Nomor Cawan 1 2 3
Berat Cawan W1 14.1 14.7 14.9
Berat Cawan + Tanah Basah W2 53.2 91.5 87.7
Berat Cawan + Tanah Kering W3 30 45.90 44.5
Berat Air Ww= W2 - W3 23.2 45.6 43.2
Berat Tanah Kering Ws= W3 - W1 15.9 31.2 29.6
Kadar Air ω = Ww/Ws × 100% 145.91% 146.15% 145.95%
Rata-rata Kadar Air ω 146.00%
SU = 4 8.72 0.6
0.8
0.9
0.9
3.59% 0.9641 8.87 0.9 0
LABORATORIUM MEKANIKA TANAH
FAKULTAS TEKNIK SIPIL
UNIVERSITAS LAMBUNG MANGKURAT
Jl. A. Yani KM. 36 Banjarbaru
Ring No. 1 2 3
1. W ring + W wet gr 136.6 146.2 134.2
2. W ring gr 57.8 62.4 56.1
3. V wet = V ring cmᶟ 49.69 52.51 49.23
4. W wet = (1) - (2) gr 78.8 83.8 78.1
5. ɣm = (4) / (3) gr/cmᶟ 1.59 1.60 1.59
ɣAverage gr/cmᶟ 1.59
0.4
8.72 0.6
0.8
0.9
0.9
3.59% 0.9641 8.87 0.9 0
Skala Utama Skala Nonius Hasil
1D 6.2 0.073 6.27 3.135
t 2 0.08 1.61
No. Piknometer 1
Berat Piknometer W1 60
Berat Piknometer + Tanah Kering W2 90
Berat Tanah Kering Wt = W2 - W1 30
Temperatur t°C 27
Berat Piknometer + Tanah + Air W3 180.10
Berat Piknometer + Air pada °C W4 161.60
Berat Jenis Pada Suhu Wt / (Wt +( W4-W3)) 2.61
Rata-rata Berat Jenis (Gs) pada suhu t°C 2.60
Rata-rata 2.60
NAH
AT
Kelompok : 26
Depth : 3,0 -3,6 m
Hasil Perhitungan
2
60.74
90.74
30
27
177.80
159.40
2.59
2.60
2.60
LABORATORIUM MEKANIKA TANAH
FAKULTAS TEKNIK SIPIL
UNIVERSITAS LAMBUNG MANGKURAT
Jl. A. Yani KM. 36 Banjarbaru
Lolos 100.00%
Saringan (%)
100.00% 99.90%
99.97%
99.87%
99.80%
99.76%
99.67%
PERSEN LOLOS (%)
99.63% 99.70%
99.57%
99.54%
99.60%
99.47%
99.50%
99.40%
99.30%
99.20%
0 0.5 1 1.5 2 2.5
UKURAN BUTIR
KURVA DISTRIBUSI BUTIRAN
Pembacaa Pembacaa
Pembacaa
n n Persen
Waktu / T hidromete n hidromete berat Kedalaman D (mm)
hidromete Temp °C Efektif, L Harga K K*(L/T)^0,
(menit) r dalam r lebih kecil
r dalam (cm) 5
suspensi cairan R2 terkoreksi P (%)
R1 R = R1 - R2
70%
Persen Lolos
N (%) 0.0740 99.47% 60%
50%
Ukur
Total Pasir :
1.59%
Pasir Kasar Pasir Sedang Pasir Halus Lanau Lempung
Pasir 17,25%
2 1.0000
0.5 0.2 0.1000 0.05 0.0100 0.002 0.0010
Ukuran Butir (mm)
0.03%
99.77%
99.59%
98.38%
34.39%
18.95%
Pasir Halus Lanau Lempung
0.0196 0,002.. - 0, 0.0015
l
TANAH HIDROMETER
D (mm)
Harga K N (%)
K*(L/T)^0,5
Ws : 50 a : 1.001
Gs : 2.6 SV % : 99.47%
P% : 84.08
Hidrometer
100%
Lolos 90%
Saringan (%)
80%
70%
100.00%
99.97% 60%
99.87% 50%
99.76% 40%
99.67% 30%
99.63%
20%
99.57%
10%
99.54%
99.47% 0%
0.1000 0.0100 0.00
D (mm)
Harga K K*(L/T)^0, N (%)
5
4.7500 100.00%
2.0000 99.97%
0.8400 99.87% 100%
0.4200 99.76%
0.2970 99.67%
0.2340 99.63%
0.1770 99.57%
0.1490 99.54%
0.0740 99.47% 99%
10.0000 1.0000 0.100
0.0010
0.0783 99.47%
0.0557 98.28%
0.0396 97.10%
