Anda di halaman 1dari 62

REKAPITULASI HARGA CCO

PEKERJAAN : PEMBANGUNAN TAHAP 2 SEKTOR KANAN GEDUNG PASCASARJANA UNIVERSITAS LANCANG KUNING
LOKASI : JL. YOS SUDARSO KM8 RUMBAI - PEKANBARU
TAHUN : 2021

JUMLAH HARGA
NO URAIAN PEKERJAAN JUMLAH HARGA KONTRAK Bobot (%) TAMBAH KURANG Bobot (%)

I PEKERJAAN KONTRUKSI 25,240,000.00 1.80 3,600,000.00 0.26


II PEKERJAAN PENDAHULUAN 3,580,000.00 0.26 3,580,000.00 0.26
III PEKERJAAN TANGGA 74,243,960.00 5.30 56,247,160.00 4.02
IV PEK. STRUKTUR DAN NON STRUKTUR 649,428,850.00 46.39 649,428,850.00 46.39
V PEKERJAAN DINDING DAN PLESTERAN 169,551,300.00 12.11 239,142,335.20 17.08
VI PEKERJAAN LANTAI DAN KERAMIK 130,265,000.00 9.30 153,908,900.00 10.99
VII PEKERJAAN ATAP DAN RANGKA ATAP 105,925,900.00 7.57 9,187,400.00 0.66
VIII PEKERJAAN KUSEN PINTU DAN JENDELA 78,900,000.00 5.64 94,590,000.00 6.76
IX PEKERJAAN PLAFOND 111,092,000.00 7.93 111,092,000.00 7.94
X PEKERJAAN INSTALASI LISTRIK 15,420,000.00 1.10 28,805,000.00 2.06
XI PEKERJAAN PENGECATAN 25,470,550.00 1.82 32,444,160.00 2.32
XII PEKERJAAN SANITASI AIR 9,917,500.00 0.71 16,982,500.00 1.21
XIII PEKERJAAN AKHIR 1,000,000.00 0.07 1,000,000.00 0.07
JUMLAH 1,400,035,060.00 100.00 1,400,008,305.20 100.00
PEMBULATAN 1,400,000,000.00 1,400,000,000.00
HASIL PENGURANGAN 0.00

Pekanbaru, 30 Agustus 2022


Dibuat Oleh,
CV. MITRA USAHA MANDIRI

MERRY CHRISTINA
Direktur
PEKERJAAN TAMBAH KURANG (CC0)
PEKERJAAN : PEMBANGUNAN TAHAP 2 SEKTOR KANAN GEDUNG PASCASARJANA UNIVERSITAS LANCANG KUNING
LOKASI : JL. YOS SUDARSO KM8 RUMBAI - PEKANBARU
TAHUN : 2021

Harga Satuan Jumlah Harga Bobot VOL Jumlah Harga Bobot Jumlah Harga Pekerjaan
NO URAIAN PEKERJAAN SAT VOL Kontrak Kontrak Kontrak Addendum Addendum Keterangan
Rp Rp % Rp % Tambah Kurang
(a) (b) (c) = a x b (d) (e) = b x d (f) = e -c (g) = c -e
I PEKERJAAN KONTRUKSI
1 Penyiapan RK3K terdiri atas
a. Pembuatan Dokumen Rencana Keselematan Set 1.00 5,000,000.00 5,000,000.00 0.36 0.00 0.00 0.00 5,000,000.00 Volume berkurang : 1,00
Kontruksi Set
b. Pembuatan Prosedur dan Instruksi Kerja
c. Penyiapan Formulir

2 Sosialisasi dan Promosi K3 terdiri atas


Volume berkurang : 5,00
a. Spanduk (Banner ) Bh 5.00 100,000.00 500,000.00 0.04 0.00 0.00 0.00 500,000.00
Bh
Volume berkurang : 3,00
b. Poster Bh 3.00 30,000.00 90,000.00 0.01 0.00 0.00 0.00 90,000.00
Bh
Volume berkurang : 1,00
c. Papan Informasi Bunga BH 1.00 100,000.00 100,000.00 0.01 0.00 0.00 0.00 100,000.00
BH

3 Alat Pelindung Kerja Terdiri Atas

a. Pagar Pengaman (Guard Railing) Ls 1.00 10,000,000.00 10,000,000.00 0.71 0.00 0.00 0.00 10,000,000.00 Volume berkurang : 1,00
Ls

4 Alat Pelindung Diri Terdiri Atas


Volume berkurang :
a. Topi Pelindung (Safety Helmet) Bh 25.00 80,000.00 2,000,000.00 0.14 10.00 800,000.00 0.06 1,200,000.00
15,00 Bh
Volume berkurang :
b. Pelindung Mata (Goggles,Spectacles) Psg 25.00 30,000.00 750,000.00 0.05 10.00 300,000.00 0.02 450,000.00
15,00 Psg

c. Pelindung Pernafasan Dan Mulut (Masker) Bh 25.00 5,000.00 125,000.00 0.01 10.00 50,000.00 0.00 75,000.00 Volume berkurang :
15,00 Bh

d. Sarung Tangan (Safety Gloves) Psg 25.00 15,000.00 375,000.00 0.03 10.00 150,000.00 0.01 225,000.00 Volume berkurang :
15,00 Psg
Volume berkurang :
e. Sepatu Keselamatan (Safety Shoes); untuk Staf Psg 25.00 150,000.00 3,750,000.00 0.27 10.00 1,500,000.00 0.11 2,250,000.00 15,00 Psg
Volume berkurang :
f. Rompi Keselamatan (Safety Vest) Bh 25.00 30,000.00 750,000.00 0.05 10.00 300,000.00 0.02 450,000.00
15,00 Bh
Harga Satuan Jumlah Harga Bobot VOL Jumlah Harga Bobot Jumlah Harga Pekerjaan
NO URAIAN PEKERJAAN SAT VOL Kontrak Kontrak Kontrak Addendum Addendum Keterangan
Rp Rp % Rp % Tambah Kurang
5 Fasilitas Sarana Kesehatan
a. Peralatan P3K Bh 1.00 500,000.00 500,000.00 0.04 1.00 500,000.00 0.04 0.00 Volume Tetap

6 Rambu - Rambu Terdiri Atas


Volume berkurang : 5,00
a. Rambu Peringatan Bh 5.00 30,000.00 150,000.00 0.01 0.00 0.00 0.00 150,000.00
Bh

b. Rambu Informasi Bh 5.00 30,000.00 150,000.00 0.01 0.00 0.00 0.00 150,000.00 Volume berkurang : 5,00
Bh

7 Lain - Lain Terkait Pengendalian Resiko K3


Volume berkurang : 2,00
a. Alat Pemadam Api Ringan (APAR); 3 Kg Bh 2.00 500,000.00 1,000,000.00 0.07 0.00 0.00 0.00 1,000,000.00 Bh
Sub Jumlah 25,240,000.00 1.80 3,600,000.00 0.26 0.00 21,640,000.00

PEKERJAAN LANTAI I ( SATU )


II PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi M² 104.00 20,000.00 2,080,000.00 0.15 104.00 2,080,000.00 0.15 0.00 0.00 Volume Tetap
2 Pek. Pengukuran dan Pemasangan Bouwplank M¹ 60.00 25,000.00 1,500,000.00 0.11 60.00 1,500,000.00 0.11 0.00 0.00 Volume Tetap
Sub Jumlah 3,580,000.00 0.26 3,580,000.00 0.26 0.00 0.00
III PEKERJAAN TANGGA
1 Pek. Tangga Cor Beton Bertulang
a. Beton K-250 M³ 7.66 1,150,000.00 8,809,000.00 0.63 7.66 8,809,000.00 0.63 0.00 0.00 Volume Tetap
b. Besi Beton Kg 779.64 19,000.00 14,813,160.00 1.06 779.64 14,813,160.00 1.06 0.00 0.00 Volume Tetap
c. Bekisting M² 46.99 390,000.00 18,326,100.00 1.31 46.99 18,326,100.00 1.31 0.00 0.00 Volume Tetap
Volume berkurang :
2 Pek. Pas. Keramik Tangga Uk.30 x 30 Cm M² 56.24 320,000.00 17,996,800.00 1.29 0.00 0.00 0.00 0.00 17,996,800.00
56,24 M²
3 Pek. Railing Tangga M¹ 22.00 600,000.00 13,200,000.00 0.94 22.00 13,200,000.00 0.94 0.00 0.00 Volume Tetap
4 Pek. Cat Air Tangga M² 33.30 33,000.00 1,098,900.00 0.08 33.30 1,098,900.00 0.08 0.00 0.00 Volume Tetap
Sub Jumlah 74,243,960.00 5.30 56,247,160.00 4.02 0.00 17,996,800.00
Harga Satuan Jumlah Harga Bobot VOL Jumlah Harga Bobot Jumlah Harga Pekerjaan
NO URAIAN PEKERJAAN SAT VOL Kontrak Kontrak Kontrak Addendum Addendum Keterangan
Rp Rp % Rp % Tambah Kurang
PEKERJAAN LANTAI II ( DUA )
IV PEK. STRUKTUR DAN NON STRUKTUR
1 Pek. Balok Lantai Cor Beton Bertulang ( Elev. + 4.40 )
a. Beton K-250 M³ 8.40 1,350,000.00 11,340,000.00 0.81 8.40 11,340,000.00 0.81 0.00 0.00 Volume Tetap
b. WF - 300 x 150 x 6.5 x 9 Kg 2,348.80 22,000.00 51,673,600.00 3.69 2,348.80 51,673,600.00 3.69 0.00 0.00 Volume Tetap
c. WF - 200 x 100 x 5.5 x 8 Kg 1,706.67 22,000.00 37,546,740.00 2.68 1,706.67 37,546,740.00 2.68 0.00 0.00 Volume Tetap
d. Wiremesh M8 Kg 610.27 20,000.00 12,205,400.00 0.87 610.27 12,205,400.00 0.87 0.00 0.00 Volume Tetap
e. Plat Bondek Tebal 0.7 Mm M³ 112.00 125,000.00 14,000,000.00 1.00 112.00 14,000,000.00 1.00 0.00 0.00 Volume Tetap

2 Pek. Tiang Kolom Cor Beton Bertulang


a. Beton K-250 M³ 18.24 1,350,000.00 24,624,000.00 1.76 18.24 24,624,000.00 1.76 0.00 0.00 Volume Tetap
b. Besi Polos Kg 4,180.38 19,000.00 79,427,220.00 5.67 4,180.38 79,427,220.00 5.67 0.00 0.00 Volume Tetap
c. Bekisting M³ 182.40 390,000.00 71,136,000.00 5.08 182.40 71,136,000.00 5.08 0.00 0.00 Volume Tetap

3 Pek. Ring Balok Cor Beto Bertulang ( Elev. + 8.00)


a. Beton K-250 M³ 22.82 1,350,000.00 30,807,000.00 2.20 22.82 30,807,000.00 2.20 0.00 0.00 Volume Tetap
b. Besi Polos Kg 6,754.52 19,000.00 128,335,880.00 9.17 6,754.52 128,335,880.00 9.17 0.00 0.00 Volume Tetap
c. Bekisting M³ 170.60 390,000.00 66,534,000.00 4.75 170.60 66,534,000.00 4.75 0.00 0.00 Volume Tetap

4 Pek. Dag Cor Beton Bertulang ( Elev. + 8.00)


a. Beton K-250 M³ 8.16 1,150,000.00 9,384,000.00 0.67 8.16 9,384,000.00 0.67 0.00 0.00 Volume Tetap
b. Besi Polos Kg 765.40 16,000.00 12,246,400.00 0.87 765.40 12,246,400.00 0.87 0.00 0.00 Volume Tetap
c. Bekisting M³ 16.80 280,000.00 4,704,000.00 0.34 16.80 4,704,000.00 0.34 0.00 0.00 Volume Tetap

5 Pek. Dinding Cor Beton Bertulang ( Elev. + 8.00)


a. Beton K-250 M³ 12.23 1,150,000.00 14,064,500.00 1.00 12.23 14,064,500.00 1.00 0.00 0.00 Volume Tetap
b. Besi Polos Kg 936.99 19,000.00 17,802,810.00 1.27 936.99 17,802,810.00 1.27 0.00 0.00 Volume Tetap
c. Bekisting M³ 163.07 390,000.00 63,597,300.00 4.54 163.07 63,597,300.00 4.54 0.00 0.00 Volume Tetap
Sub Jumlah 649,428,850.00 46.39 649,428,850.00 46.39
Harga Satuan Jumlah Harga Bobot VOL Jumlah Harga Bobot Jumlah Harga Pekerjaan
NO URAIAN PEKERJAAN SAT VOL Kontrak Kontrak Kontrak Addendum Addendum Keterangan
Rp Rp % Rp % Tambah Kurang
V PEKERJAAN DINDING DAN PLESTERAN

Volume bertambah : -
1 Pek. Pas. Dinding Batu Bata 1/2 Batu Camp. 1:4 M2 362.45 138,000.00 50,018,100.00 3.57 390.08 53,831,095.20 3.85 3,812,995.20 0.00
27,63 M2

2 Pek. Pas. Plesteran Camp. 1:4 M2 724.89 60,000.00 43,493,400.00 3.11 748.32 44,899,224.00 3.21 1,405,824.00 0.00 Volume bertambah : -
23,43 M2

Volume bertambah : -
3 Pek. Acian M2 724.89 20,000.00 14,497,800.00 1.04 771.75 15,435,016.00 1.10 937,216.00 0.00
46,86 M2

4 Pek. Dinding Partisi Triplek Lapis HPL M2 94.68 650,000.00 61,542,000.00 4.40 124.58 80,977,000.00 5.78 19,435,000.00 Volume bertambah : -
29,90 M2

5 Pek. Pas. Kusen dan Pintu Geser HPL Unit 6,500,000.00 0.00 0.00 4.00 26,000,000.00 1.86 26,000,000.00 Volume bertambah : -
4,00 Unit
Volume bertambah : -
6 Pek. Pas. Kusen dan Partisi Kaca Unit 4,500,000.00 0.00 0.00 4.00 18,000,000.00 1.29 18,000,000.00 4,00 Unit
Sub Jumlah 169,551,300.00 12.11 239,142,335.20 17.08 69,591,035.20 0.00
VI PEKERJAAN LANTAI DAN KERAMIK

1 Pek. Pas. Lantai Granit 60 x 60 Cm M2 375.38 330,000.00 123,875,400.00 8.85 438.71 144,774,300.00 10.34 20,898,900.00 0.00 Volume bertambah : -
63,33 M2

Volume bertambah : -
2 Pek. Pas. Lantai Keramik KM/WC 30 x 30 Cm M2 4.62 240,000.00 1,108,800.00 0.08 6.87 1,648,800.00 0.12 540,000.00
2,25 M2
Volume bertambah : -
3 Pek. Pas. Dinding Keramik KM/WC 30 x 60 Cm M2 18.86 280,000.00 5,280,800.00 0.38 26.74 7,485,800.00 0.53 2,205,000.00
7,88 M2
Sub Jumlah 130,265,000.00 9.30 153,908,900.00 10.99 23,643,900.00 0.00
VII PEKERJAAN ATAP DAN RANGKA ATAP
Volume berkurang :
1 Pek. Pas. Rangka Atap Baja Ringan M2 399.10 175,000.00 69,842,500.00 4.99 0.00 0.00 0.00 69,842,500.00 399,10 M2
Volume berkurang :
2 Pek. Pas. Penutup Atap Long Spandek M2 399.10 65,000.00 25,941,500.00 1.85 0.00 0.00 0.00 25,941,500.00
399,10 M2
Volume bertambah :
3 Pek. Pas. Perabung Atap M1 48.36 40,000.00 1,934,400.00 0.14 54.16 2,166,400.00 0.15 232,000.00 0.00
5,80 M1

4 Pek. Pas. Listplank PVC M1 90.00 85,000.00 7,650,000.00 0.55 82.60 7,021,000.00 0.50 629,000.00 Volume berkurang : 7,40
M1

5 Pek. Pas. Talang Air M1 4.46 125,000.00 557,500.00 0.04 0.00 0.00 0.00 0.00 557,500.00 Volume berkurang : 4,46
M1
Sub Jumlah 105,925,900.00 7.57 9,187,400.00 0.66 232,000.00 96,970,500.00
Harga Satuan Jumlah Harga Bobot VOL Jumlah Harga Bobot Jumlah Harga Pekerjaan
NO URAIAN PEKERJAAN SAT VOL Kontrak Kontrak Kontrak Addendum Addendum Keterangan
Rp Rp % Rp % Tambah Kurang
VIII PEKERJAAN KUSEN PINTU DAN JENDELA
Volume berkurang : 1,00
1 Pek. Pas. Kusen Alumanium dan Pintu Kaca ( P1 ) Set 9.00 5,500,000.00 49,500,000.00 3.54 8.00 44,000,000.00 3.14 5,500,000.00
Set

2 Pek. Pas. Kusen dan Pintu Fiber ( P2 ) Set 2.00 1,200,000.00 2,400,000.00 0.17 3.00 3,600,000.00 0.26 1,200,000.00 Volume bertambah :
1,00 Set

3 Pek. Pas. Kusen Alumanium dan Jendela Kaca ( J1 ) Set 6.00 4,500,000.00 27,000,000.00 1.93 8.00 36,000,000.00 2.57 9,000,000.00 Volume bertambah :
2,00 Set

4 Pek. Pas. Bovenlight Unit 3,000,000.00 0.00 0.00 2.00 6,000,000.00 0.43 6,000,000.00 Volume bertambah :
2,00 Unit
Volume bertambah :
5 Pek. Pas. Jendela Kaca Mati Unit 4,990,000.00 0.00 0.00 1.00 4,990,000.00 0.36 4,990,000.00 1,00 Unit
Sub Jumlah 78,900,000.00 5.64 94,590,000.00 6.76 21,190,000.00 5,500,000.00
IX PEKERJAAN PLAFOND

1 Pek. Pas. Plafond PVC + Rangka Besi Hollow M2 416.00 200,000.00 83,200,000.00 5.94 416.00 83,200,000.00 5.94 0.00 0.00 Volume Tetap

2 Pek. Pas. List Plafond PVC M1 212.00 45,000.00 9,540,000.00 0.68 212.00 9,540,000.00 0.68 0.00 0.00 Volume Tetap
3 Pek. Pas. Piri - Piri PVC + Rangka Besi Hollow M2 74.00 68,000.00 5,032,000.00 0.36 74.00 5,032,000.00 0.36 0.00 0.00 Volume Tetap

