FAISAL, ST.MT
Nip. 19750108 200801 1 001
LEGENDA
IP
Jalan kereta api
.2
Perkampungan
Rawa-rawa
Bangunan
Sungai existing
Makam/kuburan
Mesjid, Gereja,
klenteng
Kebun sawit
Semak belukar
Kebun Campuran
Sawah
Daerah genangan
Aliran
Jembatan
m
Titik tetap (Benchmark)
6
29
CL
Sungai rencana
=
R
IP
Tanggul rencana TL a
SL
Pemasangan krip
BC EC
Pintu air
R R
0 2 4 6 8 10 12 14 16 18 20 M
5
SV = 1 : 200
ELEVASI MUKA AIR BANJIR Q5 THN
0 20 40 60 80 100 120 140 160 180 200 M
SH = 1 : 2000
ELV. BANTARAN RENCANA
0
-5
-10
BIDANG PERSAMAAN
REFERENCE LEVEL
- 13.00 meter
PATOK HEKTOMETER Hm 71 Hm 70 Hm 69 Hm 68 Hm 67 Hm 66 Hm 65 Hm 64 Hm 63 Hm 62 Hm 61 Hm 60.47
HECTOMETER STONE
NOMOR PROFIL
PROFILE NUMBER SC.B3/T54 SC.B2/T53 SC.B1/T52 F.12/T51 F.13/T50 F.14/T49 F.15/T48 F.16/T47 SC.A29/T46 SC.A28/T45 SC.A27/T44 SC.A26/T43 SC.A25/T42 SC.A24/T41 SC.A23/T40 SC.A22/T39 SC.A21/T38 SC.A20/T37 SC.A19/T36
0.91 2+486.95
1.16 3+063.15
1.20 3+000.92
0.71 2+882.58
0.79 2+748.57
0.86 2+686.95
0.86 2+636.95
0.86 2+586.95
0.89 2+536.95
0.91 2+436.95
0.83 2+386.95
1.03 3+169.82
1.16 3+117.79
-5.42 0.68 3+396.92
0.75 3+334.42
0.69 3+281.25
1.35 3+228.68
0.74 2+942.75
JARAK PROFIL/JARAK LANGSUNG
62.50 53.17 52.57 58.86 52.03 54.64 62.23 58.17 60.17 69.84 64.17 61.62 50 50 50 50 50 50
ACCUMULATED DISTANCE
1.36
1.05
1.27
0.71
0.83
0.95
0.79
0.83
0.85
0.92
0.96
0.96
0.91
1.18
-5.28 0.79
-5.44 1.03
-6.14
-5.44
-6.04
-4.60
ELEVASI DASAR SUNGAI PADA AS
-6.60
-1.29
0.93
0.73
0.72
0.84
0.95
0.92
0.91
0.99
0.81
-5.173
-5.183
-5.107
-5.120
-5.133
-5.143
BED LEVEL
TRASE SUNGAI
ALIGNMENT IP. 2 CONCRETE SHEET PILE KIRI (L = 1400.145 M)
TIPE BANGUNAN
TYPE OF STRUCTURE BPT. 3 BPT. 2
DIMENSI SUNGAI DAN DATA TAMBAHAN Qr (Q5th) = 2731 m³/det Vu (Q5th) = 2.10 m/det Hu (Q5th) = 4.00 m/det Bu = 90 m m =2
RIVER DIMENSION AND ADDITIONAL DATA S = 0.00020 Vb (Q5th) = 2.28 m/det Hb (Q5th) = 3.57 m/det Bb = 80 m
PEMERINTAH ACEH
MENYETUJUI:
DINAS PENGAIRAN
KONSULTAN PERENCANA PEJABAT PELAKSANA TEKNIS KEGIATAN Jln. Ir. Mohd. Thaher No. 18 Telp. (0651)21982, 24212, 22899, 33126, 21167
CV. MITRACIPTA PRATAMA PERENCANAAN NORMALISASI SALURAN SUNGAI
DINAS PENGAIRAN
Fax. 23686 - email: sda_aceh@yahoo.com, PO. Box - 130
LUENG BATA - BANDA ACEH (23247)
DEFI CAHYADI, ST HENDRI MULYADI, ST KABUPATEN ACEH TAMIANG SID PENGENDALIAN BANJIR DAN
DIREKTUR NIP. 19761002 200502 1 004 PENGATURAN SUNGAI KR. TAMIANG KAB.