0.0281 94.73%
0.0182 87.63%
0.0119 59.21%
0.0089 30.79%
0.0063 21.31%
0.0032 20.13%
0.0013 18.95%
1.0000 0.1000 0.0100
TABEL Hubungan Antara Gs terhadap nilai a
Gs 2.900 2.890 2.880 2.870 2.860 2.850 2.840 2.830
a 0.950 0.952 0.954 0.956 0.958 0.960 0.962 0.964
Untuk mencari hubungan Gs dengan temperatur pada angka 2,46, maka menggunakan cara interpolasi
2.6000 2.58
2.55
Interpolasi
X = X1 + (Y-Y1)/(Y2-Y1)*(X2-
X = X1 + (Y-Y1)/(Y2-Y1)*(X2-
0.01277 X 0.01297
X=
n cara interpolasi
X = X1 + (Y-Y1)/(Y2-Y1)*(X2-X1)
X = X1 + (Y-Y1)/(Y2-Y1)*(X2-X1)
0.01285
55.000 54.500 54.000 53.500 53.000 52.500 52.000
7.300 7.350 7.400 7.500 7.600 7.700 7.800
0.000
16.300
LABORATORIUM MEKANIKA TANAH
FAKULTAS TEKNIK SIPIL
UNIVERSITAS LAMBUNG MANGKURAT
Jl. A. Yani KM. 36 Banjarbaru
Lo = 95.2 mm N = 0.7
Ao = 8.55 cm
Luas
Regangan ε Faktor Koreksi Terkoreksi P. Ring Dial/n
Waktu ΔL Load P (kg)
(%) Area CF (1 - ε) Ac = Ao/CF 0,01 (mm)
(cm²)
5.0
5.5
6.0
6.5
7.0
7.5
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
19.0
ANAH
URAT
Tegangan σ
(kg/cm²)
0.000
0.008
0.016 DISTURBED SAMPLE
0.016 0.030
0.024
0.024 0.025
0.024
0.020
0.015
0.010
0.005
0.000
0.00% 0.53% 1.05% 1.58% 2.10% 2.63% 3.15%
Column H
0.0120227
0.038561
LABORATORIUM MEKANIKA TAN
FAKULTAS TEKNIK SIPIL
UNIVERSITAS LAMBUNG MANGKURA
Jl. A. Yani KM. 36 Banjarbaru
Lo = 88.4 mm N = 0.7
Ao = 17.79 cm
Luas
Regangan ε Faktor Koreksi Terkoreksi
Waktu (menit) ΔL
(%) Area CF (1 - ε) Ac = Ao/CF
(cm²)
Kelompok :1
Depth : 3,0 - 3,6 m
1 0.7000 0.038
1 0.7000 0.038
0.02
-2.08166817117217E-17
-0.5% 0.0% 0.5% 1.0%
Kohesi = qu uds/2
St = Qu uds/ Qu ds
Sensitivitas <2 (TIDAK SENSITIF)
Undistrubed Sampel
Regangan ε (%)
Column J
Plastisitas Sedang
3. Shrinkage Limits (Ws)
HORIZONTAL
DEFORMATION NORMAL STRESS NORMAL STRESS
TIME
s1 = 0.255 kg/cm2 s2 = 0.369
( minute ) mm PROVING RING 0,0002 cm t1 kg/cm2 PROVING RING 0,0002 cm
HITUNGAN GESER
A= 30.47 Kedalaman = 360 cm
gamma x = 1.63 lengan beban = 4.325
C= 0.0813 Kg/cm2
f= 9.31 Degree
EDIT SENDIRI
0.482
0.049
DIRECT SHEAR TEST
Hari Ke 1 2 3
Beban
Waktu 0.5 1 2
(kg )
Tanpa Beban 0.000 2.000 2.830
15'' 0.680 2.110 3.150
30'' 0.745 2.130 3.190
1' 0.830 2.151 3.240
2' 0.935 2.190 3.305
4' 1.054 2.238 3.395
8' 1.210 2.304 3.510
15' 1.400 2.390 3.640
30' 1.608 2.480 3.790
60' 1.770 2.565 3.910
120' 1.870 2.645 3.990
240' 1.915 2.700 4.050
480' 1.955 2.745 4.090
1440' 2.000 2.830 4.190
HARI KE - 1 HARI KE - 2
Pressure Increment : kg /cm2 Pressure Increment :
HARI KE - 5 HARI KE - 6
Pressure Increment : kg /cm2 Pressure Increment :
4 8 16
KE - 2 HARI KE - 3
kg /cm2 Pressure Increment :