4 Pek. Pas. List Piri - Piri PVC M1 148.00 90,000.00 13,320,000.00 0.95 148.00 13,320,000.00 0.95 0.00 0.00 Volume Tetap

Sub Jumlah 111,092,000.00 7.93 111,092,000.00 7.94 0.00 0.00


X PEKERJAAN INSTALASI LISTRIK
Volume bertambah :
1 Pek. Instalasi Titik Lampu Ttk 49.00 180,000.00 8,820,000.00 0.63 78.00 14,040,000.00 1.00 5,220,000.00
29,00 Ttk

2 Pek. Pasang Box Panel Bh 1.00 630,000.00 630,000.00 0.04 1.00 630,000.00 0.04 0.00 0.00 Volume Tetap

Volume bertambah :
3 Pek. Pasang Lampu Downlight 25 Watt Bh 33.00 125,000.00 4,125,000.00 0.29 36.00 4,500,000.00 0.32 375,000.00 3,00 Bh

Volume bertambah :
4 Pek. Pasang Stop Kontak Biasa Bh 16.00 55,000.00 880,000.00 0.06 20.00 1,100,000.00 0.08 220,000.00
4,00 Bh

5 Pek. Pasang Saklar Triple Bh 1.00 65,000.00 65,000.00 0.00 0.00 0.00 0.00 65,000.00 Volume berkurang : 1,00
Bh

6 Pek. Pasang Saklar Ganda Bh 6.00 50,000.00 300,000.00 0.02 6.00 300,000.00 0.02 0.00 Volume Tetap

7 Pek. Pasang Saklar Tunggal Bh 12.00 50,000.00 600,000.00 0.04 7.00 350,000.00 0.02 250,000.00 Volume berkurang : 5,00
Bh

Volume bertambah :
8 Pek. Pasang Exhaust Fan Unit 930,000.00 0.00 0.00 3.00 2,790,000.00 0.20 2,790,000.00
3,00 Unit
Harga Satuan Jumlah Harga Bobot VOL Jumlah Harga Bobot Jumlah Harga Pekerjaan
NO URAIAN PEKERJAAN SAT VOL Kontrak Kontrak Kontrak Addendum Addendum Keterangan
Rp Rp % Rp % Tambah Kurang

9 Pek. Pasang Stop Kontak AC Bh 75,000.00 0.00 0.00 6.00 450,000.00 0.03 450,000.00 Volume bertambah :
6,00 Bh

Volume bertambah :
10 Pek. Pasang Box Panel 3 Phase + Aksesories Bh 1,270,000.00 0.00 0.00 1.00 1,270,000.00 0.09 1,270,000.00 1,00 Bh

Volume bertambah :
11 Pek. Pasang Kabel 4 x 10 m 135,000.00 0.00 0.00 25.00 3,375,000.00 0.24 3,375,000.00
25,00 m
Sub Jumlah 15,420,000.00 1.10 28,805,000.00 2.06 13,700,000.00 315,000.00
XI PEKERJAAN PENGECATAN
Volume bertambah :
1 Pek. Cat Air Dinding M2 523.73 35,000.00 18,330,550.00 1.31 722.98 25,304,160.00 1.81 6,973,610.00 0.00
199,25 M2
2 Pek. Waterproofing Dag Beton M2 68.00 105,000.00 7,140,000.00 0.51 68.00 7,140,000.00 0.51 0.00 0.00 Volume Tetap
Sub Jumlah 25,470,550.00 1.82 32,444,160.00 2.32 6,973,610.00 0.00
XII PEKERJAAN SANITASI AIR
Volume berkurang : 1,00
1 Pek. Pas. Klosed Jongkok Unit 1.00 550,000.00 550,000.00 0.04 0.00 0.00 0.00 0.00 550,000.00
Unit

2 Pek. Pas. Klosed Duduk Unit 1.00 3,500,000.00 3,500,000.00 0.25 3.00 10,500,000.00 0.75 7,000,000.00 0.00 Volume bertambah :
2,00 Unit

Volume bertambah :
3 Pek. Pas. Kran Air Bh 2.00 60,000.00 120,000.00 0.01 3.00 180,000.00 0.01 60,000.00 0.00 1,00 Bh

Volume bertambah :
4 Pek. Pas. Floor Drain Bh 2.00 55,000.00 110,000.00 0.01 3.00 165,000.00 0.01 55,000.00 0.00
1,00 Bh

5 Pek. Pas. Instalasi Air Kotor Pipa PVC 4" M1 73.00 65,000.00 4,745,000.00 0.34 78.00 5,070,000.00 0.36 325,000.00 0.00 Volume bertambah :
5,00 M1

Volume bertambah :
6 Pek. Pas. Instalasi Air Bersih 3/4" M1 25.50 35,000.00 892,500.00 0.06 30.50 1,067,500.00 0.08 175,000.00 0.00
5,00 M1
Sub Jumlah 9,917,500.00 0.71 16,982,500.00 1.21 7,615,000.00 550,000.00
XIII PEKERJAAN AKHIR
1 Pek. Pembersihan Akhir Ls 1.00 1,000,000.00 1,000,000.00 0.07 1.00 1,000,000.00 0.07 0.00 0.00 Volume Tetap
Sub Jumlah 1,000,000.00 0.07 1,000,000.00 0.07 0.00 0.00
Jumlah Total Harga 1,400,035,060.00 100.00 1,400,008,305.20 100.00 142,945,545.20 142,972,300.00
Pembulatan Harga 1,400,000,000.00 1,400,000,000.00
Pengurangan Hasil Pekerjaan Tambah Kurang Terhadap Kontrak 1,400,000,000.00 - 1,400,000,000.00 = 0.00
LAPORAN PROGRESS BERDASARKAN KONTRAK DAN CCO
PEKERJAAN : PEMBANGUNAN TAHAP 2 SEKTOR KANAN GEDUNG PASCASA
LOKASI : JL. YOS SUDARSO KM8 RUMBAI - PEKANBARU
TAHUN : 2021

Jumlah Harga Bobot Tahap Bobot Check List


NO URAIAN PEKERJAAN SAT VOL Addendum Addendum Penyelesaian Penyelesaian

Rp % % % Oke Not Oke


I PEKERJAAN KONTRUKSI
1 Penyiapan RK3K terdiri atas
a. Pembuatan Dokumen Rencana Keselematan
Kontruksi Set 0.00 0.00 0.00 0% 0.00

b. Pembuatan Prosedur dan Instruksi Kerja


c. Penyiapan Formulir

2 Sosialisasi dan Promosi K3 terdiri atas


a. Spanduk (Banner ) Bh 0.00 0.00 0.00 0% 0.00
b. Poster Bh 0.00 0.00 0.00 0% 0.00
c. Papan Informasi Bunga BH 0.00 0.00 0.00 0% 0.00

3 Alat Pelindung Kerja Terdiri Atas


a. Pagar Pengaman (Guard Railing) Ls 0.00 0.00 0.00 0% 0.00

4 Alat Pelindung Diri Terdiri Atas


a. Topi Pelindung (Safety Helmet) Bh 10.00 800,000.00 0.06 100% 0.06
b. Pelindung Mata (Goggles,Spectacles) Psg 10.00 300,000.00 0.02 100% 0.02
c. Pelindung Pernafasan Dan Mulut (Masker) Bh 10.00 50,000.00 0.00 100% 0.00
d. Sarung Tangan (Safety Gloves) Psg 10.00 150,000.00 0.01 100% 0.01
e. Sepatu Keselamatan (Safety Shoes); untuk Staf Psg 10.00 1,500,000.00 0.11 100% 0.11
f. Rompi Keselamatan (Safety Vest) Bh 10.00 300,000.00 0.02 100% 0.02
Jumlah Harga Bobot Tahap Bobot Check List
NO URAIAN PEKERJAAN SAT VOL Addendum Addendum Penyelesaian Penyelesaian

Rp % % % Oke Not Oke


5 Fasilitas Sarana Kesehatan
a. Peralatan P3K Bh 1.00 500,000.00 0.04 100% 0.04

6 Rambu - Rambu Terdiri Atas


a. Rambu Peringatan Bh 0.00 0.00 0.00 100% 0.00
b. Rambu Informasi Bh 0.00 0.00 0.00 100% 0.00

7 Lain - Lain Terkait Pengendalian Resiko K3


a. Alat Pemadam Api Ringan (APAR); 3 Kg Bh 0.00 0.00 0.00 100% 0.00
Sub Jumlah 3,600,000.00 0.26 0.26

PEKERJAAN LANTAI I ( SATU )


II PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi M² 104.00 2,080,000.00 0.15 100% 0.15
2 Pek. Pengukuran dan Pemasangan Bouwplank M¹ 60.00 1,500,000.00 0.11 100% 0.11
Sub Jumlah 3,580,000.00 0.26 0.26
III PEKERJAAN TANGGA
1 Pek. Tangga Cor Beton Bertulang
a. Beton K-250 M³ 7.66 8,809,000.00 0.63 100% 0.63
b. Besi Beton Kg 779.64 14,813,160.00 1.06 100% 1.06
c. Bekisting M² 46.99 18,326,100.00 1.31 100% 1.31
2 Pek. Pas. Keramik Tangga Uk.30 x 30 Cm M² 0.00 0.00 0.00 0% 0.00
3 Pek. Railing Tangga M¹ 22.00 13,200,000.00 0.94 50% 0.47
4 Pek. Cat Air Tangga M² 33.30 1,098,900.00 0.08 0% 0.00
Sub Jumlah 56,247,160.00 4.02 3.47
Jumlah Harga Bobot Tahap Bobot Check List
NO URAIAN PEKERJAAN SAT VOL Addendum Addendum Penyelesaian Penyelesaian

Rp % % % Oke Not Oke


PEKERJAAN LANTAI II ( DUA )
IV PEK. STRUKTUR DAN NON STRUKTUR
1 Pek. Balok Lantai Cor Beton Bertulang ( Elev. + 4.40 )
a. Beton K-250 M³ 8.40 11,340,000.00 0.81 100% 0.81
b. WF - 300 x 150 x 6.5 x 9 Kg 2,348.80 51,673,600.00 3.69 100% 3.69
c. WF - 200 x 100 x 5.5 x 8 Kg 1,706.67 37,546,740.00 2.68 100% 2.68
d. Wiremesh M8 Kg 610.27 12,205,400.00 0.87 100% 0.87
e. Plat Bondek Tebal 0.7 Mm M³ 112.00 14,000,000.00 1.00 100% 1.00

2 Pek. Tiang Kolom Cor Beton Bertulang


a. Beton K-250 M³ 18.24 24,624,000.00 1.76 100% 1.76
b. Besi Polos Kg 4,180.38 79,427,220.00 5.68 100% 5.68
c. Bekisting M³ 182.40 71,136,000.00 5.09 100% 5.09

3 Pek. Ring Balok Cor Beto Bertulang ( Elev. + 8.00)


a. Beton K-250 M³ 22.82 30,807,000.00 2.20 100% 2.20
b. Besi Polos Kg 6,754.52 128,335,880.00 9.17 100% 9.17
c. Bekisting M³ 170.60 66,534,000.00 4.76 100% 4.76

4 Pek. Dag Cor Beton Bertulang ( Elev. + 8.00)


a. Beton K-250 M³ 8.16 9,384,000.00 0.67 100% 0.67
b. Besi Polos Kg 765.40 12,246,400.00 0.88 100% 0.88
c. Bekisting M³ 16.80 4,704,000.00 0.34 100% 0.34

5 Pek. Dinding Cor Beton Bertulang ( Elev. + 8.00)


a. Beton K-250 M³ 12.23 14,064,500.00 1.01 100% 1.01
b. Besi Polos Kg 936.99 17,802,810.00 1.27 100% 1.27
c. Bekisting M³ 163.07 63,597,300.00 4.55 100% 4.55
Sub Jumlah 649,428,850.00 46.42 46.42
Jumlah Harga Bobot Tahap Bobot Check List
NO URAIAN PEKERJAAN SAT VOL Addendum Addendum Penyelesaian Penyelesaian

Rp % % % Oke Not Oke


V PEKERJAAN DINDING DAN PLESTERAN

1 Pek. Pas. Dinding Batu Bata 1/2 Batu Camp. 1:4 M2 390.08 53,831,095.20 3.85 100% 3.85

2 Pek. Pas. Plesteran Camp. 1:4 M2 748.32 44,899,224.00 3.21 100% 3.21

3 Pek. Acian M2 771.75 15,435,016.00 1.10 100% 1.10

4 Pek. Dinding Partisi Triplek Lapis HPL M2 124.58 80,977,000.00 5.79 100% 5.79
5 Pek. Pas. Kusen dan Pintu Geser HPL Unit 4.00 26,000,000.00 1.86 100% 1.86
6 Pek. Pas. Kusen dan Partisi Kaca Unit 4.00 18,000,000.00 1.29 100% 1.29
Sub Jumlah 239,142,335.20 17.10 17.10
VI PEKERJAAN LANTAI DAN KERAMIK

1 Pek. Pas. Lantai Granit 60 x 60 Cm M2 438.71 144,774,300.00 10.35 95% 9.83

2 Pek. Pas. Lantai Keramik KM/WC 30 x 30 Cm M2 6.87 1,648,800.00 0.12 100% 0.12

3 Pek. Pas. Dinding Keramik KM/WC 30 x 60 Cm M2 26.74 7,485,800.00 0.54 100% 0.54

Sub Jumlah 153,908,900.00 11.00 10.48


VII PEKERJAAN ATAP DAN RANGKA ATAP
1 Pek. Pas. Rangka Atap Baja Ringan M2 0.00 0.00 0.00
2 Pek. Pas. Penutup Atap Long Spandek M2 0.00 0.00 0.00
3 Pek. Pas. Perabung Atap M1 54.16 2,166,400.00 0.15 100% 0.15
4 Pek. Pas. Listplank PVC M1 82.60 7,021,000.00 0.50 100% 0.50
5 Pek. Pas. Talang Air M1 0.00 0.00 0.00
Sub Jumlah 9,187,400.00 0.66 0.66
Jumlah Harga Bobot Tahap Bobot Check List
NO URAIAN PEKERJAAN SAT VOL Addendum Addendum Penyelesaian Penyelesaian

Rp % % % Oke Not Oke


VIII PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pek. Pas. Kusen Alumanium dan Pintu Kaca ( P1 ) Set 8.00 44,000,000.00 3.15 100% 3.15
2 Pek. Pas. Kusen dan Pintu Fiber ( P2 ) Set 3.00 3,600,000.00 0.26 100% 0.26
3 Pek. Pas. Kusen Alumanium dan Jendela Kaca ( J1 ) Set 8.00 36,000,000.00 2.57 100% 2.57
4 Pek. Pas. Bovenlight Unit 2.00 6,000,000.00 0.43 100% 0.43
5 Pek. Pas. Jendela Kaca Mati Unit 1.00 4,990,000.00 0.36 100% 0.36
Sub Jumlah 94,590,000.00 6.76 6.41
IX PEKERJAAN PLAFOND

1 Pek. Pas. Plafond PVC + Rangka Besi Hollow M2 416.00 83,200,000.00 5.95 100% 5.95

2 Pek. Pas. List Plafond PVC M1 212.00 9,540,000.00 0.68 100% 0.68
3 Pek. Pas. Piri - Piri PVC + Rangka Besi Hollow M2 74.00 5,032,000.00 0.36 100% 0.36

4 Pek. Pas. List Piri - Piri PVC M1 148.00 13,320,000.00 0.95 100% 0.95

Sub Jumlah 111,092,000.00 7.94 7.94


X PEKERJAAN INSTALASI LISTRIK

1 Pek. Instalasi Titik Lampu Ttk 78.00 14,040,000.00 1.00 100% 1.00

2 Pek. Pasang Box Panel Bh 1.00 630,000.00 0.05 100% 0.05

3 Pek. Pasang Lampu Downlight 25 Watt Bh 36.00 4,500,000.00 0.32 100% 0.32

4 Pek. Pasang Stop Kontak Biasa Bh 19.00 1,045,000.00 0.07 100% 0.07

5 Pek. Pasang Saklar Triple Bh 0.00 0.00 0.00

6 Pek. Pasang Saklar Ganda Bh 6.00 300,000.00 0.02 100% 0.02

7 Pek. Pasang Saklar Tunggal Bh 7.00 350,000.00 0.03 100% 0.03

8 Pek. Pasang Exhaust Fan Unit 3.00 2,790,000.00 0.20 100% 0.20

9 Pek. Pasang Stop Kontak AC Bh 6.00 450,000.00 0.03 100% 0.03


Jumlah Harga Bobot Tahap Bobot Check List
NO URAIAN PEKERJAAN SAT VOL Addendum Addendum Penyelesaian Penyelesaian

Rp % % % Oke Not Oke

10 Pek. Pasang Box Panel 3 Phase + Aksesories Bh 1.00 1,270,000.00 0.09 100% 0.09

11 Pek. Pasang Kabel 4 x 10 m 25.00 3,375,000.00 0.24 100% 0.24

Sub Jumlah 28,750,000.00 2.06 2.06


XI PEKERJAAN PENGECATAN

1 Pek. Cat Air Dinding M2 722.98 25,304,160.00 1.81 100% 1.81

2 Pek. Waterproofing Dag Beton M2 68.00 7,140,000.00 0.51 100% 0.51


Sub Jumlah 32,444,160.00 2.32 2.32
XII PEKERJAAN SANITASI AIR
1 Pek. Pas. Klosed Jongkok Unit 0.00 0.00 0.00

2 Pek. Pas. Klosed Duduk Unit 3.00 10,500,000.00 0.75 100% 0.75

3 Pek. Pas. Kran Air Bh 3.00 180,000.00 0.01 100% 0.01

4 Pek. Pas. Floor Drain Bh 3.00 165,000.00 0.01 100% 0.01

5 Pek. Pas. Instalasi Air Kotor Pipa PVC 4" M1 78.00 5,070,000.00 0.36 100% 0.36

Sub Jumlah 15,915,000.00 1.14 1.14


XIII PEKERJAAN AKHIR
1 Pek. Pembersihan Akhir Ls 1.00 1,000,000.00 0.07 75% 0.05
Sub Jumlah 1,000,000.00 0.07 0.05
Jumlah Total Harga 1,398,885,805.20 100.00 98.56
REKAPITULASI
BILL OF QUANTITY
PEKERJAAN TAMBAHAN DAN KANOPI BETON
PEKERJAAN : PEMBANGUNAN FASILITAS PENDUKUNG GEDUNG PASCASARJANA
UNIVERSITAS LANCANG KUNING

