Anda di halaman 1dari 9

BILL OF QUANTITY (BQ)

PROGRAM : PENYELENGGARAAN LALU LINTAS DAN ANGKUTAN JALAN (LLAJ)


KEGIATAN : PENYEDIAAN PERLENGKAPAN JALAN DI JALAN KABUPATEN/KOTA
SUB KEGIATAN : PENYEDIAAN PERLENGKAPAN JALAN DI JALAN KABUPATEN/KOTA
: (Pengadaan dan Pemasangan Lampu Penerangan Jalan Umum (LPJU) Konvensional di Simpang
STAIM - Paranginan II Lintas Timur Panyabungan)
LOKASI KEGIATAN : KABUPATEN MANDAILING NATAL
SUMBER DANA : APBD
TAHUN ANGGARAN : 2023

NO URAIAN KEGIATAN ANALISA VOLUME SATUAN HARGA SATUAN JUMLAH HARGA

1 2 3 4 5 6 7

A. PEKERJAAN PENDAHULUAN
1 Pembongkaran dan Pembersihan PJU --- 1,00 Ls 799.685,00 799.685,00
2 Biaya Photo Dokumentasi --- 1,00 Ls 250.000,00 250.000,00

JUMLAH A 1.049.685,00

B. PENGADAAN DAN PEMASANGAN


LPJU KONVENSIONAL
I. PENGADAAN BAHAN
1 Lampu Jalan
Philips BRP131 LED 100 NW 100W 220- 25,00 Bh 3.746.250,00 93.656.250,00
240V DM GM
2 Terminal Kabel 25,00 Bh 24.000,00 600.000,00

II PEMASANGAN
1 Instalasi Listrik 20,00 Titik 300.000,00 6.000.000,00
2 Fhotocell 20,00 Bh 166.650,00 3.333.000,00
3 Kabel NYM 2x2.5 mm 150,00 M' 25.190,00 3.778.500,00
4 Bundel 20,00 Bh 9.630,50 192.610,00
5 Tiang Lampu PJU 16,00 Bh 2.117.500,00 33.880.000,00
6 Klem Tiang Lampu Jalan 15,00 Bh 45.000,00 675.000,00
Lengan Lampu PJU 5,00 Bh 320.000,00 1.600.000,00

JUMLAH B 143.715.360,00
C JUMLAH TOTAL = A+B 144.765.045,00
D PPn 11% = C * 11% 15.924.155,00
E JUMLAH = C + D 160.689.200,00

Terbilang : …………………………………………………………..

Panyabungan,..............................

Diketahui oleh Dibuat


PT/CV……………………………. PT/CV…………………………….

……………………………………. …………………………………….
……………………………………. …………………………………….
DAFTAR PERHITUNGAN VOLUME

PROGRAM : PENYELENGGARAAN LALU LINTAS DAN ANGKUTAN JALAN (LLAJ)


