Boqtvri
Boqtvri
NO MODEL
I. PERANGKAT AKTIF
1 SFC2000-TS
2
3
4
II. MATERIAL SUPPORT
1
2
3
4
II. PEKERJAAN INSTALASI JARINGAN
1
2
3
4
5
6
Terbilang:
Dua Puluh Tujuh Juta Seratus Dua Puluh Tujuh Ribu Seratus Rupiah
ANGGARAN BIAYA
DATA VIDEOTRON TVRI
GKAT AKTIF
Media Converter Multimode 1 x10/100BaseT - 1 x 2 Unit
10/100BaseF(M)
GKAT JARIANGAN DATA
Fiber Optic Cable 4 Core Multimode Single Jacket Direct 150 Meter
Burried
Mini OTB 4 Core MM 2 set
Multimode Patchord 3 Meter 2 ea
Cat 6 Patchord 3 Meter 2 ea
IAL SUPPORT
SUBDUCT HDPE 32/27 1 Roll
Enclosure Box 354520 1 set
Cable Power 3 x 2,5 mm 1 Roll
Small Material 1 Lot
JAAN INSTALASI JARINGAN
Pulling FO Cable & Laying Subduct 150 Meter
Digging 10 Meter
Fiber Optic Termination 4 Nodes
Enclosure Box Instalation 1 Set
Test & Commisioning 1 Lot
Mobilisasi 1 Lot
uluh Tujuh Juta Seratus Dua Puluh Tujuh Ribu Seratus Rupiah
HARGA
JUMLAH TOTAL
SATUAN
(Rp.)
(Rp.)
1,232,000 2,464,000
37,000 5,550,000
1,610,000 3,220,000
Rp 361,000 722,000
Rp 90,000 180,000
Rp 13,000 13,000
Rp 1,680,000 1,680,000
Rp 875,000 875,000
Rp 257,000 257,000
Rp 54,000 8,100,000
Rp 55,000 550,000
Rp 225,000 900,000
Rp 150,000 150,000
Rp 485,000 485,000
Rp 1,233,000 1,233,000
Jumlah 26,379,000
PPN 10% 2,637,900
Jumlah Total 29,016,900
RENCANA ANGGARAN BIAYA
HARGA JUMLAH
NO MODEL URAIAN PEKERJAAN JUMLAH SAT SATUAN JUMLAH TOTAL
(Rp.) (Rp.)
I. PERALATAN UTAMA
1 AMP/BELDEN CABLE LAN STP CAT6 160 METER
2 AMP/BELDEN RJ45 CAT6 6 UNIT
3 MIKROTIK RB750GR2 POE SUPPOER (sebagai jika cable tidak kuat) 1 UNIT Rp 862,500.00 Rp 862,500.00
HARGA JUMLAH
NO MODEL URAIAN PEKERJAAN JUMLAH SAT SATUAN JUMLAH TOTAL
(Rp.) (Rp.)
I. PERALATAN UTAMA
1 AMP/BELDEN CABLE LAN STP CAT6 90 METER
2 AMP/BELDEN RJ45 CAT6 10 UNIT
3 UBNT LiteBeam 23Dbi 5Ghz (Radio Wireless) 2 UNIT Rp 805,000.00 Rp 1,610,000.00