LOKASI : JL. YOS SUDARSO KM8 RUMBAI - PEKANBARU


TAHUN : 2022

NO URAIAN PEKERJAAN Jumlah Harga

I PEKERJAAN TAHAP 1 PASKA SARJANA


I.1 Pek. Penutup Atap dan Rangka Atap 174,752,913.00

II PEKERJAAN TAHAP 1 PASKA SARJANA


II.1 Pek. Peningkatan Ruang Prodi 33,940,000.00
II.2 Pek. Kolom Beton Bertulang (Elv. + 4.00) uk. 50 x 60 cm 34,033,438.71
II.3 Pek. Balok Beton Bertulang (Elv. + 8.00) uk. 30 x 40 cm 12,596,416.78
II.4 Pek. Kolom Beton Bertulang (Elv. + 8.00) uk. 50 x 60 cm 18,385,791.86
II.5 Pek. Balok Beton Bertulang (Elv. + 9.65) uk. 30 x 40 cm 10,236,522.30
II.6 Pek. Balok Beton Bertulang (Elv. + 9.65) uk. 30 x 50 cm 29,514,981.26
II.7 Pek. Plat Lantai Beton Bertulang (Elv. + 9.65) 26,570,890.08
II.8 Pek. Pengecatan Kolom, Balok dan kanopi 8,228,150.00
II.9 Pek. Instalasi Air Bersih 11,975,000.00
Jumlah Harga 360,234,103.98
Pembulatan 360,234,000.00
Terbilang Tiga Ratus Enam Puluh Juta Dua Ratus Tiga Puluh Empat Ribu Rupiah

Keterangan :
Pengurangan Hasil Pekerjaan Tambah Kurang Terhadap Kontrak = 0.00
Dana Tambahan Penyelesaian Pekerjaan
= 360,234,000.00 - 0.00 = 360,234,000.00

Pekanbaru, 30 Agustus 2022


Dibuat Oleh,
CV. MITRA USAHA MANDIRI

MERRY CHRISTINA
Direktur
BILL OF QUANTITY PEKERJAAN TAMBAHAN DAN KANOPI BETON

PEKERJAAN : PEMBANGUNAN FASILITAS PENDUKUNG GEDUNG PASCASARJANA UNIVERSITAS LANCANG KUNING


LOKASI : JL. YOS SUDARSO KM8 RUMBAI - PEKANBARU
TAHUN : 2022

Harga Satuan Jumlah Harga


NO URAIAN PEKERJAAN VOLUME SAT
Rp Rp
(a) (b) (c) = a x b

I PEKERJAAN TAHAP 1 PASKA SARJANA


I.1 Pek. Penutup Atap dan Rangka Atap
1 Pek. Pas. Rangka Baja Ringan untuk Atap Multi Roof 543.40 m2 209,335.72 113,753,366.39
2 Pek. Pas. Atap Multi Roof 543.40 m2 112,255.00 60,999,546.61
Sub Jumlah 174,752,913.00

II PEKERJAAN STRUKTUR DAN NON STRUKTUR


II.1 Pek. Peningkatan Ruang Prodi
a. Pek. Epoxy UNP 25.00 Kg 650,000.00 16,250,000.00
b. Pek. Epoxy Repeal (Grouting) 15.00 Kg 450,000.00 6,750,000.00
c. Pek. Pas. Plafond PVC + Rangka Besi Hollow 32.00 m2 200,000.00 6,400,000.00
d. Pek. Pas. List Plafond PVC 24.00 m1 90,000.00 2,160,000.00
e. Pek. Cat Air Dinding 68.00 m2 35,000.00 2,380,000.00
Sub Jumlah 33,940,000.00

II.2 Pek. Kolom Beton Bertulang (Elv. + 4.00) uk. 50 x 60 cm


a. Bekisting 26.40 m2 390,000.00 10,296,000.00
b. Pembesian BJTD/ Ulir 776.28 Kg 21,997.53 17,076,238.71
c. Pembesian BJTP/ Polos 94.80 Kg 19,000.00 1,801,200.00
d. Beton K.250 3.60 m3 1,350,000.00 4,860,000.00
Sub Jumlah 34,033,438.71

II.3 Pek. Balok Beton Bertulang (Elv. + 8.00) uk. 30 x 40 cm


a. Bekisting 8.00 m2 390,000.00 3,120,000.00
b. Pembesian BJTD/ Ulir 321.84 Kg 21,997.53 7,079,683.45
c. Pembesian BJTP/ Polos 57.93 Kg 19,000.00 1,100,733.33
d. Beton K.250 0.96 m3 1,350,000.00 1,296,000.00
Sub Jumlah 12,596,416.78

II.4 Pek. Kolom Beton Bertulang (Elv. + 8.00) uk. 50 x 60 cm


a. Bekisting 14.19 m2 390,000.00 5,534,100.00
b. Pembesian BJTD/ Ulir 421.47 Kg 21,997.53 9,271,296.86
c. Pembesian BJTP/ Polos 50.96 Kg 19,000.00 968,145.00
d. Beton K.250 1.94 m3 1,350,000.00 2,612,250.00
Sub Jumlah 18,385,791.86

II.5 Pek. Balok Beton Bertulang (Elv. + 9.65) uk. 30 x 40 cm


a. Bekisting 8.00 m2 390,000.00 3,120,000.00
b. Pembesian BJTD/ Ulir 214.56 Kg 21,997.53 4,719,788.96
c. Pembesian BJTP/ Polos 57.93 Kg 19,000.00 1,100,733.33
d. Beton K.250 0.96 m3 1,350,000.00 1,296,000.00
Sub Jumlah 10,236,522.30

II.6 Pek. Balok Beton Bertulang (Elv. + 9.65) uk. 30 x 50 cm


a. Bekisting 20.79 m2 390,000.00 8,108,100.00
b. Pembesian BJTD/ Ulir 670.20 Kg 21,997.53 14,742,741.26
c. Pembesian BJTP/ Polos 149.31 Kg 19,000.00 2,836,890.00
d. Beton K.250 2.84 m3 1,350,000.00 3,827,250.00
Sub Jumlah 29,514,981.26

II.7 Pek. Plat Lantai Beton Bertulang (Elv. + 9.65)


a. Pek. Pas. Plat Bondek Tebal 0.7 Mm 83.16 m2 125,000.00 10,395,000.00
b. Pek. Pas. Wiremesh M8 385.67 Kg 20,000.00 7,713,415.08
c. Beton K.250 6.27 m3 1,350,000.00 8,462,475.00
Sub Jumlah 26,570,890.08

II.8 Pek. Pengecatan Kolom, Balok dan kanopi


a. Pek. Cat Air Dinding Kolom, Balok dan Kanopi 64.99 m2 35,000.00 2,274,650.00
b. Pek. Waterproofing Dag Beton Kanopi 56.70 m2 105,000.00 5,953,500.00
Sub Jumlah 8,228,150.00
BILL OF QUANTITY PEKERJAAN TAMBAHAN DAN KANOPI BETON

PEKERJAAN : PEMBANGUNAN FASILITAS PENDUKUNG GEDUNG PASCASARJANA UNIVERSITAS LANCANG KUNING


LOKASI : JL. YOS SUDARSO KM8 RUMBAI - PEKANBARU
TAHUN : 2022

Harga Satuan Jumlah Harga


NO URAIAN PEKERJAAN VOLUME SAT
Rp Rp
(a) (b) (c) = a x b

II.9 Pek. Instalasi Air Bersih


a. Pek. Instalasi Air dari Tangki ke Gedung A 85.00 m' 35,000.00 2,975,000.00
b. Pek. Pas. Dudukan Tangki 1.00 Unit 5,500,000.00 5,500,000.00
c. Pek. Pemindahan Tangki Air 1.00 Ls 3,500,000.00 3,500,000.00
Sub Jumlah 11,975,000.00
Jumlah Total Harga 360,234,103.98
LAPORAN PEKERJAAN TAMBAHAN DAN KANOPI BETON

PEKERJAAN : PEMBANGUNAN FASILITAS PENDUKUNG GEDUNG PASCASARJANA UNIVERSITAS LANCANG KUNING


LOKASI : JL. YOS SUDARSO KM8 RUMBAI - PEKANBARU
TAHUN : 2022

Harga Jumlah Bobot Tahap Bobot


NO URAIAN PEKERJAAN VOLUME SAT Satuan Harga per Item Penyelesaian Lapangan Keterangan
(Rp) (Rp) (%) (%) (%)

I PEKERJAAN TAHAP 1 PASKA SARJANA


I.1 Pek. Penutup Atap dan Rangka Atap
1 Pek. Pas. Rangka Baja Ringan untuk Atap Multi Roof 543.40 m2 209,335.72 113,753,366.39 31.78 100% 31.78
2 Pek. Pas. Atap Multi Roof 543.40 m2 112,255.00 60,999,546.61 17.04 100% 17.04
Sub Jumlah 174,752,913.00 48.82 48.82

II PEKERJAAN STRUKTUR DAN NON STRUKTUR


II.1 Pek. Peningkatan Ruang Prodi
a. Pek. Epoxy UNP 25.00 Kg 650,000.00 16,250,000.00 4.54 100% 4.54
b. Pek. Epoxy Repeal (Grouting) 15.00 Kg 450,000.00 6,750,000.00 1.89 100% 1.89
c. Pek. Pas. Plafond PVC + Rangka Besi Hollow 32.00 m2 200,000.00 6,400,000.00 1.79 100% 1.79
d. Pek. Pas. List Plafond PVC 24.00 m1 90,000.00 2,160,000.00 0.60 100% 0.60
e. Pek. Cat Air Dinding 68.00 m2 35,000.00 2,380,000.00 0.66 100% 0.66
Sub Jumlah 33,940,000.00 9.48 9.48

II.2 Pek. Kolom Beton Bertulang (Elv. + 4.00) uk. 50 x 60 cm


a. Bekisting 26.40 m2 390,000.00 10,296,000.00 2.88 100% 2.88
b. Pembesian BJTD/ Ulir 776.28 Kg 21,997.53 17,076,238.71 4.77 100% 4.77
c. Pembesian BJTP/ Polos 94.80 Kg 19,000.00 1,801,200.00 0.50 100% 0.50
d. Beton K.250 3.60 m3 1,350,000.00 4,860,000.00 1.36 100% 1.36
Sub Jumlah 34,033,438.71 9.51 9.51

II.3 Pek. Balok Beton Bertulang (Elv. + 8.00) uk. 30 x 40 cm


a. Bekisting 8.00 m2 390,000.00 3,120,000.00 0.87 100% 0.87
b. Pembesian BJTD/ Ulir 321.84 Kg 21,997.53 7,079,683.45 1.98 100% 1.98
c. Pembesian BJTP/ Polos 57.93 Kg 19,000.00 1,100,733.33 0.31 100% 0.31
d. Beton K.250 0.96 m3 1,350,000.00 1,296,000.00 0.36 100% 0.36
Sub Jumlah 12,596,416.78 3.52 3.52

II.4 Pek. Kolom Beton Bertulang (Elv. + 8.00) uk. 50 x 60 cm


a. Bekisting 14.19 m2 390,000.00 5,534,100.00 1.55 100% 1.55
b. Pembesian BJTD/ Ulir 421.47 Kg 21,997.53 9,271,296.86 2.59 100% 2.59
c. Pembesian BJTP/ Polos 50.96 Kg 19,000.00 968,145.00 0.27 100% 0.27
d. Beton K.250 1.94 m3 1,350,000.00 2,612,250.00 0.73 100% 0.73
Sub Jumlah 18,385,791.86 5.14 5.14
LAPORAN PEKERJAAN TAMBAHAN DAN KANOPI BETON

PEKERJAAN : PEMBANGUNAN FASILITAS PENDUKUNG GEDUNG PASCASARJANA UNIVERSITAS LANCANG KUNING


LOKASI : JL. YOS SUDARSO KM8 RUMBAI - PEKANBARU
TAHUN : 2022

Harga Jumlah Bobot Tahap Bobot


NO URAIAN PEKERJAAN VOLUME SAT Satuan Harga per Item Penyelesaian Lapangan Keterangan
(Rp) (Rp) (%) (%) (%)
II.5 Pek. Balok Beton Bertulang (Elv. + 9.65) uk. 30 x 40 cm
a. Bekisting 8.00 m2 390,000.00 3,120,000.00 0.87 100% 0.87
b. Pembesian BJTD/ Ulir 214.56 Kg 21,997.53 4,719,788.96 1.32 100% 1.32
c. Pembesian BJTP/ Polos 57.93 Kg 19,000.00 1,100,733.33 0.31 100% 0.31
d. Beton K.250 0.96 m3 1,350,000.00 1,296,000.00 0.36 100% 0.36
Sub Jumlah 10,236,522.30 2.86 2.86

II.6 Pek. Balok Beton Bertulang (Elv. + 9.65) uk. 30 x 50 cm


a. Bekisting 20.79 m2 390,000.00 8,108,100.00 2.27 100% 2.27
b. Pembesian BJTD/ Ulir 670.20 Kg 21,997.53 14,742,741.26 4.12 100% 4.12
c. Pembesian BJTP/ Polos 149.31 Kg 19,000.00 2,836,890.00 0.79 100% 0.79
d. Beton K.250 2.84 m3 1,350,000.00 3,827,250.00 1.07 100% 1.07
Sub Jumlah 29,514,981.26 8.25 8.25

II.7 Pek. Plat Lantai Beton Bertulang (Elv. + 9.65)


a. Pek. Pas. Plat Bondek Tebal 0.7 Mm 68.04 m2 125,000.00 8,505,000.00 2.38 100% 2.38
b. Pek. Pas. Wiremesh 385.67 Kg 20,000.00 7,713,415.08 2.16 100% 2.16
c. Beton K.250 5.95 m3 1,350,000.00 8,037,225.00 2.25 100% 2.25
Sub Jumlah 24,255,640.08 6.78 6.78

II.8 Pek. Pengecatan Kolom, Balok dan kanopi


a. Pek. Cat Air Dinding Kolom, Balok dan Kanopi 64.99 m2 35,000.00 2,274,650.00 0.64 0.00
b. Pek. Waterproofing Dag Beton Kanopi 56.70 m2 105,000.00 5,953,500.00 1.66 0.00
Sub Jumlah 8,228,150.00 2.30 0.00

II.9 Pek. Instalasi Air Bersih


a. Pek. Instalasi Air dari Tangki ke Gedung A 85.00 m' 35,000.00 2,975,000.00 0.83 100% 0.83
b. Pek. Pas. Dudukan Tangki 1.00 Unit 5,500,000.00 5,500,000.00 1.54 100% 1.54
c. Pek. Pemindahan Tangki Air 1.00 Ls 3,500,000.00 3,500,000.00 0.98 100% 0.98
Sub Jumlah 11,975,000.00 3.35 3.35
Jumlah Total Harga 357,918,853.98 100.00 97.70
BACK UP DATA PERHITUNGAN

1 Kolom Beton Bertulang (Elv. +4.00)


Tinggi 4.00
Lebar 1 0.50
Lebar 2 0.60
Berat Jenis Jumlah
No Posisi Sat Volume Panjang Lebar (Kg/m') Jumlah Unit Jumlah

1 Bekisting m2 26.40 4.00 2.20 1.00 3.00 26.40


2 Tulangan Utama D 19 Kg 669.00 5.00 1.00 2.23 20.00 3.00 669.00
3 Tulangan Utama D 22 Kg 107.28 1.50 1.00 2.98 8.00 3.00 107.28
Jumlah Tulangan Utama Kg 776.28 776.28
4 Tulangan Polos Ø8 Kg 94.80 2.40 1.00 0.40 33.33 3.00 94.80
5 Beton K-250 m3 3.60 4.00 0.30 1.00 3.00 3.60

2 Balok Beton Bertulang (Elv. +8.00)


Panjang 4.00
Lebar 0.30
Tinggi 0.40

No Posisi Sat Volume Panjang Lebar Berat Jenis Jumlah Jumlah Jumlah
(Kg/m') Unit
1 Bekisting m2 8.00 4.00 1.00 1.00 2.00 8.00
2 Tulangan Utama D 22 Kg 214.56 4.50 1.00 2.98 8.00 2.00 214.56
3 Tulangan Utama D 22 Kg 107.28 1.50 1.00 2.98 8.00 3.00 107.28
Jumlah Tulangan Utama Kg 321.84 321.84
4 Tulangan Polos Ø8 Kg 57.93 2.20 1.00 0.40 33.33 2.00 57.93
5 Beton K-250 m3 0.96 4.00 0.12 1.00 2.00 0.96

3 Kolom Beton Bertulang (Elv. +8.00)


Tinggi 2.15
Lebar 1 0.50
Lebar 2 0.60
Berat Jenis Jumlah
No Posisi Sat Volume Panjang Lebar Jumlah Jumlah
(Kg/m') Unit
1 Bekisting m2 14.19 2.15 2.20 1.00 3.00 14.19
2 Tulangan Utama D 19 Kg 421.47 3.15 1.00 2.23 20.00 3.00 421.47
3 Tulangan Polos Ø8 Kg 50.96 2.40 1.00 0.40 17.92 3.00 50.96
4 Beton K-250 m3 1.94 2.15 0.30 1.00 3.00 1.94

4 Balok Beton Bertulang (Elv. +9.65)


Panjang 4.00
Lebar 0.30
Tinggi 0.40
Berat Jenis Jumlah
No Posisi Sat Volume Panjang Lebar Jumlah Jumlah
(Kg/m') Unit
1 Bekisting m2 8.00 4.00 1.00 1.00 2.00 8.00
2 Tulangan Utama D 22 Kg 214.56 4.50 1.00 2.98 8.00 2.00 214.56
3 Tulangan Polos Ø8 Kg 57.93 2.20 1.00 0.40 33.33 2.00 57.93
4 Beton K-250 m3 0.96 4.00 0.12 1.00 2.00 0.96
5 Balok Beton Bertulang (Elv. +9.65)
Panjang 6.30
Lebar 0.30
Tinggi 0.50
Berat Jenis Jumlah
No Posisi Sat Volume Panjang Lebar (Kg/m') Jumlah Unit Jumlah
1 Bekisting m2 20.79 6.30 1.10 1.00 3.00 20.79
2a Tulangan Utama D 22 Kg 486.34 6.80 1.00 2.98 8.00 3.00 486.34
2b Tulangan Utama D 22 Kg 50.06 0.70 1.00 2.98 8.00 3.00 50.06
3 Tulangan Utama D 19 (OS) Kg 133.80 1.00 1.00 2.23 20.00 3.00 133.80
Jumlah Tulangan Utama Kg 670.20 670.20
4 Tulangan Polos Ø8 Kg 149.31 2.40 1.00 0.40 52.50 3.00 149.31
5 Beton K-250 m3 2.84 6.30 0.15 1.00 3.00 2.84