KEGIATAN : PENYEDIAAN PERLENGKAPAN JALAN DI JALAN KABUPATEN/KOTA
SUB KEGIATAN : PENYEDIAAN PERLENGKAPAN JALAN DI JALAN KABUPATEN/KOTA
(Pengadaan dan Pemasangan Lampu Penerangan Jalan Umum (LPJU)
Konvensional di Simpang STAIM - Paranginan II Lintas Timur
Panyabungan)
LOKASI KEGIATAN : KABUPATEN MANDAILING NATAL
SUMBER DANA : APBD
TAHUN ANGGARAN : 2023
A. PEKERJAAN PENDAHULUAN
1 pt Pembongkaran dan Pembersihan
Ukuran
PJU = 1,000 Ls
1 pt Biaya Photo Dokumentasi Ukuran = 1,000 Ls
B. PENGADAAN DAN PEMASANGAN LPJU KONVENSIONAL
I. PENGADAAN BAHAN
Lampu Jalan
1 pt Lampu Jalan ukuran 25,00 = 25,00 Bh
Jumlah = 25,00 Bh
Dibulatkan = 25,00 Bh
Terminal Kabel
1 pt Terminal Kabel ukuran 25,00 = 25,00 Bh
Jumlah = 25,00 Bh
Dibulatkan = 25,00 Bh
II PEMASANGAN
Instalasi Listrik
1 pt Instalasi Listrik ukuran 20,00 = 20,00 Titik
Jumlah = 20,00 Titik
Dibulatkan = 20,00 Titik
Fhotocell
1 pt Fhotocell ukuran 20,00 = 20,00 Bh
Jumlah = 20,00 Bh
Dibulatkan = 20,00 Bh
Kabel NYM 2x2.5 mm
1 pt Kabel NYM 2x2.5 mm ukuran 150,00 = 150,00 M'
Jumlah = 150,00 M'
Dibulatkan = 150,00 M'
Bundel
1 pt Bundel ukuran 20,00 = 20,00 Bh
Jumlah = 20,00 Bh
Dibulatkan = 20,00 Bh
Tiang Lampu PJU
1 pt Tiang Lampu PJU ukuran 16,00 = 16,00 Bh
Jumlah = 16,00 Bh
Dibulatkan = 16,00 Bh
Klem Tiang Lampu Jalan
1 pt Klem Tiang Lampu Jalan ukuran 15,00 = 15,00 Bh
Jumlah = 15,00 Bh
Dibulatkan = 15,00 Bh
Lengan Lampu PJU
1 pt Lengan Lampu PJU ukuran 5,00 = 5,00 Bh
Jumlah = 5,00 Bh
Dibulatkan = 5,00 Bh

Panyabungan,..............................
Diketahui oleh Dibuat
PT/CV……………………………. PT/CV…………………………….

……………………………………. …………………………………….
……………………………………. …………………………………….
HARGA SATUAN UPAH

PROGRAM : PENYELENGGARAAN LALU LINTAS DAN ANGKUTAN JALAN (LLAJ)


KEGIATAN : PENYEDIAAN PERLENGKAPAN JALAN DI JALAN KABUPATEN/KOTA
SUB KEGIATAN : PENYEDIAAN PERLENGKAPAN JALAN DI JALAN KABUPATEN/KOTA
: (Pengadaan dan Pemasangan Lampu Penerangan Jalan Umum (LPJU)
Konvensional di Simpang STAIM - Paranginan II Lintas Timur
Panyabungan)
LOKASI KEGIATAN : KABUPATEN MANDAILING NATAL
SUMBER DANA : APBD
TAHUN ANGGARAN : 2023

JUMLAH
KODE JAM
NO URAIAN SATUAN HARGA SATUAN JUMLAH UPAH
ANALISA KERJA PER
HARI

1 Mandor S.73 OH 7 23.143,00 162.000,00


2 Kepala Tukang S.74 OH 7 23.143,00 162.000,00
3 Tukang S.75 OH 7 19.843,00 138.900,00
4 Mekanik S.76 OH 7 23.143,00 162.000,00
5 Pembantu Mekanik S.77 OH 7 19.843,00 138.900,00
6 Operator Terlatih/Terlatih S.78 OH 7 23.143,00 162.000,00
7 Operator Semi Terlatih S.79 OH 7 19.843,00 138.900,00
8 Pembantu Operator S.80 OH 7 15.000,00 105.000,00
9 Sopir Terampil/Terlatih S.81 OH 7 19.843,00 138.900,00
10 Pembantu Sopir S.82 OH 7 11.700,00 81.900,00
11 Buruh Tidak Terampil S.83 OH 7 10.243,00 71.700,00
12 Buruh Semi Terampil S.84 OH 7 11.814,00 82.700,00
13 Buruh Terlatih S.85 OH 7 13.386,00 93.700,00
14 Pekerja S.86 OH 7 10.243,00 71.700,00

Panyabungan,..............................

Diketahui oleh Dibuat


PT/CV……………………………. PT/CV…………………………….

