A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH
HARGA
(Rp.)
4,208.91
2,053.57
571.43
6,833.91
15,600.00
15,600.00
15,000.00
15,000.00
37,433.91
3,743.39
41,177.31
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH
HARGA
(Rp.)
4,208.91
2,053.57
571.43
6,833.91
26,804.79
26,804.79
10,000.00
10,000.00
43,638.70
4,363.87
48,002.57
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH
HARGA
(Rp.)
3,321.43
2,053.57
571.43
5,946.43
75,400.00
5,000.00
0.00
0.00
0.00
80,400.00
60,356.90
10,000.00
0.00
0.00
0.00
0.00
0.00
70,356.90
156,703.33
15,670.33
172,373.66
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
B. BAHAN
C. PERALATAN
xpansion Joint /Sambungan Siar Muai Tipe Asphaltic Plug (lebar 50 Cm, tebal 10 Cm)
JUMLAH
HARGA
(Rp.)
98,314.29
61,771.43
42,285.71
202,371.43
437,000,730.21
40,036.50
113,933.93
45,000.00
190,000.00
437,389,700.64
64,353.60
232,676.05
40,582.35
32,676.88
32,676.88
7,959.84
43,464.12
10,000.00
464,389.70
438,056,461.77
43,805,646.18
481,862,107.95
ANALISA HARGA SATUAN
(AHS)
I PEKERJA
Sub Total I
II MATERIAL
I PEKERJA
Sub Total I
II MATERIAL
I PEKERJA
Sub Total I
II MATERIAL
Sub Total II
III PERALATAN
Jumlah
(Rp)
3,222.29
2,883.06
5,817.23
11,922.59
95,000
95,000
15,000
15,000
121,923
18,288
140,211
ANALISA HARGA SATUAN
(AHS)
Jumlah
(Rp)
8,055.73
7,207.66
11,634.47
26,897.86
313,500
313,500
40,000
40,000
380,398
57,060
437,458
ANALISA HARGA SATUAN
(AHS)
Jumlah
(Rp)
8,055.73
7,207.66
11,770.59
27,033.98
468,160
468,160
50,000
50,000
545,194
81,779
626,973
ANALISA HARGA SATUAN
(AHS)
I PEKERJA
Sub Total I
II MATERIAL
Jumlah
(Rp)
24,167.19
21,622.97
174,517.02
220,307.19
30,720,000
4,053,333
34,773,333
100,000
100,000
35,093,641
5,264,046
40,357,687
ANALISA HARGA SATUAN
(AHS)
I PEKERJA
Sub Total I
II MATERIAL
Jumlah
(Rp)
24,167.19
21,622.97
174,517.02
220,307.19
30,720,000
4,053,333
0
34,773,333
100,000
100,000
35,093,641
5,264,046
40,357,687
ANALISA HARGA SATUAN
(AHS)
I PEKERJA
Sub Total I
II MATERIAL
Sub Total II
III PERALATAN
Jumlah
(Rp)
58,538.31
16,817.87
5,856.02
81,212.19
1,988,861.24
133,428.00
2,122,289
407,643
10,671
3,189,483
7,200,000
1,014,729
123,806
10,000
11,956,332
14,159,833
2,123,975
16,283,808
ITEM PEMBAYARAN NO. : 6.3(6b)
JENIS PEKERJAAN : Laston Lapis Antara Modifikasi (AC-BC Mod) dengan ASBUTON B 5/20
SATUAN PEMBAYARAN : Ton
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (AC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Bahan modifikasi yang digunakan:
11 Komposisi campuran AC-BC :
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Asbuton B 5/20 PC
- Aspal Minyak Pen 60/70 As
1. BAHAN
1.a. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Asbuton B 5/20 = (PC x Fh1 x 1000
1.d. Aspal Minyak = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q2
Produksi AC-BC / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
PROP / KAB / KODYA : ……………………………………
10.00 KM ITEM PEMBAYARAN NO. : 6.3(6b)
0.05 M JENIS PEKERJAAN : Laston Lapis Antara Modifikasi
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.81 ton/m3
1.51 ton/m3 NO. KOMPONEN
B. BAHAN
1. Aspal Jadi
JUMLAH HARGA BA
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E08
5. Asphalt Finisher E02
0.3510 M3 6. Tandem Roller E17
0.3092 M3 7 P. Tyre Roller E18
31.5000 Kg 8 Alat Bantu
62.1090 Kg
JUMLAH HARGA PERAL
104.48 ton
Analisa EI-636b
SBUTON B 5/20
URAIAN ANALISA HARGA SATUAN
Lanjutan
0.0096 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
3.50 ton
0.80 -
20.00 Km / Jam
30.00 Km / Jam
1.00 ton
1.00 menit
3.50 menit
30.00 menit
15.00 menit
20.00 menit
68.50 menit
2.45 ton
0.4077 Jam
5.00 m/menit
0.83 - Normal
3.15 meter
90.98 ton
0.0110 Jam
1.50 Km / Jam
1.48 M
6.00 lintasan 2 awal & 4 Akhir
3.00
0.30 m
0.83 - Normal
92.43 ton
0.0108 Jam
2.50 KM / Jam
1.99 M
6.00 lintasan
3.00
0.30 M
0.83 -
215.43 ton
0.0046 Jam
Analisa EI-636b
SBUTON B 5/20
URAIAN ANALISA HARGA SATUAN
Lanjutan
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-636a
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Lapis Antara Modifikasi (AC-B TOTAL HARGA (Rp.) : 911,989.31
% THD. BIAYA PROYEK : 0.06
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (AC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Bahan modifikasi yang digunakan:
11 Komposisi campuran AC-BC :
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Asbuton B 5/20 PC
- Aspal Minyak Pen 60/70 As
1. BAHAN
1.a. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Asbuton B 5/20 = (PC x Fh1 x 1000
1.d. Aspal Minyak = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q2
Produksi AC-BC / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
PROYEK :
No. PAKET KONTRAK : ……………………………………
NAMA PAKET : ……………………………………
……………………………………
PROP / KAB / KODYA : ……………………………………
10.00 KM ITEM PEMBAYARAN NO. : 6.3(6b)
0.05 M JENIS PEKERJAAN : Laston Lapis Antara Modifikasi
7.00 Jam SATUAN PEMBAYARAN : Ton
1.05 -
1.03 -
1.81 ton/m3
1.51 ton/m3 NO. KOMPONEN
B. BAHAN
JUMLAH HARGA BA
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E08
5. Asphalt Finisher E02
0.3510 M3 6. Tandem Roller E17
0.3092 M3 7 P. Tyre Roller E18
31.5000 Kg 8 Alat Bantu
58.7100 Kg
JUMLAH HARGA PERAL
104.48 ton
Analisa EI-636b
SBUTON B 5/20
URAIAN ANALISA HARGA SATUAN
Lanjutan
0.0096 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
3.50 ton
0.80 -
20.00 Km / Jam
30.00 Km / Jam
1.00 ton
1.00 menit
3.50 menit
30.00 menit
15.00 menit
20.00 menit
68.50 menit
2.45 ton
0.4077 Jam
5.00 m/menit
0.83 - Normal
3.15 meter
90.98 ton
0.0110 Jam
1.50 Km / Jam
1.48 M
6.00 lintasan 2 awal & 4 Akhir
3.00
0.30 m
0.83 - Normal
92.43 ton
0.0108 Jam
2.50 KM / Jam
1.99 M
6.00 lintasan
3.00
0.30 M
0.83 -
215.43 ton
0.0046 Jam
Analisa EI-636b
SBUTON B 5/20
URAIAN ANALISA HARGA SATUAN
Lanjutan
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-636a
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Lapis Antara Modifikasi (AC-B TOTAL HARGA (Rp.) : 911,989.31
% THD. BIAYA PROYEK : 0.06
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (AC-WC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Bahan modifikasi yang digunakan:
11 Komposisi campuran AC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Asbuton Butir B 5/20 FF
- Aspal minyak pen 60/70 As
1 Agregat dalam cold bin sesuai takaran dibawa ke dryer, dan ditimbang di
Hot Bin AMP
2 Asbuton B 5/20 dimasukkan ke dalam Pugmill melalui filler bin
3 Aspal minyak pen 60/70 dipanaskan dalam ketel.
Setelah suhu memenuhi syarat dipompa ke pugmill.
4 Campuran panas AC dihampar dengan Finisher dan
dipadatkan dengan Tandem & Pneumatic Tire Roller.
5 Selama pemadatan, sekelompok pekerja akan
merapikan tepi hamparaan dengan menggunakan Alat
Bantu.
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Asbuton B 5/20 = (FF x Fh1) x 1000
1.d. Aspal Minyak = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q2
Produksi AC-WC / hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
1. Pekerja (L01)
2. Mandor (L03)
2.32 ton / M3
1.42 ton / M3
1.57 ton / M3
0.05 km
B. BAHAN
1. Aspal Jadi
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E08
5. Asp. Finisher E02
6. Tandem Roller E17
0.3045 M3 7 P. Tyre Roller E18
0.3519 M3 8 Alat Bantu
21.0000 Kg
59.7400 Kg
Analisa EI-635b
UTON B 5/20
URAIAN ANALISA HARGA SATUAN
Lanjutan
104.48 ton
0.0096 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
3.50 Ton
0.80 -
20.00 KM / Jam
30.00 KM / Jam
1.00 ton
1.00 menit
3.50 menit
30.00 menit
15.00 menit
20.00 menit
68.50 menit
2.45 ton
0.4077 Jam
5.00 m/menit
0.83 -
3.15 meter
72.79 ton
0.0137 Jam
1.50 Km / Jam
1.48 M
6.00 lintasan 2 Awal & 4 Akhir
3.00
0.30 m
0.83 -
73.94 ton
0.0135 Jam
2.50 KM / jam
1.99 M
6.00 lintasan
3.00
0.30 M
0.83 -
172.34 ton
Analisa EI-635b
UTON B 5/20
URAIAN ANALISA HARGA SATUAN
Lanjutan
0.0058 Jam
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-635b
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Lapis Aus Modifikasi (AC-WC Mod) TOTAL HARGA (Rp.) : 872,371.99
% THD. BIAYA PROYEK : 0.05
"Aspal modifikasi Asbuton yg diproses" terbuat dari 80% aspal keras + 20% asbuton
Asbuton terdiri dari 30% bitumen + 70% mineral asbuton
Komposisi Aspal modifikasi Asbuton yg diproses : 80 + (20 x 30%) = 86% bitumen + (20 x 70%) = 14 % minera
Contoh kadar aspal JMF untuk Pen.60/70 = 6.1%, untuk Aspal Modifikasi naik sekitar 0,1% (karena lebih kental),
"Aspal modifikasi Asbuton yang diproses" yang diperlukan : 6.2/0.86 = 6.860465 % (bitumen + mineral d
(patokannya 6,2% bukan 6,1% karena keduanya adalah Aspa
Filler added masih diperlukan karena konstribusi mineral asbuton sebagai filler masih rendah (lolos #100 >= 95
Asp Pen.60/70 Asp Mod Asp Mod
Asb yg diproses 0.00 Polimer Asb yg diproses
Agr+Filler 41.18 41.14 40.72
93.14 52.62 52.56 52.03
2.00 2.00 1.98
5.80 5.90 6.86
101.60 101.60 101.59
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (AC-WC) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Bahan modifikasi yang digunakan:
11 Komposisi campuran AC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Asbuton Butir B 5/20 FF
- Aspal minyak pen 60/70 As
1 Agregat dalam cold bin sesuai takaran dibawa ke dryer, dan ditimbang di
Hot Bin AMP
2 Asbuton B 5/20 dimasukkan ke dalam Pugmill melalui filler bin
3 Aspal minyak pen 60/70 dipanaskan dalam ketel.
Setelah suhu memenuhi syarat dipompa ke pugmill.
4 Campuran panas AC dihampar dengan Finisher dan
dipadatkan dengan Tandem & Pneumatic Tire Roller.
5 Selama pemadatan, sekelompok pekerja akan
merapikan tepi hamparaan dengan menggunakan Alat
Bantu.
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92)
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91)
1.c. Asbuton B 5/20 = (FF x Fh1) x 1000
1.d. Aspal Minyak = (As x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
Kap.Prod. / jam = V x Fa x 60 Q4
Ts2
3. TENAGA
Produksi menentukan : AMP Q2
Produksi AC-WC / hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
1. Pekerja (L01)
2. Mandor (L03)
2.32 ton / M3
1.42 ton / M3
1.57 ton / M3
0.05 km
B. BAHAN
C. PERALATAN
1. Wheel Loader E15
2. AMP E01
3. Genset E12
4. Dump Truck E08
5. Asp. Finisher E02
6. Tandem Roller E17
0.3045 M3 7 P. Tyre Roller E18
0.3519 M3 8 Alat Bantu
31.5000 Kg
61.8000 Kg
Analisa EI-635b
UTON B 5/20
URAIAN ANALISA HARGA SATUAN
Lanjutan
104.48 ton
0.0096 Jam
49.80 ton
0.0201 Jam
49.80 ton
0.0201 Jam
3.50 Ton
0.80 -
20.00 KM / Jam
30.00 KM / Jam
1.00 ton
1.00 menit
3.50 menit
30.00 menit
15.00 menit
20.00 menit
68.50 menit
2.45 ton
0.4077 Jam
5.00 m/menit
0.83 -
3.15 meter
72.79 ton
0.0137 Jam
1.50 Km / Jam
1.48 M
6.00 lintasan 2 Awal & 4 Akhir
3.00
0.30 m
0.83 -
73.94 ton
0.0135 Jam
2.50 KM / jam
1.99 M
6.00 lintasan
3.00
0.30 M
0.83 -
172.34 ton
Analisa EI-635b
UTON B 5/20
URAIAN ANALISA HARGA SATUAN
Lanjutan
0.0058 Jam
Lump Sum
49.80 ton
348.60 ton
10.00 orang
1.00 orang
0.2008 Jam
0.0201 Jam
Analisa EI-635b
: ………………………………………………
: …………………………………………………………………..
………………………………………………………………….
: ………………………………………………
PERKIRAAN VOL. PEK. : 1.00
: Laston Lapis Aus Modifikasi (AC-WC Mod) TOTAL HARGA (Rp.) : 872,371.99
% THD. BIAYA PROYEK : 0.05
"Aspal modifikasi Asbuton yg diproses" terbuat dari 80% aspal keras + 20% asbuton
Asbuton terdiri dari 30% bitumen + 70% mineral asbuton
Komposisi Aspal modifikasi Asbuton yg diproses : 80 + (20 x 30%) = 86% bitumen + (20 x 70%) = 14 % minera
Contoh kadar aspal JMF untuk Pen.60/70 = 6.1%, untuk Aspal Modifikasi naik sekitar 0,1% (karena lebih kental),
"Aspal modifikasi Asbuton yang diproses" yang diperlukan : 6.2/0.86 = 7.093023 % (bitumen + mineral d
(patokannya 6,2% bukan 6,1% karena keduanya adalah Aspa
Filler added masih diperlukan karena konstribusi mineral asbuton sebagai filler masih rendah (lolos #100 >= 95
Asp Pen.60/70 Asp Mod Asp Mod
Asb yg diproses 0.00 Polimer Asb yg diproses
Agr+Filler 41.18 41.14 40.70
92.91 52.62 52.56 52.01
3.00 3.00 2.97
6.00 6.10 7.09
102.80 102.80 102.77
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 0.7
5 Tebal Lapis (AC-Base) padat t
6 Jam kerja efektif per-hari Tk 7.00
7 Faktor kehilanganmaterial : - Agregat Fh1 1.10
- Aspal Fh2 1.02
8 Komposisi campuran AC-WC :
- Coarse Agregat 68.0 % CA 68.31
- Fine Agregat 32.0 % FA 26.19
- Fraksi Filler semen 0.0 % FF 0.00
- Asphalt Nominal 5.5 % As 3.50
- Bit. Asb Kode Asb = 1 AsASB 2.00
1 = T 5/20 5
2 = T 15/20 7
3 = T 15/25 8.5
4 = Asmin Pen 60
5 = Asbuton Murni
6 = Asbuton Pra Campur 6 = Asbuton Pra Campur
1. BAHAN
1.a. Agregat Kasar = (CA x (D1 x 1M3) x Fh1) : D2 (M03) 0.42
1.b. Agregat Halus = (FA x (D1 x 1M3) x Fh1) : D2 (M04) 0.16
1.c. Filler = (FF x (D1 x 1M3) x Fh1) x 1000 (M05) 0.00
1.d. As Pen 60 = (AS x (D1 x 1M3) x Fh2) x 1000 (M62) 35.70
1.e. Asbuton Murni = (ASASB x (D1 x tM3) x Fh2) x 1000 (M63) 0.00
1.f. Asb. Pra PraCampur = (ASASB x (D1 x tM3) x Fh2) x 1000 (M64) 0.00
1.g. Asb. Butir = (ASASB x (D1 x tM3) x Fh2) x 1000 (M65) 102.00
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.90
Faktor efisiensi alat Fa 0.83
Waktu Siklus Ts1
- Muat T1 1.50
- Lain lain T2 0.50
Ts1 2.00
ITEM PEMBAYARAN NO. : 6.5.(3)
JENIS PEKERJAAN Laston Lapis Pondasi Asbuton (AC-Base Asb)
SATUAN PEMBAYARAN ton URAIAN ANA
3. TENAGA
Produksi menentukan : Asphalt Mixing Plant (AMP) Q2 40.00
Produksi AC-BC / hari = Tk x Q2 Qt 280.00
Kebutuhan tenaga :
- Pekerja P 7.00
- Mandor M 1.00
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1750
- Mandor = (Tk x M) / Qt (L03) 0.0250
SATUAN KETERANGAN
KM
M
Jam
-
-
% Gradasi harus -
% memenuhi -
% Spesifikasi
%
%
ton / M3
ton / M3
ton / M3
M3
M3
Kg
Kg
Kg
Kg
Kg
M3
-
-
menit
menit
menit
SATUAN KETERANGAN
M3
Jam
ton / Jam
-
ton
Jam
M2
Jam
ton
-
Km / Jam
Km / Jam
ton
menit
menit
menit
menit
menit
menit
M3
Jam
ton / Jam
-
M3
Jam
Km / Jam
M
lintasan 4 Awal & 4 Akhir
-
SATUAN KETERANGAN
M3
Jam
KM / Jam
M
lintasan 4 Awal & 4 Akhir
-
M3
Jam
Lump Sum
M3/Jam
M3
orang
orang
Jam
Jam
ITEM PEMBAYARAN
6.5.(2)
NO.
