PENJUMLAHAN
TOTAL PEKERJAAN
DAFTAR NO. 3.3 PEKERJAAN ARSITEKTUR TOWER
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
Catatan Harga
3.3.1 / 2
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
A PEKERJAAN DINDING
- Lantai 4 m2 467.15
- Lantai 5 m2 854.42
- Lantai 6 m2 517.91
- Lantai 7 m2 470.14
- Lantai 8 m2 470.14
- Lantai 9 m2 470.14
- Lantai 10 m2 470.14
- Lantai 11 m2 470.14
- Lantai 12 m2 470.14
- Lantai 13 m2 470.14
- Lantai 14 m2 470.14
- Lantai 15 m2 470.14
- Lantai 16 m2 470.14
- Lantai 17 m2 470.14
- Lantai 18 m2 470.14
- Lantai 19 m2 387.72
- Lantai 20 (Refugee Floor) m2 608.59
- Lantai 21 m2 409.18
- Lantai 22 m2 397.02
- Lantai 23 m2 397.02
- Lantai 24 m2 397.02
- Lantai 25 m2 397.02
- Lantai 26 m2 397.02
- Lantai 27 m2 397.02
- Lantai 28 m2 397.02
- Lantai 29 m2 397.02
- Lantai 30 m2 397.02
- Lantai 31 m2 397.02
- Lantai 32 m2 563.94
- Lantai 33 m2 446.00
- Lantai 34 m2 328.38
- Lantai 35 m2 223.92
- Lantai 36 m2 117.11
- Lantai 37 m2 42.46
3.3.1 / 3
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 m2 694.11
- Lantai 5 m2 752.31
- Lantai 6 m2 602.82
- Lantai 7 m2 610.19
- Lantai 8 m2 610.19
- Lantai 9 m2 610.19
- Lantai 10 m2 610.19
- Lantai 11 m2 610.19
- Lantai 12 m2 610.19
- Lantai 13 m2 610.19
- Lantai 14 m2 610.19
- Lantai 15 m2 610.19
- Lantai 16 m2 610.19
- Lantai 17 m2 610.19
- Lantai 18 m2 610.19
- Lantai 19 m2 571.29
- Lantai 20 (Refugee Floor) m2 832.94
- Lantai 21 m2 670.55
- Lantai 22 m2 460.71
- Lantai 23 m2 460.71
- Lantai 24 m2 460.71
- Lantai 25 m2 460.71
- Lantai 26 m2 460.71
- Lantai 27 m2 460.71
- Lantai 28 m2 460.71
- Lantai 29 m2 460.71
- Lantai 30 m2 460.71
- Lantai 31 m2 460.71
- Lantai 32 m2 723.03
- Lantai 33 m2 405.16
- Lantai 34 m2 496.00
- Lantai 35 m2 296.38
- Lantai 36 m2 288.46
- Lantai 37 m2 267.76
- Lantai 33 m2 97.28
- Lantai 34 m2 101.02
- Lantai 35 m2 112.34
- Lantai 36 m2 185.45
3.3.1 / 4
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
4 Pelapis Façade sisi dalam, GRC / Kalsi Board + cat dasar Legend 22
emulsi + Aluminium sheet 1.5mm + Glass Wall + jaring kawat,
termasuk kelengkapan lainnya. Terpasang sesuai gambar dan
spesifikasi pada :
- Lantai 4 m2 69.56
- Lantai 5 m2 69.56
- Lantai 6 m2 110.62
- Lantai 7 m2 114.11
- Lantai 8 m2 114.11
- Lantai 9 m2 114.11
- Lantai 10 m2 114.11
- Lantai 11 m2 114.11
- Lantai 12 m2 114.11
- Lantai 13 m2 114.11
- Lantai 14 m2 114.11
- Lantai 15 m2 114.11
- Lantai 16 m2 114.11
- Lantai 17 m2 114.11
- Lantai 18 m2 114.11
- Lantai 19 m2 114.11
- Lantai 20 (Refugee Floor) m2 155.96
- Lantai 21 m2 155.96
- Lantai 22 m2 155.96
- Lantai 23 m2 155.96
- Lantai 24 m2 155.96
- Lantai 25 m2 155.96
- Lantai 26 m2 155.96
- Lantai 27 m2 155.96
- Lantai 28 m2 141.99
- Lantai 29 m2 141.99
- Lantai 30 m2 141.99
- Lantai 31 m2 141.99
- Lantai 32 m2 141.99
- Lantai 33 m2 69.85
- Lantai 34 m2 69.85
- Lantai 35 m2 69.85
- Lantai 36 m2 69.85
- Lantai 37 m2 -
3.3.1 / 5
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
B PEKERJAAN CAT
- Lantai 4 m2 439.69
- Lantai 5 m2 311.30
- Lantai 6 m2 410.10
- Lantai 7 m2 408.73
- Lantai 8 m2 408.73
- Lantai 9 m2 408.73
- Lantai 10 m2 408.73
- Lantai 11 m2 408.73
- Lantai 12 m2 408.73
- Lantai 13 m2 408.73
- Lantai 14 m2 408.73
- Lantai 15 m2 408.73
- Lantai 16 m2 408.73
- Lantai 17 m2 408.73
- Lantai 18 m2 408.73
- Lantai 19 m2 348.75
- Lantai 20 (Refugee Floor) m2 635.02
- Lantai 21 m2 440.96
- Lantai 22 m2 518.67
- Lantai 23 m2 518.67
- Lantai 24 m2 518.67
- Lantai 25 m2 518.67
- Lantai 26 m2 518.67
- Lantai 27 m2 518.67
- Lantai 28 m2 451.58
- Lantai 29 m2 451.58
- Lantai 30 m2 451.58
- Lantai 31 m2 451.58
- Lantai 32 m2 457.41
- Lantai 33 m2 592.70
- Lantai 34 m2 154.33
- Lantai 35 m2 164.60
- Lantai 36 m2 214.20
- Lantai 37 m2 -
3.3.1 / 6
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 m2 125.65
- Lantai 5 m2 186.44
- Lantai 6 m2 126.95
- Lantai 7 m2 126.95
- Lantai 8 m2 126.95
- Lantai 9 m2 126.95
- Lantai 10 m2 126.95
- Lantai 11 m2 126.95
- Lantai 12 m2 126.95
- Lantai 13 m2 126.95
- Lantai 14 m2 126.95
- Lantai 15 m2 126.95
- Lantai 16 m2 126.95
- Lantai 17 m2 126.95
- Lantai 18 m2 126.95
- Lantai 19 m2 101.65
- Lantai 20 (Refugee Floor) m2 253.84
- Lantai 21 m2 101.37
- Lantai 22 m2 101.37
- Lantai 23 m2 101.37
- Lantai 24 m2 101.37
- Lantai 25 m2 101.37
- Lantai 26 m2 101.37
- Lantai 27 m2 101.37
- Lantai 28 m2 101.37
- Lantai 29 m2 101.37
- Lantai 30 m2 101.37
- Lantai 31 m2 101.37
- Lantai 32 m2 196.84
- Lantai 33 m2 29.87
- Lantai 34 m2 279.50
- Lantai 35 m2 29.87
- Lantai 36 m2 30.16
- Lantai 37 m2 92.17
- Lantai 4 m2 183.24
3.3.1 / 7
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 10 m2 173.50
- Lantai 11 m2 173.50
- Lantai 12 m2 173.50
- Lantai 13 m2 173.50
- Lantai 14 m2 173.50
- Lantai 15 m2 173.50
- Lantai 16 m2 173.50
- Lantai 17 m2 173.50
- Lantai 18 m2 173.50
- Lantai 19 m2 173.19
- Lantai 20 (Refugee Floor) m2 256.09
- Lantai 21 m2 259.45
- Lantai 22 m2 173.19
- Lantai 23 m2 173.19
- Lantai 24 m2 173.19
- Lantai 25 m2 173.19
- Lantai 26 m2 173.19
- Lantai 27 m2 173.19
- Lantai 28 m2 173.19
- Lantai 29 m2 173.19
- Lantai 30 m2 173.19
- Lantai 31 m2 173.19
- Lantai 32 m2 248.38
- Lantai 33 m2 227.06
- Lantai 34 m2 60.31
- Lantai 35 m2 110.31
- Lantai 36 m2 94.13
- Lantai 37 m2 68.63
- Lantai 4 m2 75.48
- Lantai 5 m2 78.17
- Lantai 32 m2 91.65
- Lantai 37 m2 106.97
C PELAPIS DINDING
3.3.1 / 8
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 m2 56.28
- Lantai 5 m2 56.28
- Lantai 4 m2 149.26
- Lantai 5 m2 241.62
- Lantai 6 m2 141.16
- Lantai 7 m2 141.16
- Lantai 8 m2 141.16
- Lantai 9 m2 141.16
- Lantai 10 m2 141.16
- Lantai 11 m2 141.16
- Lantai 12 m2 141.16
- Lantai 13 m2 141.16
- Lantai 14 m2 141.16
- Lantai 15 m2 141.16
- Lantai 16 m2 141.16
- Lantai 17 m2 141.16
- Lantai 18 m2 141.16
- Lantai 19 m2 163.26
- Lantai 20 (Refugee Floor) m2 110.34
- Lantai 21 m2 118.78
- Lantai 22 m2 118.78
- Lantai 23 m2 118.78
- Lantai 24 m2 118.78
- Lantai 25 m2 118.78
- Lantai 26 m2 118.78
- Lantai 27 m2 118.78
- Lantai 28 m2 118.78
- Lantai 29 m2 118.78
- Lantai 30 m2 118.78
- Lantai 31 m2 118.78
- Lantai 32 m2 128.40
- Lantai 33 m2 55.84
- Lantai 34 m2 31.01
3.3.1 / 9
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 m2 11.40
- Lantai 5 m2 11.40
- Lantai 6 m2 11.40
- Lantai 7 m2 11.40
- Lantai 8 m2 11.40
- Lantai 9 m2 11.40
- Lantai 10 m2 11.40
- Lantai 11 m2 11.40
- Lantai 12 m2 11.40
- Lantai 13 m2 11.40
- Lantai 14 m2 11.40
- Lantai 15 m2 11.40
- Lantai 16 m2 11.40
- Lantai 17 m2 11.40
- Lantai 18 m2 11.40
- Lantai 19 m2 11.40
- Lantai 20 (Refugee Floor) m2 10.30
- Lantai 21 m2 11.40
- Lantai 22 m2 11.40
- Lantai 23 m2 11.40
- Lantai 24 m2 11.40
- Lantai 25 m2 11.40
- Lantai 26 m2 11.40
- Lantai 27 m2 11.40
- Lantai 28 m2 11.40
- Lantai 29 m2 11.40
- Lantai 30 m2 11.40
- Lantai 31 m2 11.40
- Lantai 32 m2 7.73
- Lantai 33 m2 6.62
3.3.1 / 10
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 m2 114.99