……………………………………. …………………………………….
……………………………………. …………………………………….
DAFTAR HARGA SATUAN BAHAN

PROGRAM : PENYELENGGARAAN LALU LINTAS DAN ANGKUTAN JALAN (LLAJ)


KEGIATAN : PENYEDIAAN PERLENGKAPAN JALAN DI JALAN KABUPATEN/KOTA
SUB KEGIATAN : PENYEDIAAN PERLENGKAPAN JALAN DI JALAN KABUPATEN/KOTA
: (Pengadaan dan Pemasangan Lampu Penerangan Jalan Umum (LPJU) Konvensional di
Simpang STAIM - Paranginan II Lintas Timur Panyabungan)
LOKASI KEGIATAN : KABUPATEN MANDAILING NATAL
SUMBER DANA : APBD
TAHUN ANGGARAN : 2023

HARGA
NO JENIS MATERIAL SPESIFIKASI BAHAN SATUAN
SATUAN
1 2 3 4 5

I PIPA
Pipa Galvanis Putih Uk. 1 1/4", T=2,4 Btg 275.391,00
Pipa Galvanis Putih Uk. 1/2", T=2,4 Btg 336.552,00
Pipa Galvanis Putih Uk. 2", T=2,4 Btg 489.510,00
Pipa Galvanis Putih Uk. 2 1/2", T=2,4 Btg 550.671,00
Pipa Galvanis Putih Uk. 3", T=2,4 Btg 550.671,00
Pipa Galvanis Putih Uk. 4", T=2,4 Btg 979.020,00
Pipa Galvanis Putih Uk. 6", T=2,4 Btg 4.115.436,00
Pipa Galvanis Uk. 3/4" Btg 110.112,00
Pipa Galvanis Uk. 1" Btg 159.063,00
Pipa Galvanis Uk. 2" Btg 489.510,00
Pipa Galvanis Uk. 3" Btg 550.671,00
Pipa Galvanis Uk. 4" Btg 979.020,00
Pipa Galvanis SNI Uk. 2" M 139.860,00
Pipa Galvanis SNI Uk. 3" M 163.170,00
Pipa Galvanis SNI Uk. 4" M 193.473,00
Pipa Galvanis SNI Uk. 6" M 711.510,00
Pipa Galvanis SNI Uk. 8" M 1.067.931,00
Pipa Besi Hitam Uk. 1 1/4",T=2mm Btg 221.445,00
Pipa Besi Hitam Uk. 1/2", T=2mm Btg 125.430,00
Pipa Besi Hitam Uk. 3/4", T=2mm Btg 147.408,00
Pipa Besi Hitam Uk. 1", T=2mm Btg 198.912,00
Pipa Besi Hitam Uk. 2", T=2mm Btg 264.957,00
Pipa Besi Hitam Uk. 2 1/2", T=2mm Btg 352.980,00
Pipa Besi Hitam Uk. 3", T=2mm Btg 441.114,00
Pipa Besi Hitam Uk. 4", T=2mm Btg 587.967,00
Tiang Lampu Ganda Oktgonal,9 meter, doble arm + Angkur Unit 10.175.000,00
Tiang Lampu Ganda Oktagonal,6 metre,double arm+Angkur Unit 6.875.000,00
Lampu Jalan Mercury 250 Watt Buah 4.389.000,00
Angker Tiang Lampu Besi Baja+Mur/Baut Unit 580.800,00
Ganda
Tiang Lampu Besi Bahan Pipa Galvanis Batang 4.598.000,00
Galvanis
Tiang Lampu Bahan Pipa Hitam Batang 2.117.500,00
Tiang Lampu Ganda Bahan Pipa Hitam Batang 2.695.000,00
Tiang Lampu Jalan T=9 m Single Arm Buah 9.990.800,00
Oktagonal
Pengadaan dan Tiang Lampu, Lampu Jalan, Controller, Patok Set 16.550.000,00
Pemasangan Lampu Delineator + Pemasangan
Penerangan Jalan Umum
(LPJU) Konvensional
Pengadaan dan Tiang Lampu, Lampu Jalan, Controller, Patok Set 38.300.000,00
Pemasangan Lampu Delineator, Bateray, Panel Sollar Cell +
Penerangan Jalan Umum Pemasangan
(LPJU) Sollar Cell
HARGA
NO JENIS MATERIAL SPESIFIKASI BAHAN SATUAN
SATUAN
1 2 3 4 5

