Nomor Cawan 1 2 3
Berat Cawan W1 14.1 14.7 14.9
Berat Cawan + Tanah Basah W2 53.2 91.5 87.7
Berat Cawan + Tanah Kering W3 30 45.90 44.5
Berat Air Ww= W2 - W3 23.2 45.6 43.2
Berat Tanah Kering Ws= W3 - W1 15.9 31.2 29.6
Kadar Air ω = Ww/Ws × 100% 145.91% 146.15% 145.95%
Rata-rata Kadar Air ω 146.00%
SU = 4 8.72 0.6
0.8
0.9
0.9
3.59% 0.9641 8.87 0.9 0
LABORATORIUM MEKANIKA TANAH
FAKULTAS TEKNIK SIPIL
UNIVERSITAS LAMBUNG MANGKURAT
Jl. A. Yani KM. 36 Banjarbaru
Ring No. 1 2 3
1. W ring + W wet gr 136.6 146.2 134.2
2. W ring gr 57.8 62.4 56.1
3. V wet = V ring cmᶟ 49.69 52.51 49.23
4. W wet = (1) - (2) gr 78.8 83.8 78.1
5. ɣm = (4) / (3) gr/cmᶟ 1.59 1.60 1.59
ɣAverage gr/cmᶟ 1.59
0.4
8.72 0.6
0.8
0.9
0.9
3.59% 0.9641 8.87 0.9 0
Skala Utama Skala Nonius Hasil
1D 6.2 0.073 6.27 3.135
t 2 0.08 1.61
No. Piknometer 1
Berat Piknometer W1 60
Berat Piknometer + Tanah Kering W2 90
Berat Tanah Kering Wt = W2 - W1 30
Temperatur t°C 27
Berat Piknometer + Tanah + Air W3 180.10
Berat Piknometer + Air pada °C W4 161.60
Berat Jenis Pada Suhu Wt / (Wt +( W4-W3)) 2.61
Rata-rata Berat Jenis (Gs) pada suhu t°C 2.60
Rata-rata 2.60
NAH
AT
Kelompok : 26
Depth : 3,0 -3,6 m
Hasil Perhitungan
2
60.74
90.74
30
27
177.80
159.40
2.59
2.60
2.60
LABORATORIUM MEKANIKA TANAH
FAKULTAS TEKNIK SIPIL
UNIVERSITAS LAMBUNG MANGKURAT
Jl. A. Yani KM. 36 Banjarbaru
100.00% 99.90%
99.97%
99.87%
99.80%
99.76%
99.67%
PERSEN LOLOS (%)
99.63% 99.70%
99.57%
99.54%
99.47% 99.60%
99.50%
99.40%
99.30%
99.20%
0 0.5 1 1.5 2 2.5
UKURAN BUTIR
KURVA DISTRIBUSI BUTIRAN
D (mm)
Harga K K*(L/T)^0,5 N (%)
79.69%
76.84%
71.15%
65.46%
54.08%
22.77%
18.50%
14.23%
14.23%
12.81%
80%
70%
50%
40%
30%
20%
10%
0%
10.0000 2 1.0000 0.5 0.2 0.1000 0.05 0.0100
Ukuran Butir (mm)
Gradasi Tanah
Kerikil 0.03% 0.03%
Pasir Kasar 99.97% 0.16%
Pasir Sedang 99.82% 0.19%
Pasir Halus 99.63% 0.75%
Lanau 98.87% 79.93%
Lempung 18.95% 18.95%
SUM 100.00%
r Halus Lanau Lem-
pung
79% 20.83% 55.52%
4.75 100.00%
2.000 99.97%
0.840 99.87%
0.420 99.76%
0.297 99.67%
0.234 99.63%
0.177 99.57%
0.149 99.54%
0.074 99.47%
0.0876 99.47%
0.0622 98.28%
0.0445 97.10%
0.032 94.73%
0.0207 87.63%
0.0128 48.55%
0.0091 23.68%
0.0065 21.31%
0.0032 21.31%
0.0013 16.58%
Saringan
ln(x) + 1.11738725903558
LABORATORIUM MEKANIKA TANAH
