Anda di halaman 1dari 53

Tabel Perhitungan Evapotranspirasi

Data Unit Jan Feb Mar Apr Mei Jun Jul Agt Sept Okt Nov Des Ket
T ˚C 28 26 29 28 28 26 27 28 27 27 27 27 Data Soal
U km/jam 18 16 18 21 16 13 15 17 13 11 15 23 Data Soal
U km/hari 432 384 432 504 384 312 360 408 312 264 360 552
n/N % 50 53 50 52 53 55 50 51 40 39 43 44 Data Soal
Rh % 79 73 74 75 84 81 85 77 78 84 79 84 Data Soal
α 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
Ra mm/hari 17.7 16.4 14.15 11.6 9.3 8.7 8.85 10.4 23.1 15.45 17.2 17.85 Tabel
Rs mm/hari 8.85 8.45 7.08 5.92 4.79 4.57 4.43 5.25 10.40 6.88 8.00 8.39
Rns mbar 6.64 6.33 5.31 4.44 3.59 3.43 3.32 3.94 7.80 5.16 6.00 6.29
ea mbar 37.8 33.6 40.1 37.8 37.8 33.6 35.7 37.8 35.7 35.7 35.7 35.7 Tabel
ed mbar 29.86 24.53 29.67 28.35 31.75 27.22 30.35 29.11 27.85 29.99 28.20 29.99
ea-ed 7.94 9.07 10.43 9.45 6.05 6.38 5.36 8.69 7.85 5.71 7.50 5.71
w 0.775 0.755 0.785 0.775 0.775 0.755 0.765 0.775 0.765 0.765 0.765 0.765 Tabel
1-w 0.225 0.245 0.215 0.225 0.225 0.245 0.235 0.225 0.235 0.235 0.235 0.235
C 1.006 1.003 1.004 1.005 1.011 1.008 1.012 1.004 1.005 1.011 1.006 1.011 Tabel
F(T) 16.31 15.85 16.53 16.31 16.31 15.85 16.08 16.31 16.08 16.08 16.08 16.08 Tabel
Fed 0.10 0.12 0.10 0.11 0.09 0.11 0.10 0.10 0.11 0.10 0.11 0.10
F(n/N) 0.55 0.58 0.55 0.57 0.58 0.60 0.55 0.56 0.46 0.45 0.49 0.50
F(u) 1.44 1.31 1.44 1.63 1.31 1.11 1.24 1.37 1.11 0.98 1.24 1.76
Rnl mm/hari 0.89 1.12 0.91 0.98 0.87 1.04 0.86 0.94 0.80 0.72 0.83 0.79
Rn mm/hari 5.74 5.22 4.39 3.46 2.73 2.38 2.46 3.00 7.00 4.44 5.17 5.50
Eto mm/hari 7.06 6.86 6.70 6.18 3.93 3.57 3.48 5.03 7.44 4.77 6.18 6.64
A1 57.688
A2 30.375
A3 63.125
A total 151.19

Curah Hujan Di stasiun Biyonga Huludupitango


Tahun Jan Feb Mar Apr Mei Jun Jul
2001 65 48 40 31 47 59 16
2002 57 2 41 53 41 22 1
2003 27 17 84 68 56 4 23
2004 33 39 23 92 31 29 29
2005 12 37 47 31 70 27 134
2006 19 34 25 61 15 110 31
2007 51 29 41 85 111 44 33
2008 50 37 93 49 57 41 57
2009 79 41 43 21 59 65 14
2010 138 56 31 26 18 55 80

Curah Hujan Di stasiun Boidu Bolango


Tahun Jan Feb Mar Apr Mei Jun Jul
2001 104 50 52 40 25 57 23
2002 50 71 17 38 53 45 14
2003 54 13 33 45 49 47 30
2004 44 22 19 51 50 9 46
2005 3 49 50 55 27 33 15
2006 36 34 59 36 50 71 21
2007 28 42 30 36 38 49 44
2008 30 38 63 49 27 37 36
2009 42 30 34 47 66 30 47
2010 330 172 274 233 481 377 44

Curah Hujan Di stasiun Pohu Bongomeme


Tahun Jan Feb Mar Apr Mei Jun Jul
2001 78 32 30 29 32 5 16
2002 26 76 105 45 40 18 46
2003 53 46 60 53 70 12 64
2004 83 66 73 55 15 90 45
2005 10 62 53 67 72 65 46
2006 57 65 40 34 75 15 40
2007 38 56 31 26 18 55 80
2008 70 46 23 75 35 66 9
2009 68 29 65 99 36 8 47
2010 68 80 29 146 114 67 83
Curah Hujan Rerata Tiesen
Tahun Jan Feb Mar Apr Mei Jun Jul
2001 78.26 41.72 38.24 31.97 36.32 36.05 17.41
2002 42.65 46.76 62.90 46.65 42.99 24.95 22.40
2003 43.28 28.30 63.73 57.12 60.44 15.98 41.53
2004 56.09 46.86 43.07 68.31 28.14 50.45 39.10
2005 9.36 49.85 50.11 50.85 62.20 44.07 73.35
2006 38.28 46.94 38.09 44.70 47.08 62.50 32.75
2007 40.95 42.89 34.61 50.52 57.50 49.60 54.83
2008 54.33 40.96 57.75 59.86 41.79 50.63 32.74
2009 66.97 33.78 50.38 58.79 50.80 34.17 34.41
2010 147.35 89.33 78.99 117.69 151.10 124.70 74.02

Urutan Curah Hujan Rerata


Urutan m/n (%) Jan Feb Mar Apr Mei Jun
1 9.1 147.35 89.33 78.99 117.69 151.10 124.70
2 18.2 78.26 49.85 63.73 68.31 62.20 62.50
3 27.3 66.97 46.94 62.90 59.86 60.44 50.63
4 36.4 56.09 46.86 57.75 58.79 57.50 50.45
5 45.5 54.33 46.76 50.38 57.12 50.80 49.60
6 54.5 43.28 42.89 50.11 50.85 47.08 44.07
7 63.6 42.65 41.72 43.07 50.52 42.99 36.05
8 72.7 40.95 40.96 38.24 46.65 41.79 34.17
9 81.8 38.28 33.78 38.09 44.70 36.32 24.95
10 90.9 9.36 28.30 34.61 31.97 28.14 15.98

Debit Andalan Bulanan


1 9.0909091 1.412 1.093 1.036 1.249 1.433 1.288
2 18.181818 1.032 0.876 0.953 0.978 0.944 0.946
3 27.272727 0.970 0.860 0.948 0.931 0.934 0.880
4 36.363636 0.910 0.860 0.920 0.925 0.918 0.879
5 45.454545 0.901 0.859 0.879 0.916 0.881 0.875
6 54.545455 0.840 0.838 0.878 0.882 0.861 0.844
7 63.636364 0.837 0.831 0.839 0.880 0.838 0.800
8 72.727273 0.827 0.827 0.812 0.859 0.832 0.790
9 81.818182 0.813 0.788 0.812 0.848 0.802 0.739
10 90.909091 0.653 0.758 0.792 0.778 0.757 0.690
a Huludupitango
Agt Sept Okt Nov Des
28 18 24 47 40
11 30 20 20 54
31 37 31 24 55
20 17 45 17 17
16 16 57 23 31
3 49 3 64 47
11 72 12 51 60
37 24 61 47 44
7 29 13 31 22
16 20 36 37 25

idu Bolango
Agt Sept Okt Nov Des
22 25 45 71 41
20 25 16 56 22
29 2 51 16 30
28 19 17 65 30
10 6 23 20 43
20 35 5 36 45
21 55 14 30 67
21 45 101 26 35
29 37 60 70 77
71 75 36 55 55

Bongomeme
Agt Sept Okt Nov Des
17 21 45 48 42
6 40 23 22 65
50 69 41 58 78
27 38 109 46 49
45 18 79 60 41
14 15 55 38 87
16 20 36 37 25
56 4 17 84 75
3 30 54 40 41
60 107 97 73 54
Tiesen
Agt Sept Okt Nov Des
22.20 20.66 36.99 52.24 41.04
10.72 33.17 20.45 28.07 52.16
38.53 43.33 39.19 36.59 59.58
24.53 26.17 66.10 38.75 32.97
26.90 14.83 59.35 37.85 37.59
11.01 31.99 25.11 47.52 63.30
15.10 46.87 22.42 40.94 46.79
41.72 19.87 50.67 58.23 55.14
9.75 31.02 39.56 42.59 40.98
45.42 67.37 61.47 55.65 43.14

Jul Agt Sept Okt Nov Des


74.02 45.42 67.37 66.10 58.23 63.30
73.35 41.72 46.87 61.47 55.65 59.58
54.83 38.53 43.33 59.35 52.24 55.14
41.53 26.90 33.17 50.67 47.52 52.16
39.10 24.53 31.99 39.56 42.59 46.79
34.41 22.20 31.02 39.19 40.94 43.14
32.75 15.10 26.17 36.99 38.75 41.04
32.74 11.01 20.66 25.11 37.85 40.98
22.40 10.72 19.87 22.42 36.59 37.59
17.41 9.75 14.83 20.45 28.07 32.97

1.009 0.852 0.973 0.966 0.922 0.950


1.005 0.831 0.860 0.940 0.908 0.930
0.904 0.814 0.840 0.928 0.889 0.905
0.830 0.750 0.784 0.881 0.863 0.889
0.817 0.737 0.778 0.820 0.836 0.859
0.791 0.724 0.773 0.818 0.827 0.839
0.782 0.685 0.746 0.805 0.815 0.828
0.782 0.663 0.716 0.740 0.810 0.827
0.725 0.661 0.711 0.725 0.803 0.809
0.698 0.656 0.684 0.714 0.756 0.783
Kebutuhan Air Pada Saat Penyiapan Lahan Untuk Masa Tanam 1 Oktober

Periode Eto P T S M K IR
e
(mm/day) (mm/day) ( day ) (mm) (mm/day) (mm/day)
1 2 3 4 6 7 7=(1.1x2)+3 8=(7x4)/6
1 3.00 45 250 2.7182 8.24 1.48 10.661
Penyiapan Lahan

Okt 4.766
2 3.00 45 250 2.7182 8.24 1.48 10.661
Nov 1 6.177 3.00 45 250 2.7182 9.79 1.76 11.822
1 3.00 45 250 2.7182 10.55 1.90 12.408
Mar 6.864
2 3.00 45 250 2.7182 10.55 1.90 12.408
Apr 1 2.926 3.00 45 250 2.7182 3.00 0.54 7.190

Kebutuhan Pengambilan Air


Waktu Mulai Tanam Tanggal 1 Oktober

Eto P Re WLR Kc Etc NFR DR


Periode
(mm/day) (mm/day) (mm/day) (mm/day) (mm/day) (mm/day) (mm/day) (l/dt/ha)
1 2 3 4 5 6 7 8=(7+3+5-4) 9=8/(ex8,64)
Okt 1 3.0000 1.1720 LP 10.6606 12.4887 2.2306
4.7663
2 3.0000 1.1720 LP 10.6606 12.4887 2.2306
Nov 1 3.0000 1.7661 LP 11.8224 13.0563 2.3320
6.1769
2 3.0000 1.7661 3.3000 1.1000 6.7946 11.3284 2.0234
Des 1 3.0000 1.9125 3.3000 1.1000 7.3089 11.6964 2.0891
6.6445
2 3.0000 1.9125 3.3000 1.0500 6.9767 11.3642 2.0298
Jan 1 3.0000 1.9111 3.3000 1.0500 7.4127 11.8017 2.1079
7.0597
2 3.0000 1.9111 3.3000 1.0500 7.4127 11.8017 2.1079
Feb 1 3.0000 1.9114 3.3000 0.9500 6.5213 10.9099 1.9486
6.8645
2 3.0000 1.9114 0.0000 0.0000 1.0886 0.1944
Mar 1 3.0000 1.7843 LP 12.4084 13.6240 2.4334
6.6960
2 3.0000 1.7843 LP 12.4084 13.6240 2.4334
Apr 1 3.0000 2.1768 LP 12.4084 13.2315 2.3633
6.1781
2 3.0000 2.1768 3.3000 1.1000 6.7959 10.9191 1.9503
Mei 1 3.0000 1.9501 3.3000 1.1000 4.3271 8.6770 1.5498
3.9337
2 3.0000 1.9501 3.3000 1.0500 4.3271 8.6770 1.5498
Jun 1 3.0000 1.5946 3.3000 1.0500 3.7463 8.4518 1.5096
3.5679
2 3.0000 1.5946 3.3000 1.0500 3.7463 8.4518 1.5096
Jul 1 3.0000 1.5946 3.3000 0.9500 3.3085 8.0140 1.4314
3.4827
2 3.0000 1.5946 0.0000 0.0000 1.4054 0.2510
Aug 1 3.0000 0.5137
5.0309
2 3.0000 0.5137
Sep 1 3.0000 0.9641
7.4443
2 3.0000 0.9641
Urutan Curah Hujan Rerata Thiessen
Urutan m/n+1 Jan Feb Mar Apr Mei Jun Jul Agt Sept Okt Nov Des
1 9.09 147.35 89.33 78.99 117.69 151.10 124.70 74.02 45.42 67.37 66.10 58.23 63.30
2 18.18 78.26 49.85 63.73 68.31 62.20 62.50 73.35 41.72 46.87 61.47 55.65 59.58
3 27.27 66.97 46.94 62.90 59.86 60.44 50.63 54.83 38.53 43.33 59.35 52.24 55.14
4 36.36 56.09 46.86 57.75 58.79 57.50 50.45 41.53 26.90 33.17 50.67 47.94 52.16
5 45.45 54.33 46.76 50.38 57.12 50.80 49.60 39.10 24.53 31.99 39.56 42.59 46.79
6 54.55 43.28 42.89 50.11 50.85 47.08 44.07 34.41 22.20 31.02 39.19 40.94 43.14
7 63.64 42.65 41.72 43.07 50.52 42.99 36.05 32.75 15.10 26.17 36.99 38.75 41.04
8 72.73 40.95 40.96 38.24 46.65 41.79 34.17 32.74 11.01 20.66 25.11 37.85 40.98
9 81.82 38.28 33.78 38.09 44.70 36.32 24.95 22.40 10.72 19.87 22.42 36.59 37.59
10 90.91 9.36 28.30 34.61 31.97 28.14 15.98 17.41 9.75 14.83 20.45 28.07 32.97

Bulan Jan Feb Mar Apr Mei Jun Jul Agt Sept Okt Nov Des
R80 38.82 35.22 38.12 45.09 37.41 26.79 24.47 10.78 20.03 22.96 36.84 38.27
R50 48.81 44.82 50.24 53.98 48.94 46.83 36.75 23.37 31.51 39.38 41.76 44.96
Hari 31 59 90 120 151 181 212 243 273 304 334 365

R80 Setengah Bulanan


Jan Feb Mar Apr Mei Jun
Bulan
1 2 1 2 1 2 1 2 1 2 1 2
R80 1/2 19.60 19.21 17.65 17.57 18.45 19.67 22.59 22.50 19.86 17.55 14.18 12.62
RE 0.91 0.90 0.82 0.82 0.86 0.92 1.05 1.05 0.93 0.82 0.66 0.59
Jul Agt Sept Okt Nov Des
Bulan
1 2 1 2 1 2 1 2 1 2 1 2
R80 1/2 13.30 11.17 5.61 5.17 9.22 10.81 10.49 12.47 17.42 19.42 19.01 19.26
RE 0.62 0.52 0.26 0.24 0.43 0.50 0.49 0.58 0.81 0.91 0.89 0.90
Perhitungan C,WLR, NFR,dan DR dari Petak Tersier Untuk Waktu Mulai Tanam 1 Oktober Golongan A

Okt Nov Des Jan Feb Mar Apr Mei Jun Jul Agst Sep
Bulan
1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2
Eto (mm/hr) 4.77 4.77 6.18 6.18 6.64 6.64 7.06 7.06 6.86 6.86 6.70 6.70 6.18 6.18 3.93 3.93 3.57 3.57 3.48 3.48 5.03 5.03 7.44 7.44
P (mm/hr) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
RE (mm/Hr) 0.49 0.58 0.81 0.91 0.89 0.90 0.91 0.90 0.82 0.82 0.86 0.92 1.05 1.05 0.93 0.82 0.66 0.59 0.62 0.52 0.26 0.24 0.43 0.50

Pola Tanam PADI PADI PALAWIJA

Koefisien Tanam
C1 LP 1.10 1.10 1.05 1.05 0.95 0.00 0.00 0.00 LP 1.10 1.10 1.05 1.05 0.95 0.00 0.50 0.75 1.00 1.00 0.82 0.45 0.00 0.00
C2 LP LP 1.10 1.10 1.05 1.05 0.95 0.00 0.00 LP LP 1.10 1.10 1.05 1.05 0.95 0.00 0.50 0.75 1.00 1.00 0.82 0.45 0.00
C3 LP LP LP 1.10 1.10 1.05 1.05 0.95 0.00 LP LP LP 1.10 1.10 1.05 1.05 0.95 0.00 0.50 0.75 1.00 1.00 0.82 0.45
C rerata LP LP LP 1.08 1.07 1.02 0.67 0.32 0.00 LP LP LP 1.08 1.07 1.02 0.67 0.48 0.42 0.75 0.92 0.94 0.76 0.42 0.15

LP (mm/hr) 10.66 10.66 11.82 12.41 12.26 12.26

Pengantian Lapisan Air


WLR 1 0.00 0.00 0.00 0.00 3.30 0.00 3.30 0.00 0.00 0.00 0.00 0.00 0.00 3.30 0.00 3.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
WLR 2 0.00 0.00 0.00 0.00 0.00 3.30 0.00 3.30 0.00 0.00 0.00 0.00 0.00 0.00 3.30 0.00 3.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00
WLR 3 0.00 0.00 0.00 0.00 0.00 0.00 3.30 0.00 3.30 0.00 0.00 0.00 0.00 0.00 0.00 3.30 0.00 3.30 0.00 0.00 0.00 0.00 0.00 0.00
WLR rerata 0.00 0.00 0.00 0.00 1.10 1.10 2.20 1.10 1.10 0.00 0.00 0.00 0.00 1.10 1.10 2.20 1.10 1.10 0.00 0.00 0.00 0.00 0.00 0.00

Etc (mm/hr) 6.69 7.09 6.76 4.71 2.24 0.00 6.69 6.59 4.00 2.62 1.72 1.49 2.61 3.19 4.73 3.81 3.15 1.12

Kebutuhan Air
NFR (mm/hr) 10.17 10.08 11.01 8.79 10.30 9.96 8.99 5.44 3.28 11.59 11.40 11.35 8.64 9.64 7.17 7.00 5.16 5.00 4.99 5.67 7.47 6.57 5.72 3.61
IR {NFR/0,64} (mm/hr) 15.9 15.7 17.2 13.73 16.1 15.6 14.0 8.50 5.12 18.1 17.8 17.7 13.50 15.06 11.21 10.94 8.07 7.81 7.80 8.86 11.67 10.26 8.94 5.64
NFR (ltr/dtk/ha) 1.18 1.17 1.27 1.02 1.19 1.15 1.04 0.63 0.38 1.34 1.32 1.31 1.00 1.12 0.83 0.81 0.60 0.58 0.58 0.66 0.86 0.76 0.66 0.42
DR {e = 0,65} (ltr/dtk/ha) 1.84 1.82 1.99 1.59 1.86 1.80 1.63 0.98 0.59 2.10 2.06 2.05 1.56 1.74 1.30 1.27 0.93 0.90 0.90 1.03 1.35 1.19 1.03 0.65
Perhitungan C,WLR, NFR,dan DR dari Petak Tersier Untuk Waktu Mulai Tanam 1 Oktober Golongan B

Okt Nov Des Jan Feb Mar Apr Mei Jun Jul Agst Sep
Bulan
1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2
Eto (mm/hr) 4.77 4.77 6.18 6.18 6.64 6.64 7.06 7.06 6.86 6.86 6.70 6.70 6.18 6.18 3.93 3.93 3.57 3.57 3.48 3.48 5.03 5.03 7.44 7.44
P (mm/hr) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
RE (mm/Hr) 0.49 0.58 0.81 0.91 0.89 0.90 0.91 0.90 0.82 0.82 0.86 0.92 1.05 1.05 0.93 0.82 0.66 0.59 0.62 0.52 0.26 0.24 0.43 0.50