II BOLA LAMPU
Bola Lampu LED 10 Watt Bh 111.000,00
Bola Lampu LED 12 Watt Bh 133.200,00
Bola Lampu LED 26 Watt Bh 199.800,00
Bola Lampu LED 5 Watt Bh 55.500,00
Bola Lampu SL 18 Watt Bh 27.750,00
Bola Lampu SL 23 Watt Bh 46.620,00
Bola Lampu SL 24 Watt Bh 35.520,00
Bola Lampu SL 26 Watt Bh 38.850,00
Bola Lampu SL 32 Watt Bh 49.950,00
Bola Lampu SL 45 Watt Bh 57.720,00
Bola Lampu SL 60 Watt Bh 108.780,00
Bola Lampu SL 62 Watt Bh 114.330,00
Bola Lampu Hannock 18 Watt Bh 48.951,00
Bola Lampu Hannock 45 Watt Bh 79.254,00
Bola Lampu Philips 18 Watt Bh 48.951,00
Bola Lampu Philips 45 Watt Bh 85.082,00
Bola Lampu Philips 5 Watt Bh 12.210,00
Bola Lampu PLC 18 Watt Set 37.296,00
Bola Lampu PLC 20 Watt Set 45.288,00
Bola Lampu PLC 30 Watt Set 51.171,00
Bola Lampu PLC 50 Watt Set 87.468,00
Bola Lampu PLC 60 Watt Set 104.007,00
Bola Lampu DL PLC 18 Watt Set 110.778,00
Bola Lampu TL IB 2x20 cm Set 188.478,00
Bola Lampu TL IB 2x40 cm Set 232.545,00
Bola Lampu TL 20 Watt Set 30.636,00
Bola Lampu TL 40 Watt Set 79.587,00
Bola Lampu Running Text Komponen, elektro, listrik Buah 132.312,00
Bola Lampu Sl 32 Watt Buah 95.127,00
Bola Lampu Sl 60 Watt Buah 147.297,00
Bola Lampu Sl 18 Watt Buah 59.607,00
Bola Lampu Sl 24 Watt Buah 68.931,00
Bola Lampu Sl 62 Watt Buah 156.510,00
Bola Lampu Sl 24 watt Buah 39.072,00
Bola Lampu Sl 32 watt Buah 54.945,00
Bola Lampu Sl 62 Watt Buah 125.763,00
Bola Lampu Sl 26 watt Buah 42.735,00
Bola Lampu Sl 45 watt Buah 63.492,00
Bola Lampu Led 26 watt Buah 219.780,00
Bola Lampu Led 5 watt Buah 61.050,00
Bola Lampu Sl 60 watt Buah 119.658,00
Bola Lampu Led 12 watt Buah 146.520,00
Bola Lampu Led 10 watt Buah 122.100,00
Bola Lampu Sl 18 watt Buah 30.525,00
Bola Lampu 8 Watt Buah 58.608,00
Bola Lampu Led 8 Watt Buah 164.835,00
Bola Lampu Led 5 Watt Buah 122.100,00
Bola Lampu 50 Watt Buah 117.327,00
Bola Lampu 25 Watt Set 13.431,00
Bola Lampu 40 Watt Set 18.870,00
Bola Lampu 2 x 20 cm Set 207.348,00
Bola Lampu 2 x 40 cm Set 255.744,00
HARGA
NO JENIS MATERIAL SPESIFIKASI BAHAN SATUAN
SATUAN
1 2 3 4 5

Bola Lampu 20 Watt Set 33.633,00


Bola Lampu 40 Watt Set 87.468,00
Bola Lampu 20 Watt Set 131.091,00
Bola Lampu 40 Watt Set 154.845,00
Bola Lampu 18 Watt Set 41.070,00
Bola Lampu 20 Watt Set 49.839,00
Bola Lampu 30 Watt Set 56.277,00
Bola Lampu 50 Watt Set 96.237,00
Bola Lampu 60 Watt Set 121.878,00
Bola Lampu 18 Watt Set 255.744,00
Bola Lampu 10 Watt Set 111.000,00
Bola Lampu 10 Watt Set 111.000,00
Bola Lampu 10 Watt Set 888.444,00
Bola Lampu 25 Watt Set 1.110.555,00
Bola Lampu 500 Watt Set 110.556,00
Bola Lampu 1000 Watt Set 199.245,00
Bola Lampu 80 Watt Set 96.126,00
Bola Lampu 50 Watt Set 444.222,00
Bola Lampu 50 Watt Set 1.110.555,00
Bola Lampu 20 Watt Set 258.408,00
Bola Lampu 25 Watt Set 403.818,00
Bola Lampu Titik Lampu+Bahan Set 549.450,00

III STOP KONTAK


Stop Kontak 2 Lobang Bh 24.531,00
Stop Kontak 3 Lobang Bh 30.303,00
Stop Kontak 4 Lobang Bh 41.958,00
Stop Kontak IB Bh 17.760,00
Stop Kontak IB Bh 19.580,00
Stop Kontak OB Bh 19.580,00
Stop Kontak 4 Lubang + Saklar Bh 40.793,00
Stop Kontak Timbul Bh 24.476,00
Stop Kontak Tanam Bh 24.476,00
Stop Kontak Panasonic Bh 30.303,00
Stop Kontak 1 Group Buah 20.202,00
Stop Kontak 2 Group Buah 47.064,00
Stop Kontak 3 Group Buah 47.064,00
Stop Kontak 4 Group Buah 37.074,00
Stop Kontak 6 Group Buah 47.397,00
Stop Kontak 8 Group Buah 59.385,00

IV SAKLAR
Saklar Tunggal Timbul Bh 24.476,00
Saklar Ganda Timbul Bh 24.476,00
Saklar Tunggal Tanam Bh 24.476,00
Saklar Ganda Tanam Bh 30.303,00
Saklar Tunggal Panasonic Bh 30.303,00
Saklar Timbul 1 Bh 12.815,00
Saklar Tunggal IB Bh 18.968,75
Saklar Ganda IB Bh 19.580,00
Saklar Triple IB Bh 25.699,50
Saklar Tunggal OB Bh 13.461,50
Saklar Ganda OB Bh 19.580,00
HARGA
NO JENIS MATERIAL SPESIFIKASI BAHAN SATUAN
SATUAN
1 2 3 4 5

V MCB
MCB 4 Ampere Buah 36.630,00
MCB 6 Ampere Buah 39.072,00
MCB 10 Ampere Buah 61.050,00
MCB 20 Ampere Buah 87.912,00
MCB 63 Ampere Buah 131.868,00
MCB 32 A Buah 174.603,00
MCB 40 A Buah 179.487,00
MCB Bahan Plastik Buah 122.100,00

VI LAMPU PJU
Lampu PJU Lampu PJU Philips SON T 250 W E40 Bh 196.470,00
Lampu PJU Lampu PJU Kobra E40+SON-T 250 W Bh 943.500,00
Lampu PJU Lampu PJU SON T 150W e$) SL 12 Philips Bh 172.050,00
Lampu PJU Ballast BHL 250 W L200 Philips Bh 394.454,00
Lampu PJU Ignitor SI 51 220-240 Philips Bh 64.978,00
Lampu PJU Fitting WD E40 AL-01R-029 Bh 31.080,00
Lampu PJU Philips BRP131 LED 100 NW 100W 220-240V DM GM 0 3.746.250,00
Lampu PJU Philips BRP391 LED NW 40 W 220-240V DM MP1 Unit 4.088.676,00
Lampu PJU Philips BRP391 LED NW 55W 220-240V DM MP1 Unit 3.986.699,00
Lampu PJU Philips BRP391 LED NW 70W 220-240V DM MP1 Unit 4.115.066,00
Lampu PJU Philips BRP391 40W DM System Ready Unit 5.008.612,00
Lampu PJU Philips BRP391 40W DM CT Cabinet System Unit 5.700.928,00
Lampu PJU Philips BRP391 40W DM CT AMP-M Unit 7.526.262,00
Lampu PJU Philips BRP392 LED NW 90 W 220-240V DM MP1 Unit 4.445.606,00
Lampu PJU Philips BRP392 LED NW 120W 220-240V DM MP1 Unit 5.159.942,00
Lampu PJU Philips BRP392 120W DM System Ready Unit 5.777.024,00
Lampu PJU Philips BRP392 90W DM CT Cabinet System Unit 6.392.380,00
Lampu PJU Philips BRP392 90W DM System Ready Unit 5.697.366,00
Lampu PJU Philips BRP392 120W DM CT Cabinet System Unit 6.392.380,00
Lampu PJU Philips BRP392 90W DM CT AMP-M Unit 7.959.344,00
Lampu PJU Philips BRP392 120W DM CT AMP-M Unit 8.215.173,00
Lampu PJU Philips BRP371 55W DM MP1 Unit 5.914.855,00
Lampu PJU Philips BRP371 90W DM MP1 Unit 6.109.965,00
Lampu PJU Philips BRP371 40W DM CT AMP-M Unit 9.185.465,00
Lampu PJU Philips BRP371 90W DM CT AMP-M Unit 9.363.579,00
Lampu PJU Philips BRP372 120W DM MP1 Unit 6.393.251,00
Lampu PJU Philips BRP372 120W PSD D Unit 6.423.448,00
Lampu PJU Philips BRP372 120W DM CT AMP-M Unit 9.719.897,00
Lampu PJU Philips BVP384 425W CT Smart LED Floodlight Unit 37.247.560,00
Lampu PJU Philips BVP384 500W LED Floodlight Unit 15.872.567,00
Lampu PJU Philips BDP461 100W PostTop LED Smart System Unit 12.520.297,00
Lampu PJU Philips BDP461 60W PostTop LED Unit 11.181.717,00
Lampu PJU Philips BDP461 100W PostTop LED Unit 10.555.990,00
Lampu PJU Philips BRP471 40W CT IOT Unit 14.661.802,00
Lampu PJU Philips BRP471 90W CT IOT Unit 15.329.479,00
Lampu PJU Philips BRP471 120W CT IOT Unit 15.819.015,00

VII KABEL LISTRIK


Kabel Listrik Eterna NYA 1x1,5 mm 100 M Roll 176.000,00
Kabel Listrik Eterna NYM 2x1,5 mm 50 M Roll 264.000,00
Kabel Listrik Eterna NYA 1x2,5 mm 100 M Roll 258.500,00
Kabel Listrik Eterna NYM 3x1,5 mm 50 M Roll 341.000,00
HARGA
NO JENIS MATERIAL SPESIFIKASI BAHAN SATUAN
SATUAN
1 2 3 4 5

Kabel Listrik Eterna NYY 2x1,5 mm 50 M Roll 365.750,00


Kabel Listrik Eterna NYM 2x2,5 mm 50 M Roll 368.500,00
Kabel Listrik Supreme NYA 1x1,5 mm 100 M Roll 203.500,00
Kabel Listrik Supreme NYM 2x1,5 mm 50 M Roll 308.000,00
Kabel Listrik Supreme NYA 1,2,5 mm 100 M Roll 330.000,00
Kabel Listrik Kabel Twisted Twist Nfa 2x10 mm/PLN M 8.800,00
Kabel Listrik Mym 2 x 1,5 Gulung 599.720,00
Kabel Listrik Nym 3x2,5 mm Meter 32.890,00
Kabel Listrik Nym 2x2,5 mm Meter 25.190,00
Kabel Listrik Nym 3x1,5 mm Meter 23.210,00
Kabel Listrik Nym 2x1,5 mm Meter 17.380,00
Kabel Listrik 1 1/2" Meter 6.686.460,00
Kabel Listrik 1 1/2" M1 46.640,00
Kabel Listrik 1 1/4" M1 40.040,00
Kabel Listrik 1" M1 37.400,00
Kabel Listrik 2" M1 73.370,00
Kabel Listrik 2.5" M1 80.080,00
Kabel Listrik 3/4" M1 33.330,00
Kabel Listrik 2 x 0,75 mm Roll 205.700,00
Kabel Listrik 2x1,5 mm Roll 471.900,00
Kabel Listrik 2x2,5 mm Roll 441.650,00
Kabel Listrik 2 x 50 mm Roll 266.200,00
Kabel Listrik 2 x 80 x 0,12 V Sikom Roll 435.600,00
Kabel Listrik 4 x 2,5 Praba Roll 1.222.100,00
Kabel Listrik 2 x 80 Stel Roll 290.400,00
Kabel Listrik Uk. 1 1/2 inci Bungkus 15.730,00
Kabel Listrik Kualitas Baik Buah 12.100,00