FAKULTAS TEKNIK SIPIL
UNIVERSITAS LAMBUNG MANGKURAT
Jl. A. Yani KM. 36 Banjarbaru
Ws : 50 a : 1.001
Gs : 2.6 SV % : 99.47%
P% : 84.08
Hidrometer
100%
Lolos 90%
Saringan (%)
80%
70%
100.00%
99.97% 60%
99.87% 50%
99.76% 40%
99.67% 30%
99.63%
20%
99.57%
10%
99.54%
99.47% 0%
0.1000 0.0100 0.00
D (mm)
Harga K K*(L/T)^0, N (%)
5
4.7500 100.00%
2.0000 99.97%
0.8400 99.87% 100%
0.4200 99.76%
0.2970 99.67%
0.2340 99.63%
0.1770 99.57%
0.1490 99.54%
0.0740 99.47% 99%
10.0000 1.0000 0.100
0.0010
0.0762 60.63%
0.0542 58.38%
0.0385 56.70%
0.0274 52.77%
0.0178 48.28%
0.0115 42.67%
0.0087 36.49%
0.0062 29.19%
0.0031 25.26%
0.0013 20.21%
1.0000 0.1000 0.0100
TABEL Hubungan Antara Gs terhadap nilai a
Gs 2.900 2.890 2.880 2.870 2.860 2.850 2.840 2.830
a 0.950 0.952 0.954 0.956 0.958 0.960 0.962 0.964
Untuk mencari hubungan Gs dengan temperatur pada angka 2,46, maka menggunakan cara interpolasi
2.6000 2.58
2.55
Interpolasi
X = X1 + (Y-Y1)/(Y2-Y1)*(X2-X
0.01277 X 0.01297
X=
n cara interpolasi
X = X1 + (Y-Y1)/(Y2-Y1)*(X2-X1)
0.01285
55.000 54.500 54.000 53.500 53.000 52.500 52.000
7.300 7.350 7.400 7.500 7.600 7.700 7.800
0.000
16.300
LABORATORIUM MEKANIKA TANAH
FAKULTAS TEKNIK SIPIL
UNIVERSITAS LAMBUNG MANGKURAT
Jl. A. Yani KM. 36 Banjarbaru
Lo = 95.2 mm N = 0.7
Ao = 8.55 cm
Luas
Regangan ε Faktor Koreksi Terkoreksi P. Ring Dial/n
Waktu ΔL Load P (kg)
(%) Area CF (1 - ε) Ac = Ao/CF 0,01 (mm)
(cm²)
0.0 0.00 0.00% 1.0000 8.55 0 0
0.5 0.50 0.53% 0.9947 8.60 0.1 0.0700
1.0 1.00 1.05% 0.9895 8.64 0.2 0.1400
1.5 1.50 1.58% 0.9842 8.69 0.2 0.1400
2.0 2.00 2.10% 0.9790 8.73 0.3 0.2100
2.5 2.50 2.63% 0.9737 8.78 0.3 0.2100
3.0 3.00 3.15% 0.9685 8.83 0.3 0.2100
5.0
5.5
6.0
6.5
7.0
7.5
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
19.0
ANAH
URAT
Tegangan σ
(kg/cm²)
0.000
0.008
0.016 DISTURBED SAMPLE
0.016 0.030
0.024
0.024 0.025
0.024
0.020
0.015
0.010
0.005
0.000
0.00% 0.53% 1.05% 1.58% 2.10% 2.63% 3.15%
Column H
0.0120227
0.038561
LABORATORIUM MEKANIKA TAN
FAKULTAS TEKNIK SIPIL
UNIVERSITAS LAMBUNG MANGKUR
Jl. A. Yani KM. 36 Banjarbaru
Lo = 88.4 mm N = 0.7
Ao = 17.79 cm
Luas
Regangan ε Faktor Koreksi Terkoreksi
Waktu (menit) ΔL
(%) Area CF (1 - ε) Ac = Ao/CF
(cm²)
88.4 0.0 0.00 0.00% 1.0000 17.79
88.4 0.5 0.50 0.50% 0.9950 17.88
88.4 1.0 1.00 1.00% 0.9900 17.97