MENGETAHUI: KECAMATAN BENDAHARA/SEUREUWAY ACEH TAMIANG (OTSUS ACEH)
KUASA PENGGUNA ANGGARAN/ KUASA PENGGUNA BARANG
KEGIATAN BIDANG PROGRAM DAN PELAPORAN
DIRENCANA IR. MUSRI JUDUL GAMBAR
DINAS PENGAIRAN
DIGAMBAR ERWIN LINGGA, A.Md
POTONGAN MEMANJANG
DIPERIKSA NURUL FURQAN
Ir. AMRI, SP RENCANA
NIP.19651231 199301 1 003 DIPERIKSA YUSRAMSYAH, ST.MT
SKALA H = 1 : 4000, V = 1 : 200
CV. MITRACIPTA PRATAMA
BIRO ARSITEK DAN INSINYUR TANGGAL OKTOBER 2015
LEMBAR 09
IR. MUSRI
JUMLAH LEMBAR 12
REV. TGL. YANG DIREVISI OLEH DIPER. DISET. KETUA TIM NO. KONTRAK KU.602.A/KONSL-PP/607/2015
R AWA
CP.01
X : 414394.180
Y : 490736.811
Z : 1.066
R AWA
BM.01
X : 414387.828
Y : 490725.081
Z : 1.266
R AWA
R AWA
KUALA PEUNAGA
R AWA
R AWA
R AWA
R AWA
R AWA
R
R AWA
=
10
00
m
R AWA
R AWA
R AWA
R AWA
BM.04
X : 412971.884
Y : 490265.403
Z : 1.425
BM.02
X : 414146.708
R AWA
Y : 490254.330
Z : 1.163
CP.04
X : 412980.421
Y : 490244.073
Z : 1.153 CP.02
X : 414149.704
Y : 490247.228
R AWA
Z : 1.253
BPT. 1
TERUNTUM
DESA T E R U N T U M
IP.1
PE
R
UM
AH
AN
MESJID
PE
GA
BM.03
W
AI
X : 413739.668
KUALA PEUNAGA
K
Y : 489996.308
EB
Z : 1.159
UN
R AWA
SA
CP.03
W
IT
X : 413740.263
Y : 489990.197
Z : 1.009
R AWA
R AWA
BPT. 2
IP.2
R=
10
00
BM.05 m
X : 412440.926
Y : 488985.074
Z : 1.655
CP.05
X : 412420.848
Y : 488948.904
Z : 2.005
BPT. 3
BM.06
X : 412224.304
Y : 488294.302
Z : 1.165
CP.06
X : 412550.889
Y : 487313.794
BPT. 4 Z : 1.436
MUARA TAMIANG
R AWA
CP.01
X : 414394.180
Y : 490736.811
Z : 1.066
BM.01
X : 414387.828
Y : 490725.081
Z : 1.266
R AWA
KUALA PEUNAGA
R AWA
R
=
10
00
m
R AWA
R AWA
R AWA
BM.04
X : 412971.884
Y : 490265.403
Z : 1.425
BM.02
X : 414146.708
Y : 490254.330
Z : 1.163
CP.04
X : 412980.421
Y : 490244.073
CP.02
Z : 1.153
X : 414149.704
Y : 490247.228
Z : 1.253
BPT. 1
DESA T E R U N T U M
IP.1
PE
R
UM
AH
AN
MESJID
PE
G
AW
BM.03
AI
X : 413739.668
KUALA PEUNAGA
K
Y : 489996.308
EB
Z : 1.159
UN
SA
CP.03
W
IT
X : 413740.263
Y : 489990.197
Z : 1.009
SITUASI
SKALA 1:2000
LEGENDA
Perkampungan Aliran
Rawa-rawa Jembatan
CL
IP
TL a
SL
BC EC
R R
0 2 4 6 8 10 12 14 16 18 20 M
5
SV = 1 : 200
0 20 40 60 80 100 120 140 160 180 200 M ELEVASI MUKA AIR BANJIR Q5 THN
SH = 1 : 2000
-10
BIDANG PERSAMAAN
REFERENCE LEVEL
- 13.00 meter
PATOK HEKTOMETER
HECTOMETER STONE Hm 1 Hm 0
NOMOR PROFIL
PROFILE NUMBER F.100/T3 F.101/T2 F.102/T1
0.86 0+083.31
0.83 0+000.00
0.88 0+165.27
0.77
0.71
ELEVASI TANGGUL
BANK LEVEL
ELEVASI BANTARAN KANAN
RIGHT PLAIN LEVEL
RENCANA / DESIGN
TRASE SUNGAI
ALIGNMENT
TIPE BANGUNAN
TYPE OF STRUCTURE
DIMENSI SUNGAI DAN DATA TAMBAHAN Qr (Q5th) = 2731 m³/det Vu (Q5th) = 2.10 m/det Hu (Q5th) = 4.00 m/det Bu = 90 m m =2
RIVER DIMENSION AND ADDITIONAL DATA S = 0.00020 Vb (Q5th) = 2.28 m/det Hb (Q5th) = 3.57 m/det Bb = 80 m
PEMERINTAH ACEH
MENYETUJUI:
DINAS PENGAIRAN
KONSULTAN PERENCANA PEJABAT PELAKSANA TEKNIS KEGIATAN Jln. Ir. Mohd. Thaher No. 18 Telp. (0651)21982, 24212, 22899, 33126, 21167
CV. MITRACIPTA PRATAMA PERENCANAAN NORMALISASI SALURAN SUNGAI
DINAS PENGAIRAN
Fax. 23686 - email: sda_aceh@yahoo.com, PO. Box - 130
LUENG BATA - BANDA ACEH (23247)
DEFI CAHYADI, ST HENDRI MULYADI, ST KABUPATEN ACEH TAMIANG SID PENGENDALIAN BANJIR DAN
DIREKTUR NIP. 19761002 200502 1 004 PENGATURAN SUNGAI KR. TAMIANG KAB.
