ANALISA USULAN

KODE ANALISA : G.07


JENIS PEKERJAAN : BETON MUTU FC=19,3 MPA (K225) SLUMP (12 +- 2) CM, W/C = 0,58
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO KOMPONEN SATUAN
KUANTITAS SATUAN (Rp) HARGA (Rp)
A TENAGA
1 PEKERJA BIASA L17 ORG/HR 1.65 61,000.00 100,650.00
2 TUKANG BATU L07 ORG/HR 0.28 76,000.00 20,900.00
3 KEPALA TUKANG BATU L02 ORG/HR 0.03 90,000.00 2,520.00
4 MANDOR L01 ORG/HR 0.08 96,000.00 7,968.00
JUMLAH HARGA TENAGA 132,038.00
B BAHAN
1 PORTLAND CEMENT (PC) M037 KG 371.00 1,926.00 714,546.00
2 PASIR COR M004 M3 0.50 206,267.00 102,838.83
3 BATU PECAH MESIN 2/3 M019 M3 0.78 285,082.00 221,096.93
4 AIR BERSIH M486 LTR 215.00 44.00 9,460.00
JUMLAH HARGA BAHAN 1,047,941.76
C JUMLAH HARGA TENAGA DAN BAHAN ( TENAGA + BAHAN ) 1,179,979.76

KODE ANALISA : K.07


JENIS PEKERJAAN : PENGELASAN DENGAN LAS LISTRIK ( PIPA GP/MS)
SATUAN PEMBAYARAN : CM

PERKIRAAN HARGA JUMLAH


NO KOMPONEN SATUAN
KUANTITAS SATUAN (Rp) HARGA (Rp)
A TENAGA
1 PEKERJA BIASA L17 ORG/HR 0.00 61,000.00 244.00
2 TUKANG BESI/BAJA L09 ORG/HR 0.00 76,000.00 152.00
3 KEPALA TUKANG BESI L04 ORG/HR 0.00 90,000.00 18.00
4 MANDOR L01 ORG/HR 0.00 96,000.00 19.20
JUMLAH HARGA TENAGA 433.20
B BAHAN
1 ELEKTRODA PHILIPS M471 KG 0.04 84,040.00 3,361.60
2 SOLAR INDUSTRI M483 LTR 0.03 10,120.00 303.60
3 MINYAK PELUMAS M484 LTR 0.00 67,044.00 268.18
JUMLAH HARGA BAHAN 3,933.38
C PERLENGKAPAN
1 SEWA MESIN LAS E05 HARI 0.00 310,000.00 752.86
JUMLAH HARGA PERLENGKAPAN 752.86
D JUMLAH HARGA TENAGA DAN BAHAN DAN PERLENGKAPAN ( TENAGA + BAHAN + PERLENGKAPAN ) 5,119.43

KODE ANALISA : R.121


JENIS PEKERJAAN : PEMASANGAN ZADEL KLEM BESI DIAMETER 20"
SATUAN PEMBAYARAN : BUAH

PERKIRAAN HARGA JUMLAH


NO KOMPONEN SATUAN
KUANTITAS SATUAN (Rp) HARGA (Rp)
A TENAGA
1 PEKERJA BIASA L17 ORG/HR 0.57 61,000.00 34,750.94
2 TUKANG PIPA L12 ORG/HR 0.76 80,000.00 60,760.00
3 KEPALA TUKANG PIPA L06A ORG/HR 0.08 90,000.00 6,840.00
4 MANDOR L01 ORG/HR 0.02 96,000.00 2,208.00
JUMLAH HARGA TENAGA 104,558.94
B JUMLAH HARGA TENAGA ( TENAGA ) 104,558.94