JENIS PEKERJAAN
Laston Lapis Antara Asbuton (AC-BC Asb)
SATUAN PEMBAYARAN
ton URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 0.5 KM
5 Tebal Lapis (AC-BC) padat t M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmateria- Agregat Fh1 1.10 -
- Aspal Fh2 1.02 -
8 Komposisi campuran AC-WC :
- Coarse Agregat 66.0 % CA 66.12 %
- Fine Agregat 34.0 % FA 28.08 %
- Fraksi Filler semen 0.0 % FF 0.00 %
- Asphalt Nominal 5.8 % As 3.80 %
- Bit. Asb Kode Asb = 1 AsASB 2.00 %
1 = T 5/20 5
2 = T 15/20 7
3 = T 15/25 8.5
4 = Asmin Pen 60
5 = Asbuton Murni
6 = Asbuton Pra Campu 6 = Asbuton Pra Campur
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.90 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Muat T1 1.50 menit
- Lain lain T2 0.50 menit
Ts1 2.00 menit
Kap.Prod. V x Fa x 60 Q4 3.13 M3
D1 x Ts2
Kap.Prod. V x Fa Q5 30.00 M3
D1
Koefisien = 1 : Q5 (E02) 0.0333 Jam
3. TENAGA
Produksi menentukan : Asphalt Mixing Plant (AMP) Q2 41.50 M3/Jam
Produksi AC-BC / hari = Tk x Q2 Qt 290.50 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1687 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0241 Jam
KETERANGAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
Gradasi harus -
memenuhi -
Spesifikasi
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) Jam 0.0165
2. AMP (E01) Jam 0.0241
3. Genset (E12) Jam 0.0241
4. Dump Truck (E08) Jam 0.3200
5. Asphalt Finisher (E02) Jam 0.0333
6. Tandem Roller (E17) Jam 0.0023
7 P. Tyre Roller (E18) Jam 0.0021
8 Alat Bantu E34 Ls 1.0000
KETERANGAN
4 Awal & 4 Akhir
KETERANGAN
Lump Sum
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK 0
No. PAKET KONTRAK 0
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. 0
JENIS PEKERJAAN 0
SATUAN PEMBAYARAN 0
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) Jam 0.0165
2. AMP (E01) Jam
3. Genset (E12) Jam 0.0241
4. Dump Truck (E08) Jam 0.3373
5. Asphalt Finisher (E02) Jam 0.0333
6. Tandem Roller (E17) Jam 0.0023
7 P. Tyre Roller (E18) Jam 0.0021
8 Alat Bantu E34 Ls 1.0000
NDAR UNTUK
G-MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
508,400.00 205,441.56
250,000.00 33,568.50 1007680.53
3,700.00 0.00
10,000.00 387,600.00
10,000.00 0.00 968769.03
0.00
9,000.00
622,534.28 10,288.63
10,387,060.90
797,370.74 19,213.75
456,453.32 146,062.44
838,509.82 27,950.33
501,612.83 1,151.15
500,803.89 1,072.67
100.00 100.00
NDAR UNTUK
G-MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
304.29 51.33
25,291.01 609.42
816269.7984
578,463.76 9,560.28
11,412,408.31
714,738.50 17,222.61
410,546.52 9,560.28
799,588.67 26,652.96
463,969.25 9,560.28
454,667.55 9,560.28
100.00 100.00
AN ( A + B + C ) 899,147.22
134,872.08
1,034,019.30
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 0.5
5 Tebal Lapis (AC-WC) padat t
6 Jam kerja efektif per-hari Tk 7.00
7 Faktor kehilangan material : - Agregat Fh1 1.10
- Aspal Fh2 1.02
8 Komposisi campuran AC-WC :
- Coarse Agregat 64.0 % CA 60.04
- Fine Agregat 36.0 % FA 33.96
- Fraksi Filler semen 0.0 % FF 0.00
- Asphalt Nominal 6.0 % As 4.00
- Bit. Asb Kode Asb = 1 AsASB 2.00
1 = T 5/20
2 = T 15/20
3 = T 15/25
4 = Asmin Pen 60
5 = Asbuton Murni
6 = Asbuton Pra Campur 6 = Asbuton Pra Campur
1. BAHAN
1.a. Agregat Kasar = (CA x (D1 x tM3) x Fh1) : D2 (M03) 0.37
1.b. Agregat Halus = (FA x (D1 x tM3) x Fh1) : D2 (M04) 0.21
1.c. Filler = (FF x (D1 x tM3) x Fh1) x 1000 (M05) 0.00
1.d. As Pen 60 = (AS x (D1 x tM3) x Fh2) x 1000 (M62) 40.80
1.e. Asbuton Murni = (ASASB x (D1 x tM3) x Fh2) x 1000 (M63) 0.00
1.f. Asb. Pra PraCampur = (ASASB x (D1 x tM3) x Fh2) x 1000 (M64) 0.00
1.g. Asb. Butir = (ASASB x (D1 x tM3) x Fh2) x 1000 (M65) 102.00
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.90
Faktor efisiensi alat Fa 0.80
Waktu Siklus Ts1
- Muat T1 1.50
- Lain lain T2 0.50
Ts1 2.00
ITEM PEMBAYARAN NO. : 6.5.(1)
JENIS PEKERJAAN Laston Lapis Aus Asbuton (AC-WC Asb)
SATUAN PEMBAYARAN ton UR
3. TENAGA
Produksi menentukan : Asphalt Mixing Plant (AMP) Q2 40.00
Produksi AC-WC / hari = Tk x Q2 Qt 280.00
Kebutuhan tenaga :
- Pekerja P 10.00
- Mandor M 1.00
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.2500
- Mandor = (Tk x M) / Qt (L03) 0.0250
SATUAN KETERANGAN
KM
M
Jam
-
-
% Gradasi harus -
% memenuhi -
% Spesifikasi
%
%
ton / M3
ton / M3
ton / M3
m3
m3
Kg
Kg
Kg
Kg
Kg
M3
-
-
menit
menit
menit
SATUAN KETERANGAN
M3
Jam
ton / Jam
-
M2
Jam
M2
Jam
Ton
-
KM / Jam
KM / Jam
ton
menit
menit
menit
menit
menit
menit
M2
Jam
ton / jam
-
M2
Jam
Km / Jam
M
lintasan 4 Awal & 4 Akhir
-
Berlanjut ke hal. berikut.
Analisa EI-635
SATUAN KETERANGAN
M2
Jam
KM / jam
M
lintasan
-
M2
Jam
M2
Jam
Lump Sum
M2 / Jam
M2
orang
orang
Jam
Jam
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : Perencanaan Jembatan Wai Kapala (L = 12 M, ) Box Culvert 2 x 6
PROP / KAB / KODYA 0
ITEM PEMBAYARAN NO. 6.5.(1) PERKIRAAN VOL. PEK.
JENIS PEKERJAAN Laston Lapis Aus Asbuton (AC-WC Asb) TOTAL HARGA (Rp.)
SATUAN PEMBAYARAN ton % THD. BIAYA PROYEK
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) Jam 0.0171 622,534.28
2. AMP (E01) Jam 0.0250 10,387,060.90
3. Genset (E12) Jam 0.0250 797,370.74
4. Dump Truck (E08) Jam 0.7872 456,453.32
5. Asp. Finisher (E02) Jam 0.0417 838,509.82
6. Tandem Roller (E17) Jam 0.0033 501,612.83
7 P. Tyre Roller (E18) Jam 0.0022 500,803.89
8 Asphalt Liquid Mixer E34 Jam 0.0250 170,825.80
9 Alat Bantu Ls 1.0000 100.00
UAN
: 0.00
: 0.00
: 0.00
JUMLAH
HARGA
(Rp.)
76.07
632.28
708.35
186,530.57
51,886.79
0.00
646,417.37
10,674.46
19,934.27
359,321.14
34,937.91
1,672.04
1,112.90
4,270.65
100.00
432,023.36
1,079,149.08
161,872.36
1,241,021.44
DATA PENDUKUNG PERHITUNGAN KOEFISIEN UPAH, BAHAN, PERALATAN
% Berat Yang Lolos
100
90
80
70
Batas Bawah LPA (CBR 60%)
60
Batas Atas LPA (CBR 60%)
50 Contoh Gradasi LPA (CBR 60%)
40
30
20
10
0
0.01 0.1 1 10 100
100
90
80
70
Batas Bawah LPermA (CBR
60 60%)
Batas Atas LPermA (CBR 60%)
50 Contoh Gradasi LPermA (CBR
60%)
40
30
20
10
0
0.01 0.1 1 10 100
60%)
100
%
%
%
%
faktor diambil
% 1.2
%
%
PERALATAN
100
%
%
%
%
faktor diambil
% 1.2
%
%
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
BALAI PELAKSANAAN JALAN NASIONAL XIV
SATUAN KERJA PERENCANAAN DAN PENGAWASAN JALAN NASIONAL
PROVINSI MALUKU
ENGINEER'S ESTIMATE
0.00
Proyek / Bagpro :
No. Paket Kontrak :
Nama Paket : Perencanaan Teknis Jembatan Seram 1.3
Ruas Jalan : Perencanaan Jembatan Wai Kapala (L = 12 M, ) Box Culvert 2 x 6
Prop / Kab / Kodya : Maluku/ Kabupaten Seram Utara Barat
1 Umum
2 Drainase
3 Pekerjaan Tanah dan Geosintetik
4 Pekerjaan Preventif
5 Perkerasan Berbutir dan Perkerasan Beton Semen
6 Perkerasan Aspal
7 Struktur
8 Preservasi Jembatan
9 Pekerjaan Harian dan Pekerjaan Lain-lain
10 Pekerjaan Pemeliharaan
Terbilang : Enam Milyar Lima Ratus Lima Puluh Empat Juta Tujuh Ratus Tiga Puluh Ribu Ru
Julia Olivia Joris, ST., M.Reg, Dev Ir. M. Husni Maricar, M.T.
NIP. 19800707 200502 2 001 Team Leader Perencanaan
REKAPITULASI
ERKIRAAN HARGA PEKERJAAN
Jumlah Harga
Pekerjaan
(Rupiah)
734,778,832.80
124,122,500.84
775,451,518.49
0.00
929,886,663.22
608,699,970.14
2,675,789,399.64
0.00
110,124,606.51
0.00
5,958,853,491.64
595,885,349.16
6,554,738,840.81
6,554,730,000.00
atus Lima Puluh Empat Juta Tujuh Ratus Tiga Puluh Ribu Rupiah
Proyek / Bagpro:
No. Paket Kontr :
Nama Paket : Perencanaan Teknis Jembatan Seram 1.3
Ruas Jalan : Perencanaan Jembatan Wai Kapala (L = 12 M, ) Box Culvert 2 x 6
Prop / Kab / Ko : Maluku/ Kabupaten Seram Utara Barat
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 261,470,500.00 261,470,500.00
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 50,800,000.00 50,800,000.00
1.8.(2) Jembatan Sementara LS 1.00 50,319,642.86 50,319,642.86
1.17 (1a) Pengujian pH Buah 6.00 314.333 1,886.00
1.17 (1b) Pengujian Oksigen Terlarut (DO) Buah 6.00 315.333 1,892.00
1.17 (1c) Pengujian Zat Padat Terlarut (TDS) Buah 6.00 317.333 1,904.00
1.17 (1d) Pengujian Zat Padat Tersuspensi (TSS) Buah 6.00 317.333 1,904.00
1.17 (1e) Pengujian Biological Oxygen Demand (BOD) Buah 6.00 322.333 1,934.00
1.17 (1f) Pengujian Chemical Oxygen Demand (COD) Buah 6.00 328.333 1,970.00
1.17 (1g) Pengujian Coliform Buah 6.00 329.333 1,976.00
1.17 (1h) Pengujian E. Coli Buah 6.00 329.333 1,976.00
1.17 (1i) Pengujian Destruksi Cu, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn Buah 18.00 389.333 7,007.99
1.17 (1j) Pengujian Temperatur (Suhu) Buah 6.00 310.333 1,862.00
1.17 (1k) Pengujian Parameter Kualitas Air Lainnya Buah 30.00 319.533 9,585.99
1.17 (2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Kesehatan Buah 9.00 433.333 3,900.00
1.17 (2b) Pengujian Tingkat Getaran Kendaraan Bermotor Buah
1.17 (2c) Pengujian Parameter Kebisingan dan/atau Getaran Lainnya: Buah 9.00 319.333 2,874.00
1.17 (3a) Pengujian NOx Buah 9.00 345.333 3,108.00
1.17 (3b) Pengujian Sulfurdioksida (SO2) Buah 9.00 345.333 3,108.00
1.17 (3c) Pengujian Karbondioksida (CO2) Buah
1.17 (3d) Pengujian Hidro Carbon (HC)-CH4 Buah
1.17 (3f) Pengujian Total Partikulat (TSP) - Debu Buah 9.00 335.333 3,018.00
1.17 (3g) Pengujian Timah Hitam (Pb) Buah
1.17 (3h) Pengujian Parameter Udara Emisi dan Ambien lainnya: Buah 27.00 325.333 8,783.99
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 268,130,000.00 268,130,000.00
1.20.(1) Pengeboran, termasuk SPT dan Laporan M1
1.20.(2) Sondir termasuk Laporan M1
1.21 Manajemen Mutu LS 1.00 104,000,000.00 104,000,000.00
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 734,778,832.80
No. Mata Harga Jumlah
Pembayaran Uraian Satuan Volume Satuan Harga-Harga
(Rupiah) (Rupiah)
SPESIFIKASI 2017
DIVISI 2. DRAINASE
2.1.(1) Galian Untuk Saluran Air M3 189.79 39,156.40 7,431,337.00
2.2.(1) Pasangan Batu dengan Mortar M3 137.88 846,305.66 116,691,163.84
2.3.(1) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 m M1
2.3.(2) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm M1
2.3.(3) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cm M1
2.3.(4) Gorong-gorong Pipa Beton Bertulang, diameter dalam 40 cm M1
2.3.(5) Gorong-gorong Pipa Beton Bertulang, diameter dalam 60 cm M1
2.3.(6) Gorong-gorong Pipa Beton Bertulang, diameter dalam 80 cm M1
2.3.(7) Gorong-gorong Pipa Beton Bertulang, diameter dalam 100 cm M1
2.3.(8) Gorong-gorong Pipa Beton Bertulang, diameter dalam 120 cm M1
2.3.(9) Gorong-gorong Pipa Beton Bertulang, diameter dalam 150 cm M1
2.3.(10) Gorong-gorong Pipa Baja Bergelombang Ton
2.3.(11) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 40 cm x 40 cm M1
2.3.(12) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 50 cm x 50 cm M1
2.3.(13) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 60 cm x 60 cm M1
2.3.(14) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 80 cm x 80 cm M1
2.3.(15) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 100 cm x 100 cm M1
2.3.(16) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 120 cm x 120 cm M1
2.3.(17) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 140 cm x 140 cm M1
2.3.(18) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 150 cm x 150 cm M1
2.3.(19) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 160 cm x 160 cm M1
2.3.(20) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 180 cm x 180 cm M1
2.3.(21) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 200 cm x 200 cm M1
2.3.(22) Saluran Berbentuk U Tipe DS 1 M1
2.3.(23) Saluran Berbentuk U Tipe DS 1a (dengan tutup) M1
2.3.(24) Saluran Berbentuk U Tipe DS 2 M1
2.3.(25) Saluran Berbentuk U Tipe DS 2a (dengan tutup) M1
2.3.(26) Saluran Berbentuk U Tipe DS 3 M1
2.3.(27) Saluran Berbentuk U Tipe DS 3a (dengan tutup) M1
2.3.(28) Saluran Berbentuk U Tipe DS 4 M1
2.3.(29) Saluran Berbentuk U Tipe DS 4a (dengan tutup) M1
2.3.(30) Saluran Berbentuk U Tipe DS 5 M1
2.3.(31) Saluran Berbentuk U Tipe DS 5a (dengan tutup) M1
2.3.(32) Saluran Berbentuk U Tipe DS 6 M1
2.3.(33) Saluran Berbentuk U Tipe DS 6a (dengan tutup) M1
2.3.(34) Pasangan Batu tanpa Adukan (Aanstamping) M3
2.4.(1) Bahan Porous untuk Bahan Penyaring (Filter) M3
2.4.(2) Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan, diameter 4 inch M1
2.4.(3) Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan, diameter 5 inch M1
2.4.(4) Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan, diameter 6 inch M1
2.4.(5) Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan, diameter 8 inch M1
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 124,122,500.84
No. Mata Harga Jumlah
Pembayaran Uraian Satuan Volume Satuan Harga-Harga
(Rupiah) (Rupiah)
SPESIFIKASI 2017
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 775,451,518.49
No. Mata Harga Jumlah
Pembayaran Uraian Satuan Volume Satuan Harga-Harga
(Rupiah) (Rupiah)
SPESIFIKASI 2017
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -
No. Mata Harga Jumlah
Pembayaran Uraian Satuan Volume Satuan Harga-Harga
(Rupiah) (Rupiah)
SPESIFIKASI 2017
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 929,886,663.22
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 608,699,970.14
No. Mata Harga Jumlah
Pembayaran Uraian Satuan Volume Satuan Harga-Harga
(Rupiah) (Rupiah)
SPESIFIKASI 2017
DIVISI 7. STRUKTUR
7.1.(1) Beton Struktur fc’50 MPa M3 -
7.1.(2) Beton Struktur fc’45 MPa M3 -
7.1.(3) Beton Struktur fc’40 MPa M3 -
7.1.(4) Beton Struktur fc’35 MPa M3 -
7.1.(5a) Beton Struktur fc’30 MPa (sedikit perancah) M3 187.51 1,956,035.78 366,776,268.19
a. Pelat Injak M3
b. Trotoar Jembatan M3
c. Pelat Lantai Jembatan M3
Beton Struktur fc’30 MPa (banyak perancah) M3
a. Abutmen M3
b. Wingwall M3
c. Pilar M3
Beton Struktur fc’30 MPa (isian tiang pancang) M3
7.1.(5b) Beton Struktur Bervolume Besar, fc'30 MPa M3
7.1.(5c) Beton Struktur Memadat Sendiri, fc'30 MPa M3
7.1.(6a) Beton Struktur fc’25 MPa M3
7.1.(6b) Beton Struktur Bervolume Besar, fc'25 MPa M3
7.1.(6c) Beton Struktur Memadat Sendiri, fc'25 MPa M3
7.1.(7a) Beton Struktur fc’20 MPa M3
7.1.(7b) Beton Struktur Bervolume Besar, fc'20 MPa M3
7.1.(7c) Beton Struktur Memadat Sendiri, fc'20 MPa M3
7.1.(7d) Beton Struktur fc’20 MPa yang dilaksanakan di air M3 -
7.1.(8) Beton fc’15 MPa (untuk rabat beton di bahu jalan) M3 1,754,423.84 -
7.1.(9) Beton Siklop, fc’15 Mpa M3 17.32 1,408,073.61 24,387,834.91
7.1.(10) Beton fc’10 MPa (untuk lantai kerja) M3 19.80 1,558,127.91 30,850,932.57
7.2.(1a) Penyediaan Unit Pracetak Gelagar Tipe I Bentang 16 meter Buah -
7.2.(1b) Penyediaan Unit Pracetak Gelagar Tipe I Bentang 25 meter Buah -
7.2.(1c) Penyediaan Unit Pracetak Gelagar Tipe I Bentang ... meter Buah -
7.2.(2a) Pemasangan Unit Pracetak Gelagar Tipe I Bentang 16 meter Buah -
7.2.(2b) Pemasangan Unit Pracetak Gelagar Tipe I Bentang 25 meter Buah -
7.2.(2c) Pemasangan Unit Pracetak Gelagar Tipe I Bentang ... meter Buah -
7.2.(3a) Penyediaan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah -
7.2.(3b) Penyediaan Unit Pracetak Gelagar Tipe U Bentang … meter Buah -
7.2.(4a) Pemasangan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah -
7.2.(4b) Pemasangan Unit Pracetak Gelagar Tipe U Bentang … meter Buah -
7.2.(5) Penyediaan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter Buah -
7.2.(6) Pemasangan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter Buah -
7.2.(7) Baja Prategang Kg -
7.2.(8) Penyediaan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah -
7.2.(9) Pemasangan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah -
7.2.(10) Beton Pratekan untuk Diafragma fc’ 45 MPa termasuk pekerjaan penegangan setelah pengecoran (post tension) m3 -
7.2.(11a) Penyediaan Balok T Beton Pratekan bentang 60 m Buah -
7.2.(11b) Pemasangan Balok T Beton Pratekan bentang 60 m Buah -
7.2.(12a) Penyediaan panel full depth slab Buah -
7.2.(12b) Pemasangan panel full depth slab Buah -
7.3.(1) Baja Tulangan Polos BjTP 280 Kg
7.3.(2) Baja Tulangan Sirip BjTS 280 Kg 4,119.35 20,707.50 85,301,440.13
7.3.(3) Baja Tulangan Sirip BjTS 420A Kg
7.3.(4) Baja Tulangan Sirip BjTS 420B Kg 27,188.49 21,609.50 587,529,674.66
7.4.(3) Penyediaan Struktur Jembatan Rangka Baja Standar Panjang 60 m Kg -
7.4.(4) Pemasangan Jembatan Rangka Baja Standar Panjang 60 m Kg -
7.4.(5a) Pemasangan Jembatan Rangka Baja yang disediakan Pengguna Jasa Kg
7.4.(5b) Pengangkutan Bahan Jembatan yang disediakan Pengguna Jasa Kg -
7.6.(8).c Penyediaan Tiang Pancang Baja Diameter 600 mm dengan tebal 12 mm M1 -
7.6.(14).b Pemancangan Tiang Pancang Baja Diameter 600 mm M1 -
7.9.(1) Pasangan Batu M3 1,526.05 1,033,092.02 1,576,547,490.42
7.10.(1) Pasangan Batu Kosong yang Diisi Adukan M3 -
7.10.(2) Pasangan Batu Kosong M3 -
7.10.(3a) Bronjong dengan kawat yang dilapisi galvanis M3 -
7.10.(3b) Bronjong dengan kawat yang dilapisi PVC M3 -
7.10.(4) Tambahan Biaya untuk Anyaman Penulangan Tanah dengan Kawat yang Dilapisi PVC M2 -
7.11.(1a) Sambungan Siar Muai Tipe Asphaltic Plug, Fixed M1 -
7.11.(1b) Sambungan Siar Muai Tipe Asphaltic Plug, Moveable M1 -
7.11.(2) Sambungan Siar Muai Tipe Silicone Seal M1 -
7.11.(3) Sambungan Siar Muai Tipe Strip Seal M1 -
7.11.(4) Sambungan Siar Muai Tipe Compression Seal M1 -
7.11.(5) Sambungan Siar Muai Expansion Join Tipe Modular Lebar …… M1 -
7.11.(6) Sambungan Siar Muai Expansion Joint Tipe Finger Plate, lebar… M1