KE - 6 CONSOLIDA
kg /cm2
Specific Gravity = 2.60
t Dial Reading Level Arm Ratio = 0.049
menit Sample Diameter = 6.43
( mm ) Sample Heights = 1.73
6.550 Sample Volume = 56.15
6.890 Void Height = 1.256
6.960 Area ( A ) = 32.46
7.040 Weight Ring ( W ) = 56.53
7.130
7.240
WATER CONTENT
7.365
7.460 Speciment Location
7.605 Container No.
7.710 Wwet Soil + Cont. gr
7.800 Wdry Soil + Cont. gr
7.855 Wwater gr
7.905 Wcontainer gr
7.955 Wdry Soil gr
Water Content %
kg/cm2 kg mm
0.0000 0 0
0.3081 1 2.830
0.6162 2 4.190
1.2324 4 5.695
2.4649 8 6.550
4.9298 16 7.955
0.6162 2 6.369
16 2 0.5
HARI KE - 4
kg /cm2 Pressure Increment : kg /cm2
CONSOLIDATION TEST
2.60 Ws
Soil Height Hs =
Gs w A
cm
2 H Hs
cm Void Ratio e =
Hs
cm
cm
w G
cm2 Saturation S =
e
gr
cm cm cm t90
0.0000 1.7300 1.7300 2.6496 1.6300
CS 0.392
CV 3.976E-05 cm2/sec
GRAFI
HARI KE 1
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
0 5 10 15 20 25 30 35 40
12.5 14.375
Fitting Time T90
10.8 6998.4
HARI KE 4
4.19
4.39
4.59
4.79
4.99
5.19
5.39
5.59
0 5 10 15 20 25 30 35 40
13 14.95
Fitting Time T90
10.6 6741.6
138.160 1.
56.53 0.
81.630 0.01 0.10 0.9 1.00 10.00
Cv
cm2/sec
0.848Ha2 0
t90
0
Cv ( cm2/second )
0
6.71E-05 0
0
5.55E-05
0
5.40E-05 0
0
3.93E-05
0
0.10 1.00 10.00
2.95E-05
Pressure ( Kg/cm2 )
3.29E-05
GRAFIK PENURUNAN KONSOLIDASI HARI KE 1-6
HARI KE-2
2.00
2.10
2.20
2.30
2.40
2.50
2.60
2.70
2.80
0 5 10 15 20 25 30 35 40
13.6 15.64
Fitting Time T90
11 7260
HARI KE-5
5.70
5.80
5.90
6.00
6.10
6.20
6.30
6.40
6.50
0 5 10 15 20 25 30 35 40
13.6 15.64
Fitting Time T90
11 7260
SSURE
2.80
2.60
2.40
2.20
2.00
1.80
1.60
1.40
1.20
1.00
0.80
00 10.00
0.000080
0.000070
0.000060
0.000050
0.000040
0.000030
0.000020
0.000010
0.000000
10.00
-6
HARI KE 3
2.83
3.03
3.23
3.43
3.63
3.83
4.03
0 5 10 15 20 25 30 35 40
12.7 14.605
Fitting Time T90
10 6000
HARI KE 6
6.55
6.75
6.95
7.15
7.35
7.55
7.75
7.95
0 5 10 15 20 25 30 35 40
13.6 15.64
Fitting Time T90
10.5 6615
d dalam= 15.12 cm
t= 10.584 cm
3993.7500099032
#REF!