MENGETAHUI: KECAMATAN BENDAHARA/SEUREUWAY ACEH TAMIANG (OTSUS ACEH)
KUASA PENGGUNA ANGGARAN/ KUASA PENGGUNA BARANG
KEGIATAN BIDANG PROGRAM DAN PELAPORAN
DIRENCANA IR. MUSRI JUDUL GAMBAR
DINAS PENGAIRAN
DIGAMBAR ERWIN LINGGA, A.Md
POTONGAN MEMANJANG
DIPERIKSA NURUL FURQAN
Ir. AMRI, SP RENCANA
NIP.19651231 199301 1 003 DIPERIKSA YUSRAMSYAH, ST.MT
SKALA H = 1 : 4000, V = 1 : 200
CV. MITRACIPTA PRATAMA
BIRO ARSITEK DAN INSINYUR TANGGAL OKTOBER 2015
LEMBAR 12
IR. MUSRI
JUMLAH LEMBAR 12
REV. TGL. YANG DIREVISI OLEH DIPER. DISET. KETUA TIM NO. KONTRAK KU.602.A/KONSL-PP/607/2015
LEGENDA
SITUASI
Kontur SKALA 1:2000
Jalan existing
Jalan rencana
Perkampungan
Rawa-rawa
Bangunan
Sungai existing
Makam/kuburan
Mesjid, Gereja,
klenteng
Kebun sawit
Semak belukar
Sawah
Daerah genangan
Aliran
Jembatan
Pemasangan krip
BC EC
Pintu air
R R
BPT. 1
R
A
W
0 2 4 6 8 10 12 14 16 18 20 M A
5
SV = 1 : 200
0 20 40 60 80 100 120 140 160 180 200 M ELEVASI MUKA AIR BANJIR Q5 THN
SH = 1 : 2000 ELEVASI MUKA AIR NORMAL
-10
BIDANG PERSAMAAN
REFERENCE LEVEL
- 13.00 meter
PATOK HEKTOMETER
HECTOMETER STONE Hm 11 Hm 10 Hm 9 Hm 8 Hm 7 Hm 6 Hm 5 Hm 4 Hm 3 Hm 2
NOMOR PROFIL
PROFILE NUMBER F.87/T16 F.88/T15 F.89/14 F.90/T13 F.91/T12 F.92/T11 F.93/T10 F.94/T9 F.95/T8 F.96/T7 F.97/T6 F.98/T5 F.99/T4 F.100/T3
0.57 1+158.48
0.72 1+058.42
0.76 1+011.15
0.63 0+968.13
0.60 0+907.23
0.64 0+826.49
0.51 0+716.62
0.54 0+609.38
1.02 0+509.80
1.03 0+417.13
0.95 0+335.48
0.88 0+249.79
0.88 0+165.27
0.55 1+254.87
JARAK PROFIL/JARAK LANGSUNG 96.39 100.06 47.27 43.02 60.9 80.74 109.87 107.24 99.58 92.67 81.65 85.69 84.52
ACCUMULATED DISTANCE
-2.96 0.71
-3.66 0.81
-4.56 0.74
-3.56 0.90
0.68
-3.26 0.59
0.98
-3.66 0.78
0.64
0.58
0.62
0.79
0.71
GROUND LEVEL AT LEFT BANK LEVEL
ELEVASI DASAR SUNGAI PADA AS
-6.16
-2.66
-2.46
-2.16
-2.06
-1.76
-2.43