88.4 1.5 1.50 1.50% 0.9850 18.06
88.4 2.0 2.00 2.00% 0.9800 18.15
88.4 2.5 2.50 2.50% 0.9750 18.25
88.4 3.0 3.00 3.00% 0.9700 18.34
88.4
88.4
88.4
88.4
88.4
88.4
88.4
88.4
88.4
88.4
88.4
88.4
88.4
88.4
ATORIUM MEKANIKA TANAH
KULTAS TEKNIK SIPIL
SITAS LAMBUNG MANGKURAT
Jl. A. Yani KM. 36 Banjarbaru
Kelompok :1
Depth : 3,0 - 3,6 m
P. Ring Dial/n
Load P (kg)
Tegangan σ Undist
0,01 (mm) (kg/cm²)
0.06
0.4 0.28 0.0157391793
0.4 0.2800 0.016
0.6 0.4200 0.023
0.8 0.5600 0.031
1 0.7000 0.039
0.04
Tegangan σ (kg/cm²)
1 0.7000 0.038
1 0.7000 0.038
0.02
-2.08166817117217E-17
-0.5% 0.0% 0.5% 1.0%
Kohesi = qu uds/2
St = Qu uds/ Qu ds
Regangan ε (%)
Column J
Plastisitas Sedang
3. Shrinkage Limits (Ws)
HORIZONTAL
DEFORMATION NORMAL STRESS NORMAL STRESS
TIME
s1 = 0.255 kg/cm 2
s2 = 0.369
( minute ) mm PROVING RING 0,0002 cm t1 kg/cm2 PROVING RING 0,0002 cm
HITUNGAN GESER
A= 30.47 Kedalaman = 360 cm
gamma x = 1.63 lengan beban = 4.325
C= 0.0813 Kg/cm2
f= 9.31 Degree
EDIT SENDIRI
0.482
0.049
DIRECT SHEAR TEST
f(x) = − 0.0361785542986844 x + 0.0680428747073922
R² = 0.75
Hari Ke 1 2 3
Beban
Waktu 0.5 1 2
(kg )
Tanpa Beban 0.000 2.000 2.830
15'' 0.680 2.110 3.150
30'' 0.745 2.130 3.190
1' 0.830 2.151 3.240
2' 0.935 2.190 3.305
4' 1.054 2.238 3.395
8' 1.210 2.304 3.510
15' 1.400 2.390 3.640
30' 1.608 2.480 3.790
60' 1.770 2.565 3.910
120' 1.870 2.645 3.990
240' 1.915 2.700 4.050
480' 1.955 2.745 4.090
1440' 2.000 2.830 4.190
HARI KE - 1 HARI KE - 2
Pressure Increment : kg /cm2 Pressure Increment :
4 8 16
KE - 2 HARI KE - 3
kg /cm2 Pressure Increment :
kg/cm2 kg mm
0.0000 0 0
0.3081 1 2.830
0.6162 2 4.190
1.2324 4 5.695
2.4649 8 6.550
4.9298 16 7.955
0.6162 2 6.369
16 2 0.5
HARI KE - 4
kg /cm2 Pressure Increment : kg /cm2
2.60 Ws
Soil Height Hs =
Gs w A
cm
2 H Hs
cm Void Ratio e =
Hs
cm
cm
Saturation w G =
cm2 S
gr e
cm cm cm t90
0.0000 1.7300 1.7300 2.6496 1.6300
CS 0.392
CV 7.613E-05 cm2/sec
GRAFI
HARI KE 1
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
0 5 10 15 20 25 30 35 40
8.3 9.545
Fitting Time T90
7.5 3375
HARI KE 4
4.19
4.39
4.59
4.79
4.99
5.19
5.39
5.59
0 5 10 15 20 25 30 35 40
9.8 11.27
Fitting Time T90
8.2 4034.4
0.474 GRAFIK VOID RATIO & PRESSURE
2.8
2.6
2.650
2.4
Void Ratio ( e )
2.2
2.0
96.728
1.8
1.6
1.4
Final 1.2
