Anda di halaman 1dari 1

JUMLAH PAKET BIAYA

NO LOKASI PEMBANGUNA
FISIK PERENCANAAN PENGAWASAN
N / REHAB
1 KAB. ACEH BARAT 2 4.727.700.000 141.831.000 94.554.000
2 KAB. ACEH BARAT DAYA -
3 KAB. ACEH BESAR -
4 KAB. ACEH JAYA 2 555.100.000 16.653.000 11.102.000
5 KAB. ACEH SELATAN -
6 KAB. ACEH SINGKIL -
7 KAB. ACEH TAMIANG 5 2.810.812.500 84.324.375 56.216.250
8 KAB. ACEH TENGAH 4 5.131.620.000 153.948.600 102.632.400
9 KAB. ACEH TENGGARA 6 6.782.400.000 203.472.000 135.648.000
10 KAB. ACEH TIMUR 9 4.965.170.000 148.955.100 99.303.400
11 KAB. ACEH UTARA 12 5.751.615.000 172.548.450 115.032.300
12 KAB. BENER MERIAH 1 1.764.000.000 52.920.000 35.280.000
13 KAB. BIREUEN 11 6.113.520.000 183.405.600 122.270.400
14 KAB. GAYO LUES 3 3.186.360.000 95.590.800 63.727.200
15 KAB. NAGAN RAYA 4 5.021.820.000 150.654.600 100.436.400
16 KAB. PIDIE 4 1.584.000.000 47.520.000 31.680.000
17 KAB. PIDIE JAYA -
18 KAB. SIMEULUE 3 970.000.000 29.100.000 19.400.000
19 KOTA BANDA ACEH -
20 KOTA LANGSA -
21 KOTA LHOKSEUMAWE -
22 KOTA SABANG 1 2.726.460.000 81.793.800 54.529.200
23 KOTA SUBULUSSALAM 3 2.210.760.000 66.322.800 44.215.200
########## 1.629.040.125 ##########

Anda mungkin juga menyukai