BED LEVEL IN CENTER LINE
-5.419 1.151 -1.419 -1.419 2.151
TRASE SUNGAI
ALIGNMENT
TIPE BANGUNAN
TYPE OF STRUCTURE BPT. 1
DIMENSI SUNGAI DAN DATA TAMBAHAN Qr (Q5th) = 2731 m³/det Vu (Q5th) = 2.10 m/det Hu (Q5th) = 4.00 m/det Bu = 90 m m =2
RIVER DIMENSION AND ADDITIONAL DATA S = 0.00020 Vb (Q5th) = 2.28 m/det Hb (Q5th) = 3.57 m/det Bb = 80 m
PEMERINTAH ACEH
MENYETUJUI:
DINAS PENGAIRAN
KONSULTAN PERENCANA PEJABAT PELAKSANA TEKNIS KEGIATAN Jln. Ir. Mohd. Thaher No. 18 Telp. (0651)21982, 24212, 22899, 33126, 21167
CV. MITRACIPTA PRATAMA PERENCANAAN NORMALISASI SALURAN SUNGAI
DINAS PENGAIRAN
Fax. 23686 - email: sda_aceh@yahoo.com, PO. Box - 130
LUENG BATA - BANDA ACEH (23247)
DEFI CAHYADI, ST HENDRI MULYADI, ST KABUPATEN ACEH TAMIANG SID PENGENDALIAN BANJIR DAN
DIREKTUR NIP. 19761002 200502 1 004
PENGATURAN SUNGAI KR. TAMIANG KAB.
MENGETAHUI: KECAMATAN BENDAHARA/SEUREUWAY ACEH TAMIANG (OTSUS ACEH)
KUASA PENGGUNA ANGGARAN/ KUASA PENGGUNA BARANG
KEGIATAN BIDANG PROGRAM DAN PELAPORAN
DIRENCANA IR. MUSRI JUDUL GAMBAR
DINAS PENGAIRAN
DIGAMBAR ERWIN LINGGA, A.Md
POTONGAN MEMANJANG
DIPERIKSA NURUL FURQAN
Ir. AMRI, SP RENCANA
NIP.19651231 199301 1 003 DIPERIKSA YUSRAMSYAH, ST.MT
SKALA H = 1 : 4000, V = 1 : 200
CV. MITRACIPTA PRATAMA
BIRO ARSITEK DAN INSINYUR TANGGAL OKTOBER 2015
LEMBAR 11
IR. MUSRI
JUMLAH LEMBAR 12
REV. TGL. YANG DIREVISI OLEH DIPER. DISET. KETUA TIM NO. KONTRAK KU.602.A/KONSL-PP/607/2015
LEGENDA
DE
Kontur SITUASI S AT
Jalan existing SKALA 1:2000
E RU
Jalan rencana NT
Jalan kereta api U M
Perkampungan
R
=
30
2
Rawa-rawa m
Bangunan
Sungai existing
Makam/kuburan
Mesjid, Gereja,
klenteng
BM
Kebun sawit .03
X :
Semak belukar
Y : 4137
Z 48 39
m
9 .
: 1.1 996 668
Kebun Campuran
=0
59 .30 IP.
Sawah
8
R
Daerah genangan
1
Aliran
CP
.0
X 3
Jembatan
:
Titik tetap (Benchmark)
Y : 4137
CL
Z 48 9
40
.