- Lantai 5 m2 114.99
- Lantai 6 m2 114.99
- Lantai 7 m2 114.99
- Lantai 8 m2 114.99
- Lantai 9 m2 114.99
- Lantai 10 m2 114.99
- Lantai 11 m2 114.99
- Lantai 12 m2 114.99
- Lantai 13 m2 114.99
- Lantai 14 m2 114.99
- Lantai 15 m2 114.99
- Lantai 16 m2 114.99
- Lantai 17 m2 114.99
- Lantai 18 m2 114.99
- Lantai 19 m2 114.99
- Lantai 20 (Refugee Floor) m2 95.32
- Lantai 21 m2 114.99
- Lantai 22 m2 114.99
- Lantai 23 m2 114.99
- Lantai 24 m2 114.99
- Lantai 25 m2 114.99
- Lantai 26 m2 114.99
- Lantai 27 m2 114.99
- Lantai 28 m2 114.99
- Lantai 29 m2 114.99
3.3.1 / 11
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 m2 19.20
- Lantai 5 m2 19.20
- Lantai 6 m2 19.20
- Lantai 7 m2 19.20
- Lantai 8 m2 19.20
- Lantai 9 m2 19.20
- Lantai 10 m2 19.20
- Lantai 11 m2 19.20
- Lantai 12 m2 19.20
- Lantai 13 m2 19.20
- Lantai 14 m2 19.20
- Lantai 15 m2 19.20
- Lantai 16 m2 19.20
- Lantai 17 m2 19.20
- Lantai 18 m2 19.20
- Lantai 19 m2 19.20
- Lantai 20 (Refugee Floor) m2 19.20
- Lantai 21 m2 19.20
- Lantai 22 m2 19.20
- Lantai 23 m2 19.20
- Lantai 24 m2 19.20
- Lantai 25 m2 19.20
- Lantai 26 m2 19.20
- Lantai 27 m2 19.20
- Lantai 28 m2 19.20
- Lantai 29 m2 19.20
3.3.1 / 12
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 m2 30.36
- Lantai 5 m2 31.35
- Lantai 37 m2 230.99
3.3.1 / 13
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
SUB PENJUMLAHAN
HALAMAN 3.3.1 / 2
HALAMAN 3.3.1 / 3
HALAMAN 3.3.1 / 4
HALAMAN 3.3.1 / 5
HALAMAN 3.3.1 / 6
HALAMAN 3.3.1 / 7
HALAMAN 3.3.1 / 8
HALAMAN 3.3.1 / 9
HALAMAN 3.3.1 / 10
HALAMAN 3.3.1 / 11
HALAMAN 3.3.1 / 12
3.3.1 / 14
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
3.3.1 / 15
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
Catatan Harga
3.3.2 / 16
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
A. Pintu Besi
- Lantai 4 Bh 1.00
- Lantai 5 Bh 2.00
- Lantai 6 Bh 1.00
- Lantai 7 Bh 1.00
- Lantai 8 Bh 1.00
- Lantai 9 Bh 1.00
- Lantai 10 Bh 1.00
- Lantai 11 Bh 1.00
- Lantai 12 Bh 1.00
- Lantai 13 Bh 1.00
- Lantai 14 Bh 1.00
- Lantai 15 Bh 1.00
- Lantai 16 Bh 1.00
- Lantai 17 Bh 1.00
- Lantai 18 Bh 1.00
- Lantai 19 Bh 1.00
- Lantai 20 (Refugee Floor) Bh 1.00
- Lantai 21 Bh 1.00
- Lantai 22 Bh 1.00
- Lantai 23 Bh 1.00
- Lantai 24 Bh 1.00
- Lantai 25 Bh 1.00
- Lantai 26 Bh 1.00
- Lantai 27 Bh 1.00
- Lantai 28 Bh 1.00
- Lantai 29 Bh 1.00
- Lantai 30 Bh 1.00
- Lantai 31 Bh 1.00
- Lantai 32 Bh 4.00
- Lantai 33 Bh 1.00
- Lantai 34 Bh 1.00
- Lantai 35 Bh 1.00
Hardware :
- Lever handle KEND HRE.75.01 US32D Ps 36
- Lockcase swing besi CISA 52710-60 US32D Bh 36
- Double Cylinder CISA OG300-15 US14 Bh 36
- Hinges KEND 497 USP Ps 36
3.3.2 / 17
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 Bh 2.00
Hardware :
- Lever handle KEND HRE.75.01 US32D Ps 2.00
- Lockcase swing besi CISA 52710-60 US32D Bh 2.00
- Double Cylinder CISA OG300-15 US14 Bh 2.00
- Hinges KEND 497 USP Ps 2.00
- Lantai 4 Bh 4.00
- Lantai 5 Bh 3.00
- Lantai 6 Bh 2.00
- Lantai 7 Bh 2.00
- Lantai 8 Bh 2.00
- Lantai 9 Bh 2.00
- Lantai 10 Bh 2.00
- Lantai 11 Bh 2.00
- Lantai 12 Bh 2.00
- Lantai 13 Bh 2.00
- Lantai 14 Bh 2.00
- Lantai 15 Bh 2.00
- Lantai 16 Bh 2.00
- Lantai 17 Bh 2.00
- Lantai 18 Bh 2.00
- Lantai 19 Bh 2.00
- Lantai 20 (Refugee Floor) Bh 2.00
- Lantai 21 Bh 3.00
- Lantai 22 Bh 2.00
- Lantai 23 Bh 2.00
- Lantai 24 Bh 2.00
- Lantai 25 Bh 2.00
- Lantai 26 Bh 2.00
- Lantai 27 Bh 2.00
- Lantai 28 Bh 2.00
- Lantai 29 Bh 2.00
- Lantai 30 Bh 2.00
- Lantai 31 Bh 2.00
- Lantai 32 Bh 2.00
3.3.2 / 18
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 33 Bh -
- Lantai 34 Bh -
- Lantai 35 Bh -
- Lantai 36 Bh -
- Lantai 37 Bh 1.00
Hardware :
- Lever handle KEND HRE.75.01 US32D Ps 63
- Lockcase swing besi CISA 52710-60 US32D Bh 63
- Double Cylinder CISA OG300-15 US14 Bh 63
- Hinges KEND 497 USP Ps 63
- Lantai 4 Bh 1.00
Hardware :
- Lever handle KEND HRE.75.01 US32D set 2.00
- Lockcase swing besi CISA 52710-60 US32D Bh 1.00
- Double Cylinder CISA OG300-15 US14 Bh 1.00
- Flush bolt KEND 333 12” US14 Bh 1.00
- Flush bolt KEND 333 6” US14 Bh 1.00
- Hinges KEND 497 USP set 2.00
- Lantai 20 Bh 1.00
Hardware :
- Pull handle KEND PR.73.01 US32D set 2.00
- Escutcheon KEND E.73.01 US32D set 1.00
- Lockcase pelor besi KEND 75720-55 US32D Bh 1.00
- Double Cylinder CISA OG300-15 US14 Bh 1.00
- Flush bolt KEND 333 12” US14 Bh 1.00
- Flush bolt KEND 333 6” US14 Bh 1.00
- Hinges KEND 497 USP set 3.00
3.3.2 / 19
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 Bh 2.00
- Lantai 5 Bh -
- Lantai 33 Bh 1.00
Hardware :
- Lever handle KEND HRE.75.01 US32D set 10.00
- Lockcase swing besi CISA 52710-60 US32D Bh 5.00
- Double Cylinder CISA OG300-15 US14 Bh 5.00
- Flush bolt KEND 333 12” US14 Bh 5.00
- Flush bolt KEND 333 6” US14 Bh 5.00
- Hinges KEND 497 USP set 10.00
- Lantai 36 Bh 1.00
Hardware :
- Lever handle KEND HRE.75.01 US32D Ps 1.00
- Lockcase swing besi CISA 52710-60 US32D Bh 1.00
- Double Cylinder CISA OG300-15 US14 Bh 1.00
- Hinges KEND 497 USP Ps 1.00
- Lantai 4 Bh 2.00
- Lantai 5 Bh 3.00
- Lantai 6 Bh 2.00
- Lantai 7 Bh 2.00
- Lantai 8 Bh 2.00
- Lantai 9 Bh 2.00
- Lantai 10 Bh 2.00
- Lantai 11 Bh 2.00
- Lantai 12 Bh 2.00
- Lantai 13 Bh 2.00
- Lantai 14 Bh 2.00
- Lantai 15 Bh 2.00
3.3.2 / 20
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 19 Bh 2.00
- Lantai 20 (Refugee Floor) Bh 4.00
- Lantai 21 Bh 2.00
- Lantai 22 Bh 2.00
- Lantai 23 Bh 2.00
- Lantai 24 Bh 2.00
- Lantai 25 Bh 2.00
- Lantai 26 Bh 2.00
- Lantai 27 Bh 2.00
- Lantai 28 Bh 2.00
- Lantai 29 Bh 2.00
- Lantai 30 Bh 2.00
- Lantai 31 Bh 2.00
- Lantai 32 Bh 2.00
- Lantai 33 Bh 3.00
- Lantai 34 Bh 1.00
- Lantai 35 Bh 1.00
- Lantai 36 Bh 1.00
- Lantai 37 Bh -
Hardware :
- Panic exit Bar CISA 59011-10 Only Black Bh 67
- Panic exit Hand CISA 07078-68 Black Bh 67
- Hinges KEND 497 USP set 101
- Door closer CISA D1415-03 S Bh 67
- Lantai 6 Bh 1.00
Hardware :
- Panic exit Bar CISA 59011-10 Only Black Bh 2.00
- Panic exit Hand CISA 07078-68 Black Bh 2.00
- Auto Flushbolt KEND 75-556 US32D Bh 2.00
- Hinges KEND 497 USP set 3.00
- Door closer CISA D1415-03 S Bh 2.00
3.3.2 / 21
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 Bh 2.00
- Lantai 5 Bh 3.00
- Lantai 6 Bh 3.00
- Lantai 7 Bh 2.00
- Lantai 8 Bh 2.00
- Lantai 9 Bh 2.00
- Lantai 10 Bh 2.00
- Lantai 11 Bh 2.00
- Lantai 12 Bh 2.00
- Lantai 13 Bh 2.00
- Lantai 14 Bh 2.00
- Lantai 15 Bh 2.00
- Lantai 16 Bh 2.00
- Lantai 17 Bh 2.00
- Lantai 18 Bh 2.00
- Lantai 19 Bh 2.00
- Lantai 20 (Refugee Floor) Bh 4.00
- Lantai 21 Bh 2.00
- Lantai 22 Bh 2.00
- Lantai 23 Bh 2.00
- Lantai 24 Bh 2.00
- Lantai 25 Bh 2.00
- Lantai 26 Bh 2.00
- Lantai 27 Bh 2.00
- Lantai 28 Bh 2.00
- Lantai 29 Bh 2.00
- Lantai 30 Bh 2.00
- Lantai 31 Bh 2.00
- Lantai 32 Bh 2.00
- Lantai 33 Bh 1.00
- Lantai 34 Bh 1.00
- Lantai 35 Bh 1.00
- Lantai 36 Bh 1.00
- Lantai 37 Bh 1.00
Hardware :
- Panic exit Bar CISA 59011-10 Only Black Bh 67.00
- Panic exit Hand CISA 07078-68 Black Bh 67.00
3.3.2 / 22
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 Bh 4.00
- Lantai 5 Bh 6.00
- Lantai 6 Bh 4.00
- Lantai 7 Bh 4.00
- Lantai 8 Bh 4.00
- Lantai 9 Bh 4.00
- Lantai 10 Bh 4.00
- Lantai 11 Bh 4.00
- Lantai 12 Bh 4.00
- Lantai 13 Bh 4.00
- Lantai 14 Bh 4.00
- Lantai 15 Bh 4.00
- Lantai 16 Bh 4.00
- Lantai 17 Bh 4.00
- Lantai 18 Bh 4.00
- Lantai 19 Bh 3.00
- Lantai 20 (Refugee Floor) Bh 3.00
- Lantai 21 Bh 3.00
- Lantai 22 Bh 3.00
- Lantai 23 Bh 3.00
- Lantai 24 Bh 3.00
- Lantai 25 Bh 3.00
- Lantai 26 Bh 3.00
- Lantai 27 Bh 3.00
- Lantai 28 Bh 3.00
- Lantai 29 Bh 3.00
- Lantai 30 Bh 3.00
- Lantai 31 Bh 3.00
- Lantai 32 Bh 3.00
- Lantai 33 Bh 4.00
- Lantai 34 Bh 4.00
- Lantai 35 Bh 4.00
- Lantai 36 Bh 4.00
- Lantai 37 Bh 1.00
Hardware :
- Flush ring handle KEND FRP.75.01 US32D set 60.50
3.3.2 / 23
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 Bh 4.00
- Lantai 5 Bh 4.00
- Lantai 6 Bh 4.00
- Lantai 7 Bh 4.00
- Lantai 8 Bh 4.00
- Lantai 9 Bh 4.00
- Lantai 10 Bh 4.00
- Lantai 11 Bh 4.00
- Lantai 12 Bh 4.00
- Lantai 13 Bh 4.00
- Lantai 14 Bh 4.00
- Lantai 15 Bh 4.00
- Lantai 16 Bh 4.00
- Lantai 17 Bh 4.00
- Lantai 18 Bh 4.00
- Lantai 19 Bh 4.00
- Lantai 20 (Refugee Floor) Bh 4.00
- Lantai 21 Bh 4.00
- Lantai 22 Bh 4.00
- Lantai 23 Bh 4.00
- Lantai 24 Bh 4.00
- Lantai 25 Bh 4.00
- Lantai 26 Bh 4.00
- Lantai 27 Bh 4.00
- Lantai 28 Bh 4.00
- Lantai 29 Bh 4.00
- Lantai 30 Bh 4.00
- Lantai 31 Bh 4.00
- Lantai 32 Bh 5.00
- Lantai 33 Bh 3.00
- Lantai 34 Bh 4.00
- Lantai 35 Bh 3.00
Hardware :
- Flush ring handle KEND FRP.75.01 US32D set 127.00
- Security bolt KEND 5071+Key US14D Bh 127.00
3.3.2 / 24
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
B. Pintu Kayu
1 Type Pintu PK-1, ukuran overall 900 mm x 2200 mm, terdiri
dari daun pintu Solid + Laminated + Edging kayu sungkai
10x40mm + Vission Glass (Single swing), kusen kayu
kamper oven daun pintu + kusen engineering, sesuai
dengan gambar dan spesifikasi, pada:
- Lantai 4 Bh 2.00
- Lantai 5 Bh 2.00
- Lantai 6 Bh 2.00
- Lantai 7 Bh 2.00
- Lantai 8 Bh 2.00
- Lantai 9 Bh 2.00
- Lantai 10 Bh 2.00
- Lantai 11 Bh 2.00
- Lantai 12 Bh 2.00
- Lantai 13 Bh 2.00
- Lantai 14 Bh 2.00
- Lantai 15 Bh 2.00
- Lantai 16 Bh 2.00
- Lantai 17 Bh 2.00
- Lantai 18 Bh 2.00
- Lantai 19 Bh 1.00
- Lantai 20 (Refugee Floor) Bh 1.00
- Lantai 21 Bh 1.00
- Lantai 22 Bh 1.00
- Lantai 23 Bh 1.00
- Lantai 24 Bh 1.00
- Lantai 25 Bh 1.00
- Lantai 26 Bh 1.00
- Lantai 27 Bh 1.00
- Lantai 28 Bh 1.00
- Lantai 29 Bh 1.00
- Lantai 30 Bh 1.00
- Lantai 31 Bh 1.00
- Lantai 32 Bh 1.00
Hardware :
- Lever handle KEND HRE.75.01 US32D set 44.00
- Lockcase swing kayu CISA 52110-60 US14 Bh 44.00
3.3.2 / 25
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
3.3.2 / 26
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
3.3.2 / 27
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 33 Bh 1.00
Hardware :
- Pull handle KEND GHD0003 i US32 set 6.00
- Patch fitting KEND PT.2220 US32 Bh 6.00
- Patch fitting KEND PT.2210/C US32 Bh 6.00
- Patch fitting KEND PT.2230 US32 Bh 2.00
- Patch fitting KEND PT.2240 US32 Bh 4.00
- Patch lock KEND US.2210 US32 Bh 6.00
- Double Cylinder CISA OG300-10 US14 Bh 6.00
- Covering plate CISA 07124 US32D Bh 6.00
- Floor hinge CISA 60231 Bh 6.00
3.3.2 / 28
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 Bh 1.00
- Lantai 5 Bh 3.00
- Lantai 6 Bh 1.00
- Lantai 7 Bh 1.00
- Lantai 8 Bh 1.00
- Lantai 9 Bh 1.00
- Lantai 10 Bh 1.00
- Lantai 11 Bh 1.00
- Lantai 12 Bh 1.00
- Lantai 13 Bh 1.00
- Lantai 14 Bh 1.00
- Lantai 15 Bh 1.00
- Lantai 16 Bh 1.00
- Lantai 17 Bh 1.00
- Lantai 18 Bh 1.00
- Lantai 20 (Refugee Floor) Bh 2.00
- Lantai 32 Bh 2.00
- Lantai 33 Bh 1.00
- Lantai 34 Bh 1.00
- Lantai 35 Bh 1.00
Hardware :
- Pull handle KEND GHD0003 i US32 set 48.00
- Patch fitting KEND PT.2220 US32 Bh 48.00
- Patch fitting KEND PT.2210/C US32 Bh 48.00
- Patch fitting KEND PT.2240 US32 Bh 48.00
- Patch lock KEND US.2210 US32 Bh 48.00
- Double Cylinder CISA OG300-10 US14 Bh 48.00
- Covering plate CISA 07124 US32D Bh 48.00
- Floor hinge CISA 60231 Bh 48.00
3.3.2 / 29
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 34 Bh 1.00
Hardware :
- Pull handle KEND GHD0003 i US32 set 2.00
- Patch fitting KEND PT.2220 US32 Bh 2.00
- Patch fitting KEND PT.2210/C US32 Bh 2.00
Patch fitting KEND PT.2240 US32 Bh 2.00
- Patch lock KEND US.2210 US32 Bh 2.00
- Double Cylinder CISA OG300-10 US14 Bh 2.00
- Covering plate CISA 07124 US32D Bh 2.00
- Floor hinge CISA 60231 Bh 2.00
- Lantai 35 Bh 1.00
Hardware :
- Pull handle KEND GHD0003 i US32 set 1.00
- Patch fitting KEND PT.2220 US32 Bh 1.00
- Patch fitting KEND PT.2210/C US32 Bh 1.00
- Patch fitting KEND PT.2240 US32 Bh 1.00
- Patch lock KEND US.2210 US32 Bh 1.00
- Double Cylinder CISA OG300-10 US14 Bh 1.00
- Covering plate CISA 07124 US32D Bh 1.00
- Floor hinge CISA 60231 Bh 1.00
- Lantai 34 Bh 1.00
- Lantai 35 Bh 1.00
3.3.2 / 30
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 36 Bh 1.00
Hardware :
- Pull handle KEND GHD0003 i US32 set 1.00
- Patch fitting KEND PT.2220 US32 Bh 1.00
- Patch fitting KEND PT.2210/C US32 Bh 1.00
- Patch fitting KEND PT.2240 US32 Bh 1.00
- Patch lock KEND US.2210 US32 Bh 1.00
- Double Cylinder CISA OG300-10 US14 Bh 1.00
- Covering plate CISA 07124 US32D Bh 1.00
- Floor hinge CISA 60231 Bh 1.00
- Lantai 4 Bh 1.00
- Lantai 5 Bh 1.00
- Lantai 6 Bh 1.00
- Lantai 7 Bh 1.00
- Lantai 8 Bh 1.00
- Lantai 9 Bh 1.00
- Lantai 10 Bh 1.00
- Lantai 11 Bh 1.00
- Lantai 12 Bh 1.00
- Lantai 13 Bh 1.00
- Lantai 14 Bh 1.00
3.3.2 / 31
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 28 Bh 1.00
- Lantai 29 Bh 1.00
- Lantai 30 Bh 1.00
- Lantai 31 Bh 1.00
- Lantai 32 Bh 1.00
Hardware :
- Pull handle KEND GHD0003 i US32 set 28.00
- Shower hinge GG KEND E.572 180° S26 set 28.00
- Lantai 22 Bh 2.00
- Lantai 23 Bh 2.00
- Lantai 24 Bh 2.00
- Lantai 25 Bh 2.00
- Lantai 26 Bh 2.00
- Lantai 27 Bh 2.00
- Lantai 28 Bh 2.00
- Lantai 29 Bh 2.00
- Lantai 30 Bh 2.00
- Lantai 31 Bh 2.00
Hardware :
- Pull Handle KEND GHD9603 38x1200mm US32D set 40.00
- Lockcase pelor AL KEND K87738-25 US32D Bh 20.00
- Double Cylinder CISA OG300-10 US14 Bh 20.00
- Flush bolt KEND 333 12" US14 Bh 20.00
3.3.2 / 32
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
E. Jendela
3.3.2 / 33
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
SUB PENJUMLAHAN
HALAMAN 3.3.2 / 2
HALAMAN 3.3.2 / 3
HALAMAN 3.3.2 / 4
HALAMAN 3.3.2 / 5
HALAMAN 3.3.2 / 6
HALAMAN 3.3.2 / 7
HALAMAN 3.3.2 / 8
HALAMAN 3.3.2 / 9
HALAMAN 3.3.2 / 10
HALAMAN 3.3.2 / 11
HALAMAN 3.3.2 / 12
HALAMAN 3.3.2 / 13
HALAMAN 3.3.2 / 14
HALAMAN 3.3.2 / 15
3.3.2 / 34
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
HALAMAN 3.3.2 / 16
HALAMAN 3.3.2 / 17
HALAMAN 3.3.2 / 18
3.3.2 / 35
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
Catatan Harga
3.3.3 / 36
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
A PELAPIS LANTAI
- Lantai 4 m2 113.15
- Lantai 5 m2 112.76
- Lantai 6 m2 112.78
- Lantai 7 m2 112.85
- Lantai 8 m2 112.85
- Lantai 9 m2 112.85
- Lantai 10 m2 112.85
- Lantai 11 m2 112.85
- Lantai 12 m2 112.85
- Lantai 13 m2 112.85
- Lantai 14 m2 112.85
- Lantai 15 m2 112.85
- Lantai 16 m2 112.85
- Lantai 17 m2 112.85
- Lantai 18 m2 112.85
- Lantai 19 m2 156.47
- Lantai 20 (Refugee Floor) m2 96.76
- Lantai 21 m2 97.42
- Lantai 22 m2 98.18
- Lantai 23 m2 98.18
- Lantai 24 m2 98.18
- Lantai 25 m2 98.18
- Lantai 26 m2 98.18
- Lantai 27 m2 98.18
- Lantai 28 m2 98.20
- Lantai 29 m2 98.20
- Lantai 30 m2 98.20
- Lantai 31 m2 98.20
- Lantai 32 m2 113.22
- Lantai 33 m2 446.31
- Lantai 34 m2 17.71
- Lantai 35 m2 17.69
3.3.3 / 37
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 m2 12.38
- Lantai 5 m2 17.74
- Lantai 6 m2 12.38
- Lantai 7 m2 12.39
- Lantai 8 m2 12.39
- Lantai 9 m2 12.39
- Lantai 10 m2 12.39
- Lantai 11 m2 12.39
- Lantai 12 m2 12.39
- Lantai 13 m2 12.39
- Lantai 14 m2 12.39
- Lantai 15 m2 12.39
- Lantai 16 m2 12.39
- Lantai 17 m2 12.39
- Lantai 18 m2 12.39
- Lantai 19 m2 12.39
- Lantai 20 (Refugee Floor) m2 22.41
- Lantai 21 m2 12.31
- Lantai 22 m2 12.31
- Lantai 23 m2 12.31
- Lantai 24 m2 12.31
- Lantai 25 m2 12.31
- Lantai 26 m2 12.31
- Lantai 27 m2 12.31
- Lantai 28 m2 12.31
- Lantai 29 m2 12.31
- Lantai 30 m2 12.31
- Lantai 31 m2 12.31
- Lantai 32 m2 12.31
- Lantai 33 m2 27.36
- Lantai 34 m2 6.16
- Lantai 35 m2 6.16
- Lantai 36 m2 5.99
- Lantai 33 m2 335.73
3.3.3 / 38
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 m2 34.11
- Lantai 5 m2 34.07
- Lantai 6 m2 34.21
- Lantai 7 m2 34.21
- Lantai 8 m2 34.21
- Lantai 9 m2 34.21
- Lantai 10 m2 34.21
- Lantai 11 m2 34.21
- Lantai 12 m2 34.21
- Lantai 13 m2 34.21
- Lantai 14 m2 34.21
- Lantai 15 m2 34.21
- Lantai 16 m2 34.21
- Lantai 17 m2 34.21
- Lantai 18 m2 34.21
- Lantai 19 m2 34.21
- Lantai 20 (Refugee Floor) m2 29.32
- Lantai 21 m2 34.02
- Lantai 22 m2 33.93
- Lantai 23 m2 33.93
- Lantai 24 m2 33.93
- Lantai 25 m2 33.93
- Lantai 26 m2 33.93
- Lantai 27 m2 33.93
- Lantai 28 m2 34.21
- Lantai 29 m2 34.21
- Lantai 30 m2 34.21
- Lantai 31 m2 34.21
- Lantai 32 m2 45.77
- Lantai 33 m2 29.85
- Lantai 34 m2 581.83
- Lantai 35 m2 365.75
- Lantai 36 m2 342.89
3.3.3 / 39
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 m2 17.65
- Lantai 5 m2 15.63
- Lantai 6 m2 15.63
- Lantai 7 m2 16.61
- Lantai 8 m2 16.61
- Lantai 9 m2 16.61
- Lantai 10 m2 16.61
- Lantai 11 m2 16.61
- Lantai 12 m2 16.61
- Lantai 13 m2 16.61
- Lantai 14 m2 16.61
- Lantai 15 m2 16.61
- Lantai 16 m2 16.61
- Lantai 17 m2 16.61
- Lantai 18 m2 16.61
- Lantai 19 m2 16.64
- Lantai 20 (Refugee Floor) m2 20.52
- Lantai 21 m2 17.80
- Lantai 22 m2 17.80
- Lantai 23 m2 17.80
- Lantai 24 m2 17.80
- Lantai 25 m2 17.80
- Lantai 26 m2 17.80
- Lantai 27 m2 17.80
- Lantai 28 m2 16.64
- Lantai 29 m2 16.64
- Lantai 30 m2 16.64
- Lantai 31 m2 16.64
- Lantai 32 m2 72.47
- Lantai 33 m2 67.20
- Lantai 34 m2 3.32
- Lantai 35 m2 1.89
- Lantai 33 m2 440.77
3.3.3 / 40
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 m2 31.43
- Lantai 5 m2 31.41
- Lantai 6 m2 33.01
- Lantai 7 m2 34.77
- Lantai 8 m2 34.77
- Lantai 9 m2 34.77
- Lantai 10 m2 34.77
- Lantai 11 m2 34.77
- Lantai 12 m2 34.77
- Lantai 13 m2 34.77
- Lantai 14 m2 34.77
- Lantai 15 m2 34.77
- Lantai 16 m2 34.77
- Lantai 17 m2 34.77
- Lantai 18 m2 34.77
- Lantai 19 m2 34.62
- Lantai 20 (Refugee Floor) m2 17.32
- Lantai 21 m2 63.51
- Lantai 22 m2 34.65
- Lantai 23 m2 34.65
- Lantai 24 m2 34.65
- Lantai 25 m2 34.65
- Lantai 26 m2 34.65
- Lantai 27 m2 34.65
- Lantai 28 m2 34.64
- Lantai 29 m2 34.64
- Lantai 30 m2 34.64
- Lantai 31 m2 34.64
- Lantai 32 m2 58.30
3.3.3 / 41
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 m2 21.98
- Lantai 5 m2 309.17
- Lantai 6 m2 21.98
- Lantai 7 m2 14.66
- Lantai 8 m2 14.66
- Lantai 9 m2 14.66
- Lantai 10 m2 14.66
- Lantai 11 m2 14.66
- Lantai 12 m2 14.66
- Lantai 13 m2 14.66
- Lantai 14 m2 14.66
- Lantai 15 m2 14.66
- Lantai 16 m2 14.66
- Lantai 17 m2 14.66
- Lantai 18 m2 14.66
- Lantai 19 m2 14.66
- Lantai 20 (Refugee Floor) m2 14.66
- Lantai 21 m2 14.66
- Lantai 22 m2 14.66
- Lantai 23 m2 14.66
- Lantai 24 m2 14.66
- Lantai 25 m2 14.66
- Lantai 26 m2 14.66
- Lantai 27 m2 14.66
- Lantai 28 m2 14.66
- Lantai 29 m2 14.66
- Lantai 30 m2 14.66
- Lantai 31 m2 14.66
- Lantai 32 m2 14.66
- Lantai 33 m2 14.66
- Lantai 34 m2 21.98
- Lantai 35 m2 140.07
- Lantai 36 m2 14.66
- Lantai 37 m2 337.31
3.3.3 / 42
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
3.3.3 / 43
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
3.3.3 / 44
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 m2 1,124.78
- Lantai 5 m2 824.30
- Lantai 6 m2 1,146.99
- Lantai 7 m2 1,144.60
- Lantai 8 m2 1,144.60
- Lantai 9 m2 1,144.60
- Lantai 10 m2 1,144.60
- Lantai 11 m2 1,144.60
- Lantai 12 m2 1,144.60
- Lantai 13 m2 1,144.60
- Lantai 14 m2 1,144.60
- Lantai 15 m2 1,144.60
- Lantai 16 m2 1,144.60
- Lantai 17 m2 1,144.60
- Lantai 18 m2 1,144.60
- Lantai 19 m2 1,116.10
- Lantai 20 m2 1,175.04
- Lantai 21 m2 1,148.65
- Lantai 22 m2 1,212.95
- Lantai 23 m2 1,212.95
- Lantai 24 m2 1,212.95
- Lantai 25 m2 1,212.95
- Lantai 26 m2 1,212.95
- Lantai 27 m2 1,212.95
- Lantai 28 m2 1,204.51
- Lantai 29 m2 1,204.51
- Lantai 30 m2 1,204.51
- Lantai 31 m2 1,204.51
- Lantai 32 m2 1,042.01
3.3.3 / 45
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
B WATERPROOFING
- Lantai 4 m2 34.11
- Lantai 5 m2 34.07
- Lantai 6 m2 34.21
- Lantai 7 m2 34.21
- Lantai 8 m2 34.21
- Lantai 9 m2 34.21
- Lantai 10 m2 34.21
- Lantai 11 m2 34.21
- Lantai 12 m2 34.21
- Lantai 13 m2 34.21
- Lantai 14 m2 34.21
- Lantai 15 m2 34.21
- Lantai 16 m2 34.21
- Lantai 17 m2 34.21
- Lantai 18 m2 34.21
- Lantai 19 m2 34.21
- Lantai 20 (Refugee Floor) m2 29.32
- Lantai 21 m2 34.02
- Lantai 22 m2 33.93
- Lantai 23 m2 33.93
- Lantai 24 m2 33.93
- Lantai 25 m2 33.93
- Lantai 26 m2 33.93
- Lantai 27 m2 33.93
- Lantai 28 m2 34.21
- Lantai 29 m2 34.21
3.3.3 / 46
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
C SKIRTING
- Lantai 33 m2 302.12
3.3.3 / 47
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 34 m 231.92
- Lantai 35 m 137.87
- Lantai 36 m 146.21
3.3.3 / 48
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
5 Plester coak + cat epoxy tinggi 100mm, dengan perekat dan LEGEND 9
kelengkapan lainnya pada:outdoor AC, r. tangga, r.
gondola, mesin lift
3.3.3 / 49
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
SUB PENJUMLAHAN
HALAMAN 3.3.3 / 2
HALAMAN 3.3.3 / 3
HALAMAN 3.3.3 / 4
HALAMAN 3.3.3 / 5
HALAMAN 3.3.3 / 6
HALAMAN 3.3.3 / 7
HALAMAN 3.3.3 / 8
HALAMAN 3.3.3 / 9
HALAMAN 3.3.3 / 10
HALAMAN 3.3.3 / 11
3.3.3 / 50
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
HALAMAN 3.3.3 / 13
HALAMAN 3.3.3 / 14
3.3.3 / 51
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
Catatan Harga
III Jumlah luas plafond dan plafond vertikal ( drop ceiling ) tidak
dikurangi dengan lampu dan grill A/C.