6 Plat Lantai Beton Bertulang (Elv. +9.65)


Panjang 6.30
Lebar 4.50
Tinggi 0.11
Berat Jenis Jumlah
No Posisi Sat Volume Panjang Lebar Jumlah Jumlah
(Kg/m2) Unit
1 Plat Bondek tebal 0,70 mm m2 68.04 6.30 4.50 1.20 2.00 68.04
Penambahan Overlaping m2 15.12 6.30 1.00 1.20 2.00 15.12
Total m2 83.16 83.16

2 Wiremesh Kg 370.74 6.30 4.50 5.45 1.20 2.00 370.74


3 Tulangan Polos Ø8 Kg 14.93 0.60 1.00 0.40 31.50 2.00 14.93
Total Kg 385.67 385.67

4 Beton K-250 (Plat) m3 5.95 6.30 4.50 0.11 1.00 2.00 5.95
Beton K-250 (Topi) m3 0.32 6.30 0.25 0.10 1.00 2.00 0.32
Total m3 6.27 6.27

7 Pengecatan Kanopi
Jumlah
No Posisi Sat Volume Panjang Lebar Jumlah Unit Jumlah
1 Kolom 50 x 60 cm m2 26.40 4.00 2.20 1.00 3.00 26.40
2 Balok uk. 30 x 40 cm m2 8.80 4.00 1.10 1.00 1.00 2.00 8.80
3 Balok uk. 30 x 50 cm m2 15.60 6.00 1.30 1.00 1.00 2.00 15.60
4 Kolom 50 x 60 cm m2 14.19 2.15 2.20 1.00 3.00 14.19
5 Ruang Toilet m2 9.80 7.00 1.40 1.00 1.00 9.80
Jumlah m2 64.99 64.99

8 Water proofing
No Posisi Sat Volume Panjang Lebar Jumlah Jumlah Jumlah
Unit
1 Plat Lantai Beton m2 56.70 6.30 4.50 1.00 2.00 56.70

9 Granit Tangga
Jumlah
No Posisi Sat Volume Panjang Lebar Jumlah Unit Jumlah
1 Teras Bawah m2 4.00 4.00 1.00 1.00 1.00 4.00
2 Horizontal 1 m2 15.60 4.00 0.30 13.00 1.00 15.60
3 Vertikal 1 m2 7.80 4.00 0.15 13.00 1.00 7.80
4 Horizontal 2 m2 10.80 4.00 0.30 9.00 1.00 10.80
5 Vertikal 2 m2 5.40 4.00 0.15 9.00 1.00 5.40
6 Teras Gedung Sebelah m2 8.00 4.00 1.00 1.00 2.00 8.00
7 Dinding Anak Tangga m2 0.80 4.00 0.20 1.00 1.00 0.80
Jumlah m2 52.40 52.40
7 Pengecatan Tahap1
Jumlah
No Posisi Sat Volume Panjang Lebar Jumlah Unit Jumlah
1 Dinding luar arah 24 meter m2 96.00 24.00 4.00 1.00 1.00 96.00
2 Dinding arah 12 meter m2 64.00 8.00 4.00 1.00 1.00 2.00 64.00
3 Dinding Dalam arah 24 meter m2 244.80 24.00 3.40 1.00 1.00 3.00 244.80
4 Dinding Dalam arah 8 meter m2 217.60 8.00 3.40 1.00 8.00 217.60
5 Dinding Kamar mandi m2 25.20 6.00 1.40 1.00 3.00 25.20
6 Dinding Selasar Ujung m2 27.20 4.00 3.40 1.00 2.00 27.20
7 Dinding Selasar m2 60.00 20.00 1.50 1.00 2.00 60.00
Kolom Besar m2 45.94 3.48 2.20 1.00 6.00 45.94
Jumlah m2 780.74 780.74

Faktor Pengurang
Jumlah
No Posisi Sat Volume Panjang Lebar Jumlah Jumlah
Unit
1 Jendela Kaca m2 11.52 1.20 0.60 2.00 8.00 11.52
2 Pintu m2 35.20 2.20 1.00 1.00 2.00 8.00 35.20
3 Kaca mati m2 5.28 2.20 1.20 1.00 2.00 1.00 5.28
4 Bovenlight m2 5.76 2.40 0.60 1.00 2.00 2.00 5.76
Jumlah m2 57.76 57.76

Hasil Akhir m2 780.74 - 57.76 = 722.98


TIME SCHEDULE

PEKERJAAN : PEMBANGUNAN FASILITAS PENDUKUNG GEDUNG PASCASARJANA UNIVERSITAS LANCANG KUNING


LOKASI : JL. YOS SUDARSO KM8 RUMBAI - PEKANBARU
TAHUN : 2022

BOBOT BULAN KE 1 BULAN KE 2 BULAN KE 3


NO URAIAN PEKERJAAN MINGGU KE MINGGU KE MINGGU KE SKALA KET
(%) 1 2 3 4 5 6 7 8 9 10 11 12
100
II PEKERJAAN STRUKTUR DAN NON STRUKTUR
II.1 Pek. Peningkatan Ruang Prodi
a. Pek. Epoxy UNP 10.15 2.03 2.03 2.03 2.03 2.03
b. Pek. Epoxy Repeal (Grouting) 4.22 0.84 0.84 0.84 0.84 0.84
c. Pek. Pas. Plafond PVC + Rangka Besi Hollow 4.00 0.80 0.80 0.80 0.80 0.80
d. Pek. Pas. List Plafond PVC 1.35 0.27 0.27 0.27 0.27 0.27
Sub Jumlah 19.72

II.2 Pek. Kolom Beton Bertulang (Elv. + 4.00) uk. 50 x 60 cm


a. Bekisting 6.43 1.61 1.61 1.61 1.61
b. Pembesian BJTD/ Ulir 9.20 2.30 2.30 2.30 2.30 80
c. Pembesian BJTP/ Polos 1.13 0.28 0.28 0.28 0.28
d. Beton K.250 3.04 0.76 0.76 0.76 0.76
Sub Jumlah 19.79

II.3 Pek. Balok Beton Bertulang (Elv. + 8.00) uk. 30 x 40 cm


a. Bekisting 1.95 0.49 0.49 0.49 0.49
b. Pembesian BJTD/ Ulir 2.95 0.74 0.74 0.74 0.74
c. Pembesian BJTP/ Polos 0.69 0.17 0.17 0.17 0.17
d. Beton K.250 0.81 0.20 0.20 0.20 0.20
Sub Jumlah 6.40
60
II.4 Pek. Kolom Beton Bertulang (Elv. + 8.00) uk. 50 x 60 cm
a. Bekisting 3.46 0.86 0.86 0.86 0.86
b. Pembesian BJTD/ Ulir 5.79 1.45 1.45 1.45 1.45
c. Pembesian BJTP/ Polos 0.60 0.15 0.15 0.15 0.15
d. Beton K.250 1.63 0.41 0.41 0.41 0.41
Sub Jumlah 11.49

II.5 Pek. Balok Beton Bertulang (Elv. + 9.65) uk. 30 x 40 cm


a. Bekisting 1.95 0.49 0.49 0.49 0.49
b. Pembesian BJTD/ Ulir 2.95 0.74 0.74 0.74 0.74
c. Pembesian BJTP/ Polos 0.69 0.17 0.17 0.17 0.17 40
d. Beton K.250 0.81 0.20 0.20 0.20 0.20
Sub Jumlah 6.40
TIME SCHEDULE

PEKERJAAN : PEMBANGUNAN FASILITAS PENDUKUNG GEDUNG PASCASARJANA UNIVERSITAS LANCANG KUNING


LOKASI : JL. YOS SUDARSO KM8 RUMBAI - PEKANBARU
TAHUN : 2022
40
BOBOT BULAN KE 1 BULAN KE 2 BULAN KE 3
NO URAIAN PEKERJAAN MINGGU KE MINGGU KE MINGGU KE SKALA KET
(%) 1 2 3 4 5 6 7 8 9 10 11 12
II.6 Pek. Balok Beton Bertulang (Elv. + 9.65) uk. 30 x 50 cm
a. Bekisting 5.07 1.27 1.27 1.27 1.27
b. Pembesian BJTD/ Ulir 6.68 1.67 1.67 1.67 1.67
c. Pembesian BJTP/ Polos 1.77 0.44 0.44 0.44 0.44
d. Beton K.250 2.39 0.60 0.60 0.60 0.60
Sub Jumlah 15.91

II.7 Pek. Plat Lantai Beton Bertulang (Elv. + 9.65) 20


a. Pek. Pas. Plat Bondek Tebal 0.7 Mm 5.31 1.33 1.33 1.33 1.33
b. Pek. Pas. Wiremesh 4.82 1.20 1.20 1.20 1.20
c. Beton K.250 5.02 1.26 1.26 1.26 1.26
Sub Jumlah 15.16

II.8 Pek. Pengecatan


a. Pek. Cat Air Dinding 1.42 0.47 0.47 0.47
b. Pek. Waterproofing Dag Beton 3.72 1.24 1.24 1.24
Sub Jumlah 5.14
Rencana Kemajuan Pekerjaan (%) 100.00 3.94 8.89 10.49 13.36 14.96 10.05 12.24 9.37 7.77 5.50 1.71 1.71
Rencana Kemajuan Pekerjaan Komulatif (%) 0.00 3.94 12.84 23.33 36.69 51.65 61.70 73.94 83.30 91.07 96.57 98.29 100.00
Realisasi Kemajuan Pekerjaan Komulatif (%)
Deviasi (+/-)

Pekanbaru, 30 Agustus 2022


Dibuat Oleh,
CV. MITRA USAHA MANDIRI

MERRY CHRISTINA
Direktur
TIME SCHEDULE

PEKERJAAN : PEMBANGUNAN FASILITAS PENDUKUNG GEDUNG PASCASARJANA UNIVERSITAS LANCANG KUNING


LOKASI : JL. YOS SUDARSO KM8 RUMBAI - PEKANBARU
TAHUN : 2022

BOBOT BULAN KE 1 BULAN KE 2 BULAN KE 3


NO URAIAN PEKERJAAN MINGGU KE MINGGU KE MINGGU KE SKALA KET
(%) 1 2 3 4 5 6 7 8 9 10 11 12
100
I PEKERJAAN TAHAP 1 PASKA SARJANA
I.1 Pek. Penutup Atap dan Rangka Atap
1 Pek. Pas. Rangka Baja Ringan 28.69 4.78 4.78 4.78 4.78 4.78 4.78
2 Pek. Pas. Atap Multi Roof 15.39 2.56 2.56 2.56 2.56 2.56 2.56
3 Pek. Pas. Perabung Atap 0.55 0.09 0.09 0.09 0.09 0.09 0.09
4 Pek. Pas. Listplank PVC 1.77 0.30 0.30 0.30 0.30 0.30 0.30
Sub Jumlah 46.39

I.2 Pek. Dinding Partisi Triplex lapis HPL


a. Pek. Dinding Partisi Triplek Lapis HPL 20.42 3.40 3.40 3.40 3.40 3.40 3.40
Sub Jumlah 20.42 80

I.3 Pek. Penambahan Pintu dan Jendela


a. Pek. Pas. Kusen dan Pintu Geser HPL 6.56 1.09 1.09 1.09 1.09 1.09 1.09
b. Pek. Pas. Kusen dan Partisi Kaca 4.54 0.76 0.76 0.76 0.76 0.76 0.76
c. Pek. Pas. Bovenlight 1.51 0.25 0.25 0.25 0.25 0.25 0.25
Sub Jumlah 12.61

I.4 Penambahan Dinding Toilet Profesor


a. Pas. Pas. Batu Bata 1/2 Batu Camp. 1:4 0.83 0.14 0.14 0.14 0.14 0.14 0.14
b. Pas. Plesteran Camp. 1:4 0.30 0.05 0.05 0.05 0.05 0.05 0.05
c. Pek. Acian 0.24 0.04 0.04 0.04 0.04 0.04 0.04 60
d. Pek. Pas. Keramik Lantai 40 x 40 cm Kasar 0.14 0.02 0.02 0.02 0.02 0.02 0.02
e. Pek. Pas. Keramik Dinding 25 x 40 cm 0.56 0.09 0.09 0.09 0.09 0.09 0.09
Sub Jumlah 1.36

I.5 Pek. Sanitasi Air


a. Pek. Pas. Kloset Duduk 1.77 0.29 0.29 0.29 0.29 0.29 0.29
b. Pek. Pas. Kran Air 0.02 0.00 0.00 0.00 0.00 0.00 0.00
c. Pek. Pas. Floor Drain 0.01 0.00 0.00 0.00 0.00 0.00 0.00
d. Pek. Pas. Instalasi Air Kotor Pipa PVC 4" 0.08 0.01 0.01 0.01 0.01 0.01 0.01
e. Pek. Pas. Instalasi Air Bersih 3/4" 0.04 0.01 0.01 0.01 0.01 0.01 0.01
f. Pek. Instalasi Air dari Tangki ke Gedung A 0.75 0.13 0.13 0.13 0.13 0.13 0.13 40
g. Pek. Pas. Dudukan Tangki 1.39 0.23 0.23 0.23 0.23 0.23 0.23
h. Pek. Pemindahan Tangki Air 0.88 0.15 0.15 0.15 0.15 0.15 0.15
Sub Jumlah 4.94
TIME SCHEDULE

PEKERJAAN : PEMBANGUNAN FASILITAS PENDUKUNG GEDUNG PASCASARJANA UNIVERSITAS LANCANG KUNING


LOKASI : JL. YOS SUDARSO KM8 RUMBAI - PEKANBARU
TAHUN : 2022
40
BOBOT BULAN KE 1 BULAN KE 2 BULAN KE 3
NO URAIAN PEKERJAAN MINGGU KE MINGGU KE MINGGU KE SKALA KET
(%) 1 2 3 4 5 6 7 8 9 10 11 12

I.6 Pek. Tangga Penghubung


a. Pek. Pas. Granit Tangga Uk. 60 x 60 cm 5.27 1.05 1.05 1.05 1.05 1.05
b. Pek. Railing Tangga 3.33 0.67 0.67 0.67 0.67 0.67
c. Pek. Cat Air Tangga 0.28 0.06 0.06 0.06 0.06 0.06
Sub Jumlah 8.88

I.7 Pek. Instalasi Listrik 20


a. Pek. Instalasi Titik Lampu 2.81 0.47 0.47 0.47 0.47 0.47 0.47
b. Pek. Pasang Box Panel 0.16 0.03 0.03 0.03 0.03 0.03 0.03
c. Pek. Pasang Lampu Downlight 25 Watt 1.14 0.19 0.19 0.19 0.19 0.19 0.19
d. Pek. Pasang Stop Kontak Biasa 0.25 0.04 0.04 0.04 0.04 0.04 0.04
e. Pek. Pasang Exhaust Fan 0.70 0.12 0.12 0.12 0.12 0.12 0.12
f. Pek. Pasang Saklar Ganda 0.13 0.02 0.02 0.02 0.02 0.02 0.02
g. Pek. Pasang Saklar Tunggal 0.09 0.01 0.01 0.01 0.01 0.01 0.01
h. Pek. Pasang Stop Kontak AC 0.11 0.02 0.02 0.02 0.02 0.02 0.02
Sub Jumlah 5.39
Rencana Kemajuan Pekerjaan (%) 100.00 8.07 8.07 8.07 8.07 13.20 15.30 7.23 9.00 9.00 9.00 3.88 1.78
Rencana Kemajuan Pekerjaan Komulatif (%) 0.00 8.07 16.15 24.22 32.30 45.50 60.80 68.03 77.03 86.04 95.04 98.92 100.00
Realisasi Kemajuan Pekerjaan Komulatif (%)
Deviasi (+/-)

Pekanbaru, 30 Agustus 2022


Dibuat Oleh,
CV. MITRA USAHA MANDIRI

MERRY CHRISTINA
Direktur
TIME SCHEDULE

PEKERJAAN : PEMBANGUNAN FASILITAS PENDUKUNG GEDUNG PASCASARJANA UNIVERSITAS LANCANG KUNING


LOKASI : JL. YOS SUDARSO KM8 RUMBAI - PEKANBARU
TAHUN : 2022

BULAN KE 1 BULAN KE 2 BULAN KE 3


BOBOT
NO URAIAN PEKERJAAN MINGGU KE MINGGU KE MINGGU KE SKALA KET
(%) 1 2 3 4 5 6 7 8 9 10 11 12

I PEKERJAAN TAHAP 1 PASKA SARJANA 100


I.1 Pek. Penutup Atap dan Rangka Atap
1 Pek. Rangka Baja Ringan Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
2 Pek. Pas. Atap Multi Roof Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
3 Pek. Pas. Perabung Atap Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
4 Pek. Pas. Listplank PVC Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Sub Jumlah Err:509

I.2 Pek. Dinding Partisi Triplex lapis HPL


a. Pek. Dinding Partisi Triplek Lapis HPL Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Sub Jumlah Err:509

I.3 Pek. Penambahan Pintu dan Jendela


a. Pemasangan Kusen dan Pintu Geser HPL Err:509 Err:509 Err:509 Err:509 Err:509 80
b. Pemasangan Kusen dan Partisi Kaca Err:509 Err:509 Err:509 Err:509 Err:509
c. Pemasangan Bovenlight Err:509 Err:509 Err:509 Err:509 Err:509
Sub Jumlah Err:509

I.4 Penambahan Dinding Toilet Profesor


a. Pas. Pas. Batu Bata 1/2 Batu Camp. 1:4 Err:509 Err:509 Err:509 Err:509 Err:509
b. Pas. Plesteran Camp. 1:4 Err:509 Err:509 Err:509 Err:509 Err:509
c. Pas. Acian Err:509 Err:509 Err:509 Err:509 Err:509
Sub Jumlah Err:509

I.5 Pek. Sanitasi Air


a. Instalasi Air dari Tangki ke Gedung A Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
b. Kloset Duduk Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 60
c. Keramik Lantai 40 x 40 cm Kasar Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
d. Keramik Dinding 25 x 40 cm Kasar Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
e. Kran Air Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
f. Floor Drain Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
g. Pek. Pas. Instalasi Air Kotor Pipa PVC 4" Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
h. Pek. Pas. Instalasi Air Bersih 3/4" Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Sub Jumlah Err:509

I.6 Pek. Tangga Penghubung


a. Pek. Pas. Granit Tangga Uk. 60 x 60 cm Err:509 Err:509 Err:509 Err:509 Err:509
b. Pek. Railing Tangga Err:509 Err:509 Err:509 Err:509 Err:509
c. Pek. Cat Air Tangga Err:509 Err:509 Err:509 Err:509 Err:509
Sub Jumlah Err:509 40

I.7 Pek. Instalasi Listrik


a. Pek. Instalasi Titik Lampu Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
b. Pek. Pasang Box Panel Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
c. Pek. Pasang Lampu Downlight 25 Watt Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
d. Pek. Pasang Stop Kontak Biasa Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
e. Pek. Pasang Exhaust Fan Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
f. Pek. Pasang Saklar Ganda Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
g. Pek. Pasang Saklar Tunggal Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
h. Pek. Pasang Stop Kontak Biasa Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Sub Jumlah Err:509

II PEKERJAAN TAHAP 1 PASKA SARJANA 20


II.1 Pek. Peningkatan Ruang Prodi
a. Epoxy UNP Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
b. Epoxy Repeal (Grouting) Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
c. Pek. Pas. Plafond PVC + Rangka Besi Hollow Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
d. Pek. Pas. List Plafond PVC Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Sub Jumlah Err:509
II.2 Pek. Tiang Kolom Cor Beton Bertulang (3 Unit)
a. Bekisting Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
b. Pembesian BJTD/ Ulir D19 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
c. Pembesian BJTP/ Polos Ø 8 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
d. Beton K.250 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Sub Jumlah Err:509
Rencana Kemajuan Pekerjaan (%) Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 0
Rencana Kemajuan Pekerjaan Komulatif (%) 0.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Realisasi Kemajuan Pekerjaan Komulatif (%)
Deviasi (+/-)

Pekanbaru, 30 Agustus 2022


Dibuat Oleh,
CV. MITRA USAHA MANDIRI

MERRY CHRISTINA
Direktur
REKAPITULASI
HARGA PERKIRAAN SENDIRI (HPS)

PEKERJAAN : PEMBANGUNAN FASILITAS PENDUKUNG GEDUNG PASCASARJANA


UNIVERSITAS LANCANG KUNING

LOKASI : JL. YOS SUDARSO KM8 RUMBAI - PEKANBARU


TAHUN : 2022

NO URAIAN PEKERJAAN Jumlah Harga

I PEKERJAAN TAHAP 1 PASKA SARJANA


I.1 Pek. Penutup Atap dan Rangka Atap 185,301,801.68
I.2 Pek. Dinding Partisi Triplex lapis HPL 174,422,994.19
I.3 Pek. Penambahan Pintu dan Jendela 50,000,000.00
I.4 Penambahan Dinding Toilet Profesor 7,071,123.20
I.5 Pek. Sanitasi Air 13,721,149.38
I.6 Pek. Tangga Penghubung 40,004,138.67

II PEKERJAAN TAHAP 1 PASKA SARJANA


II.1 Pek. Peningkatan Ruang Prodi 35,288,994.67
II.2 Pek. Tiang Kolom Cor Beton Bertulang (3 Unit) 33,627,575.53

Jumlah Harga 539,437,777.31


Pembulatan 539,437,000.00
Terbilang

Keterangan :
Selisih Pekerjaan Tambah Kurang = 0.00
Dana Tambahan Penyelesaian Pekerjaan
= 539,437,000.00 - 0.00 = 539,437,000.00

Pekanbaru, 30 Agustus 2022


Dibuat Oleh,
CV. MITRA USAHA MANDIRI

MERRY CHRISTINA
Direktur
HARGA PERKIRAAN SENDIRI (HPS)

PEKERJAAN : PEMBANGUNAN FASILITAS PENDUKUNG GEDUNG PASCASARJANA UNIVERSITAS LANCANG KUNING


LOKASI : JL. YOS SUDARSO KM8 RUMBAI - PEKANBARU
TAHUN : 2022

Harga Satuan Jumlah Harga


NO URAIAN PEKERJAAN VOLUME SAT
Rp Rp
(a) (b) (c) = a x b

I PEKERJAAN TAHAP 1 PASKA SARJANA


I.1 Pek. Penutup Atap dan Rangka Atap
1 Pek. Rangka Baja Ringan 543.40 m2 209,335.72 113,753,366.39
2 Pek. Pas. Atap Multi Roof 543.40 m2 112,255.00 60,999,546.61
3 Pek. Pas. Perabung Atap 54.16 m1 83,798.00 4,538,499.68
4 Pek. Pas. Listplank PVC 82.60 m1 72,765.00 6,010,389.00
Sub Jumlah 185,301,801.68

I.2 Pek. Dinding Partisi Triplex lapis HPL


a. Pemasangan Rangka Dinding Pemisah 124.58 m2 198,899.25 24,778,868.57
b. Pemasangan HPL 249.16 m2 600,594.50 149,644,125.62
Sub Jumlah 174,422,994.19

I.3 Pek. Penambahan Pintu dan Jendela


a. Pemasangan Kusen dan Pintu Geser HPL 4.00 Unit 6,500,000.00 26,000,000.00
b. Pemasangan Kusen dan Partisi Kaca 4.00 Unit 4,500,000.00 18,000,000.00
c. Pemasangan Bovenlight 2.00 Unit 3,000,000.00 6,000,000.00
Sub Jumlah 50,000,000.00

I.4 Penambahan Dinding Toilet Profesor


a. Pas. Pas. Batu Bata 1/2 Batu Camp. 1:4 23.80 m2 128,595.50 3,060,572.90
b. Pas. Plesteran Camp. 1:4 19.60 m2 101,210.56 1,983,726.98
c. Pas. Acian 46.86 m2 43,252.00 2,026,823.32
Sub Jumlah 7,071,123.20

I.5 Pek. Sanitasi Air


a. Instalasi Air dari Tangki ke Gedung A 85.00 m' 32,514.46 2,763,729.10
b. Kloset Duduk 2.00 Unit 3,477,210.00 6,954,420.00
c. Keramik Lantai 40 x 40 cm Kasar 2.25 m2 218,091.67 490,706.26
d. Keramik Dinding 25 x 40 cm Kasar 7.88 m2 294,617.40 2,320,112.03
e. Kran Air 1.00 buah 75,000.00 75,000.00
f. Floor Drain 1.00 buah 208,560.00 208,560.00
g. Pek. Pas. Instalasi Air Kotor Pipa PVC 4" 5.00 m' 149,209.94 746,049.70
h. Pek. Pas. Instalasi Air Bersih 3/4" 5.00 m' 32,514.46 162,572.30
Sub Jumlah 13,721,149.38

I.6 Pek. Tangga Penghubung


a. Pek. Pas. Granit Tangga Uk. 60 x 60 cm 63.33 m2 325,130.30 20,590,501.90
b. Pek. Railing Tangga 22.00 m' 800,000.00 17,600,000.00
c. Pek. Cat Air Tangga 33.30 m2 54,463.57 1,813,636.77
Sub Jumlah 40,004,138.67

II PEKERJAAN TAHAP 1 PASKA SARJANA


II.1 Pek. Peningkatan Ruang Prodi
a. Epoxy UNP 25.00 Kg 650,000.00 16,250,000.00
b. Epoxy Repeal (Grouting) 15.00 Kg 450,000.00 6,750,000.00
c. Pek. Pas. Plafond PVC + Rangka Besi Hollow 32.00 m2 347,376.33 11,116,042.67
d. Pek. Pas. List Plafond PVC 24.00 m' 48,873.00 1,172,952.00
Sub Jumlah 35,288,994.67
II.2 Pek. Tiang Kolom Cor Beton Bertulang (3 Unit)
a. Bekisting 26.40 m2 432,761.54 11,424,904.70
b. Pembesian BJTD/ Ulir D19 669.00 Kg 21,997.53 14,716,344.23
c. Pembesian BJTP/ Polos Ø 8 94.80 Kg 18,786.63 1,780,972.05
d. Beton K.250 3.60 m3 1,584,820.71 5,705,354.56
Sub Jumlah 33,627,575.53
Jumlah Total Harga 539,437,777.31
TIME SCHEDULE

PEKERJAAN : PEMBANGUNAN FASILITAS PENDUKUNG GEDUNG PASCASARJANA UNIVERSITAS LANCANG KUNING


LOKASI : JL. YOS SUDARSO KM8 RUMBAI - PEKANBARU
TAHUN : 2022

BULAN KE 1 BULAN KE 2 BULAN KE 3


BOBOT
NO URAIAN PEKERJAAN MINGGU KE MINGGU KE MINGGU KE SKALA KET
(%) 1 2 3 4 5 6 7 8 9 10 11 12

I PEKERJAAN TAHAP 1 PASKA SARJANA 100


I.1 Pek. Penutup Atap dan Rangka Atap
1 Pek. Rangka Baja Ringan 21.09 4.22 4.22 4.22 4.22 4.22
2 Pek. Pas. Atap Multi Roof 11.31 2.26 2.26 2.26 2.26 2.26
3 Pek. Pas. Perabung Atap 0.84 0.17 0.17 0.17 0.17 0.17
4 Pek. Pas. Listplank PVC 1.11 0.22 0.22 0.22 0.22 0.22
Sub Jumlah 34.35

I.2 Pek. Dinding Partisi Triplex lapis HPL


a. Pemasangan Rangka Dinding Pemisah 4.59 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46
b. Pemasangan HPL 27.74 2.77 2.77 2.77 2.77 2.77 2.77 2.77 2.77 2.77 2.77
Sub Jumlah 32.33 80

I.3 Pek. Penambahan Pintu dan Jendela


a. Pemasangan Kusen dan Pintu Geser HPL 4.82 1.20 1.20 1.20 1.20
b. Pemasangan Kusen dan Partisi Kaca 3.34 0.83 0.83 0.83 0.83
c. Pemasangan Bovenlight 1.11 0.28 0.28 0.28 0.28
Sub Jumlah 9.27

I.4 Penambahan Dinding Toilet Profesor


a. Pas. Pas. Batu Bata 1/2 Batu Camp. 1:4 0.57 0.14 0.14 0.14 0.14
b. Pas. Plesteran Camp. 1:4 0.37 0.09 0.09 0.09 0.09
c. Pas. Acian 0.38 0.09 0.09 0.09 0.09 60
Sub Jumlah 1.31

I.5 Pek. Sanitasi Air


a. Instalasi Air dari Tangki ke Gedung A 0.51 0.10 0.10 0.10 0.10 0.10
b. Kloset Duduk 1.29 0.26 0.26 0.26 0.26 0.26
c. Keramik Lantai 40 x 40 cm Kasar 0.09 0.02 0.02 0.02 0.02 0.02
d. Keramik Dinding 25 x 40 cm Kasar 0.43 0.09 0.09 0.09 0.09 0.09
e. Kran Air 0.01 0.00 0.00 0.00 0.00 0.00
f. Floor Drain 0.04 0.01 0.01 0.01 0.01 0.01
g. Pek. Pas. Instalasi Air Kotor Pipa PVC 4" 0.14 0.03 0.03 0.03 0.03 0.03
h. Pek. Pas. Instalasi Air Bersih 3/4" 0.03 0.01 0.01 0.01 0.01 0.01 40
Sub Jumlah 2.54

I.6 Pek. Tangga Penghubung


a. Pek. Pas. Granit Tangga Uk. 60 x 60 cm 3.82 0.95 0.95 0.95 0.95
b. Pek. Railing Tangga 3.26 0.82 0.82 0.82 0.82
c. Pek. Cat Air Tangga 0.34 0.08 0.08 0.08 0.08
Sub Jumlah 7.42

II PEKERJAAN TAHAP 1 PASKA SARJANA


II.1 Pek. Peningkatan Ruang Prodi
a. Epoxy UNP 3.01 0.60 0.60 0.60 0.60 0.60 20
b. Epoxy Repeal (Grouting) 1.25 0.25 0.25 0.25 0.25 0.25
c. Pek. Pas. Plafond PVC + Rangka Besi Hollow 2.06 0.41 0.41 0.41 0.41 0.41
d. Pek. Pas. List Plafond PVC 0.22 0.04 0.04 0.04 0.04 0.04
Sub Jumlah 6.54
II.2 Pek. Tiang Kolom Cor Beton Bertulang (3 Unit)
a. Bekisting 2.12 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21
b. Pembesian BJTD/ Ulir D19 2.73 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27
c. Pembesian BJTP/ Polos Ø 8 0.33 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
d. Beton K.250 1.06 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11
Sub Jumlah 6.23
Rencana Kemajuan Pekerjaan (%) 100.00 9.01 9.01 12.87 12.87 12.82 4.13 4.13 4.13 7.75 7.75 7.75 7.75 0
Rencana Kemajuan Pekerjaan Komulatif (%) 0.00 9.01 18.03 30.90 43.77 56.60 60.73 64.87 69.00 76.75 84.50 92.25 100.00
Realisasi Kemajuan Pekerjaan Komulatif (%)
Deviasi (+/-)
REKAPITULASI
HARGA PERKIRAAN SENDIRI (HPS)

PEKERJAAN : PEMBANGUNAN FASILITAS PENDUKUNG GEDUNG PASCASARJANA


UNIVERSITAS LANCANG KUNING

LOKASI : JL. YOS SUDARSO KM8 RUMBAI - PEKANBARU


TAHUN : 2022

NO URAIAN PEKERJAAN Jumlah Harga

I PEKERJAAN TOWER BAJA SIKU TINGGI 8 METER


I.1 Pekerjaan Persiapan Err:509
I.2 Pekerjaan Mini Pile 20 x 20 cm Err:509
I.3 Pekerjaan Tanah Err:509
I.4 Pekerjaan Beton Bertulang Err:509
I.5 Pekerjaan Rangka Menara Err:509

Jumlah Harga Err:509


Pembuatan Err:509
Terbilang Tiga Ratus Delapan Puluh Juta Lima Ratus Lima Puluh Lima Ribu Rupiah
HARGA PERKIRAAN SENDIRI (HPS)

PEKERJAAN : PEMBANGUNAN FASILITAS PENDUKUNG GEDUNG PASCASARJANA UNIVERSITAS LANCANG KUNING


LOKASI : JL. YOS SUDARSO KM8 RUMBAI - PEKANBARU
TAHUN : 2022

Harga Satuan Jumlah Harga


NO URAIAN PEKERJAAN VOLUME SAT
Rp Rp
(a) (b) (c) = a x b

I PEKERJAAN TOWER BAJA SIKU TINGGI 8 METER


I.1 Pekerjaan Persiapan
1 Pek. Pembersihan dan Perataan Err:509 m2 20,350.00 Err:509
2 Pek. Pengukuran dan Bowplank Err:509 m1 81,038.83 Err:509
3 Pek. Papan Nama Kegiatan Err:509 Unit 593,587.50 Err:509
4 Pek. Mobdemob K3 Err:509 Ls 6,350,000.00 Err:509
Sub Jumlah Err:509

I.2 Pekerjaan Mini Pile 20 x 20 cm


1 Pemancangan Minipile 20 x 20 cm Err:509 m1 426,212.44 Err:509
2 Penyambungan Tiang Pancang Err:509 Unit 37,665.75 Err:509
3 Pemotongan kepala tiang Err:509 Titik 150,000.00 Err:509
Sub Jumlah Err:509

I.3 Pekerjaan Tanah


1 Galian tanah untuk pondasi Err:509 m3 91,025.00 Err:509
2 Urugan kembali bekas galian Err:509 m3 66,550.00 Err:509
3 Urugan pasir bawah pondasi Err:509 m3 340,010.00 Err:509
Sub Jumlah Err:509

I.4 Pekerjaan Beton Bertulang


1 Cor lantai kerja (K-100) Err:509 m3 1,168,212.88 Err:509
2 Pondasi setempat (PC1) uk. 80 x 80 x 30 cm (4 Unit)
a. Bekisting Err:509 m2 268,548.50 Err:509
b. Pembesian BJTD/ Ulir Err:509 Kg 21,997.53 Err:509
c. Beton K.225 Err:509 m3 1,479,423.83 Err:509
3 Kolom Pedestal 30 x 30 cm (4 Unit)
a. Bekisting Err:509 m2 432,761.54 Err:509
b. Pembesian BJTD/ Ulir D19 Err:509 Kg 21,997.53 Err:509
c. Pembesian BJTP/ Polos Ø8 Err:509 Kg 18,786.63 Err:509
d. Beton K.225 Err:509 m3 1,479,423.83 Err:509
4 Balok Sloof (BS1) Ukuran 20/40 cm
a. Bekisting Err:509 m2 287,798.50 Err:509
b. Pembesian BJTD/ Ulir D19 Err:509 kg 21,997.53 Err:509
c. Pembesian BJTP/ Polos Ø8 Err:509 kg 18,786.63 Err:509
d. Beton K.225 Err:509 m3 1,479,423.83 Err:509
5 Pek. Pas. Angkur Bolt 19 mm panjang 50 cm Err:509 Set 180,000.00 Err:509
Sub Jumlah Err:509

I.5 Pekerjaan Rangka Menara


6 Pek. Instalasi Tower Baja & Pengelasan (Tinggi 8 m) Err:509 Kg 51,568.00 Err:509
Sub Jumlah Err:509
Sub Jumlah Err:509
DAFTAR HARGA BAHAN & PERALATAN
HARGA PERKIRAAN SENDIRI (HPS)
TAHUN 2022

HARGA SURVEI
NO. NAMA BAHAN SATUAN
RATA2 2021

I BAHAN PASANGAN
1 Air Ltr 8.00
2 Aspal Curah Kg 7,000.00
3 Aspal Drum DRUM 1,600,000.00
4 Bataco Bh 3,633.33
5 Batu Alam Alur M2 320,000.00
6 Batu Alam Polos M2 271,000.00
7 Batu Bata Biasa Bh 625.00
8 Batu Bata Press Bh 2,000.00
9 Batu Kerawang Bh 41,666.67
10 Batu Sikat M2 354,000.00
11 Con Block 20 x 20 Bh 48,000.00
12 Con Block 30 x 30 Bh 68,000.00
13 Gorong-gorong Dia. 20 Cm Bh 337,000.00
14 Gorong-gorong Dia. 40 Cm Bh 260,000.00
15 Gorong-gorong Dia. 60 Cm Bh 345,000.00
16 Gorong-gorong Dia. 80 Cm Bh 445,000.00
17 Gorong-gorong Dia. 100 Cm Bh 462,500.00
18 Ijuk Kg 13,150.00
19 Kaca Block Uk. 20 x 20 Bh 25,333.33
20 Kerikil m3 374,066.67
21 batu pecah/ Splite 502,700.00
22 Pasir Cor / Beton m3 354,066.67
23 Pasir Pasang m3 245,000.00
24 Pasir Urug m3 230,000.00
25 Paving Block 6 cm Bh 1,600.00
26 Paving Block 8 cm (Segi 6 ) Bh 4,000.00
27 Semen Merah M3 93,000.00
28 Semen Portland Zak 84,000.00
29 Semen Portland Kg 1,680.00
30 Semen Warna Zak 106,000.00
31 Semen Warna Kg 3,000.00
32 Semen 50Kg sak 64,000.00
33 Tanah Urug M3 132,000.00
34 Tanah Urug Pilihan M3 135,000.00
35 Waterstop 150 mm M1 26,000.00
36 Waterstop 200 mm M1 68,000.00
37 Waterstop 230-320 mm M1 68,000.00
38 Plastik Alas M2 6,000.00
39 Batu Bata bh 600.00