KODE ANALISA : R.111


JENIS PEKERJAAN : PEMASANGAN STEEL GATE VALVE DIAMETER 16"
SATUAN PEMBAYARAN : BUAH

PERKIRAAN HARGA JUMLAH


NO KOMPONEN SATUAN
KUANTITAS SATUAN (Rp) HARGA (Rp)
A TENAGA
1 PEKERJA BIASA L17 ORG/HR 1.67 61,000.00 102,170.75
2 TUKANG PIPA L12 ORG/HR 1.67 80,000.00 133,994.43
3 KEPALA TUKANG PIPA L06A ORG/HR 0.84 90,000.00 75,371.87
4 MANDOR L01 ORG/HR 0.39 96,000.00 37,106.15
JUMLAH HARGA TENAGA 348,643.20
B JUMLAH HARGA TENAGA ( TENAGA ) 348,643.20

KODE ANALISA : R.54


JENIS PEKERJAAN : PENYAMBUNGAN PIPA HDPE DIAMETER 16" (BUTT FUSSION)
SATUAN PEMBAYARAN : BH

PERKIRAAN HARGA JUMLAH


NO KOMPONEN SATUAN
KUANTITAS SATUAN (Rp) HARGA (Rp)
A TENAGA
1 PEKERJA BIASA L17 ORG/HR 0.65 61,000.00 39,363.30
2 TUKANG PIPA L12 ORG/HR 0.32 80,000.00 25,808.00
3 KEPALA TUKANG PIPA L06A ORG/HR 0.16 90,000.00 14,517.00
4 MANDOR L01 ORG/HR 0.05 96,000.00 4,800.00
JUMLAH HARGA TENAGA 84,488.30
B BAHAN
1 SOLAR INDUSTRI M483 LTR 2.42 10,120.00 24,489.10
2 MINYAK PELUMAS M484 LTR 0.05 67,044.00 3,352.20
JUMLAH HARGA BAHAN 27,841.30
C PERLENGKAPAN
SEWA BUTT WELDING MACHINE KL ( 315 -
1 E28 HARI 0.16 650,000.00 104,845.00
630 )
2 SEWA MESIN GENSET E03 HARI 0.16 330,000.00 53,229.00
JUMLAH HARGA PERLENGKAPAN 158,074.00
D JUMLAH HARGA TENAGA DAN BAHAN DAN PERLENGKAPAN ( TENAGA + BAHAN + PERLENGKAPAN ) 270,403.60

KODE ANALISA : R.56


JENIS PEKERJAAN : PENYAMBUNGAN PIPA HDPE DIAMETER 24" (BUTT FUSSION)
SATUAN PEMBAYARAN : BH

PERKIRAAN HARGA JUMLAH


NO KOMPONEN SATUAN
KUANTITAS SATUAN (Rp) HARGA (Rp)
A TENAGA
1 PEKERJA BIASA L17 ORG/HR 0.86 61,000.00 52,582.00
2 TUKANG PIPA L12 ORG/HR 0.43 80,000.00 34,488.00
3 KEPALA TUKANG PIPA L06A ORG/HR 0.22 90,000.00 19,395.00
4 MANDOR L01 ORG/HR 0.05 96,000.00 4,800.00
JUMLAH HARGA TENAGA 111,265.00
B BAHAN
1 SOLAR INDUSTRI M483 LTR 4.31 10,120.00 43,626.28
2 MINYAK PELUMAS M484 LTR 0.05 67,044.00 3,352.20
JUMLAH HARGA BAHAN 46,978.48
C PERLENGKAPAN
SEWA BUTT WELDING MACHINE KL ( 315 -
1 E28 HARI 0.40 650,000.00 260,000.00
630 )
2 SEWA MESIN GENSET E03 HARI 0.22 330,000.00 71,115.00
JUMLAH HARGA PERLENGKAPAN 331,115.00
D JUMLAH HARGA TENAGA DAN BAHAN DAN PERLENGKAPAN ( TENAGA + BAHAN + PERLENGKAPAN ) 489,358.48