Pola Tanam PADI PADI PALAWIJA

Koefisien Tanam
C1 0.00 LP 1.10 1.10 1.05 1.05 0.95 0.00 0.00 0.00 LP 1.10 1.10 1.05 1.05 0.95 0.00 0.50 0.75 1.00 1.00 0.82 0.45 0.00
C2 0.00 LP LP 1.10 1.10 1.05 1.05 0.95 0.00 0.00 LP LP 1.10 1.10 1.05 1.05 0.95 0.00 0.50 0.75 1.00 1.00 0.82 0.45
C3 0.45 LP LP LP 1.10 1.10 1.05 1.05 0.95 0.00 LP LP LP 1.10 1.10 1.05 1.05 0.95 0.00 0.50 0.75 1.00 1.00 0.82
C rerata 0.15 LP LP LP 1.08 1.07 1.02 0.67 0.32 0.00 LP LP LP 1.08 1.07 1.02 0.67 0.48 0.42 0.75 0.92 0.94 0.76 0.42

LP (mm/hr) 10.66 11.82 11.82 12.26 12.26 11.82

Pengantian Lapisan Air


WLR 1 0.00 0.00 0.00 0.00 0.00 3.30 0.00 3.30 0.00 0.00 0.00 0.00 0.00 0.00 3.30 0.00 3.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00
WLR 2 0.00 0.00 0.00 0.00 0.00 0.00 3.30 0.00 3.30 0.00 0.00 0.00 0.00 0.00 0.00 3.30 0.00 3.30 0.00 0.00 0.00 0.00 0.00 0.00
WLR 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.30 0.00 3.30 0.00 0.00 0.00 0.00 0.00 0.00 3.30 0.00 3.30 0.00 0.00 0.00 0.00 0.00
WLR rerata 0.00 0.00 0.00 0.00 0.00 1.10 1.10 2.20 1.10 1.10 0.00 0.00 0.00 0.00 1.10 1.10 2.20 1.10 1.10 0.00 0.00 0.00 0.00 0.00

Etc (mm/hr) 0.71 7.20 7.09 7.18 4.71 2.17 0.00 6.69 4.20 4.00 2.38 1.72 1.45 2.61 4.61 4.73 5.63 3.15

Kebutuhan Air
NFR (mm/hr) 3.23 10.08 11.01 10.92 9.31 10.29 10.36 9.01 5.45 3.28 11.40 11.35 10.77 8.64 7.37 7.28 6.92 5.24 4.93 5.09 7.35 7.49 8.20 5.65
IR {NFR/0,64} (mm/hr) 5.04 15.7 17.2 17.1 14.55 16.1 16.2 14.1 8.52 5.13 17.8 17.7 16.8 13.50 11.51 11.38 10.81 8.18 7.70 7.95 11.48 11.70 12.82 8.82
NFR (ltr/dtk/ha) 0.37 1.17 1.27 1.26 1.08 1.19 1.20 1.04 0.63 0.38 1.32 1.31 1.25 1.00 0.85 0.84 0.80 0.61 0.57 0.59 0.85 0.87 0.95 0.65
DR {e = 0,65} (ltr/dtk/ha) 0.58 1.82 1.99 1.97 1.68 1.86 1.87 1.63 0.99 0.59 2.06 2.05 1.95 1.56 1.33 1.32 1.25 0.95 0.89 0.92 1.33 1.35 1.48 1.02
Perhitungan C,WLR, NFR,dan DR dari Petak Tersier Untuk Waktu Mulai Tanam 1 Oktober Golongan C

Okt Nov Des Jan Feb Mar Apr Mei Jun Jul Agst Sep
Bulan
1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2
Eto (mm/hr) 4.77 4.77 6.18 6.18 6.64 6.64 7.06 7.06 6.86 6.86 6.70 6.70 6.18 6.18 3.93 3.93 3.57 3.57 3.48 3.48 5.03 5.03 7.44 7.44
P (mm/hr) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
RE (mm/Hr) 0.49 0.58 0.81 0.91 0.89 0.90 0.91 0.90 0.82 0.82 0.86 0.92 1.05 1.05 0.93 0.82 0.66 0.59 0.62 0.52 0.26 0.24 0.43 0.50

Pola Tanam PADI PADI PALAWIJA

Koefisien Tanam
C1 0.00 0.00 LP 1.10 1.10 1.05 1.05 0.95 0.00 0.00 0.00 LP 1.10 1.10 1.05 1.05 0.95 0.00 0.50 0.75 1.00 1.00 0.82 0.45
C2 0.45 0.00 LP LP 1.10 1.10 1.05 1.05 0.95 0.00 0.00 LP LP 1.10 1.10 1.05 1.05 0.95 0.00 0.50 0.75 1.00 1.00 0.82
C3 0.82 0.45 LP LP LP 1.10 1.10 1.05 1.05 0.95 0.00 LP LP LP 1.10 1.10 1.05 1.05 0.95 0.00 0.50 0.75 1.00 1.00
C rerata 0.42 0.15 LP LP LP 1.08 1.07 1.02 0.67 0.32 0.00 LP LP LP 1.08 1.07 1.02 0.67 0.48 0.42 0.75 0.92 0.94 0.76

LP (mm/hr) 11.82 11.82 12.22 12.26 11.82 11.82

Pengantian Lapisan Air


WLR 1 0.00 0.00 0.00 0.00 0.00 0.00 3.30 0.00 3.30 0.00 0.00 0.00 0.00 0.00 0.00 3.30 0.00 3.30 0.00 0.00 0.00 0.00 0.00 0.00
WLR 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.30 0.00 3.30 0.00 0.00 0.00 0.00 0.00 0.00 3.30 0.00 3.30 0.00 0.00 0.00 0.00 0.00
WLR 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.30 0.00 3.30 0.00 0.00 0.00 0.00 0.00 0.00 3.30 0.00 3.30 0.00 0.00 0.00 0.00
WLR rerata 0.00 0.00 0.00 0.00 0.00 0.00 1.10 1.10 2.20 1.10 1.10 0.00 0.00 0.00 0.00 1.10 1.10 2.20 1.10 1.10 0.00 0.00 0.00 0.00

Etc (mm/hr) 2.02 0.71 7.20 7.53 7.18 4.58 2.17 0.00 4.26 4.20 3.63 2.38 1.68 1.45 3.77 4.61 7.00 5.63

Kebutuhan Air
NFR (mm/hr) 4.53 3.13 11.01 10.92 11.33 9.30 10.72 10.38 8.95 5.45 3.24 11.35 10.77 10.77 6.33 7.48 7.07 6.99 5.16 5.03 6.51 7.37 9.57 8.13
IR {NFR/0,64} (mm/hr) 7.08 4.90 17.2 17.1 17.7 14.53 16.74 16.2 14.0 8.52 5.06 17.7 16.8 16.8 9.90 11.68 11.04 10.92 8.07 7.86 10.17 11.52 14.9 12.70
NFR (ltr/dtk/ha) 0.52 0.36 1.27 1.26 1.31 1.08 1.24 1.20 1.04 0.63 0.37 1.31 1.25 1.25 0.73 0.87 0.82 0.81 0.60 0.58 0.75 0.85 1.11 0.94
DR {e = 0,65} (ltr/dtk/ha) 0.82 0.57 1.99 1.97 2.05 1.68 1.94 1.88 1.62 0.99 0.59 2.05 1.95 1.95 1.15 1.35 1.28 1.26 0.93 0.91 1.18 1.33 1.73 1.47
Perhitungan Kebutuhan Air Pada Saat Penyiapan Lahan

Eto Eo * P M* T S LP *
Bulan k* e
mm/hr hr mm mm/hr
Jan 7.06 7.77 3 10.77 45 250 1.94 2.7182 12.5771
Feb 6.86 7.55 3 10.55 45 250 1.90 2.7182 12.4085
Mar 6.70 7.37 3 10.37 45 250 1.87 2.7182 12.2638
Apr 6.18 6.80 3 9.80 45 250 1.76 2.7182 11.8236
Mei 3.93 4.33 3 7.33 45 250 1.32 2.7182 10.0021
Jun 3.57 3.92 3 6.92 45 250 1.25 2.7182 9.7194
Jul 3.48 3.83 3 6.83 45 250 1.23 2.7182 9.6541
Agst 5.03 5.53 3 8.53 45 250 1.54 2.7182 10.8745
Sep 7.44 8.19 3 11.19 45 250 2.01 2.7182 12.9120
Okt 4.77 5.24 3 8.24 45 250 1.48 2.7182 10.6608
Nov 6.18 6.79 3 9.79 45 250 1.76 2.7182 11.8225
Des 6.64 7.31 3 10.31 45 250 1.86 2.7182 12.2197

Eo *) = 1,1 x Eto
M *) = Eo + P
MxT
k *) =
S
LP *)= M x e^k
e^k - 1
Tabel Nilai DR Berbagai Macam Alternatif

Okt Nov Des Jan Feb Mar


Bulan
1 2 1 2 1 2 1 2 1 2 1 2
1 1.84 1.82 1.99 1.59 1.86 1.80 1.63 0.98 0.59 2.10 2.06 2.05
2 0.58 1.82 1.99 1.97 1.68 1.86 1.87 1.63 0.99 0.59 2.06 2.05
Alterntif

3 0.82 0.57 1.99 1.97 2.05 1.68 1.94 1.88 1.62 0.99 0.59 2.05
4 1.21 1.82 1.99 1.78 1.77 1.83 1.75 1.31 0.79 1.34 2.06 2.05
5 1.08 1.40 1.99 1.85 1.87 1.78 1.81 1.50 1.07 1.23 1.57 2.05
6 0.70 1.19 1.99 1.97 1.87 1.77 1.91 1.75 1.30 0.79 1.32 2.05

Apr Mei Jun Jul Agst Sep


Bulan
1 2 1 2 1 2 1 2 1 2 1 2
1 1.56 1.74 1.30 1.27 0.93 0.90 0.90 1.03 1.35 1.19 1.03 0.65
2 1.95 1.56 1.33 1.32 1.25 0.95 0.89 0.92 1.33 1.35 1.48 1.02
Alterntif

3 1.95 1.95 1.15 1.35 1.28 1.26 0.93 0.91 1.18 1.33 1.73 1.47
4 1.75 1.65 1.31 1.29 1.09 0.93 0.90 0.97 1.34 1.27 1.26 0.84
5 1.82 1.75 1.26 1.31 1.15 1.04 0.91 0.95 1.29 1.29 1.42 1.05
6 1.95 1.76 1.24 1.33 1.26 1.11 0.91 0.92 1.25 1.34 1.61 1.25

1 DR alternatif 1 = DR gol A
Padi Musim 1
2 DR alternatif 2= DR gol B
3 DR alternatif 2= DR gol C
Padi Musim 2
4 DR alternatif 4 = rata-rata dari DR alternatif 1 & 2
5 DR alternatif 5 = rata-rata dari DR alternatif 1,2,3
Palawija
6 DR alternatif 5 = rata-rata dari DR alternatif 2 & 3
PERHITUNGAN DEBIT BULANAN, MENGGUNAKAN METODE FJ. MOCK

DAS :
Luas DAS : 151.19 km2
Thn. Pengamatan : 2001

No. Meteorological Data Hitungan Unit Jan Feb Mar Apr Mei Jun Jul Agu Sep Okt Nop Des
1 Catc. Precip (P; mm/month) Data mm 78 42 38 32 36 36 17 22 21 37 52 41
2 Catc. Rain Days (n ;days) Data days 12 11 10 13 8 18 7 5 5 7 9 14
3 Days of Month (Hr; days) Data days 31 28 31 30 31 30 31 31 30 31 30 31
Potential Evapo-Transpiration
4 Suhu (T) ◦C 28 26 29 28 28 26 27 28 27 27 27 27
5 n % 50 53 50 52 53 55 50 51 40 39 43 44
6 Rh % 79 73 74 75 84 81 85 77 78 84 79 84
7 A Tabel 0.917 0.828 0.965 0.917 0.917 0.828 0.873 0.917 0.873 0.873 0.873 0.873
8 B Tabel 16.700 16.200 16.900 16.700 16.700 16.200 16.450 16.700 16.450 16.450 16.450 16.450
9 ea Tabel 28.300 25.200 30.050 28.300 28.300 25.200 26.750 28.300 26.750 26.750 26.750 26.750
10 ed (6) * (9) 22.357 18.396 22.237 21.225 23.772 20.412 22.738 21.791 20.865 22.470 21.133 22.470
11 Ra mm/hari 17.700 16.400 14.150 11.600 9.300 8.700 8.850 10.400 23.100 15.450 17.200 17.850
12 F1=f(T,S) =A(0.18+0.55S)/(A+0.27) 0.35 0.34 0.36 0.35 0.35 0.34 0.35 0.35 0.35 0.35 0.35 0.35
13 F2=F(T,h)=AB(0.56-0.092×√𝑒𝑑)/(A+0.27) 1.61 2.02 1.67 1.76 1.44 1.76 1.52 1.68 1.76 1.56 1.72 1.56
14 F3=f(T,h)=0.27×0.35(ea-ed)/(A+0.27) 0.47 0.59 0.60 0.56 0.36 0.41 0.33 0.52 0.49 0.35 0.46 0.35
15 Koefisien Refleksi Tentukan 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
16 E1=F1×Ra (1-r) 3.73 3.38 3.02 2.45 1.96 1.79 1.85 2.19 4.82 3.22 3.59 3.72
17 E2=F2(0.1+0.9S) 0.89 1.11 0.92 0.97 0.79 0.97 0.84 0.93 0.97 0.86 0.95 0.86
18 E3=F3(k+0.01w) 0.19 0.23 0.24 0.23 0.14 0.16 0.13 0.21 0.19 0.14 0.19 0.14
19 Evaptranspirasi Potensial ETo (16) - (17) + (18) 3.04 2.50 2.34 1.71 1.31 0.99 1.14 1.47 4.05 2.51 2.82 3.01
20 Evaptranspirasi Potensial Bulanan ETo mm/month 94.09 69.98 72.58 51.17 40.76 29.58 35.33 45.71 121.35 77.71 84.74 93.22
Limited Evapotranspiration
21 Exposed Surface (m; %) Tentukan 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00
22 na (number of rainy days) 2 12 11 10 13 8 18 7 5 5 7 9 14
23 (Delta E)/Epm = (m/20)(18-na);(%) 0.10 0.11 0.15 0.08 0.18 0.00 0.20 0.23 0.22 0.20 0.16 0.07
24 Delta E (20) * (23) mm/month 9.16 0.08 0.11 0.04 0.07 0.00 0.07 0.11 0.27 0.16 0.13 0.07
25 Ea (mm/month) = Epm-Delta E (20) - (24) mm/month 84.94 69.90 72.47 51.13 40.69 29.58 35.26 45.60 121.08 77.55 84.61 93.15
Water Balance
26 P-Ea (mm/month) (1) - (25) mm/month -6.67 -28.17 -34.24 -19.16 -4.37 6.47 -17.85 -23.40 -100.43 -40.56 -32.37 -52.12
27 SMS = ISM+(P-Ea); ISM + (26) 193.33 165.15 130.92 111.76 107.39 113.86 182.15 158.75 58.32 17.76 -14.61 -66.72
28 Soil Moist Storage (mm/month); SMC= 200.00 193.33 165.15 130.92 111.76 107.39 200.00 182.15 158.75 58.32 17.76 -14.61 -66.72
29 Soil Storage (mm/month) mm/month -6.67 -28.17 -34.24 -19.16 -4.37 0.00 -17.85 -23.40 -100.43 -40.56 -32.37 -52.12
30 Water Surplus (mm/month); [(26)-(29)] (26) - (29) mm/month 0.00 0.00 0.00 0.00 0.00 6.47 0.00 0.00 0.00 0.00 0.00 0.00
Run Off & Ground. Stor. (mm/month)
31 Infiltration Coefficient (if) Tentukan 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
32 Infiltration (i); (30)x if, (30) * (31) 0.00 0.00 0.00 0.00 0.00 1.94 0.00 0.00 0.00 0.00 0.00 0.00
33 K (monthly flow recession constan) Tentukan 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60
34 PF (Percentage Factor) Tentukan 0.10 0.10 0.07 0.05 0.05 0.05 0.05 0.05 0.05 0.07 0.10 0.10
35 1/2 x (1 + K) x i 0.00 0.00 0.00 0.00 0.00 1.55 0.00 0.00 0.00 0.00 0.00 0.00
36 Kx(Gsom); 0.04 0.03 0.02 0.01 0.01 0.00 0.93 0.56 0.34 0.20 0.12 0.07
37 GS; Gsom (35) * (36) 0.07 0.04 0.03 0.02 0.01 0.01 1.56 0.93 0.56 0.34 0.20 0.12 0.07
38 GS = -Gsom + GS (37) - Gsom -0.03 -0.02 -0.01 -0.01 0.00 1.55 -0.62 -0.37 -0.22 -0.13 -0.08 -0.05
39 Base Flow = i-GS (32) - (38) 0.03 0.02 0.01 0.01 0.00 0.39 0.62 0.37 0.22 0.13 0.08 0.05
40 DRO = WS-i (15) - (17) 0.00 0.00 0.00 0.00 0.00 4.53 0.00 0.00 0.00 0.00 0.00 0.00
41 Storm run off = PxPF if WS > 0, SRO=0 (1) * (34) 7.83 4.17 2.68 1.73 1.96 1.95 0.94 1.11 1.03 2.51 5.22 4.10
42 Total Run Off = BFlow+DRO+Storm 7.85 4.19 2.69 1.73 1.97 6.87 1.56 1.48 1.26 2.65 5.30 4.15
Location: DAS Bendung Randangan
43 Flow (m3/second) m3/second 0.443 0.262 0.152 0.101 0.111 0.401 0.088 0.084 0.073 0.149 0.309 0.234
PERHITUNGAN DEBIT BULANAN, MENGGUNAKAN METODE FJ. MOCK