: 1.0 990 263
Sungai rencana
IP
a 09 .19
Tanggul rencana TL
SL
7
Pemasangan krip
BC EC
Pintu air
KUALA PEUNAGA
R R
0 2 4 6 8 10 12 14 16 18 20 M
5
SV = 1 : 200
ELEVASI MUKA AIR BANJIR Q5 THN
0 20 40 60 80 100 120 140 160 180 200 M
SH = 1 : 2000 ELEVASI MUKA AIR NORMAL
ELV. BANTARAN RENCANA
0
KOORDINAT RADIUS SUDUT TL SL CL
No. IP
X Y Meter a Meter Meter Meter ELV. DASAR SUNGAI RENCANA
-5
-10
BIDANG PERSAMAAN
REFERENCE LEVEL
- 13.00 meter
PATOK HEKTOMETER
HECTOMETER STONE
NOMOR PROFIL
PROFILE NUMBER SC.A19/T36 SC.A18/T35 SC.A17/T34 SC.A16/T33 SC.A15/T32 SC.A14/T31 SC.A13/T30 SC.A12/T29 SC.A11/T28 SC.A10/T27 SC.A9/T26 SC.A8/T25 SC.A7/T24 SC.A6/T23 SC.A5/T22 SC.A4/T21 SC.A3/T20 SC.A2/T19 SC.A1/T18 F.86/T17 F.87/T16
1.23 1+886.95
0.83 2+386.95
0.97 2+336.95
0.93 2+286.95
0.92 2+236.95
0.96 2+186.95
1.12 2+136.95
1.20 2+086.95
1.16 2+036.95
1.16 1+986.95
1.18 1+936.95
1.21 1+836.95
1.22 1+787.16
1.21 1+737.16
1.18 1+676.01
1.17 1+606.42
0.55 1+308.22
0.55 1+254.87
0.73 1+374.60
0.96 1+528.05
0.75 1+450.57
JARAK PROFIL/JARAK LANGSUNG
50 50 50 50 50 50 50 50 50 50 50 49.79 50 61.15 69.59 78.37 77.48 75.97 66.38 53.35
ACCUMULATED DISTANCE
ELEVASI MUKA TANAH PADA AS TANGGUL KANAN
YANG ADA
1.11 -2.90
0.80 -3.62
0.83
0.84
0.87
0.97
0.92
1.12
1.16
1.21
1.22
1.12
1.23
1.22
1.21
1.25
1.01
0.61
0.51
0.63
0.68
GROUND LEVEL AT LEFT BANK LEVEL
ELEVASI DASAR SUNGAI PADA AS
-8.22
-6.56
-6.16
0.93
0.88
0.85
0.83
0.99
1.08
1.16
1.17
1.18
1.20
1.21
1.20
1.25
1.22
1.12
0.83
BED LEVEL IN CENTER LINE
-5.193 1.377 -1.193 -1.193 2.377
-5.313
-5.323
-5.380
BED LEVEL
TRASE SUNGAI
ALIGNMENT CONCRETE SHEET PILE KIRI (L = 1400.145 M) IP. 1
TIPE BANGUNAN
TYPE OF STRUCTURE
DIMENSI SUNGAI DAN DATA TAMBAHAN Qr (Q5th) = 2731 m³/det Vu (Q5th) = 2.10 m/det Hu (Q5th) = 4.00 m/det Bu = 90 m m =2
RIVER DIMENSION AND ADDITIONAL DATA S = 0.00020 Vb (Q5th) = 2.28 m/det Hb (Q5th) = 3.57 m/det Bb = 80 m
PEMERINTAH ACEH
MENYETUJUI:
DINAS PENGAIRAN
KONSULTAN PERENCANA PEJABAT PELAKSANA TEKNIS KEGIATAN Jln. Ir. Mohd. Thaher No. 18 Telp. (0651)21982, 24212, 22899, 33126, 21167
CV. MITRACIPTA PRATAMA PERENCANAAN NORMALISASI SALURAN SUNGAI
DINAS PENGAIRAN
Fax. 23686 - email: sda_aceh@yahoo.com, PO. Box - 130
LUENG BATA - BANDA ACEH (23247)
DEFI CAHYADI, ST HENDRI MULYADI, ST KABUPATEN ACEH TAMIANG SID PENGENDALIAN BANJIR DAN
DIREKTUR NIP. 19761002 200502 1 004 PENGATURAN SUNGAI KR. TAMIANG KAB.
MENGETAHUI: KECAMATAN BENDAHARA/SEUREUWAY ACEH TAMIANG (OTSUS ACEH)
KUASA PENGGUNA ANGGARAN/ KUASA PENGGUNA BARANG
KEGIATAN BIDANG PROGRAM DAN PELAPORAN
DIRENCANA IR. MUSRI JUDUL GAMBAR
DINAS PENGAIRAN
DIGAMBAR ERWIN LINGGA, A.Md
POTONGAN MEMANJANG
DIPERIKSA NURUL FURQAN
Ir. AMRI, SP RENCANA
NIP.19651231 199301 1 003 DIPERIKSA YUSRAMSYAH, ST.MT
SKALA H = 1 : 4000, V = 1 : 200
CV. MITRACIPTA PRATAMA
BIRO ARSITEK DAN INSINYUR TANGGAL OKTOBER 2015
LEMBAR 10
IR. MUSRI
JUMLAH LEMBAR 12
REV. TGL. YANG DIREVISI OLEH DIPER. DISET. KETUA TIM NO. KONTRAK KU.602.A/KONSL-PP/607/2015