DAK BETON K250

5.925 5.075 0.15 = 4.51 M3 M2 = 30.07


1.000 3.375 0.15 = 0.51 M3 M2 = 3.38
2.850 1.475 0.15 = 0.63 M3 M2 = 4.20
1.900 3.000 0.15 = 0.86 M3 M2 = 5.70
2.350 4.000 0.15 = 1.41 M3 M2 = 9.40
1.825 4.150 0.15 = 1.14 M3 M2 = 7.57
= 9.05 M3 M2 = 60.32

15 % = 58,813,828

Per Bulan 6,000,000 =

tukang 4 = 180,000 x 6 Hr = 1,080,000 = 4,320,000


kenek 6 = 150,000 x 6 Hr = 900,000 = 5,400,000

9,720,000
#NAME?
6,000,000 = #NAME? Bln

6,500,000 = 392,092,188

TOTAL = #NAME?
12 % = #NAME?
Per Bulan 6,000,000 = #NAME? Bln

9.8 Bln

Minggu x 4= 17,280,000 x 4 Bln = 69,120,000


Minggu x 4= 21,600,000 x 4 Bln = 86,400,000

Minggu 38,880,000 Bln 155,520,000


All
DAFTAR KEBUTUHAN MATERIAL

NO URAIAN PEKERJAAN VOL SAT


I PEKERJAAN BESI DAN ATAP
- Atap spandex panjang @6 meter u/ gudang 21 lbr
- Atap spandex panjang @5,5 meter u/ gudang 20 lbr
- Besi Cnp/Gording 10 u/gudang 36 btg
- Besi Cnp/Gording 12,5 u/ kuda-kuda gudang 16 btg
- Baut roofing @7 cm 2 dus
- Cat Zincromate/meni besi - Hijau 4 galon

II PEKERJAAN MESS KARYAWAN


- Besi ulir 10mm u/ sloof, kolom L, kolom pratis 55 btg
- Besi polos 8 mm u/ begel/ring sloof, kolom L, kolom praktis 75 btg
- Besi ulir 12 mm u/ pile cap 10 btg
- Triplek 9 mm u/ bekisting sloof, kolom 12 lbr
- Peku 10 10 kg
- Paku 7 10 kg
- Paku 5 10 kg
- Pipa air bersih aw 1/2" 3 btg
- Pipa air kotor d 3" 3 btg
- Hebel 7,5 6 m3
- Semen biasa - secukupnya dulu
- Semen perekat hebel secukupnya dulu
- Pasir secukupnya dulu

-
-
10 mm ilir 58.1666666666667 8 mm polos 92.47222

Sloff 15 x 40 Kolom L
8 8 biji = 64 5
8 8 biji = 64 5
3 8 biji = 24 5
3 8 biji = 24 5
3 8 biji = 24 5
2 8 biji = 16 5
5
27 = 180 = 216 5
225 10 mm ulir = 18 btg
8 polos 18.75 btg 40
586.6667
Ring balk 15 x 30 8 polos 48.88889
8 6 biji = 48
8 6 biji = 48 Kolom Praktis 15 x 15
3 6 biji = 18 4
3 6 biji = 18 4
3 6 biji = 18 4
2 6 biji = 12 4
4
27 = 180 = 162
198 10 mm ulir = 13.5 btg 20
8 polos 16.5 btg 100
8 polos 8.333333
15 x 30 x 15 x 30
6= 30
6= 30
6= 30
6= 30
6= 30
6= 30
6= 30
6= 30

= 266.6667 = 240
10 mm ulir = 20 btg
btg

Kolom Praktis 15 x 15
4= 16
4= 16
4= 16
4= 16
4= 16

= 133.3333 = 80
10 mm ulir = 6.666667 btg
btg
BESI KOLOM

16 Ulir

13 Ulir

10 Ulir

BESI DAK

16 Ulir

13 Ulir

10 Ulir

WIREMESH

M8
TUKANG 3 x 175,000 = 525,000 x 6

KENEK 7 x 150,000 = 1,050,000 x 6

TOTAL 5 Bln = 189,000,000


Hr = 3,150,000

Hr = 6,300,000

9,450,000 x 4 Minggu = 37,800,000 Bln


TUKANG LAS 21 x 200,000 = 4,200,000
TUKANG LAS 21 x 200,000 = 4,200,000

KENEK LAS 21 x 150,000 = 3,150,000


KENEK LAS 21 x 150,000 = 3,150,000

230 = 63,913 14,700,000

TUKANG ACI + DLL 37 x 180,000 = 6,660,000


TUKANG ACI + DLL 37 x 180,000 = 6,660,000
TUKANG ACI + DLL 37 x 180,000 = 6,660,000
KENEK ACI + DLL 37 x 140,000 = 5,180,000
KENEK ACI + DLL 37 x 140,000 = 5,180,000
KENEK ACI + DLL 37 x 140,000 = 5,180,000

230 = 154,435 35,520,000

TUKANG KERAMIK 7x 180,000 = 1,260,000

KENEK KERAMIK 7x 140,000 = 980,000

230 = 9,739 2,240,000

Wermesh M6 area kantor = 5 lbr


Wermesh M10 area gudang = 18 lbr

Beton K200 area kantor = 4 m3


Beton K300 area gudang = 18 m3

Gording area kantor = 18 btg @6 mtr


Gording area gudang = 45 btg @6 mtr
WF area gudang = 12 btg @6 mtr

TUKANG LISTRIK 7x 200,000 = 1,400,000

KENEK LISTRIK 7x 200,000 = 1,400,000

230 = 12,174 2,800,000


TUKANG ACI + DLL 25 x 180,000 = 4,500,000
TUKANG ACI + DLL 25 x 180,000 = 4,500,000
KENEK ACI + DLL 25 x 140,000 = 3,500,000
KENEK ACI + DLL 25 x 140,000 = 3,500,000

24 = 666,667 16,000,000
71,260,000

15 % 10,689,000

TOTAL = 81,949,000

LUAS = 230 10 23
PER - M² = 356,300

1 180,000
2 180,000
3 180,000

4 180,000 1,280,000
= 160000
5 140,000
6 140,000
7 140,000
8 140,000