Anda di halaman 1dari 21

DAFTAR BELANJA BANGUNAN REHAB RUMAH

No Tanggal Nama barang Jumlah Satuan Jml Harga


1 23-Oct-22 Cakar ayam 11 bh 100,000 1,100,000
2 Paint Remover 1 Klg 50,000 50,000
3 25-Oct-22 Besi behel 10 Full 42 Btg 80,000 3,360,000
4 Ring behel 8x12cm 350 Bh 1,400 490,000
5 Kawat bendrat 5 Kg 20,000 100,000
6 27-Oct-22 Ring behl 10x20cm 20 Bh 2,200 44,000
7 Pasir Ps Rangkas 2 Kjg 240,000 480,000
8 Batu split 2 Kjg 240,000 480,000
9 Triplek 8mm 5 Lbr 90,000 450,000
10 Semen Tiga roda 8 Zak 72,000 576,000
11 Paku 5 n 7 2 Kg 20,000 40,000
12 31-Oct-22 Hebel 10cm 2 M3 600,000 1,200,000
13 MU 380 2 Zak 127,000 254,000
14 31-Oct-22 Pasir Ps Rangkas 1 Kjg 240,000 240,000
15 Semen Tiga roda 5 Zak 72,000 360,000
16 Pipa 3" D 1 Btg 110,000 110,000
17 01-Nov-22 Hebel 10cm 1 M3 580,000 580,000
18 MU 380 1 Zak 115,000 115,000
19 Hebel 10cm 1 M3 600,000 600,000
20 MU 380 1 Zak 127,000 127,000
21 Kusen pintu & jendela 1 Pkt 19,000,000 19,000,000
22 Ongkos kerja thp-1 1 Pkt 10,000,000 10,000,000
23 02-Nov-22 Batu split 1 Kjg 260,000 260,000
24 Semen Tiga roda 4 Zak 72,000 288,000
25 Paku 5 n 7 4 Kg 20,000 80,000
26 Ember cor 4 Zak 72,000 288,000
27 Besi behel 10 Full 25 Btg 80,000 2,000,000
28 Ring behel 8x12cm 250 Bh 2,000 500,000
29 Kawat bendrat 5 Kg 20,000 100,000
30 Ongkos kerja thp-2 1 Pkt 10,000,000 10,000,000
31 Besi behel 10 Full 10 Btg 80,000 800,000
32 Besi behel 8 Full 1 Btg 80,000 80,000
33 Ring behel 8x12cm 50 Bh 2,000 100,000
34 05-Nov-22 Pasir Ps Rangkas 2 Kjg 240,000 480,000
35 Semen Tiga roda 10 Zak 72,000 720,000
Jumlah dipindahkan 55,452,000
No Tanggal Nama barang Jumlah Satuan Jml Harga
Jumlah pindahan 55,452,000
36 05-Nov-22 Batu split 1 Kjg 240,000 240,000
37 Besi behel 8" 3 Btg 45,000 135,000
38 Besi behel 6" 3 Btg 33,000 99,000
39 07-Nov-22 Bondex 6mx9 lbr 54 M 137,000 7,398,000
40 Bondex 4mx4 lbr 16 M 137,000 2,192,000
41 Weremes 8 9 lbr 518,000 4,662,000
42 Besi behel 10" 10 Btg 80,000 800,000
43 Kawat bendrat 4 Kg 20,000 80,000
44 WD 4" 10 Bh 5,000 50,000
45 08-Nov-22 Pengki 3 Bh 20,000 60,000
46 Benang 3 Bh 5,000 15,000
47 Pasir Rankas 2 Enkl 670,000 1,340,000
48 Batu split 1 Enkl 670,000 670,000
49 Semen tiga roba 50 Zak 72,000 3,600,000
50 09-Nov-22 Batu split 1 Enkl 670,000 670,000
51 10-Nov-22 Besi behel 10" 10 Btg 80,000 800,000
52 Ring 8x12 100 Bh 1,400 140,000
53 Ongkos kerja thp-3 1 Pkt 10,000,000 10,000,000
54 11-Nov-22 Ember 8 Bh 12,000 96,000
55 Paku 5/7 cm 2 Kg 18,000 36,000
56 Sewa Molen 1 Hr 400,000 400,000
57 13-Nov-22 Hebel 2 M3 600,000 1,200,000
58 Pasir Rankas 1 Kjg 270,000 270,000
59 Semen tiga roba 2 Zak 72,000 144,000
60 MU 380 1 Zak 127,000 127,000
61 14-Nov-22 Besi behel 10" 20 Btg 80,000 1,600,000
62 Kawat bendrat 2 Kg 20,000 40,000
63 Pasir Rankas 1 Kjg 240,000 240,000
64 Semen tiga roba 2 Zak 72,000 144,000
65 Paku 7cm 2 Kg 18,000 36,000
66 Triplek 9mm 4 Lbr 125,000 500,000
67 Pipa 3" 2 Btg 110,000 220,000
68 Lem paralon 1 Tb 10,000 10,000
69 15-Nov-22 Pasir Cor 1 Kjg 280,000 280,000
70 Semen tiga roba 6 Zak 72,000 432,000
71 16-Nov-22 MU 380 2 Zak 127,000 254,000
72 Hebel 10cm 2 M3 600,000 1,200,000
Jumlah dipindahkan 95,632,000