DAS :
Luas DAS : 151.19 km2
Thn. Pengamatan : 2002

No. Meteorological Data Hitungan Unit Jan Feb Mar Apr Mei Jun Jul Agu Sep Okt Nop Des
1 Catc. Precip (P; mm/month) Data mm 43 47 63 47 43 25 22 11 33 20 28 52
2 Catc. Rain Days (n ;days) Data days 12 11 10 13 8 18 7 5 5 7 9 14
3 Days of Month (Hr; days) Data days 31 28 31 30 31 30 31 31 30 31 30 31
Potential Evapo-Transpiration
4 Suhu (T) ◦C 28 26 29 28 28 26 27 28 27 27 27 27
5 n % 50 53 50 52 53 55 50 51 40 39 43 44
6 Rh % 79 73 74 75 84 81 85 77 78 84 79 84
7 A Tabel 0.917 0.828 0.965 0.917 0.917 0.828 0.8725 0.917 0.8725 0.8725 0.8725 0.8725
8 B Tabel 16.7 16.2 16.9 16.7 16.7 16.2 16.45 16.7 16.45 16.45 16.45 16.45
9 ea Tabel 28.3 25.2 30.05 28.3 28.3 25.2 26.75 28.3 26.75 26.75 26.75 26.75
10 ed (6) * (9) 22.357 18.396 22.237 21.225 23.772 20.412 22.738 21.791 20.865 22.470 21.133 22.470
11 Ra mm/hari 17.7 16.4 14.15 11.6 9.3 8.7 8.85 10.4 23.1 15.45 17.2 17.85
12 F1=f(T,S) =A(0.18+0.55S)/(A+0.27) 0.35 0.34 0.36 0.35 0.35 0.34 0.35 0.35 0.35 0.35 0.35 0.35
13 F2=F(T,h)=AB(0.56-0.092×√𝑒𝑑)/(A+0.27) 1.61 2.02 1.67 1.76 1.44 1.76 1.52 1.68 1.76 1.56 1.72 1.56
14 F3=f(T,h)=0.27×0.35(ea-ed)/(A+0.27) 0.47 0.59 0.60 0.56 0.36 0.41 0.33 0.52 0.49 0.35 0.46 0.35
15 Koefisien Refleksi Tentukan 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
16 E1=F1×Ra (1-r) 3.73 3.38 3.02 2.45 1.96 1.79 1.85 2.19 4.82 3.22 3.59 3.72
17 E2=F2(0.1+0.9S) 0.89 1.11 0.92 0.97 0.79 0.97 0.84 0.93 0.97 0.86 0.95 0.86
18 E3=F3(k+0.01w) 0.19 0.23 0.24 0.23 0.14 0.16 0.13 0.21 0.19 0.14 0.19 0.14
19 Evaptranspirasi Potensial ETo (16) - (17) + (18) 3.04 2.50 2.34 1.71 1.31 0.99 1.14 1.47 4.05 2.51 2.82 3.01
20 Epm (mm/month) = HrxEp ETo mm/month 94.09 69.98 72.58 51.17 40.76 29.58 35.33 45.71 121.35 77.71 84.74 93.22
Limited Evapotranspiration
21 Exposed Surface (m; %) Tentukan 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00
22 na (number of rainy days) 2 12 11 10 13 8 18 7 5 5 7 9 14
23 (Delta E)/Epm = (m/20)(18-na);(%) 0.10 0.11 0.15 0.08 0.18 0.00 0.20 0.23 0.22 0.20 0.16 0.07
24 Delta E (5) * (8) mm/month 9.16 0.08 0.11 0.04 0.07 0.00 0.07 0.11 0.27 0.16 0.13 0.07
25 Ea (mm/month) = Epm-Delta E (5) - (9) mm/month 84.94 69.90 72.47 51.13 40.69 29.58 35.26 45.60 121.08 77.55 84.61 93.15
Water Balance
26 P-Ea (mm/month) (1) - (10) mm/month -42.29 -23.14 -9.57 -4.48 2.31 -4.63 -12.86 -34.88 -87.91 -57.10 -56.54 -40.99
27 SMS = ISM+(P-Ea); ISM + (11) 157.71 134.58 125.01 120.52 122.83 195.37 182.51 147.63 59.72 2.62 -53.92 -94.91
28 Soil Moist Storage (mm/month); SMC= 200.00 157.71 134.58 125.01 120.52 200.00 195.37 182.51 147.63 59.72 2.62 -53.92 -94.91
29 Soil Storage (mm/month) mm/month -42.29 -23.14 -9.57 -4.48 0.00 -4.63 -12.86 -34.88 -87.91 -57.10 -56.54 -40.99
30 Water Surplus (mm/month); [(26)-(29)] (11 - (14) mm/month 0.00 0.00 0.00 0.00 2.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Run Off & Ground. Stor. (mm/month)
31 Infiltration Coefficient (if) Tentukan 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
32 Infiltration (i); (30)x if, (15) * (16) 0.00 0.00 0.00 0.00 0.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00
33 K (monthly flow recession constan) Tentukan 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60
34 PF (Percentage Factor) Tentukan 0.10 0.10 0.07 0.05 0.05 0.05 0.05 0.05 0.05 0.07 0.10 0.10
35 1/2 x (1 + K) x i 0.00 0.00 0.00 0.00 0.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00
36 Kx(Gsom); 0.01 0.01 0.00 0.00 0.00 0.33 0.20 0.12 0.07 0.04 0.03 0.02
37 GS; Gsom (20) * (21) 0.02 0.01 0.01 0.00 0.00 0.56 0.33 0.20 0.12 0.07 0.04 0.03 0.02
38 GS = -Gsom + GS (22) - Gsom -0.01 0.00 0.00 0.00 0.55 -0.22 -0.13 -0.08 -0.05 -0.03 -0.02 -0.01
39 Base Flow = i-GS (17) - (23) 0.01 0.00 0.00 0.00 0.14 0.22 0.13 0.08 0.05 0.03 0.02 0.01
40 DRO = WS-i (15) - (17) 0.00 0.00 0.00 0.00 1.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00
41 Storm run off = PxPF if WS > 0, SRO=0 (1) * (19) 4.27 4.68 4.40 2.52 2.32 1.35 1.21 0.54 1.66 1.39 2.81 5.22
42 Total Run Off = BFlow+DRO+Storm 4.27 4.68 4.41 2.52 4.08 1.57 1.34 0.62 1.71 1.42 2.82 5.23
Location: DAS Bendung Randangan
43 Flow (m3/second) m3/second 0.241 0.293 0.249 0.147 0.230 0.092 0.076 0.035 0.100 0.080 0.165 0.295
PERHITUNGAN DEBIT BULANAN, MENGGUNAKAN METODE FJ. MOCK

DAS :
Luas DAS : 151.19 km2
Thn. Pengamatan : 2003

No. Meteorological Data Hitungan Unit Jan Feb Mar Apr Mei Jun Jul Agu Sep Okt Nop Des
1 Catc. Precip (P; mm/month) Data mm 43 28 64 57 60 16 42 39 43 39 37 60
2 Catc. Rain Days (n ;days) Data days 12 11 10 13 8 18 7 5 5 7 9 14
3 Days of Month (Hr; days) Data days 31 28 31 30 31 30 31 31 30 31 30 31
Potential Evapo-Transpiration
4 Suhu (T) ◦C 28 26 29 28 28 26 27 28 27 27 27 27
5 n % 50 53 50 52 53 55 50 51 40 39 43 44
6 Rh % 79 73 74 75 84 81 85 77 78 84 79 84
7 A Tabel 0.917 0.828 0.965 0.917 0.917 0.828 0.8725 0.917 0.8725 0.8725 0.8725 0.8725
8 B Tabel 16.7 16.2 16.9 16.7 16.7 16.2 16.45 16.7 16.45 16.45 16.45 16.45
9 ea Tabel 28.3 25.2 30.05 28.3 28.3 25.2 26.75 28.3 26.75 26.75 26.75 26.75
10 ed (6) * (9) 22.357 18.396 22.237 21.225 23.772 20.412 22.7375 21.791 20.865 22.47 21.1325 22.47
11 Ra mm/hari 17.7 16.4 14.15 11.6 9.3 8.7 8.85 10.4 23.1 15.45 17.2 17.85
12 F1=f(T,S) =A(0.18+0.55S)/(A+0.27) ### ### ### ### ### ### ### ### ### ### ### ###
13 F2=F(T,h)=AB(0.56-0.092×√𝑒𝑑)/(A+0.27) ### ### ### ### ### ### ### ### ### ### ### ###
14 F3=f(T,h)=0.27×0.35(ea-ed)/(A+0.27) ### ### ### ### ### ### ### ### ### ### ### ###
15 Koefisien Refleksi Tentukan 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4
16 E1=F1×Ra (1-r) ### ### ### ### ### ### ### ### ### ### ### ###
17 E2=F2(0.1+0.9S) ### ### ### ### ### ### ### ### ### ### ### ###
18 E3=F3(k+0.01w) ### ### ### ### ### ### ### ### ### ### ### ###
19 Evaptranspirasi Potensial ETo (16) - (17) + (18) 3.04 2.50 2.34 1.71 1.31 0.99 1.14 1.47 4.05 2.51 2.82 3.01
20 Epm (mm/month) = HrxEp ETo mm/month 94.09 69.98 72.58 51.17 40.76 29.58 35.33 45.71 121.35 77.71 84.74 93.22
Limited Evapotranspiration
21 Exposed Surface (m; %) Tentukan 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00
22 na (number of rainy days) 2 12 11 10 13 8 18 7 5 5 7 9 14
23 (Delta E)/Epm = (m/20)(18-na);(%) 0.10 0.11 0.15 0.08 0.18 0.00 0.20 0.23 0.22 0.20 0.16 0.07
24 Delta E (5) * (8) mm/month 9.16 0.08 0.11 0.04 0.07 0.00 0.07 0.11 0.27 0.16 0.13 0.07
25 Ea (mm/month) = Epm-Delta E (5) - (9) mm/month 84.94 69.90 72.47 51.13 40.69 29.58 35.26 45.60 121.08 77.55 84.61 93.15
Water Balance
26 P-Ea (mm/month) (1) - (10) mm/month -41.66 -41.59 -8.74 5.99 19.75 -13.60 6.27 -7.07 -77.76 -38.36 -48.02 -33.57
27 SMS = ISM+(P-Ea); ISM + (11) 158.34 116.75 108.01 114.00 219.75 186.40 192.66 192.93 115.17 76.82 28.80 -4.77
28 Soil Moist Storage (mm/month); SMC= 200.00 158.34 116.75 108.01 200.00 200.00 186.40 200.00 192.93 115.17 76.82 28.80 -4.77
29 Soil Storage (mm/month) mm/month -41.66 -41.59 -8.74 0.00 0.00 -13.60 0.00 -7.07 -77.76 -38.36 -48.02 -33.57
30 Water Surplus (mm/month); [(26)-(29)] (11 - (14) mm/month 0.00 0.00 0.00 5.99 19.75 0.00 6.27 0.00 0.00 0.00 0.00 0.00
Run Off & Ground. Stor. (mm/month)
31 Infiltration Coefficient (if) Tentukan 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
32 Infiltration (i); (30)x if, (15) * (16) 0.00 0.00 0.00 1.80 5.93 0.00 1.88 0.00 0.00 0.00 0.00 0.00
33 K (monthly flow recession constan) Tentukan 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60
34 PF (Percentage Factor) Tentukan 0.10 0.10 0.07 0.05 0.05 0.05 0.05 0.05 0.05 0.07 0.10 0.10
35 1/2 x (1 + K) x i 0.00 0.00 0.00 1.44 4.74 0.00 1.50 0.00 0.00 0.00 0.00 0.00
36 Kx(Gsom); 0.16 0.10 0.06 0.03 0.88 3.37 2.02 2.12 1.27 0.76 0.46 0.27
37 GS; Gsom (20) * (21) 0.27 0.16 0.10 0.06 1.47 5.62 3.37 3.53 2.12 1.27 0.76 0.46 0.27
38 GS = -Gsom + GS (22) - Gsom -0.11 -0.06 -0.04 1.41 4.15 -2.25 0.15 -1.41 -0.85 -0.51 -0.30 -0.18
39 Base Flow = i-GS (17) - (23) 0.11 0.06 0.04 0.38 1.77 2.25 1.73 1.41 0.85 0.51 0.30 0.18
40 DRO = WS-i (15) - (17) 0.00 0.00 0.00 4.19 13.83 0.00 4.39 0.00 0.00 0.00 0.00 0.00
41 Storm run off = PxPF if WS > 0, SRO=0 (1) * (19) 4.33 2.83 4.46 3.09 3.27 0.86 2.24 1.93 2.17 2.66 3.66 5.96
42 Total Run Off = BFlow+DRO+Storm 4.44 2.90 4.50 7.66 18.87 3.11 8.36 3.34 3.01 3.17 3.96 6.14
Location: DAS Bendung Randangan
43 Flow (m3/second) m3/second 0.250 0.181 0.254 0.447 1.065 0.182 0.472 0.188 0.176 0.179 0.231 0.347
PERHITUNGAN DEBIT BULANAN, MENGGUNAKAN METODE FJ. MOCK

DAS :
Luas DAS : 151.19 km2
Thn. Pengamatan : 2004

No. Meteorological Data Hitungan Unit Jan Feb Mar Apr Mei Jun Jul Agu Sep Okt Nop Des
1 Catc. Precip (P; mm/month) Data mm 56 47 43 68 28 50 39 25 26 66 39 33
2 Catc. Rain Days (n ;days) Data days 12 11 10 13 8 18 7 5 5 7 9 14
3 Days of Month (Hr; days) Data days 31 28 31 30 31 30 31 31 30 31 30 31
Potential Evapo-Transpiration
4 Suhu (T) ◦C 28 26 29 28 28 26 27 28 27 27 27 27
5 n % 50 53 50 52 53 55 50 51 40 39 43 44
6 Rh % 79 73 74 75 84 81 85 77 78 84 79 84
7 A Tabel 0.917 0.828 0.965 0.917 0.917 0.828 0.873 0.917 0.873 0.873 0.873 0.873
8 B Tabel 16.700 16.200 16.900 16.700 16.700 16.200 16.450 16.700 16.450 16.450 16.450 16.450
9 ea Tabel 28.300 25.200 30.050 28.300 28.300 25.200 26.750 28.300 26.750 26.750 26.750 26.750
10 ed (6) * (9) 22.357 18.396 22.237 21.225 23.772 20.412 22.738 21.791 20.865 22.470 21.133 22.470
11 Ra mm/hari 17.700 16.400 14.150 11.600 9.300 8.700 8.850 10.400 23.100 15.450 17.200 17.850
12 F1=f(T,S) =A(0.18+0.55S)/(A+0.27) 0.352 0.343 0.356 0.352 0.352 0.343 0.347 0.352 0.347 0.347 0.347 0.347
13 F2=F(T,h)=AB(0.56-0.092×√𝑒𝑑)/(A+0.27) 1.613 2.021 1.666 1.757 1.438 1.763 1.524 1.684 1.756 1.556 1.722 1.556
14 F3=f(T,h)=0.27×0.35(ea-ed)/(A+0.27) 0.473 0.586 0.598 0.563 0.360 0.412 0.332 0.518 0.487 0.354 0.465 0.354
15 Koefisien Refleksi Tentukan 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400
16 E1=F1×Ra (1-r) 3.733 3.376 3.018 2.446 1.961 1.791 1.845 2.193 4.816 3.221 3.586 3.721
17 E2=F2(0.1+0.9S) 0.887 1.111 0.916 0.966 0.791 0.970 0.838 0.926 0.966 0.856 0.947 0.856
18 E3=F3(k+0.01w) 0.189 0.234 0.239 0.225 0.144 0.165 0.133 0.207 0.195 0.142 0.186 0.142
19 Evaptranspirasi Potensial ETo (16) - (17) + (18) 3.04 2.50 2.34 1.71 1.31 0.99 1.14 1.47 4.05 2.51 2.82 3.01
20 Epm (mm/month) = HrxEp ETo mm/month 94.09 69.98 72.58 51.17 40.76 29.58 35.33 45.71 121.35 77.71 84.74 93.22
Limited Evapotranspiration
21 Exposed Surface (m; %) Tentukan 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00
22 na (number of rainy days) 2 12 11 10 13 8 18 7 5 5 7 9 14
23 (Delta E)/Epm = (m/20)(18-na);(%) 0.10 0.11 0.15 0.08 0.18 0.00 0.20 0.23 0.22 0.20 0.16 0.07
24 Delta E (5) * (8) mm/month 9.16 0.08 0.11 0.04 0.07 0.00 0.07 0.11 0.27 0.16 0.13 0.07
25 Ea (mm/month) = Epm-Delta E (5) - (9) mm/month 84.94 69.90 72.47 51.13 40.69 29.58 35.26 45.60 121.08 77.55 84.61 93.15
Water Balance
26 P-Ea (mm/month) (1) - (10) mm/month -28.85 -23.04 -29.40 17.18 -12.55 20.87 3.84 -21.07 -94.91 -11.45 -45.85 -60.18
27 SMS = ISM+(P-Ea); ISM + (11) 171.15 148.11 118.71 135.90 187.45 208.32 203.84 178.93 84.01 72.56 26.71 -33.47
28 Soil Moist Storage (mm/month); SMC= 200.00 171.15 148.11 118.71 200.00 187.45 200.00 200.00 178.93 84.01 72.56 26.71 -33.47
29 Soil Storage (mm/month) mm/month -28.85 -23.04 -29.40 0.00 -12.55 0.00 0.00 -21.07 -94.91 -11.45 -45.85 -60.18
30 Water Surplus (mm/month); [(26)-(29)] (11 - (14) mm/month 0.00 0.00 0.00 17.18 0.00 20.87 3.84 0.00 0.00 0.00 0.00 0.00
Run Off & Ground. Stor. (mm/month)
31 Infiltration Coefficient (if) Tentukan 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
32 Infiltration (i); (30)x if, (15) * (16) 0.00 0.00 0.00 5.16 0.00 6.26 1.15 0.00 0.00 0.00 0.00 0.00
33 K (monthly flow recession constan) Tentukan 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60
34 PF (Percentage Factor) Tentukan 0.10 0.10 0.07 0.05 0.05 0.05 0.05 0.05 0.05 0.07 0.10 0.10
35 1/2 x (1 + K) x i 0.00 0.00 0.00 4.12 0.00 5.01 0.92 0.00 0.00 0.00 0.00 0.00
36 Kx(Gsom); 0.23 0.14 0.08 0.05 2.50 1.50 3.91 2.90 1.74 1.04 0.63 0.38
37 GS; Gsom (20) * (21) 0.38 0.23 0.14 0.08 4.17 2.50 6.51 4.83 2.90 1.74 1.04 0.63 0.38
38 GS = -Gsom + GS (22) - Gsom -0.15 -0.09 -0.05 4.09 -1.67 4.01 -1.68 -1.93 -1.16 -0.70 -0.42 -0.25
39 Base Flow = i-GS (17) - (23) 0.15 0.09 0.05 1.06 1.67 2.25 2.83 1.93 1.16 0.70 0.42 0.25
40 DRO = WS-i (15) - (17) 0.00 0.00 0.00 12.03 0.00 14.61 2.69 0.00 0.00 0.00 0.00 0.00
41 Storm run off = PxPF if WS > 0, SRO=0 (1) * (19) 5.61 4.69 3.02 3.69 1.52 2.73 2.11 1.23 1.31 4.49 3.88 3.30
42 Total Run Off = BFlow+DRO+Storm 5.76 4.78 3.07 16.79 3.19 19.59 7.63 3.16 2.47 5.19 4.29 3.55
Location: DAS Bendung Randangan
43 Flow (m3/second) m3/second 0.325 0.299 0.173 0.979 0.180 1.143 0.431 0.178 0.144 0.293 0.250 0.200
PERHITUNGAN DEBIT BULANAN, MENGGUNAKAN METODE FJ. MOCK

