm Supreme 1roll = 50m roll 9.04 560,000 5,062,400
Kabel NYM 2x2.5mm Supreme 1roll = 50m roll 16.24 500,000 8,120,000
Conduit pipa PVC dia ⅝" C m' 480.00 11,000 5,280,000
Tee dos bh 116.00 3,000 348,000
Inbow dos bh 116.00 3,000 348,000
Klem conduit 1 pack = 100 pcs pack 10.44 65,000 678,600
Perlengkapan & Aksesories ls 1.00 200,000 200,000
Intalasi TV Broco titik 1.00 240,000 240,000
Elbow 1/2 inch Rucika bh 232.00 2,500 580,000
Lastdop 1 pack = 100 pcs bh 3.48 30,000 104,400
Sock bh 348.00 1,000 348,000
Flexible pipe m' 73.00 7,000 511,000

F Material Finishing
Amplas roll 2.00 150,000 300,000
Cat Alkali Resisting Primer 1 Lapis 1pail = 20kg Pail 5.28 495,000 2,615,789
Cat Vinilex 2 Lapis 1pail = 20kg Pail 7.39 900,000 6,651,720
Pintu 150x230cm, Jendela 120x230cm Kusen Almunium 3" Pollywood Jendela Kaca 5mm set 2.00 3,840,000 7,680,000
Pintu 90x230cm Kusen Almunium 3" unit 2.00 1,600,000 3,200,000
Pintu Kamar Mandi 70x200cm Pintu Pvc unit 1.00 760,000 760,000
Jendela rg Makan 60x160cm Kusen Almunium 3" 5mm unit 2.00 1,200,000 2,400,000
Jendela 4 Daun 240x230cm Kamar depan Kusen Almunium 3" 5mm set 2.00 4,637,880 9,275,760
Jendela Dapur 60x130cm Kusen Almunium 3" 5mm unit 1.00 800,000 800,000
Pintu Kamar ART Plywood kusen almunium 3" unit 1.00 2,240,000 2,240,000
Pintu Kamar Mandi pvc unit 1.00 760,000 760,000
Pintu Masuk Utama 2 daun + jendela Pintu Kaca Kusen Almunium 3" set 1.00 3,840,000 3,840,000
Jendela Kamar Depan 230x60cm set 1.00 4,637,880 4,637,880
Jendela Dapur 130x60cm unit 1.00 888,160 888,160
Jendela Ruang Makan 150x60cm unit 2.00 1,200,000 2,400,000
Pintu Geser 90x230cm+jendela 60x230cm Kusen Almunium 3" daun kaca Jendela Kaca 5mm set 2.00 3,261,440 6,522,880
Pintu Geser 90x230cm Kusen Almunium 3" daun Kaca 5mm unit 1.00 1,243,000 1,243,000
Pintu Geser 60x230cm+jendela 60x230cm Kusen Almunium 3" daun Kaca 5mm unit 1.00 4,074,000 4,074,000
Jendela mati 120x230cm Kusen Almunium 3" daun Kaca 5mm set 1.00 1,445,400 1,445,400
Jendela mati 120x230cm Kusen Almunium 3" daun Kaca 5mm set 1.00 2,050,800 2,050,800
Bouvenlight kamar ART 20x40cm Kusen Almunium 3" Kaca 5mm unit 1.00 180,000 180,000
Bouvlight Kamar Anak Kusen Almunium 3" kaca 5mm bh 3.00 372,320 1,116,960
Bouvenlight kamar Mandi 20x40cm Kusen Almunium 3" Kaca 5mm unit 1.00 180,000 180,000

G Material Plumbing & Sanitasy


Instalasi Plumbing Pipa Wave m1 36.00 120,000 4,320,000
Kloset duduk TOTO CW 660 PJ / SW 660 J/setara bh 1.00 3,000,000 3,000,000
Pipa PVC 3/4" AW Wavin AW btg 17.00 30,000 510,000
Pipa PVC 4" D Type Wavin D btg 20.00 150,000 3,000,000
Seal tape bh 1.00 13,900 13,900
Instalasi Jet Nozzles Hayward bh 4.00 720,000 2,880,000
Jet Washer toto bh 1.00 250,000 250,000
Kran air onda bh 5.00 120,000 600,000
Instalasi floor drain Hayward 1.5" unit 1.00 520,000 520,000
Floor drain SUS 304 Model TOTO bh 4.00 180,000 720,000
Box Shower Full Kaca Temperred tinggi 2m unit 1.00 1,795,000 1,795,000
headshower Flusso 226 set kran shower Tiang silver/setara unit 1.00 350,000 350,000
Roofdrain Onda bh 16.00 59,000 944,000
wastafel TOTO LW 899CJ/setara unit 1.00 458,000 458,000
Pool Shower Washer/ setara bh 1.00 250,000 250,000
torent 3000 liter unit 1.00 3,400,000 3,400,000
Mesin Pompa unit 1.00 5,080,000 5,080,000
Sumur Dalam asumsi 20 meter + Pompa + Pipa m' 20.00 240,000.00 4,800,000

Total Cost Material 474,839,165


II UPAH
- Upah Pekerjaan Sipil Estimasi 30minggu x Rp. 7.000.000/minggu mggu 30.00 7,000,000 210,000,000
Total Cost Upah 210,000,000

III ALAT KERJA


- Sewa Truk Ls 1.00 5,000,000 5,000,000
Total Cost Alat Kerja 5,000,000

IV SITE MANAGEMENT
- Pelaksana Lapangan Bulan 6.00 3,300,000 19,800,000
- Project koordinator Bulan 6.00 1,000,000 6,000,000
- Bonus project Jika dapat menyelesaikan pekerjaan sesuai perencanaan ls 1.00 5,000,000 5,000,000
- Keamanan ls 6.00 1,000,000 6,000,000
- Mobilisasi & Pulsa Ls 6.00 1,500,000 9,000,000

Total Cost Site Management 45,800,000

V BIAYA TAK TERDUGA


Biaya tak terduga ls 1.00 1,000,000.00 1,000,000.00
Total Biaya Tak Terduga 1,000,000
REKAPITULASI RENCANA ANGGARAN PELAKSANAAN (ESTIMASI)

Tanggal : 15 Februari 2019


Nomor RAP :
Nama pekerjaan : RENOVASI RUMAH TINGGAL
Pemberi pekerjaan : Ibu Rivia
Lokasi : Cipadu

Berikut ini kami sampaikan rincian anggaran biaya pekerjaan sebagai berikut :

No RINCIAN TOTAL PRICE


1 MATERIAL Rp 474,839,164.73
2 JASA Rp 210,000,000.00
3 SEWA ALAT KERJA Rp 5,000,000.00
4 SITE MANAGEMENT Rp 45,800,000.00
5 BIAYA TAK TERDUGA Rp 1,000,000.00

JUMLAH ANGGARAN Rp 736,639,164.73

TOTAL NILAI KONTRAK : Rp 921,200,000.00


TOTAL RAP : Rp 736,639,164.73
PROFIT : Rp 184,560,835.27
MARGIN : 20.03%

Jakarta, 15 Februari 2019


PT. BINTORO BANGUN INDONESIA

Disusun oleh :

Fadly Ermawan Putri Darmayanti


Purchasing Manager Cost Control

Panji Tejo Buono N. Catur Iswanto


Project Manager Direktur Utama