3.3.4 / 52
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 m2 67.22
- Lantai 5 m2 67.22
- Lantai 6 m2 67.22
- Lantai 7 m2 67.22
- Lantai 8 m2 67.22
- Lantai 9 m2 67.22
- Lantai 10 m2 67.22
- Lantai 11 m2 67.22
- Lantai 12 m2 67.22
- Lantai 13 m2 67.22
- Lantai 14 m2 67.22
- Lantai 15 m2 67.22
- Lantai 16 m2 67.22
- Lantai 17 m2 67.22
- Lantai 18 m2 67.22
- Lantai 19 m2 67.22
- Lantai 20 (Refugee Floor) m2 51.15
- Lantai 21 m2 67.22
- Lantai 22 m2 67.22
- Lantai 23 m2 67.22
- Lantai 24 m2 67.22
- Lantai 25 m2 67.22
- Lantai 26 m2 67.22
- Lantai 27 m2 67.22
- Lantai 28 m2 67.22
- Lantai 29 m2 67.22
- Lantai 30 m2 67.22
- Lantai 31 m2 67.22
- Lantai 32 m2 95.21
- Lantai 33 m2 31.50
- Lantai 34 m2 31.50
- Lantai 35 m2 31.42
3.3.4 / 53
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 m2 143.44
- Lantai 5 m2 137.13
- Lantai 6 m2 143.44
- Lantai 7 m2 143.44
- Lantai 8 m2 143.44
- Lantai 9 m2 143.44
- Lantai 10 m2 143.44
- Lantai 11 m2 143.44
- Lantai 12 m2 143.44
- Lantai 13 m2 143.44
- Lantai 14 m2 143.44
- Lantai 15 m2 143.44
- Lantai 16 m2 143.44
- Lantai 17 m2 143.44
- Lantai 18 m2 143.44
- Lantai 19 m2 121.55
- Lantai 20 (Refugee Floor) m2 154.62
- Lantai 21 m2 183.49
- Lantai 22 m2 121.55
- Lantai 23 m2 121.55
- Lantai 24 m2 121.55
- Lantai 25 m2 121.55
- Lantai 26 m2 121.55
- Lantai 27 m2 121.55
- Lantai 28 m2 121.55
- Lantai 29 m2 121.55
- Lantai 30 m2 121.55
- Lantai 31 m2 121.55
- Lantai 32 m2 153.17
- Lantai 33 m2 82.56
- Lantai 34 m2 15.40
- Lantai 35 m2 12.25
- Lantai 36 m2 89.24
3.3.4 / 54
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 m2 23.10
- Lantai 5 m2 23.10
- Lantai 6 m2 23.10
- Lantai 7 m2 23.10
- Lantai 8 m2 23.10
- Lantai 9 m2 23.10
- Lantai 10 m2 23.10
- Lantai 11 m2 23.10
- Lantai 12 m2 23.10
- Lantai 13 m2 23.10
- Lantai 14 m2 23.10
- Lantai 15 m2 23.10
- Lantai 16 m2 23.10
- Lantai 17 m2 23.10
- Lantai 18 m2 23.10
- Lantai 19 m2 46.20
- Lantai 20 (Refugee Floor) m2 23.10
- Lantai 21 m2 23.10
- Lantai 22 m2 23.10
- Lantai 23 m2 23.10
- Lantai 24 m2 23.10
- Lantai 25 m2 23.10
- Lantai 26 m2 23.10
- Lantai 27 m2 23.10
- Lantai 28 m2 23.10
- Lantai 29 m2 23.10
- Lantai 30 m2 23.10
- Lantai 31 m2 23.10
- Lantai 32 m2 23.10
- Lantai 33 m2 23.10
3.3.4 / 55
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 34 m2 15.39
- Lantai 35 m2 15.39
- Lantai 4 m2 67.22
- Lantai 5 m2 67.22
- Lantai 6 m2 67.22
- Lantai 7 m2 67.22
- Lantai 8 m2 67.22
- Lantai 9 m2 67.22
- Lantai 10 m2 67.22
- Lantai 11 m2 67.22
- Lantai 12 m2 67.22
- Lantai 13 m2 67.22
- Lantai 14 m2 67.22
- Lantai 15 m2 67.22
- Lantai 16 m2 67.22
- Lantai 17 m2 67.22
- Lantai 18 m2 67.22
- Lantai 19 m2 67.22
- Lantai 20 (Refugee Floor) m2 51.15
- Lantai 21 m2 67.22
- Lantai 22 m2 67.22
- Lantai 23 m2 67.22
- Lantai 24 m2 67.22
- Lantai 25 m2 67.22
- Lantai 26 m2 67.22
- Lantai 27 m2 67.22
- Lantai 28 m2 67.22
- Lantai 29 m2 67.22
- Lantai 30 m2 67.22
- Lantai 31 m2 67.22
- Lantai 32 m2 95.21
- Lantai 33 m2 31.50
- Lantai 34 m2 31.50
- Lantai 35 m2 31.42
3.3.4 / 56
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 m2 58.89
- Lantai 5 m2 52.58
- Lantai 6 m2 58.89
- Lantai 7 m2 58.89
- Lantai 8 m2 58.89
- Lantai 9 m2 58.89
- Lantai 10 m2 58.89
- Lantai 11 m2 58.89
- Lantai 12 m2 58.89
- Lantai 13 m2 58.89
- Lantai 14 m2 58.89
- Lantai 15 m2 58.89
- Lantai 16 m2 58.89
- Lantai 17 m2 58.89
- Lantai 18 m2 58.89
- Lantai 19 m2 37.00
- Lantai 20 (Refugee Floor) m2 70.06
- Lantai 21 m2 98.94
- Lantai 22 m2 37.00
- Lantai 23 m2 37.00
- Lantai 24 m2 37.00
- Lantai 25 m2 37.00
- Lantai 26 m2 37.00
- Lantai 27 m2 37.00
- Lantai 28 m2 37.00
- Lantai 29 m2 37.00
- Lantai 30 m2 37.00
- Lantai 31 m2 37.00
- Lantai 32 m2 68.61
- Lantai 33 m2 82.56
- Lantai 34 m2 15.40
- Lantai 35 m2 12.25
- Lantai 36 m2 89.24
3.3.4 / 57
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
7 Cat Plafond dengan Cat Epoxy, pada Plat Beton (Skimcoat): Legend 7
- Lantai 4 m2 14.50
- Lantai 5 m2 293.40
- Lantai 6 m2 14.50
- Lantai 7 m2 14.50
- Lantai 8 m2 14.50
- Lantai 9 m2 14.50
- Lantai 10 m2 14.50
- Lantai 11 m2 14.50
- Lantai 12 m2 14.50
- Lantai 13 m2 14.50
- Lantai 14 m2 14.50
- Lantai 15 m2 14.50
- Lantai 16 m2 14.50
- Lantai 17 m2 14.50
- Lantai 18 m2 14.50
- Lantai 19 m2 14.50
- Lantai 20 (Refugee Floor) m2 14.50
- Lantai 21 m2 14.50
- Lantai 22 m2 14.50
- Lantai 23 m2 14.50
- Lantai 24 m2 14.50
- Lantai 25 m2 14.50
- Lantai 26 m2 14.50
- Lantai 27 m2 14.50
- Lantai 28 m2 14.50
- Lantai 29 m2 14.50
- Lantai 30 m2 14.50
- Lantai 31 m2 14.50
- Lantai 32 m2 7.28
- Lantai 33 m2 12.88
- Lantai 34 m2 7.28
- Lantai 35 m2 7.28
- Lantai 36 m2 7.28
3.3.4 / 58
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
3.3.4 / 59
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
SUB PENJUMLAHAN
HALAMAN 3.3.4 / 2
HALAMAN 3.3.4 / 3
HALAMAN 3.3.4 / 4
HALAMAN 3.3.4 / 5
HALAMAN 3.3.4 / 6
HALAMAN 3.3.4 / 7
HALAMAN 3.3.4 / 8
3.3.4 / 60
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
3.3.4 / 61
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
Catatan Harga
3.3.5 / 62
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 Bh 7.00
- Lantai 5 Bh 7.00
- Lantai 6 Bh 7.00
- Lantai 7 Bh 7.00
- Lantai 8 Bh 7.00
- Lantai 9 Bh 7.00
- Lantai 10 Bh 7.00
- Lantai 11 Bh 7.00
- Lantai 12 Bh 7.00
- Lantai 13 Bh 7.00
- Lantai 14 Bh 7.00
- Lantai 15 Bh 7.00
- Lantai 16 Bh 7.00
- Lantai 17 Bh 7.00
- Lantai 18 Bh 7.00
- Lantai 19 Bh 7.00
- Lantai 20 (Refugee Floor) Bh 7.00
- Lantai 21 Bh 7.00
- Lantai 22 Bh 7.00
- Lantai 23 Bh 7.00
- Lantai 24 Bh 7.00
- Lantai 25 Bh 7.00
- Lantai 26 Bh 7.00
- Lantai 27 Bh 7.00
- Lantai 28 Bh 7.00
- Lantai 29 Bh 7.00
- Lantai 30 Bh 7.00
- Lantai 31 Bh 7.00
- Lantai 32 Bh 7.00
- Lantai 33 Bh 6.00
- Lantai 34 Bh 6.00
- Lantai 35 Bh 4.00
- Lantai 4 Bh 4.00
- Lantai 5 Bh 4.00
- Lantai 6 Bh 4.00
- Lantai 7 Bh 4.00
- Lantai 8 Bh 4.00
3.3.5 / 63
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 Bh 1.00
- Lantai 5 Bh 1.00
- Lantai 6 Bh 1.00
- Lantai 7 Bh 1.00
- Lantai 8 Bh 1.00
- Lantai 9 Bh 1.00
- Lantai 10 Bh 1.00
- Lantai 11 Bh 1.00
- Lantai 12 Bh 1.00
- Lantai 13 Bh 1.00
- Lantai 14 Bh 1.00
- Lantai 15 Bh 1.00
- Lantai 16 Bh 1.00
3.3.5 / 64
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 Bh 3.00
- Lantai 5 Bh 3.00
- Lantai 6 Bh 3.00
- Lantai 7 Bh 3.00
- Lantai 8 Bh 3.00
- Lantai 9 Bh 3.00
- Lantai 10 Bh 3.00
- Lantai 11 Bh 3.00
- Lantai 12 Bh 3.00
- Lantai 13 Bh 3.00
- Lantai 14 Bh 3.00
- Lantai 15 Bh 3.00
- Lantai 16 Bh 3.00
- Lantai 17 Bh 3.00
- Lantai 18 Bh 3.00
- Lantai 19 Bh 3.00
- Lantai 20 (Refugee Floor) Bh 3.00
- Lantai 21 Bh 3.00
- Lantai 22 Bh 3.00
- Lantai 23 Bh 3.00
- Lantai 24 Bh 3.00
- Lantai 25 Bh 3.00
- Lantai 26 Bh 3.00
3.3.5 / 65
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 Bh 2.00
- Lantai 5 Bh 2.00
- Lantai 6 Bh 2.00
- Lantai 7 Bh 2.00
- Lantai 8 Bh 2.00
- Lantai 9 Bh 2.00
- Lantai 10 Bh 2.00
- Lantai 11 Bh 2.00
- Lantai 12 Bh 2.00
- Lantai 13 Bh 2.00
- Lantai 14 Bh 2.00
- Lantai 15 Bh 2.00
- Lantai 16 Bh 2.00
- Lantai 17 Bh 2.00
- Lantai 18 Bh 2.00
- Lantai 19 Bh 2.00
- Lantai 20 (Refugee Floor) Bh 2.00
- Lantai 21 Bh 2.00
- Lantai 22 Bh 2.00
- Lantai 23 Bh 2.00
- Lantai 24 Bh 2.00
- Lantai 25 Bh 2.00
- Lantai 26 Bh 2.00
- Lantai 27 Bh 2.00
- Lantai 28 Bh 2.00
- Lantai 29 Bh 2.00
- Lantai 30 Bh 2.00
- Lantai 31 Bh 2.00
- Lantai 32 Bh 3.00
3.3.5 / 66
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 Bh 3.00
- Lantai 5 Bh 3.00
- Lantai 6 Bh 3.00
- Lantai 7 Bh 3.00
- Lantai 8 Bh 3.00
- Lantai 9 Bh 3.00
- Lantai 10 Bh 3.00
- Lantai 11 Bh 3.00
- Lantai 12 Bh 3.00
- Lantai 13 Bh 3.00
- Lantai 14 Bh 3.00
- Lantai 15 Bh 3.00
- Lantai 16 Bh 3.00
- Lantai 17 Bh 3.00
- Lantai 18 Bh 3.00
- Lantai 19 Bh 3.00
- Lantai 20 (Refugee Floor) Bh 3.00
- Lantai 21 Bh 3.00
- Lantai 22 Bh 3.00
- Lantai 23 Bh 3.00
- Lantai 24 Bh 3.00
- Lantai 25 Bh 3.00
- Lantai 26 Bh 3.00
- Lantai 27 Bh 3.00
- Lantai 28 Bh 3.00
- Lantai 29 Bh 3.00
- Lantai 30 Bh 3.00
- Lantai 31 Bh 3.00
- Lantai 32 Bh 3.00
- Lantai 33 Bh 2.00
- Lantai 34 Bh 2.00
- Lantai 35 Bh 2.00
3.3.5 / 67
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
Lanjutan ex TotoType TX 8
- Lantai 12 Bh 3.00
- Lantai 13 Bh 3.00
- Lantai 14 Bh 3.00
- Lantai 15 Bh 3.00
- Lantai 16 Bh 3.00
- Lantai 17 Bh 3.00
- Lantai 18 Bh 3.00
- Lantai 19 Bh 3.00
- Lantai 20 (Refugee Floor) Bh 3.00
- Lantai 21 Bh 3.00
- Lantai 22 Bh 3.00
- Lantai 23 Bh 3.00
- Lantai 24 Bh 3.00
- Lantai 25 Bh 3.00
- Lantai 26 Bh 3.00
- Lantai 27 Bh 3.00
- Lantai 28 Bh 3.00
- Lantai 29 Bh 3.00
- Lantai 30 Bh 3.00
- Lantai 31 Bh 3.00
- Lantai 32 Bh 3.00
- Lantai 33 Bh 2.00
- Lantai 34 Bh 2.00
- Lantai 35 Bh 2.00
3.3.5 / 68
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 Bh 3.00
- Lantai 5 Bh 3.00
- Lantai 6 Bh 3.00
- Lantai 7 Bh 3.00
- Lantai 8 Bh 3.00
- Lantai 9 Bh 3.00
- Lantai 10 Bh 3.00
- Lantai 11 Bh 3.00
- Lantai 12 Bh 3.00
- Lantai 13 Bh 3.00
- Lantai 14 Bh 3.00
- Lantai 15 Bh 3.00
- Lantai 16 Bh 3.00
- Lantai 17 Bh 3.00
- Lantai 18 Bh 3.00
- Lantai 19 Bh 3.00
- Lantai 20 (Refugee Floor) Bh 3.00
- Lantai 21 Bh 3.00
3.3.5 / 69
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
3.3.5 / 70
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
3.3.5 / 71
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 Bh 7.00
- Lantai 5 Bh 7.00
- Lantai 6 Bh 7.00
- Lantai 7 Bh 7.00
- Lantai 8 Bh 7.00
- Lantai 9 Bh 7.00
- Lantai 10 Bh 7.00
- Lantai 11 Bh 7.00
- Lantai 12 Bh 7.00
- Lantai 13 Bh 7.00
- Lantai 14 Bh 7.00
- Lantai 15 Bh 7.00
- Lantai 16 Bh 7.00
- Lantai 17 Bh 7.00
- Lantai 18 Bh 7.00
- Lantai 19 Bh 7.00
- Lantai 20 (Refugee Floor) Bh 7.00
- Lantai 21 Bh 7.00
- Lantai 22 Bh 7.00
- Lantai 23 Bh 7.00
- Lantai 24 Bh 7.00
3.3.5 / 72
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 Bh 1.00
- Lantai 5 Bh 1.00
- Lantai 6 Bh 1.00
- Lantai 7 Bh 1.00
- Lantai 8 Bh 1.00
- Lantai 9 Bh 1.00
- Lantai 10 Bh 1.00
- Lantai 11 Bh 1.00
- Lantai 12 Bh 1.00
- Lantai 13 Bh 1.00
- Lantai 14 Bh 1.00
- Lantai 15 Bh 1.00
- Lantai 16 Bh 1.00
3.3.5 / 73
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 Bh 1.00
- Lantai 5 Bh 1.00
- Lantai 6 Bh 1.00
- Lantai 7 Bh 1.00
- Lantai 8 Bh 1.00
- Lantai 9 Bh 1.00
- Lantai 10 Bh 1.00
- Lantai 11 Bh 1.00
- Lantai 12 Bh 1.00
- Lantai 13 Bh 1.00
- Lantai 14 Bh 1.00
- Lantai 15 Bh 1.00
- Lantai 16 Bh 1.00
- Lantai 17 Bh 1.00
- Lantai 18 Bh 1.00
- Lantai 19 Bh 1.00
- Lantai 20 (Refugee Floor) Bh 1.00
- Lantai 21 Bh 1.00
- Lantai 22 Bh 1.00
- Lantai 23 Bh 1.00
- Lantai 24 Bh 1.00
- Lantai 25 Bh 1.00
- Lantai 26 Bh 1.00
3.3.5 / 74
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 Bh 1.00
- Lantai 5 Bh 1.00
- Lantai 6 Bh 1.00
- Lantai 7 Bh 1.00
- Lantai 8 Bh 1.00
- Lantai 9 Bh 1.00
- Lantai 10 Bh 1.00
- Lantai 11 Bh 1.00
- Lantai 12 Bh 1.00
- Lantai 13 Bh 1.00
16 Shower set ex TOTO, Terdiri dari: Fix Shower (TX 488 SIZ),
Hand Shower (TX 472 SESMN), Bath Spout (TX 441 SM),
Mixing (TX 484 SI, TX 443 SIN) lengkap dengan fittings dan
kelengkapan pada
3.3.5 / 75
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
DAFTARShower
NO.3.3.5
set -ex
PEKERJAAN SANITARI
TOTO, Terdiri dari: Fix Shower (TX 488 SIZ),
Hand Shower (TX 472 SESMN), Bath Spout (TX 441 SM), HARGA SAT. JUMLAH HARGA
NO. Mixing (TX 484 SI, TX 443 SIN)
URAIAN lengkap dengan fittings dan
PEKERJAAN SAT. VOLUME
kelengkapan pada Rp Rp
- Lantai 4 Bh 1.00
- Lantai 5 Bh 1.00
- Lantai 6 Bh 1.00
- Lantai 7 Bh 1.00
- Lantai 8 Bh 1.00
- Lantai 9 Bh 1.00
- Lantai 10 Bh 1.00
- Lantai 11 Bh 1.00
- Lantai 12 Bh 1.00
- Lantai 13 Bh 1.00
- Lantai 14 Bh 1.00
- Lantai 15 Bh 1.00
- Lantai 16 Bh 1.00
- Lantai 17 Bh 1.00
- Lantai 18 Bh 1.00
- Lantai 19 Bh 1.00
- Lantai 20 (Refugee Floor) Bh 1.00
- Lantai 21 Bh 1.00
- Lantai 22 Bh 1.00
- Lantai 23 Bh 1.00
SUB PENJUMLAHAN
HALAMAN 3.3.5 / 2
HALAMAN 3.3.5 / 3
3.3.5 / 76
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
HALAMAN 3.3.5 / 5
HALAMAN 3.3.5 / 6
HALAMAN 3.3.5 / 7
HALAMAN 3.3.5 / 8
HALAMAN 3.3.5 / 9
HALAMAN 3.3.5 / 10
HALAMAN 3.3.5 / 11
HALAMAN 3.3.5 / 12
HALAMAN 3.3.5 / 13
HALAMAN 3.3.5 / 14
HALAMAN 3.3.5 / 15
3.3.5 / 77
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
Catatan Harga
3.3.6 / 78
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
A. Jendela
1 Type Jendela J-5, Aluminium Louvre pipa hollow 60x120mm
+ frame aluminium 60x120mm, Ukuran Overall
7200x2900mm, terpasang sesuai dengan gambar dan
spesifikasi, pada: (Gambar A-4302 & A-4303) (Aluminium
Ex. Indalex / YKK / Allure / setara) (Tampak Timur & Tampak
Barat)
- Lantai 4 bh 2.00
- Lantai 5 bh 2.00
- Lantai 6 bh 2.00
- Lantai 7 bh 2.00
- Lantai 8 bh 2.00
- Lantai 9 bh 2.00
- Lantai 10 bh 2.00
- Lantai 11 bh 2.00
- Lantai 12 bh 2.00
- Lantai 13 bh 2.00
- Lantai 14 bh 2.00
- Lantai 15 bh 2.00
- Lantai 16 bh 2.00
- Lantai 17 bh 2.00
- Lantai 18 bh 2.00
- Lantai 19 bh 2.00
- Lantai 20 (Refugee Floor) bh 2.00
- Lantai 21 bh 2.00
- Lantai 22 bh 2.00
- Lantai 23 bh 2.00
- Lantai 24 bh 2.00
- Lantai 25 bh 2.00
- Lantai 26 bh 2.00
- Lantai 27 bh 2.00
- Lantai 28 bh 2.00
- Lantai 29 bh 2.00
- Lantai 30 bh 2.00
- Lantai 31 bh 2.00
- Lantai 32 bh 2.00
3.3.6 / 79
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
B. Curtain Wall
1 CW 2, Curtain Wall, terdiri dari double glass (8mm Low-E
on Tinted + 12 mm As + 6mm Clear Glass), (Kaca ex.
Asahimas / CSG-China Southern Glass / Saint Gobain
Glass), (Aluminium Ex. Indalex / YKK / Allure / setara)
terpasang sesuai dengan gambar A-4301 s.d A-4307 dan
spesifikasi, pada:
A. Tampak Selatan
- Lantai 4 m2 79.40
- Lantai 5 m2 79.40
- Lantai 6 m2 79.40
- Lantai 7 m2 79.40
- Lantai 8 m2 79.40
- Lantai 9 m2 79.40
- Lantai 10 m2 79.40
- Lantai 11 m2 79.40
- Lantai 12 m2 79.40
- Lantai 13 m2 79.40
- Lantai 14 m2 79.40
- Lantai 15 m2 79.40
- Lantai 16 m2 79.40
- Lantai 17 m2 79.40
- Lantai 18 m2 79.40
- Lantai 19 m2 79.40
- Lantai 20 (Refugee Floor) m2 79.40
- Lantai 21 m2 79.40
- Lantai 22 m2 79.40
- Lantai 23 m2 79.40
- Lantai 24 m2 79.40
- Lantai 25 m2 79.40
- Lantai 26 m2 79.40
- Lantai 27 m2 79.40
- Lantai 28 m2 68.06
- Lantai 29 m2 68.06
- Lantai 30 m2 68.06
- Lantai 31 m2 68.06
- Lantai 32 m2 68.06
- Lantai 33 m2 68.06
- Lantai 34 m2 68.06
- Lantai 35 m2 99.24
- Lantai 36 m2 46.99
B. Tampak Utara
- Lantai 4 m2 15.12
- Lantai 5 m2 15.12
- Lantai 6 m2 75.62
3.3.6 / 80
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 7 m2 79.40
- Lantai 8 m2 79.40
- Lantai 9 m2 79.40
- Lantai 10 m2 79.40
- Lantai 11 m2 79.40
- Lantai 12 m2 79.40
- Lantai 13 m2 79.40
- Lantai 14 m2 79.40
- Lantai 15 m2 79.40
- Lantai 16 m2 79.40
- Lantai 17 m2 79.40
- Lantai 18 m2 79.40
- Lantai 19 m2 79.40
- Lantai 20 (Refugee Floor) m2 79.40
- Lantai 21 m2 79.40
- Lantai 22 m2 79.40
- Lantai 23 m2 79.40
- Lantai 24 m2 79.40
- Lantai 25 m2 79.40
- Lantai 26 m2 79.40
- Lantai 27 m2 79.40
- Lantai 28 m2 68.06
- Lantai 29 m2 68.06
- Lantai 30 m2 68.06
- Lantai 31 m2 68.06
- Lantai 32 m2 68.06
- Lantai 33 m2 129.66
- Lantai 34 m2 68.45
- Lantai 35 m2 99.24
- Lantai 36 m2 46.99
3.3.6 / 81
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
A. Tampak Selatan
- Lantai 4 m2 27.93
- Lantai 5 m2 27.93
- Lantai 6 m2 27.93
- Lantai 7 m2 27.93
- Lantai 8 m2 27.93
- Lantai 9 m2 27.93
- Lantai 10 m2 27.93
- Lantai 11 m2 27.93
- Lantai 12 m2 27.93
- Lantai 13 m2 27.93