DAS :
Luas DAS : 151.19 km2
Thn. Pengamatan : 2005

No. Meteorological Data Hitungan Unit Jan Feb Mar Apr Mei Jun Jul Agu Sep Okt Nop Des
1 Catc. Precip (P; mm/month) Data mm 9 50 50 51 62 44 73 27 15 59 38 38
2 Catc. Rain Days (n ;days) Data days 12 11 10 13 8 18 7 5 5 7 9 14
3 Days of Month (Hr; days) Data days 31 28 31 30 31 30 31 31 30 31 30 31
Potential Evapo-Transpiration
4 Suhu (T) ◦C 28 26 29 28 28 26 27 28 27 27 27 27
5 n % 50 53 50 52 53 55 50 51 40 39 43 44
6 Rh % 79 73 74 75 84 81 85 77 78 84 79 84
7 A Tabel 0.917 0.828 0.965 0.917 0.917 0.828 0.873 0.917 0.873 0.873 0.873 0.873
8 B Tabel 16.700 16.200 16.900 16.700 16.700 16.200 16.450 16.700 16.450 16.450 16.450 16.450
9 ea Tabel 28.300 25.200 30.050 28.300 28.300 25.200 26.750 28.300 26.750 26.750 26.750 26.750
10 ed (6) * (9) 22.357 18.396 22.237 21.225 23.772 20.412 22.738 21.791 20.865 22.470 21.133 22.470
11 Ra mm/hari 17.700 16.400 14.150 11.600 9.300 8.700 8.850 10.400 23.100 15.450 17.200 17.850
12 F1=f(T,S) =A(0.18+0.55S)/(A+0.27) 0.352 0.343 0.356 0.352 0.352 0.343 0.347 0.352 0.347 0.347 0.347 0.347
13 F2=F(T,h)=AB(0.56-0.092×√𝑒𝑑)/(A+0.27) 1.613 2.021 1.666 1.757 1.438 1.763 1.524 1.684 1.756 1.556 1.722 1.556
14 F3=f(T,h)=0.27×0.35(ea-ed)/(A+0.27) 0.473 0.586 0.598 0.563 0.360 0.412 0.332 0.518 0.487 0.354 0.465 0.354
15 Koefisien Refleksi Tentukan 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400
16 E1=F1×Ra (1-r) 3.733 3.376 3.018 2.446 1.961 1.791 1.845 2.193 4.816 3.221 3.586 3.721
17 E2=F2(0.1+0.9S) 0.887 1.111 0.916 0.966 0.791 0.970 0.838 0.926 0.966 0.856 0.947 0.856
18 E3=F3(k+0.01w) 0.189 0.234 0.239 0.225 0.144 0.165 0.133 0.207 0.195 0.142 0.186 0.142
19 Evaptranspirasi Potensial ETo (16) - (17) + (18) 3.04 2.50 2.34 1.71 1.31 0.99 1.14 1.47 4.05 2.51 2.82 3.01
20 Epm (mm/month) = HrxEp ETo mm/month 94.09 69.98 72.58 51.17 40.76 29.58 35.33 45.71 121.35 77.71 84.74 93.22
Limited Evapotranspiration
21 Exposed Surface (m; %) Tentukan 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00
22 na (number of rainy days) 2 12 11 10 13 8 18 7 5 5 7 9 14
23 (Delta E)/Epm = (m/20)(18-na);(%) 0.10 0.11 0.15 0.08 0.18 0.00 0.20 0.23 0.22 0.20 0.16 0.07
24 Delta E (5) * (8) mm/month 9.16 0.08 0.11 0.04 0.07 0.00 0.07 0.11 0.27 0.16 0.13 0.07
25 Ea (mm/month) = Epm-Delta E (5) - (9) mm/month 84.94 69.90 72.47 51.13 40.69 29.58 35.26 45.60 121.08 77.55 84.61 93.15
Water Balance
26 P-Ea (mm/month) (1) - (10) mm/month -75.58 -20.05 -22.36 -0.28 21.51 14.49 38.09 -18.70 -106.26 -18.19 -46.76 -55.57
27 SMS = ISM+(P-Ea); ISM + (11) 124.42 104.37 82.01 81.73 103.24 214.49 238.09 181.30 75.04 56.85 10.09 -45.48
28 Soil Moist Storage (mm/month); SMC= 200.00 124.42 104.37 82.01 81.73 200.00 200.00 200.00 181.30 75.04 56.85 10.09 -45.48
29 Soil Storage (mm/month) mm/month -75.58 -20.05 -22.36 -0.28 0.00 0.00 0.00 -18.70 -106.26 -18.19 -46.76 -55.57
30 Water Surplus (mm/month); [(26)-(29)] (11 - (14) mm/month 0.00 0.00 0.00 0.00 21.51 14.49 38.09 0.00 0.00 0.00 0.00 0.00
Run Off & Ground. Stor. (mm/month)
31 Infiltration Coefficient (if) Tentukan 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
32 Infiltration (i); (30)x if, (15) * (16) 0.00 0.00 0.00 0.00 6.45 4.35 11.43 0.00 0.00 0.00 0.00 0.00
33 K (monthly flow recession constan) Tentukan 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60
34 PF (Percentage Factor) Tentukan 0.10 0.10 0.07 0.05 0.05 0.05 0.05 0.05 0.05 0.07 0.10 0.10
35 1/2 x (1 + K) x i 0.00 0.00 0.00 0.00 5.16 3.48 9.14 0.00 0.00 0.00 0.00 0.00
36 Kx(Gsom); 0.61 0.37 0.22 0.13 0.08 3.14 3.97 7.87 4.72 2.83 1.70 1.02
37 GS; Gsom (20) * (21) 1.02 0.61 0.37 0.22 0.13 5.24 6.62 13.12 7.87 4.72 2.83 1.70 1.02
38 GS = -Gsom + GS (22) - Gsom -0.41 -0.24 -0.15 -0.09 5.11 1.38 6.49 -5.25 -3.15 -1.89 -1.13 -0.68
39 Base Flow = i-GS (17) - (23) 0.41 0.24 0.15 0.09 1.34 2.97 4.93 5.25 3.15 1.89 1.13 0.68
40 DRO = WS-i (15) - (17) 0.00 0.00 0.00 0.00 15.06 10.14 26.66 0.00 0.00 0.00 0.00 0.00
41 Storm run off = PxPF if WS > 0, SRO=0 (1) * (19) 0.94 4.98 3.51 2.75 3.36 2.38 3.96 1.35 0.74 4.03 3.78 3.76
42 Total Run Off = BFlow+DRO+Storm 1.34 5.23 3.65 2.84 19.76 15.49 35.56 6.59 3.89 5.92 4.92 4.44
Location: DAS Bendung Randangan
43 Flow (m3/second) m3/second 0.076 0.327 0.206 0.165 1.115 0.904 2.007 0.372 0.227 0.334 0.287 0.251
PERHITUNGAN DEBIT BULANAN, MENGGUNAKAN METODE FJ. MOCK

DAS :
Luas DAS : 151.19 km2
Thn. Pengamatan : 2006

No. Meteorological Data Hitungan Unit Jan Feb Mar Apr Mei Jun Jul Agu Sep Okt Nop Des
1 Catc. Precip (P; mm/month) Data mm 38 47 38 45 47 62 33 11 32 25 48 63
2 Catc. Rain Days (n ;days) Data days 12 11 10 13 8 18 7 5 5 7 9 14
3 Days of Month (Hr; days) Data days 31 28 31 30 31 30 31 31 30 31 30 31
Potential Evapo-Transpiration
4 Suhu (T) ◦C 28 26 29 28 28 26 27 28 27 27 27 27
5 n % 50 53 50 52 53 55 50 51 40 39 43 44
6 Rh % 79 73 74 75 84 81 85 77 78 84 79 84
7 A Tabel 0.917 0.828 0.965 0.917 0.917 0.828 0.873 0.917 0.873 0.873 0.873 0.873
8 B Tabel 16.700 16.200 16.900 16.700 16.700 16.200 16.450 16.700 16.450 16.450 16.450 16.450
9 ea Tabel 28.300 25.200 30.050 28.300 28.300 25.200 26.750 28.300 26.750 26.750 26.750 26.750
10 ed (6) * (9) 22.357 18.396 22.237 21.225 23.772 20.412 22.738 21.791 20.865 22.470 21.133 22.470
11 Ra mm/hari 17.700 16.400 14.150 11.600 9.300 8.700 8.850 10.400 23.100 15.450 17.200 17.850
12 F1=f(T,S) =A(0.18+0.55S)/(A+0.27) 0.352 0.343 0.356 0.352 0.352 0.343 0.347 0.352 0.347 0.347 0.347 0.347
13 F2=F(T,h)=AB(0.56-0.092×√𝑒𝑑)/(A+0.27) 1.613 2.021 1.666 1.757 1.438 1.763 1.524 1.684 1.756 1.556 1.722 1.556
14 F3=f(T,h)=0.27×0.35(ea-ed)/(A+0.27) 0.473 0.586 0.598 0.563 0.360 0.412 0.332 0.518 0.487 0.354 0.465 0.354
15 Koefisien Refleksi Tentukan 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400
16 E1=F1×Ra (1-r) 3.733 3.376 3.018 2.446 1.961 1.791 1.845 2.193 4.816 3.221 3.586 3.721
17 E2=F2(0.1+0.9S) 0.887 1.111 0.916 0.966 0.791 0.970 0.838 0.926 0.966 0.856 0.947 0.856
18 E3=F3(k+0.01w) 0.189 0.234 0.239 0.225 0.144 0.165 0.133 0.207 0.195 0.142 0.186 0.142
19 Evaptranspirasi Potensial ETo (16) - (17) + (18) 3.04 2.50 2.34 1.71 1.31 0.99 1.14 1.47 4.05 2.51 2.82 3.01
20 Epm (mm/month) = HrxEp ETo mm/month 94.09 69.98 72.58 51.17 40.76 29.58 35.33 45.71 121.35 77.71 84.74 93.22
Limited Evapotranspiration
21 Exposed Surface (m; %) Tentukan 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00
22 na (number of rainy days) 2 12 11 10 13 8 18 7 5 5 7 9 14
23 (Delta E)/Epm = (m/20)(18-na);(%) 0.10 0.11 0.15 0.08 0.18 0.00 0.20 0.23 0.22 0.20 0.16 0.07
24 Delta E (5) * (8) mm/month 9.16 0.08 0.11 0.04 0.07 0.00 0.07 0.11 0.27 0.16 0.13 0.07
25 Ea (mm/month) = Epm-Delta E (5) - (9) mm/month 84.94 69.90 72.47 51.13 40.69 29.58 35.26 45.60 121.08 77.55 84.61 93.15
Water Balance
26 P-Ea (mm/month) (1) - (10) mm/month -46.66 -22.95 -34.38 -6.43 6.40 32.92 -2.51 -34.59 -89.09 -52.44 -37.09 -29.85
27 SMS = ISM+(P-Ea); ISM + (11) 153.34 130.39 96.01 89.59 95.99 232.92 197.49 162.90 73.80 21.37 -15.72 -45.57
28 Soil Moist Storage (mm/month); SMC= 200.00 153.34 130.39 96.01 89.59 200.00 200.00 197.49 162.90 73.80 21.37 -15.72 -45.57
29 Soil Storage (mm/month) mm/month -46.66 -22.95 -34.38 -6.43 0.00 0.00 -2.51 -34.59 -89.09 -52.44 -37.09 -29.85
30 Water Surplus (mm/month); [(26)-(29)] (11 - (14) mm/month 0.00 0.00 0.00 0.00 6.40 32.92 0.00 0.00 0.00 0.00 0.00 0.00
Run Off & Ground. Stor. (mm/month)
31 Infiltration Coefficient (if) Tentukan 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
32 Infiltration (i); (30)x if, (15) * (16) 0.00 0.00 0.00 0.00 1.92 9.88 0.00 0.00 0.00 0.00 0.00 0.00
33 K (monthly flow recession constan) Tentukan 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60
34 PF (Percentage Factor) Tentukan 0.10 0.10 0.07 0.05 0.05 0.05 0.05 0.05 0.05 0.07 0.10 0.10
35 1/2 x (1 + K) x i 0.00 0.00 0.00 0.00 1.54 7.90 0.00 0.00 0.00 0.00 0.00 0.00
36 Kx(Gsom); 0.25 0.15 0.09 0.05 0.03 0.94 5.30 3.18 1.91 1.15 0.69 0.41
37 GS; Gsom (20) * (21) 0.41 0.25 0.15 0.09 0.05 1.57 8.84 5.30 3.18 1.91 1.15 0.69 0.41
38 GS = -Gsom + GS (22) - Gsom -0.16 -0.10 -0.06 -0.04 1.51 7.27 -3.54 -2.12 -1.27 -0.76 -0.46 -0.27
39 Base Flow = i-GS (17) - (23) 0.16 0.10 0.06 0.04 0.41 2.60 3.54 2.12 1.27 0.76 0.46 0.27
40 DRO = WS-i (15) - (17) 0.00 0.00 0.00 0.00 4.48 23.04 0.00 0.00 0.00 0.00 0.00 0.00
41 Storm run off = PxPF if WS > 0, SRO=0 (1) * (19) 3.83 4.69 2.67 2.42 2.54 3.38 1.77 0.55 1.60 1.71 4.75 6.33
42 Total Run Off = BFlow+DRO+Storm 3.99 4.79 2.73 2.45 7.43 29.02 5.31 2.67 2.87 2.47 5.21 6.60
Location: DAS Bendung Randangan
43 Flow (m3/second) m3/second 0.225 0.300 0.154 0.143 0.419 1.693 0.300 0.151 0.168 0.139 0.304 0.373
PERHITUNGAN DEBIT BULANAN, MENGGUNAKAN METODE FJ. MOCK

DAS :
Luas DAS : 151.19 km2
Thn. Pengamatan : 2007

No. Meteorological Data Hitungan Unit Jan Feb Mar Apr Mei Jun Jul Agu Sep Okt Nop Des
1 Catc. Precip (P; mm/month) Data mm 41 43 35 51 58 50 55 15 47 22 41 47
2 Catc. Rain Days (n ;days) Data days 12 11 10 13 8 18 7 5 5 7 9 14
3 Days of Month (Hr; days) Data days 31 28 31 30 31 30 31 31 30 31 30 31
Potential Evapo-Transpiration
4 Suhu (T) ◦C 28 26 29 28 28 26 27 28 27 27 27 27
5 n % 50 53 50 52 53 55 50 51 40 39 43 44
6 Rh % 79 73 74 75 84 81 85 77 78 84 79 84
7 A Tabel 0.917 0.828 0.965 0.917 0.917 0.828 0.873 0.917 0.873 0.873 0.873 0.873
8 B Tabel 16.700 16.200 16.900 16.700 16.700 16.200 16.450 16.700 16.450 16.450 16.450 16.450
9 ea Tabel 28.300 25.200 30.050 28.300 28.300 25.200 26.750 28.300 26.750 26.750 26.750 26.750
10 ed (6) * (9) 22.357 18.396 22.237 21.225 23.772 20.412 22.738 21.791 20.865 22.470 21.133 22.470
11 Ra mm/hari 17.700 16.400 14.150 11.600 9.300 8.700 8.850 10.400 23.100 15.450 17.200 17.850
12 F1=f(T,S) =A(0.18+0.55S)/(A+0.27) 0.352 0.343 0.356 0.352 0.352 0.343 0.347 0.352 0.347 0.347 0.347 0.347
13 F2=F(T,h)=AB(0.56-0.092×√𝑒𝑑)/(A+0.27) 1.613 2.021 1.666 1.757 1.438 1.763 1.524 1.684 1.756 1.556 1.722 1.556
14 F3=f(T,h)=0.27×0.35(ea-ed)/(A+0.27) 0.473 0.586 0.598 0.563 0.360 0.412 0.332 0.518 0.487 0.354 0.465 0.354
15 Koefisien Refleksi Tentukan 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400
16 E1=F1×Ra (1-r) 3.733 3.376 3.018 2.446 1.961 1.791 1.845 2.193 4.816 3.221 3.586 3.721
17 E2=F2(0.1+0.9S) 0.887 1.111 0.916 0.966 0.791 0.970 0.838 0.926 0.966 0.856 0.947 0.856
18 E3=F3(k+0.01w) 0.189 0.234 0.239 0.225 0.144 0.165 0.133 0.207 0.195 0.142 0.186 0.142
19 Evaptranspirasi Potensial ETo (16) - (17) + (18) 3.04 2.50 2.34 1.71 1.31 0.99 1.14 1.47 4.05 2.51 2.82 3.01
20 Epm (mm/month) = HrxEp ETo mm/month 94.09 69.98 72.58 51.17 40.76 29.58 35.33 45.71 121.35 77.71 84.74 93.22
Limited Evapotranspiration
21 Exposed Surface (m; %) Tentukan 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00
22 na (number of rainy days) 2 12 11 10 13 8 18 7 5 5 7 9 14
23 (Delta E)/Epm = (m/20)(18-na);(%) 0.10 0.11 0.15 0.08 0.18 0.00 0.20 0.23 0.22 0.20 0.16 0.07
24 Delta E (5) * (8) mm/month 9.16 0.08 0.11 0.04 0.07 0.00 0.07 0.11 0.27 0.16 0.13 0.07
25 Ea (mm/month) = Epm-Delta E (5) - (9) mm/month 84.94 69.90 72.47 51.13 40.69 29.58 35.26 45.60 121.08 77.55 84.61 93.15
Water Balance
26 P-Ea (mm/month) (1) - (10) mm/month -43.99 -27.01 -37.86 -0.61 16.82 20.02 19.57 -30.50 -74.21 -55.13 -43.67 -46.36
27 SMS = ISM+(P-Ea); ISM + (11) 156.01 129.00 91.15 90.54 107.36 220.02 219.57 169.50 95.28 40.16 -3.51 -49.87
28 Soil Moist Storage (mm/month); SMC= 200.00 156.01 129.00 91.15 90.54 200.00 200.00 200.00 169.50 95.28 40.16 -3.51 -49.87
29 Soil Storage (mm/month) mm/month -43.99 -27.01 -37.86 -0.61 0.00 0.00 0.00 -30.50 -74.21 -55.13 -43.67 -46.36
30 Water Surplus (mm/month); [(26)-(29)] (11 - (14) mm/month 0.00 0.00 0.00 0.00 16.82 20.02 19.57 0.00 0.00 0.00 0.00 0.00
Run Off & Ground. Stor. (mm/month)
31 Infiltration Coefficient (if) Tentukan 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
32 Infiltration (i); (30)x if, (15) * (16) 0.00 0.00 0.00 0.00 5.05 6.00 5.87 0.00 0.00 0.00 0.00 0.00
33 K (monthly flow recession constan) Tentukan 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60
34 PF (Percentage Factor) Tentukan 0.10 0.10 0.07 0.05 0.05 0.05 0.05 0.05 0.05 0.07 0.10 0.10
35 1/2 x (1 + K) x i 0.00 0.00 0.00 0.00 4.04 4.80 4.70 0.00 0.00 0.00 0.00 0.00
36 Kx(Gsom); 0.42 0.25 0.15 0.09 0.05 2.45 4.35 5.43 3.26 1.96 1.17 0.70
37 GS; Gsom (20) * (21) 0.70 0.42 0.25 0.15 0.09 4.09 7.26 9.05 5.43 3.26 1.96 1.17 0.70
38 GS = -Gsom + GS (22) - Gsom -0.28 -0.17 -0.10 -0.06 4.00 3.17 1.79 -3.62 -2.17 -1.30 -0.78 -0.47
39 Base Flow = i-GS (17) - (23) 0.28 0.17 0.10 0.06 1.05 2.84 4.08 3.62 2.17 1.30 0.78 0.47
40 DRO = WS-i (15) - (17) 0.00 0.00 0.00 0.00 11.77 14.01 13.70 0.00 0.00 0.00 0.00 0.00
41 Storm run off = PxPF if WS > 0, SRO=0 (1) * (19) 4.10 4.29 2.42 2.73 3.11 2.68 2.96 0.75 2.34 1.52 4.09 4.68
42 Total Run Off = BFlow+DRO+Storm 4.38 4.46 2.52 2.79 15.92 19.53 20.74 4.38 4.52 2.83 4.88 5.15
Location: DAS Bendung Randangan
43 Flow (m3/second) m3/second 0.247 0.279 0.142 0.163 0.899 1.139 1.171 0.247 0.263 0.160 0.284 0.291
PERHITUNGAN DEBIT BULANAN, MENGGUNAKAN METODE FJ. MOCK