COM
DRY DENSITY DETERMINATION
Mold No. 1
1. Mixture of water cc 600
2. Blow per Layer 56
3. Number of Layer 5
4. Wmold + soil gram 10639
5. Wmold gram 5639
6. Wsoil gram 5000
7. Volume of Soil cm3 1901.157
8. gamma Gram/cm3 2.63
9. Moisture Content % 25.20
10. Dry Density Gram/cm3 2.10
GRAF
3.00
2.50
2.00
1.50
1.00
15.00 17.00 19.00 21.00 23.00
2 3 4
700 800 900
56 56 56
5 5 5
10740 10830 10760
5740 5830 5760
5000 5000 5000
1901.157 1901.157 1901.157
2.63 2.63 2.63
20.34 20.80 21.09
2.19 2.18 2.17
B C D
B1 B2 B3 C1 C2 C3 D1 D2
73.70 88.60 56.60 81.70 83.10 73.20 46.80 60.60
63.50 75.10 48.70 69.70 70.50 62.00 42.80 49.20
10.20 13.50 7.90 12.00 12.60 11.20 4.00 11.40
11.70 9 10.9 11.90 9.90 8.30 8.80 9.30
51.80 66.10 37.80 57.80 60.60 53.70 34.00 39.90
19.69 20.42 20.90 20.76 20.79 20.86 11.76 28.57
20.34 20.80 21.09
2 3 4
20.34 20.80 21.09
2.690 2.690 2.690
2.09 2.08 2.08
GRAFIK PEMADATAN
2.08
2.19
2.18
2.17
2.092.08 2.10
2.01
1.91
1.84
9.00 21.00 23.00 25.00 27.00 29.00 31.00 33.00 35.00 37.00 39.00
gram/cm3
1040.1655947
1040.1655947
x y
25.20 2.01 0 2.18
20.34 2.09 20.80 2.18
20.80 2.08 20.80 0.00
21.09 2.08 20.80 2.18
37.40 1.84 20.80 2.18
0
1040.1656
4 5
900 1000
56 56
5 5 t 10.65
10760 10750 D 15.13
5760 5750 V 1913.8025
5000 5000
1901.157 1901.157
2.63 2.63
21.09 37.40
2.17 1.91
D E
D3 E1 E2 E3
59.60 51.00 59.80 60.60
50.40 40.30 48.00 44.60
9.20 10.70 11.80 16.00
10.30 9.8 9.8 10 16.31
40.10 30.50 38.20 34.60 0.29
22.94 35.08 30.89 46.24 0.47
21.09 37.40 -4.86
4 5
21.09 37.40
2.690 2.690
2.08 1.84
19
15 0.15
5000 100 750
1040.1656 5000
5000
39.00
d dalam= 15.1 cm
t= 10.71 cm
COMPACTION TEST
DRY DENSITY DETERMINATION
Mold No. 1 2 3 4 5
1. Mixture of water cc 600 700 800 900 1000
2. Blow per Layer 56 56 56 56 56
3. Number of Layer 5 5 5 5 5
4. Wmold + soil gram 10510 10670 10870 10760 10650
5. Wmold gram 7210 7210 7210 7210 7210
6. Wsoil gram 3300 3460 3660 3550 3440
7. Volume of Soil cm3 1916.96 1916.96 1916.96 1916.96 1916.96
8. gamma Gram/cm3 1.72 1.80 1.91 1.85 1.79
9. Moisture Content % 20.44 21.84 23.97 25.99 28.57
10. Dry Density Gram/cm3 1.43 1.48 1.54 1.47 1.40
GRAFIK PEMADATAN
2.20
2.04
1.5 2.02
1.99
23.1 2.00 1.95
1.92
Dry Density (gr/cm3)
1.80
1.60 1.54
1.48 1.47
1.43
1.40
1.40
1.20
1.00
16 18 20 22 24 26 28 30
1198.3574009 x y x y
20.44 1.43 20.44 2.04
21.84 1.48 21.84 2.02
23.97 1.54 23.97 1.99
25.99 1.47 25.99 1.95
28.57 1.40 28.57 1.92
d dalam= 15.1 cm
t= 10.71 cm
COMPACTION TEST
DRY DENSITY DETERMINATION
Mold No. 1 2 3 4 5
1. Mixture of water cc 600 700 800 900 1000
2. Blow per Layer 56 56 56 56 56
3. Number of Layer 5 5 5 5 5
4. Wmold + soil gram 10639 10740 10830 10760 10750
5. Wmold gram 7210 7210 7210 7210 7210
6. Wsoil gram 3429 3530 3620 3550 3540
7. Volume of Soil cm3 1916.96 1916.96 1916.96 1916.96 1916.96
8. gamma Gram/cm3 1.79 1.84 1.89 1.85 1.85
9. Moisture Content % 20.50 21.88 23.99 25.93 28.42