138.160 1.0
56.53 0.8
81.630 0.01 0.10 0.9 1.00 10.00
56.123
Pressure ( Kg/cm2 )
1.454
0.713
2.648
102.190
Cv
cm2/sec
0.848Ha2 0
t90 0
Cv ( cm2/second )
1.39E-04 0
0
5.55E-05
0
5.40E-05 0
0
6.57E-05
0
0.10 1.00 10.00
1.49E-04
Pressure ( Kg/cm2 )
7.01E-05
GRAFIK PENURUNAN KONSOLIDASI HARI KE 1-6
HARI KE-2
2.00
2.10
2.20
2.30
2.40
2.50
2.60
2.70
2.80
0 5 10 15 20 25 30 35 40
13.6 15.64
Fitting Time T90
11 7260
HARI KE-5
5.70
5.80
5.90
6.00
6.10
6.20
6.30
6.40
6.50
0 5 10 15 20 25 30 35 40
9.8 11.27
Fitting Time T90
4.9 1440.6
ESSURE
2.80
2.60
2.40
2.20
2.00
1.80
1.60
1.40
1.20
1.00
0.80
00 10.00
0.000160
0.000140
0.000120
0.000100
0.000080
0.000060
0.000040
0.000020
0.000000
10.00
-6
HARI KE 3
2.83
3.03
3.23
3.43
3.63
3.83
4.03
0 5 10 15 20 25 30 35 40
12.7 14.605
Fitting Time T90
10 6000
HARI KE 6
6.55
6.75
6.95
7.15
7.35
7.55
7.75
7.95
0 5 10 15 20 25 30 35 40
9 10.35
Fitting Time T90
7.2 3110.4
d dalam= 15.12 cm
t= 10.584 cm
3993.7500099032
#REF!
COMP
DRY DENSITY DETERMINATION
Mold No. 1
1. Mixture of water cc 600
2. Blow per Layer 56
3. Number of Layer 5
4. Wmold + soil gram 10639
5. Wmold gram 5639
6. Wsoil gram 5000
7. Volume of Soil cm3 1901.157
8. gamma Gram/cm3 2.63
9. Moisture Content % 25.20
10. Dry Density Gram/cm3 2.10
GRAF
3.00
2.50
2.00
1.50
1.00
15.00 17.00 19.00 21.00 23.00
1040.165595 x y
25.20 2.10
20.34 2.19
20.80 2.18
21.09 2.17
37.40 1.91
COMPACTION TEST
2 3 4
700 800 900
56 56 56
5 5 5
10740 10830 10760
5740 5830 5760
5000 5000 5000
1901.157 1901.157 1901.157
2.63 2.63 2.63
20.34 20.80 21.09
2.19 2.18 2.17
B C D
B1 B2 B3 C1 C2 C3 D1 D2
73.70 88.60 56.60 81.70 83.10 73.20 46.80 60.60
63.50 75.10 48.70 69.70 70.50 62.00 42.80 49.20
10.20 13.50 7.90 12.00 12.60 11.20 4.00 11.40
11.70 9 10.9 11.90 9.90 8.30 8.80 9.30
51.80 66.10 37.80 57.80 60.60 53.70 34.00 39.90
19.69 20.42 20.90 20.76 20.79 20.86 11.76 28.57
20.34 20.80 21.09
2 3 4
20.34 20.80 21.09
2.690 2.690 2.690
2.09 2.08 2.08
GRAFIK PEMADATAN
2.08
2.19
2.18
2.17
2.092.08 2.10
2.01
1.91
1.84
9.00 21.00 23.00 25.00 27.00 29.00 31.00 33.00 35.00 37.00 39.00
gram/cm3
1040.165595
1040.165595
x y
25.20 2.01 0 2.18
20.34 2.09 20.80 2.18
20.80 2.08 20.80 0.00
21.09 2.08 20.80 2.18
37.40 1.84 20.80 2.18
0
1040.1656
4 5
900 1000
56 56
5 5 t 10.65