KODE ANALISA : R.175.SP.2


JENIS PEKERJAAN : PEMASANGAN ALL FLANGE TEE GI 24"
SATUAN PEMBAYARAN : BUAH

PERKIRAAN HARGA JUMLAH


NO KOMPONEN SATUAN
KUANTITAS SATUAN (Rp) HARGA (Rp)
A TENAGA
1 PEKERJA BIASA L17 ORG/HR 2.32 61,000.00 141,243.67
2 TUKANG PIPA L12 ORG/HR 1.19 80,000.00 94,993.60
3 KEPALA TUKANG PIPA L06A ORG/HR 0.59 90,000.00 53,433.90
4 MANDOR L01 ORG/HR 0.13 96,000.00 12,368.64
JUMLAH HARGA TENAGA 302,039.81
B JUMLAH HARGA TENAGA ( TENAGA ) 302,039.81

KODE ANALISA : R.175


JENIS PEKERJAAN : PEMASANGAN ALL FLANGE TEE GI 16"
SATUAN PEMBAYARAN : BUAH

PERKIRAAN HARGA JUMLAH


NO KOMPONEN SATUAN
KUANTITAS SATUAN (Rp) HARGA (Rp)
A TENAGA
1 PEKERJA BIASA L17 ORG/HR 0.99 61,000.00 60,263.86
2 TUKANG PIPA L12 ORG/HR 0.51 80,000.00 40,530.55
3 KEPALA TUKANG PIPA L06A ORG/HR 0.25 90,000.00 22,798.43
4 MANDOR L01 ORG/HR 0.05 96,000.00 5,277.42
JUMLAH HARGA TENAGA 128,870.26
B JUMLAH HARGA TENAGA ( TENAGA ) 128,870.26

KODE ANALISA : B.10


JENIS PEKERJAAN : URUGAN KEMBALI
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO KOMPONEN SATUAN
KUANTITAS SATUAN (Rp) HARGA (Rp)
A TENAGA
1 PEKERJA BIASA L17 ORG/HR 0.49 61,000.00 30,042.50
2 TUKANG BATU L07 ORG/HR 0.00 76,000.00 0.00
3 KEPALA TUKANG BATU L02 ORG/HR 0.00 90,000.00 0.00
4 MANDOR L01 ORG/HR 0.02 96,000.00 2,000.00
JUMLAH HARGA TENAGA 32,042.50
B JUMLAH HARGA TENAGA ( TENAGA ) 32,042.50

KODE ANALISA : B.01. A


JENIS PEKERJAAN : GALIAN TANAH BIASA DENGAN ALAT BERAT
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO KOMPONEN SATUAN
KUANTITAS SATUAN (Rp) HARGA (Rp)
A TENAGA
1 OPERATOR L20 ORG/HR 0.01 10,571.43 71.90
2 MANDOR L01 ORG/HR 0.01 13,714.29 93.28
JUMLAH HARGA TENAGA 165.18
B BAHAN
1 SOLAR M483.A LTR 0.07 6,900.00 481.40
JUMLAH HARGA BAHAN 481.40
C PERLENGKAPAN
1 SEWA ALAT BERAT KHUSUS EXCAVATOR E10 HARI 0.01 2,750,000.00 18,703.85
SEWA ALAT BERAT KHUSUS DUMP TRUCK 3
2 E17 HARI 0.29 205,714.29 59,044.94
- 4 M3
3 ALAT BANTU (1 SET; 3 ALAT) E87 M2 1.00 0.00 0.00
JUMLAH HARGA PERLENGKAPAN 77,748.79
D JUMLAH HARGA TENAGA DAN BAHAN DAN PERLENGKAPAN ( TENAGA + BAHAN + PERLENGKAPAN ) 78,395.37
VOLUME PEKERJAA

PEKERJAAN : PEKERJAAN TANAH


LOKASI : JL KH MALIK (TANDON AIR BURING) PERUMDA AIR MINUM TUGU TIRTA KOTA MALANG

NO JENIS PEKERJAAN
Galian Tanah ( 3 * 3 * 5
( 6 * 1 * 2
( 28 * 1 * 2
( 15 * 2 * 6

