Formulir 4.1. : TKDN Gabungan Barang dan Jasa untuk Material Langsung (Bahan Baku)
B I A Y A (USD)
TKDN
Spesifikasi/ Pemasok / TKDN Harga Satuan
No. Uraian Jumlah Satuan Barang
Kode Negara Asal (%) (USD) KDN KLN TOTAL (%)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
0.00%
1 Steel Plate 0.00%
Sumitomo /
Carbon Steel Plate 0.00% 90,000 Kg 15.00 - 1,350,000.00 1,350,000.00 0.00%
Jepang
PT. Krakatau
Carbon Steel Plate Steel (TKDN 40.00% 70,000 Kg 15.00 420,000.00 630,000.00 1,050,000.00 9.89%
40%)
2 Steel Canal - - - 0.00%
PT. Krakatau
C. 100.50.20.2,3 Steel (TKDN 40.00% 100,000 Kg 16.00 640,000.00 960,000.00 1,600,000.00 15.07%
40%)
3 Steeel Angle - - - 0.00%
PT. Gunawan
L. 80.80.8 Dianjaya Steel 25.00% 10,000 Kg 9.00 22,500.00 67,500.00 90,000.00 0.53%
(TKDN 25%)
Stainless Steel Lumpsu
4 Stainless Steel Flanges 0.00% 1 73,000.00 - 73,000.00 73,000.00 0.00%
Pte, Ltd m
PT Wika Beton
5 Tiang Pancang 70.00% 200 pcs 80.00 11,200.00 4,800.00 16,000.00 0.26%
(TKDN = 70%)
PT Maspion
6 Pipa HDPE 50.00% 50 joint 100.00 2,500.00 2,500.00 5,000.00 0.06%
(TKDN = 50%)
SUB TOTAL 1,096,200.00 3,087,800.00 4,184,000.00 25.81%
Self Assessment
Formulir 4.2. : TKDN Gabungan Barang dan Jasa untuk Peralatan (Barang Jadi)
B I A Y A (USD)
TKDN
Pemasok / Negara TKDN Harga Satuan
No. Uraian Spesifikasi Jumlah Satuan Barang
Asal (%) (USD) KDN KLN TOTAL (%)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Produce Water Treatment Foreign Pty, Ltd 0.00% 1 Unit 25,000.00 - 25,000.00 25,000.00 0.00%
2 Fire & Safety Equipment PT Otech Nusantara 10.00% 1 Unit 8,000.00 800.00 7,200.00 8,000.00 0.02%
Cap. PT Guna
3 Fire water pump packages 48.00% 1 Unit 20,000.00 9,600.00 10,400.00 20,000.00 0.23%
570KL/hour Baja/Indonesia
PT Sanggar
4 Pressure Vessel 45.00% 1 Unit 10,000.00 4,500.00 5,500.00 10,000.00 0.11%
Sarana/Indonesia
- - - 0.00%
- - - 0.00%
- - - 0.00%
- - - 0.00%
- - - 0.00%
- - - 0.00%
- - - 0.00%
- - - 0.00%
Formulir 4.3. : TKDN Gabungan Barang dan Jasa untuk Manajemen Proyek dan Perekayasaan
B I A Y A (USD)
Kewarganegaraa TKDN Upah
No. Uraian Kualifikasi Jumlah Durasi
n (%) (USD) KDN KLN TOTAL
- - -
TKDN
Jasa
(%)
(10)
0.00%
0.00%
1.17%
0.00%
1.75%
0.00%
0.00%
2.92%
Self Assessme
Formulir 4.4. : TKDN Gabungan Barang dan Jasa untuk Alat Kerja/Fasilitas Kerja
PT Triasta
1 Yard Facilities LN DN 75.00% 1 24 Bulan 15,000.00 270,000 90,000 360,000
Indonesia
PT Super
2 Rental Mobile Crane 50 Ton DN DN+LN 90.0% 1 24 Bulan 2,000.00 43,200 4,800 48,000
Crane
Foreign Pty
3 Straight Line Cutting Machine LN LN 0.00% 1 12 Bulan 20,000.00 - 240,000 240,000
Ltd
- - -
- - -
- - -
- - -
- - -