7.11.(7) Sambungan Siar Muai Tipe Karet dengan Lebar Celah … cm M1 -
7.11.(8) Joint Filler untuk Sambungan Konstruksi M1
7.11.(9) Sambungan Siar Muai Tipe Modular Lebar …… M1
7.12.(1a) Perletakan Logam Tipe Fixed buah -
7.12.(1b) Perletakan Logam Tipe Moveable buah -
7.12.(1c) Perletakan Logam Tipe ….. buah -
7.12.(2) Perletakan Elastomerik Alam Ukuran ……mm x ……. mm x ……. mm buah -
7.12.(3) Perletakan Elastomerik Sintetis Ukuran 400 mm x 500 mm x 70 mm buah
7.12.(4) Landasan Karet Strip M1 -
7.12.(5) Landasan Tipe Logam Berongga (Pot Bearing)
7.12.(6) Landasan Tipe Logam Jenis Spherical
7.13.(1) Sandaran (Railing) M1
7.14.(1) Papan Nama Jembatan buah 2.00 1,545,379.38 3,090,758.77
7.15.(1) Pembongkaran Pasangan Batu M3
7.15.(2) Pembongkaran Beton M3
7.15.(3) Pembongkaran Beton Pratekan M3 -
7.15.(4) Pembongkaran Bangunan Gedung M2 -
7.15.(5) Pembongkaran Rangka Baja M2 -
7.15.(6) Pembongkaran Balok Baja (Steel Stringers) M' -
7.15.(7) Pembongkaran Lantai Jembatan Kayu M2
7.15.(8) Pembongkaran Jembatan Kayu M2
7.15.(9) Pengangkutan Hasil Bongkaran yang melebihi 5 km M3 per Km
7.16.(1) Deck drain Buah -
7.16.(2a) Pipa Drainase Baja diameter 150 mm M' 6.00 217,500.00 1,305,000.00
7.16.(2b) Pipa Drainase Baja diameter ... mm M' -
7.16.(3a) Pipa Drainase PVC diameter 150 mm (Pada Pelat Lantai) M' -
7.16.(3b) Pipa Drainase PVC diameter …. mm M' -
7.16.(4) Pipa Penyalur PVC (untuk TPT) M'
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 2,675,789,399.64
No. Mata Harga Jumlah
Pembayaran Uraian Satuan Volume Satuan Harga-Harga
(Rupiah) (Rupiah)
SPESIFIKASI 2017
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -
No. Mata Harga Jumlah
Pembayaran Uraian Satuan Volume Satuan Harga-Harga
(Rupiah) (Rupiah)
SPESIFIKASI 2017
Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 110,124,606.51
No. Mata Harga Jumlah
Pembayaran Uraian Satuan Volume Satuan Harga-Harga
(Rupiah) (Rupiah)
SPESIFIKASI 2017
Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -
DAFTAR KUANTITAS DAN
SPESIFIKASI 2010 Revi
Proyek / Bagpro :
No. Paket Kontrak :
Nama Paket : Perencanaan Teknis Jembatan Seram 1.3
Ruas Jalan : Perencanaan Jembatan Wai Kapala (L = 12 M, ) Box Culvert 2 x 6
Prop / Kab / Kodya : PROV SULAWESI UTARA / KAB. MINAHASA & MINUT
No. Mata
Uraian Satuan
Pembayaran
SPESIFIKASI
DIVISI 1. UMUM
1.2 Mobilisasi LS
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS
1.8.(2) Jembatan Sementara LS
1.17 Pengamanan Lingkungan Hidup LS
1.20.(1) Pengeboran, termasuk SPT dan Laporan M1
1.20.(2) Sondir termasuk Laporan M1
1.21 Manajemen Mutu LS
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 2. DRAINASE
2.1.(1) Galian Untuk Saluran Air M3
2.2.(1) Pasangan Batu dengan Mortar M3
2.3.(1) Gorong-gorong Pipa Beton Bertulang, diameter dalam 35 - 45 cm M1
2.3.(2) Gorong-gorong Pipa Beton Bertulang, diameter 55 - 65 cm M1
2.3.(3) Gorong-gorong Pipa Beton Bertulang, diameter dalam 75 - 85 cm M1
2.3.(4) Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - 105 cm M1
2.3.(5) Gorong2 Pipa Baja Bergelombang Ton
2.3.(6) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cm M1
2.3.(7) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm M1
2.3.(8) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cm M1
2.3.(9) Saluran berbentuk U Tipe DS 1 M1
2.3.(10) Saluran berbentuk U Tipe DS 2 M1
2.3.(11) Saluran Berbentuk U Tipe DS 3 M1
2.3.(11) Saluran Berbentuk U Tipe DS 8 M1
2.3.(12) Beton K250 (fc’ 20) untuk struktur drainase beton minor M3
2.3.(13) Baja Tulangan untuk struktur drainase beton minor Kg
2.3.(14) Pasangan Batu tanpa Adukan (Aanstamping) M3
2.4.(1) Bahan Porous untuk Bahan Penyaring (Filter) M3
2.4.(2) Anyaman Filter Plastik M2
2.4.(3) Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah M1
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 7. STRUKTUR
7.1 (1) Beton mutu tinggi fc’50 Mpa M3
7.1 (2) Beton mutu tinggi fc’45 Mpa M3
7.1 (3) a Beton mutu tinggi fc’40 Mpa dengan traveler M3
7.1 (3) b Beton mutu tinggi fc’40 Mpa perancah M3
7.1 (4) Beton mutu tinggi fc’35 Mpa M3
7.1 (5) a Beton mutu sedang fc’30 MPa lantai jembatan M3
7.1 (5) a Beton mutu sedang fc’30 Mpa M3
7.1 (5) b Beton mutu sedang fc’30 MPa untuk Gorong-gorong M3
7.1 (6) Beton mutu sedang fc’25 Mpa M3
7.1 (7) a Beton mutu sedang fc’20 MPa M3
7.1 (7) b Beton mutu sedang fc’20 MPa yang dilaksanakan di air M3
7.1 (8) Beton mutu rendah fc’15 MPa M3
7.1 (9) Beton Siklop fc’15 Mpa M3
7.1 (10) Beton mutu rendah fc’10 Mpa M3
7.2 (1a) Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter Buah
7.2 (1b) Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter Buah
7.2 (1c) Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 40.60 meter Buah
7.2 (2a) Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter Buah
7.2 (2b) Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter Buah
7.2 (2c) Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 40.60 meter Buah
7.2 (3)a Penyediaan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah
7.2 (3)b Penyediaan Unit Pracetak Gelagar Tipe U Bentang … meter Buah
7.2 (4)a Pemasangan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah
7.2 (4)b Pemasangan Unit Pracetak Gelagar Tipe U Bentang … meter Buah
7.2.(5) Penyediaan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter Buah
7.2.(6) Pemasangan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter Buah
7.2.(7) Baja Prategang Kg
7.2.(8) Penyediaan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah
7.2.(9) Pemasangan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah
7.2.(10) Beton Diafragma fc’ 30 MPa termasuk pekerjaan penegangan setelah pengeco m3
7.2.(11).a Penyediaan balok gelagar Tee Beam bentang 60 m Buah
7.2.(11).b Pemasangan balok gelagar Tee Beam bentang 60 m Buah
7.2.(12).a Penyediaan panel full deph slab Buah
7.2.(12).b Pemasangan panel full deph slab Buah
7.3 (1) Baja Tulangan U 24 Polos Kg
7.3 (2) Baja Tulangan U 32 Polos Kg
7.3 (3) Baja Tulangan U 32 Ulir Kg
7.3 (4) Baja Tulangan U 39 Ulir Kg
7.3 (5) Baja Tulangan U 48 Ulir Kg
7.3 (6) Anyaman Kawat Yang Dilas (Welded Wire Mesh) Kg
7.4 (1) a Penyediaan Baja Struktur BJ 34 (Titik Leleh 210 MPa) Kg
7.4 (1) b Penyediaan Baja Struktur BJ 37 (Titik Leleh 240 MPa) Kg
7.4 (1) c Penyediaan Baja Struktur BJ …. (Titik Leleh ….. MPa) Kg
7.4 (2) a Pemasangan Baja Struktur BJ 34 (Titik Leleh 210 MPa) Kg
7.4 (2) b Pemasangan Baja Struktur BJ 37 (Titik Leleh 240 MPa) Kg
7.4 (2) c Pemasangan Baja Struktur BJ …. (Titik Leleh ….. MPa) Kg
7.4 (3) a Pengadaan Struktur Jembatan Rangka Baja Panjang 40 m, Lebar 9 m Buah
7.4 (3) b Pengadaan Struktur Jembatan Rangka Baja Panjang 50 m, Lebar 9 m Buah
7.4 (3) c Pengadaan Struktur Jembatan Rangka Baja Panjang 60 m, Lebar 9 m Buah
7.4 (3) d Pengadaan Struktur Jembatan Rangka Baja Panjang .... m, Lebar .. m Buah
7.4.(4).a Pemasangan jembatan rangka baja standar panjang 40 m, lebar 9 m Buah
7.4.(4).b Pemasangan jembatan rangka baja standar panjang 50 m, lebar 9 m Buah
7.4.(4).c Pemasangan jembatan rangka baja standar panjang 60 m, lebar 9 m Buah
7.4.(4).d Pemasangan jembatan rangka baja standar panjang …. m, lebar …. m Buah
7.5 (1) Pemasangan jembatan Rangka Baja Kg
7.5 (2) Pengangkutan Bahan Jembatan Kg
7.6 (1) Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk M1
7.6 (2) Dinding Turap Kayu Tanpa Pengawetan M2
7.6 (3) Dinding Turap Kayu Dengan Pengawetan M2
7.6 (4) Dinding Turap Baja M2
7.6 (5) Dinding Turap Beton M2
7.6 (6) Penyediaan Tiang Pancang Kayu Tanpa Pengawetan Ukuran …. Mm M1
7.6 (7) Penyediaan Tiang Pancang Kayu dengan Pengawetan Ukuran …. mm M1
7.6 (8) a Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal 10 mm M1
7.6 (8) b Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal 12 mm M1
7.6 (8) c Penyediaan Tiang Pancang Baja Diameter ….. mm dengan tebal ... mm M1
7.6 (9) a Penyediaan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 mm x 10 m M1
7.6 (9) b Penyediaan Tiang Pancang Baja H Beam Ukuran …... mm x ….. mm x …. m M1
7.6 (10) a Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x 350 M1
7.6 (10) b Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran ….. mm x …... M1
7.6 (11) a Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 M1
7.6 (11) b Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran ….. mm x …... M1
7.6 (12) a Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm M1
7.6 (12) b Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter ……mm M1
7.6 (13) Pemancangan Tiang Pancang Kayu Ukuran …. mm M1
7.6 (14) a Pemancangan Tiang Pancang Baja Diameter 500 mm M1
7.6 (14) b Pemancangan Tiang Pancang Baja Diameter ..… mm M1
7.6 (15) a Pemancangan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 mm x 10 M1
7.6 (15) b Pemancangan Tiang Pancang Baja H Beam Ukuran …... mm x ….. mm x …. M1
7.6 (16) a Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x 3 M1
7.6 (16) b Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran ….. mm x … M1
7.6 (17) a Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 4 M1
7.6 (17) b Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran ….. mm x …. M1
7.6 (18) a Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm M1
7.6 (18) b Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter …... mm M1
7.6 (19) a Tiang Bor Beton, diameter 800 mm M1
7.6 (19) b Tiang Bor Beton, diameter ….. mm M1
7.6 (20) Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(13) s/d 7.6.(18) bila Ti M1
di Tempat Yang Berair.
7.6 (21) Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(19) bila Tiang Bor Beton M1
di Tempat Yang Berair.
7.6 (22) Pengujian Pembebanan Pada Tiang Dengan Diameter sampai 600 mm buah
7.6 (23) Pengujian Pembebanan Pada Tiang Dengan Diameter diatas 600 mm buah
7.6 (24) Tiang Uji jenis …… ukuran ……. M1
7.6 (25) a Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan beban buah
7.6 (25) b Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan beba buah
7.6 (26) a Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan meja buah
Cara Beban Siklik
7.6 (26) b Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan meja buah
Cara Beban Bertahap
7.6 (27) a Pengujian Crosshole sonic logging (CSL) pada Tiang bor beton diameter .... buah
7.6 (27) b Pengujian Pembebanan Dinamis Jenis PDLT (Pile Dynamic Load Testing) pada buah
7.6 (28) Pengujian Keutuhan Tiang dengan Pile Integrated Test (PIT) buah
7.7.(1) Dinding Sumuran Silinder terpasang, Diameter ……………. M1
7.9.(1) Pasangan Batu M3
7.10.(1) Pasangan Batu Kosong yang Diisi Adukan M3
7.10.(2) Pasangan Batu Kosong M3
7.10.(3) a. Bronjong dengan kawat yang dilapisi galvanis M3
7.10.(3) b. Bronjong dengan kawat yang dilapisi PVC M3
7.10.(3) c. Tambahan Biaya untuk Anyaman Penulangan Tanah dengan Kawat yang Dil M2
7.11.(1) a. Expansion Joint Tipe Asphaltic Plug, Fixed M1
7.11.(1) b. Expansion Joint Tipe Asphaltic Plug, Moveable M1
7.11.(2) Expansion Joint Tipe Rubber 1 M1
7.11.(3) Expansion Joint Tipe Rubber 2 M1
7.11.(4) Expansion Joint Tipe Rubber 2 M1
7.11.(5) Joint Filler untuk Sambungan Konstruksi M1
7.11.(6) Expansion Joint Tipe Baja Bersudut M1
7.11.(7) Expansion Joint Tipe Modular Lebar …… M1
7.12.(1a) Perletakan Logam Tipe Fixed 150 Ton buah
7.12.(1b) Perletakan Logam Tipe Moveable 150 Ton buah
7.12.(1c) Perletakan Logam Tipe ….. buah
7.12.(2) Perletakan Elastomerik Alam Ukuran ……mm x ……. mm x ……. mm buah
7.12.(3) Perletakan Elastomerik Sintetis Ukuran 600 mm x 380 mm x 68 mm buah
7.12.(4) Perletakan Strip M1
7.13.(1) Sandaran (Railing) M1
7.14.(1) Papan Nama Jembatan buah
7.15.(1) Pembongkaran Pasangan Batu M3
7.15.(2) Pembongkaran Beton M3
7.15.(3) Pembongkaran Beton Pratekan M3
7.15.(4) Pembongkaran Bangunan Gedung M2
7.15.(5) Pembongkaran Rangka Baja M2
7.15.(6) Pembongkaran Balok Baja (Steel Stringers) M'
7.15.(7) Pembongkaran Lantai Jembatan Kayu M2
7.15.(8) Pembongkaran Jembatan Kayu M2
7.15.(9) Pengangkutan Hasil Bongkaran yang melebihi 5 km M3 per Km
7.16.(1) Deck drain Unit
7.16.(2).a Pipa Drainase Baja diameter 75 mm M'
7.16.(2).b Pipa Drainase Baja diameter ….. mm M'
7.16.(3).a Pipa Drainase PVC diameter 75 mm M'
7.16.(3).a Pipa Drainase PVC diameter 100 mm M'
7.16.(4) Pipa Penyalur PVC M'
SS. 7(10)4 Shotcrete M2
R.3.2.(10) Pengadaan unit lantai pracetak jenis double T M2
R.3.2.(21) Pemasangan unit lantai pracetak jenis double T M2
R.3.4.(1). Cairan perekat (epoxy resin) Kg
R.3.4.(2) Bahan penutup (sealant) Kg
R.3.4.(3) Alat penyuntik anti gravitasi buah
R.3.4.(4) Alat penyuntik gravitasi buah
R.3.5.(1) Penambalan (patching) – furnished M3
R.3.5.(2) Perbaikan dengan cara Grouting - furnished M3
R.3.6.(3)a Pengecatan Plat Baja / Gelagar Baja (Cat Dasar) M2
R.3.6.(3)b Pengecatan Plat Baja / Gelagar Baja (Cat Utama/Akhir) M2
R.3.6.(6) Perkuatan Struktur dengan bahan fibre composite jenis carbon (furnished) M2
R.4.1.(3) Penggantian Baut Mutu Tinggi Bh
R.4.1. (6) Baja Struktur mutu > BJ 52 Kg
R.4.2.(3) Pengelasan pada baja mutu BJ-52 M'
R.4.4.(4) Pengecatan pada baja galvanis dengan kategori B M2
R.4.5.(1)a Perkuatan dengan eksternal stressing untuk jembatan dengan bentang 50 M ( Unit jembatan
R.4.5.(1)b Perkuatan dengan eksternal stressing untuk jembatan dengan bentang 60 M ( Unit jembatan
R.8.1.(7) Pengantian Landasan Elastomer Karet Alam buah
R.8.2.(1)b Expansion Joint /Sambungan Siar Muai Tipe Asphaltic Plug (lebar 50 Cm, teb M'
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
KUANTITAS DAN HARGA
IFIKASI 2010 Revisi 3
PELEBARAN JALAN
Harga Jumlah
Satuan Harga-Harga
Volume Jumlah Harga (Rp)
(Rupiah) (Rupiah)
SPESIFIKASI 2017
416,270,500.00 416,270,500.00
#REF! #REF!
#REF! #REF!
1,212,401.38 - 0 -
1,217,205.57 - 0 -
695,171.60 #REF! #REF! #REF!
1,773,489.75 - 0 -
282,793.19 - 0 -
9,080.02 - 0 -
11,254.83 - 0 -
14,694.62 - 0 -
13,282.29 - 0 -
1,339,866.85 - 0 -
1,529,856.23 - 0 -
1,280,838.41 - 0 -
1,477,980.81 - 0 -
38,500.00 - 0 -
2,080,446.45 - 0 -
2,269,540.19 - 0 -
1,559,782.00 - 0 -
#REF! #REF!
#REF! #REF!
#REF! #REF!
- 0 -
2,763,849.38 - 0 -
- 0 -
- 0 -
2,584,232.07 - 0 -
1,956,035.78 #REF! #REF! #REF!
1,956,035.78 #REF! #REF! #REF!
1,956,035.78 - 0 -
1,952,203.00 - 0 -
1,887,900.30 #REF! #REF! #REF!
- 0 -
1,754,423.84 #REF! #REF! #REF!
1,408,073.61 - 0 -
1,558,127.91 #REF! #REF! #REF!
16,500,000.00 - 0 -
22,000,000.00 - 0 -
612,920,000.00 #REF! #REF! #REF!
48,566,012.11 - 0 -
77,568,395.56 - 0 -
113,687,981.56 #REF! #REF! #REF!
16,500,000.00 - 0 -
- - 0 -
3,763,024.21 - 0 -
3,763,024.21 - 0 -
- 0 -
- 0 -
326,939.51 - 0 -
20,630,219.18 - 0 -
20,915,828.25 - 0 -
1,741,375.91 #REF! #REF! #REF!
- 0 -
- 0 -
- 0 -
- 0 -
20,707.50 - 0 -
18,188.25 - 0 -
21,609.50 #REF! #REF! #REF!
17,088.25 - 0 -
18,379.41 - 0 -
53,062.41 - 0 -
29,077.64 - 0 -
29,077.64 - 0 -
477.64 - 0 -
2,490.53 - 0 -
2,490.53 - 0 -
12,295.06 - 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
3,068.85 - 0 -
#DIV/0! - #DIV/0! #DIV/0!
55,597.14 - 0 -
72,882.86 - 0 -
85,760.71 - 0 -
42,973.10 - 0 -
635,852.54 - 0 -
72,882.86 - 0 -
78,885.71 - 0 -
187,318.33 - 0 -
185,711.80 #REF! #REF! #REF!
3,654,117.44 - 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
556,904.16 - 0 -
185,634.72 #REF! #REF! #REF!
371,269.44 - 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
1,916,394.89 - 0 -
2,993,350.91 - 0 -
181,542.77 - 0 -
- 0 -
26,681.34 - 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
1,033,092.02 #REF! #REF! #REF!
927,783.65 - 0 -
432,850.00 - 0 -
944,762.50 - 0 -
- 0 -
- 0 -
1,567,503.30 #REF! #REF! #REF!
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
1,350,000.00 #REF! #REF! #REF!
- 0 -
204,603.67 #REF! #REF! #REF!
1,545,379.38 #REF! #REF! #REF!
533,679.73 - 0 -
966,163.18 - 0 -
450,524.16 - 0 -
173,824.31 - 0 -
546,595.25 - 0 -
349,543.31 - 0 -
185,850.57 - 0 -
346,394.72 - 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
42,500.00 #REF! #REF! #REF!
- 0 -
1,069,889.69 - 0 -
9,809,572.97 - 0 -
404,788.77 - 0 -
626,973.08 - 0 -
437,457.53 - 0 -
140,210.98 - 0 -
- 0 -
40,357,686.60 - 0 -
40,357,686.60 - 0 -
41,177.31 - 0 -
48,002.57 - 0 -
1,653,417.08 - 0 -
91,059.04 - 0 -
12,295.06 - 0 -
195,640.75 - 0 -
172,373.66 - 0 -
- 0 -
- 0 -
16,283,807.97 - 0 -
481,862,107.95 - 0 -
#REF! #REF!
647,577.43 - 0 -
847,319.08 - 0 -
594,564.09 - 0 -
838,783.10 - 0 -
3,358,450.23 - 0 -
2,132,617.18 - 0 -
2,087,465.39 - 0 -
3,363,834.15 - 0 -
12,240.21 - 0 -
- 0 -
14,885.75 - 0 -
21,461.87 - 0 -
14,401.75 - 0 -
557,898.00 - 0 -
336,998.45 #REF! #REF! #REF!
309,099.98 - 0 -
931,078.05 #REF! #REF! #REF!
1,739,025.63 - 0 -
955,438.95 - 0 -
1,342,829.14 - 0 -
232,481.39 - 0 -
612,654.47 - 0 -
277,820.91 - 0 -
1,208,588.43 #REF! #REF! #REF!
178,453.70 - 0 -
240,053.70 - 0 -
143,082.77 #REF! #REF! #REF!
158,899.22 - 0 -
165,561.11 - 0 -
192,249.79 - 0 -
227,096.61 - 0 -
84,429.62 - 0 -
688,859.00 - 0 -
- 0 -
- 0 -
77,022.28 - 0 -
246,865.76 - 0 -
- 0 -
- 0 -
17,500,000.00 - 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
174,824.77 - 0 -
390,280.00 - 0 -
86,619.18 - 0 -
3,358,450.23 - 0 -
647,577.43 - 0 -
847,319.08 - 0 -
594,564.09 - 0 -
838,783.10 - 0 -
3,358,450.23 - 0 -
2,132,617.18 - 0 -
2,087,465.39 - 0 -
3,363,834.15 - 0 -
12,240.21 - 0 -
#REF! #REF!