- Lantai 14 m2 27.93
- Lantai 15 m2 27.93
- Lantai 16 m2 27.93
- Lantai 17 m2 27.93
- Lantai 18 m2 27.93
- Lantai 19 m2 27.93
- Lantai 20 (Refugee Floor) m2 27.93
- Lantai 21 m2 27.93
- Lantai 22 m2 27.93
- Lantai 23 m2 27.93
- Lantai 24 m2 27.93
- Lantai 25 m2 27.93
- Lantai 26 m2 27.93
- Lantai 27 m2 27.93
- Lantai 28 m2 23.94
- Lantai 29 m2 23.94
- Lantai 30 m2 23.94
- Lantai 31 m2 23.94
- Lantai 32 m2 23.94
- Lantai 33 m2 23.94
- Lantai 34 m2 23.94
B. Tampak Utara
- Lantai 4 m2 5.320
- Lantai 5 m2 5.320
3.3.6 / 82
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 12 m2 27.93
- Lantai 13 m2 27.93
- Lantai 14 m2 27.93
- Lantai 15 m2 27.93
- Lantai 16 m2 27.93
- Lantai 17 m2 27.93
- Lantai 18 m2 27.93
- Lantai 19 m2 27.93
- Lantai 20 (Refugee Floor) m2 27.93
- Lantai 21 m2 27.93
- Lantai 22 m2 27.93
- Lantai 23 m2 27.93
- Lantai 24 m2 27.93
- Lantai 25 m2 27.93
- Lantai 26 m2 27.93
- Lantai 27 m2 27.93
- Lantai 28 m2 23.94
- Lantai 29 m2 23.94
- Lantai 30 m2 23.94
- Lantai 31 m2 23.94
- Lantai 32 m2 23.94
- Lantai 33 m2 23.94
- Lantai 34 m2 23.94
A. Tampak Selatan
- Lantai 36 m2 97.81
- Lantai 37 m2 47.81
B. Tampak Utara
- Lantai 36 m2 97.81
- Lantai 37 m2 47.81
3.3.6 / 83
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
A. Tampak Selatan
- Lantai 28 m2 25.33
- Lantai 29 m2 25.33
- Lantai 30 m2 25.33
- Lantai 31 m2 25.33
- Lantai 32 m2 25.33
- Lantai 33 m2 25.36
- Lantai 34 m2 25.59
- Lantai 35 m2 18.67
B. Tampak Utara
- Lantai 28 m2 25.40
- Lantai 29 m2 25.40
- Lantai 30 m2 25.40
- Lantai 31 m2 25.40
- Lantai 32 m2 25.40
- Lantai 33 m2 52.42
- Lantai 34 m2 25.52
- Lantai 35 m2 9.40
3.3.6 / 84
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 13 m2 45.14
- Lantai 14 m2 45.14
- Lantai 15 m2 45.14
- Lantai 16 m2 45.14
- Lantai 17 m2 45.14
- Lantai 18 m2 45.14
- Lantai 19 m2 45.14
- Lantai 20 (Refugee Floor) m2 15.00
- Lantai 21 m2 45.14
- Lantai 22 m2 45.14
- Lantai 23 m2 45.14
- Lantai 24 m2 45.14
- Lantai 25 m2 45.14
- Lantai 26 m2 45.14
- Lantai 27 m2 45.14
- Lantai 28 m2 45.14
- Lantai 29 m2 45.14
- Lantai 30 m2 45.14
- Lantai 31 m2 45.14
- Lantai 32 m2 45.14
- Lantai 33 m2 66.78
- Lantai 34 m2 59.07
B. Tampak Barat
- Lantai 7 m2 55.14
- Lantai 8 m2 55.14
- Lantai 9 m2 55.14
- Lantai 10 m2 55.14
- Lantai 11 m2 55.14
- Lantai 12 m2 55.14
- Lantai 13 m2 55.14
- Lantai 14 m2 55.14
- Lantai 15 m2 55.14
- Lantai 16 m2 55.14
- Lantai 17 m2 55.14
- Lantai 18 m2 55.14
3.3.6 / 85
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 28 m2 55.14
- Lantai 29 m2 55.14
- Lantai 30 m2 55.14
- Lantai 31 m2 55.14
- Lantai 32 m2 55.14
- Lantai 33 m2 66.78
A. Tampak Timur
- Lantai 4 m2 76.11
- Lantai 5 m2 76.11
- Lantai 6 m2 76.11
B. Tampak Barat
- Lantai 4 m2 76.11
- Lantai 5 m2 76.11
- Lantai 6 m2 76.11
A. Tampak Timur
- Lantai 35 m2 66.18
- Lantai 36 m2 61.25
- Lantai 37 m2 42.00
B. Tampak Barat
- Lantai 34 m2 65.05
3.3.6 / 86
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 35 m2 51.94
- Lantai 36 m2 21.25
- Lantai 35 m2 51.70
- Lantai 36 m2 61.25
- Lantai 37 m2 42.00
A. Tampak Selatan
- Lantai 4 m2 23.73
- Lantai 5 m2 23.73
- Lantai 6 m2 23.73
- Lantai 7 m2 23.73
- Lantai 8 m2 23.73
- Lantai 9 m2 23.73
- Lantai 10 m2 23.73
- Lantai 11 m2 23.73
- Lantai 12 m2 23.73
- Lantai 13 m2 23.73
- Lantai 14 m2 23.73
- Lantai 15 m2 23.73
- Lantai 16 m2 23.73
- Lantai 17 m2 23.73
- Lantai 18 m2 23.73
- Lantai 19 m2 23.73
- Lantai 20 (Refugee Floor) m2 23.73
- Lantai 21 m2 23.73
- Lantai 22 m2 23.73
3.3.6 / 87
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
B. Tampak Utara
- Lantai 4 m2 4.52
- Lantai 5 m2 4.52
- Lantai 6 m2 22.60
- Lantai 7 m2 22.60
- Lantai 8 m2 22.60
- Lantai 9 m2 22.60
- Lantai 10 m2 22.60
- Lantai 11 m2 22.60
- Lantai 12 m2 22.60
- Lantai 13 m2 22.60
- Lantai 14 m2 22.60
- Lantai 15 m2 22.60
- Lantai 16 m2 22.60
- Lantai 17 m2 22.60
- Lantai 18 m2 22.60
- Lantai 19 m2 22.60
- Lantai 20 (Refugee Floor) m2 22.60
- Lantai 21 m2 22.60
- Lantai 22 m2 22.60
- Lantai 23 m2 22.60
- Lantai 24 m2 22.60
- Lantai 25 m2 22.60
- Lantai 26 m2 22.60
- Lantai 27 m2 22.60
- Lantai 28 m2 22.60
- Lantai 29 m2 22.60
- Lantai 30 m2 22.60
- Lantai 31 m2 22.60
- Lantai 32 m2 22.60
3.3.6 / 88
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 4 m 110.32
- Lantai 5 m 110.32
- Lantai 6 m 152.91
- Lantai 7 m 152.91
- Lantai 8 m 152.91
- Lantai 9 m 152.91
- Lantai 10 m 152.91
- Lantai 11 m 152.91
- Lantai 12 m 152.91
- Lantai 13 m 152.91
- Lantai 14 m 152.91
- Lantai 15 m 152.91
- Lantai 16 m 152.91
- Lantai 17 m 152.91
- Lantai 18 m 152.91
- Lantai 19 m 152.91
- Lantai 20 (Refugee Floor) m 152.91
- Lantai 21 m 152.91
- Lantai 22 m 152.91
- Lantai 23 m 152.91
- Lantai 24 m 152.91
- Lantai 25 m 152.91
- Lantai 26 m 152.91
- Lantai 27 m 152.91
- Lantai 28 m 152.91
- Lantai 29 m 152.91
3.3.6 / 89
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
A. Tampak Selatan
- Lantai 4 m2 162.18
- Lantai 5 m2 162.18
- Lantai 6 m2 162.18
- Lantai 7 m2 162.18
- Lantai 8 m2 162.18
- Lantai 9 m2 162.18
- Lantai 10 m2 162.18
- Lantai 11 m2 162.18
- Lantai 12 m2 162.18
- Lantai 13 m2 162.18
- Lantai 14 m2 162.18
- Lantai 15 m2 162.18
- Lantai 16 m2 162.18
- Lantai 17 m2 162.18
- Lantai 18 m2 162.18
- Lantai 19 m2 162.18
- Lantai 20 (Refugee Floor) m2 162.18
- Lantai 21 m2 162.18
- Lantai 22 m2 162.18
3.3.6 / 90
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
B. Tampak Utara
- Lantai 4 m2 162.18
- Lantai 5 m2 162.18
- Lantai 6 m2 162.18
- Lantai 7 m2 162.18
- Lantai 8 m2 162.18
- Lantai 9 m2 162.18
- Lantai 10 m2 162.18
- Lantai 11 m2 162.18
- Lantai 12 m2 162.18
- Lantai 13 m2 162.18
- Lantai 14 m2 162.18
- Lantai 15 m2 162.18
- Lantai 16 m2 162.18
- Lantai 17 m2 162.18
- Lantai 18 m2 162.18
- Lantai 19 m2 162.18
- Lantai 20 (Refugee Floor) m2 162.18
- Lantai 21 m2 162.18
- Lantai 22 m2 162.18
- Lantai 23 m2 162.18
- Lantai 24 m2 162.18
- Lantai 25 m2 162.18
- Lantai 26 m2 162.18
3.3.6 / 91
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 14 m2 6.07
- Lantai 15 m2 6.07
- Lantai 16 m2 6.07
- Lantai 17 m2 6.07
- Lantai 18 m2 6.07
- Lantai 19 m2 6.07
- Lantai 20 (Refugee Floor) m2 6.07
- Lantai 21 m2 6.07
- Lantai 22 m2 6.07
- Lantai 23 m2 6.07
- Lantai 24 m2 6.07
- Lantai 25 m2 6.07
- Lantai 26 m2 6.07
- Lantai 27 m2 6.07
- Lantai 28 m2 6.07
- Lantai 29 m2 6.07
- Lantai 30 m2 6.07
- Lantai 31 m2 6.07
- Lantai 32 m2 6.07
- Lantai 33 m2 6.08
- Lantai 34 m2 6.10
- Lantai 35 m2 6.97
3.3.6 / 92
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 25 m2 6.07
- Lantai 26 m2 6.07
- Lantai 27 m2 6.07
- Lantai 28 m2 6.07
- Lantai 29 m2 6.07
- Lantai 30 m2 6.07
- Lantai 31 m2 6.07
- Lantai 32 m2 6.07
- Lantai 33 m2 6.08
- Lantai 34 m2 6.10
- Lantai 35 m2 6.13
- Lantai 36 m2 6.20
- Lantai 37 m2 6.31
A. Tampak Timur
3.3.6 / 93
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 28 m2 10.47
- Lantai 29 m2 10.47
- Lantai 30 m2 10.47
- Lantai 31 m2 10.47
- Lantai 32 m2 10.47
B. Tampak Barat
- Lantai 4 m2 8.88
- Lantai 5 m2 10.48
- Lantai 6 m2 10.48
- Lantai 7 m2 10.48
- Lantai 8 m2 10.48
- Lantai 9 m2 10.48
- Lantai 10 m2 10.48
- Lantai 11 m2 10.48
- Lantai 12 m2 10.48
- Lantai 13 m2 10.48
- Lantai 14 m2 10.48
3.3.6 / 94
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
A. Tampak Timur
- Lantai 7 m2 26.07
- Lantai 8 m2 26.07
- Lantai 9 m2 26.07
- Lantai 10 m2 26.07
- Lantai 11 m2 26.07
- Lantai 12 m2 26.07
- Lantai 13 m2 26.07
- Lantai 14 m2 26.07
- Lantai 15 m2 26.07
- Lantai 16 m2 26.07
- Lantai 17 m2 26.07
- Lantai 18 m2 26.07
- Lantai 19 m2 26.07
- Lantai 20 (Refugee Floor) m2 26.07
- Lantai 21 m2 26.07
- Lantai 22 m2 26.07
- Lantai 23 m2 26.07