DAS :
Luas DAS : 151.19 km2
Thn. Pengamatan : 2008

No. Meteorological Data Hitungan Unit Jan Feb Mar Apr Mei Jun Jul Agu Sep Okt Nop Des
1 Catc. Precip (P; mm/month) Data mm 54 41 58 60 42 51 33 42 20 51 58 55
2 Catc. Rain Days (n ;days) Data days 12 11 10 13 8 18 7 5 5 7 9 14
3 Days of Month (Hr; days) Data days 31 28 31 30 31 30 31 31 30 31 30 31
Potential Evapo-Transpiration
4 Suhu (T) ◦C 28 26 29 28 28 26 27 28 27 27 27 27
5 n % 50 53 50 52 53 55 50 51 40 39 43 44
6 Rh % 79 73 74 75 84 81 85 77 78 84 79 84
7 A Tabel 0.917 0.828 0.965 0.917 0.917 0.828 0.873 0.917 0.873 0.873 0.873 0.873
8 B Tabel 16.700 16.200 16.900 16.700 16.700 16.200 16.450 16.700 16.450 16.450 16.450 16.450
9 ea Tabel 28.300 25.200 30.050 28.300 28.300 25.200 26.750 28.300 26.750 26.750 26.750 26.750
10 ed (6) * (9) 22.357 18.396 22.237 21.225 23.772 20.412 22.738 21.791 20.865 22.470 21.133 22.470
11 Ra mm/hari 17.700 16.400 14.150 11.600 9.300 8.700 8.850 10.400 23.100 15.450 17.200 17.850
12 F1=f(T,S) =A(0.18+0.55S)/(A+0.27) 0.352 0.343 0.356 0.352 0.352 0.343 0.347 0.352 0.347 0.347 0.347 0.347
13 F2=F(T,h)=AB(0.56-0.092×√𝑒𝑑)/(A+0.27) 1.613 2.021 1.666 1.757 1.438 1.763 1.524 1.684 1.756 1.556 1.722 1.556
14 F3=f(T,h)=0.27×0.35(ea-ed)/(A+0.27) 0.473 0.586 0.598 0.563 0.360 0.412 0.332 0.518 0.487 0.354 0.465 0.354
15 Koefisien Refleksi Tentukan 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400
16 E1=F1×Ra (1-r) 3.733 3.376 3.018 2.446 1.961 1.791 1.845 2.193 4.816 3.221 3.586 3.721
17 E2=F2(0.1+0.9S) 0.887 1.111 0.916 0.966 0.791 0.970 0.838 0.926 0.966 0.856 0.947 0.856
18 E3=F3(k+0.01w) 0.189 0.234 0.239 0.225 0.144 0.165 0.133 0.207 0.195 0.142 0.186 0.142
19 Evaptranspirasi Potensial ETo (16) - (17) + (18) 3.04 2.50 2.34 1.71 1.31 0.99 1.14 1.47 4.05 2.51 2.82 3.01
20 Epm (mm/month) = HrxEp ETo mm/month 94.09 69.98 72.58 51.17 40.76 29.58 35.33 45.71 121.35 77.71 84.74 93.22
Limited Evapotranspiration
21 Exposed Surface (m; %) Tentukan 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00
22 na (number of rainy days) 2 12 11 10 13 8 18 7 5 5 7 9 14
23 (Delta E)/Epm = (m/20)(18-na);(%) 0.10 0.11 0.15 0.08 0.18 0.00 0.20 0.23 0.22 0.20 0.16 0.07
24 Delta E (5) * (8) mm/month 9.16 0.08 0.11 0.04 0.07 0.00 0.07 0.11 0.27 0.16 0.13 0.07
25 Ea (mm/month) = Epm-Delta E (5) - (9) mm/month 84.94 69.90 72.47 51.13 40.69 29.58 35.26 45.60 121.08 77.55 84.61 93.15
Water Balance
26 P-Ea (mm/month) (1) - (10) mm/month -30.61 -28.94 -14.73 8.73 1.10 21.05 -2.52 -3.88 -101.22 -26.88 -26.38 -38.02
27 SMS = ISM+(P-Ea); ISM + (11) 169.39 140.46 125.73 134.46 201.10 221.05 197.48 193.60 92.38 65.50 39.12 1.10
28 Soil Moist Storage (mm/month); SMC= 200.00 169.39 140.46 125.73 200.00 200.00 200.00 197.48 193.60 92.38 65.50 39.12 1.10
29 Soil Storage (mm/month) mm/month -30.61 -28.94 -14.73 0.00 0.00 0.00 -2.52 -3.88 -101.22 -26.88 -26.38 -38.02
30 Water Surplus (mm/month); [(26)-(29)] (11 - (14) mm/month 0.00 0.00 0.00 8.73 1.10 21.05 0.00 0.00 0.00 0.00 0.00 0.00
Run Off & Ground. Stor. (mm/month)
31 Infiltration Coefficient (if) Tentukan 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
32 Infiltration (i); (30)x if, (15) * (16) 0.00 0.00 0.00 2.62 0.33 6.32 0.00 0.00 0.00 0.00 0.00 0.00
33 K (monthly flow recession constan) Tentukan 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60
34 PF (Percentage Factor) Tentukan 0.10 0.10 0.07 0.05 0.05 0.05 0.05 0.05 0.05 0.07 0.10 0.10
35 1/2 x (1 + K) x i 0.00 0.00 0.00 2.09 0.26 5.05 0.00 0.00 0.00 0.00 0.00 0.00
36 Kx(Gsom); 0.17 0.10 0.06 0.04 1.28 0.93 3.59 2.15 1.29 0.77 0.46 0.28
37 GS; Gsom (20) * (21) 0.28 0.17 0.10 0.06 2.13 1.54 5.98 3.59 2.15 1.29 0.77 0.46 0.28
38 GS = -Gsom + GS (22) - Gsom -0.11 -0.07 -0.04 2.07 -0.59 4.44 -2.39 -1.43 -0.86 -0.52 -0.31 -0.19
39 Base Flow = i-GS (17) - (23) 0.11 0.07 0.04 0.55 0.92 1.88 2.39 1.43 0.86 0.52 0.31 0.19
40 DRO = WS-i (15) - (17) 0.00 0.00 0.00 6.11 0.77 14.74 0.00 0.00 0.00 0.00 0.00 0.00
41 Storm run off = PxPF if WS > 0, SRO=0 (1) * (19) 5.43 4.10 4.04 3.23 2.26 2.74 1.77 2.09 0.99 3.44 5.82 5.51
42 Total Run Off = BFlow+DRO+Storm 5.55 4.16 4.08 9.89 3.95 19.35 4.16 3.52 1.85 3.96 6.13 5.70
Location: DAS Bendung Randangan
43 Flow (m3/second) m3/second 0.313 0.260 0.230 0.577 0.223 1.129 0.235 0.199 0.108 0.223 0.358 0.322
PERHITUNGAN DEBIT BULANAN, MENGGUNAKAN METODE FJ. MOCK

DAS :
Luas DAS : 151.19 km2
Thn. Pengamatan : 2009

No. Meteorological Data Hitungan Unit Jan Feb Mar Apr Mei Jun Jul Agu Sep Okt Nop Des
1 Catc. Precip (P; mm/month) Data mm 67 34 50 59 51 34 34 10 31 40 43 41
2 Catc. Rain Days (n ;days) Data days 12 11 10 13 8 18 7 5 5 7 9 14
3 Days of Month (Hr; days) Data days 31 28 31 30 31 30 31 31 30 31 30 31
Potential Evapo-Transpiration
4 Suhu (T) ◦C 28 26 29 28 28 26 27 28 27 27 27 27
5 n % 50 53 50 52 53 55 50 51 40 39 43 44
6 Rh % 79 73 74 75 84 81 85 77 78 84 79 84
7 A Tabel 0.917 0.828 0.965 0.917 0.917 0.828 0.873 0.917 0.873 0.873 0.873 0.873
8 B Tabel 16.700 16.200 16.900 16.700 16.700 16.200 16.450 16.700 16.450 16.450 16.450 16.450
9 ea Tabel 28.300 25.200 30.050 28.300 28.300 25.200 26.750 28.300 26.750 26.750 26.750 26.750
10 ed (6) * (9) 22.357 18.396 22.237 21.225 23.772 20.412 22.738 21.791 20.865 22.470 21.133 22.470
11 Ra mm/hari 17.700 16.400 14.150 11.600 9.300 8.700 8.850 10.400 23.100 15.450 17.200 17.850
12 F1=f(T,S) =A(0.18+0.55S)/(A+0.27) 0.352 0.343 0.356 0.352 0.352 0.343 0.347 0.352 0.347 0.347 0.347 0.347
13 F2=F(T,h)=AB(0.56-0.092×√𝑒𝑑)/(A+0.27) 1.613 2.021 1.666 1.757 1.438 1.763 1.524 1.684 1.756 1.556 1.722 1.556
14 F3=f(T,h)=0.27×0.35(ea-ed)/(A+0.27) 0.473 0.586 0.598 0.563 0.360 0.412 0.332 0.518 0.487 0.354 0.465 0.354
15 Koefisien Refleksi Tentukan 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400
16 E1=F1×Ra (1-r) 3.733 3.376 3.018 2.446 1.961 1.791 1.845 2.193 4.816 3.221 3.586 3.721
17 E2=F2(0.1+0.9S) 0.887 1.111 0.916 0.966 0.791 0.970 0.838 0.926 0.966 0.856 0.947 0.856
18 E3=F3(k+0.01w) 0.189 0.234 0.239 0.225 0.144 0.165 0.133 0.207 0.195 0.142 0.186 0.142
19 Evaptranspirasi Potensial ETo (16) - (17) + (18) 3.04 2.50 2.34 1.71 1.31 0.99 1.14 1.47 4.05 2.51 2.82 3.01
20 Epm (mm/month) = HrxEp ETo mm/month 94.09 69.98 72.58 51.17 40.76 29.58 35.33 45.71 121.35 77.71 84.74 93.22
Limited Evapotranspiration
21 Exposed Surface (m; %) Tentukan 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00
22 na (number of rainy days) 2 12 11 10 13 8 18 7 5 5 7 9 14
23 (Delta E)/Epm = (m/20)(18-na);(%) 0.10 0.11 0.15 0.08 0.18 0.00 0.20 0.23 0.22 0.20 0.16 0.07
24 Delta E (5) * (8) mm/month 9.16 0.08 0.11 0.04 0.07 0.00 0.07 0.11 0.27 0.16 0.13 0.07
25 Ea (mm/month) = Epm-Delta E (5) - (9) mm/month 84.94 69.90 72.47 51.13 40.69 29.58 35.26 45.60 121.08 77.55 84.61 93.15
Water Balance
26 P-Ea (mm/month) (1) - (10) mm/month -17.96 -36.12 -22.09 7.66 10.12 4.59 -0.85 -35.85 -90.06 -37.99 -42.01 -52.17
27 SMS = ISM+(P-Ea); ISM + (11) 182.04 145.92 123.83 131.49 210.12 204.59 199.15 163.30 73.24 35.25 -6.76 -58.93
28 Soil Moist Storage (mm/month); SMC= 200.00 182.04 145.92 123.83 200.00 200.00 200.00 199.15 163.30 73.24 35.25 -6.76 -58.93
29 Soil Storage (mm/month) mm/month -17.96 -36.12 -22.09 0.00 0.00 0.00 -0.85 -35.85 -90.06 -37.99 -42.01 -52.17
30 Water Surplus (mm/month); [(26)-(29)] (11 - (14) mm/month 0.00 0.00 0.00 7.66 10.12 4.59 0.00 0.00 0.00 0.00 0.00 0.00
Run Off & Ground. Stor. (mm/month)
31 Infiltration Coefficient (if) Tentukan 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
32 Infiltration (i); (30)x if, (15) * (16) 0.00 0.00 0.00 2.30 3.04 1.38 0.00 0.00 0.00 0.00 0.00 0.00
33 K (monthly flow recession constan) Tentukan 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60
34 PF (Percentage Factor) Tentukan 0.10 0.10 0.07 0.05 0.05 0.05 0.05 0.05 0.05 0.07 0.10 0.10
35 1/2 x (1 + K) x i 0.00 0.00 0.00 1.84 2.43 1.10 0.00 0.00 0.00 0.00 0.00 0.00
36 Kx(Gsom); 0.09 0.05 0.03 0.02 1.11 2.13 1.94 1.16 0.70 0.42 0.25 0.15
37 GS; Gsom (20) * (21) 0.15 0.09 0.05 0.03 1.86 3.54 3.23 1.94 1.16 0.70 0.42 0.25 0.15
38 GS = -Gsom + GS (22) - Gsom -0.06 -0.04 -0.02 1.83 1.68 -0.32 -1.29 -0.77 -0.46 -0.28 -0.17 -0.10
39 Base Flow = i-GS (17) - (23) 0.06 0.04 0.02 0.47 1.35 1.69 1.29 0.77 0.46 0.28 0.17 0.10
40 DRO = WS-i (15) - (17) 0.00 0.00 0.00 5.36 7.08 3.21 0.00 0.00 0.00 0.00 0.00 0.00
41 Storm run off = PxPF if WS > 0, SRO=0 (1) * (19) 6.70 3.38 3.53 3.18 2.75 1.85 1.86 0.49 1.55 2.69 4.26 4.10
42 Total Run Off = BFlow+DRO+Storm 6.76 3.41 3.55 9.01 11.18 6.75 3.15 1.26 2.02 2.97 4.43 4.20
Location: DAS Bendung Randangan
43 Flow (m3/second) m3/second 0.381 0.213 0.200 0.526 0.631 0.394 0.178 0.071 0.118 0.167 0.258 0.237
PERHITUNGAN DEBIT BULANAN, MENGGUNAKAN METODE FJ. MOCK

DAS :
Luas DAS : 151.19 km2
Thn. Pengamatan : 2010

No. Meteorological Data Hitungan Unit Jan Feb Mar Apr Mei Jun Jul Agu Sep Okt Nop Des
1 Catc. Precip (P; mm/month) Data mm 147 89 79 118 151 125 74 45 67 61 56 43
2 Catc. Rain Days (n ;days) Data days 12 11 10 13 8 18 7 5 5 7 9 14
3 Days of Month (Hr; days) Data days 31 28 31 30 31 30 31 31 30 31 30 31
Potential Evapo-Transpiration
4 Suhu (T) ◦C 28 26 29 28 28 26 27 28 27 27 27 27
5 n % 50 53 50 52 53 55 50 51 40 39 43 44
6 Rh % 79 73 74 75 84 81 85 77 78 84 79 84
7 A Tabel 0.917 0.828 0.965 0.917 0.917 0.828 0.873 0.917 0.873 0.873 0.873 0.873
8 B Tabel 16.700 16.200 16.900 16.700 16.700 16.200 16.450 16.700 16.450 16.450 16.450 16.450
9 ea Tabel 28.300 25.200 30.050 28.300 28.300 25.200 26.750 28.300 26.750 26.750 26.750 26.750
10 ed (6) * (9) 22.357 18.396 22.237 21.225 23.772 20.412 22.738 21.791 20.865 22.470 21.133 22.470
11 Ra mm/hari 17.700 16.400 14.150 11.600 9.300 8.700 8.850 10.400 23.100 15.450 17.200 17.850
12 F1=f(T,S) =A(0.18+0.55S)/(A+0.27) 0.352 0.343 0.356 0.352 0.352 0.343 0.347 0.352 0.347 0.347 0.347 0.347
13 F2=F(T,h)=AB(0.56-0.092×√𝑒𝑑)/(A+0.27) 1.613 2.021 1.666 1.757 1.438 1.763 1.524 1.684 1.756 1.556 1.722 1.556
14 F3=f(T,h)=0.27×0.35(ea-ed)/(A+0.27) 0.473 0.586 0.598 0.563 0.360 0.412 0.332 0.518 0.487 0.354 0.465 0.354
15 Koefisien Refleksi Tentukan 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400
16 E1=F1×Ra (1-r) 3.733 3.376 3.018 2.446 1.961 1.791 1.845 2.193 4.816 3.221 3.586 3.721
17 E2=F2(0.1+0.9S) 0.887 1.111 0.916 0.966 0.791 0.970 0.838 0.926 0.966 0.856 0.947 0.856
18 E3=F3(k+0.01w) 0.189 0.234 0.239 0.225 0.144 0.165 0.133 0.207 0.195 0.142 0.186 0.142
19 Evaptranspirasi Potensial ETo (16) - (17) + (18) 3.04 2.50 2.34 1.71 1.31 0.99 1.14 1.47 4.05 2.51 2.82 3.01
20 Epm (mm/month) = HrxEp ETo mm/month 94.09 69.98 72.58 51.17 40.76 29.58 35.33 45.71 121.35 77.71 84.74 93.22
Limited Evapotranspiration
21 Exposed Surface (m; %) Tentukan 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00
22 na (number of rainy days) 2 12 11 10 13 8 18 7 5 5 7 9 14
23 (Delta E)/Epm = (m/20)(18-na);(%) 0.10 0.11 0.15 0.08 0.18 0.00 0.20 0.23 0.22 0.20 0.16 0.07
24 Delta E (5) * (8) mm/month 9.16 0.08 0.11 0.04 0.07 0.00 0.07 0.11 0.27 0.16 0.13 0.07
25 Ea (mm/month) = Epm-Delta E (5) - (9) mm/month 84.94 69.90 72.47 51.13 40.69 29.58 35.26 45.60 121.08 77.55 84.61 93.15
Water Balance
26 P-Ea (mm/month) (1) - (10) mm/month 62.41 19.43 6.51 66.56 110.42 95.12 38.76 -0.18 -53.71 -16.08 -28.96 -50.02
27 SMS = ISM+(P-Ea); ISM + (11) 262.41 219.43 206.51 266.56 310.42 295.12 238.76 199.82 146.11 130.03 101.07 51.06
28 Soil Moist Storage (mm/month); SMC= 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 199.82 146.11 130.03 101.07 51.06
29 Soil Storage (mm/month) mm/month 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -0.18 -53.71 -16.08 -28.96 -50.02
30 Water Surplus (mm/month); [(26)-(29)] (11 - (14) mm/month 62.41 19.43 6.51 66.56 110.42 95.12 38.76 0.00 0.00 0.00 0.00 0.00
Run Off & Ground. Stor. (mm/month)
31 Infiltration Coefficient (if) Tentukan 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
32 Infiltration (i); (30)x if, (15) * (16) 18.72 5.83 1.95 19.97 33.13 28.54 11.63 0.00 0.00 0.00 0.00 0.00
33 K (monthly flow recession constan) Tentukan 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60
34 PF (Percentage Factor) Tentukan 0.10 0.10 0.07 0.05 0.05 0.05 0.05 0.05 0.05 0.07 0.10 0.10
35 1/2 x (1 + K) x i 14.98 4.66 1.56 15.97 26.50 22.83 9.30 0.00 0.00 0.00 0.00 0.00
36 Kx(Gsom); 1.74 10.03 8.82 6.23 13.32 23.89 28.03 22.40 13.44 8.06 4.84 2.90
37 GS; Gsom (20) * (21) 2.90 16.72 14.69 10.38 22.20 39.82 46.72 37.34 22.40 13.44 8.06 4.84 2.90
38 GS = -Gsom + GS (22) - Gsom 13.82 -2.02 -4.31 11.82 17.62 6.90 -9.39 -14.93 -8.96 -5.38 -3.23 -1.94
39 Base Flow = i-GS (17) - (23) 4.90 7.85 6.27 8.15 15.51 21.64 21.01 14.93 8.96 5.38 3.23 1.94
40 DRO = WS-i (15) - (17) 43.69 13.60 4.56 46.59 77.29 66.59 27.13 0.00 0.00 0.00 0.00 0.00
41 Storm run off = PxPF if WS > 0, SRO=0 (1) * (19) 14.73 8.93 5.53 6.36 8.17 6.74 4.00 2.27 3.37 4.18 5.56 4.31
42 Total Run Off = BFlow+DRO+Storm 63.33 30.39 16.36 61.10 100.96 94.96 52.15 17.21 12.33 9.55 8.79 6.25
Location: DAS Bendung Randangan
43 Flow (m3/second) m3/second 3.575 1.899 0.923 3.564 5.699 5.539 2.944 0.971 0.719 0.539 0.513 0.353
DEBIT BULANAN DARI TAHUN 2001 - 2010

BULAN
NO Jan Feb Mar Apr Mei Jun Jul Agu Sep Okt Nop Des
TAHUN
1 2001 0.44 0.26 0.15 0.10 0.11 0.40 0.09 0.08 0.07 0.15 0.31 0.23
2 2002 0.24 0.29 0.25 0.15 0.23 0.09 0.08 0.03 0.10 0.08 0.16 0.30
3 2003 0.25 0.18 0.25 0.45 1.06 0.18 0.47 0.19 0.18 0.18 0.23 0.35
4 2004 0.33 0.30 0.17 0.98 0.18 1.14 0.43 0.18 0.14 0.29 0.25 0.20
5 2005 0.08 0.33 0.21 0.17 1.12 0.90 2.01 0.37 0.23 0.33 0.29 0.25
6 2006 0.23 0.30 0.15 0.14 0.42 1.69 0.30 0.15 0.17 0.14 0.30 0.37
7 2007 0.25 0.28 0.14 0.16 0.90 1.14 1.17 0.25 0.26 0.16 0.28 0.29
8 2008 0.31 0.26 0.23 0.58 0.22 1.13 0.23 0.20 0.11 0.22 0.36 0.32
9 2009 0.38 0.21 0.20 0.53 0.63 0.39 0.18 0.07 0.12 0.17 0.26 0.24
10 2010 3.57 1.90 0.92 3.56 5.70 5.54 2.94 0.97 0.72 0.54 0.51 0.35