25,142.86 - 0 -
14,614.29 - 0 -
18,071.43 - 0 -
502,098.65 - 0 -
- 0 -
889,779.36 - 0 -
- 0 -
500,201.08 - 0 -
981,078.70 - 0 -
832,133.41 - 0 -
Err:511 - Err:511 Err:511
514,013.12 - 0 -
762,838.50 - 0 -
737,920.97 - 0 -
551,774.11 - 0 -
506,367.40 - 0 -
114,873.93 - 0 -
550,884.28 - 0 -
331,962.95 - 0 -
259,111.72 - 0 -
83,915.77 - 0 -
93,920.86 - 0 -
- -
458,281,468.19 - 0 -
1,775,316,313.09 - 0 -
141,550,411.15 - 0 -
83,625,586.06 - 0 -
49,082,107.92 - 0 -
0 -
131,447.01 - 0 -
501,003.53 - 0 -
873,453.60 - 0 -
1,074,436.18 - 0 -
1,217,798.18 - 0 -
481,501.28 - 0 -
615,252.82 - 0 -
1,652,485.26 - 0 -
1,570,205.52 - 0 -
3,326,579.08 - 0 -
3,546,452.29 - 0 -
1,953,966.94 - 0 -
11,710.70 - 0 -
2,568,019.98 - 0 -
1,758,176.87 - 0 -
939,178.46 - 0 -
23,331,825.00 - 0 -
131,447.01 - 0 -
501,003.53 - 0 -
873,453.60 - 0 -
1,074,436.18 - 0 -
481,501.28 - 0 -
3,326,579.08 - 0 -
11,710.70 - 0 -
939,178.46 - 0 -
13,999,095.00 - 0 -
77,100.00 - 0 -
1,828,000.00 - 0 -
75,500.00 - 0 -
84,335.43 - 0 -
924,997.90 - 0 -
71,000.00 - 0 -
447,000.00 - 0 -
2,498,000.00 - 0 -
999,399.15 - 0 -
- -
PERHITUNGAN VOLUME
JEMBATAN LOLAK
II. SALURAN
panjang area jml lokasi
1. Galian Saluran 200.00 1.60 x 2.00 =
Total =
0+200
0+225 25.00 7.50 0.50 1.00 =
0+250 25.00 7.50 0.50 1.00 =
0+275 25.00 7.50 0.50 1.00 =
AKHIR 0+300 25.00 7.50 0.50 2.00 =
0+325 25.00 7.50 0.50 0.00 =
0+350 25.00 7.50 0.50 0.00 =
Total =
0+200
0+225 25.00 29.50 1.00 =
0+250 25.00 13.46 1.00 =
0+275 25.00 3.19 1.00 =
AKHIR 0+300 25.00 2.14 1.00 =
0+325 25.00 1.73 0.00 =
0+350 25.00 2.05 0.00 =
Total =
V. PERKERASAN BERBITUR
1. AGREGAT KLAS A Panjang Lebar Tinggi Jml Lok
0+000
0+025 25.00 7.50 0.40 2.00 =
0+050 25.00 7.50 0.40 2.00 =
0+075 25.00 7.50 0.40 2.00 =
0+100 25.00 7.50 0.40 2.00 =
0+125 25.00 7.50 0.40 2.00 =
0+150 25.00 7.50 0.40 2.00 =
0+200
0+225 25.00 7.50 0.40 2.00 =
0+250 25.00 7.50 0.40 2.00 =
0+275 25.00 7.50 0.40 2.00 =
AKHIR 0+300 25.00 7.50 0.40 2.00 =
0+325 25.00 7.50 0.40 0.00 =
0+350 25.00 7.50 0.40 0.00 =
Total =
III. PEKERJAAN STRUKTUR
Area Panjang Jml Lok
1. Beton Fc 30
Lantai 2.70 x 40.94 x 1.00 =
Total =
4 Beton K-125/B0
lantai kerja Abutmen 0.47 x 10.20 x 2.00 =
Plat Injak 0.23 x 7.00 x 2.00 =
DPT 0.28 x 120.00 x 2.00 =
Total =
8. Pasangan Batu
1.74 x 50.00 x 2.00 =
0.12 x 315.00 x 2.00 =
Total =
11 Diafragma =
12 Deck Slab =
15 Sandaran (Railing) =
20 Kerb pracetak
Trotoar Jbt 2.00 x 47.55 =
Trotoar Jalan 2.00 x 260.00 =
Median 1.00 x 260.00 =
Total =
21 marka jalan =
22 Rambu =
23 Bronjong =
PERKERASAN ASPAL
0+200
0+225 25.00 7.50 1.00 2.00 =
0+250 25.00 7.50 1.00 2.00 =
0+275 25.00 7.50 1.00 2.00 =
0+300 25.00 7.50 1.00 2.00 =
0+325 25.00 7.50 1.00 0.00 =
0+350 25.00 7.50 1.00 0.00 =
Total =
7 ADDITIVE
AC WC 417.60 X 5.8 X 0.3 =
AC BC 536.62 X 5.4 X 0.3 =
Total =
LAMPU JALAN =
PEMBONGKARAN PASANGAN BATU =
PEMBONGKARAN BETON =
volume satuan
640.00 M3
640.00 M3
378.00 M3
378.00 M3
Volume Satuan
0.00 M3
187.50 M3
0.00 M3
0.00 M3
0.00 M3
0.00 M3
93.75 M3
93.75 M3
93.75 M3
187.50 M3
0.00 M3
0.00 M3
656.25 M3
Volume Satuan
94.94 M3
94.94 M3
384.00 M3
180.00 M3
753.88 M3
94.94 M3
94.94 M3
189.88 M3
85.45 M3
85.45 M3
170.89 M3
Volume Satuan
68.75 M3
95.75 M3
343.25 M3
497.25 M3
906.50 M3
1,225.75 M3
737.50 M3
336.50 M3
79.75 M3
53.50 M3
0.00 M3
0.00 M3
4,344.50 M3
Volume Satuan
96.35 M3
430.50 M3
526.85 M3
1,426.63 M2
Volume Satuan
150.00 M3
150.00 M3
150.00 M3
150.00 M3
150.00 M3
150.00 M3
150.00 M3
150.00 M3
150.00 M3
150.00 M3
0.00 M3
0.00 M3
1,500.00 M3
Volume Satuan
110.54 M3
110.54 M3
230.79 M3
230.79 M3
12.82 M3
474.40 M3
Volume Satuan
122.21 M3
122.21 M3
17.08 M3
70.52 M3
332.02 M3
19.97 M3
9.59 M3
3.22 M3
67.20 M3
80.01 M3
23,966.88 Kg
45,943.85 Kg
6,571.48 Kg
46,713.37 Kg
123,195.58 Kg
134.40 M3
221.40 M3
355.80 M3
174.00 M3
75.60 M3
249.60 M3
252.00 m
252.00 m
14.00 m
518.00 m
5.00 Buah
8.78 M3
164.00 Buah
20.20 M
10.00 Buah
80.00 M
2.00 Buah
25.00 M
190.20 M
200.00 M
415.20 M
520.00 M2
1,040.00 M2
1,560.00 M2
95.10 M
520.00 M
260.00 M
780.00 M
216.00 m2
6.00 Buah
154.00 M3
Volume Satuan
375.00 Liter
375.00 Liter
375.00 Liter
375.00 Liter
375.00 Liter
375.00 Liter
375.00 Liter
375.00 Liter
375.00 Liter
375.00 Liter
0.00 Liter
0.00 Liter
3,750.00 Liter
Volume Satuan
56.25 Liter
56.25 Liter
56.25 Liter
56.25 Liter
56.25 Liter
56.25 Liter
56.25 Liter
56.25 Liter
56.25 Liter
56.25 Liter
56.25 Liter
56.25 Liter
0.00 Liter
0.00 Liter
675.00 Liter
Volume Satuan
34.80 Ton
34.80 Ton
34.80 Ton
34.80 Ton
34.80 Ton
37.58 Ton
59.86 Ton
41.76 Ton
34.80 Ton
34.80 Ton
34.80 Ton
0.00 Ton
0.00 Ton
417.60 Ton
Volume Satuan
52.20 Ton
52.20 Ton
52.20 Ton
52.20 Ton
52.20 Ton
56.38 Ton
0.00 Ton
62.64 Ton
52.20 Ton
52.20 Ton
52.20 Ton
0.00 Ton
0.00 Ton
536.62 Ton
72.66 KG
86.93 KG
159.59 KG
25.73 M3
0.00 Buah
12 M3
3.6 M3
168 M1
60.00 M3
33.75 M3
16.00 M3
109.75 M3
31.50 M3
4.80 M3
36.30 M3
3,993.00 Kg
INFORMASI UMUM
No. URAIAN INFORM
11. Jarak rata-rata Base Camp ke lokasi pekerjaan ---> L= 0.45 Kilometer ###
0.3 Km = a C 0.30 Km = b
A B
0.3 Km = c
Base Camp --------->
D
b. Pekerjaan Drainase dilaksanakan untuk mengalirkan air ke permukaan yang lebih rendah supaya tidak mer
c. Pekerjaan Tanah dilaksanakan untuk perbaikan tanah dasar sehingga didapatkan elevasi yang derencanak
...........................................................................
d. Pekerjaan bahu jalan dilaksanakan untuk menyiapkan tempat pemberhentian sementara disamping jalur lalu
...........................................................................
e Pekerjaan perkerasan berbutir dilaksanakan untuk menyiapkan Lapisan Pondasi yang mantap pada badan
...........................................................................
f Pekerjaan aspal dilakukan untuk pelapisan ulang pada lokasi efektif
...........................................................................
g Pekerjaan Struktur dilakukan untuk pembuatan struktur baru
...........................................................................
h Pekerjaan Pengembalian Kondisi dan pekerjaan minor dilakukan untuk memperbaiki kerusakan badan jalan
diselesaikan sebelum overlay dilakukan
i Pekerjaan Harian dilaksanakan untuk menanggulangi keadaan darurat selama periode kontrak
20 ....................................
21 ....................................
22 ....................................
FORMASI UMUM
INFORMASI
Kilometer ( Leff = a + b )
meter
meter
air ke permukaan yang lebih rendah supaya tidak merusak struktur badan jalan
No. Mata
Pembayaran
1.2
1.8.(1)
2.1.(1)
2.2.(1)
2.3.(3)
3.1.(1a)
3.1.(7)
3.1.(8)
3.2.(1b)
3.2.(2a)
3.3.(1)
4.2.(2b)
5.1.(1)
7.1 (7) a
7.1 (7) b
7.1 (8)
7.1 (9)
7.1 (10)
7.2 (1a)
7.2 (1b)
7.2 (1c)
7.2 (2a)
7.2 (2b)
7.2 (2c)
7.2 (3)a
7.2 (3)b
7.2 (4)a
7.2 (4)b
7.2.(5)
7.2.(6)
7.2.(7)
7.2.(8)
7.2.(9)
7.2.(10)
7.2.(11).a
7.2.(11).b
7.2.(12).a
7.2.(12).b
7.3 (1)
7.3 (2)
7.3 (3)
7.3 (4)
7.3 (5)
7.3 (6)
7.4 (1) a
7.4 (1) b
7.4 (1) c
7.4 (2) a
7.4 (2) b
7.4 (2) c
7.4 (3) a
7.4 (3) b
7.4 (3) c
7.4 (3) d
7.4.(4).a
7.4.(4).b
7.4.(4).c
7.4.(4).d
7.5 (1)
7.5 (2)
7.6 (1)
7.6 (2)
7.6 (3)
7.6 (4)
7.6 (5)
7.6 (6)
7.6 (7)
7.6 (8) a
7.6 (8) b
7.6 (8) c
7.6 (9) a
7.6 (9) b
7.6 (10) a
7.6 (10) b
7.6 (11) a
7.6 (11) b
7.6 (12) a
7.6 (12) b
7.6 (13)
7.6 (14) a
7.6 (14) b
7.6 (15) a
7.6 (15) b
7.6 (16) a
7.6 (16) b
7.6 (17) a
7.6 (17) b
7.6 (18) a
7.6 (18) b
7.6 (19) a
7.6 (19) b
7.6 (20)
7.6 (21)
7.6 (22)
7.6 (23)
7.6 (24)
7.6 (25) a
7.6 (25) b
7.6 (26) a
7.6 (26) b
7.6 (27) a
7.6 (27) b
7.6 (28)
7.7.(1)
7.9.(1)
7.15.(1)
7.15.(2)
SKh-1.10.1.(1)
SKh-1.10.1.(2)
SKh-1.10.1.(3)
SKh-1.10.1.(4)
SKh-1.10.1.(6)
SKh-1.10.1.(10)
SKh-1.10.1.(16)
SKh-1.10.1.(18)
SKh.1.10.1(1)
SKh.1.10.1(2)
SKh.1.10.1(3)
SKh.1.10.1(4)
SKh.1.10.1(5)
SKh.1.10.1(7)
SKh.1.10.1(8)
SKh.1.10.1(10)
Uraian Satuan
b c
DIVISI 1. UMUM
Mobilisasi LS
Manajemen dan Keselamatan Lalu Lintas LS
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 2. DRAINASE
Galian untuk Selokan Drainase dan Saluran Air M3
Pasangan Batu dengan Mortar M3
Gorong-gorong Pipa Beton Bertulang, diameter dalam 75 - 85 cm M1
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 6. PERKERASAN ASPAL
Lapis Resap Pengikat - Aspal Cair Liter
Lapis Perekat - Aspal Cair Liter
Laston Lapis Aus (AC-WC) Ton
Laston Lapis Aus Perata (AC-WC(L)) Ton
Laston Lapis Antara (AC-BC) Ton
Bahan anti pengelupasan Kg
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 7. STRUKTUR
Beton mutu sedang fc’20 MPa M3
Beton mutu sedang fc’20 MPa yang dilaksanakan di air M3
Beton mutu rendah fc’15 MPa M3
Beton Siklop fc’15 Mpa M3
Beton mutu rendah fc’10 Mpa M3
Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter Buah
Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter Buah
Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang … meter Buah
Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter Buah
Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter Buah
Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang … meter Buah
Penyediaan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah
Penyediaan Unit Pracetak Gelagar Tipe U Bentang … meter Buah
Pemasangan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah
Pemasangan Unit Pracetak Gelagar Tipe U Bentang … meter Buah
Penyediaan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter Buah
Pemasangan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter Buah
Baja Prategang Kg
Penyediaan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah
Pemasangan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah
Beton Diafragma fc’ 30 MPa termasuk pekerjaan penegangan setelah pengecoran (post tension) m3
Penyediaan balok gelagar Tee Beam bentang 60 m Buah
Pemasangan balok gelagar Tee Beam bentang 60 m Buah
Penyediaan panel full deph slab Buah
Pemasangan panel full deph slab Buah
Baja Tulangan U 24 Polos Kg
Baja Tulangan U 32 Polos Kg
Baja Tulangan U 32 Ulir Kg
Baja Tulangan U 39 Ulir Kg
Baja Tulangan U 48 Ulir Kg
Anyaman Kawat Yang Dilas (Welded Wire Mesh) Kg
Penyediaan Baja Struktur BJ 34 (Titik Leleh 210 MPa) Kg
Penyediaan Baja Struktur BJ 37 (Titik Leleh 240 MPa) Kg
Penyediaan Baja Struktur BJ …. (Titik Leleh ….. MPa) Kg
Pemasangan Baja Struktur BJ 34 (Titik Leleh 210 MPa) Kg
Pemasangan Baja Struktur BJ 37 (Titik Leleh 240 MPa) Kg
Pemasangan Baja Struktur BJ …. (Titik Leleh ….. MPa) Kg
Pengadaan Struktur Jembatan Rangka Baja Panjang 40 m, Lebar 9 m Buah
Pengadaan Struktur Jembatan Rangka Baja Panjang 50 m, Lebar 9 m Buah
Pengadaan Struktur Jembatan Rangka Baja Panjang 60 m, Lebar 9 m Buah
Pengadaan Struktur Jembatan Rangka Baja Panjang .... m, Lebar .. m Buah
Pemasangan jembatan rangka baja standar panjang 40 m, lebar 9 m Buah
Pemasangan jembatan rangka baja standar panjang 50 m, lebar 9 m Buah
Pemasangan jembatan rangka baja standar panjang 60 m, lebar 9 m Buah
Pemasangan jembatan rangka baja standar panjang …. m, lebar …. m Buah
Pemasangan jembatan Rangka Baja Kg
Pengangkutan Bahan Jembatan Kg
Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk M1
Dinding Turap Kayu Tanpa Pengawetan M2
Dinding Turap Kayu Dengan Pengawetan M2
Dinding Turap Baja M2
Dinding Turap Beton M2
Penyediaan Tiang Pancang Kayu Tanpa Pengawetan Ukuran …. Mm M1
Penyediaan Tiang Pancang Kayu dengan Pengawetan Ukuran …. mm M1
Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal 10 mm M1
Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal … mm M1
Penyediaan Tiang Pancang Baja Diameter ….. mm dengan tebal ... mm M1
Penyediaan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 mm x 10 mm x 15 mm M1
Penyediaan Tiang Pancang Baja H Beam Ukuran …... mm x ….. mm x …. mm x …. mm M1
Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x 350 mm M1
Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran ….. mm x …... mm M1
Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 mm M1
Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran ….. mm x …... mm M1
Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm M1
Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter ……mm M1
Pemancangan Tiang Pancang Kayu Ukuran …. mm M1
Pemancangan Tiang Pancang Baja Diameter 500 mm M1
Pemancangan Tiang Pancang Baja Diameter ..… mm M1
Pemancangan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 mm x 10 mm x 15 mm M1
Pemancangan Tiang Pancang Baja H Beam Ukuran …... mm x ….. mm x …. mm x …. mm M1
Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x 350 mm M1
Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran ….. mm x …... mm M1
Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 mm M1
Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran ….. mm x …... mm M1
Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm M1
Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter …... mm M1
Tiang Bor Beton, diameter 800 mm M1
Tiang Bor Beton, diameter ….. mm M1
Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(13) s/d 7.6.(18) bila Tiang Pancang dikerj M1
di Tempat Yang Berair.
Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(19) bila Tiang Bor Beton dikerjakan M1
di Tempat Yang Berair.
Pengujian Pembebanan Pada Tiang Dengan Diameter sampai 600 mm buah
Pengujian Pembebanan Pada Tiang Dengan Diameter diatas 600 mm buah
Tiang Uji jenis …… ukuran ……. M1
Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan beban hidrolik Cara Beba buah
Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan beban hidrolik Cara Be buah
Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan meja beban statis buah
Cara Beban Siklik
Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan meja beban statis buah
Cara Beban Bertahap
Pengujian Crosshole sonic logging (CSL) pada Tiang bor beton diameter .... buah
Pengujian Pembebanan Dinamis Jenis PDLT (Pile Dynamic Load Testing) pada Tiangukuran / diam buah
Pengujian Keutuhan Tiang dengan Pile Integrated Test (PIT) buah
Dinding Sumuran Silinder terpasang, Diameter ……………. M1
Pasangan Batu M3
Pembongkaran Pasangan Batu M3
Pembongkaran Beton M3
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
Lapis Pondasi Agregat Kelas A utk Pekerjaan Minor M3
Campuran Aspal Panas untuk Pekerjaan Minor M3
Marka Jalan Termoplastik M2
Rambu Jalan Tunggal dengan Permukaan Pemantul Engineer Grade Buah
Patok Pengarah Buah
Patok Kilometer Buah
Patok Hektometer Buah
Rel Pengaman M1
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DAFTAR KUANTITAS DAN HARGA
SPESIFIKASI 2010 Revisi 3
261,470,500.00
50,800,000.00
39,156.40
846,305.66
2,278,561.91
53,592.74
1,593,938.24
280,865.00
11,501.61
349,672.76
1,255.31
695,171.60
1,044,665.97
14,595.67
13,282.29
1,391,574.94
1,391,574.94
1,339,866.85
35,000.00
1,887,900.30
1,754,423.84
1,408,073.61
1,558,127.91
16,500,000.00
22,000,000.00
-
48,566,012.11
77,568,395.56
87,452,293.51
16,500,000.00
-
3,763,024.21
3,763,024.21
326,939.51
20,630,219.18
20,915,828.25
1,741,375.91
20,707.50
18,188.25
21,609.50 #REF!
17,088.25
18,379.41
53,062.41
29,077.64
29,077.64
477.64
2,490.53
2,490.53
12,295.06
3,068.85
#DIV/0!