10. Dry Density Gram/cm3 1.48 1.51 1.52 1.47 1.44
GRAFIK PEMADATAN
2.30
1.5
2.20
23.1
Dry Density (gr/cm3)
2.10
2.04
2.02
2.00 1.99
1.96
1.92
1.90
1.80
1.70
1.60
10 15 20 25 30 35 40 45
1199.2925367 x y x y
20.50 1.48 20.50 2.04
21.88 1.51 21.88 2.02
23.99 1.52 23.99 1.99
25.93 1.47 25.93 1.96
28.42 1.44 28.42 1.92
CBR UNSOAKED TEST
ELAPS
ED PENETRATION 1st TEST 2st TEST
TIME Load Load
PROVING RING 0,0002
(minute (0.01 mm) (inch) PROVING RING 10-4 inch
CM
) Lbs Lbs
0.00 0.00 0.000 0.00 0.00 0.00 0.00
0.50 63.50 0.025 1.20 32.31 1.80 48.47
1.00 127.00 0.050 2.00 53.85 3.70 99.62
1.30 190.50 0.075 4.00 107.70 7.50 201.94
2.00 254.00 0.100 6.00 161.55 10.50 282.72
2.30 317.50 0.125 8.00 215.40 13.00 350.03
3.00 381.00 0.150 11.00 296.18 15.00 403.88
3.30 444.50 0.175 13.00 350.03 17.00 457.73
4.00 508.00 0.200 15.00 403.88 19.00 511.58
5.00 635.00 0.250 17.50 471.20 22.00 592.36
6.00 762.00 0.300 19.50 525.05 25.00 673.14
7.00 889.00 0.350 21.50 578.90 27.50 740.45
8.00 1016.00 0.400 24.00 646.21 30.00 807.76
9.00 1143.00 0.450 26.00 700.06 32.50 875.08
10.00 1270.00 0.500 27.00 726.99 34.50 928.93
1125.49
MOISTURE CONTENT DETERMINATION
Mold No. 1 2
1. Container No. 1 2 3 4
W 7210.00 W 8415.00
D 15.1 D 14.93
T 10.71 T 10.82
ST CBR UNSOAKED TEST
0.0002 cm 3500
10
26.9255 lbs/div 25
3000
56
2500
3st TEST
Load
PROVING RING 0,0002
CM
Lbs 2000
0.00 0.00
Loads (Lbs)
2.40 64.62
6.50 175.02 1500
11.40 306.95
15.00 403.88
18.00 484.66 1000
21.00 565.44
23.00 619.29
25.50 686.60 500
29.00 780.84
32.00 861.62
35.40 953.16 0
38.00 1023.17 0.000 0.100 0.200 0.300 0.400 0.50
41.50 1117.41
Penetration (Inch)
44.00 1184.72
CBR VALUE
3
Loads0,1"
5 6 CBRat0,1" x100%
3000
48.10 74.00 Loads 0, 2"
CBR x100 %
41.5 62.40 at 0,2" 4500
6.60 11.60
13.9 13.90 Loads at Pent (Lbs) CBR Value (%)
BLOWS
27.60 48.50 0,1" 0,2" 0,1" 0,2"
23.91 23.92 56 403.88 686.60 13.46 15.26
23.92 25 282.72 511.58 9.42 11.37
10 161.55 403.88 5.39 8.98
3
11210
7540
3670
1927.13
1.90
23.92
1.54
2.40
2.00
1.80
1.60
1.40
1.20
1.00
6 8 10 12 14 16 18
Water Content (%)
0
0.12
0.12
s
mbunan Pilihan Bebutir.
0 400
CBR UNSOAKED TEST
2.40
Dry Density (gram/cm3)
2.20
2.00
1.80
1.60
f(x) = 0.0217744321555416 x + 1.20882127002965
1.40 R² = 0.98084385050965
1.20
1.00
0 5 10 15 20
14 16 18 CBR (%)
0 400
0.00 0.00 0 0.00
0.00 0 0.00
0.00 0 0.00
0.00 0 0.00
0 0.00
0 0.00
Lokasi / ID : Laboratorium Mekanika Tanah
Fakultas Teknik ULM
Hari / Tanggal : Senin, 28 Agustus 2022
Dimensi Sampel
Diameter : 6.31 cm L (length of sample) : 1.67 cm
Area standpipe, ɑ : 0.5027 cm2 dburette : 0.8 cm
Standpipe : Burette Area of sample : 31.27156 cm2
h1 , cm h2 , cm t,s T, °C
64 63.6 3600 27
63.6 63.05 7200 27
63.05 62.5 10800 27
62.5 62.35 14400 27
62.35 61.8 18000 27
Average
kT , cm/s
4.68E-08
3.24E-08
2.18E-08
4.48E-09
1.32E-08
2.3724E-08
tas
beban penetrasi
9.0766071
18.1532142
27.2298213