DEBIT ANDALAN 80% DARI TAHUN 2001 - 2010

m
NO P (%) Jan Feb Mar Apr Mei Jun Jul Agu Sep Okt Nop Des
n+1
1 0.09 9.09 3.57 1.90 0.92 3.56 5.70 5.54 2.94 0.97 0.72 0.54 0.51 0.37
2 0.18 18.18 0.44 0.33 0.25 0.98 1.12 1.69 2.01 0.37 0.26 0.33 0.36 0.35
3 0.27 27.27 0.38 0.30 0.25 0.58 1.06 1.14 1.17 0.25 0.23 0.29 0.31 0.35
4 0.36 36.36 0.33 0.30 0.23 0.53 0.90 1.14 0.47 0.20 0.18 0.22 0.30 0.32
5 0.45 45.45 0.31 0.29 0.21 0.45 0.63 1.13 0.43 0.19 0.17 0.18 0.29 0.30
6 0.55 54.55 0.25 0.28 0.20 0.17 0.42 0.90 0.30 0.18 0.14 0.17 0.28 0.29
7 0.64 63.64 0.25 0.26 0.17 0.16 0.23 0.40 0.23 0.15 0.12 0.16 0.26 0.25
8 0.73 72.73 0.24 0.26 0.15 0.15 0.22 0.39 0.18 0.08 0.11 0.15 0.25 0.24
9 0.82 81.82 0.23 0.21 0.15 0.14 0.18 0.18 0.09 0.07 0.10 0.14 0.23 0.23
10 0.91 90.91 0.08 0.18 0.14 0.10 0.11 0.09 0.08 0.03 0.07 0.08 0.16 0.20

BULAN Jan Feb Mar Apr Mei Jun Jul Agu Sep Okt Nop Des
Q 80 0.23 0.22 0.15 0.14 0.19 0.22 0.11 0.07 0.10 0.14 0.24 0.23
BULAN Q80 DR DR
m3/d lt/d/ha m3/d
JANUARI 0.23 2.61
FEBRUARI 0.22 2.69
MARET 0.15 4.11 DEBIT ANDALAN
APRIL 0.14 3.31 0.25
MEI 0.19 2.56
0.20
JUNI 0.22 1.84
JULI 0.11 1.93 0.15

Q80
AGUSTUS 0.07 2.54 0.10
SEPTEMBER 0.10 1.69
0.05
OKTOBER 0.14 3.66
NOVEMBER 0.24 3.58 0.00
I I T L EI NI LI
DESEMBER 0.23 3.66 AR UAR RE RI M JU US BE
R
BE
R
BE
R
U A AP JU T B
N BR M US EM T O E M EM
JA FE AG PT OK V S
SE NO DE

BULAN
DEBIT ANDALAN
0.25

0.20

0.15
Q80

0.10

0.05

0.00
I I T L EI NI LI
AR UAR RE RI M JU US BE
R
BE
R
BE
R
BE
R
U A AP JU T
N BR M US EM T O M M
JA FE AG PT OK VE SE
SE NO DE

BULAN
BULAN Q80
JANUARI 0.23
FEBRUARI 0.22
MARET 0.15 DEBIT ANDALAN
APRIL 0.14 0.25
MEI 0.19
0.20
JUNI 0.22
JULI 0.11 0.15

Q80
AGUSTUS 0.07 0.10
SEPTEMBER 0.10
0.05
OKTOBER 0.14
NOVEMBER 0.24 0.00
I I T L EI NI LI
DESEMBER 0.23 AR UAR RE RI M JU US BE
R ER ER
U A AP JU T OB EMB EMB
N BR M US E M T
JA FE AG PT OK V S
SE NO DE

BULAN
DEBIT ANDALAN
0.25

0.20

0.15
Q80

0.10

0.05

0.00
I I T L EI NI LI
AR UAR RE RI M JU US R
BE OBE
R
BE
R
BE
R
U A AP JU T
N BR M US E M T E M E M
JA FE AG PT OK V S
SE NO DE

BULAN
Qandalan DR (lt/dt/ha)
Periode
(m3/dt) Alt. I Alt. II Alt. III Alt. IV Alt. V Alt. VI
Oktober 1 0.24 1.84 0.58 0.82 1.21 1.08 0.70
2 0.24 1.82 1.82 0.57 1.82 1.40 1.19
November 1 0.24 1.99 1.99 1.99 1.99 1.99 1.99
2 0.24 1.59 1.97 1.97 1.78 1.85 1.97
Desember 1 0.24 1.86 1.68 2.05 1.77 1.87 1.87
2 0.24 1.80 1.86 1.68 1.83 1.78 1.77
Januari 1 0.24 1.63 1.87 1.94 1.75 1.81 1.91
2 0.24 0.98 1.63 1.88 1.31 1.50 1.75
Februari 1 0.24 0.59 0.99 1.62 0.79 1.07 1.30
2 0.24 2.10 0.59 0.99 1.34 1.23 0.79
Maret 1 0.24 2.06 2.06 0.59 2.06 1.57 1.32
2 0.24 2.05 2.05 2.05 2.05 2.05 2.05
April 1 0.24 1.56 1.95 1.95 1.75 1.82 1.95
2 0.24 1.74 1.56 1.95 1.65 1.75 1.76
Mei 1 0.24 1.30 1.33 1.15 1.31 1.26 1.24
2 0.24 1.27 1.32 1.35 1.29 1.31 1.33
Juni 1 0.24 0.93 1.25 1.28 1.09 1.15 1.26
2 0.24 0.90 0.95 1.26 0.93 1.04 1.11
Juli 1 0.24 0.90 0.89 0.93 0.90 0.91 0.91
2 0.24 1.03 0.92 0.91 0.97 0.95 0.92
Agustus 1 0.24 1.35 1.33 1.18 1.34 1.29 1.25
2 0.24 1.19 1.35 1.33 1.27 1.29 1.34
September 1 0.24 1.03 1.48 1.73 1.26 1.42 1.61
2 0.24 0.65 1.02 1.47 0.84 1.05 1.25
2.10 2.06 2.05 2.06 2.05 2.05
LUAS LAYANAN MINIMUM SAWAH MUSIM 1
LUAS LAYANAN MINIMUM SAWAH MUSIM 2
LUAS LAYANAN MINIMUM PALAWIJA
Luas Layanan (Ha)
Alt. I Alt. II Alt. III Alt. IV Alt. V Alt. VI
127.77 402.92 287.00 194.02 217.51 335.22
128.95 128.95 414.83 128.95 167.40 196.74
118.04 118.04 118.04 118.04 118.04 118.04
147.93 119.05 119.05 131.93 127.34 119.05
126.17 139.58 114.68 132.54 126.00 125.91
130.53 126.31 139.75 128.39 131.96 132.69
144.53 125.41 121.28 134.30 129.66 123.31
238.95 144.25 125.20 179.89 157.03 134.05
396.67 238.46 145.17 297.86 220.54 180.47
112.14 396.19 238.29 174.81 191.84 297.59
113.98 113.98 401.25 113.98 149.70 177.52
114.55 114.55 114.55 114.55 114.55 114.55
150.44 120.68 120.68 133.93 129.20 120.68
134.82 150.37 120.63 142.17 134.18 133.87
181.20 176.36 205.16 178.75 186.76 189.67
185.57 178.51 173.82 181.97 179.17 176.13
251.72 187.89 183.93 215.17 203.64 185.89
260.04 248.23 185.93 254.00 226.37 212.61
260.37 263.58 251.73 261.97 258.46 257.52
229.16 255.29 258.39 241.53 246.90 256.83
174.04 176.82 199.59 175.42 182.80 187.52
197.95 173.56 176.33 184.96 181.99 174.94
227.16 158.44 135.84 186.68 165.97 146.27
359.77 230.14 159.88 280.71 224.23 188.68

118.04 118.04 114.68 118.04 118.04 118.04


112.14 113.98 114.55 113.98 114.55 114.55
174.04 158.44 135.84 175.42 165.97 146.27
Alt. V
Luas Minimum Areal Sawah Yang Bisa Dilayani
Okt Nov Des Jan Feb Mar Apr Mei Jun Jul Agst Sep
Bulan
1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2
1 1.84 1.82 1.99 1.59 1.86 1.80 1.63 0.98 0.59 2.10 2.06 2.05 1.56 1.74 1.30 1.27 0.93 0.90 0.90 1.03 1.35 1.19 1.03 0.65
2 0.58 1.82 1.99 1.97 1.68 1.86 1.87 1.63 0.99 0.59 2.06 2.05 1.95 1.56 1.33 1.32 1.25 0.95 0.89 0.92 1.33 1.35 1.48 1.02
Alterntif

3 0.82 0.57 1.99 1.97 2.05 1.68 1.94 1.88 1.62 0.99 0.59 2.05 1.95 1.95 1.15 1.35 1.28 1.26 0.93 0.91 1.18 1.33 1.73 1.47
4 1.21 1.82 1.99 1.78 1.77 1.83 1.75 1.31 0.79 1.34 2.06 2.05 1.75 1.65 1.31 1.29 1.09 0.93 0.90 0.97 1.34 1.27 1.26 0.84
5 1.08 1.40 1.99 1.85 1.87 1.78 1.81 1.50 1.07 1.23 1.57 2.05 1.82 1.75 1.26 1.31 1.15 1.04 0.91 0.95 1.29 1.29 1.42 1.05
6 0.70 1.19 1.99 1.97 1.87 1.77 1.91 1.75 1.30 0.79 1.32 2.05 1.95 1.76 1.24 1.33 1.26 1.11 0.91 0.92 1.25 1.34 1.61 1.25
Luas Layanan
Bulan Okt Nov Des Jan Feb Mar Apr Mei Jun Jul Agst Sep
Q 80 (m/dtk) 3.32 3.32 3.32 3.32 3.32 3.32 3.32 3.32 3.32 3.32 3.32 3.32 3.32 3.32 3.32 3.32 3.32 3.32 3.32 3.32 3.32 3.32 3.32 3.32
1 1.80 1.82 1.67 2.09 1.78 1.84 2.04 3.38 5.60 1.58 1.61 1.62 2.13 1.90 2.56 2.62 3.56 3.67 3.68 3.24 2.46 2.80 3.21 5.08
2 5.69 1.82 1.67 1.68 1.97 1.78 1.77 2.04 3.37 5.60 1.61 1.62 1.70 2.12 2.49 2.52 2.65 3.51 3.72 3.61 2.50 2.45 2.24 3.25
Alterntif

3 4.05 5.86 1.67 1.68 1.62 1.97 1.71 1.77 2.05 3.37 5.67 1.62 1.70 1.70 2.90 2.46 2.60 2.63 3.56 3.65 2.82 2.49 1.92 2.26
4 2.74 1.82 1.67 1.86 1.87 1.81 1.90 2.54 4.21 2.47 1.61 1.62 1.89 2.01 2.52 2.57 3.04 3.59 3.70 3.41 2.48 2.61 2.64 3.97
5 3.07 2.36 1.67 1.80 1.78 1.86 1.83 2.22 3.12 2.71 2.11 1.62 1.83 1.90 2.64 2.53 2.88 3.20 3.65 3.49 2.58 2.57 2.34 3.17
6 4.74 2.78 1.67 1.68 1.78 1.87 1.74 1.89 2.55 4.20 2.51 1.62 1.70 1.89 2.68 2.49 2.63 3.00 3.64 3.63 2.65 2.47 2.07 2.67