10760 10750 D 15.13
5760 5750 V 1913.8025
5000 5000
1901.157 1901.157
2.63 2.63
21.09 37.40
2.17 1.91
D E
D3 E1 E2 E3
59.60 51.00 59.80 60.60
50.40 40.30 48.00 44.60
9.20 10.70 11.80 16.00
10.30 9.8 9.8 10 16.31
40.10 30.50 38.20 34.60 0.29
22.94 35.08 30.89 46.24 0.47
21.09 37.40 -4.86
4 5
21.09 37.40
2.690 2.690
2.08 1.84
19
15 0.15
5000 100 750
1040.1656 5000
5000
39.00
d dalam= 15.1 cm
t= 10.71 cm
COMPACTION TEST
DRY DENSITY DETERMINATION
Mold No. 1 2 3 4 5
1. Mixture of water cc 600 700 800 900 1000
2. Blow per Layer 56 56 56 56 56
3. Number of Layer 5 5 5 5 5
4. Wmold + soil gram 10510 10670 10870 10760 10650
5. Wmold gram 7210 7210 7210 7210 7210
6. Wsoil gram 3300 3460 3660 3550 3440
7. Volume of Soil cm3 1916.96 1916.96 1916.96 1916.96 1916.96
8. gamma Gram/cm3 1.72 1.80 1.91 1.85 1.79
9. Moisture Content % 20.44 21.84 23.97 25.99 28.57
10. Dry Density Gram/cm3 1.43 1.48 1.54 1.47 1.40
GRAFIK PEMADATAN
2.20
2.04
1.5 2.02
1.99
23.1 2.00 1.95
1.92
Dry Density (gr/cm3)
1.80
1.60 1.54
1.48 1.47
1.43
1.40
1.40
1.20
1.00
16 18 20 22 24 26 28 30
1198.357401 x y x y
20.44 1.43 20.44 2.04
21.84 1.48 21.84 2.02
23.97 1.54 23.97 1.99
25.99 1.47 25.99 1.95
28.57 1.40 28.57 1.92
d dalam= 15.1 cm
t= 10.71 cm
COMPACTION TEST
DRY DENSITY DETERMINATION
Mold No. 1 2 3 4 5
1. Mixture of water cc 600 700 800 900 1000
2. Blow per Layer 56 56 56 56 56
3. Number of Layer 5 5 5 5 5
4. Wmold + soil gram 10639 10740 10830 10760 10750
5. Wmold gram 7210 7210 7210 7210 7210
6. Wsoil gram 3429 3530 3620 3550 3540
7. Volume of Soil cm3 1916.96 1916.96 1916.96 1916.96 1916.96
8. gamma Gram/cm3 1.79 1.84 1.89 1.85 1.85
9. Moisture Content % 20.50 21.88 23.99 25.93 28.42
10. Dry Density Gram/cm3 1.48 1.51 1.52 1.47 1.44
GRAFIK PEMADATAN
2.30
1.5
2.20
23.1
Dry Density (gr/cm3)
2.10
2.04
2.02
2.00 1.99
1.96
1.92
1.90
1.80
1.70
1.60
10 15 20 25 30 35 40 45
1199.292537 x y x y
20.50 1.48 20.50 2.04
21.88 1.51 21.88 2.02
23.99 1.52 23.99 1.99
25.93 1.47 25.93 1.96
28.42 1.44 28.42 1.92
CBR UNSOAKED TEST
ELAPS PENETRATION
1st TEST 2st TEST
ED Load Load
TIME (0.01 mm) (inch) PROVING RING 10-4 inch
PROVING RING 0,0002
CM
(minute) Lbs Lbs
0.00 0.00 0.000 0.00 0.00 0.00 0.00
0.50 63.50 0.025 1.20 32.31 1.80 48.47
1.00 127.00 0.050 2.00 53.85 4.00 107.70