No Tanggal Nama barang Jumlah Satuan Jml Harga


Jumlah pindahan 95,632,000
73 16-Nov-22 Pasir Rangkas 2 Kjg 240,000 480,000
74 Semen tiga roba 8 Zak 72,000 576,000
75 17-Nov-22 Ring 8x15 100 Bh 1,600 160,000
76 Ring 8x12 100 Bh 1,400 140,000
77 Kawat bendrat 2 Kg 20,000 40,000
78 Besi behel 10" 10 Btg 80,000 800,000
79 Pasir Rangkas 1 Kjg 240,000 240,000
80 Batu Split 1 Kjg 240,000 240,000
81 Semen tiga roda 5 Zak 72,000 360,000
82 18-Nov-22 Hebel 10cm 1 M3 600,000 600,000
83 Kawat bendrat 2 Kg 20,000 40,000
84 Besi hebel 10" 10 Btg 80,000 800,000
85 Ring 8x15 50 Bh 1,600 80,000
86 19-Nov-22 Ongkos kerja thp-4 1 Pkt 10,000,000 10,000,000
87 20-Nov-22 Paku 7cm 1.5 Kg 20,000 30,000
88 Kawat bendrat 1 Kg 24,000 24,000
89 Ring 8x15 25 Bh 1,400 35,000
90 22-Nov-22 Semen 3 roda 10 Zak 72,000 720,000
91 Pasir cor hitam 1 Kol 280,000 280,000
92 Batu split 1 Kol 280,000 280,000
93 Besi behel 10" full 6 Btg 78,000 468,000
94 Paku 5cm 0.5 Kg 20,000 10,000
95 Glass block 4 Bh 26,000 104,000
96 23-Nov-22 Bondex 6mx4 lbr 24 M 137,000 3,288,000
97 Bondex 4mx2 lbr 8M 137,000 1,096,000
98 Weremes 8 3 lbr 515,000 1,545,000
99 Besi behel 10" 10 Btg 80,000 800,000
100 Besi behel 6" 4 Btg 30,000 120,000
101 Kawat bendrat 2 Kg 20,000 40,000
102 Pasir bangka 1 Kol 350,000 350,000
103 Pipa listrik 5 Btg 10,000 50,000
104 Semen 3 roda 2 Zak 72,000 144,000
105 24-Nov-22 Pembuatan jendela 1 Pkt 12,000,000 12,000,000
106 Ring 8x12 1 Ikat 105,000 105,000
107 Paku 7cm 2 Kg 18,000 36,000
108 Pasir bangka 2 Kol 360,000 720,000
109 Semen 3 roda 5 Zak 72,000 360,000
Jumlah dipindahkan 132,793,000