55,597.14
72,882.86
85,760.71
42,973.10
635,852.54
72,882.86
78,885.71
187,318.33
185,711.80
3,654,117.44
556,904.16
185,634.72
371,269.44
1,916,394.89
2,993,350.91
181,542.77
26,681.34
1,033,092.02
533,679.73
966,163.18
647,577.43
3,358,450.23
336,998.45
931,078.05
232,481.39
612,654.47
277,820.91
1,208,588.43
###
ITEM PEMBAYARAN NO. : SKh-1.10.2.(1)
JENIS PEKERJAAN : Pembersihan Jembatan
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA SATUAN
2. ALAT
2.a. AIR COMPRESSOR
Kapasitas Alat = Kapasitas Pekerja V 60.00 M2
Faktor Efisiensi Alat Fa 0.80
Waktu Siklus :
- Waktu tempuh isi = = (L : v1 ) * 60 T1 4.00 Menit
- Waktu tempuh kosong = = (L : v2) * 60 T2 2.40 Menit
- Memuat dan menurunkan T3 60.00 Menit
- Lain-lain T4 2.00 Menit
Ts1 68.40 Menit
3. TENAGA
Kap. Prod. Pembersihan Jembatan / Hari Qt 60.00 M2
Kebutuhan Tenaga :
- Mandor M 1.00 O.H
- Tukang Tb 2.00 O.H
- Pekerja P 6.00 O.H
Koefisien Tenaga / M2 :
- Mandor = (Tk * M) : Qt 0.1167 Jam
- Tukang = (Tk * Tb) : Qt 0.2333 Jam
- Pekerja = (Tk * P) : Qt 0.7000 Jam
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Faktor konversi
dihapus, masuk
dalam waktu siklus
disesuaikam
Berlanjut ke halaman berikut
KETERANGAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
B. BAHAN
1.
C. PERALATAN
1. Air Compressor Jam 0.0208 301,784.50
2 Excavator Jam 0.0102 693,489.54
3 Flat Bed Truck Jam 0.0475 808,890.33
4 Alat Bantu Ls 1.0000 2,500.00
Note: 1 Perkiraan kuantitas yang dicantumkan harus diperkirakan mendekati kondisi sebenarnya.
2 Harga Lump Sum harus mencakup seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarka
dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan.
3 Pekerjaan dan kuantitas yang ditunjukkan di atas adalah perkiraan semata yang menjadi dasar penetapan
Pembayaran Pekerjaan Pemeliharaan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai
ketentuan dalam Spesifikasi yang tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa in
FORMULIR STANDAR UNTUK
N ANALISA MASING-MASING HARGA SATUAN
JUMLAH
HARGA
(Rp.)
9,300.00
3,833.33
2,666.67
15,800.00
6,287.18
7,087.53
38,422.29
2,500.00
54,296.99
70,096.99
7,009.70
77,106.69
77,100.00
p seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarkan
njukkan di atas adalah perkiraan semata yang menjadi dasar penetapan Mata
aan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai
tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa ini.
ITEM PEMBAYARAN NO. : SKh-1.10.2.(2)
JENIS PEKERJAAN : Perbaikan Retak / Kerusakan Beton Non Struktural
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HAR
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jembatan
3 Bahan / material diterima seluruhnya di lokasi
pekerjaan proyek
4 Jam kerja efektif per-hari Tk 7.00 jam
2. ALAT
2.a. Alat Penyuntik anti gravitasi
Memotong diasumsikan = 0.85 jam per m2 0.75 jam
3. TENAGA
Produksi Perbaikan Retak / Kerusakan Beton Non Struktural
dalam 1 hari
= Tk x Q1 = Qt 5.25 m2
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 1.3333 jam
- Tukang = (Tk x Tb) : Qt (L02) 2.6667 jam
- Pekerja = (Tk x P) : Qt (L01) 5.3333 jam
URAIAN ANALISA HARGA SATUAN
KETERANGAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
B. BAHAN
C. PERALATAN
1. Alat Suntik Anti Gravitasi jam 0.7500 95,000.00
2 Alat Bantu Ls 1.0000 75,000.00
Note: 1 Perkiraan kuantitas yang dicantumkan harus diperkirakan mendekati kondisi sebenarnya.
2 Harga Lump Sum harus mencakup seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarka
dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan.
3 Pekerjaan dan kuantitas yang ditunjukkan di atas adalah perkiraan semata yang menjadi dasar penetapan
Pembayaran Pekerjaan Pemeliharaan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai
ketentuan dalam Spesifikasi yang tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa in
FORMULIR STANDAR UNTUK
N ANALISA MASING-MASING HARGA SATUAN
JUMLAH
HARGA
(Rp.)
70,857.14
43,809.52
30,476.19
145,142.86
468,160.00
142,500.00
760,000.00
1,370,660.00
71,250.00
75,000.00
146,250.00
1,662,052.86
166,205.29
1,828,258.14
1,828,000.00
p seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarkan
njukkan di atas adalah perkiraan semata yang menjadi dasar penetapan Mata
aan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai
tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa ini.
ITEM PEMBAYARAN NO. : SKh-1.10.2.(3)
JENIS PEKERJAAN : Pengecatan Sederhana
SATUAN PEMBAYARAN : M2
2. ALAT
3. TENAGA
Kap. Prod. Pengecatan Sederhana / Hari Qt 30.00 M2
Kebutuhan Tenaga :
- Mandor M 1.00 O.H
- Tukang Tb 2.00 O.H
- Pekerja P 6.00 O.H
Koefisien Tenaga / M2 :
- Mandor = (Tk * M) : Qt 0.2333 Jam
- Tukang = (Tk * Tb) : Qt 0.4667 Jam
- Pekerja = (Tk * P) : Qt 1.4000 Jam
KETERANGAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
B. BAHAN
C. PERALATAN
1. Alat Bantu Ls 1.0000 20,000.00
Note: 1 Perkiraan kuantitas yang dicantumkan harus diperkirakan mendekati kondisi sebenarnya.
2 Harga Lump Sum harus mencakup seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarka
dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan.
3 Pekerjaan dan kuantitas yang ditunjukkan di atas adalah perkiraan semata yang menjadi dasar penetapan
Pembayaran Pekerjaan Pemeliharaan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai
ketentuan dalam Spesifikasi yang tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa in
FORMULIR STANDAR UNTUK
N ANALISA MASING-MASING HARGA SATUAN
JUMLAH
HARGA
(Rp.)
18,600.00
7,666.67
5,333.33
31,600.00
17,010.73
17,010.73
20,000.00
20,000.00
68,610.73
6,861.07
75,471.80
75,500.00
p seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarkan
njukkan di atas adalah perkiraan semata yang menjadi dasar penetapan Mata
aan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai
tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa ini.
ITEM PEMBAYARAN NO. : SKh-1.10.2.(6)
JENIS PEKERJAAN : Pengecatan Tiang Pancang
SATUAN PEMBAYARAN : M2
2. ALAT
3. TENAGA
Kap. Prod. Pengecatan Sederhana / Hari Qt 30.00 M2
Kebutuhan Tenaga :
- Mandor M 1.00 O.H
- Tukang Tb 3.00 O.H
- Pekerja P 6.00 O.H
Koefisien Tenaga / M2 :
- Mandor = (Tk * M) : Qt 0.2333 Jam
- Tukang = (Tk * Tb) : Qt 0.7000 Jam
- Pekerja = (Tk * P) : Qt 1.4000 Jam
KETERANGAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
B. BAHAN
C. PERALATAN
1. Alat Bantu Ls 1.0000 20,000.00
Note: 1 Perkiraan kuantitas yang dicantumkan harus diperkirakan mendekati kondisi sebenarnya.
2 Harga Lump Sum harus mencakup seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarka
dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan.
3 Pekerjaan dan kuantitas yang ditunjukkan di atas adalah perkiraan semata yang menjadi dasar penetapan
Pembayaran Pekerjaan Pemeliharaan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai
ketentuan dalam Spesifikasi yang tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa in
FORMULIR STANDAR UNTUK
N ANALISA MASING-MASING HARGA SATUAN
JUMLAH
HARGA
(Rp.)
74,400.00
23,000.00
32,000.00
129,400.00
256,666.67
256,666.67
20,000.00
20,000.00
406,066.67
40,606.67
446,673.33
447,000.00
p seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarkan
njukkan di atas adalah perkiraan semata yang menjadi dasar penetapan Mata
aan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai
tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa ini.
ITEM PEMBAYARAN NO. : SKh-1.10.2.(8)
JENIS PEKERJAAN : Perbaikan Sambungan Siar Muai
SATUAN PEMBAYARAN : M URAIAN ANALISA HAR
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jembatan
3 Bahan / material diterima seluruhnya di lokasi
pekerjaan proyek
4 Jam kerja efektif per-hari Tk 7.00 jam
2. ALAT
2.a. Cutter Machine
Memotong diasumsikan = 0.85 jam per m 0.85 jam
3. TENAGA
Produksi bongkar dan pasang siar muai dalam 1 hari
= Tk x Q1 = Qt 4.00 m
Koefisien Tenaga / M :
- Mandor = (Tk x M) : Qt (L03) 1.7500 jam
- Tukang = (Tk x Tb) : Qt (L02) 3.5000 jam
- Pekerja = (Tk x P) : Qt (L01) 15.7500 jam
URAIAN ANALISA HARGA SATUAN
KETERANGAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
B. BAHAN
C. PERALATAN
1. Alat Bantu Ls 1.0000 464,389.70
Note: 1 Perkiraan kuantitas yang dicantumkan harus diperkirakan mendekati kondisi sebenarnya.
2 Harga Lump Sum harus mencakup seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarka
dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan.
3 Pekerjaan dan kuantitas yang ditunjukkan di atas adalah perkiraan semata yang menjadi dasar penetapan
Pembayaran Pekerjaan Pemeliharaan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai
ketentuan dalam Spesifikasi yang tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa in
FORMULIR STANDAR UNTUK
N ANALISA MASING-MASING HARGA SATUAN
JUMLAH
HARGA
(Rp.)
209,250.00
57,500.00
40,000.00
306,750.00
1,500,000.00
1,500,000.00
464,389.70
464,389.70
2,271,139.70
227,113.97
2,498,253.67
2,498,000.00
p seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarkan
njukkan di atas adalah perkiraan semata yang menjadi dasar penetapan Mata
aan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai
tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa ini.
ITEM PEMBAYARAN NO. : SKh-1.10.2.(9)
JENIS PEKERJAAN : Perbaikan Fender
SATUAN PEMBAYARAN : M
2. ALAT
3. TENAGA
Kap. Prod. Pengecatan Sederhana / Hari Qt 15.00 M2
Kebutuhan Tenaga :
- Mandor M 1.00 O.H
- Tukang Tb 3.00 O.H
- Pekerja P 6.00 O.H
Koefisien Tenaga / M2 :
- Mandor = (Tk * M) : Qt 0.4667 Jam
- Tukang = (Tk * Tb) : Qt 1.4000 Jam
- Pekerja = (Tk * P) : Qt 2.8000 Jam
KETERANGAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK :
NAMA PAKET : PRESERVASI REHABILITASI JALAN KEMA - RUMBIA - BUYAT
PERKIRAAN HARGA J
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH
HARGA
(Rp.)
55,800.00
23,000.00
16,000.00
94,800.00
128,333.33
120,889.98
53,271.37
506,250.00
808,744.68
5,000.00
5,000.00
908,544.68
90,854.47
999,399.15
No. Mata
Pembayaran
1.2
1.8.(1)
2.1.(1)
2.2.(1)
2.3.(3)
3.1.(1a)
3.1.(7)
3.1.(8)
3.2.(1b)
3.2.(2a)
3.3.(1)
4.2.(2b)
5.1.(1)
6.1 (1)(a)
6.1 (2)(a)
6.3(5a)
6.3(5c)
6.3(6a)
6.3.(8)
7.1 (7) a
7.3 (3)
7.9.(1)
7.15.(1)
7.15.(2)
8.1 (1)
8.1 (5)
8.4.(1)
8.4.(3a)
8.4.(5)
8.4.(6a)
8.4.(6b)
8.4.(7)
10.1 (4)
10.1 (5)
DAFTAR KUANTITAS
SPESIFIKASI 2010 Revisi 3
:
:
: Perencanaan Teknis Jembatan Seram 1.3
: Perencanaan Jembatan Wai Kapala (L = 12 M, ) Box Culvert 2 x 6
: Maluku/ Kabupaten Seram Utara Barat
Uraian Satuan
b c
DIVISI 1. UMUM
Mobilisasi LS
Manajemen dan Keselamatan Lalu Lintas LS
DIVISI 2. DRAINASE
Galian untuk Selokan Drainase dan Saluran Air M3
Pasangan Batu dengan Mortar M3
Gorong-gorong Pipa Beton Bertulang, diameter dalam 75 - 85 cm M1
DIVISI 7. STRUKTUR
Beton mutu sedang fc’20 MPa M3
Baja Tulangan U 32 Ulir Kg
Pasangan Batu M3
Pembongkaran Pasangan Batu M3
Pembongkaran Beton M3
Perkiraan
Kuantitas
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
DIV - II DIV - III
URAIAN
GALIAN SALURAN SALURAN MORTAR GALIAN TIMBUNAN BIASA
JARAK LEBAR PERKERASAN (M) AREA VOLUME AREA VOLUME AREA (M2) VOLUME AREA VOLUME
STA
(m) EXISTING RENCANA ( m2 ) ( m3 ) ( m2 ) ( m3 ) BD.JALAN JLN JUMLAH ( m3 ) ( m2 ) ( m3 )
1.00 0.48 0.66 1.20
121+000 0.00 6.00 2.00 0.96 9.00 5.94 9.12 15.06 0.00
25 50.00 24.00 1,832.13 0.00
121+025 0.00 6.00 2.00 0.96 9.00 5.94 125.57 131.51 0.00
25 50.00 24.00 2,327.25 0.00
121+050 0.00 6.00 2.00 0.96 9.00 5.94 48.73 54.67 0.00
25 50.00 24.00 966.13 0.00
121+075 0.00 6.00 2.00 0.96 9.00 5.94 16.68 22.62 0.00
25 50.00 24.00 558.38 0.00
121+100 0.00 6.00 2.00 0.96 9.00 5.94 16.11 22.05 0.00
25 50.00 24.00 392.38 0.00
121+125 0.00 6.00 2.00 0.96 ` 9.00 5.94 3.40 9.34 0.00
25 25.00 12.00 191.00 641.00
121+150 0.00 6.00 0.00 0.00 9.00 5.94 - 5.94 51.28
25 25.00 12.00 148.50 641.00
121+175 0.00 6.00 2.00 0.96 9.00 5.94 - 5.94 0.00
25 50.00 24.00 157.38 0.00
121+200 0.00 6.00 2.00 0.96 9.00 5.94 6.65 6.65 0.00
25 50.00 24.00 315.50 0.00
121+225 0.00 6.00 2.00 0.96 9.00 5.94 18.59 18.59 0.00
25 50.00 24.00 639.75 0.00
121+250 0.00 6.00 2.00 0.96 9.00 5.94 32.59 32.59 0.00
25 50.00 24.00 1,180.75 0.00
121+275 0.00 6.00 2.00 0.96 9.00 5.94 55.93 61.87 0.00
25 50.00 24.00 1,995.13 0.00
121+300 0.00 6.00 2.00 0.96 9.00 5.94 91.80 97.74 0.00
25 50.00 24.00 3,313.38 0.00
121+325 0.00 6.00 2.00 0.96 9.00 5.94 161.39 167.33 0.00
25 50.00 24.00 4,885.63 0.00
121+350 0.00 6.00 2.00 0.96 9.00 5.94 217.58 223.52 0.00
25 50.00 24.00 5,950.50 0.00
121+375 0.00 6.00 2.00 0.96 9.00 5.94 246.58 252.52 0.00
25 50.00 24.00 5,955.00 0.00
121+400 0.00 6.00 2.00 0.96 9.00 5.94 217.94 223.88 0.00
25 50.00 24.00 4,439.75 0.00
121+425 0.00 6.00 2.00 0.96 9.00 5.94 125.36 131.30 0.00
25 50.00 24.00 3,274.38 0.00
121+450 0.00 6.00 2.00 0.96 9.00 5.94 124.71 130.65 0.00
25 50.00 24.00 2,513.38 0.00
121+475 0.00 6.00 2.00 0.96 9.00 5.94 64.48 70.42 0.00
25 50.00 24.00 1,811.50 0.00
121+500 0.00 6.00 2.00 0.96 9.00 5.94 68.56 74.50 0.00
25 50.00 24.00 1,464.50 0.00
121+525 0.00 6.00 2.00 0.96 9.00 5.94 36.72 42.66 0.00
25 50.00 18.00 677.88 0.00
121+550 0.00 6.00 2.00 0.48 9.00 5.94 5.63 11.57 0.00
25 50.00 6.00 285.38 33.88
121+575 0.00 6.00 2.00 0.00 9.00 5.94 5.32 11.26 2.71
25 50.00 0.00 418.13 33.88
121+600 0.00 6.00 2.00 0.00 9.00 5.94 16.25 22.19 0.00
25 50.00 0.00 761.38 0.00
121+625 0.00 6.00 2.00 0.00 9.00 5.94 32.78 38.72 0.00
25 50.00 12.00 1,168.25 0.00
121+650 0.00 6.00 2.00 0.96 9.00 5.94 48.80 54.74 0.00
25 50.00 24.00 2,315.25 0.00
121+675 0.00 6.00 2.00 0.96 9.00 5.94 124.54 130.48 0.00
25 50.00 24.00 3,707.50 0.00
121+700 0.00 6.00 2.00 0.96 9.00 5.94 160.18 166.12 0.00
25 50.00 24.00 3,497.88 0.00
121+725 0.00 6.00 2.00 0.96 9.00 5.94 107.77 113.71 0.00
25 50.00 24.00 2,442.00 0.00
121+750 0.00 6.00 2.00 0.96 9.00 5.94 75.71 81.65 0.00
25 50.00 24.00 2,061.63 0.00
121+775 0.00 6.00 2.00 0.96 9.00 5.94 77.34 83.28 0.00
25 50.00 24.00 2,101.13 0.00
121+800 0.00 6.00 2.00 0.96 9.00 5.94 78.87 84.81 0.00
25 50.00 24.00 2,124.00 0.00
121+825 0.00 6.00 2.00 0.96 9.00 5.94 79.17 85.11 0.00
25 50.00 24.00 1,752.38 0.00
121+850 0.00 6.00 2.00 0.96 9.00 5.94 49.14 55.08 0.00
25 50.00 24.00 762.75 114.00
121+875 0.00 6.00 2.00 0.96 9.00 5.94 - 5.94 9.12
25 50.00 24.00 148.50 114.00
121+900 0.00 6.00 2.00 0.96 9.00 5.94 - 5.94 0.00
25 50.00 24.96 391.88 0.00
121+925 0.00 6.00 2.00 0.96 9.00 5.94 19.47 25.41 0.00
25 50.00 24.00 513.38 0.00
121+950 0.00 6.00 2.00 0.96 9.00 5.94 9.72 15.66 0.00
25 50.00 24.00 308.00 0.00
121+975 0.00 6.00 2.00 0.96 ` 9.00 5.94 3.04 8.98 0.00
25 50.00 24.00 315.63 0.00
122+000 0.00 6.00 2.00 0.96 9.00 5.94 10.33 16.27 0.00
122+000 0.00 6.00 2.00 0.96 9.00 5.94 10.33 16.27 0.00
25 50.00 24.00 1,162.13 0.00
122+025 0.00 6.00 2.00 0.96 9.00 5.94 70.76 76.70 0.00
25 25.00 12.00 2,152.38 0.00
122+050 0.00 6.00 0.00 0.00 9.00 5.94 89.55 95.49 0.00
25 0.00 0.00 2,974.00 0.00
122+075 0.00 6.00 0.00 0.00 9.00 5.94 136.49 142.43 0.00
25 0.00 0.00 3,655.75 0.00
122+100 0.00 6.00 0.00 0.00 9.00 5.94 144.09 150.03 0.00
25 2.00 12.00 3,063.50 0.00
122+125 0.00 6.00 2.00 0.96 ` 9.00 5.94 89.11 95.05 0.00
25 50.00 24.00 2,554.25 0.00
122+150 0.00 6.00 2.00 0.96 9.00 5.94 103.35 109.29 0.00
25 50.00 24.00 1,619.38 0.00
122+175 0.00 6.00 2.00 0.96 9.00 5.94 14.32 20.26 0.00
25 50.00 24.00 416.25 0.00
122+200 0.00 6.00 2.00 0.96 9.00 5.94 7.10 13.04 0.00