Urugan Kembali ( 3 * 3 * 5
( 6 * 1 * 2
( 28 * 1 * 2
( 15 * 2 * 6

(( 3.1429 )* 0.2 * 0.2


VOLUME PEKERJAAN

TA KOTA MALANG

PERHITUNGAN VOLUME
)* 1 = 45 M3
)* 1 = 12 M3
)* 1 = 56 M3
)* 1 = 180 M3 +
293 M3

293 * 1 =

)* 1 = 45 M3
)* 1 = 12 M3
)* 1 = 56 M3
)* 1 = 180 M3 +
293 M3

* 52 )* 1 = 6.5371 M3 +
6.5371 M3

293 - 6.5371 * 1 =
293

293

286.462857142857

286.462857142857
RENCANA ANGGARAN BIAYA

PEKERJAAN : PEKERJAAN TANAH


LOKASI : JL KH MALIK (TANDON AIR BURING) PERUMDA AIR MINUM TUGU TIRTA KOTA

NO URAIAN PEKERJAAN SATUAN VOLUME


1 2 3 4
I GALIAN TANAH M3 293.000

II URUGAN KEMBALI M3 286.463


NA ANGGARAN BIAYA

RING) PERUMDA AIR MINUM TUGU TIRTA KOTA MALANG

HARGA (Rp.)
ANALISA
SATUAN HARGA SATUAN HARGA SELURUH
5 6 7 8
: B.01. A 78,395.37 22,969,842.92
22,969,842.92
: B.10 32,042.50 9,178,986.09
9,178,986.09
REKAPITULASI RENCANA ANGGARAN BIAYA

PEKERJAAN : PEKERJAAN TANAH


LOKASI : JL KH MALIK (TANDON AIR BURING) PERUMDA AIR MINUM TUGU TIRTA KOTA MALANG

NO URAIAN PEKERJAAN JUMLAH


1 2 3
I GALIAN TANAH Rp. 22,969,842.92
II URUGAN KEMBALI Rp. 9,178,986.09
Jumlah Rp. 32,148,829.01
Terbilang : Tiga puluh lima juta tiga ratus enam puluh empat ribu

Keterangan : Biaya tersebut diatas berdasarkan analisa SNI Malang, 07 December 2021
VOLUME PEKERJAAN
PEKERJAAN : PEMASANGAN INTERKONEKSI PIPA BALANCE PIPA PE O 400 MM SEPANJANG 52 METER
LOKASI : JL KH MALIK (TANDON AIR BURING) PERUMDA AIR MINUM TUGU TIRTA KOTA MALANG

NO JENIS PEKERJAAN PERHITUNGAN VOLUME


1 GALIAN TANAH KERAS
GALIAN PIPA
= 0.00000 m3
2 GALIAN TANAH BIASA
GALIAN PIPA
= 0.00000 m3
3 URUGAN TANAH & PEMADATAN
GALIAN PIPA
= 0.00000 m3
GALIAN PIPA

4 BUANGAN TANAH GALIAN TANAH KERAS + GALIAN TANAH BIASA - URUGAN TANAH KEMBALI 0.00000 + 0.00000 - 0.00000 = 0.00000 m3
5 PEMBUATAN THURST BLOCK
BEND
HDPE PN 12.5 16 ((( 0.9 x 1.5188 )+( 0.55 x 0.9 ))/ 2 )x 0.3 x 4 titik = 1.11714 m3
HDPE PN 12.5 16 ((( 0.9 x 1.5188 )+( 0.55 x 0.9 ))/ 2 )x 0.3 x 2 titik = 0.55857 m3

TEE / VALVE / DOP


GP 28 ((( 0.5 x 2 )+( 0.5 x 2 ))/ 2 )x 2 x 2 titik = 4.00000 m3
HDPE PN 12.5 16 ((( 0.9 x 1.0739 )+( 0.55 x 0.9 ))/ 2 )x 0.3 x 1 titik = 0.21923 m3
= 5.89494 m3
6 PENGELASAN
HDPE PN 12.5 24 ( 3.1429 )x 0.63 x 3 x 100 M = 594.00000 M
HDPE PN 12.5 16 ( 3.1429 )x 0.4 x 3 x 100 M = 377.14286 M
= 971.14286 M
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMASANGAN INTERKONEKSI PIPA BALANCE PIPA PE O 400 MM SEPANJANG
LOKASI : JL KH MALIK (TANDON AIR BURING) PERUMDA AIR MINUM TUGU TIRTA KOTA

