SUMARY VERIFICATION DRILLING PT. JAJIB XANANA (RX) DAN PT.

SENTEKAN JAYA (SJ)


Titik Koordinat (GPS) Total Coal Interval (M)
Tanggal Seam Ketebalan
No Geos Titik Bor Lokasi Depth Open Hole Coring Remarks
X Y Z Predict Batu Bara
Mulai Selesai (M) Dari Sampai Tebal Dari Sampai Tebal
4.30 7.95 3.95 BU 3.95
1 30/10/20 01/11/20 DC EEI-RX06 RX-BARAT 388884 37766 62 40 29.69 30.32 0.63 BL 0.63
14.80 17.55 2.75 BU 2.75
2 07/11/20 08/11/20 DC EEI-RX05 RX-BARAT 389132 37480 119 39 34.20 35.00 0.80 BL OH
0.80
4.15 6.62 2.47 BU 2.47
8.90 9.00 0.10 - OH
0.10 OH
3 10/11/20 13/11/20 DC EEI-RX04 RX-BARAT 388865 37378 98 30 15.10 15.30 0.20 - 0.20 OH
28.00 28.50 0.50 BL 0.50
3.50 6.30 2.80 BU 2.80
4 16/11/20 17/11/20 DC EEI-SJ02 SJ 387541 38086 83 36.90 34.50 36.65 2.15 BL 2.15
6.90 11.40 4.50 BU 4.50
5 18/11/20 20/11/20 DC EEI-SJ01 SJ 387610 38084 100 26.40 22.50 25.75 3.25 BL1 3.25
25.84 26.08 0.224 BL2 0.24
4.50 8.03 3.53 BU 3.53
6 25/11/20 27/11/20 DC EEI-SJ03 SJ 387700 38144 75 38.10 34.70 37.80 3.10 BL 3.10
7 01/12/20 02/12/20 DC EEI-RX02 RX-TIMUR 396275 38286 67 48 47.60 47.80 0.20 No Coal
8 05/12/20 05/12/20 DC EEI-RX03 RX-TIMUR 395280 38753 70 40 No Coal
TOTAL 298.40