25 25.00 12.00 286.00 0.00
122+225 0.00 6.00 0.00 0.00 9.00 5.94 3.90 9.84 0.00
25 12.50 6.00 323.13 0.00
122+250 0.00 6.00 1.00 0.48 9.00 5.94 10.07 16.01 0.00
25 37.50 18.00 379.63 0.00
122+275 0.00 6.00 2.00 0.96 9.00 5.94 8.42 14.36 0.00
25 50.00 24.00 295.75 0.00
122+300 0.00 6.00 2.00 0.96 9.00 5.94 3.36 9.30 0.00
25 50.00 24.00 190.50 0.00
122+325 0.00 6.00 2.00 0.96 9.00 5.94 - 5.94 0.00
10 20.00 9.60 59.40 0.00
122+335 0.00 6.00 2.00 0.96 9.00 5.94 - 5.94 0.00
0.00 0.00 - 0.00
122+350 0.00 6.00 2.00 0.96 9.00 5.94 - 5.94 0.00
0.00 0.00 - 0.00
122+375 0.00 6.00 2.00 0.96 9.00 5.94 3.17 9.11 0.00
0.00 0.00 - 0.00
122+400 0.00 6.00 2.00 0.96 9.00 5.94 - 5.94 2.24
0.00 0.00 - 0.00
122+425 0.00 6.00 2.00 0.96 9.00 5.94 - 5.94 0.00
125+575 0.00 6.00 2.00 0.96 9.00 5.94 5.64 11.58 0.00
0.00 0.00 - 0.00
125+600 4.50 6.00 2.00 0.96 4.50 2.97 7.47 10.44 0.00
0.00 0.00 - 0.00
125+625 4.50 6.00 2.00 0.96 4.50 2.97 10.20 13.17 0.00
0.00 0.00 - 0.00
125+650 0.00 6.00 2.00 0.96 9.00 5.94 10.90 16.84 0.00
0.00 0.00 - 0.00
125+675 4.50 6.00 2.00 0.96 4.50 2.97 6.40 9.37 0.00
0.00 0.00 - 0.00
125+700 4.50 6.00 2.00 0.96 ` 4.50 2.97 7.20 10.17 0.00
0.00 0.00 - 0.00
125+725 4.50 6.00 2.00 0.96 4.50 2.97 6.40 9.37 0.00
0.00 0.00 - 0.00
125+750 0.00 6.00 2.00 0.96 9.00 5.94 6.75 12.69 0.00
0.00 0.00 - 0.00
125+775 4.50 6.00 2.00 0.96 4.50 2.97 6.40 9.37 0.00
0.00 0.00 - 0.00
125+800 4.50 6.00 2.00 0.96 4.50 2.97 6.30 9.27 0.00
0.00 0.00 - 0.00
125+825 4.50 6.00 2.00 0.96 4.50 2.97 6.20 9.17 0.00
0.00 0.00 - 0.00
125+850 0.00 6.00 2.00 0.96 9.00 5.94 - 5.94 11.20
0.00 0.00 - 0.00
125+875 4.50 6.00 2.00 0.96 4.50 2.97 4.00 6.97 0.00
0.00 0.00 - 0.00
125+900 4.50 6.00 2.00 0.96 4.50 2.97 4.00 6.97 0.00
0.00 0.00 - 0.00
125+925 4.50 6.00 2.00 0.96 4.50 2.97 4.00 6.97 0.00
0.00 0.00 - 0.00
125+950 4.50 6.00 2.00 0.96 4.50 2.97 4.00 6.97 0.00
0.00 0.00 - 0.00
125+975 0.00 6.00 2.00 0.96 9.00 5.94 9.75 15.69 0.00
0.00 0.00 - 0.00
126+000 0.00 6.00 2.00 0.96 9.00 5.94 3.08 9.02 0.00
0.00 0.00 - 0.00
126+025 0.00 6.00 2.00 0.96 9.00 5.94 - 5.94 6.41
0.00 0.00 - 0.00
126+050 4.50 6.00 2.00 0.96 4.50 2.97 2.00 4.97 0.00
0.00 0.00 - 0.00
126+075 4.50 6.00 2.00 0.96 4.50 2.97 4.00 6.97 0.00
0.00 0.00 - 0.00
126+100 4.50 6.00 2.00 0.96 4.50 2.97 4.00 6.97 0.00
129+150 0.00 6.00 2.00 0.96 9.00 5.94 3.37 9.31 0.00
0.00 0.00 - 0.00
129+175 0.00 6.00 2.00 0.96 9.00 5.94 4.24 10.18 0.00
0.00 0.00 - 0.00
129+200 4.80 6.00 2.00 0.96 4.20 2.77 2.42 5.19 0.00
0.00 0.00 - 0.00
129+225 4.80 6.00 2.00 0.96 4.20 2.77 2.13 4.90 0.00
0.00 0.00 - 0.00
129+250 4.80 6.00 2.00 0.96 4.20 2.77 2.20 4.97 0.00
0.00 0.00 - 0.00
129+275 4.80 6.00 2.00 0.96 ` 4.20 2.77 1.20 3.97 0.00
0.00 0.00 - 0.00
129+300 4.80 6.00 2.00 0.96 4.20 2.77 1.20 3.97 0.00
0.00 0.00 - 0.00
129+325 4.80 6.00 2.00 0.96 4.20 2.77 3.15 5.92 0.00
0.00 0.00 - 0.00
129+350 4.80 6.00 2.00 0.96 4.20 2.77 3.07 5.84 0.00
0.00 0.00 - 0.00
129+375 4.80 6.00 2.00 0.96 4.20 2.77 1.21 3.98 0.00
0.00 0.00 - 0.00
129+400 4.80 6.00 2.00 0.96 4.20 2.77 - 2.77 0.00
0.00 0.00 - 0.00
129+425 4.80 6.00 2.00 0.96 4.20 2.77 - 2.77 0.00
0.00 0.00 - 0.00
129+450 4.80 6.00 2.00 0.96 4.20 2.77 - 2.77 5.78
0.00 0.00 - 0.00
129+475 4.80 6.00 2.00 0.96 4.20 2.77 13.37 16.14 0.00
0.00 0.00 - 0.00
129+500 4.80 6.00 2.00 0.96 4.20 2.77 3.92 6.69 0.00
0.00 0.00 - 0.00
129+525 4.80 6.00 2.00 0.96 4.20 2.77 2.63 5.40 0.00
0.00 0.00 - 0.00
129+550 4.80 6.00 2.00 0.96 4.20 2.77 2.32 5.09 0.00
0.00 0.00 - 0.00
129+575 4.80 6.00 2.00 0.96 4.20 2.77 2.30 5.07 0.00
0.00 0.00 - 0.00
129+600 4.80 6.00 2.00 0.96 4.20 2.77 2.20 4.97 0.00
0.00 0.00 - 0.00
129+625 4.80 6.00 2.00 0.96 4.20 2.77 3.34 6.11 0.00
0.00 0.00 - 0.00
129+650 4.80 6.00 2.00 0.96 4.20 2.77 3.30 6.07 0.00
0.00 0.00 - 0.00
129+675 4.80 6.00 2.00 0.96 4.20 2.77 3.32 6.09 0.00
0.00 0.00 - 0.00
129+700 4.80 6.00 2.00 0.96 4.20 2.77 3.34 6.11 0.00
0.00 0.00 - 0.00
129+725 4.80 6.00 2.00 0.96 4.20 2.77 3.32 6.09 0.00
0.00 0.00 - 0.00
129+750 4.80 6.00 2.00 0.96 4.20 2.77 3.34 6.11 0.00
0.00 0.00 - 0.00
129+775 4.80 6.00 2.00 0.96 4.20 2.77 3.23 6.00 0.00
0.00 0.00 - 0.00
129+800 4.80 6.00 2.00 0.96 4.20 2.77 3.40 6.17 0.00
0.00 0.00 - 0.00
129+825 4.80 6.00 2.00 0.96 4.20 2.77 3.00 5.77 0.00
0.00 0.00 - 0.00
129+850 4.80 6.00 2.00 0.96 4.20 2.77 3.42 6.19 0.00
25 50.00 24.00 151.55 0.00
129+875 4.80 6.00 2.00 0.96 4.20 2.77 3.16 5.93 0.00
25 50.00 24.00 148.18 0.00
129+900 4.80 6.00 2.00 0.96 4.20 2.77 3.15 5.92 0.00
25 50.00 24.00 146.18 0.00
129+925 4.80 6.00 2.00 0.96 4.20 2.77 3.00 5.77 0.00
25 50.00 24.00 149.30 0.00
129+950 4.80 6.00 2.00 0.96 4.20 2.77 3.40 6.17 0.00
25 50.00 24.00 151.80 0.00
129+975 4.80 6.00 2.00 0.96 4.20 2.77 3.20 5.97 0.00
25 50.00 24.00 149.30 0.00
130+000 4.80 6.00 2.00 0.96 4.20 2.77 3.20 5.97 0.00
25 25.00 12.00 109.30 106.75
130+025 4.80 6.00 0.00 0.00 4.20 2.77 - 2.77 8.54
25 0.00 0.00 69.30 342.25
130+050 4.80 6.00 0.00 0.00 4.20 2.77 - 2.77 18.84
25 0.00 0.00 69.30 522.63
130+075 4.80 6.00 0.00 0.00 4.20 2.77 - 2.77 22.97
25 0.00 0.00 69.30 505.38
130+100 4.80 6.00 0.00 0.00 4.20 2.77 - 2.77 17.46
25 0.00 0.00 69.30 250.63
130+125 4.80 6.00 0.00 0.00 ` 4.20 2.77 - 2.77 2.59
25 0.00 0.00 69.30 73.13
130+150 4.80 6.00 0.00 0.00 4.20 2.77 - 2.77 3.26
0.70
DIV - II DIV - III
URAIAN
GALIAN SALURAN SALURAN MORTAR GALIAN TIMBUNAN BIASA
JARAK LEBAR PERKERASAN (M) AREA VOLUME AREA VOLUME AREA (M2) VOLUME AREA VOLUME
STA
(m) EXISTING RENCANA ( m2 ) ( m3 ) ( m2 ) ( m3 ) BADAN JALAN TEBING JUMLAH ( m3 ) ( m2 ) ( m3 )
4,438 2,059 97,198 4,640
PATCHING
CAP 2,568.00 4.5 5 0.06 34.668 M3
AGG 2,568.00 4.5 0.5 0.3 17.334 M3
1,200.00 6,000.00 300.00 3,800.00 0.00 0.00 824.40 1,384.99 0.00 0.00
402.00 2,010.00 100.50 1,273.00 0.00 0.00 276.17 463.97 0.00 0.00
5.20 5.40 5.40
DIV - IV DIV - V DIV - VI
TIMBINAN PILIHAN PENY. BADAN JALAN SHOULDER AGG A AC Base AC BC AC WC L
ADTV ADTV ADTV
AREA VOLUME LEBAR VOLUME WIDTH VOLUME AREA VOLUME AREA VOL AREA VOL AREA VOL
( m2 ) ( m3 ) ( m2 ) ( m2 ) 3.00 ( m3 ) ( m2 ) ( m3 ) (m2) (Ton) KG (m2) (Ton) KG (m2) (Ton) KG
0.10
0.00 6.00 0.30 3.80 0.00 0.36 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.30 1.50 0.30 2.00 0.00 0.09 0.23
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.30 1.50 0.30 2.00 0.00 0.09 0.23
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.20 6.00 0.30 3.80 0.00 0.36 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.30 1.50 0.30 2.00 0.00 0.09 0.23
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.30 1.50 0.30 2.00 0.00 0.09 0.23
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.30 1.50 0.30 2.00 0.00 0.09 0.23
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.20 6.00 0.30 3.80 0.00 0.36 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.30 1.50 0.30 2.00 0.00 0.09 0.23
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.30 1.50 0.30 2.00 0.00 0.09 0.23
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.30 1.50 0.30 2.00 0.00 0.09 0.23
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.20 6.00 0.30 3.80 0.00 0.36 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.30 1.50 0.30 2.00 0.00 0.09 0.23
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.30 1.50 0.30 2.00 0.00 0.09 0.23
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.30 1.50 0.30 2.00 0.00 0.09 0.23
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.30 1.50 0.30 2.00 0.00 0.09 0.23
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.20 6.00 0.30 3.80 0.00 0.36 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.20 6.00 0.30 3.80 0.00 0.36 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.20 6.00 0.30 3.80 0.00 0.36 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.30 1.50 0.30 2.00 0.00 0.09 0.23
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.30 1.50 0.30 2.00 0.00 0.09 0.23
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.30 1.50 0.30 2.00 0.00 0.09 0.23
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5.20 5.40 5.40
DIV - IV DIV - V DIV - VI
TIMBINAN PILIHAN PENY. BADAN JALAN SHOULDER AGG A AC Base AC BC AC WC L
ADTV ADTV ADTV
AREA VOLUME LEBAR VOLUME WIDTH VOLUME AREA VOLUME AREA VOL AREA VOL AREA VOL
( m2 ) ( m3 ) ( m2 ) ( m2 ) 3.00 ( m3 ) ( m2 ) ( m3 ) (m2) (Ton) KG (m2) (Ton) KG (m2) (Ton) KG
0.10
1.20 6.00 0.30 3.80 0.00 0.36 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.20 6.00 0.30 3.80 0.00 0.36 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
72.00 360.00 90.00 564.00 0.00 0.00 49.46 83.10 164.16 275.79
5.20 5.40 5.40
DIV - IV DIV - V DIV - VI
TIMBINAN PILIHAN PENY. BADAN JALAN SHOULDER AGG A AC Base AC BC AC WC L
ADTV ADTV ADTV
AREA VOLUME LEBAR VOLUME WIDTH VOLUME AREA VOLUME AREA VOL AREA VOL AREA VOL
( m2 ) ( m3 ) ( m2 ) ( m2 ) 3.00 ( m3 ) ( m2 ) ( m3 ) (m2) (Ton) KG (m2) (Ton) KG (m2) (Ton) KG
0.10
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
6.00 30.00 7.50 47.00 0.00 0.00 4.12 6.92 13.68 22.98
0.24 1.20 0.30 1.88 0.00 0.07 0.24
1.92 9.60 2.40 15.04 0.00 0.00 1.32 2.22 4.38 7.35
0.24 1.20 0.30 1.88 0.00 0.07 0.24
223.92 1,119.60 279.90 1,754.04 0.00 0.00 153.83 258.44 510.54 857.70
DIV - IV DIV - V DIV - VI
TIMBINAN PILIHAN PENY. BADAN JALAN SHOULDER AGG A AC Base AC BC L AC BC
ADTV ADTV ADTV
AREA VOLUME LEBAR VOLUME WIDTH VOLUME AREA VOLUME AREA VOL AREA VOL AREA VOL
( m2 ) ( m3 ) ( m2 ) ( m2 ) 3.00 ( m3 ) ( m2 ) ( m3 ) (m2) (Ton) KG (m2) (Ton) KG (m2) (Ton) KG
1,898 9,490 770 7,391 0 0 1,304 2,191 675 1,133
770.40 10272.00
5.40
DIV - VI DIV - VII
AC WC TACK COAT PAS. BATU
ADTV PRIME COAT
AREA VOL TC-1 TC-3 KA KI VOLUME
(m2) (Ton) KG ( Ltr ) ( Ltr ) ( Ltr ) ( m2 ) ( m2 ) (m3)
0.24 - - ###
13.68 22.98 150.00 - 25.50 -
0.24 - - ###
13.68 22.98 150.00 - 25.50
0.24 1.45 1.45 ###
13.68 22.98 150.00 - 25.50 72.50
0.24 1.45 1.45 ###
13.68 22.98 150.00 - 25.50 72.50
0.24 1.45 1.45 ###
13.68 22.98 150.00 - 25.50
0.24 - - ###
13.68 22.98 150.00 - 25.50 -
0.24 - - ###
13.68 22.98 150.00 - 25.50 -
0.24 - - ###
13.68 22.98 150.00 - 25.50 -
0.24 - - ###
13.68 22.98 150.00 - 25.50 -
0.24 - - ###
13.68 22.98 150.00 - 25.50 -
0.24 - - ###
13.68 22.98 150.00 - 25.50 -
0.24 - - ###
13.68 22.98 150.00 - 25.50 -
0.24 - - ###
13.68 22.98 150.00 - 25.50 -
0.24 - - ###
5.47 9.19 60.00 - 10.20 -
0.24 - - ###
0.00 0.00 - - - -
0.24 - - ###
0.00 0.00 - - - -
0.24 - - ###
0.00 0.00 - - - -
0.24 - - ###
0.00 0.00 - - - -
0.24 - - ###
183.31 307.96 2,010.00 0.00 341.70 145.00
5.40
DIV - VI DIV - VII
AC WC TACK COAT PAS. BATU
ADTV PRIME COAT
AREA VOL TC-1 TC-3 KA KI VOLUME
(m2) (Ton) KG ( Ltr ) ( Ltr ) ( Ltr ) ( m2 ) ( m2 ) (m3)
0.24 - - ###
0.00 0.00 - - - -
0.06 - - ###
0.00 0.00 - - - -
0.06 - - ###
0.00 0.00 - - - -
0.24 - - ###
0.00 0.00 - - - -
0.06 - - ###
0.00 0.00 - - - -
0.06 - - ###
0.00 0.00 - - - -
0.06 - - ###
0.00 0.00 - - - -
0.24 - - ###
0.00 0.00 - - - -
0.06 - - ###
0.00 0.00 - - - -
0.06 - - ###
0.00 0.00 - - - -
0.06 - - ###
0.00 0.00 - - - -
0.24 - - ###
0.00 0.00 - - - -
0.06 - - ###
0.00 0.00 - - - -
0.06 - - ###
0.00 0.00 - - - -
0.06 - - ###
0.00 0.00 - - - -
0.06 - - ###
0.00 0.00 - - - -
0.24 - - ###
0.00 0.00 - - - -
0.24 - - ###
0.00 0.00 - - - -
0.24 - - ###
0.00 0.00 - - - -
0.06 - - ###
0.00 0.00 - - - -
0.06 - - ###
0.00 0.00 - - - -
0.06 - - ###
0.00 0.00 0.00 0.00 0.00 0.00
5.40
DIV - VI DIV - VII
AC WC TACK COAT PAS. BATU
ADTV PRIME COAT
AREA VOL TC-1 TC-3 KA KI VOLUME
(m2) (Ton) KG ( Ltr ) ( Ltr ) ( Ltr ) ( m2 ) ( m2 ) (m3)
0.24 - - ###
0.00 0.00 - - - -
0.24 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
0.00 0.00 - - - -
0.05 - - ###
2.74 4.60 30.00 36.00 25.50 -
0.05 - - ###
2.74 4.60 30.00 36.00 25.50 -
0.05 - - ###
2.74 4.60 30.00 36.00 25.50 -
0.05 - - ###
2.74 4.60 30.00 36.00 25.50 -
0.05 - - ###
2.74 4.60 30.00 36.00 25.50 -
0.05 - - ###
2.74 4.60 30.00 36.00 25.50 -
0.05 - - ###
2.74 4.60 30.00 36.00 25.50 12.88
0.05 1.03 - ###
2.74 4.60 30.00 36.00 25.50 69.50
0.05 2.63 1.90 ###
2.74 4.60 30.00 36.00 25.50 136.88
0.05 3.21 3.21 ###
2.74 4.60 30.00 36.00 25.50 146.00
0.05 2.63 2.63 ###
2.74 4.60 30.00 36.00 25.50 137.50
0.05 1.90 3.84 ###
2.74 4.60 30.00 36.00 25.50 63.88
0.05 3.21 1.90 ###
32.83 55.16 360.00 432.00 306.00 566.63
5.40
DIV - VI DIV - VII
AC WC TACK COAT PAS. BATU
ADTV PRIME COAT
AREA VOL TC-1 TC-3 KA KI VOLUME
(m2) (Ton) KG ( Ltr ) ( Ltr ) ( Ltr ) ( m2 ) ( m2 ) (m3)
59 6,554,730,000
###
VOLUME BOX CULVERT 2,00 X 2.20 M
30 4 1 120.00
92.10
4. Railling 10 m
RESUME
1. GALIAN 120 M3
2 BETON K-250 92.1 M3
BAJA TULANGAN U 32 11512.5 KG
3 BETON K-125 7.5 M3
4 PASANGAN BATU 8 M3
5 Railling 10 M
6 Terucuk 279 M
VOLUME BOX CULVERT DIMENSI 1.00 X 1,00 M
5. Railing
Volume
24.00
4.00
28.00 m3 196.00
30.00 30.00 m3 210.00
Tebal Volume
24.48 m3
0.5 2.86
0.2 2.24
29.58 m3 207.06
Tebal Volume
0.1 3.36
3.36 m3 23.52
### kg 22,776.60
- kg
Tebal Volume
4.00 4.00 m3 28.00
- m
2.00 bh 14.00
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
21 STONE CRUSHER E21 Unit 1 10,000,000 10,000,000
22 WATER PUMP 70-100 mm E22 Unit 4 150,000 600,000
23 WATER TANKER 3000-4500 L. E23 Unit 1 1,500,000 1,500,000
24 PEDESTRIAN ROLLER E24 Unit 1 750,000 750,000
25 TAMPER E25 Unit 1 350,000 350,000
26 JACK HAMMER E26 Unit -
27 FULVI MIXER E27 Unit -
28 CONCRETE PUMP E28 Unit 1 2,500,000 2,500,000
29 TRAILER 20 TON E29 Unit 1 2,500,000 2,500,000
30 PILE DRIVER + HAMER 3.5 TON E30 Unit
31 CRANE ON TRACK 35 TON E31 Unit
32 WELDING SET E32 Unit 2 500,000 1,000,000
33 BORE PILE MACHINE E33 Unit -
34 ASPHALT LIQUID MIXER E34 Unit -
35 TRONTON E35 Unit 1,000,000 -
36 COLD MILLING MACHINE E37 Unit -
37 ROCK DRILL BREAKER E36 Unit -
38 COLD RECYCLER E38 Unit -
39 HOT RECYCLER E39 Unit -
40 AGGREGAT (CHIP) SPREADER E40 Unit -
41 ASPHALT DISTRIBUTOR E41 Unit 1 2,500,000 2,500,000
42 SLIP FORM PAVER E42 Unit -
43 CONCRETE PAN MIXER E43 Unit -
44 CONCRETE BREAKER E44 Unit -
45 ASPAHLT TANKER E45 Unit -
46 CEMENT TANKER E46 Unit -
47 CONDRETE MIXER (350) E47 Unit -
48 VIBRATING RAMMER E48 Unit -
49 TRUK MIXER (AGITATOR) 3.0 M3 E49 Unit 1 3,000,000 3,000,000
50 BORE PILE MACHINE E50 Unit -
51 CRANE ON TRACK 75-100 TON E51 Unit -
52 BLENDING EQUIPMENT E52 Unit
53 MOBILE BATCHING PLANT 10 m3/jam E53 Unit 1 15,000,000 15,000,000
54 MOBIL PICK UP Unit 1 250,000 250,000
Total untuk Item B pada Lembar 2 100,000,000
ITEM PEMBAYARAN NO. : 1.8 (2)
JENIS PEKERJAAN : Pemasangan & Pemeliharaan Jembatan Sementara
HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
Catatan : Jumlah yang tercantum pada masing-masing item di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
No Jenis Peralatan Satuan Harga
Total 180,000.00
4. M07 - G r a v e l M3 476,000.00 15
6. M16 - S i r t u M3 387,100.00 15
Catatan : Harga Royalty sudah ditambah biaya retribusi sebesar Rp. 300,-/m3
Y)
KET.
wai Ela
wai Ela
wai tea
wai Ela
wai Ela
wai Ela
wai Ela
wai Ela
wai Ela
wai Ela
wai Ela
wai Ela
wai Ela
wai Ela
wai Ela
wai Ela
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M01a - Pasir Pasang
Lokasi : Quarry
Tujuan : Base Camp
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 15.30 Km
4 Harga satuan pasir di Quarry RpM01 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam
7 Berat volume pasir Bil 1.42 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
HARGA
SATUAN
(Rp.)