No Tanggal Nama barang Jumlah Satuan Jml Harga


Jumlah pindahan 132,793,000
110 27-Nov-22 Ongkos kerja thp-5 1 Pkt 10,000,000 10,000,000
111 28-Nov-22 Pasir bangka 1 Engkl 950,000 950,000
112 Batu split 1 Kol 260,000 260,000
113 Semen 3 roda 25 Zak 72,000 1,800,000
114 Besi behel 10 full 6 Btg 78,000 468,000
115 Kawat bendrat 2 Kg 24,000 48,000
116 Paku 5cm 1 Kg 20,000 20,000
117 29-Nov-22 Batu split 0.5 Kol 260,000 130,000
118 25-Nov-22 Pasir bangka 1 Kol 350,000 350,000
119 Semen 3 roda 5 Zak 72,000 360,000
120 20-Nov-22 Hebel 10cm 1 M3 600,000 600,000
121 MU 1 Zak 127,000 127,000
122 30-Nov-22 Hebel 10cm 1 M3 600,000 600,000
123 MU 1 Zak 127,000 127,000
124 Pipa 3" D 2 Btg 115,000 230,000
125 T 3" 3 Bh 20,000 60,000
126 Keni 3" 3 Bh 15,000 45,000
127 Kawat ayam 1 Roll 65,000 65,000
128 Lem PVC 1 Klg 65,000 65,000
129 Pipa 1/5" 6 Btg 28,000 168,000
130 Keni 1/2" 6 Bh 4,000 24,000
131 T 1/5" 3 Bh 5,000 15,000
132 Dos listrik 10 Bh 5,000 50,000
133 Selotip listrik 2 Bh 11,000 22,000
134 01-Dec-22 Hebel 10cm 1 M3 600,000 600,000
135 MU 1 Zak 127,000 127,000
136 02-Dec-22 Ongkos kerja thp-6 1 Pkt 10,000,000 10,000,000
137 Paku 10cm 2 Kg 20,000 40,000
138 Paku 5Cm 1 Kg 20,000 20,000
139 Batu split 0.5 Kol 260,000 130,000
140 03-Dec-22 Semen 3 roda 5 Zak 72,000 360,000
141 Milk 2 Krg 20,000 40,000
142 04-Dec-22 Pasir bangka 2 Kol 350,000 700,000
143 Semen 3 roda 10 Zak 72,000 720,000
144 Milk 1 Krg 20,000 20,000
145 Hebel 10cm 1 M3 600,000 600,000
146 MU 1 Zak 127,000 127,000
Jumlah dipindahkan 162,861,000

No Tanggal Nama barang Jumlah Satuan Jml Harga


Jumlah pindahan 162,861,000
147 T-Dus 10 Bh 4,000 40,000
148 Box MCB 2 Bh 20,000 40,000
149 05-Dec-22 Pasir bangka 1 Kol 350,000 350,000
150 Semen 3 roda 5 Zak 72,000 360,000
151 06-Dec-22 Milk 6 Zak 20,000 120,000
152 T 4" 2 Bh 50,000 100,000
153 Ploksok 4-3" 2 Bh 25,000 50,000
154 Keni drat kng 0,5" 2 Bh 15,000 30,000
155 Besi behel 10 Full 10 Btg 80,000 800,000
156 Kawat bendrat 2 Kg 24,000 48,000
157 08-Dec-22 Pasir bangka 1 Kol 350,000 350,000
158 Semen 3 roda 10 Zak 72,000 720,000
159 Paku 7cm 2 Kg 20,000 40,000
160 Paku 5cm 1 Kg 20,000 20,000
161 10-Dec-22 Milk 6 Zak 20,000 120,000
162 Ongkos kerja thp-7 1 Pkt 10,000,000 10,000,000
163 12-Dec-22 Bondek 5M 4 lbr 20 M 130,000 2,600,000
164 Bondek 4M 1 lbr 4M 130,000 520,000
165 Kawat bendrat 3 Kg 20,000 60,000
166 13-Dec-22 Semen 3 roda 5 Zak 72,000 360,000
167 Milk 6 Zak 20,000 120,000
168 14-Dec-22 Pasir bangka 1 Kol 350,000 350,000
169 Batu split 1 Kol 260,000 260,000
170 Semen 3 roda 10 Zak 72,000 720,000
171 15-Dec-22 Pasir bangka 1 Kol 350,000 350,000
172 Semen 3 roda 4 Zak 72,000 288,000
173 16-Dec-22 Kabel 3x1,5 1 Roll 460,000 460,000
174 Kabel 2x2,5 1 Roll 650,000 650,000
175 Gypsum Jaya 30 Lbr 75,000 2,250,000
176 Hollo 2x4 40 Btg 18,000 720,000
177 Hollo 4x4 50 Btg 23,000 1,150,000
178 Scrup gypsum 3 Dus 98,000 294,000
179 Kasa gypsum 2 Roll 7,000 14,000
180 Paku beton 4cm 1 Dus 46,000 46,000
181 Embodus listrik 10 Bh 5,000 50,000
182 Klem kabel 4 Dus 12,500 50,000
183 Kompon 2 Zak 65,000 130,000
Jumlah dipindahkan 187,491,000

No Tanggal Nama barang Jumlah Satuan Jml Harga


Jumlah pindahan 187,491,000
184 16-Dec-22 Paku beton 4cm 1 Dus 46,000 46,000
185 Ongkos kerja thp-8 1 Pkt 10,000,000 10,000,000
186 17-Dec-22 Pasir bangka 1 Kol 350,000 350,000
187 Semen 3 roda 5 Zak 72,000 360,000
188 Pipa listrik 6 Btg 15,000 90,000
189 Biaya ngebor sumur 1 Pkt 12,300,000 12,300,000
190 19-Dec-22 Hollo 2x4 40 Btg 18,000 720,000
191 Hollo 4x4 50 Btg 23,000 1,150,000
192 20-Dec-22 Gypsum Jaya 15 Lbr 75,000 1,125,000
193 Sekrup Gypsum 2 Dus 100,000 200,000
194 22-Dec-22 Pasir Rangkas 1 Kol 230,000 230,000
195 Semen 3 roda 10 Zak 72,000 720,000
196 pipa paralon 3" 3 Btg 115,000 345,000
197 Keni 3" 1 Bh 22,000 22,000
198 Pipa 1/2" 5 Bh 28,000 140,000
199 Keni i/2" 4 Bh 4,000 16,000
200 T 1/2" 4 Bh 4,000 16,000
201 Angkut puing 50 Kol 100,000 5,000,000
202 Pasir bangka rangkas 1 Kol 290,000 290,000
203 23-Dec-22 Lis S 10 cm 110 Btg 14,000 1,540,000
204 Lis Sidding nat 40 Btg 10,000 400,000
205 T 4" 1 Bh 50,000 50,000
206 T 3" 1 Bh 35,000 35,000
207 Keni 3" 1 Bh 22,000 22,000
208 Pipa 1" 2 Bh 50,000 100,000
209 Keni 1" 2 Bh 14,000 28,000
210 T 1" 1 Bh 8,000 8,000
211 Tutup Septiteng 1 Bh 25,000 25,000
212 Plak sok 3/4" 1 Bh 5,000 5,000
213 24-Dec-22 Kompon 2 Sak 65,000 130,000
214 Mill 2 Sak 20,000 40,000
215 Mata gergaji besi 2 Bh 15,000 30,000
216 26-Dec-22 Pasir bangka rangkas 1 Kol 290,000 290,000
217 Semen 3 roda 5 Zak 72,000 360,000
218 Pipa, keni, dll 1 Pkt 100,000 100,000
219 Kabel 2x2.5 15 M 14,000 210,000
220 Kabel 2x1.5 1 Roll 460,000 460,000
Jumlah dipindahkan 224,444,000

No Tanggal Nama barang Jumlah Satuan Jml Harga


Jumlah pindahan 224,444,000
221 Sellotipe 2 Bh 5,000 10,000
222 Kran 2 Bh 50,000 100,000
223 Kran SKI 1 Bh 55,000 55,000
224 Keni DD 1/2 K 2 Bh 15,000 30,000
225 28-Dec-22 Lis beton kecil 17 Bh 15,000 255,000
226 Lis beton besar 5 Bh 20,000 100,000
227 28-Dec-22 Kompon 2 Zak 65,000 130,000
228 Semen pth,lem fox, dll 1 Pkt 395,000 395,000
229 Hebel 1 M3 600,000 600,000
230 MU 1 Zak 127,000 127,000
231 29-Dec-22 Sekrup Gypusm 1 Dus 65,000 65,000
232 Paku beton 4cm 2 Dus 45,000 90,000
233 Sekrup Gypusm 7cm 4 Ktg 5,000 20,000
75 234 30-Dec-22 Gypsum Jayaborad 10 Lbr 75,000 750,000
235 Holo 4x4cm 20 Btg 22,000 440,000
236 Sekrup gymsum 1 Dus 65,000 65,000
237 Loster ceton L-4 40 Bh 20,000 800,000
238 Pasir bangka 1 Kol 350,000 350,000
239 Semen 3 roda 2 Zak 72,000 144,000
240 31-Dec-22 Ongkos kerja thp-9 1 Pkt 10,000,000 10,000,000
241 02-Jan-23 Loster beton 12 Bh 20,000 240,000
242 Mangkok listrik 9 Bh 5,000 45,000
243 Kassa gypsum 1 Bh 7,000 7,000
244 Sekrup gypsum 0.5 Dus 65,000 32,500
245 Stop kontak 9 Bh 25,000 225,000
246 Stop kontak AC 4 Bh 90,000 360,000
247 04-Jan-23 Gypsum Jaya 9 Lbr 75,000 675,000
248 Holo 4x4cm 20 Btg 23,000 460,000
249 Holo 2x4 15 Btg 18,000 270,000
250 Skrup gypsum 2 Dus 65,000 130,000
251 Kompon 1 Sak 65,000 65,000
252 Mill 2 Sak 20,000 40,000
253 05-Jan-23 Cat Mitrolit 2 Pel 630,000 1,260,000
254 Roll cat 1 Bh 38,000 38,000
255 Kuas 3" 1 Bh 17,000 17,000
256 Kuas 2,5" 1 Bh 15,000 15,000
257 Paku 7cm 1 Kg 20,000 20,000
Jumlah dipindahkan 242,869,500