3.3.6 / 95
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 24 m2 25.95
- Lantai 25 m2 25.80
- Lantai 26 m2 25.64
- Lantai 27 m2 25.51
- Lantai 28 m2 25.35
- Lantai 29 m2 25.19
- Lantai 30 m2 25.05
- Lantai 31 m2 24.90
- Lantai 32 m2 24.75
- Lantai 33 m2 24.52
3.3.6 / 96
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
DAFTARACP,
NO.3.3.6 - PEKERJAAN
Aluminium CompositeFAÇADE
Panel Unitized System,
(Horisontal Area Planter Box), ukuran tinggi = HARGA SAT. JUMLAH HARGA
NO. 250+900+700mm, termasuk rangka aluminium + sealant
URAIAN PEKERJAAN SAT. VOLUME
struktural, terpasang sesuai dengan gambar dan spesifikasi, Rp Rp
pada: (ex. Larson / Reynobond / Alpolic)
A. Tampak Timur
- Lantai 7 m2 38.35
- Lantai 8 m2 38.35
- Lantai 9 m2 38.35
- Lantai 10 m2 38.35
- Lantai 11 m2 38.35
- Lantai 12 m2 38.35
- Lantai 13 m2 38.35
- Lantai 14 m2 38.35
- Lantai 15 m2 38.35
- Lantai 16 m2 38.35
- Lantai 17 m2 38.35
- Lantai 18 m2 38.35
- Lantai 19 m2 38.35
- Lantai 20 (Refugee Floor) m2 38.35
- Lantai 21 m2 38.35
- Lantai 22 m2 38.35
- Lantai 23 m2 38.35
- Lantai 24 m2 38.19
- Lantai 25 m2 37.97
- Lantai 26 m2 37.75
- Lantai 27 m2 37.56
- Lantai 28 m2 37.34
- Lantai 29 m2 37.11
- Lantai 30 m2 36.91
- Lantai 31 m2 36.69
- Lantai 32 m2 36.49
- Lantai 33 m2 38.00
- Lantai 34 m2 34.98
B. Tampak Barat
- Lantai 7 m2 38.35
- Lantai 8 m2 38.35
- Lantai 9 m2 38.35
- Lantai 10 m2 38.35
- Lantai 11 m2 38.35
- Lantai 12 m2 38.35
- Lantai 13 m2 38.35
- Lantai 14 m2 38.35
- Lantai 15 m2 38.35
- Lantai 16 m2 38.35
- Lantai 17 m2 38.35
3.3.6 / 97
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
A. Tampak Selatan
- Lantai 36 m2 156.75
- Lantai 37 m2 204.73
B. Tampak Utara
- Lantai 36 m2 156.75
- Lantai 37 m2 204.73
SUB PENJUMLAHAN
HALAMAN 3.3.6 / 2
HALAMAN 3.3.6 / 3
HALAMAN 3.3.6 / 4
HALAMAN 3.3.6 / 5
3.3.6 / 98
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
HALAMAN 3.3.6 / 6
HALAMAN 3.3.6 / 7
HALAMAN 3.3.6 / 8
HALAMAN 3.3.6 / 9
HALAMAN 3.3.6 / 10
HALAMAN 3.3.6 / 11
HALAMAN 3.3.6 / 12
HALAMAN 3.3.6 / 13
HALAMAN 3.3.6 / 14
HALAMAN 3.3.6 / 15
HALAMAN 3.3.6 / 16
HALAMAN 3.3.6 / 17
HALAMAN 3.3.6 / 18
HALAMAN 3.3.6 / 19
HALAMAN 3.3.6 / 20
3.3.6 / 99
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
Catatan Harga
3.3.7 / 100
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 6 m 19.82
- Lantai 7 m 19.82
- Lantai 8 m 19.82
- Lantai 9 m 19.82
- Lantai 10 m 19.82
- Lantai 11 m 19.82
- Lantai 12 m 19.82
- Lantai 13 m 19.82
- Lantai 14 m 19.82
- Lantai 15 m 19.82
- Lantai 16 m 19.82
- Lantai 17 m 19.82
- Lantai 18 m 19.82
- Lantai 19 m 19.82
- Lantai 20 m 16.67
- Lantai 21 m 16.67
- Lantai 22 m 16.67
- Lantai 23 m 16.67
- Lantai 24 m 16.67
- Lantai 25 m 16.67
- Lantai 26 m 16.67
- Lantai 27 m 16.67
- Lantai 28 m 16.67
- Lantai 29 m 16.67
- Lantai 30 m 16.67
- Lantai 31 m 16.67
- Lantai 32 m 18.09
- Lantai 33 m 16.84
- Lantai 34 m 25.28
- Lantai 35 m 7.77
- Lantai 36 m 23.39
- Lantai 37 m 6.81
3.3.7 / 101
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
3.3.7 / 102
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 6 Bh 1.00
- Lantai 7 Bh 1.00
- Lantai 8 Bh 1.00
- Lantai 9 Bh 1.00
- Lantai 10 Bh 1.00
- Lantai 11 Bh 1.00
- Lantai 12 Bh 1.00
- Lantai 13 Bh 1.00
- Lantai 14 Bh 1.00
- Lantai 15 Bh 1.00
- Lantai 16 Bh 1.00
- Lantai 17 Bh 1.00
- Lantai 18 Bh 1.00
- Lantai 19 Bh 1.00
- Lantai 20 Bh 1.00
- Lantai 21 Bh 1.00
- Lantai 22 Bh 1.00
- Lantai 23 Bh 1.00
- Lantai 24 Bh 1.00
- Lantai 25 Bh 1.00
- Lantai 26 Bh 1.00
- Lantai 27 Bh 1.00
- Lantai 28 Bh 1.00
- Lantai 29 Bh 1.00
- Lantai 30 Bh 1.00
- Lantai 31 Bh 1.00
- Lantai 32 Bh 1.00
3.3.7 / 103
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 6 Bh 1.00
- Lantai 7 Bh 1.00
- Lantai 8 Bh 1.00
- Lantai 9 Bh 1.00
- Lantai 10 Bh 1.00
- Lantai 11 Bh 1.00
- Lantai 12 Bh 1.00
- Lantai 13 Bh 1.00
- Lantai 14 Bh 1.00
- Lantai 15 Bh 1.00
- Lantai 16 Bh 1.00
- Lantai 17 Bh 1.00
- Lantai 18 Bh 1.00
- Lantai 19 Bh 1.00
- Lantai 20 Bh 1.00
- Lantai 21 Bh 1.00
- Lantai 22 Bh 1.00
- Lantai 23 Bh 1.00
- Lantai 24 Bh 1.00
- Lantai 25 Bh 1.00
- Lantai 26 Bh 1.00
- Lantai 27 Bh 1.00
- Lantai 28 Bh 1.00
- Lantai 29 Bh 1.00
- Lantai 30 Bh 1.00
- Lantai 31 Bh 1.00
- Lantai 32 Bh 1.00
3.3.7 / 104
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 6 Bh 1.00
- Lantai 7 Bh 1.00
- Lantai 8 Bh 1.00
- Lantai 9 Bh 1.00
- Lantai 10 Bh 1.00
- Lantai 11 Bh 1.00
- Lantai 12 Bh 1.00
- Lantai 13 Bh 1.00
- Lantai 14 Bh 1.00
- Lantai 15 Bh 1.00
- Lantai 16 Bh 1.00
- Lantai 17 Bh 1.00
- Lantai 18 Bh 1.00
- Lantai 19 Bh 1.00
- Lantai 20 Bh 1.00
- Lantai 21 Bh 1.00
- Lantai 22 Bh 1.00
- Lantai 23 Bh 1.00
- Lantai 24 Bh 1.00
- Lantai 25 Bh 1.00
- Lantai 26 Bh 1.00
- Lantai 27 Bh 1.00
- Lantai 28 Bh 1.00
- Lantai 29 Bh 1.00
- Lantai 30 Bh 1.00
- Lantai 31 Bh 1.00
- Lantai 32 Bh 1.00
- Lantai 33 Bh 2.00
- Lantai 34 Bh 2.00
- Lantai 35 Bh 1.00
3.3.7 / 105
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
3.3.7 / 106
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
3.3.7 / 107
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 6 Bh 1.00
- Lantai 7 Bh 1.00
- Lantai 8 Bh 1.00
- Lantai 9 Bh 1.00
- Lantai 10 Bh 1.00
- Lantai 11 Bh 1.00
- Lantai 12 Bh 1.00
- Lantai 13 Bh 1.00
- Lantai 14 Bh 1.00
- Lantai 15 Bh 1.00
- Lantai 16 Bh 1.00
- Lantai 17 Bh 1.00
- Lantai 18 Bh 1.00
- Lantai 19 Bh 1.00
- Lantai 20 Bh 1.00
- Lantai 21 Bh 1.00
- Lantai 22 Bh 1.00
- Lantai 23 Bh 1.00
- Lantai 24 Bh 1.00
- Lantai 25 Bh 1.00
- Lantai 26 Bh 1.00
- Lantai 27 Bh 1.00
- Lantai 28 Bh 1.00
- Lantai 29 Bh 1.00
- Lantai 30 Bh 1.00
- Lantai 31 Bh 1.00
- Lantai 32 Bh 1.00
- Lantai 33 Bh 2.00
3.3.7 / 108
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 35 Bh 1.00
- Lantai 4 m 3.39
- Lantai 5 m 3.39
- Lantai 6 m 3.39
- Lantai 7 m 3.39
- Lantai 8 m 3.39
- Lantai 9 m 3.39
- Lantai 10 m 3.39
- Lantai 11 m 3.39
- Lantai 12 m 3.39
- Lantai 13 m 3.39
- Lantai 14 m 3.39
- Lantai 15 m 3.39
- Lantai 16 m 3.39
- Lantai 17 m 3.39
- Lantai 18 m 3.39
- Lantai 19 m 3.39
- Lantai 20 m 3.39
- Lantai 21 m 3.39
- Lantai 22 m 3.39
- Lantai 23 m 3.39
- Lantai 24 m 3.39
- Lantai 25 m 3.39
- Lantai 26 m 3.39
- Lantai 27 m 3.39
- Lantai 28 m 3.39
- Lantai 29 m 3.39
- Lantai 30 m 3.39
- Lantai 31 m 3.39
- Lantai 32 m 4.54
- Lantai 33 m 2.55
3.3.7 / 109
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
3.3.7 / 110
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
- Lantai 6 m2 10.62
- Lantai 7 m2 10.62
- Lantai 8 m2 10.62
- Lantai 9 m2 10.62
- Lantai 10 m2 10.62
- Lantai 11 m2 10.62
- Lantai 12 m2 10.62
- Lantai 13 m2 10.62
- Lantai 14 m2 10.62
- Lantai 15 m2 10.62
- Lantai 16 m2 10.62
- Lantai 17 m2 10.62
- Lantai 18 m2 10.62
- Lantai 19 m2 10.62
- Lantai 20 m2 10.62
- Lantai 21 m2 10.62
- Lantai 22 m2 10.62
- Lantai 23 m2 10.62
- Lantai 24 m2 10.62
- Lantai 25 m2 10.62
- Lantai 26 m2 10.62
- Lantai 27 m2 10.62
- Lantai 28 m2 10.62
- Lantai 29 m2 10.62
- Lantai 30 m2 10.62
- Lantai 31 m2 10.62
3.3.7 / 111
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
SUB PENJUMLAHAN
HALAMAN 3.3.6 / 2
HALAMAN 3.3.6 / 3
HALAMAN 3.3.6 / 4
HALAMAN 3.3.6 / 5
HALAMAN 3.3.6 / 6
HALAMAN 3.3.6 / 7
HALAMAN 3.3.6 / 8
HALAMAN 3.3.6 / 9
HALAMAN 3.3.6 / 10
HALAMAN 3.3.6 / 11
HALAMAN 3.3.6 / 12
3.3.7 / 112
DAFTAR NO.3.3. PEKERJAAN ARSITEKTUR TOWER
PROYEK BRI TOWER - JAKARTA
3.3.7 / 113
DAFTAR NO. 3.3
ARSITEKTUR TOWER
DAFTAR NO. 3.3.1
PEKERJAAN DINDING
DAFTAR NO. 3.3.2
PEKERJAAN LPINTU DAN JENDELA
DAFTAR NO. 3.3.3
PEKERJAAN LANTAI
DAFTAR NO. 3.3.4
PEKERJAAN PLAFOND
DAFTAR NO. 3.3.5
PEKERJAAN SANITARI
DAFTAR NO. 3.3.6
PEKERJAAN FAÇADE
DAFTAR NO. 3.3.7
PEKERJAAN LAIN -LAIN