II BAHAN ROOSTER GRC

III CONCRETE PILE


1 Square Pile 20 x 20 cm M1 309,550.00
2 Square Pile 25 x 25 cm M1 442,600.00
3 Penyambungan Tiang Pancang Ttk 150,000.00
IV BAHAN MINYAK, PELUMAS & PENGENCER
1 Bensin Ltr 9,000.00
2 Minyak Bekisting Ltr 34,000.00
3 Minyak Cat / Tinner Ltr 43,000.00
4 Bio Solar Ltr 11,000.00
5 Spritus Ltr 26,000.00
6 Thinner Setara Merk Laba - Laba Kg 43,000.00
7 Oli Ltr 51,000.00
8 Minyak Tanah Ltr 12,600.00

V BETON READY MIX


Untuk Jarak Tempuh < 20 Km
1 Ready Mix K-100 1,065,075.00
2 Ready Mix K-125 M3 1,099,367.50
3 Ready Mix K-175 M3 1,154,505.00
4 Ready Mix K-225 M3 1,209,780.00
5 Ready Mix K-250 M3 1,259,555.00
6 Ready Mix K-300 M3 1,330,175.00
7 Ready Mix K-350 M3 1,381,105.00
8 Ready Mix K-400 M3 1,688,500.00

VI BAHAN KAYU
1 Kayu Cerucuk Dia. 3 s/d 4 Inci (MAHANG) Btg 9,000.00
2 Kayu Cerocok Dia. 5 s/d 6 inci-15 Cm BTG 18,000.00
5 Kayu Kelas I (MERANTI) M3 4,000,000.00
6 Kayu Kelas II (Mentangor) M3 3,800,000.00
7 Kayu Kelas III M3 3,500,000.00
8 Kayu Kelas IV M3 6,000.00
8 Kayu Profil Btg 15,000.00
9 Teakwood Tebal 3 mm Lbr 55,000.00
10 Teakwood Tebal 4 mm Lbr 67,000.00
11 Teakwood Tebal 6 mm Lbr 130,000.00
12 Teakwood Tebal 8 mm Lbr 140,000.00
13 Papan Lebar 20 cm /m3 60,000.00
14 Broty 45,000.00
15 HPL Lbr 160,000.00
16 PVC Plafon m2 185,000.00
17 List PVC Plafon m' 27,000.00

VII BAHAN BESI & ALUMINIUM


1 Aluminium Strip Lebar 8 Cm M1 5,000.00
2 Baja Profil Kg 35,000.00
3 Baja Siku Kg 23,000.00
4 Baut + Mur Bh 4,000.00
5 Besi Beton Polos Kg 15,000.00
6 Besi Beton Ulir Kg 17,000.00
7 Pagar BRC Lbr 75,000.00
7 Besi Strip Kg 60,000.00
8 Dynabolt Bh 4,250.00
9 Anchor Bolt Bh 180,000.00
9 Formite/penjaga jarak bekisting/spacer Bh 2,000.00
10 Hollow 40.40.2 M1 40,000.00
11 Kanal C75.0,75 (TASO) Btg 91,666.67
12 Kawat Berduri Rol 133,200.00
13 Kawat Beton Kg 24,583.33
14 Kawat Harmonika /M 313,333.33
15 Kawat Las Kg 30,250.00
16 Kawat Nyamuk (BAJA) M2 67,000.00
17 Metal Fuuring M1 14,500.00
18 Paku Asbes Kg 30,000.00
19 Paku Beton Kg 22,200.00
20 Paku Biasa 0,5"-1" Kg 22,500.00
21 Paku Biasa 2" - 5" Kg 18,583.33
22 Paku Seng Kg 31,000.00
23 Paku Tripleks Kg 15,166.67
24 Plat Besi Kg 36,000.00
25 Profil Aluminium 4" M1 152,000.00
26 Reng R32 MEREK GNET btg 38,333.33
27 Reng R 45 btg 45,000.00
28 Screw Truss Bh 1,000.00
29 Screw Roof Bh 500.00
30 Skrup Fixer Bh 8,000.00
31 Listplank GRC lebar 20 cm
32 Teralis Besi M2 547,000.00
33 Vertical Blind M2 211,000.00
48 Tabung Las Oksigen 145,000.00
49 Railing Tangga Pipa Galvanish finishing cat Duco ( Terpasang ) m1 800,000.00

VIII BAHAN ATAP


1 Aluminium Foil Double M2
2 Aluminium Foil Single M2 472,000.00
3 Atap Poly Carbonate M2 214,000.00
4 Bubungan Genteng Kodok / Glazzur Bh 43,000.00
5 Bubungan Genteng Plentong "S" Bh 26,000.00
6 Genteng Metal Tebal 0.25 mm Lbr 57,666.67
7 Genteng Metal Tebal 0.3 mm Lbr 59,500.00
9 Genteng Metal Tebal 0.4 mm Lbr 138,000.00
10 Nok Genteng Metal Lbr 23,000.00
11 Nok Seng Lbr 43,000.00
12 Plastik Gelombang Tebal Lbr 156,000.00
13 Plastik Gelombang Tipis Lbr 23,000.00
14 Seng Aluminium Polos 0.25 mm Lbr 31,500.00
15 Seng Aluminium Polos 0.30 mm Lbr 105,000.00
16 Seng Aluminium Polos 0.40 mm Lbr 82,500.00
17 Seng Gelombang BJLS 18 Lbr 71,000.00
18 Seng Gelombang BJLS 20 Lbr 55,000.00
19 Seng Gelombang BJLS 30 Lbr 105,000.00
20 Seng Plat BJLS 18 Lbr 85,000.00
21 Seng Plat BJLS 20 Lbr 89,000.00
22 Seng Plat BJLS 30 Lbr 93,000.00
23 Spandek 0,25 mm M2 42,500.00
24 Spandek 0,30 mm M2 47,000.00
27 Sunscreen Aluminium M2 58,500.00
28 Jinek Roof 0,125 56,000.00

IX BAHAN PENGGANTUNG DAN PENGUNCI

X BAHAN SANITAIR
1 Kloset Jongkok Kwalitas Bagus (Setara Toto/ AMSTARD) Bh 336,400.00
2 Kloset Jongkok Kwalitas Menengah (Setara Duty/ OTO) Bh 234,750.00
3 Kloset Jongkok Kwalitas Biasa Bh 150,666.67
4 Kloset Duduk Kwalitas Bagus + Tabung (2 Tombol Air Setara Toto) Set 2,500,000.00
5 Kloset Duduk Kwalitas Menengah + Tabung (1 Tombol Air Setara To Set 1,698,250.00
6 Kloset Duduk Kwalitas Biasa + Tabung (2 Tombol Air) Set 1,245,000.00
7 Bak Air Fiberglass Kwalitas Bagus Bh 279,333.33
8 Bak Air Fiberglass Kwalitas Menengah Bh 234,250.00
9 Bak Air Fiberglass Kwalitas Biasa Bh 190,000.00
10 Bathtub Kwalitas Bagus (Setara Toto) Set 4,275,000.00
11 Bathtub Kwalitas Menengah Set 1,100,000.00
12 Bathtub Kwalitas Biasa Set
12 Bathtub Kwalitas Biasa Set 120,000.00
13 Shower Kwalitas Bagus (Setara Toto) Set 522,500.00
14 Shower Kwalitas Menengah Set 210,500.00
15 Shower Kwalitas Biasa Set 116,000.00
16 Westafel Kwalitas Bagus (Setara Toto) Bh 818,333.33
17 Westafel Kwalitas Menengah (Setara AS) Bh 605,500.00
18 Westafel Kwalitas Biasa Bh 267,500.00
19 Pintu Fiber Set 220,250.00
20 Urinoir Lengkap Kwalitas Bagus (Moslem Type Setara Toto) Set 3,100,000.00
21 Urinoir Lengkap Kwalitas Menengah Set 680,000.00
22 Urinoir Lengkap Kwalitas Biasa Set 1,100,000.00
21 Tangki Air Kapasitas 500 Liter (Setara Tedmond) Bh 987,500.00
22 Tangki Air Kapasitas 900 Liter (Setara Tedmond) Bh 636,666.67
23 Tangki Air Kapasitas 1.000 liter (Setara Tedmond Bh 1,163,333.33
24 Kran Air Kwalitas Bagus Bh 126,000.00
25 Kran Air Kwalitas Menengah Bh 81,500.00
### 26 Kran Air Kwalitas Biasa Bh 58,750.00
27 Floor Drain Kwalitas Bagus Bh 173,750.00
28 Floor Drain Kwalitas Menengah Bh 220,000.00
29 Floor Drain Kwalitas Biasa Bh 63,250.00
30 Pompa Air Biasa Bh 345,000.00
31 Gantungan handuk 5 Kait Bh 168,750.00
32 Tempat sabun keramik Bh 183,000.00
33 Tempat sabun Stainless Bh 285,000.00
34 Bak cuci piring 2 lubang bagus Bh 771,750.00
35 Bak cuci piring 2 lubang menengah Bh 510,000.00
36 Bak cuci piring 2 lubang biasa Bh 376,666.67
37 Sealtape 8,250.00

XI BAHAN LANTAI
1 Granit Uk 60 x 60 cm (Setara Granito) M2 343,750.00
2 Granit Uk 60 x 60 cm (Setara Garuda) M2 220,000.00
3 Keramik Kualitas Bagus
4 Keramik Uk. 20 x 20 Cm (Setara Platinum) M2 72,666.67
5 Keramik Uk. 20 x 25 Cm (Setara Asia Tile) M2 74,000.00
6 Keramik Uk. 25 x 25 Cm (Setara Aristocrat) M2 72,750.00
7 Keramik Uk. 30 x 30 Cm (Setara Platinum) M2 64,000.00
8 Keramik Uk. 25 x 40 Cm (Setara Platinum) M2 81,500.00
9 Keramik Uk. 40 x 40 Cm (Setara Ikad) M2 73,800.00
10 Keramik Kualitas Menengah
11 Keramik Uk. 20 x 20 Cm (Setara Ikad) M2 71,750.00
12 Keramik Uk. 20 x 25 Cm (Setara Ikad) M2 75,400.00
13 Keramik Uk. 25 x 25 Cm (Setara Mulia) M2 72,500.00
14 Keramik Uk. 30 x 30 Cm (Setara Ikad) M2 73,333.33
15 Keramik Uk. 25 x 40 Cm (Setara Ikad) M2 81,000.00
16 Keramik Uk. 40 x 40 Cm (Setara Mulia) M2 55,750.00
17 Keramik Kualitas Biasa
18 Keramik Uk. 20 x 20 Cm (Setara Garuda) M2 60,666.67
19 Keramik Uk. 20 x 25 Cm (Setara Garuda) M2 70,666.67
20 Keramik Uk. 25 x 25 Cm (Setara Garuda) M2 69,200.00
21 Keramik Uk. 30 x 30 Cm (Setara Garuda) M2 61,666.67
22 Keramik Uk. 25 x 40 Cm (Setara Garuda) M2 73,500.00
23 Keramik Uk. 40 x 40 Cm (Setara Garuda) M2 55,250.00
24 Keramik Uk. 60 x 60 Cm (Setara Garuda) M2 130,000.00
25 Plint Keramik M1 70,000.00
26 Bon-bon Keramik M1 10,000.00
27 Lem Vinyl Kg 750,000.00
28 Vinyl M2 600,000.00

XII BAHAN PLAFOND


1 Akustik M2 253,000.00
2 Akustik 30x30 cm Lbr 26,000.00
3 Akustik 30x60 cm Lbr 43,000.00
4 Akustik 60x120 cm Lbr 38,000.00
5 Asbes M2 78,000.00
6 Calsiboard Lbr 75,000.00
7 Eternit M2
8 Gypsumboard 9 mm (INDO BOARD) Lbr 67,333.33
9 Kawat Dia. 4 mm Kg 25,000.00
10 List Calsiboard M1 60,000.00
11 List Eternit M1
12 List Gypsumboard M1 22,000.00
13 Maplex Lbr 118,000.00
14 Paku Pancing Kg
15 Paku Skrup GYPSUM Kg 62,000.00
16 Paku Skrup GYPSUM Bh 200.00
17 Profil Aluminimum T M1 55,000.00
18 Plafond PVC (Setara Sunda Plafond) Lbr 60,000.00
19 Profil PVC Btg 31,000.00
20 Ramset Bh 59,000.00
21 Tepung Gypsum Kg 32,666.67
22 Tripleks Tebal 3 mm Lbr 50,000.00
23 Tripleks Tebal 3.6 mm Lbr 77,500.00
24 Tripleks Tebal 4 mm Lbr 69,875.00
25 Tripleks Tebal 6 mm Lbr 96,000.00
26 Tripleks Tebal 8 mm Lbr 129,000.00
27 Tripleks Tebal 9 mm Lbr 136,875.00
28 Tripleks Tebal 12 mm Lbr 182,333.33
29 GRC 4,8 MM 74,000.00
30 GRC 3,5 MM 62,000.00
31 GRC 6 MM 135,000.00

XIII BAHAN KACA 1 kaki=10.76 m2


1 Kaca Bening 3 mm UK. 120X150 M2 110,370.43
2 Kaca Bening 5 mm UK.120X150 M2 146,134.34
3 Kaca Bening 8 mm UK. 120X150 M2 289,699.25
4 Kaca Bening 10 mm UK. 110X195 M2 362,639.10
5 Kaca Bening 12 mm UK. 600X300 M2 676,852.14
6 Kaca Rayben 3 mm UK. 120150 M2 120,370.43
7 Kaca Rayben 5 mm UK. 120X200 M2 156,134.34
8 Kaca Rayben 10 mm M2 269,097.76
9 Kaca Nako + Bingkai 5 TINGKAT M2 232,639.10
10 Kaca Nako Bh 13,500.00
11 Kaca Block Bh
12 Kaca Cermin 5 mm UK.200X130 M2 453,518.81
13 Profil Kaca M1 37,000.00
14 Sealant Tube 38,333.33
XIV BAHAN LISTRIK
1 Pemasangan Instalasi Titik 170,000.00
2 Stop Kontak (CLIPSAL) Bh 15,000.00
3 Stop Kontak (Setara PANASONIC) Bh 36,500.00
4 Stop Kontak (Setara VIBA) Bh 14,000.00
5 Saklar Tunggal Kualitas Bagus Setara CLIPSAL Bh 12,000.00
6 Saklar Tunggal Kualitas Menengah Setara PANASONIC Bh 25,000.00
7 Saklar Tunggal Kualitas Biasa VIBA Bh 11,333.33
8 Saklar Ganda Kualitas Bagus Setara CLIPSAL Bh 15,000.00
9 Saklar Ganda Kualitas Menengah Setara PANASONIC Bh 36,000.00
10 Saklar Ganda Kualitas Biasa Setara VIBA Bh 15,000.00
11 Saklar Triple Kualitas Bagus Bh 48,000.00
12 Saklar Triple Kualitas Menengah Bh 22,500.00
13 Saklar Triple Kualitas Biasa Bh 16,000.00
14 Lampu Pijar Bh 7,500.00
15 Kabel NYA 1 x 2,5 mm M1 9,000.00
16 Pipa Paralon 5/8" Btg 9,500.00
17 Lampu TL 20 Watt Set 16,500.00
18 Lampu SL 18 Watt Bh 26,000.00
19 Fitting Keramik Bh 15,000.00
20 Lampu Pijar 25 Watt Bh 8,333.33
21 MCB 6 A Bh 50,000.00
22 Pannel Box Bh 380,000.00
23 Isolasi Bh 6,500.00

XV BAHAN PIPA
A BAHAN PIPA SNI PRALON
I Pipa PVC Pralon S-10 (12.5 kgf/cm2)
1 Pipa PVC Dia. 1/2" M1 5,115.00
2 Pipa PVC Dia. 3/4" M1 7,755.00
3 Pipa PVC Dia. 1" M1 12,305.00
4 Pipa PVC Dia. 1 1/4" M1 18,645.00
5 Pipa PVC Dia. 1 1/2" M1 7,250.00
6 Pipa PVC Dia. 2" M1 45,650.00
7 Pipa PVC Dia. 2 1/2" M1 64,460.00
8 Pipa PVC Dia. 3" M1 92,345.00
9 Pipa PVC Dia. 4" M1 138,490.00
10 Pipa PVC Dia. 5" M1 221,925.00
11 Pipa PVC Dia. 6" M1 292,215.00
12 Pipa PVC Dia. 8" M1 455,070.00
13 Pipa PVC Dia. 10" M1 706,585.00
14 Pipa PVC Dia. 12" M1 1,127,280.00

A Pipa PVC WAVIN (Pipa Tebal)


1 Pipa PVC Dia. 1/2" M1 8,100.00
2 Pipa PVC Dia. 3/4" M1 10,530.00
3 Pipa PVC Dia. 1" M1 10,530.00
4 Pipa PVC Dia. 1 1/2" M1 22,680.00
5 Pipa PVC Dia. 2" M1 29,160.00
6 Pipa PVC Dia. 2 1/2" M1 38,070.00
7 Pipa PVC Dia. 3" M1 49,410.00
8 Pipa PVC Dia. 4" M1 66,420.00
9 Pipa PVC Dia. 6" M1 187,920.00
-
XVI BAHAN CAT / FINISHING
1 Plamir Kg 29,225.00
2 Residu Ltr 30,000.00
3 Dempul Kg 88,411.67
4 Amplas m 6,870.00
5 Kuas Gulung Kecil Bh 18,730.00
6 Kuas Gulung besar Bh 33,820.00
7 Kuas Biasa 1" Bh 9,708.33
8 Kuas Biasa 1 1/2" Bh 10,041.67
9 Kuas Biasa 2" Bh 13,883.33
10 Kuas Biasa 2 1/2" Bh 17,900.00
11 Kuas 3" Bh 22,416.67
12 Kuas 4" Bh 29,108.33
13 Kuas 5" Bh 34,250.00
14 Tempat Cat Bagus Bh 17,470.00
15 Tempat Cat Biasa Bh 15,000.00
17 Cat Dasar merek jotun Kg 70,553.33
25 Cat Minyak Kwalitas JOTUN Exterior Kg 98,500.00
26 Cat Minyak Kwalitas AVIAN Kg 65,875.00
28 Cat Minyak Kwalitas Biasa Setara YOYO Kg 56,480.00
31 Cat Air Kwalitas JOTUN Exterior Kg 84,890.00
33 Cat Air Kwalitas Menengah Setara CATYLAC ICI/SPECTRUM Kg 57,600.00
34 Cat Air Kwalitas Biasa Setara LEKTONE/SIMPATI Kg 34,360.71
36 Cat Maritex Kg 36,844.44
38 Type Cat Setara Jotun Interior Ltr 119,450.00
39 Type Cat Setara Jotun Eksterior Ltr 146,100.00
40 Cat Kayu Dasar /Menie Kg 43,166.67
41 Cat Many Besi Kg 38,550.00
42 Vernish Biasa Ltr 67,000.00
43 Vernish Bagus Ltr 85,466.67
44 Lem Kayu Kg 22,766.67
45 Wall Paper Kualitas Sedang M2 185,500.00
46 Wallpaper Kualitas Bagus M2 828,000.00
48 Soda Api Kg 43,750.00
49 Sabun bh

XVII KELOMPOK PERALATAN


1 Crane sewa/hari 3,712,500.00
2 Alat Hammer 0,5 - 1 Ton sewa/hari 618,750.00
3 Alat Hammer 1 - 2 Ton sewa/hari 742,500.00
4 Concrete Pump sewa/hari 3,712,500.00
5 Molen 0,3 M3 sewa/hari 309,375.00
6 Vibrator sewa/hari 123,750.00
7 Waterpass sewa/hari 123,750.00
8 Theodolith sewa/hari 185,625.00
9 Concrete Cutter sewa/hari 185,625.00
10 Air Compressor sewa/hari 61,875.00
11 Alat Tamper sewa/hari
11 Alat Las sewa/Jam 35,000.00
PEKERJAAN PERSIAPAN
2.1.1.6 1 m2 Membersihkan lapangan dan perataan

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.10 105,000.00 10,500.00
2 Mandor L.04 OH 0.05 160,000.00 8,000.00

Jumlah Harga Tenaga Kerja 18,500.00


B Bahan

Jumlah Harga Bahan -


C Peralatan

Jumlah Harga Peralatan -


D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 18,500.00
E Profit/ Overhead 10% 1,850.00
F Harga Satuan Pekerjaan (D+E) 20,350.00

2.1.1.4 1 M1 Pengukuran dan Pasang Bouwplank

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.100 105,000.00 10,500.00
2 Tukang Kayu L.02 OH 0.100 125,000.00 12,500.00
3 Kepala Tukang L.03 OH 0.010 150,000.00 1,500.00
4 Mandor L.04 OH 0.005 160,000.00 800.00
Jumlah Harga Tenaga Kerja 25,300.00
B Bahan
1 Kayu Balok 5/7 Kls III m3 0.012 3,000,000.00 36,000.00
2 Paku 2" - 3" Kg 0.020 18,583.33 371.67
3 Kayu Papan 2/20 Kls III m3 0.004 3,000,000.00 12,000.00

Jumlah Harga Bahan 48,371.67


C Peralatan

Jumlah Harga Peralatan -


D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 73,671.67
E Profit/ Overhead 10% 7,367.17
F Harga Satuan Pekerjaan (D+E) 81,038.83

2.1.1.2 1 M2 Papan Nama Proyek

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang Kayu L.02 OH 1.000 125,000.00 125,000.00
3 Kepala Tukang Kayu L.03 OH 0.100 150,000.00 15,000.00
4 Mandor L.04 OH 0.100 160,000.00 16,000.00
Jumlah Harga Tenaga Kerja 261,000.00
B Bahan
1 Banner m2 1.000 100,000.00 100,000.00
2 Kayu 5/7 Kelas II m3 0.020 3,500,000.00 70,000.00
3 Kayu 5/10 Kelas II m3 0.023 3,500,000.00 80,500.00
3 Paku Campuran 5 cm dan 7 cm Kg 1.250 22,500.00 28,125.00
Jumlah Harga Bahan 278,625.00
C Peralatan

Jumlah Harga Peralatan -


D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 539,625.00
E Profit/ Overhead 10% 53,962.50
F Harga Satuan Pekerjaan (D+E) 593,587.50

3.1.1.1 1 m1 Pemancangan Tiang Pancang beton bertulang uk. 20 x 20 cm (mekanis)

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0286 105,000.00 3,004.44
2 Tukang L.02 OH 0.0057 125,000.00 715.34
3 Mandor L.04 OH 0.0028 160,000.00 455.41
4 Operator Crane L.05 OH 0.0057 150,000.00 858.41
5 Pembantu Operator L.06 OH 0.0057 105,000.00 600.89
Jumlah Harga Tenaga Kerja 5,634.50
B Bahan
1 Tiang pancang beton bertulang M1 1.030 309,550.00 318,836.50
20 x 20 cm
Jumlah Harga Bahan 318,836.50
C Peralatan
1 Alat Bantu Ls 0.000 500.00 -
1 Crane 5-10 ton sewa-jam 0.0401 530,357.14 21,245.71
2 Alat pancang + Hammer 2 ton sewa-jam 0.0401 106,071.43 4,249.14
3 Alat penyambung tiang pancang bh 0.2500 150,000.00 37,500.00
Jumlah Harga Peralatan 62,994.86
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 387,465.86
E Profit/ Overhead 10% 38,746.59
F Harga Satuan Pekerjaan (D+E) 426,212.44

2.1.1.7 Pembongkaran 1 m3 beton bertulang

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 3.334 105,000.00 350,017.50
2 Mandor L.04 OH 0.167 160,000.00 26,640.00

Jumlah Harga Tenaga Kerja 376,657.50


B Bahan

Jumlah Harga Bahan -


C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 376,657.50
E Profit/ Overhead 10% 37,665.75
F Harga Satuan Pekerjaan (D+E) 414,323.25

2.2.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.750 105,000.00 78,750.00
2 Mandor L.04 OH 0.025 160,000.00 4,000.00
Jumlah Harga Tenaga Kerja 82,750.00
B Bahan

Jumlah Harga Bahan -


C Peralatan Pemadat Timbunan
1
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 82,750.00
E Profit/ Overhead 10% 8,275.00
F Harga Satuan Pekerjaan (D+E) 91,025.00

2.2.1.7 Pengurugan Kembali 1 m3 galian tanah biasa sedalam 1 m

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.5000 105,000.00 52,500.00
2 Mandor L.04 OH 0.0500 160,000.00 8,000.00

Jumlah Harga Tenaga Kerja 60,500.00


B Bahan

Jumlah Harga Bahan -


C Peralatan

Jumlah Harga Peralatan -


D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 60,500.00
E Profit/ Overhead 10% 6,050.00
F Harga Satuan Pekerjaan (D+E) 66,550.00

2.2.1.11 Pengurugan 1 m3 dengan pasir urug (diliat dr data timbunan tanah atau urugan tanah kembali)

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.300 105,000.00 31,500.00
2 Mandor L.04 OH 0.010 160,000.00 1,600.00

Jumlah Harga Tenaga Kerja 33,100.00


B Bahan
1 Pasir Urug 1.200 230,000.00 276,000.00
Jumlah Harga Bahan 276,000.00
C Peralatan

Jumlah Harga Peralatan -


D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 309,100.00
E Profit/ Overhead 10% 30,910.00
F Harga Satuan Pekerjaan (D+E) 340,010.00

4.1.1.7 Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K 100), slump (3 - 6) cm, w/c = 0,87

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.200 105,000.00 126,000.00
2 Tukang Batu L.02 OH 0.200 125,000.00 25,000.00
3 Kepala Tukang L.03 OH 0.020 150,000.00 3,000.00
4 Mandor L.04 OH 0.06 160,000.00 9,600.00
Jumlah Harga Tenaga Kerja 163,600.00
B Bahan
1 Semen Portland Kg 230.000 1,680.00 386,400.00
2 Pasir Beton m3 0.638 354,066.67 225,843.95
3 Kerikil (Maks 30 mm) m3 0.761 374,066.67 284,567.75
4 Air Liter 200.000 8.00 1,600.00
Jumlah Harga Bahan 898,411.71
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 1,062,011.71
E Profit/ Overhead 10% 106,201.17
F Harga Satuan Pekerjaan (D+E) 1,168,212.88

4.1.1.31 Pembesian 1 Kg dengan besi ulir

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0070 105,000.00 735.00
2 Tukang Besi L.02 OH 0.0070 125,000.00 875.00
3 Kepala Tukang L.03 OH 0.0007 150,000.00 105.00
4 Mandor L.04 OH 0.0004 160,000.00 64.00
Jumlah Harga Tenaga Kerja 1,779.00
B Bahan
1 Besi beton ulir kg 1.050 17,000.00 17,850.00
2 Kawat beton kg 0.015 24,583.33 368.75
Jumlah Harga Bahan 18,218.75
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 19,997.75
E Profit/ Overhead 10% 1,999.78
F Harga Satuan Pekerjaan (D+E) 21,997.53
4.1.1.29 Pembesian 1 Kg dengan besi polos

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.00200 105,000.00 210.00
2 Tukang Besi L.02 OH 0.00600 125,000.00 750.00
3 Kepala Tukang L.03 OH 0.00000 150,000.00 -
4 Mandor L.04 OH 0.00000 160,000.00 -
Jumlah Harga Tenaga Kerja 960.00
B Bahan
1 Besi beton polos kg 1.050 15,000.00 15,750.00
2 Kawat beton kg 0.015 24,583.33 368.75
Jumlah Harga Bahan 16,118.75
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 17,078.75
E Profit/ Overhead 10% 1,707.88
F Harga Satuan Pekerjaan (D+E) 18,786.63

4.1.1.34 Pemasangan 1 m2 bekisting untuk pondasi

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.5200 105,000.00 54,600.00
2 Tukang Kayu L.02 OH 0.2600 125,000.00 32,500.00
3 Kepala Tukang L.03 OH 0.0260 150,000.00 3,900.00
4 Mandor L.04 OH 0.0260 160,000.00 4,160.00
Jumlah Harga Tenaga Kerja 95,160.00
B Bahan
1 Kayu kelas III m3 0.040 3,500,000.00 140,000.00
2 Paku 5 - 10 cm kg 0.300 18,583.33 5,575.00
3 Minyak bekisting Liter 0.100 34,000.00 3,400.00
Jumlah Harga Bahan 148,975.00
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 244,135.00
E Profit/ Overhead 10% 24,413.50
F Harga Satuan Pekerjaan (D+E) 268,548.50
4.1.1.35 Pemasangan 1 m2 bekisting untuk sloof

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.5200 105,000.00 54,600.00
2 Tukang Kayu L.02 OH 0.2600 125,000.00 32,500.00
3 Kepala Tukang L.03 OH 0.0260 150,000.00 3,900.00
4 Mandor L.04 OH 0.0260 160,000.00 4,160.00
Jumlah Harga Tenaga Kerja 95,160.00
B Bahan
1 Kayu kelas III m3 0.045 3,500,000.00 157,500.00
2 Paku 5 - 10 cm kg 0.300 18,583.33 5,575.00
3 Minyak bekisting Liter 0.100 34,000.00 3,400.00
Jumlah Harga Bahan 166,475.00
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 261,635.00
E Profit/ Overhead 10% 26,163.50
F Harga Satuan Pekerjaan (D+E) 287,798.50

4.1.1.36 Pemasangan 1 m2 bekisting untuk kolom

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.6600 105,000.00 69,300.00
2 Tukang Kayu L.02 OH 0.3300 125,000.00 41,250.00
3 Kepala Tukang L.03 OH 0.0330 150,000.00 4,950.00
4 Mandor L.04 OH 0.0330 160,000.00 5,280.00
Jumlah Harga Tenaga Kerja 120,780.00
B Bahan
1 Kayu kelas III m3 0.040 3,500,000.00 140,000.00
2 Paku 5 - 10 cm kg 0.400 18,583.33 7,433.33
3 Minyak Bekisting Liter 0.200 34,000.00 6,800.00
4 Balok kayu kelas II m3 0.015 3,500,000.00 52,500.00
5 Plywood tebal 9 mm Lbr 0.350 136,875.00 47,906.25
6 Dolken kayu ɸ 8 - 10 cm Panjang 4 m Batang 2.000 9,000.00 18,000.00
Jumlah Harga Bahan 272,639.58
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 393,419.58
E Profit/ Overhead 10% 39,341.96
F Harga Satuan Pekerjaan (D+E) 432,761.54
4.1.1.13 Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 (Molen)

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.323 105,000.00 138,915.00
2 Tukang Batu L.02 OH 0.189 125,000.00 23,625.00
3 Kepala Tukang L.03 OH 0.019 150,000.00 2,850.00
4 Mandor L.04 OH 0.066 160,000.00 10,560.00
Jumlah Harga Tenaga Kerja 175,950.00
B Bahan
1 Semen Portland Kg 371.000 1,680.00 623,280.00
2 Pasir Beton m3 0.499 354,066.67 176,527.52
3 Kerikil (Maks 30 mm) m3 0.776 374,066.67 290,109.48
4 Air Liter 215.000 8.00 1,720.00
Jumlah Harga Bahan 1,091,637.01
C Peralatan
1 Molen 0,35 Sewa-hari 0.250 309,375.00 77,343.75
Jumlah Harga Peralatan 77,343.75
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 1,344,930.76
E Profit/ Overhead 10% 134,493.08
F Harga Satuan Pekerjaan (D+E) 1,479,423.83

4.2.1.1 Pemasangan 1 kg besi profil

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.060 105,000.00 6,300.00
2 Tukang las konstruksi L.02 OH 0.060 125,000.00 7,500.00
3 Kepala tukang L.03 OH 0.006 150,000.00 900.00
4 Mandor L.04 OH 0.003 160,000.00 480.00
Jumlah Harga Tenaga Kerja 15,180.00
B Bahan
1 Besi Profil Kg 1.150 23,000.00 26,450.00
Jumlah Harga Bahan 26,450.00
C Peralatan
1 Mesin Las Jam 0.150 35,000.00 5,250.00
Jumlah Harga Peralatan 5,250.00
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 46,880.00
E Profit/ Overhead 10% 4,688.00
F Harga Satuan Pekerjaan (D+E) 51,568.00
4.1.1.40 Pemasangan 1 m2 bekisting untuk tangga

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.6600 105,000.00 69,300.00
2 Tukang Kayu L.02 OH 0.3300 125,000.00 41,250.00
3 Kepala Tukang L.03 OH 0.0330 150,000.00 4,950.00
4 Mandor L.04 OH 0.0330 160,000.00 5,280.00
Jumlah Harga Tenaga Kerja 120,780.00
B Bahan
1 Kayu kelas III m3 0.030 3,000,000.00 90,000.00
2 Paku 5 - 12 cm kg 0.400 18,583.33 7,433.33
3 Minyak Bekisting Liter 0.150 34,000.00 5,100.00
4 Balok kayu kelas II m3 0.015 3,500,000.00 52,500.00
5 Plywood tebal 9 mm Lbr 0.350 136,875.00 47,906.25
6 Dolken kayu ɸ 8 - 10 cm Panjang 4 m Batang 2.000 9,000.00 18,000.00
Jumlah Harga Bahan 220,939.58
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 341,719.58
E Profit/ Overhead 10% 34,171.96
F Harga Satuan Pekerjaan (D+E) 375,891.54

4.1.1.55 1 M3 Beton K-250 (Ready Mix)

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.0000 105,000.00 105,000.00
2 Tukang Batu L.02 OH 0.2500 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.0250 150,000.00 3,750.00
4 Mandor L.04 OH 0.1000 160,000.00 16,000.00
Jumlah Harga Tenaga Kerja 156,000.00
B Bahan
1 Campuran beton Ready Mix K-250 m3 1.020 1,259,555.00 1,284,746.10
Jumlah Harga Bahan 1,284,746.10
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 1,440,746.10
E Profit/ Overhead 10% 144,074.61
F Harga Satuan Pekerjaan (D+E) 1,584,820.71
4.2.1.16 Pemasangan 1 m2 rangka kuda - kuda baja ringan

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.247 105,000.00 25,935.00
2 Tukang Besi L.02 OH 0.176 125,000.00 22,000.00
3 Kepala Tukang L.03 OH 0.117 150,000.00 17,550.00
4 Mandor L.04 OH 0.005 160,000.00 800.00
Jumlah Harga Tenaga Kerja 66,285.00
B Bahan
1 Main truss C-75-75 m 2.800 15,277.78 42,777.78
2 Roof Bottom / reng R 32-0,45 m 5.100 6,388.89 32,583.33
3 Self drilling screw dia. 6 x 20 mm (truss scre Bh 25.000 1,000.00 25,000.00
4 Self drilling screw dia. 6 x 20 mm (roof batte Bh 35.000 500.00 17,500.00
5 Dynabol dia. 12 x 20 mm Bh 1.000 4,250.00 4,250.00
Jumlah Harga Bahan 122,111.11
C Peralatan
1 Alat bantu (mesin bor listrik) / gensit Ls 1.000 1,000.00 1,000.00
Jumlah Harga Peralatan 1,000.00
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 189,396.11
E Profit/ Overhead 10% 18,939.61
F Harga Satuan Pekerjaan (D+E) 209,335.72

0 Pemasangan 1 m2 genteng metal, tebal 0,3 mm

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.200 105,000.00 21,000.00
2 Tukang Kayu L.02 OH 0.100 125,000.00 12,500.00
3 Kepala Tukang L.03 OH 0.010 150,000.00 1,500.00
4 Mandor L.04 OH 0.001 160,000.00 160.00
Jumlah Harga Tenaga Kerja 35,160.00
B Bahan
1 Genteng metal Buah 1.02 59,500.00 60,690.00
2 Paku biasa ½”-1” Kg 0.20 31,000.00 6,200.00

Jumlah Harga Bahan 66,890.00


C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 102,050.00
E Profit/ Overhead 10% 10,205.00
F Harga Satuan Pekerjaan (D+E) 112,255.00
0 Pemasangan 1 m1 nok genteng metal

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.250 105,000.00 26,250.00
2 Tukang Kayu L.02 OH 0.150 125,000.00 18,750.00
3 Kepala Tukang L.03 OH 0.015 150,000.00 2,250.00
4 Mandor L.04 OH 0.013 160,000.00 2,080.00
Jumlah Harga Tenaga Kerja 49,330.00
B Bahan
1 Nok genteng metal Buah 1.10 23,000.00 25,300.00
2 Paku biasa ½”-1” Kg 0.05 31,000.00 1,550.00

Jumlah Harga Bahan 26,850.00


C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 76,180.00
E Profit/ Overhead 10% 7,618.00
F Harga Satuan Pekerjaan (D+E) 83,798.00

1 m' Pasang lisplank GRC

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.100 105,000.00 10,500.00
2 Tukang Kayu L.02 OH 0.200 125,000.00 25,000.00
3 Kepala Tukang L.03 OH 0.020 150,000.00 3,000.00
4 Mandor L.04 OH 0.005 160,000.00 800.00
Jumlah Harga Tenaga Kerja 39,300.00
B Bahan
1 Listplank GRC Double (9x250x2440 mm) Buah 1.10 23,000.00 25,300.00
2 Paku sekrup Kg 0.05 31,000.00 1,550.00

Jumlah Harga Bahan 26,850.00


C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 66,150.00
E Profit/ Overhead 10% 6,615.00
F Harga Satuan Pekerjaan (D+E) 72,765.00
PEMASANGAN HPL
A. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm, kayu kelas II

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang Kayu L.02 OH 0.450 125,000.00 56,250.00
3 Kepala Tukang L.03 OH 0.045 150,000.00 6,750.00
4 Mandor L.04 OH 0.008 160,000.00 1,280.00
Jumlah Harga Tenaga Kerja 80,030.00
B Bahan
1 Balok Kayu m3 0.028 3,500,000.00 98,000.00
2 Paku 5 cm - 7 cm Kg 0.150 18,583.33 2,787.50
Jumlah Harga Bahan 100,787.50
C Peralatan

Jumlah Harga Peralatan -


D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 180,817.50
E Profit/ Overhead 10% 18,081.75
F Harga Satuan Pekerjaan (D+E) 198,899.25

B. Pemasangan 1 m2 HVL Lebar Ukuran 120 X 240 cm

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.350 105,000.00 141,750.00
2 Tukang Batu L.02 OH 0.175 125,000.00 21,875.00
3 Kepala Tukang L.03 OH 0.017 150,000.00 2,550.00
4 Mandor L.04 OH 0.002 160,000.00 320.00
Jumlah Harga Tenaga Kerja 166,495.00
B Bahan
1 HVL M2 1.200 160,000.00 192,000.00
2 Lem Vynil Kg 0.250 750,000.00 187,500.00

Jumlah Harga Bahan 379,500.00


C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 545,995.00
E Profit/ Overhead 10% 54,599.50
F Harga Satuan Pekerjaan (D+E) 600,594.50
PEMASANGAN PLAON PVC DAN RANGKA HOLLOW
A. Pemasangan 1 m2 rangka besi hollow 1 x 40.40.2 mm, modul 60 x 60 cm, plafon

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.350 105,000.00 36,750.00
2 Tukang Besi L.02 OH 0.350 125,000.00 43,750.00
3 Kepala Tukang L.03 OH 0.035 150,000.00 5,250.00
4 Mandor L.04 OH 0.018 160,000.00 2,880.00
Jumlah Harga Tenaga Kerja 88,630.00
B Bahan
1 Rangka metal hollow 40.40.2 mm m 4.000 40,000.00 160,000.00
2 Assesoris (perkuatan, las dll) Ls % x rangka 32,000.00 32,000.00
Jumlah Harga Bahan 192,000.00
C Peralatan

Jumlah Harga Peralatan -


D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 280,630.00
E Profit/ Overhead 10% 28,063.00
F Harga Satuan Pekerjaan (D+E) 308,693.00

B. Pemasangan 1 m2 Plafon PVC

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.100 105,000.00 10,500.00
2 Tukang Besi L.02 OH 0.050 125,000.00 6,250.00
3 Kepala Tukang L.03 OH 0.005 150,000.00 750.00
4 Mandor L.04 OH 0.005 160,000.00 800.00
Jumlah Harga Tenaga Kerja 18,300.00
B Bahan
1 PVC panel 8 mm m2 1.100 12,333.33 13,566.67
2 Paku skrup / asbes kg 0.110 30,000.00 3,300.00
Jumlah Harga Bahan 16,866.67
C Peralatan

Jumlah Harga Peralatan -


D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 35,166.67
E Profit/ Overhead 10% 3,516.67
F Harga Satuan Pekerjaan (D+E) 38,683.33
Jumlah Harga 347,376.33
Pemasangan 1 m1 List Plafon PVC

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.050 105,000.00 5,250.00
2 Tukang Besi L.02 OH 0.050 125,000.00 6,250.00
3 Kepala Tukang L.03 OH 0.005 150,000.00 750.00
4 Mandor L.04 OH 0.003 160,000.00 480.00
Jumlah Harga Tenaga Kerja 12,730.00
B Bahan
1 List PVC board m' 1.100 27,000.00 29,700.00
2 paku skrup buah 4.000 500.00 2,000.00
Jumlah Harga Bahan 31,700.00
C Peralatan

Jumlah Harga Peralatan -


D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 44,430.00
E Profit/ Overhead 10% 4,443.00
F Harga Satuan Pekerjaan (D+E) 48,873.00

5.1.1.25 Pemasangan 1 m’ pipa PVC tipe AW diameter 1”


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.036 105,000.00 3,780.00
2 Tukang batu L.02 OH 0.06 125,000.00 7,500.00
3 Kepala tukang L.03 OH 0.006 150,000.00 900.00
4 Mandor L.04 OH 0.002 160,000.00 320.00
Jumlah Harga Tenaga Kerja 12,500.00
B BAHAN
1 Pipa PVC 1” M 1.20 10,530.00 12,636.00
2 Perlengkapan % 35.00 4,422.60 4,422.60
Jumlah Harga Bahan 17,058.60
C Peralatan

Jumlah Harga Peralatan -


D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 29,558.60
E Profit/ Overhead 10% 2,955.86
F Harga Satuan Pekerjaan (D+E) 32,514.46
5.1.1.1 Pemasangan 1 buah closet duduk / monobolck

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A TENAGA KERJA
1 Pekerja L.01 OH 3.30 105,000.00 346,500.00
2 Tukang batu L.02 OH 1.10 125,000.00 137,500.00
3 Kepala tukang L.03 OH 0.01 150,000.00 1,500.00
4 Mandor L.04 OH 0.16 160,000.00 25,600.00
Jumlah Harga Tenaga Kerja 511,100.00
B Bahan
1 Closet duduk Unit 1.00 2,500,000.00 2,500,000.00
2 Perlengkapan Ls 6% x closet 150,000.00 150,000.00
Jumlah Harga Bahan 2,650,000.00
C Peralatan

Jumlah Harga Peralatan -


D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 3,161,100.00
E Profit/ Overhead 10% 316,110.00
F Harga Satuan Pekerjaan (D+E) 3,477,210.00

4.4.3.16 Pemasangan 1 m2 lantai keramik ukuran 40 cm x 40 cm

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja 3.00 OH 0.70 105,000.00 73,500.00
2 Tukang Batu - OH 0.35 125,000.00 43,750.00
3 Kepala Tukang L.01 OH 0.035 150,000.00 5,250.00
4 Mandor L.02 OH 0.035 160,000.00 5,600.00
Jumlah Harga Tenaga Kerja 128,100.00
B Bahan
1 Ubin keramik (Setara Garuda) Buah 11.87 5,195.17 61,666.67
2 Semen portland Kg 10.00 1,280.00 12,800.00
3 Pasir Pasang M3 0.045 245,000.00 11,025.00
4 Semen warna Kg 1.50 3,000.00 4,500.00
Jumlah Harga Bahan 89,991.67
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 218,091.67
E Profit/ Overhead 10% 21,809.17
F Harga Satuan Pekerjaan (D+E) 218,091.67
4.4.3.33 Pemasangan 1 m2 dinding keramik 25 cm x 40 cm

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja 3.00 OH 0.90 105,000.00 94,500.00
2 Tukang Batu - OH 0.45 125,000.00 56,250.00
3 Kepala Tukang L.01 OH 0.045 150,000.00 6,750.00
4 Mandor L.02 OH 0.045 160,000.00 7,200.00
Jumlah Harga Tenaga Kerja 164,700.00
B Bahan
1 Keramik (Setara Ikad) Buah 10.000 8,100.00 81,000.00
2 Semen Porlant Kg 9.300 1,280.00 11,904.00
3 Pasir Pasang M3 0.018 245,000.00 4,410.00
4 Semen warna Kg 1.940 3,000.00 5,820.00
Jumlah Harga Bahan 103,134.00
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 267,834.00
E Profit/ Overhead 10% 26,783.40
F Harga Satuan Pekerjaan (D+E) 294,617.40

5.1.1.12 Pemasangan 1 buah floor drain


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.01 105,000.00 1,050.00
2 Tukang batu L.02 OH 0.10 125,000.00 12,500.00
3 Kepala tukang L.03 OH 0.01 150,000.00 1,500.00
4 Mandor L.04 OH 0.005 160,000.00 800.00
Jumlah Harga Tenaga Kerja 15,850.00
B BAHAN
1 Floor drain Unit 1.00 173,750.00 173,750.00

Jumlah Harga Bahan 173,750.00


C Peralatan

Jumlah Harga Peralatan


D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 189,600.00
E Profit/ Overhead 10% 18,960.00
F Harga Satuan Pekerjaan (D+E) 208,560.00
5.1.1.30 Pemasangan 1 m’ pipa PVC tipe AW diameter 4”
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.081 105,000.00 8,505.00
2 Tukang batu L.02 OH 0.135 125,000.00 16,875.00
3 Kepala tukang L.03 OH 0.0135 150,000.00 2,025.00
4 Mandor L.04 OH 0.004 160,000.00 640.00
Jumlah Harga Tenaga Kerja 28,045.00
B BAHAN
1 Pipa PVC 4” M 1.20 66,420.00 79,704.00
2 Perlengkapan % 35.00 27,896.40 27,896.40

Jumlah Harga Bahan 107,600.40


C Peralatan

Jumlah Harga Peralatan


D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 135,645.40
E Profit/ Overhead 10% 13,564.54
F Harga Satuan Pekerjaan (D+E) 149,209.94

5.1.1.24 Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4”


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.036 105,000.00 3,780.00
2 Tukang batu L.02 OH 0.06 125,000.00 7,500.00
3 Kepala tukang L.03 OH 0.006 150,000.00 900.00
4 Mandor L.04 OH 0.002 160,000.00 320.00
Jumlah Harga Tenaga Kerja 12,500.00
B BAHAN
1 Pipa PVC 3/4” M 1.20 10,530.00 12,636.00
2 Perlengkapan % 35.00 4,422.60 4,422.60

Jumlah Harga Bahan 17,058.60


C Peralatan

Jumlah Harga Peralatan


D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 29,558.60
E Profit/ Overhead 10% 2,955.86
F Harga Satuan Pekerjaan (D+E) 32,514.46
4.4.3.1 Pemasangan 1 m2 Granit Lantai Uk. 60 x 60 cm
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.240 105,000.00 25,200.00
2 Tukang batu L.02 OH 0.12 125,000.00 15,000.00
3 Kepala tukang L.03 OH 0.012 150,000.00 1,800.00
4 Mandor L.04 OH 0.012 160,000.00 1,920.00
Jumlah Harga Tenaga Kerja 43,920.00
B BAHAN
1 Granit 60 X 60 (Setara Garuda) m2 1.00 220,000.00 220,000.00
2 Semen portland Kg 9.60 1,680.00 16,128.00
3 Pasir pasang m3 0.05 245,000.00 11,025.00
4 Semen warna kg 1.50 3,000.00 4,500.00

Jumlah Harga Bahan 251,653.00


C Peralatan

Jumlah Harga Peralatan


D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 295,573.00
E Profit/ Overhead 10% 29,557.30
F Harga Satuan Pekerjaan (D+E) 325,130.30

1 m2 pengecatan tembok Exterior (1 lapis plamir, 3 lapis cat penutup)


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.020 105,000.00 2,100.00
2 Tukang batu L.02 OH 0.06 125,000.00 7,875.00
3 Kepala tukang L.03 OH 0.006 150,000.00 945.00
4 Mandor L.04 OH 0.003 160,000.00 480.00
Jumlah Harga Tenaga Kerja 11,400.00
B BAHAN
1 Cat dasar /Alkali m2 0.10 70,553.33 7,055.33
2 Cat penutup Kg 0.26 119,450.00 31,057.00

Jumlah Harga Bahan 38,112.33


C Peralatan

Jumlah Harga Peralatan


D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 49,512.33
E Profit/ Overhead 10% 4,951.23
F Harga Satuan Pekerjaan (D+E) 54,463.57
4.4.1.9 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu camp 1 SP : 4 PP

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.300 105,000.00 31,500.00
2 Tukang Batu L.02 OH 0.100 125,000.00 12,500.00
3 Kepala Tukang L.03 OH 0.010 150,000.00 1,500.00
4 Mandor L.04 OH 0.015 160,000.00 2,400.00
Jumlah Harga Tenaga Kerja 47,900.00
B Bahan
1 Bata Merah Buah 70.0000 625.00 43,750.00
2 Semen Portland Kg 11.5000 1,280.00 14,720.00
3 Pasir Pasang m3 0.0430 245,000.00 10,535.00
Jumlah Harga Bahan 69,005.00
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 116,905.00
E Profit/ Overhead 10% 11,690.50
F Harga Satuan Pekerjaan (D+E) 128,595.50

Pemasangan 1 m2 plesteran 1 SP : 4 PP tebal 20 mm

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.400 105,000.00 42,000.00
2 Tukang Batu L.02 OH 0.200 125,000.00 25,000.00
3 Kepala Tukang L.03 OH 0.020 150,000.00 3,000.00
4 Mandor L.04 OH 0.022 160,000.00 3,520.00
Jumlah Harga Tenaga Kerja 73,520.00
B Bahan
1 Semen Portland Kg 8.320 1,280.00 10,649.60
2 Pasir Pasang m3 0.032 245,000.00 7,840.00

Jumlah Harga Bahan 18,489.60


C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 92,009.60
E Profit/ Overhead 10% 9,200.96
F Harga Satuan Pekerjaan (D+E) 101,210.56
Pemasangan 1 m2 acian

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.200 105,000.00 21,000.00
2 Tukang Batu L.02 OH 0.100 125,000.00 12,500.00
3 Kepala Tukang L.03 OH 0.010 150,000.00 1,500.00
4 Mandor L.04 OH 0.001 160,000.00 160.00
Jumlah Harga Tenaga Kerja 35,160.00
B Bahan
1 Semen Portland Kg 3.250 1,280.00 4,160.00

Jumlah Harga Bahan 4,160.00


C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 39,320.00
E Profit/ Overhead 10% 3,932.00
F Harga Satuan Pekerjaan (D+E) 43,252.00

Pemasangan Pintu Geser

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A Tenaga
1 Ongkos Pasang - lot 0.050 3,883,310.34 194,165.52

Jumlah Harga Tenaga Kerja 194,165.52


B Bahan
1 Kusen Allumunium 4'' m' 7.160 102,000.00 730,320.00
Kaca bening 5 mm m2 0.671 140,000.00 93,954.00
Engsel Stainles steel 100x75x2 bh 3.000 35,000.00 105,000.00
Daun Pintu Rangka Kayu + Plywood 9 mm m2 3.169 450,000.00 1,426,005.00
Lapis HPL m2 6.338 160,000.00 1,014,048.00
Kunci pintu + Handle set 1.000 425,000.00 425,000.00
Sealant/ Silikon m' 4.280 3,000.00 12,840.00
Aksesories (2%) lot 0.020 3,807,167.00 76,143.34

Jumlah Harga Bahan 3,883,310.34


C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 4,077,475.86
E Profit/ Overhead 10% 407,747.59
F Harga Satuan Pekerjaan (D+E) 4,485,223.44
BACK UP DATA HASIL PERHITUNGAN LAPANGAN
PEKERJAAN : PEMBANGUNAN TAHAP 2 SEKTOR KANAN GEDUNG PASCA SARJANA
UNIVERSITAS LANCANG KUNING

No ITEM PEKERJAAN Sat Volume Panjang Lebar Tebal Sisi Jumlah Jumlah

II PEKERJAAN LANTAI DUA


II.1 PEKERJAAN ATAP DAN RANGKA ATAP
1 Pek. Pas. Rangka Atap Baja Ringan

No Posisi Sat Volume Panjang Panjang Lebar / Luas Sisi Jumlah


Bawah Atas Tinggi
1 Sisi Panjang (Trapesium) m2 424.40 28.50 16.08 9.52 212.20 2.00 424.40
2 Sisi Panjang Limas m2 119.00 12.50 0.00 9.52 59.50 2.00 119.00
Jumlah m2 543.40 543.40
VII PEKERJAAN ATAP DAN RANGKA ATAP
2 Pek. Atap Spandex menjadi Multi Roof
No Posisi Sat Volume Panjang Panjang Lebar / Luas Sisi Jumlah
Bawah Atas Tinggi
1 Sisi Panjang (Trapesium) m2 424.40 28.50 16.08 9.52 212.20 2.00 424.40
2 Sisi Panjang Limas m2 119.00 12.50 0.00 9.52 59.50 2.00 119.00
Jumlah m2 543.40 543.40

3 Pek. Perabung
No Posisi Sat Volume Panjang Sisi Jumlah
1 Perabung Top Atap m' 16.08 16.08 1.00 16.08
2 Perabung Sisi Limas m' 38.08 9.52 4.00 38.08
Jumlah m' 54.16 54.16

4 Pek. List plank


No Posisi Sat Volume Panjang Ofset Sisi Jumlah
1 Sisi Panjang m' 57.30 28.65 2.00 57.30
2 Sisi Lebar m' 25.30 12.65 2.00 25.30
Jumlah m' 82.60 82.60

I Penambahan Dinding Toilet Prof


No Posisi Sat Volume Panjang Lebar Sisi Jumlah
1 Pas. Bata m2 23.80 7.00 3.40 1.00 23.80
Pas. Bata m2 3.83 3.42 1.12 1.00 3.83
m2 27.63 27.63
2 Pas. Plesteran m2 19.60 7.00 1.40 2.00 19.60
Pas. Plesteran m2 3.83 3.42 1.12 1.00 3.83
m2 23.43 23.43
3 Pas. Acian m2 46.86 23.43 1.00 2.00 46.86
I Kolom Beton Bertulang 0.5 0.6 4
No Posisi Sat Volume Panjang Lebar BJ Jumlah Sisi Jumlah
1 Bekisting m2 26.40 4.00 1.10 2.00 3.00 26.40
2 Tulangan Utama D 19 Kg 669.00 5.00 1.00 2.23 20.00 3.00 669.00
3 Tulangan Polos Ø8 Kg 94.80 2.40 1.00 0.40 33.33 3.00 94.80
1 Beton K-250 m3 3.60 4.00 0.50 0.60 3.00 1.00 3.60

Anda mungkin juga menyukai