250,000.00
693,489.54
456,453.32
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M1c- Pasir Beton
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 15.30 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam
7 Berat isi volume pasir beton Bil 1.69 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 22.41 M3 / Jam
Ts1
HARGA
SATUAN
(Rp.)
250,000.00
693,489.54
456,453.32
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M02 - Batu Kali
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 40.30 Km
4 Harga satuan batu kali di Quarry RpM02 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam
7 Berat volume batu kali Bil 1.44 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1
HARGA
SATUAN
(Rp.)
250,000.00
693,489.54
456,453.32
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M06 - Batu Belah
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 15.30 Km
4 Harga satuan batu kali di Quarry RpM06 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam
7 Harga Satuan Dasar Wheel Loader RpE15 1.00 Jam
8 Harga Satuan Upah Pekerja RpL01 1.00 Jam
9 Berat volume batu belah Bil 1.60 ton/m3
3.d PEKERJA
Biaya Pekerja / M3 =
{ (7 Jam x P) : Qt } x RpL01 Rp4 7,171.54 Rupiah
HARGA
SATUAN
(Rp.)
250,000.00
693,489.54
456,453.32
622,534.28
13,285.71
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M07 - Gravel
Lokasi : Quarry
Tujuan : Base Camp
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 15.30 Km
4 Harga satuan Gravel di Quarry RpM07 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam
7 Berat volume gravel Bil 2.20 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1
HARGA
SATUAN
(Rp.)
275,000.00
693,489.54
456,453.32
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M16 - Sirtu
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 15.30 Km
4 Harga satuan Sirtu di Quarry RpM16 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam
7 Berat volume sirtu Bil 1.51 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
HARGA
SATUAN
(Rp.)
250,000.00
693,489.54
456,453.32
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M44 - Pasir Urug
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 15.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam
7 Berat volume pasir urug Bil 1.42 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
HARGA
SATUAN
(Rp.)
250,000.00
693,489.54
456,453.32
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : Agregat halus
Lokasi : Pelabuhan
Tujuan : Lokasi Pekerjaan
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 15.30 Km
4 Harga satuan agregat kasar di Pelabuhan RpM44 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam
7 Berat isi volume agregat kasar Bil 1.60 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
HARGA
SATUAN
(Rp.)
250,000.00
693,489.54
456,453.32
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : Agregat kasar
Lokasi : Pelabuhan
Tujuan : Lokasi Pekerjaan
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 15.30 Km
4 Harga satuan agregat kasar di Pelabuhan RpM44 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam
7 Berat isi volume agregat kasar Bil 1.60 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
HARGA
SATUAN
(Rp.)
250,000.00
693,489.54
456,453.32
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : Agregat Klas A
Lokasi : Pelabuhan
Tujuan : Lokasi Pekerjaan
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 15.30 Km
4 Harga satuan agregat kasar di Pelabuhan RpM44 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam
7 Berat isi volume agregat kasar Bil 1.60 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
HARGA
SATUAN
(Rp.)
579,639.57
693,489.54
456,453.32
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA
BIAYA
No. URAIAN KO HP KAP. HARGA SEWA KET.
DE ALAT ALAT/JAM
(di luar PPN)
2 Handling - - -
Bahan : Aspal
100000
1475.25
11,143,636.00
50,000.00
150,000.00
50,000.00
222,872.72
ITEM PEMBAYARAN NO. : SK.
JENIS PEKERJAAN : Saluran Beton Setengah Lingkaran Dia 40 cm
SATUAN PEMBAYARAN : M1 URAIAN ANALISA HARGA SA
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan `
3 Diameter bagian dalam gorong-gorong d 0.40 m
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 0.45 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal gorong-gorong tg 5.00 Cm
2. ALAT
2.a. TAMPER (pemadatan lapis dasar) (E25)
Kecepatan v 1.00 Km / Jam
Efisiensi alat Fa 0.83 -
Lebar pemadatan Lb 0.50 M
Banyak lintasan n 10 lintasan
Tebal lapis hamparan tp 0.10 M
Kap. Prod. / Jam = v x 1000 x Fa x Lb x tp Q1 276.67 M' / Jam
n x (El-241)
3. TENAGA
Produksi Gorong-gorong / hari Qt 20.00 M'
Kebutuhan tenaga :
- Pekerja P 8.00 orang
- Tukang T 1.00 orang
- Mandor M 1.00 orang
KETERANGAN
PROYEK :
No. PAKET KONTRAK
NAMA PAKET
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
B. BAHAN
C. PERALATAN
Analisa EI-234
KETERANGAN
Lump Sump
Analisa EI-234
R STANDAR UNTUK
MASING-MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
13,285.71 37,200.00
16,428.57 5,750.00
22,857.14 8,000.00
1,774,730.00 62,724.14
14,500.00 61,496.68
167,723.64 2,515.85
1,033,092.02 61,985.52
104,430.85 3,397.15
808,890.33 14,009.40
0.00 0.00
RALATAN ( A + B + C ) 257,078.73
0.00
257,078.73
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan TRONTON
2. Tenaga Pw 150.0 HP
3. Kapasitas Cp 15.0 Ton
4. Alat Baru a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 775,638,024 Rupiah
5.
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan COLD MILLING MACHINE
2. Tenaga Pw 248.0 HP
3. Kapasitas Cp 1,000 m
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 665,460,216 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan ROCK DRILL BREAKER
2. Tenaga Pw 3.0 HP
3. Kapasitas Cp - -
4. Alat Baru a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,629,449,923 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan COLD RECYCLER
2. Tenaga Pw 900.0 HP
3. Kapasitas Cp 2,200 M
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 8,043,379,065 Rupiah
5.
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan HOT RECYCLER
2. Tenaga Pw 400.0 HP
3. Kapasitas Cp 3 M
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 7,518,542,827 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan AGGREGAT (CHIP) SPREADER
2. Tenaga Pw 115.0 HP
3. Kapasitas Cp 3.5 M
4. Alat Baru a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B ### Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT DISTRIBUTOR
2. Tenaga Pw 115 HP
3. Kapasitas Cp 4,000 Liter
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 904,868,393 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan SLIP FORM PAVER
2. Tenaga Pw 105 HP
3. Kapasitas Cp 2.50 M
4. Alat Baru a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,002,385,832 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE PAN MIXER
2. Tenaga Pw 134 HP
3. Kapasitas Cp 600.00 Liter
4. Alat Baru a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,323,944,824 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE BREAKER
2. Tenaga Pw 290 HP
3. Kapasitas Cp 20.00 m3/jam
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,807,094,112 Rupiah
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 180,709,411 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CEMENT TANKER
2. Tenaga Pw 190 HP
3. Kapasitas Cp 4,000.00 liter
4. Alat Baru a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,195,812,254 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CONDRETE MIXER (350)
2. Tenaga Pw 20 HP
3. Kapasitas Cp 350.00 liter
4. Alat Baru a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 458,912,535 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATING RAMMER
2. Tenaga Pw 4 HP
3. Kapasitas Cp 80.00 KG
4. Alat Baru a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 262,793,921 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan TRUK MIXER (AGITATOR)
2. Tenaga Pw 220 HP
3. Kapasitas Cp 5.00 M3
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,398,989,243 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan BORE PILE MACHINE
2. Tenaga Pw 125 HP
3. Kapasitas Cp 60.00 CM
4. Alat Baru a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 2,020,146,494 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan CRANE ON TRACK 75-100 TON
2. Tenaga Pw 200 HP
3. Kapasitas Cp 75.00 Ton
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 8,117,309,523 Rupiah
A. URAIAN PERALATAN
1. Jenis Peralatan BLENDING EQUIPMENT
2. Tenaga Pw 50 HP
3. Kapasitas Cp 30.00 Ton
4. Alat Baru a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 677,835,968 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan BAR BENDER
2. Tenaga Pw 3 HP
3. Kapasitas Cp
4. Alat Baru a. Umur Ekonomis A 8 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,250 Jam
c. Harga Alat B 100 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan BAR CUTTER
2. Tenaga Pw 3 HP
3. Kapasitas Cp
4. Alat Baru a. Umur Ekonomis A 8 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,250 Jam
c. Harga Alat B 100 Rupiah
5.
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan BREAKER
2. Tenaga Pw 80 HP
3. Kapasitas Cp 3 m3/jam
4. Alat Baru a. Umur Ekonomis A 5 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 100 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A URAIAN PERALATAN
1. Jenis Peralatan JACK HIDROLIC
2. Tenaga Pw 3 HP
3. Kapasitas Cp 150 Ton
4. Alat Baru a. Umur Ekonomis A 5 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 100 Rupiah
A URAIAN PERALATAN
1. Jenis Peralatan MESIN LAS
2. Tenaga Pw 3.0 Hp
3. Kapasitas Cp 0.17 Ton
4. Alat Baru a. Umur Ekonomis A 3.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 900 Jam
c. Harga Alat B 100 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A URAIAN PERALATAN
1. Jenis Peralatan PILE DRIVER LEADER, 75 kw
2. Tenaga Pw 70.0 HP
3. Kapasitas Cp 75.0 kw
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 9,600.0 Jam
c. Harga Alat B 100 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A URAIAN PERALATAN
1. Jenis Peralatan PILE HAMMER
2. Tenaga Pw 10.0 Hp
3. Kapasitas Cp 0.0 0
4. Alat Baru a. Umur Ekonomis A 3.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 800.0 Jam
c. Harga Alat B 100 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A URAIAN PERALATAN
1. Jenis Peralatan PILE HAMMER, 2,5 Ton
2. Tenaga Pw 1.0 HP
3. Kapasitas Cp 2.5 Ton
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 8,000.0 Jam
c. Harga Alat B 100 Rupiah
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 10 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A URAIAN PERALATAN
1. Jenis Peralatan WELDING MACHINE, 300 A
2. Tenaga Pw 5.0 HP
3. Kapasitas Cp
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 10,000.0 Jam
c. Harga Alat B 100 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 19,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 11,132.10 Liter
5. Bahan Bakar Solar Ms 14,783.90 Liter
6. Minyak Pelumas Mp 45,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
KET.
E35
% / Tahun
KET.
E37
% / Tahun
KET.
E36
% / Tahun
KET.
E38
% / Tahun
KET.
E39
% / Tahun
KET.
E40
% / Tahun
KET.
E41
% / Tahun
KET.
E42
% / Tahun
KET.
E43
% / Tahun
KET.
E44
% / Tahun
KET.
E45
% / Tahun
KET.
E46
% / Tahun
KET.
E47
% / Tahun
KET.
E48
% / Tahun
KET.
E49
% / Tahun
KET.
E50
% / Tahun
KET.
E51
% / Tahun
KET.
E52
% / Tahun
KET.
% / Tahun
KET.
% / Tahun
KET.
% / Tahun
KETERANGAN
% / Tahun
KETERANGAN
% / Tahun
KETERANGAN
% / Tahun
KETERANGAN
% / Tahun
KETERANGAN
% / Tahun
KETERANGAN
% / Tahun
KETERANGAN
% / Tahun
KETERANGAN
% / Tahun
ITEM PEMBAYARAN : AGREGAT KASAR & HALUS untuk bahan lapis Agregat dan lapis Aspal
JENIS PEKERJAAN : PENGADAAN AGREGAT KASAR & HALUS
SATUAN PEMBAYARAN : M3
I ASUMSI
1 Bahan dasar Sirtu (material Batu bercampur pasir) diterima di lokasi Alat
Pemecah Batu (di Base Camp)
2 Kegiatan dilakukan di dalam lokasi Base Camp
4 Berat Isi Bahan : - Batu / Gravel D1
- Pasir D2
- Batu Pecah D3
5 Harga Satuan Bahan Dasar : - Batu Kali Rp1
- Sirtu Rp2
6 Biaya Operasi Alat : - Pemecah Batu (Stone Crusher) Rp3
- Wheel Loader Rp4
7 Kapasitas Alat : - Pemecah Batu (Stone Crusher) Cp1
- Wheel Loader Cp2
8 Faktor Efisiensi Alat : - Pemecah Batu (Stone Crusher) Fa1
- Wheel Loader Fa2
9 Faktor Kehilangan Material Fh
II METHODE PELAKSANAAN
1 Wheel Loader mengangkut Sirtu dari tumpukan
dan menuangkannya ke Alat Pemecah Batu.
2 Bahan dasar yang digunakan Sirtu (material Batu bercampur kerikil dan pasir)
3 Dilokasi hooper/Feeder dipasang penyiram air (water sprayer)
berfungsi sebagai pencucian bahan dari kotoran (lumpur)
4 Setelah disemprot air Sirtu dimasukkan kedalam pemecah pertama
(primary crusher) kapasitas 60 ton/jam (bukaan Jaw 10 cm s.d 20 cm tergantung
ukuran boulder)
6 Hasil Primary Crusher disaring memakai Scalping Screen(screen 1) dengan
ukuran ayakan #1,5 inch (3,75 cm) atau #2,0 inch (5,00 cm)
yg menghasilkan lolos ayakan agregat ukuran (0 - 50) dan tdk lolos agg.(50 - 200)
Asumsi material yang lolos saringan (screen1)
Asumsi keseluruhannya menghasilkan ukuran (0 - 50)
7 Hasil yang lolos saringan(screen1) sebagai fraksi halus tidak boleh dipakai
langsung untuk bahan campuran lapisan perkerasan aspal, tetapi dapat digunakan
untuk bahan campuran Agregat kelas B dan S, khusus untuk Agregat A yang
digunakan hanya ukuran (0 - 5)
8 Hasil yang tidak lolos screen1 dimasukan ke pemecah kedua (Secondary Crusher)
kemudian dipisahkan mempergunakan Screen2 yang menghasilkan ukuran
(0 - 5), (5 - 3/8"=9,50mm) dan (3/8" - 3/4"=19mm atau 1"=2,54mm))
yang dapat langsung digunakan untuk kebutuhan Agregat Kasar Lapis pondasi
Agregat A (ukuran 5 - 1") dan Agg.Kasar dan Agg.Halus lapisan perkerasan Aspal
Asumsi proporsi hasil pemisahan saringan (screen2)
- menghasilkan ukuran (0 - 5)
- menghasilkan ukuran (5 - 3/8"=9,5mm)
- menghasilkan ukuran (3/8" - 3/4"=19mm)
9 Hasil yang tidak lolos dimasukan kedalam pemecah ketiga (Tertiary crusher)
atau (secondary Crusher) dan hasilnya dimasukan kembali ke saringan screen2
1.c. Biaya Produksi Batu Pecah stone crusher 1 set dgn wheel loader
= {(Tst x Rp3) + (Tw x Rp4)} Bp
IV PERHITUNGAN
1 Primary Crusher
Produksi Primary Crusher + scalping Screen 1 Prod
Lolos scalping screen (sreen1) LSc 1
Tidak lolos scalping screen(screen1) ( 100 - LSc 1 ) TLSc1
Asumsi % Biaya proses scalping screen ukuran # 2"=50 mm thdp biaya produksi LSc2
Biaya Produksi scalping Screen BPSc
Volume (0 - 50) = ((Prod x LSc 1) x LSc2))/D1 V1
2 Secondary Crusher
Produksi Secondary Crusher + scalping Screen 2 Prod
Asumsi % Biaya proses produksi Batu Pecah thdp BOP S.Crusher 1 set LSc3
Biaya Produksi = LSc3 : 100 x BP + BPSc : 2 Bprod
kapasitas yang diproduksi = Prod x TLSc1/100 : D3 CpSC1
Lolos screen2 ukuran ( 0 - 5) LSc4
Volume ukuran ( 0 - 5) = (CpSC1 x LSc4/100) V2
Lolos screen2 ukuran ( 5 - 9,5) LSc5
Volume ukuran ( 5 - 9,5) = (CpSC1 x LSc5/100) V3
Lolos screen2 ukuran ( 9.5 - 19,0) LSc6
Volume ukuran ( 9,5 - 19.0) = (CpSC1 x LSc6/100) V4
Secondary Crusher
Asumsi %Biaya produksi per fraksi (untuk tiap lengan conveyor 1/3 biaya produksi) LSc2
Biaya Produksi per Fraksi = Hs 1 : 3 PF
Agregat pecah mesin ( 0 - 5) = PF : V2 + Rp2 Hs2
Agregat pecah mesin (5 - 9.5) = PF : V3 + Rp2 Hs3
Agregat pecah mesin (9.5 - 19) = PF : V4 + Rp2 Hs4
20 %
8.74 m3 72
80 %
38.96 m3
20 %
30 %
50 %
1.00 Jam
34.09 M3/Jam Batu pecah
40.38 M3/Jam
1.25 M3
3.00 menit
1.62 Jam
2,119,288.38 Rp./Jam
2,445,057.61 Rp.
60.00 Ton/Jam
20.00 %
80.00 %
20.00 %
423,857.68 Rp.
8.74 m3
48.00 Ton/Jam
80.00 %
1,907,359.54 Rp.
38.96 m3
20.00 %
7.79 m3
30.00 %
11.69 m3
50.00 %
19.48 m3
33.33 %
815,019.20 Rp.
354,594.13 Rp./M3
319,729.42 Rp./M3 or agregat lolos #1"
291,837.65 Rp./M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 0.45 KM
5 Tebal lapis agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Kasar APK 69.85 %
- Aggregat Halus Lapis pondasi A PU 30.15 %
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Faktor kehilangan - Agregat Pecah Kasar Fh1 1.05
- Aggregat Halus Lapis pondasi A Fh2 1.05
1. BAHAN
Agregat Pecah Kasar = APK x 1 M3 x Fh1 M92 0.7334 M3
Aggregat Halus Lapis pond A = PU x 1 M3 x Fh2 M44 0.3166 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Waktu pemuatan alat blending T1 2.00 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 31.75 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 222.23 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0630 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0315 Jam
RAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : Perencanaan Jembatan Wai Kapala (L = 12 M, ) Box Culvert 2 x 6
PROP / KAB / KODYA : Maluku/ Kabupaten Seram Utara Barat
ITEM PEMBAYARAN NO. : AGREGAT KELAS A (kondisi lepas)
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS A
SATUAN PEMBAYARAN : M3
A. TENAGA
B. BAHAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
13,285.71 836.96
22,857.14 719.97
508,400.00 372,873.27
508,400.00 160,946.73
622,534.28 19,608.92
304,064.61 14,653.72
10,000.00 10,000.00
RALATAN ( A + B + C ) 579,639.57
ITEM PEMBAYARAN : AGREGAT KELAS B (kondisi lepas)
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS B
SATUAN PEMBAYARAN : M3
I ASUMSI
1 Bahan Agregat Halus & Kasar diterima di lokasi
Base Camp
2 Jarak dari stockpile ke alat blending l
3 Jam kerja effektif perhari Tk
4 Kegiatan dilakukan di dalam lokasi Base Camp
5 Berat isi padat Bip
6 Jam kerja efektif per-hari Tk
8 Proporsi Campuran : Fraksi lolos Scalping Screen 0 - 50 mm 20-30
Fraksi lolos Scalping Screen 0 - 50 mm St
9 Berat volume agregat (lepas) Bil
- Agregat Pecah Mesin 20 - 30 mm Fh1
- Agregat Pecah Mesin 5 - 10 & 10 - 20 Fh2
Fraksi lolos Scalping Screen 0 - 50 mm Fh3
II URUTAN PEKERJAAN
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor Efisiensi alat Fa
Waktu Siklus :
- Waktu pemuatan alat belending T1
Ts1
Koefisien Alat / M3 = 1 : Q2
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1
Produksi Agregat / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
I ASUMSI
1 Bahan Agregat Halus & Kasar diterima di lokasi
Base Camp
2 Jarak dari stockpile ke alat blending l
3 Jam kerja effektif perhari Tk
4 Kegiatan dilakukan di dalam lokasi Base Camp
5 Berat isi padat Bip
6 Jam kerja efektif per-hari Tk
8 Proporsi Campuran : Agregat Pecah Kasar 20-30
Agregat Lolos # 1 " 5-10&10-20
- Fraksi lolos Scalping 0 - 37,5 mm St
Screen 0 - 37,5 mm
9 Berat volume agregat (lepas) Bil
Agregat Pecah Kasar Fh1
Agregat Lolos # 1 " Fh2
- Fraksi lolos Scalping 0 - 37,5 mm Fh3
Screen 0 - 37,5 mm
II URUTAN PEKERJAAN
Ts1
Koefisien Alat / M3 = 1 : Q2
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1
Produksi Agregat / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01)
- Mandor = (Tk x M) : Qt (L03)
URAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING H
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : Perencanaan Jembatan Wai Kapala (L = 12
PROP / KAB / KODYA : Maluku/ Kabupaten Seram Utara Barat
50.00 M ITEM PEMBAYARAN NO. : AGREGAT KELAS B (kondisi lepas)
7.00 jam JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS B
SATUAN PEMBAYARAN : M3
1.81
7.00 jam
39.60 % Gradasi harus
60.40 % memenuhi NO. KOMPONEN SATUAN
1.51 ton/m3 Spesifikasi
1.05
1.05
1.05 A. TENAGA
B. BAHAN
1.50 M3 (lepas)
0.85 - kondisi sedang C. PERALATAN
0.83 - 1. Wheel Loader (E15) jam
2. Blending Equpment (E52) jam
2.00 menit jarak 50 meter 3 Alat Bantu Ls
2.00 menit
31.75 M3 padat
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B
0.0315 jam
25.00 M3/jam
0.83
20.75 M3
0.0482 jam
31.75 M3/Jam
222.23 M3
2.00 orang
1.00 orang
0.0630 Jam
0.0315 Jam
PROYEK :
No. PAKET KONTRAK :
50.00 M NAMA PAKET : Perencanaan Jembatan Wai Kapala (L = 12
7.00 jam PROP / KAB / KODYA : Maluku/ Kabupaten Seram Utara Barat
ITEM PEMBAYARAN NO. : AGREGAT KELAS S
1.81 JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS S
7.00 jam SATUAN PEMBAYARAN : M3
18.00 % Gradasi harus
18.30 % memenuhi
63.70 % Spesifikasi
NO. KOMPONEN SATUAN
1.51 ton/m3
1.05
1.05
1.05 A. TENAGA
B. BAHAN
2.00 menit
0.0315 jam
25.00 M3/jam
0.83
20.75 M3
0.0482 jam
31.75 M3/Jam
222.23 M3
2.00 orang
1.00 orang
0.0630 Jam
0.0315 Jam
FORMULIR STANDAR UNTUK
ANALISA MASING-MASING HARGA SATUAN
B. URUTAN KERJA
1 Penyedia setelah menerima SPMK mengusulkan personil
Tenaga Ahli Mutu Pekerjaan sbg Manajer Kendali Mutu
2 Tenaga Ahli dibantu oleh Asisten Kendali Mutu yang
berpengalaman dibidangnya dan tenaga pendukung
3 Membuat RMK dan laporan mutu yg disetujui PPK
4 Melakukan pengendalian mutu semua pekerjaan dan
membuat laporan secara berkala
C. TENAGA / PERSONIL
Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
Asuransi Tenaga Kerja dan pengeluaran lainnya.