VIII LAIN - LAIN


Pipa Listrik Btg 5.828,00
Isolasi Bh 17.483,00
Paku Klem No. 8 Bks 36.713,00
Paku Klem No. 9 Bks 36.713,00
Paku Klem No. 15 Bks 42.541,00
Tedos Simpang 2 Bh 5.828,00
Tedos Simpang 3 Bh 5.828,00
Mangkok Stop Kontak Bh 5.828,00
Mangkok Stop Kontak Panasonic Bh 30.303,00
Photocell SELCON Sensor Cahaya 3A Buah 166.650,00
Bundel/Tap 1 Baut Kedap Air Buah 9.630,50
Connector/Konektor Listrik
Terminal Kabel Bahan Plastik Buah 24.000,00

Panyabungan,..............................

Diketahui oleh Dibuat


PT/CV……………………… PT/CV…………………………
….

……………………………… …………………………………….
………………………………. …………………………………….
TIME SCHEDULE

PROGRAM : PENYELENGGARAAN LALU LINTAS DAN ANGKUTAN JALAN (LLAJ)


KEGIATAN : PENYEDIAAN PERLENGKAPAN JALAN DI JALAN KABUPATEN/KOTA
SUB KEGIATAN : PENYEDIAAN PERLENGKAPAN JALAN DI JALAN KABUPATEN/KOTA
: (Pengadaan dan Pemasangan Lampu Penerangan Jalan Umum (LPJU) Konvensional di Simpang STAIM - Paranginan II Lintas Timur Panyabungan)
LOKASI KEGIATAN : KABUPATEN MANDAILING NATAL
SUMBER DANA : APBD
TAHUN ANGGARAN : 2023

MASA KERJA MASA


BOBOT
NO URAIAN PEKERJAAN BULAN I BULAN II BULAN IiI PEMELIHARAAN KET
(%) I II III IV I II III IV I II III IV 1 2 3 4 5 6

A. PEKERJAAN PENDAHULUAN
1 Pembongkaran dan Pembersihan PJU 0,498 0,166 0,166 0,166
2 Biaya Photo Dokumentasi 0,156 0,052 0,052 0,052

B. PENGADAAN DAN PEMASANGAN


LPJU KONVENSIONAL
PENGADAAN BAHAN
1 Lampu Jalan 58,284 19,428 19,428 19,428
Philips BRP131 LED 100 NW 100W
220-240V DM GM
2 Terminal Kabel 0,373 0,124 0,124 0,124

II PEMASANGAN
1 Instalasi Listrik 3,734 1,245 1,245 1,245
2 Fhotocell 2,074 0,691 0,691 0,691
3 Kabel NYM 2x2.5 mm 2,351 0,784 0,784 0,784
4 Bundel 0,120 0,040 0,040 0,040
5 Tiang Lampu PJU 21,084 7,028 7,028 7,028
6 Klem Tiang Lampu Jalan 0,420 0,140 0,140 0,140
Lengan Lampu PJU 0,996 0,332 0,332 0,332

JUMLAH 90,090 0,218 19,552 10,260 - 0,218 19,552 10,260 - 0,218 19,552 10,260 -
PPN 11% 9,910 0,024 2,151 1,129 - 0,024 2,151 1,129 - 0,024 2,151 1,129 -
JUMLAH TOTAL 100,00 0,24 21,70 11,39 - 0,24 21,70 11,39 - 0,24 21,70 11,39 -

TARGET RENCANA 0,24 21,70 11,39 - 0,24 21,70 11,39 - 0,24 21,70 11,39 -
RENCANA 0,24 21,94 33,33 33,33 33,58 55,28 66,67 66,67 66,91 88,61 100,00 100,00
RENCANA KOMULATIF

Panyabungan,..............................

Diketahui oleh Dibuat


PT/CV……………………… PT/CV…………………………….

……………………………… …………………………………….
………………………………. …………………………………….

Anda mungkin juga menyukai