1.30 190.50 0.075 4.00 107.70 8.00 215.40
2.00 254.00 0.100 6.00 161.55 11.00 296.18
2.30 317.50 0.125 8.00 215.40 13.00 350.03
3.00 381.00 0.150 11.00 296.18 15.00 403.88
3.30 444.50 0.175 13.00 350.03 17.00 457.73
4.00 508.00 0.200 15.00 403.88 19.00 511.58
5.00 635.00 0.250 17.50 471.20 22.00 592.36
6.00 762.00 0.300 19.50 525.05 25.00 673.14
7.00 889.00 0.350 21.50 578.90 27.50 740.45
8.00 1016.00 0.400 24.00 646.21 30.00 807.76
9.00 1143.00 0.450 26.00 700.06 32.50 875.08
10.00 1270.00 0.500 27.00 726.99 34.50 928.93
1125.49
MOISTURE CONTENT DETERMINATION
Mold No. 1 2
1. Container No. 1 2 3 4
W 7210.00 W 8415.00
D 15.1 D 14.93
T 10.71 T 10.82
T CBR UNSOAKED TEST
0.0002 cm 3500
10
26.9255 lbs/div 25
3000
56
2500
3st TEST
Load
PROVING RING 0,0002
CM
Lbs 2000
0.00 0.00
Loads (Lbs)
2.30 61.93
5.40 145.40 1500
10.00 269.25
15.00 403.88
18.00 484.66 1000
21.00 565.44
23.00 619.29
25.50 686.60 500
29.00 780.84
32.00 861.62
35.40 953.16 0
38.00 1023.17 0.000 0.100 0.200 0.300 0.400 0.5
42.50 1144.33
Penetration (Inch)
45.00 1211.65
CBR VALUE
3
Loads0,1"
5 6 CBRat0,1" x100%
3000
48.10 74.00
Loads 0, 2"
CBR x100 %
at 0,2 "
41.5 62.40 4500
6.60 11.60
13.9 13.90 Loads at Pent (Lbs) CBR Value (%)
BLOWS
27.60 48.50 0,1" 0,2" 0,1" 0,2"
23.91 23.92 56 403.88 686.60 13.46 15.26
23.92 25 296.18 511.58 9.87 11.37
10 161.55 403.88 5.39 8.98
3
11210
7540
3670
1927.13
1.90
23.92
1.54
2.40
2.00
1.80
1.60
1.40
1.20
1.00
6 8 10 12 14 16 18
Water Content (%)
0
0.12
0.12
s
mbunan Pilihan Bebutir.
0 400
CBR UNSOAKED TEST
2.40
Dry Density (gram/cm3)
2.20
2.00
1.80
1.60
f(x) = 0.0217744321555416 x + 1.20882127002965
1.40 R² = 0.98084385050965
1.20
1.00
0 5 10 15 20
14 16 18 CBR (%)
0 400
0.00 0.00 0 0.00
0.00 0 0.00
0.00 0 0.00
0.00 0 0.00
0 0.00
0 0.00
Lokasi / ID : Laboratorium Mekanika Tanah
Fakultas Teknik ULM
Hari / Tanggal : Senin, 28 Agustus 2022
Dimensi Sampel
Diameter : 6.31 cm L (length of sample) : 1.67 cm
Area standpipe, ɑ : 0.5027 cm 2
dburette : 0.8 cm
Standpipe : Burette Area of sample : 31.27156 cm2
h1 , cm h2 , cm t,s T, °C
64 63.6 3600 27
63.6 63.05 7200 27
63.05 62.5 10800 27
62.5 62.35 14400 27
62.35 61.8 18000 27
Average
kT , cm/s
4.68E-08
3.24E-08
2.18E-08
4.48E-09
1.32E-08
2.3724E-08
tas
beban penetrasi
9.0766071
18.1532142
27.2298213