2. Biaya tersebut sudah termasuk biaya pembuatan laporan yang terkait dengan mutu pekerjaan
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan pembuatan laporan mutu seperti komputer, printer, kertas dan sebagainya.
Analisa EI-221
PROYEK 0.00
No. PAKET KONTRAK
NAMA PAKET
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : Perencanaan Jembatan Wai Kapala (L = 12 M, ) Box Culvert 2 x 6
PROP / KAB / KODYA : Maluku/ Kabupaten Seram Utara Barat
ITEM PEMBAYARAN NO. : 3.4.(4) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Pemotongan Pohon Pilihan diameter 50 – 75 cm TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : buah % THD. BIAYA PROYEK : 0.00
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : Perencanaan Jembatan Wai Kapala (L = 12 M, ) Box Culvert 2 x 6
0
PROP / KAB / KODYA : Maluku/ Kabupaten Seram Utara Barat
ITEM PEMBAYARAN NO. : 4.2.(2b) PERKIRAAN VOL. PEK. : 128.80
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas S TOTAL HARGA : 105,749,677.98
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 1.61
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0085 622,534.28 5,288.57
2. Dump Truck (E09) jam (0.1274) 830,615.86 (105,810.86)
3. Motor Grader (E13) jam 0.0043 756,484.92 3,222.22
4. Tandem Roller (E17) jam 0.0054 501,612.83 2,686.01
5. Water Tanker (E23) jam 0.0141 454,728.25 6,391.76
6. Alat Bantu Ls 1.0000 1,000.00 1,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : Perencanaan Jembatan Wai Kapala (L = 12 M, ) Box Culvert 2 x 6
0
PROP / KAB / KODYA : Maluku/ Kabupaten Seram Utara Barat
ITEM PEMBAYARAN NO. : 4.2.(1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 0.45 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.03 -
6 Komposisi campuran :
- Aspal Pen 60 atau Pen 80 As 64 % terhadap volume
- Kerosene K 36 % terhadap volume
7 Berat isi bahan :
- Aspal Pen 60 atau Pen 2 D1 1.03 Kg / liter
- Kerosene D2 0.80 Kg / liter
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan : ( 1 liter x Fh ) PC 1.03 liter
2. ALAT
2.a. ASPHALT DISTRIBUTOR (E41)
Lebar penyemprotan b 3.00 M
Kecepatan penyemprotan V 15.00 m/menit Asumsi
Kapasitas pompa aspal pas 14 liter/menit Panduan
Faktor effisiensi kerja Fa 0.80 Sedang
3. TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR Q4 680.00 liter
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt 4,760.00 liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
PROYEK 0.00
No. PAKET KONTRAK :
NAMA PAKET : Perencanaan Jembatan Wai Kapala (L = 12 M, ) Box Culvert 2 x 6
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 0.45 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.03 -
6 Komposisi campuran (Spesifikasi) :
- Aspal Pen 60 atau Pen 80 As 80 % terhadap volume
- Kerosene K 20 % terhadap volume
7 Berat isi bahan :
- Aspal Pen 60 atau Pen 80 D1 1.03 Kg / liter
- Kerosene D2 0.80 Kg / liter
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan : ( 1 liter x Fh ) PC 1.03 liter
2. ALAT
2.a. ASPHALT SPRAYER (E41)
Lebar penyemprotan b 3.00 M
Kecepatan penyemprotan v 15.00 M/menit asumsi
Kapasitas pompa aspal pas 14 liter/menit Panduan
Faktor effesiensi kerja Fa 0.80 sedang
3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q4 680.00 liter
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt 4,760.00 liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
PROYEK 0.00
No. PAKET KONTRAK :
NAMA PAKET : Perencanaan Jembatan Wai Kapala (L = 12 M, ) Box Culvert 2 x 6
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 0.50 KM
5 Tebal Lapis (AC-WC) padat t 0.04 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi Agregat (padat) Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran AC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15 44.70 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 48.00 % memenuhi -
- Semen FF 1.90 % Spesifikasi
- Asphalt As 5.60 %
- Bahan Modifikasi (% terhadap asphalt) Bm 8.00 %As Jika "aspal alam"
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92) 0.3305 M3
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91) 0.3210 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf 15.00 km/jam panduan
- Kecepatan kembali rata rata Vr 20.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.20 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit
- Lain - lain (waktu pasti) T3 0.75 menit
Ts1 1.10 menit
3. TENAGA
Produksi menentukan : AMP Q2 49.80 ton
Produksi AC-WC / hari = Tk x Q2 Qt 348.60 ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
PROYEK 0.00
No. PAKET KONTRAK
NAMA PAKET
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 0.50 KM
5 Tebal Lapis (AC) padat t 0.06 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi Agregat (padat) Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran AC-BC :
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 13.10 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 40.80 % memenuhi -
- Semen FF 1.90 % Spesifikasi
- Asphalt As 44.20 %
- Bahan Modifikasi Bm 8.00 %As
11 Berat Isi bahan :
- AC-BC D1 2.30 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 20 mm D2 1.45 ton / M3
- Agr Pch Mesin 0 - 5 mm D3 1.60 ton / M3
12 Jarak Stock pile ke Cold Bin l 0.05 km
1. BAHAN
1.a. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D2 (M92) 0.0949 M3
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91) 0.2678 M3
1.c. Bahan Modifikasi = (Bm x As x Fh2) x 1000 (M67) 36.4208 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1 1.10 menit
- Kecepatan maju rata rata Vf 15.00 km/jam panduan
- Kecepatan kembali rata rata Vr 20.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.20 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit
- Lain - lain (waktu pasti) T3 0.75 menit
Ts1 1.10 menit
3. TENAGA
Produksi menentukan : AMP Q2 49.80 ton
Produksi AC-BC / hari = Tk x Q5 Qt 348.60 ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
PROYEK 0.00
No. PAKET KONTRAK
NAMA PAKET
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : Perencanaan Jembatan Wai Kapala (L = 12 M, ) Box Culvert 2 x 6
0
PROP / KAB / KODYA : Maluku/ Kabupaten Seram Utara Barat
ITEM PEMBAYARAN NO. : 7.5 (1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN :Pemasangan jembatan Rangka Baja TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : Perencanaan Jembatan Wai Kapala (L = 12 M, ) Box Culvert 2 x 6
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : Perencanaan Jembatan Wai Kapala (L = 12 M, ) Box Culvert 2 x 6
PROP / KAB / KODYA : Maluku/ Kabupaten Seram Utara Barat
MATA PEMBAYARAN NO. : 8.1 (1) PERKIRAAN VOL. PEK. : Err:509
JENIS PEKERJAAN : Pondasi Agregat Kls. A Untuk - TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 Pek. Minor % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : Perencanaan Jembatan Wai Kapala (L = 12 M, ) Box Culvert 2 x 6
PROP / KAB / KODYA : Maluku/ Kabupaten Seram Utara Barat
ITEM PEMBAYARAN NO. : 8.1 (5) PERKIRAAN VOL. PEK. : Err:509
JENIS PEKERJAAN : Camp. Aspal Panas Utk.Pek.Minor TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0301 622,534.28 18,765.74
2. AMP E01 Jam 0.0554 10,387,060.90 575,668.44
3. Genset E12 Jam 0.0554 797,370.74 44,191.63
4. Dump Truck E09 Jam 0.2027 830,615.86 168,369.84
5. Pedestrian Roller E24 Jam 0.1975 104,292.63 20,598.98
6. Alat Bantu Ls 1.0000 2,000.00 2,000.00
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 0.5 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Material Fh 1.05 -
7 Tebal lapisan cat secara manual t 0.0030 M Spec.10.4.3(2)(d)
8 Berat Jenis Bahan Cat BJ.Cat 1.00 Kg/Liter
9 Perbandingan pemakaian bahan : - Cat C 65 %
- Thinner T 35 %
II. URUTAN KERJA
1 Permukaan jalan dibersihkan dari debu/kotoran
2 Cat disemprotkan dengan Compressor di atas maal
tripleks yang dipasang di permukaan jalan
3 Glass Beat ditaburkan segera setelah cat marka selesai
disemprotkan
1. BAHAN
1.a. Cat Marka Thermoplastic = C x R x (BJ.Cat) (M17b) 1.9500 Kg
1.b. Minyak Pencair (Thinner) = TxR (M33) 1.0500 Liter
1.c. Glass Bead (M34) 0.4500 Kg
2. ALAT
2.a. COMPRESSOR (E05)
Kapasitas penyemprotan V 40.00 Ltr/Jam
Jumlah cat cair = (1 M x 1 M) x t x 1000 R 3.00 Ltr/M2
3. TENAGA
Produksi pekerjaan per hari = Q1 x Tk Qt 93.33 M2
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Cat Tb 3.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / M2 :
- Mandor = ( M x Tk ) : Qt (L03) 0.0750 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.2250 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.6000 jam
Berlanjut ke hal. berikut.
ITEM PEMBAYARAN NO. : 8.4.(1) Analisa EI-841
JENIS PEKERJAAN : Marka Jalan Termoplastik
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA SATUAN
Lanjutan
Rp. 336,998.45 / M2
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 0.5 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
1. BAHAN
1.a. Pelat Rambu Jadi (Engineering Grade) (M35a) 1.00 BH
1.b. Pipa Galvanis Dia.1,6" (M24) 1.00 Batang
1.c. Beton K-175 (M60) 0.016 M3
1.d. Cat, dan bahan lainnya - 1.0000 Ls
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0 Buah
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 30.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 2.2 menit
- Menurunkan = Rata-rata 2.5 menit / buah T3 37.5 menit
- Lain-lain = geser, atur, tunggu, dll. T4 30.0 menit
Ts 99.7 menit
3. TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1 Qt 63.21 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 3.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1107 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.3322 jam
- Pekerja = (Tk x P) : Qt (L01) 0.5537 jam
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar rel pengaman diterima di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 0.5 Km ukuran
5 Jam kerja efektif per-hari Tk 7.00 jam sesuai
6 Faktor kehilangan bahan Fh 1.00 - drawing
7 Tulangan praktis Rc 50.00 Kg/Cu.m
2. ALAT
2,a DUMP TRUCK (E08) (E08)
Kapasitas 1 kali Angkut Cp 15.0 M'
Waktu Siklus : Ts
- Memuat T1 50.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 2.16 menit
- Menurunkan T3 60.0 menit
- Lain-lain T4 30.0 menit
Ts 142.2 menit
3. TENAGA
Produksi pasang pagar pengaman / hari = Tk x Q1 Qt 44.32 M'
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / M' :
- Mandor = (Tk x M) : Qt (L03) 0.1580 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.3159 jam
- Pekerja = (Tk x P) : Qt (L01) 1.2636 jam
A. PEKERJA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : Perencanaan Jembatan Wai Kapala (L = 12 M, ) Box Culvert 2 x 6
PROP / KAB / KODYA : Maluku/ Kabupaten Seram Utara Barat
ITEM PEMBAYARAN NO. : 8.4.(5) PERKIRAAN VOL. PEK. : 32.00
JENIS PEKERJAAN : Patok Pengarah TOTAL HARGA (Rp.) : 7,439,404.56
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK : 0.11
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 9.4 PER
JENIS PEKERJAAN : PEKERJAAN HARIAN TOT
DUMP TRUCK 3-4 M3 %T
SATUAN PEMBAYARAN : JAM E08
PERKIRAAN HARGA JU
NO. KOMPONEN SATUAN KUANTITAS SATUAN HA
(Rp.) (
A. PEKERJA
1. - -
2. - -
B. BAHAN
1. - -
2. - -
C. ALAT
: Err:509
: ###
: ###
JUMLAH
HARGA
(Rp.)
-
-
-
-
###
-
###
###
###
asi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 9.9 PER
JENIS PEKERJAAN : PEKERJAAN HARIAN TOT
WHEEL LOADER 1.0-1.6 M3 %T
SATUAN PEMBAYARAN : JAM (E15)
PERKIRAAN HARGA JU
NO. KOMPONEN SATUAN KUANTITAS SATUAN HA
(Rp.) (
A. PEKERJA
1. - -
2. - -
B. BAHAN
1. - -
2. - -
C. ALAT
: Err:509
: ###
: ###
JUMLAH
HARGA
(Rp.)
-
-
-
-
###
-
###
###
###
asi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
A. PEKERJA
B. BAHAN
C. PERALATAN
2.00
66,737,055.01
JUMLAH
HARGA
(Rp.)
79,714.29
32,857.14
22,857.14
135,428.57
300,484.96
341,475.00
7,750,000.00
2,812,500.00
6,812,500.00
887,500.00
7,562,500.00
1,687,500.00
387,500.00
28,541,959.96
333,722.35
5,000.00
338,722.35
29,016,110.87
4,352,416.63
33,368,527.50
asi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
n setiap komponen untuk menyelesaikan satu satuan pekerjaan
an yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
skalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (1)
JENIS PEKERJAAN : Pemeliharaan Rutin Perkerasan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK : 1.43
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (3)
JENIS PEKERJAAN : Pemeliharaan Rutin Selokan, Saluran Air, Galian & Timbunan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK : 2.01
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
PROPINSI :
MATA PEMBAYARAN :
URAIAN : PEMELIHARAAN RUTIN UNTUK PEMOTONGAN RUMPUT
SATUAN PEMBAYARAN : M2
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH
HARGA
(Rp.)
3,720.00
1,600.00
5,320.00
1,000.00
1,000.00
6,320.00
632.00
6,952.00
8,342,400.00
Analisa Skh-10.1.1
PROYEK :
No. PAKET KONTRAK
NAMA PAKET
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK
NAMA PAKET
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) Jam 0.0151 622,534.28 9,412.28
2. Dump Truck (E08) Jam 0.3156 456,453.32 144,072.31
3. Motor Grader (E13) Jam 0.0040 756,484.92 3,001.92
3. Tandem (E17) Jam 0.0161 501,612.83 8,078.23
4. Water Tanker (E23) Jam 0.0201 454,728.25 9,131.09
5. Alat Bantu Ls 1.0000 1,000.00 1,000.00
PROYEK :
No. PAKET KONTRAK
NAMA PAKET
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
MATA PEMBAYARAN NO. : SKh.1.10.1.(4) PERKIRAAN VOL. PEK.
JENIS PEKERJAAN : Lapis Pondasi Agregat Klas A TOTAL HARGA (Rp.)
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
:
:
:
JUMLAH
HARGA
(Rp.)
1,046.20
179.99
1,226.19
1,054,714.57
1,054,714.57
4,902.23
(102,643.81)
11,169.22
6,391.76
1,000.00
(79,180.60)
976,760.17
97,676.02
1,074,436.18
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
PROYEK :
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
MATA PEMBAYARAN NO. : SKh.1.10.1.(6) PERKIRAAN VOL. PEK.
JENIS PEKERJAAN : Lapis Pondasi Agregat Klas S TOTAL HARGA (Rp.)
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
:
:
:
JUMLAH
HARGA
(Rp.)
1,129.90
161.99
1,291.89
718,212.25
718,212.25
4,412.01
(306,982.55)
13,403.07
6,391.76
1,000.00
(281,775.71)
437,728.43
43,772.84
481,501.28
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
PROYEK :
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO. : SKh.1.10.1.(10) PERKIRAAN VOL. PEK.
JENIS PEKERJAAN : Campuran Aspal Panas TOTAL HARGA (Rp.)
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0229 622,534.28
2. AMP E01 Jam 0.0554 10,387,060.90
3. Genset E12 Jam 0.0554 797,370.74
4. Dump Truck E09 Jam 0.3080 830,615.86
5. Pedestrian Roller E24 Jam 0.4016 104,292.63
6. Alat Bantu Ls 1.0000 1,000.00
:
:
:
JUMLAH
HARGA
(Rp.)
7,363.17
1,266.78
8,629.95
396,594.37
267,969.17
139,150.00
1,293,232.50
2,096,946.03
14,236.08
575,668.44
44,191.63
255,842.16
41,884.59
1,000.00
918,586.82
3,024,162.80
302,416.28
3,326,579.08
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
PROYEK :
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO. : SKh.1.10.1.(13) PERKIRAAN VOL. PEK.
JENIS PEKERJAAN : Residu Bitumen TOTAL HARGA
SATUAN PEMBAYARAN : LITER % THD. BIAYA PROYEK
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
:
:
:
JUMLAH
HARGA
(Rp.)
27.72
7.95
35.67
7,997.69
2,184.00
10,181.69
34.99
104.93
288.81
428.73
10,646.09
1,064.61
11,710.70
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
PROYEK :
No. PAKET KONTRAK
NAMA PAKET
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
:
:
:
JUMLAH
HARGA
(Rp.)
72,564.54
22,432.59
15,605.28
110,602.41
268,125.00
196,000.00
116,610.58
580,735.58
160,821.44
639.18
1,000.00
162,460.61
853,798.60
85,379.86
939,178.46
si untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
PROYEK
PAKET
NAMA KONTRAK
PROVINSI
ITEM PEMBAYARAN NO. : SKh.1.10.1.(17)
JENIS PEKERJAAN : Pengendalian Tanaman Pada Rumija
SATUAN PEMBAYARAN : LS (untuk setiap Kilometer) Panjang Penanganan
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
: 0.60
JUMLAH
HARGA
(Rp.)
186.00
64.00
250.00
0.00
1,400,000.00
525,000.00
3,000.00
1,928,000.00
1,928,250.00
192,825.00
2,121,075.00
23,331,825.00
13,999,095.00
LAMPIRAN II
SURAT EDARAN MENTERI PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
NOMOR: 66/SE/M/2015
TENTANG
DAN KESEHATAN KERJA (SMK3) KONSTRUKSI BIDANG PEKERJAAN UMUM
TOTAL
TOTAL HARGA KET
1,500,000.0
500,000.0
2,000,000.0
1,000,000.0
3,000,000.0
2,500,000.0
1,750,000.0
750,000.0
3,000,000.0
12,000,000.0
31,550,000.0
48,050,000.0
Risiko K3 Tinggi
28,000,000.0 Risiko K3 Sdg/Kecil
21,000,000.0
21,000,000.0
21,000,000.0
21,000,000.0
112,000,000.0
3,000,000.0
5,000,000.0
2,500,000.0
TOTAL HARGA KET
300,000.0
10,800,000.0
2,400,000.0
200,000.0
100,000.0
- Tidak diperlukan
280,000.0
2,000,000.0
500,000.0
5,480,000.0
268,130,000.0
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK
NAMA PAKET
A. TENAGA
B. BAHAN
C. PERALATAN