SUB TOTAL 313,200.00 334,800.00 648,000.00
Self Assessment
a/Fasilitas Kerja
TKDN Jasa
(%)
(9)
0.00%
13.16%
2.11%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
15.26%
Self Assessment
B I A Y A (USD)
TKDN Satuan/ Upah
No. Uraian Kewarganegaraan Jumlah
(%) Durasi (USD) KDN KLN TOTAL
Konstruksi - - -
7 Pemasangan Tiang Pancang PT ABC 98.00% 1 1 lot 10,000.00 9,800 200 10,000
8 Pemasangan Pipa HDPE PT DEF 98.00% 1 1 lot 9,800.00 9,604 196 9,800
- - -
- - -
- - -
- - -
- - -
- - -
SUB TOTAL 733,404.00 180,396.00 913,800.00
Self Assessment
nstruksi/Fabrikasi
TKDN
Jasa
(%)
(9)
0.00%
2.63%
14.62%
5.85%
11.70%
0.00%
0.00%
0.48%
0.47%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
35.74%
Self Assessment
Formulir 4.6. : TKDN Gabungan Barang dan Jasa untuk Jasa Umum
B I A Y A (USD)
Negara Asal / Harga TKDN
Spesifikasi / TKDN Satuan/
No. Uraian Kepemilikan / Jumlah Satuan Jasa
Kualifikasi (%) Durasi KDN KLN TOTAL
Kewarganegaraan (USD) (%)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
- - - 0.00%
A ASURANSI - - - 0.00%
1 Tenaga kerja langsung Jamsostek 100.00% 1 Lot 500.00 500.00 - 500.00 0.02%
2 Tenaga kerja tidak langsung Jamsostek 100.00% 1 Lot 500.00 500.00 - 500.00 0.02%
4 Construction All Risk (CAR) Mandiri 100.00% 1 Lot 10,000.00 10,000.00 - 10,000.00 0.49%
B PAJAK - - - 0.00%
1 Import Duty Ditjen Pajak 100.00% 1 Lot 90,000.00 90,000.00 - 90,000.00 4.39%
2 Custom Clearance Ditjen Pajak 100.00% 1 Lot 22,000.00 22,000.00 - 22,000.00 1.07%
3 Personnel Tax Ditjen Pajak 100.00% 1 Project 40,000.00 40,000.00 - 40,000.00 1.95%
1 Equipment Mobilization Mandala Shipping 100.00% 1 Lot 3,000.00 3,000.00 - 3,000.00 0.15%
2 Transportation cost for material Korea express 0.00% 1 Lot 50,000.00 - 50,000.00 50,000.00 0.00%
- - - 0.00%
SUB TOTAL 170,000.00 50,000.00 220,000.00 8.29%
Formulir 4.7. : Rekapitulasi Penilaian TKDN Gabungan Barang dan Jasa
Jasa
III. Manajemen Proyek dan Perekayasaan 60,000 210,000 270,000 2.92% 95.26%
*) Biaya Gabungan Barang dan Jasa dapat diambil dari biaya job order, lelang, atau kontrak.
Capaian nilai TKDN diatas dinyatakan sendiri oleh PT. Harapan Mulia
Formulasi Perhitungan
+
Biaya Jasa - Biaya Jasa Komponen Luar Negeri
Biaya Gabungan Barang dan Jasa
Halaman 12 dari 14
Biaya Gabungan Barang dan Jasa*) (USD) TKDN (%)
Uraian Pekerjaan TOTAL Barang
KDN KLN Gabungan
(USD) dan Jasa
(1) (2) (3) (4) (7) (8)
Jakarta, dd mm yyyy
Dinyatakan Oleh,
PT Bangun Bahari Konstruksi
XXXXXXX
Jabatan
Halaman 13 dari 14
LAMPIRAN 4.8 : FORMULIR ISIAN DAN CONTOH PENILAIAN CAPAIAN TINGKAT KOMPONEN DALAM NEGERI
UNTUK ANALISA HARGA SATUAN
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -