persiapan 1 Banner Digital Printing 1 x 1 m Rp 84.000 m² 2 listrik kerja pakai ( kwh listrik eksisting) Rp 1.467 VA Bahan 1 Kayu kaso Rp 3.500.000 m³ 2 Triplek 4 mm Rp 78.000 lbr 3 Paku biasa 2"-5" Rp 13.800 kg 4 Kaso 5/7 cm Rp 2.500.000 m³ 5 Papan 3/20 Rp 4.500.000 m³ 6 Paku 5 cm dan 7 cm Rp 17.000 kg 7 Sirtu Rp 200.000 m³ 8 BBM non Subsidi Rp 10.000 L 4 Ready mix K-100 Rp 1.110.000 m³ 5 Ready mix K-225 Rp 1.170.000 m³ 6 U Ditch 30x30x120 Rp 358.500 m1 3 Cover U Ditch 30x60 Rp 120.500 m1 4 U Ditch 40x40x120 Rp 518.500 m¹ 5 Cover U Ditch 40x60 Rp 150.500 m¹ 6 Box Culvert 40x40x100 Rp 970.000 m¹ 7 U Ditch 60x60x120 Rp 841.500 m¹ 8 Cover U Ditch 60x60 Rp 260.500 m¹ 9 Box Culvert 60x60x100 Rp 1.680.750 m¹ 10 Semen Rp 1.500 kg 11 Aspal Rp 14.500 kg 12 Lolos screen ukuran (0-5) Rp 285.000 m³ 13 Agr 5-10 & 10-15 Rp 275.000 m³ 14 Tack Coat Rp 27.800 kg 15 Pasir halus Rp 273.254 m³ Alat 1 Crane on Truck Rp 438.888 jam 2 Flat Blad Truck Rp 291.828 jam 3 Jack Hammer + Operator Rp 400.000 jam 4 gerobak Rp 12.500 Jam 5 Tandem Roller Rp 333.601 jam 6 Dump Truck Rp 255.013 jam 7 Genset Rp 541.667 jam 8 P. Tyre Roller Rp 333.601 jam 9 Asphalt Finisher Rp 459.173 jam 10 AMP Rp 5.409.069 jam 11 Mobil Engkel Rp 3.400.000 jam 12 Mobil Pickup Rp 850.000 jam