No Tanggal Nama barang Jumlah Satuan Jml Harga


Jumlah pindahan 242,869,500
258 Lis gypsum S 10cm 40 Btg 14,000 560,000
259 Kap lampu gypsum bsr 3 Bh 100,000 300,000
260 Kap lampu gypsum kcl 3 Bh 50,000 150,000
261 06-Feb-23 Lis semen sedang 10 Bh 15,000 150,000
262 Lis semen besar 13 Bh 20,000 260,000
263 Lis semen kecil 40 Bh 10,000 400,000
264 10-Jan-23 Pasir pasang 1 Kol 230,000 230,000
265 Semen 3 roda 5 Zak 72,000 360,000
266 Cat tembok dalam 1 Pail 2,174,000 2,174,000
267 Cat dasar tembok 2 Galon 138,500 277,000
268 Cat metalik Homedeco 1 Klg 221,800 221,800
269 Downliht 3" 4 Bh 26,500 106,000
270 10-Jan-23 Pasir pasang 1 Kol 230,000 230,000
271 Semen 3 roda 15 Zak 72,000 1,080,000
272 Cat tembok dalam 3 Gln 160,000 480,000
273 Amplas 4M 10,000 40,000
274 13-Jan-23 Pasir pasang 2 Engkl 680,000 1,360,000
275 14-Jan-23 Ongkos kerja thp-10 1 Pkt 10,000,000 10,000,000
276 15-Jan-23 Cat Vinilex 1 Gln 160,000 160,000
277 Aplas 150 4M 10,000 40,000
278 Pasir pasang 1 Kol 230,000 230,000
279 Semen 3 roda 10 Zak 72,000 720,000
280 21-Jan-23 Semen 3 roda 5 Zak 72,000 360,000
281 Semen putih 5 Kg 5,000 25,000
282 Lem Fox 4 Bks 22,000 88,000
283 23-Jan-23 Semen 3 roda 2 Zak 72,000 144,000
284 Semen putih 10 Kg 5,000 50,000
285 Lem Fox 5 Bks 22,000 110,000
286 25-Jan-23 Seller 5400 1 Gln 150,000 150,000
287 Sika Top 20 kg 1 Set 360,000 360,000
288 Pasir pasang 1 Kol 230,000 230,000
289 Semen 3 roda 5 Zak 72,000 360,000
290 Lampu LED Philips 10w 2 bh 54,000 108,000
291 Lampu LED Philips 8w 4 Bh 49,000 196,000
292 Lampu LED Philips 6w 8 Bh 44,000 352,000
293 26-Jan-23 Keramik Tiang Urbano br 9 Dus 78,000 702,000
294 Keramik tangga 10 Dus 93,000 930,000
Jumlah dipindahkan 266,563,300

No Tanggal Nama barang Jumlah Satuan Jml Harga


Jumlah pindahan 266,563,300
295 26-Jan-23 Keramik tangga 72 Kpg 17,000 1,224,000
296 Keramik balkon lt 2 25 Dus 66,000 1,650,000
297 Keramik blk kolam 10 Dus 78,000 780,000
298 Keramik meja dapur 3 Dus 266,400 799,200
299 Keramik dinding dapur 7 Dus 79,000 553,000
300 Pasir pasang 1 Kol 230,000 230,000
301 Semen 3 roda 5 Zak 72,000 360,000
302 Sika Top 20 kg 1 Set 360,000 360,000
303 Sika, Kompon, dll 1 Pkt 828,000 828,000
304 27-Jan-23 Pasir pasang 1 Kol 230,000 230,000
305 Semen 3 roda 5 Zak 72,000 360,000
306 Cat tembok dalam 1 Pail 2,174,000 2,174,000
307 Cat dasar tembok 2 Galon 138,500 277,000
308 Broco fiting plafon 2 Klg 31,000 62,000
309 Downliht 3" 4 Bh 26,500 106,000
310 Ongkos kerja thp-11 1 Pkt 10,000,000 10,000,000
311 30-Jan-23 Pasir pasang 1 Kol 230,000 230,000
312 Semen 3 roda 5 Zak 72,000 360,000
313 31-Jan-23 Impra kamper 4 Klg 55,000 220,000
314 Tinner Impala 4 Klg 37,000 148,000
315 Amplas 2M 10,000 20,000
316 Kuwas 1 Bh 10,000 10,000
317 Semen putih 10 Kg 10,000 100,000
318 01-Feb-23 Stepnosing tangga htm 5 Kpg 30,000 150,000
319 Athena 30/30 cream 1 Dus 93,000 93,000
320 Platinum 30/60 cream 4 Dus 79,000 316,000
321 Athena 30/30 cream 8 Kpg 17,000 136,000
322 02-Feb-23 Pasir pasang 1 Kol 230,000 230,000
323 Semen 3 roda 10 Zak 72,000 720,000
324 Lis semen 22 Btg 20,000 440,000
325 Lis semen kecil 34 Btg 20,000 680,000
326 Korbel 6 Bh 75,000 450,000
327 Glous cotting AM 1 Klg 85,000 85,000
328 03-Feb-23 Ongkos kerja thp-12 1 Pkt 10,000,000 10,000,000
329 KIA White 40x40 4 Dus 68,000 272,000
330 Floordrain VNA Garis 2 Bh 245,000 490,000
331 Pintu Crystal 1 Bh 875,000 875,000
Jumlah dipindahkan 302,581,500

No Tanggal Nama barang Jumlah Satuan Jml Harga


Jumlah pindahan 302,581,500
04-Feb-23 Mulia Urbano Beige 1 Dus 76,000 76,000
Floordrain 2 Bh 50,000 100,000
Downliht 4" 2 Bh 31,500 63,000
05-Feb-23 Pasir pasang 1 Kol 230,000 230,000
Semen 3 roda 5 Zak 72,000 360,000
Aqua proof 061 1 Pail 1,050,000 1,050,000
Gypsum Jayaboard 4 Lbr 75,000 300,000
07-Feb-23 Pasir pasang 1 Kol 230,000 230,000
Semen 3 roda 5 Zak 72,000 360,000
Aqua proof 061 2 Gln 220,000 440,000
Cat tembok dalam 1 Pail 2,174,000 2,174,000
Nippon Solareflect pth 2 Galon 427,000 854,000
Nippon Solareflect ckl 1 Galon 411,000 411,000
Mulia Ares Light Beige 4 Dus 44,000 176,000
Keramik garasi 22 Dus 72,000 1,584,000
Granit lantai Granito 167 M2 235,000 39,245,000
Pasir pasang 1 Kol 230,000 230,000
Semen 3 roda 10 Zak 72,000 720,000
Amplas 3M 10,000 30,000
Rall cat 1 Bh 38,000 38,000
Floordrain 2 Bh 135,000 270,000
Kran fleksibel 1 Bh 235,000 235,000
Politur 2 Kl 81,600 163,200
Glous politur 1 Kl 81,600 81,600
Kuas 2 Bh 15,000 30,000
11-Feb-23 Ongkos kerja thp-13 1 Pkt 10,000,000 10,000,000
13-Feb-23 Pagar, tangga, 1 Pkt 20,000,000 20,000,000
Keramik, cat, dll 1 Pkt 5,953,000 5,953,000
17-Feb-23 Ongkos kerja thp-14 1 Pkt 10,000,000 10,000,000
Kawat nyamuk, dll 1 Pkt 400,000 400,000
20-Feb-23 Ongkos kerja ke15-16 2 Pkt 10,000,000 20,000,000
Gambar & Pengawasan 1 Pkt 6,886,500 6,886,500
Kunci, engsel pintu/jen 1 Pkt 7,080,000 7,080,000
28-Jan-23 Hebel 40 Bh 8,000 320,000
Pasir pasang 4 Kol 230,000 920,000
Semen 3 roda 35 Zak 72,000 2,520,000
MU 5 Ktg 10,000 50,000
Loster 56 Bh 20,000 1,120,000
Paku 4 n 5 cm 1 Kg 20,000 20,000
Lampu, semen, dll 1 Paket 3,582,000 3,582,000
Wastavel dapur dll 1 Pkt 5,000,000 5,000,000
0
IMB Pkt 0

Jumlah dipindahkan 445,883,800


7128000
1,390,000,000 Tanah
500,000,000 Bangunan
445,883,800 Rehab
2,335,883,800 Harga Jual
DAFTAR BELANJA BANGUNAN REHAB RUMAH IFAN

NoTanggal
Nama barang Jumlah Satuan Jml Harga
1 Hebel 10cm 6 M3 600,000 3,600,000
2 MU 380 6 Zak 127,000 762,000
3 Besi behel 10 Full 10 Btg 80,000 800,000
4 Ring behel 8x12cm 100 Bh 1,400 140,000
5 Kawat bendrat 2 Kg 20,000 40,000
6 Pasir pasang 7 Kol 230,000 1,610,000
7 Pasir bangka 4 Kol 360,000 1,440,000
8 Batu split 0.5 Kol 240,000 120,000
9 Kaso 4x6 15 Btg 50,000 750,000
10 Reng 3x4 10 Btg 25,000 250,000
11 Triplek 9mm 3 Lbr 125,000 375,000
12 Semen Tiga roda 35 Zak 72,000 2,520,000
13 Milk 15 Zak 20,000 300,000
14 Paku 5 n 7 2 Kg 20,000 40,000
15 Holo 4x4 40 Btg 23,000 920,000
16 Holo 2x4 20 Btg 18,000 360,000
17 Gypsum Jaya board 30 Lbr 75,000 2,250,000
18 Kap lampu gypsum 3 Bh 75,000 225,000
19 Sekrup gypsum 3 Dus 65,000 195,000
20 Kompon 2 Sak 65,000 130,000
21 Hebel 7,5cm 0.5 M3 600,000 300,000
22 Besi 8" 8 Btg 60,000 480,000
23 Keramik meja dapur 60x60 2 Dus 240,000 480,000
24 Keramik dinding dpr 30x60 12 M2 80,000 960,000
25 Keramik cuci piring dapur 2 M2 80,000 160,000
26 Wastafel cuci piring dll 1 Pkt 3,000,000 3,000,000
27 Keramik dinding 2 km mandi 20 M2 80,000 1,600,000
28 Keramik 2 kmr mandi 6 M2 80,000 480,000
29 Kloset duduk, kran, dll 2 Pkt 5,000,000 10,000,000
30 Kabel 3x1,5 2 Roll 460,000 920,000
31 Kabel 2x2,5 1 Roll 650,000 650,000
32 Cat tembok 1.5 Pail 2,137,000 3,205,500
33 Kunci pintu 2 Bh 250,000 500,000
34 Pintu kamar mandi 1 Bh 875,000 875,000
35 Engsel pintu, slot jendela dll 1 Pkt 750,000 750,000
Jumlah dipindahkan 41,187,500

NoTanggal Nama barang Jumlah Satuan Jml Harga


Jumlah pindahan 41,187,500
36 Keramik lantai 80 M2 120,000 9,600,000
37 Kusen dan pintu kamar 1 Set 1,750,000 1,750,000
38 Aqua proff 1 Pail 1,050,000 1,050,000
39 Ngebor Sumur 1 Paket 12,000,000 12,000,000
40 Pelitur 2 Klg 75,000 150,000
41 Paralon, lem, amplas, dll 1 Paket 4,157,000 4,157,000
42 Downligt 3" n 4" 10 Bh 40,000 400,000
43 Pompa Air Jet Pump 1 Bh 3,000,000 3,000,000
44 Batu Andesit 15 M2 125,000 1,875,000
45 Lis beton 30 bh 20,000 600,000
46 Jendela kamar 2 bh 1,512,000 3,024,000
47 0
48 0
49 0
50 0
Jumlah 78,793,500
0

440,000,000
160,000,000

Anda mungkin juga menyukai