Anda di halaman 1dari 3

Material Bak Sampah DKPP

No. Uraian Size Jumlah


Unp 80x50x4.5mm 65 cm 10 Btg
Unp 80x50x4.5mm 22 cm 10 Btg
Unp 80x50x4.5mm 80 cm 6 Btg
Unp 80x50x4.5mm 67 cm 3 Btg
Unp 80x50x4.5mm 323 cm 8 Btg
Unp 80x50x4.5mm 169 cm 2 Btg
Unp 80x50x4.5mm 200 cm 2 Btg
Unp 80x50x4.5mm 125 cm 2 Btg
Unp 80x50x4.5mm 63 cm 2 Btg
Unp 100x50x4.5mm 130 cm 2 Btg
Unp 120x50x4.5mm 323 cm 2 Btg

Plat 2,6mm

No. Description Material Qty Btg harga


1 Main Frame UNP 150 16 m 2.66666667 3,300,000
2 Crossmember UNP 100 29.95 m 4.99166667 2,500,000
3 Plat Lantai Plat 3mm 7 lbr 5,250,000
4 Plat Dinding Plat 2.3mm
5 Plat Pintu Plat 2.3mm
6 Tiang depan/Belakang UNP 100
7 Rangka Dinding Plat 2.3mm
8 Frame Samping UNP 100
9 Rangka Pintu Plat 2.3mm
10 Roda Container Pipa Ø 6"
11 Pengait Container Assental Ø 1.5"
11,050,000
55,250,000
Ongkos kerja 22,500,000
makan 450,000
sewa tempat dan Genset plus travo 15,000,000
consumable 8,000,000

Total 101,200,000
Total Keterangan
650 cm Samping Body
220 cm Samping Bawah
480 cm Samping Atas
201 cm Atas Bak
2584 cm Tulang depan kebelakang
338 cm Depan bawah dan belakang
400 cm Pintu Depan Melintang
250 cm Pintu Depan Berdiri
126 cm Pintu belakang melintang
260 cm Pintu belakang berdiri
646 cm Sasis Bawah

6155 Cm
61.55 m
62 m
10.333333333 Btg @6m
7 Lbr

8.45
15
930,000,000
38,750,000
526,000,000
35,066,667

rab 198,000,000
ppn 19,800,000
fee akbr 20,000,000
500,000 smmary 158,200,000
laba 57,000,000
SPESIFIKASI TEKNIS
SAMPAH KONTAINER 6m3
DKPP
No. Description
1 Main Frame
2 Crossmember
3 Plat Lantai
4 Plat Dinding
5 Plat Pintu
6 Tiang depan/Belakang
7 Rangka Dinding
8 Frame Samping
9 Rangka Pintu
10 Roda Container
11 Pengait Container
12 Slot Kunci

Anda mungkin juga menyukai