Alternatif 1 1.42 1.67 1.58 2.46 1.90 Padi Musim


Alternatif 2 1.44 1.67 1.61 0.9 1.39 1
Alternatif 3 1.44 1.62 1.62 0.79 1.34 Padi Musim
Alternatif 4 1.43 1.67 1.61 1.04 1.44 2
Alternatif 5 1.43 1.67 1.62 0.94 1.41
Palawija
Alternatif 6 1.44 1.67 1.62 0.84 1.38
DIMENSI SALURAN PRIMER, SEKUNDER, DAN TERSIER
Nama Jenis Luas Q V A n h b P R = A/P W H B
No DR Efisiensi m k I
Saluran Saluran Layanan m3/d m/d Q/V b/h m m m m m m m
1 S Pr K Primer 1769.8 2.10 0.90 4.1212 0.5776 7.1350 1.50 3.00 40 1.34 4.01 8.23 0.87 0.0002525 0.60 1.94 9.81 0.908764 36.35055
2 K Kr Tersier 38 2.10 0.85 0.0937 0.2465 0.3800 1.00 1.00 35 0.31 0.31 1.18 0.32 0.0002265 0.40 0.71 1.72 0.468067 16.38234
3 K Ka Tersier 32 2.10 0.85 0.0789 0.2372 0.3326 1.00 1.00 35 0.29 0.29 1.10 0.30 0.0002292 0.40 0.69 1.67 0.447642 15.66748
4 S Sc P1 Sekunder 1369 2.10 0.85 3.3754 0.5522 6.1123 1.50 2.50 40 1.24 3.09 7.00 0.87 0.0002286 0.60 1.84 8.60 0.913198 36.52791
5 P1 Kr Tersier 48 2.10 0.85 0.1183 0.2598 0.4555 1.00 1.00 35 0.34 0.34 1.29 0.35 0.0002228 0.40 0.74 1.81 0.497335 17.40672
6 P1 Ka Tersier 42 2.10 0.85 0.1036 0.2522 0.4107 1.00 1.00 35 0.32 0.32 1.23 0.33 0.0002249 0.40 0.72 1.76 0.480389 16.8136
7 S Sc P2 Sekunder 1279 2.10 0.85 3.1535 0.5438 5.7985 1.50 2.50 40 1.20 3.01 6.82 0.85 0.0002296 0.60 1.80 8.42 0.897217 35.88867
8 P2 Kr Tersier 54 2.10 0.85 0.1331 0.2668 0.4990 1.00 1.00 35 0.35 0.35 1.35 0.37 0.000221 0.40 0.75 1.86 0.512778 17.94722
9 P2 Ka Tersier 46.8 2.10 0.85 0.1154 0.2584 0.4466 1.00 1.00 35 0.33 0.33 1.28 0.35 0.0002232 0.40 0.73 1.80 0.494076 17.29267
10 S Sc P3 Sekunder 1178.2 2.10 0.85 2.9050 0.5339 5.4411 1.50 2.50 40 1.17 2.92 6.60 0.82 0.0002309 0.60 1.77 8.21 0.878297 35.13188
11 P3 Kr Tersier 44.8 2.10 0.85 0.1105 0.2558 0.4318 1.00 1.00 35 0.33 0.33 1.26 0.34 0.0002239 0.40 0.73 1.79 0.488506 17.0977
12 P3 Ka Tersier 46 2.10 0.85 0.1134 0.2574 0.4407 1.00 1.00 35 0.33 0.33 1.27 0.35 0.0002235 0.40 0.73 1.80 0.49187 17.21544
13 S Sc P4 Sekunder 1087.4 2.10 0.85 2.6811 0.5243 5.1132 1.50 2.50 40 1.13 2.83 6.40 0.80 0.0002322 0.60 1.73 8.02 0.860199 34.40794
14 P4 Kr Tersier 44 2.10 0.85 0.1085 0.2548 0.4258 1.00 1.00 35 0.33 0.33 1.25 0.34 0.0002242 0.40 0.73 1.78 0.486226 17.0179
15 P4 Ka Tersier 44 2.10 0.85 0.1085 0.2548 0.4258 1.00 1.00 35 0.33 0.33 1.25 0.34 0.0002242 0.40 0.73 1.78 0.486226 17.0179
16 S Sc P 5 Sekunder 999.4 2.10 0.85 2.4641 0.5145 4.7895 1.50 2.50 40 1.09 2.74 6.20 0.77 0.0002336 0.60 1.69 7.82 0.841557 33.66227
17 P5 Kr Tersier 47.6 2.10 0.85 0.1174 0.2594 0.4525 1.00 1.00 35 0.34 0.34 1.29 0.35 0.000223 0.40 0.74 1.81 0.496255 17.36894
18 P5 Ka Tersier 46.4 2.10 0.85 0.1144 0.2579 0.4437 1.00 1.00 35 0.33 0.33 1.28 0.35 0.0002234 0.40 0.73 1.80 0.492977 17.25418
19 S Sc P6 Sekunder 905.4 2.10 0.85 2.2324 0.5032 4.4365 1.50 2.50 40 1.05 2.63 5.96 0.74 0.0002352 0.60 1.65 7.59 0.820249 32.80997
20 P6 Kr Tersier 52 2.10 0.85 0.1282 0.2646 0.4846 1.00 1.00 35 0.35 0.35 1.33 0.36 0.0002216 0.40 0.75 1.84 0.507778 17.77223
21 P6 Ka Tersier 21.6 2.10 0.85 0.0533 0.2171 0.2453 1.00 1.00 35 0.25 0.25 0.95 0.26 0.0002355 0.40 0.65 1.54 0.404217 14.14758
22 S Sc P7 Sekunder 831.8 2.10 0.85 2.0509 0.4937 4.1544 1.50 2.50 40 1.02 2.55 5.77 0.72 0.0002366 0.60 1.62 7.41 0.802391 32.09564
23 P7 Kr Tersier 45.6 2.10 0.85 0.1124 0.2569 0.4377 1.00 1.00 35 0.33 0.33 1.27 0.35 0.0002236 0.40 0.73 1.79 0.490756 17.17645
24 P7 Ka Tersier 22 2.10 0.85 0.0542 0.2180 0.2488 1.00 1.00 35 0.25 0.25 0.95 0.26 0.0002352 0.40 0.65 1.55 0.406147 14.21514
25 S Sc P8 Sekunder 764.2 2.10 0.85 1.8842 0.4843 3.8903 1.50 2.50 40 0.99 2.47 5.58 0.70 0.000238 0.60 1.59 7.22 0.784926 31.39704
26 P8 Kr Tersier 42.4 2.10 0.85 0.1045 0.2527 0.4137 1.00 1.00 35 0.32 0.32 1.23 0.34 0.0002248 0.40 0.72 1.76 0.481572 16.85503
27 P8 Ka Tersier 28.5 2.10 0.85 0.0703 0.2311 0.3041 1.00 1.00 35 0.28 0.28 1.06 0.29 0.000231 0.40 0.68 1.63 0.434381 15.20333
28 S Sc P9 Sekunder 693.3 2.10 0.85 1.7094 0.4738 3.6075 1.00 2.00 40 0.95 1.90 4.59 0.79 0.0001935 0.50 1.45 4.80 0.851539 34.06156
29 P9 Kr Tersier 24.7 2.10 0.85 0.0609 0.2238 0.2722 1.00 1.00 35 0.26 0.26 1.00 0.27 0.0002333 0.40 0.66 1.58 0.418539 14.64885
30 P9 Ka Tersier 36 2.10 0.85 0.0888 0.2436 0.3644 1.00 1.00 35 0.30 0.30 1.16 0.32 0.0002273 0.40 0.70 1.71 0.461542 16.15398
31 S Sc P10 Sekunder 632.6 2.10 0.85 1.5597 0.4642 3.3602 1.00 2.00 40 0.92 1.83 4.43 0.76 0.0001948 0.50 1.42 4.67 0.831522 33.26086
32 P10 Kr Tersier 16 2.10 0.85 0.0394 0.2029 0.1944 1.00 1.00 35 0.22 0.22 0.84 0.23 0.0002405 0.40 0.62 1.46 0.373918 13.08712
33 P10 Ka Tersier 37 2.10 0.85 0.0912 0.2451 0.3723 1.00 1.00 35 0.31 0.31 1.17 0.32 0.0002269 0.40 0.71 1.72 0.464837 16.2693
34 S Sc P11 Sekunder 579.6 2.10 0.85 1.4291 0.4551 3.1399 1.00 2.00 40 0.89 1.77 4.28 0.73 0.0001959 0.50 1.39 4.54 0.812845 32.51379
35 P11 Kr Tersier 38.4 2.10 0.85 0.0947 0.2471 0.3831 1.00 1.00 35 0.31 0.31 1.18 0.32 0.0002263 0.40 0.71 1.73 0.469341 16.42694
36 P11 Ka Tersier 51.2 2.10 0.85 0.1262 0.2636 0.4788 1.00 1.00 35 0.35 0.35 1.32 0.36 0.0002218 0.40 0.75 1.84 0.505738 17.70084
37 S Sc P12 Sekunder 441 2.10 0.85 1.0873 0.4280 2.5406 1.00 2.00 35 0.80 1.59 3.85 0.66 0.0002608 0.50 1.30 4.19 0.757169 26.50091
38 P12 Kr Tersier 32 2.10 0.85 0.0789 0.2372 0.3326 1.00 1.00 35 0.29 0.29 1.10 0.30 0.0002292 0.40 0.69 1.67 0.447642 15.66748
39 P12 Ka Tersier 64 2.10 0.85 0.1578 0.2772 0.5692 1.00 1.00 35 0.38 0.38 1.44 0.39 0.0002184 0.40 0.78 1.93 0.535903 18.7566
40 S Sc P13 Sekunder 207 2.10 0.85 0.5104 0.3610 1.4137 1.00 1.50 35 0.59 0.89 2.57 0.55 0.0002374 0.40 0.99 2.88 0.669457 23.431
41 P13 Kr Tersier 18 2.10 0.85 0.0444 0.2084 0.2130 1.00 1.00 35 0.23 0.23 0.88 0.24 0.0002385 0.40 0.63 1.49 0.385529 13.4935
42 P13 Ka Tersier 57 2.10 0.85 0.1405 0.2701 0.5204 1.00 1.00 35 0.36 0.36 1.38 0.38 0.0002202 0.40 0.76 1.88 0.520027 18.20093
43 S Sc N1 Sekunder 36 2.10 0.85 0.0888 0.2436 0.3644 1.00 1.00 35 0.30 0.30 1.16 0.32 0.0002273 0.40 0.70 1.71 0.461542 16.15398
44 N1 Kr Tersier 36 2.10 0.85 0.0888 0.2436 0.3644 1.00 1.00 35 0.30 0.30 1.16 0.32 0.0002273 0.40 0.70 1.71 0.461542 16.15398
45 S Sc N2 Sekunder 20 2.10 0.85 0.0493 0.2134 0.2311 1.00 1.00 35 0.24 0.24 0.92 0.25 0.0002368 0.40 0.64 1.52 0.39622 13.8677
46 N2 Kr Tersier 20 2.10 0.85 0.0493 0.2134 0.2311 1.00 1.00 35 0.24 0.24 0.92 0.25 0.0002368 0.40 0.64 1.52 0.39622 13.8677
47 S Sc M1 Sekunder 49 2.10 0.85 0.1208 0.2611 0.4628 1.00 1.00 35 0.34 0.34 1.30 0.36 0.0002225 0.40 0.74 1.82 0.500004 17.50015
48 M1 Ka Tersier 49 2.10 0.85 0.1208 0.2611 0.4628 1.00 1.00 35 0.34 0.34 1.30 0.36 0.0002225 0.40 0.74 1.82 0.500004 17.50015
49 S Sc D1 Sekunder 102 2.10 0.85 0.2515 0.3079 0.8169 1.00 1.00 35 0.45 0.45 1.73 0.47 0.0002115 0.40 0.85 2.16 0.604838 21.16934
50 D1 Ka Tersier 64 2.10 0.85 0.1578 0.2772 0.5692 1.00 1.00 35 0.38 0.38 1.44 0.39 0.0002184 0.40 0.78 1.93 0.535903 18.7566
51 S Sc D2 Sekunder 38 2.10 0.85 0.0937 0.2465 0.3800 1.00 1.00 35 0.31 0.31 1.18 0.32 0.0002265 0.40 0.71 1.72 0.468067 16.38234
52 D2 Ka Tersier 38 2.10 0.85 0.0937 0.2465 0.3800 1.00 1.00 35 0.31 0.31 1.18 0.32 0.0002265 0.40 0.71 1.72 0.468067 16.38234
53 S Sc R1 Sekunder 112 2.10 0.85 0.2761 0.3144 0.8783 1.00 1.00 35 0.47 0.47 1.79 0.49 0.0002101 0.40 0.87 2.21 0.619705 21.68966
54 R1 Ka Tersier 70 2.10 0.85 0.1726 0.2829 0.6102 1.00 1.00 35 0.39 0.39 1.50 0.41 0.0002171 0.40 0.79 1.97 0.548517 19.1981
55 S Sc R2 Sekunder 42 2.10 0.85 0.1036 0.2522 0.4107 1.00 1.00 35 0.32 0.32 1.23 0.33 0.0002249 0.40 0.72 1.76 0.480389 16.8136
56 R2 Ka Tersier 42 2.10 0.85 0.1036 0.2522 0.4107 1.00 1.00 35 0.32 0.32 1.23 0.33 0.0002249 0.40 0.72 1.76 0.480389 16.8136
57 S Pr B1 Primer 330.8 2.10 0.9 0.7703 0.3960 1.9450 1.00 1.50 35 0.70 1.05 3.02 0.64 0.0002307 0.50 1.20 3.44 0.744966 26.07381
58 B1 Kr Tersier 24.8 2.10 0.85 0.0611 0.2240 0.2730 1.00 1.00 35 0.26 0.26 1.00 0.27 0.0002333 0.40 0.66 1.58 0.418978 14.66422
59 B1 Ka Tersier 28.2 2.10 0.85 0.0695 0.2305 0.3016 1.00 1.00 35 0.27 0.27 1.05 0.29 0.0002312 0.40 0.67 1.62 0.433189 15.16162
60 S Sc B2 Sekunder 277.8 2.10 0.85 0.6849 0.3857 1.7758 1.00 1.50 35 0.67 1.00 2.88 0.62 0.0002326 0.50 1.17 3.33 0.722592 25.29071
61 B2 Kr Tersier 20 2.10 0.85 0.0493 0.2134 0.2311 1.00 1.00 35 0.24 0.24 0.92 0.25 0.0002368 0.40 0.64 1.52 0.39622 13.8677
62 B2 Ka Tersier 29 2.10 0.85 0.0715 0.2320 0.3082 1.00 1.00 35 0.28 0.28 1.06 0.29 0.0002308 0.40 0.68 1.63 0.436347 15.27213
63 S Sc B3 Sekunder 228.8 2.10 0.85 0.5641 0.3692 1.5278 1.00 1.50 35 0.62 0.93 2.68 0.57 0.0002358 0.40 1.02 2.96 0.687089 24.0481
64 B3 Kr Tersier 18 2.10 0.85 0.0444 0.2084 0.2130 1.00 1.00 35 0.23 0.23 0.88 0.24 0.0002385 0.40 0.63 1.49 0.385529 13.4935
65 B3 Ka Tersier 30.2 2.10 0.85 0.0745 0.2341 0.3181 1.00 1.00 35 0.28 0.28 1.08 0.29 0.0002301 0.40 0.68 1.65 0.440964 15.43375
66 S Sc B4 Sekunder 180.6 2.10 0.85 0.4453 0.3501 1.2719 1.00 1.50 35 0.56 0.85 2.44 0.52 0.0002396 0.40 0.96 2.77 0.646159 22.61556
67 B4 Kr Tersier 20 2.10 0.85 0.0493 0.2134 0.2311 1.00 1.00 35 0.24 0.24 0.92 0.25 0.0002368 0.40 0.64 1.52 0.39622 13.8677
68 B4 Ka Tersier 29 2.10 0.85 0.0715 0.2320 0.3082 1.00 1.00 35 0.28 0.28 1.06 0.29 0.0002308 0.40 0.68 1.63 0.436347 15.27213
69 S Sc B5 Sekunder 93.2 2.10 0.85 0.2298 0.3017 0.7617 1.00 1.00 35 0.44 0.44 1.67 0.46 0.0002128 0.40 0.84 2.11 0.590835 20.67922
70 B5 Kr Tersier 26 2.10 0.85 0.0641 0.2264 0.2832 1.00 1.00 35 0.27 0.27 1.02 0.28 0.0002325 0.40 0.67 1.60 0.42415 14.84523
71 B5 Ka Tersier 31 2.10 0.85 0.0764 0.2355 0.3246 1.00 1.00 35 0.28 0.28 1.09 0.30 0.0002297 0.40 0.68 1.65 0.443968 15.53887
72 S Sc K1 Sekunder 38.4 2.10 0.85 0.0947 0.2471 0.3831 1.00 1.00 35 0.31 0.31 1.18 0.32 0.0002263 0.40 0.71 1.73 0.469341 16.42694
73 K1 Ka Tersier 38.4 2.10 0.85 0.0947 0.2471 0.3831 1.00 1.00 35 0.31 0.31 1.18 0.32 0.0002263 0.40 0.71 1.73 0.469341 16.42694
74 S Sc K2 Sekunder 36.2 2.10 0.85 0.0893 0.2439 0.3660 1.00 1.00 35 0.30 0.30 1.16 0.32 0.0002272 0.40 0.70 1.71 0.462207 16.17723
75 K2 Ka Tersier 36.2 2.10 0.85 0.0893 0.2439 0.3660 1.00 1.00 35 0.30 0.30 1.16 0.32 0.0002272 0.40 0.70 1.71 0.462207 16.17723
PERHITUNGAN MUKA AIR RENCANA
No Saluran A a b c I L d=I*L e f g ∆h
1 S Pr K 22 0.1 0.05 0.05 0.0002525 640 0.16159 0.05 0.05 0.11 0.15
2 K Kr 21.2 0.1 0.05 0.05 0.0002265 640 0.14494 0.05 0.05 0.11 0.15
3 K Ka 21.2 0.1 0.05 0.05 0.0002292 640 0.14668 0.05 0.05 0.11 0.15
4 S Sc P1 21 0.1 0.05 0.05 0.0002286 400 0.09142 0.05 0.05 0.11 0.15
5 P1 Kr 19.2 0.1 0.05 0.05 0.0002228 1100 0.24512 0.05 0.05 0.11 0.15
6 P1 Ka 19 0.1 0.05 0.05 0.0002249 860 0.19342 0.05 0.05 0.11 0.15
7 S Sc P2 18 0.1 0.05 0.05 0.0002296 400 0.09185 0.05 0.05 0.11 0.15
8 P2 Kr 17.8 0.1 0.05 0.05 0.000221 1280 0.28292 0.05 0.05 0.11 0.15
9 P2 Ka 17.7 0.1 0.05 0.05 0.0002232 1200 0.26788 0.05 0.05 0.11 0.15
10 S Sc P3 17 0.1 0.05 0.05 0.0002309 400 0.09238 0.05 0.05 0.11 0.15
11 P3 Kr 16.7 0.1 0.05 0.05 0.0002239 1400 0.31347 0.05 0.05 0.11 0.15
12 P3 Ka 16.5 0.1 0.05 0.05 0.0002235 1180 0.26373 0.05 0.05 0.11 0.15
13 S Sc P4 16 0.1 0.05 0.05 0.0002322 400 0.09289 0.05 0.05 0.11 0.15
14 P4 Kr 15.7 0.1 0.05 0.05 0.0002242 1100 0.2466 0.05 0.05 0.11 0.15
15 P4 Ka 15.5 0.1 0.05 0.05 0.0002242 1100 0.2466 0.05 0.05 0.11 0.15
16 S Sc P 5 15 0.1 0.05 0.05 0.0002336 400 0.09344 0.05 0.05 0.11 0.15
17 P5 Kr 14.8 0.1 0.05 0.05 0.000223 1120 0.24972 0.05 0.05 0.11 0.15
18 P5 Ka 14.8 0.1 0.05 0.05 0.0002234 1020 0.22783 0.05 0.05 0.11 0.15
19 S Sc P6 14 0.1 0.05 0.05 0.0002352 400 0.09408 0.05 0.05 0.11 0.15
20 P6 Kr 13.6 0.1 0.05 0.05 0.0002216 1300 0.28809 0.05 0.05 0.11 0.15
21 P6 Ka 13.6 0.1 0.05 0.05 0.0002355 560 0.13188 0.05 0.05 0.11 0.15
22 S Sc P7 12 0.1 0.05 0.05 0.0002366 400 0.09463 0.05 0.05 0.11 0.15
23 P7 Kr 11.7 0.1 0.05 0.05 0.0002236 1300 0.29072 0.05 0.05 0.11 0.15
24 P7 Ka 11.5 0.1 0.05 0.05 0.0002352 660 0.15524 0.05 0.05 0.11 0.15
25 S Sc P8 11.3 0.1 0.05 0.05 0.000238 400 0.09519 0.05 0.05 0.11 0.15
26 P8 Kr 10.6 0.1 0.05 0.05 0.0002248 1100 0.24724 0.05 0.05 0.11 0.15
27 P8 Ka 10.4 0.1 0.05 0.05 0.000231 720 0.16634 0.05 0.05 0.11 0.15
28 S Sc P9 10 0.1 0.05 0.05 0.0001935 400 0.07741 0.05 0.05 0.11 0.15
29 P9 Kr 9.6 0.1 0.05 0.05 0.0002333 1100 0.25666 0.05 0.05 0.11 0.15
30 P9 Ka 9.5 0.1 0.05 0.05 0.0002273 880 0.20004 0.05 0.05 0.11 0.15
31 S Sc P10 9.2 0.1 0.05 0.05 0.0001948 400 0.07791 0.05 0.05 0.11 0.15
32 P10 Kr 8.8 0.1 0.05 0.05 0.0002405 580 0.13946 0.05 0.05 0.11 0.15
33 P10 Ka 8.6 0.1 0.05 0.05 0.0002269 1080 0.24504 0.05 0.05 0.11 0.15
34 S Sc P11 8 0.1 0.05 0.05 0.0001959 500 0.09797 0.05 0.05 0.11 0.15
35 P11 Kr 7.7 0.1 0.05 0.05 0.0002263 400 0.09052 0.05 0.05 0.11 0.15
36 P11 Ka 7.5 0.1 0.05 0.05 0.0002218 1600 0.35495 0.05 0.05 0.11 0.15
37 S Sc P12 7.3 0.1 0.05 0.05 0.0002608 400 0.10433 0.05 0.05 0.11 0.15
38 P12 Kr 6.8 0.1 0.05 0.05 0.0002292 800 0.18335 0.05 0.05 0.11 0.15
39 P12 Ka 6.6 0.1 0.05 0.05 0.0002184 1600 0.34951 0.05 0.05 0.11 0.15
40 S Sc P13 6 0.1 0.05 0.05 0.0002374 400 0.09496 0.05 0.05 0.11 0.15
41 P13 Kr 5.8 0.1 0.05 0.05 0.0002385 800 0.1908 0.05 0.05 0.11 0.15
42 P13 Ka 5.6 0.1 0.05 0.05 0.0002202 1640 0.36113 0.05 0.05 0.11 0.15
43 S Sc N1 7 0.1 0.05 0.05 0.0002273 800 0.18186 0.05 0.05 0.11 0.15
44 N1 Kr 6.8 0.1 0.05 0.05 0.0002273 1600 0.36372 0.05 0.05 0.11 0.15
45 S Sc N2 6 0.1 0.05 0.05 0.0002368 800 0.18941 0.05 0.05 0.11 0.15
46 N2 Kr 5.8 0.1 0.05 0.05 0.0002368 900 0.21309 0.05 0.05 0.11 0.15
47 S Sc M1 8 0.1 0.05 0.05 0.0002225 1600 0.35603 0.05 0.05 0.11 0.15
48 M1 Ka 7.8 0.1 0.05 0.05 0.0002225 920 0.20472 0.05 0.05 0.11 0.15
49 S Sc D1 7 0.1 0.05 0.05 0.0002115 1600 0.33841 0.05 0.05 0.11 0.15
50 D1 Ka 6.8 0.1 0.05 0.05 0.0002184 1600 0.34951 0.05 0.05 0.11 0.15