NO URAIAN PEKERJAAN SATUAN VOLUME


1 2 3 4

I PEKERJAAN PERSIAPAN
PENGUKURAN PIPA U/ MC 0 km 1.0000

II PEKERJAAN PASANGAN
PEMBUATAN THURSTBLOCK M3 5.8949

III PEKERJAAN PENGEMBALIAN JALAN


IV PEKERJAAN PIPA
1. BAHAN
A. PIPA
HDPE PN 12.5 16 M 52.0000

B. AKSESORIS JARINGAN
1. DETAIL 1
PACKING KARET FLANGE EPDM 16" buah 1.0000
PACKING KARET FLANGE EPDM 24'' buah 3.0000
STUB FLANGE 400 MM 16'' buah 1.0000
STUB FLANGE 630 MM 24'' buah 2.0000
PIPA GP 24" m 1.0000
ALL FLANGE TEE 24" X 16" buah 1.0000
MUR BAUT (JUMLAH 16 BH) 1'' X 4 1/2" lokal 16.0000
MUR BAUT (JUMLAH 20 BH) 1 1/4'' X 5 1/2" buah 60.0000
PLENDES/FLANGE & LUBANG 24'' buah 2.0000
2. DETAIL 2 (4X)
BUTTFUSION ELBOW 45 PN12.5 400 MM 16'' buah 4.0000
3. DETAIL 3
BUTTFUSION ELBOW 45 PN12.5 400 MM 16'' buah 2.0000
4. DETAIL 4
GATE VALVE RESILENT 16" buah 1.0000
PACKING KARET FLANGE EPDM 12" buah 3.0000
PACKING KARET FLANGE EPDM 16" buah 4.0000
PIPA GP/MS 12" meter 1.0000
PLENDES/FLANGE & LUBANG 12" buah 2.0000
REDUCER ALL FLANGE 16" X 12" buah 2.0000
STUB FLANGE 400 MM 16'' buah 1.0000
MUR BAUT (JUMLAH 12 BH) 7/8'' X 4" lokal 36.0000
ALL FLANGE TEE 16" X 16" buah 1.0000
MUR BAUT (JUMLAH 16 BH) 1'' X 4 1/2" lokal 64.0000
5. PENYAMBUNGAN BUTTFUSION
PENYAMBUNGAN PIPA HDPE 16" (BUTTFUSION) 16'' buah 4.0000

2. UPAH
A. PEMASANGAN PIPA
HDPE PN 12.5 16 m 52.0000

B. UPAH DETAIL 1
STUB FLANGE 400 MM 16'' titik 1.0000
STUB FLANGE 630 MM 24'' titik 2.0000
ALL FLANGE TEE 24" X 16" titik 1.0000
C. UPAH DETAIL 2 (4X)
BUTTFUSION ELBOW 45 PN12.5 400 MM 16'' titik 4.0000
D. UPAH DETAIL 3
BUTTFUSION ELBOW 45 PN12.5 400 MM 16'' titik 2.0000
E. UPAH DETAIL 4
GATE VALVE RESILENT 16" titik 1.0000
STUB FLANGE 400 MM 16'' titik 1.0000
ALL FLANGE TEE 16" X 16" titik 1.0000
F. UPAH PENYAMBUNGAN BUTTFUSION
PENYAMBUNGAN PIPA HDPE 16" (BUTTFUSION) 16'' titik 4.0000

G. BIAYA PENGELASAN
HDPE PN 12.5 24 M 594.0000
HDPE PN 12.5 16 M 377.1429

V PEKERJAAN TANAH PAKET 1.0000


PEMBERSIHAN LOKASI DAN PEMBUANGAN BEKAS
VI M3 1.0000
GALIAN
NA ANGGARAN BIAYA
PIPA BALANCE PIPA PE O 400 MM SEPANJANG 52 METER
RING) PERUMDA AIR MINUM TUGU TIRTA KOTA MALANG