51 S Sc D2 7 0.1 0.05 0.05 0.0002265 1600 0.36236 0.05 0.05 0.11 0.15
52 D2 Ka 6.8 0.1 0.05 0.05 0.0002265 1000 0.22647 0.05 0.05 0.11 0.15
53 S Sc R1 6 0.1 0.05 0.05 0.0002101 1600 0.33622 0.05 0.05 0.11 0.15
54 R1 Ka 5.8 0.1 0.05 0.05 0.0002171 1600 0.34735 0.05 0.05 0.11 0.15
55 S Sc R2 6 0.1 0.05 0.05 0.0002249 1600 0.35985 0.05 0.05 0.11 0.15
56 R2 Ka 5.8 0.1 0.05 0.05 0.0002249 1100 0.2474 0.05 0.05 0.11 0.15
57 S Pr B1 20 0.1 0.05 0.05 0.0002307 1600 0.36916 0.05 0.05 0.11 0.15
58 B1 Kr 19.8 0.1 0.05 0.05 0.0002333 700 0.16329 0.05 0.05 0.11 0.15
59 B1 Ka 19.8 0.1 0.05 0.05 0.0002312 680 0.15722 0.05 0.05 0.11 0.15
60 S Sc B2 19 0.1 0.05 0.05 0.0002326 400 0.09304 0.05 0.05 0.11 0.15
61 B2 Kr 18.5 0.1 0.05 0.05 0.0002368 540 0.12785 0.05 0.05 0.11 0.15
62 B2 Ka 18.5 0.1 0.05 0.05 0.0002308 700 0.16153 0.05 0.05 0.11 0.15
63 S Sc B3 18 0.1 0.05 0.05 0.0002358 400 0.0943 0.05 0.05 0.11 0.15
64 B3 Kr 17.7 0.1 0.05 0.05 0.0002385 400 0.0954 0.05 0.05 0.11 0.15
65 B3 Ka 17.5 0.1 0.05 0.05 0.0002301 800 0.18408 0.05 0.05 0.11 0.15
66 S Sc B4 17 0.1 0.05 0.05 0.0002396 400 0.09586 0.05 0.05 0.11 0.15
67 B4 Kr 16.5 0.1 0.05 0.05 0.0002368 400 0.09471 0.05 0.05 0.11 0.15
68 B4 Ka 16.2 0.1 0.05 0.05 0.0002308 800 0.1846 0.05 0.05 0.11 0.15
69 S Sc B5 16 0.1 0.05 0.05 0.0002128 400 0.08513 0.05 0.05 0.11 0.15
70 B5 Kr 15.7 0.1 0.05 0.05 0.0002325 400 0.093 0.05 0.05 0.11 0.15
71 B5 Ka 15.7 0.1 0.05 0.05 0.0002297 780 0.17916 0.05 0.05 0.11 0.15
72 S Sc K1 17 0.1 0.05 0.05 0.0002263 800 0.18105 0.05 0.05 0.11 0.15
73 K1 Ka 16.5 0.1 0.05 0.05 0.0002263 960 0.21726 0.05 0.05 0.11 0.15
74 S Sc K2 16 0.1 0.05 0.05 0.0002272 800 0.18179 0.05 0.05 0.11 0.15
75 K2 Ka 15.7 0.1 0.05 0.05 0.0002272 1120 0.2545 0.05 0.05 0.11 0.15
P
22.7216
21.9049 1400
21.9067 1100
21.6514 860
20.0051 1280
19.7534 1200
18.6519 1400
18.6429 1180
18.5279 1100
17.6524 1100
17.5735 1120
17.3237 1020
16.6529 1300
16.5066 560
16.3066 1300
15.6534 660
15.6097 1100
15.5878 720
14.6541 1100
14.4481 880
14.2919 580
12.6546 1080
12.5507 400
12.2152 1600
11.9552 800
11.4072 1600
11.1263 800
10.6374 1640
10.4167 1600
10.26 900
9.83791 920
9.49946 1600
9.40504 1000
8.65797 1600
8.35052 1100
8.41495 700
7.96433 680
7.54335 540
7.50951 700
6.65496 400
6.5508 800
6.52113 400
7.74186 800
7.72372 400
6.74941 780
6.57309 960
8.91603 1120
8.56472
7.89841
7.70951
7.92236
7.58647
6.89622
6.70735
6.91985
6.6074
20.9292
20.5233
20.5172
19.653
19.1879
19.2215
18.6543
18.3554
18.2441
17.6559
17.1547
16.9446
16.6451
16.353
16.4392
17.741
17.2773
16.7418
16.5145
TABEL ELEVASI
Q h W ELEVASI
No Nama Saluran
m3/det m m MUKA TANAH ASLI MUKA AIR RENC. MUKA TANGGUL
1 S Pr K 4.1212 1.34 0.60 22 22.7216 23.3216
2 K Kr 0.0937 0.31 0.40 21.2 21.9049 22.3049
3 K Ka 0.0789 0.29 0.40 21.2 21.9067 22.3067
4 S Sc P1 3.3754 1.24 0.60 21 21.6514 22.2514
5 P1 Kr 0.1183 0.34 0.40 19.2 20.0051 20.4051
6 P1 Ka 0.1036 0.32 0.40 19 19.7534 20.1534
7 S Sc P2 3.1535 1.20 0.60 18 18.6519 19.2519
8 P2 Kr 0.1331 0.35 0.40 17.8 18.6429 19.0429
9 P2 Ka 0.1154 0.33 0.40 17.7 18.5279 18.9279
10 S Sc P3 2.9050 1.17 0.60 17 17.6524 18.2524
11 P3 Kr 0.1105 0.33 0.40 16.7 17.5735 17.9735
12 P3 Ka 0.1134 0.33 0.40 16.5 17.3237 17.7237
13 S Sc P4 2.6811 1.13 0.60 16 16.6529 17.2529
14 P4 Kr 0.1085 0.33 0.40 15.7 16.5066 16.9066
15 P4 Ka 0.1085 0.33 0.40 15.5 16.3066 16.7066
16 S Sc P 5 2.4641 1.09 0.60 15 15.6534 16.2534
17 P5 Kr 0.1174 0.34 0.40 14.8 15.6097 16.0097
18 P5 Ka 0.1144 0.33 0.40 14.8 15.5878 15.9878
19 S Sc P6 2.2324 1.05 0.60 14 14.6541 15.2541
20 P6 Kr 0.1282 0.35 0.40 13.6 14.4481 14.8481
21 P6 Ka 0.0533 0.25 0.40 13.6 14.2919 14.6919
22 S Sc P7 2.0509 1.02 0.60 12 12.6546 13.2546
23 P7 Kr 0.1124 0.33 0.40 11.7 12.5507 12.9507
24 P7 Ka 0.0542 0.25 0.40 11.5 12.2152 12.6152
25 S Sc P8 1.8842 0.99 0.60 11.3 11.9552 12.5552
26 P8 Kr 0.1045 0.32 0.40 10.6 11.4072 11.8072
27 P8 Ka 0.0703 0.28 0.40 10.4 11.1263 11.5263
28 S Sc P9 1.7094 0.95 0.50 10 10.6374 11.1374
29 P9 Kr 0.0609 0.26 0.40 9.6 10.4167 10.8167
30 P9 Ka 0.0888 0.30 0.40 9.5 10.2600 10.6600
31 S Sc P10 1.5597 0.92 0.50 9.2 9.8379 10.3379
32 P10 Kr 0.0394 0.22 0.40 8.8 9.4995 9.8995
33 P10 Ka 0.0912 0.31 0.40 8.6 9.4050 9.8050
34 S Sc P11 1.4291 0.89 0.50 8 8.6580 9.1580
35 P11 Kr 0.0947 0.31 0.40 7.7 8.3505 8.7505
36 P11 Ka 0.1262 0.35 0.40 7.5 8.4150 8.8150
37 S Sc P12 1.0873 0.80 0.50 7.3 7.9643 8.4643
38 P12 Kr 0.0789 0.29 0.40 6.8 7.5433 7.9433
39 P12 Ka 0.1578 0.38 0.40 6.6 7.5095 7.9095
40 S Sc P13 0.5104 0.59 0.40 6 6.6550 7.0550
41 P13 Kr 0.0444 0.23 0.40 5.8 6.5508 6.9508
42 P13 Ka 0.1405 0.36 0.40 5.6 6.5211 6.9211
43 S Sc N1 0.0888 0.30 0.40 7 7.7419 8.1419
44 N1 Kr 0.0888 0.30 0.40 6.8 7.7237 8.1237
45 S Sc N2 0.0493 0.24 0.40 6 6.7494 7.1494
46 N2 Kr 0.0493 0.24 0.40 5.8 6.5731 6.9731
47 S Sc M1 0.1208 0.34 0.40 8 8.9160 9.3160
48 M1 Ka 0.1208 0.34 0.40 7.8 8.5647 8.9647
49 S Sc D1 0.2515 0.45 0.40 7 7.8984 8.2984
50 D1 Ka 0.1578 0.38 0.40 6.8 7.7095 8.1095
51 S Sc D2 0.0937 0.31 0.40 7 7.9224 8.3224
52 D2 Ka 0.0937 0.31 0.40 6.8 7.5865 7.9865
53 S Sc R1 0.2761 0.47 0.40 6 6.8962 7.2962
54 R1 Ka 0.1726 0.39 0.40 5.8 6.7073 7.1073
55 S Sc R2 0.1036 0.32 0.40 6 6.9199 7.3199
56 R2 Ka 0.1036 0.32 0.40 5.8 6.6074 7.0074
57 S Pr B1 0.7703 0.70 0.50 20 20.9292 21.4292
58 B1 Kr 0.0611 0.26 0.40 19.8 20.5233 20.9233
59 B1 Ka 0.0695 0.27 0.40 19.8 20.5172 20.9172
60 S Sc B2 0.6849 0.67 0.50 19 19.6530 20.1530
61 B2 Kr 0.0493 0.24 0.40 18.5 19.1879 19.5879
62 B2 Ka 0.0715 0.28 0.40 18.5 19.2215 19.6215
63 S Sc B3 0.5641 0.62 0.40 18 18.6543 19.0543
64 B3 Kr 0.0444 0.23 0.40 17.7 18.3554 18.7554
65 B3 Ka 0.0745 0.28 0.40 17.5 18.2441 18.6441
66 S Sc B4 0.4453 0.56 0.40 17 17.6559 18.0559
67 B4 Kr 0.0493 0.24 0.40 16.5 17.1547 17.5547
68 B4 Ka 0.0715 0.28 0.40 16.2 16.9446 17.3446
69 S Sc B5 0.2298 0.44 0.40 16 16.6451 17.0451
70 B5 Kr 0.0641 0.27 0.40 15.7 16.3530 16.7530
71 B5 Ka 0.0764 0.28 0.40 15.7 16.4392 16.8392
72 S Sc K1 0.0947 0.31 0.40 17 17.7410 18.1410
73 K1 Ka 0.0947 0.31 0.40 16.5 17.2773 17.6773
74 S Sc K2 0.0893 0.30 0.40 16 16.7418 17.1418
75 K2 Ka 0.0893 0.30 0.40 15.7 16.5145 16.9145
DASAR SAL. RENC.
21.3860
21.5967
21.6183
20.4153
19.6677
19.4330
17.4478
18.2897
18.1937
16.4861
17.2449
16.9918
15.5223
16.1804
15.9804
14.5592
15.2734
15.2548
13.6009
14.1000
14.0442
11.6355
12.2199
11.9658
10.9690
11.0856
10.8506
9.6877
10.1558
9.9582
8.9214
9.2790
9.1000
7.7720
8.0410
8.0690
7.1674
7.2550
7.1323
6.0605
6.3201
6.1605
7.4400
7.4219
6.5091
6.3327
8.5759
8.2246
7.4465
7.3323
7.6141
7.2782
6.4276
6.3168
6.5994
6.2870
20.2318
20.2620
20.2426
18.9868
18.9475
18.9439
18.0363
18.1247
17.9621
17.0920
16.9143
16.6670
16.2088
16.0869
16.1543
17.4316
16.9678
16.4393
16.2120
ELEVASI
No Nama Saluran m b h W
MUKA TANAH ASLI MUKA AIR RENC.
1 S Pr K 1.50 4.01 1.34 0.60 22 22.7216
2 K Kr 1.00 0.31 0.31 0.40 21.2 21.9049
3 K Ka 1.00 0.29 0.29 0.40 21.2 21.9067
4 S Sc P1 1.50 3.09 1.24 0.60 21 21.6514
5 P1 Kr 1.00 0.34 0.34 0.40 19.2 20.0051
6 P1 Ka 1.00 0.32 0.32 0.40 19 19.7534
7 S Sc P2 1.50 3.01 1.20 0.60 18 18.6519
8 P2 Kr 1.00 0.35 0.35 0.40 17.8 18.6429
9 P2 Ka 1.00 0.33 0.33 0.40 17.7 18.5279
10 S Sc P3 1.50 2.92 1.17 0.60 17 17.6524
11 P3 Kr 1.00 0.33 0.33 0.40 16.7 17.5735
12 P3 Ka 1.00 0.33 0.33 0.40 16.5 17.3237
13 S Sc P4 1.50 2.83 1.13 0.60 16 16.6529
14 P4 Kr 1.00 0.33 0.33 0.40 15.7 16.5066
15 P4 Ka 1.00 0.33 0.33 0.40 15.5 16.3066
16 S Sc P 5 1.50 2.74 1.09 0.60 15 15.6534
17 P5 Kr 1.00 0.34 0.34 0.40 14.8 15.6097
18 P5 Ka 1.00 0.33 0.33 0.40 14.8 15.5878
19 S Sc P6 1.50 2.63 1.05 0.60 14 14.6541
20 P6 Kr 1.00 0.35 0.35 0.40 13.6 14.4481
21 P6 Ka 1.00 0.25 0.25 0.40 13.6 14.2919
22 S Sc P7 1.50 2.55 1.02 0.60 12 12.6546
23 P7 Kr 1.00 0.33 0.33 0.40 11.7 12.5507
24 P7 Ka 1.00 0.25 0.25 0.40 11.5 12.2152
25 S Sc P8 1.50 2.47 0.99 0.60 11.3 11.9552
26 P8 Kr 1.00 0.32 0.32 0.40 10.6 11.4072
27 P8 Ka 1.00 0.28 0.28 0.40 10.4 11.1263
28 S Sc P9 1.00 1.90 0.95 0.50 10 10.6374
29 P9 Kr 1.00 0.26 0.26 0.40 9.6 10.4167
30 P9 Ka 1.00 0.30 0.30 0.40 9.5 10.2600
31 S Sc P10 1.00 1.83 0.92 0.50 9.2 9.8379
32 P10 Kr 1.00 0.22 0.22 0.40 8.8 9.4995
33 P10 Ka 1.00 0.31 0.31 0.40 8.6 9.4050
34 S Sc P11 1.00 1.77 0.89 0.50 8 8.6580
35 P11 Kr 1.00 0.31 0.31 0.40 7.7 8.3505
36 P11 Ka 1.00 0.35 0.35 0.40 7.5 8.4150
37 S Sc P12 1.00 1.59 0.80 0.50 7.3 7.9643
38 P12 Kr 1.00 0.29 0.29 0.40 6.8 7.5433
39 P12 Ka 1.00 0.38 0.38 0.40 6.6 7.5095
40 S Sc P13 1.00 0.89 0.59 0.40 6 6.6550
41 P13 Kr 1.00 0.23 0.23 0.40 5.8 6.5508
42 P13 Ka 1.00 0.36 0.36 0.40 5.6 6.5211
43 S Sc N1 1.00 0.30 0.30 0.40 7 7.7419
44 N1 Kr 1.00 0.30 0.30 0.40 6.8 7.7237
45 S Sc N2 1.00 0.24 0.24 0.40 6 6.7494
46 N2 Kr 1.00 0.24 0.24 0.40 5.8 6.5731
47 S Sc M1 1.00 0.34 0.34 0.40 8 8.9160
48 M1 Ka 1.00 0.34 0.34 0.40 7.8 8.5647
49 S Sc D1 1.00 0.45 0.45 0.40 7 7.8984
50 D1 Ka 1.00 0.38 0.38 0.40 6.8 7.7095
51 S Sc D2 1.00 0.31 0.31 0.40 7 7.9224
52 D2 Ka 1.00 0.31 0.31 0.40 6.8 7.5865
53 S Sc R1 1.00 0.47 0.47 0.40 6 6.8962
54 R1 Ka 1.00 0.39 0.39 0.40 5.8 6.7073
55 S Sc R2 1.00 0.32 0.32 0.40 6 6.9199
56 R2 Ka 1.00 0.32 0.32 0.40 5.8 6.6074
57 S Pr B1 1.00 1.05 0.70 0.50 20 20.9292
58 B1 Kr 1.00 0.26 0.26 0.40 19.8 20.5233
59 B1 Ka 1.00 0.27 0.27 0.40 19.8 20.5172
60 S Sc B2 1.00 1.00 0.67 0.50 19 19.6530
61 B2 Kr 1.00 0.24 0.24 0.40 18.5 19.1879
62 B2 Ka 1.00 0.28 0.28 0.40 18.5 19.2215
63 S Sc B3 1.00 0.93 0.62 0.40 18 18.6543
64 B3 Kr 1.00 0.23 0.23 0.40 17.7 18.3554
65 B3 Ka 1.00 0.28 0.28 0.40 17.5 18.2441
66 S Sc B4 1.00 0.85 0.56 0.40 17 17.6559
67 B4 Kr 1.00 0.24 0.24 0.40 16.5 17.1547
68 B4 Ka 1.00 0.28 0.28 0.40 16.2 16.9446
69 S Sc B5 1.00 0.44 0.44 0.40 16 16.6451
70 B5 Kr 1.00 0.27 0.27 0.40 15.7 16.3530
71 B5 Ka 1.00 0.28 0.28 0.40 15.7 16.4392
72 S Sc K1 1.00 0.31 0.31 0.40 17 17.7410
73 K1 Ka 1.00 0.31 0.31 0.40 16.5 17.2773
74 S Sc K2 1.00 0.30 0.30 0.40 16 16.7418
75 K2 Ka 1.00 0.30 0.30 0.40 15.7 16.5145
ELEVASI H (m) LUAS (m2) VOLUME (m)
MUKA TANGGUL DASAR SAL. RENC. GALIAN TIMBUNAN GALIAN TIMBUNAN GALIAN TIMBUNAN
23.3216 21.3860 0.61 1.32 3.03 7.92 302.55 791.52
22.3049 21.5967 -0.40 1.10 0.04 1.56 3.51 156.15
22.3067 21.6183 -0.42 1.11 0.05 1.54 5.43 154.39
22.2514 20.4153 0.58 1.25 2.32 6.22 231.99 621.65
20.4051 19.6677 -0.47 1.21 0.06 1.86 6.09 185.90
20.1534 19.4330 -0.43 1.15 0.05 1.70 4.87 170.00
19.2519 17.4478 0.55 1.25 2.12 6.12 211.93 611.88
19.0429 18.2897 -0.49 1.24 0.07 1.98 6.69 198.38
18.9279 18.1937 -0.49 1.23 0.08 1.92 7.88 191.80
18.2524 16.4861 0.51 1.25 1.89 6.00 189.47 600.43
17.9735 17.2449 -0.54 1.27 0.12 2.04 11.79 204.01
17.7237 16.9918 -0.49 1.22 0.08 1.90 7.86 190.37
17.2529 15.5223 0.48 1.25 1.69 5.90 169.27 589.60
16.9066 16.1804 -0.48 1.21 0.07 1.85 7.40 184.96
16.7066 15.9804 -0.48 1.21 0.07 1.85 7.40 184.96
16.2534 14.5592 0.44 1.25 1.50 5.79 149.74 578.56
16.0097 15.2734 -0.47 1.21 0.06 1.87 6.49 187.03
15.9878 15.2548 -0.45 1.19 0.06 1.81 5.54 180.65
15.2541 13.6009 0.40 1.25 1.29 5.66 128.96 566.09
14.8481 14.1000 -0.50 0.75 0.08 0.82 7.60 82.00
14.6919 14.0442 -0.44 1.09 0.09 1.46 8.73 146.26
13.2546 11.6355 0.36 1.25 1.13 5.56 112.79 555.77
12.9507 12.2199 -0.52 1.25 0.10 1.98 9.83 197.80
12.6152 11.9658 -0.47 1.12 0.10 1.52 10.08 152.19
12.5552 10.9690 0.33 1.26 0.98 5.46 98.04 545.79
11.8072 11.0856 -0.49 1.21 0.08 1.85 7.97 184.57
11.5263 10.8506 -0.45 1.13 0.08 1.58 7.88 157.92
11.1374 9.6877 0.31 1.14 0.69 3.45 69.06 345.40
10.8167 10.1558 -0.56 1.22 0.16 1.80 16.39 179.76
10.6600 9.9582 -0.46 1.16 0.07 1.70 7.16 169.59
10.3379 8.9214 0.28 1.14 0.59 3.38 58.84 338.07
9.8995 9.2790 -0.48 1.10 0.12 1.45 12.39 145.12
9.8050 9.1000 -0.50 1.21 0.10 1.82 9.75 181.97
9.1580 7.7720 0.23 1.16 0.46 3.39 45.60 339.28
8.7505 8.0410 -0.34 1.05 0.01 1.43 1.08 142.87
8.8150 8.0690 -0.57 1.31 0.13 2.18 12.69 218.41
8.4643 7.1674 0.13 1.16 0.23 3.21 22.90 321.15
7.9433 7.2550 -0.45 1.14 0.08 1.64 7.58 163.70
7.9095 7.1323 -0.53 1.31 0.08 2.21 8.25 220.88
7.0550 6.0605 -0.06 1.05 -0.05 2.05 -5.03 205.37
6.9508 6.3201 -0.52 1.15 0.15 1.59 15.05 158.99
6.9211 6.1605 -0.56 1.32 0.11 2.22 11.20 222.19
8.1419 7.4400 -0.44 1.14 0.06 1.65 6.08 164.85
8.1237 7.4219 -0.62 1.32 0.20 2.15 19.90 215.18
7.1494 6.5091 -0.51 1.15 0.14 1.60 13.68 159.74
6.9731 6.3327 -0.53 1.17 0.16 1.66 15.58 165.81
9.3160 8.5759 -0.58 1.32 0.14 2.18 13.58 217.96
8.9647 8.2246 -0.42 1.16 0.04 1.75 3.58 175.27
8.2984 7.4465 -0.45 1.30 0.00 2.27 -0.24 227.26
8.1095 7.3323 -0.53 1.31 0.08 2.21 8.25 220.88
8.3224 7.6141 -0.61 1.32 0.19 2.16 18.79 215.62
7.9865 7.2782 -0.48 1.19 0.08 1.77 8.13 177.34
7.2962 6.4276 -0.43 1.30 -0.02 2.29 -1.75 228.76
7.1073 6.3168 -0.52 1.31 0.07 2.22 6.52 221.98
7.3199 6.5994 -0.60 1.32 0.17 2.16 16.72 216.49
7.0074 6.2870 -0.49 1.21 0.08 1.84 8.11 184.47
21.4292 20.2318 -0.23 1.43 -0.19 3.54 -18.87 353.73
20.9233 20.2620 -0.46 1.12 0.09 1.56 9.28 155.52
20.9172 20.2426 -0.44 1.12 0.07 1.55 7.44 155.49
20.1530 18.9868 0.01 1.15 0.01 2.48 1.34 248.19
19.5879 18.9475 -0.45 1.09 0.09 1.44 9.27 144.49
19.6215 18.9439 -0.44 1.12 0.07 1.57 7.39 156.91
19.0543 18.0363 -0.04 1.05 -0.03 2.09 -3.23 208.89
18.7554 18.1247 -0.42 1.06 0.08 1.36 8.23 135.74
18.6441 17.9621 -0.46 1.14 0.08 1.63 8.32 163.15
18.0559 17.0920 -0.09 1.06 -0.07 2.01 -6.93 200.79
17.5547 16.9143 -0.41 1.05 0.07 1.37 7.21 136.59
17.3446 16.6670 -0.47 1.14 0.09 1.63 8.85 162.78
17.0451 16.2088 -0.21 1.05 -0.05 1.55 -4.75 154.84
16.7530 16.0869 -0.39 1.05 0.05 1.39 4.68 138.90
16.8392 16.1543 -0.45 1.14 0.08 1.62 7.70 162.22
18.1410 17.4316 -0.43 1.14 0.05 1.66 5.27 165.51
17.6773 16.9678 -0.47 1.18 0.07 1.75 7.40 175.03
17.1418 16.4393 -0.44 1.14 0.06 1.65 6.01 164.91
16.9145 16.2120 -0.51 1.21 0.11 1.84 10.73 184.24

Anda mungkin juga menyukai