HARGA (Rp.)
ANALISA
SATUAN HARGA SATUAN HARGA SELURUH
5 6 7 8

LS 100,000.00 100,000.00
100,000.00

: G.07 1,179,979.76 6,955,914.26


6,955,914.26

PAS 2,561,337.50 133,189,550.00


133,189,550.00

PAS 601,172.00 601,172.00


PAS 862,500.00 2,587,500.00
PAS 6,072,000.00 6,072,000.00
PAS 19,893,390.00 39,786,780.00
PAS 4,160,459.77 4,160,459.77
PAS 37,350,232.57 37,350,232.57
PAS 37,700.00 603,200.00
PAS 51,709.78 3,102,586.80
PAS 3,941,541.30 7,883,082.60

PAS 6,273,043.00 25,092,172.00

PAS 6,273,043.00 12,546,086.00

PAS 65,824,000.00 65,824,000.00


PAS 167,267.50 501,802.50
PAS 601,172.00 2,404,688.00
PAS 2,037,494.80 2,037,494.80
PAS 1,042,360.00 2,084,720.00
PAS 7,419,478.00 14,838,956.00
PAS 6,072,000.00 6,072,000.00
PAS 26,390.00 950,040.00
PAS 15,976,950.00 15,976,950.00
PAS 37,700.00 2,412,800.00

PAS 0,000.00 0,000.00


252,888,723.04
: R.121 104,558.94 5,437,064.75
5,437,064.75

: R.54 270,403.60 270,403.60


: R.56 489,358.48 978,716.96
: R.175.SP.2 302,039.81 302,039.81

: R.54 270,403.60 1,081,614.41

: R.54 270,403.60 540,807.21

: R.111 348,643.20 348,643.20


: R.54 270,403.60 270,403.60
: R.175 128,870.26 128,870.26

: R.54 270,403.60 1,081,614.41


5,003,113.47

: K.07 5,119.43 3,040,943.29


: K.07 5,119.43 1,930,757.64
4,971,700.93

PAKET 32,148,829.01 32,148,829.01 32,148,829.01


LS 200,000.00 200,000.00 200,000.00
REKAPITULASI RENCANA ANGGARAN BIAYA

PEKERJAAN : PEMASANGAN INTERKONEKSI PIPA BALANCE PIPA PE O 400 MM SEPANJANG 52 METER


LOKASI : JL KH MALIK (TANDON AIR BURING) PERUMDA AIR MINUM TUGU TIRTA KOTA MALANG

NO URAIAN PEKERJAAN JUMLAH


1 2 3
I PEKERJAAN PERSIAPAN Rp. 100,000.00
II PEKERJAAN PASANGAN Rp. 6,955,914.26
III PEKERJAAN PIPA
1. BAHAN
A. PIPA Rp. 133,189,550.00
B. AKSESORIS JARINGAN Rp. 252,888,723.04
2. UPAH
A. PEMASANGAN PIPA Rp. 5,437,064.75
B. BIAYA PEMASANGAN AKSESORIS Rp. 5,003,113.47
C. BIAYA PENGELASAN Rp. 4,971,700.93
IV PEKERJAAN TANAH Rp. 32,148,829.01
V PEMBERSIHAN LOKASI DAN PEMBUANGAN BEKAS GALIAN Rp. 200,000.00
Jumlah Rp. 440,894,895.46
Ppn 10% Rp. 44,089,489.55
Jumlah Total Rp. 484,984,385.01
Dibulatkan Rp. 484,984,000.00
Terbilang : Empat ratus delapan puluh empat juta sembilan ratus delapan puluh empat ribu

Keterangan : Biaya tersebut diatas berdasarkan analisa SNI Malang, 07 December 2021
Menyetujui,
Manajer Perencanaan Teknik

Hendrik Ribowo, ST
NPP : 06090593

Mengetahui, Mengetahui,
Direktur Administrasi dan Keuangan Direktur Teknik

Moch. Syaifudin Zuhri, SE,MM Ir. Ari Mukti, MT

Disetujui,
Untuk dilaksanakan,

Direktur Utama
M. Nor Muhlas, S.Pd, M.Si

Anda mungkin juga menyukai