Anda di halaman 1dari 9

Rekap Kas Anto Project Tahti & Ditlantas

Tanggal Pembelian Uang Keluar Uang Masuk Saldo


kas masuk 50,000 29,000
bendrat 21,000 8,000
27-Jul-22
paku 10 cm (1/2 kg) 10,000 -2,000
catut 30,000 -32,000
kas masuk 200,000 168,000
28-Jul-22
makan siang pelaksana 17,000 151,000
pertalite pelaksana 20,000 131,000
29-Jul-22 paku 10 cm (1 kg) 20,000 111,000
makan siang pelaksana 16,000 95,000
sisa kas tahti pidah ke kabluk 673,900 768,900
makan siang pelaksana 17,000 751,900
4-Aug-22 hollo 2x4 (20 batang ) 400,000 351,900
kiriman matrial 10,000 341,900
isi ulang galon minum tukang 10,000 331,900
bayar angkutan scafolding 100,000 231,900
kabel 1.5x2 panjang 4 meter 48,000 183,900
5-Aug-22
pertalite pelaksana 10,000 173,900
solasi elektrik ( hitam ) besar 13,000 160,900
skrup gypsum 1 dus 45,000 115,900
6-Aug-22 fiting lampu 2 buah 19,000 96,900
makan siang pelaksana 17,000 79,900
bensin pertalite pelaksana 20,000 59,900
8-Aug-22
makan siang 17,000 42,900
9-Aug-22 makan siang 17,000 25,900
kas masuk 1,000,000 1,025,900
lampu 15 watt 20,000 1,005,900
10-Aug-22 tembelan asbes (flasban) 2 meter 24,000 981,900
bensin pertalite pelaksana 20,000 961,900
isi ulang galon minum tukang 10,000 951,900
makan siang 12,000 939,900
11-Aug-22
bengkel motor pelaksana 150,000 789,900
makan siang pelaksana 17,000 772,900
hollo 2x4 (5 batang ) 100,000 672,900
12-Aug-22 hollo 4x4 (7 batang ) 192,500 480,400
scrup gypsum 200 biji 25,000 455,400
kiriman matrial angkut 10,000 445,400
makan siang pelaksana 17,000 428,400
13-Aug-22
bensin pertalite pelaksana 20,000 408,400
skrup gypsum 1 dus 3 cm 37,000 371,400
skrup gypsum 1 dus 2 cm 37,000 334,400
3 lbr serat fiber 9,000 325,400
makan siang pelaksana 17,000 308,400
15-Aug-22
bendrat 1/4 kg 6,000 302,400
1 kg paku 10 cm 20,000 282,400
15-Aug-22

bendrat 1/2 kg 12,500 269,900


benang 1 gulung 4,000 265,900
paku 1 kg 10 cm 18,000 247,900
bendrat 1/2 kg 10,000 237,900
kawat gypsum 1kg 25,000 212,900
1 galon cat putih aries 43,500 169,400
16-Aug-22 1 driver bosch hitam 16,000 153,400
makan siang pelaksana 17,000 136,400
refill isi curter besar 10,000 126,400
isi ulang galon tukang + es teh 15,000 111,400
kas masuk 2,000,000 2,111,400
2 galon cat putih aries (sintamart) 110,000 2,001,400
kain perca 5,000 1,996,400
1 scrap 2" 10,000 1,986,400
roll kecil 15,000 1,971,400
kuas 3" 1 buah 14,000 1,957,400
scrup gypsum 200 biji 30,000 1,927,400
lampu 15 watt lap. Badminton 18,000 1,909,400
17-Aug-22
pel karet ngepel lap badminton 18,000 1,891,400
bensin pertalite pelaksana 20,000 1,871,400
makan siang pelaksana 15,000 1,856,400
bon mahmudi 100,000 1,756,400
bon toriq 100,000 1,656,400
bon solikin 200,000 1,456,400
bon endar 100,000 1,356,400
8 batang list plafon 80,000 1,276,400
hansaplas perban tukang 10,000 1,266,400
18-Aug-22 cat putih aries plafon 43,500 1,222,900
makan siang pelaksana 16,000 1,206,900
buang brangkal truk 300,000 906,900
cat coklat abc 68,000 838,900
updiner 15,000 823,900
bensin pertalite pelaksana 20,000 803,900
makan siang pelaksana 17,000 786,900
kas masuk 1,500,000 2,286,900
19-Aug-22
25 lembar listplang calsiboard 20cm x
1,000,000 1,286,900
3m
1/2 kg paku payung 20,000 1,266,900
1/4 paku calsiboard 12,500 1,254,400
ongkir matrial kirim 10,000 1,244,400
4 batang 4x6 kayu glugu 180,000 1,064,400

19 lembar kalsiboard 30cm x 3 m 500,000 564,400

1 dus paku calsiboard 27,500 536,900


20-Aug-22
1/2 paku 7 cm 10,000 526,900
ongkir matrial kirim+ nurunin barang 10,000 516,900
minum galon tukang 20,000 496,900
20-Aug-22

cat kayu coklat 3 kaleng (sintamart) 204,000 292,900


updiner 3 botol 45,000 247,900
2 cat abc coklat 136,000 111,900
updiner 1 botol 15,000 96,900
100 biji skrup 15,000 81,900
22-Aug-22
bensin pertalite pelaksana 20,000 61,900
makan siang pelaksana 17,000 44,900
scrup gypsum 1 dus 37,000 7,900
paku 1/4 kg 12,000 -4,100
updiner 2 botol 26,000 -30,100
kuas 2 buah 25,000 -55,100
makan siang 18,000 -73,100
23-Aug-22
kas masuk 1,000,000 926,900
bon mahmudi 100,000 826,900
bon toriq 100,000 726,900
bon mus 100,000 626,900
mata bor (-) buka crup asbes 15,000 611,900
paku payung 1/4 kg 13,000 598,900
lampu 15 watt 2 buah 36,000 562,900
isolasi besar 13,000 549,900
listplang 3 meter 30x3m 1buah 55,000 494,900
rofing 7 cm 20 buah 30,000 464,900
24-Aug-22 makan siang 2 pelaksana + ms iwan 32,000 432,900
galon minum tukang 20,000 412,900
semen 60,000 352,900
gosokan 10,000 342,900
kuas 3" 2 buah 30,000 312,900
bon solikin 100,000 212,900
bensin pertalite pelaksana 20,000 192,900
25-Aug-22 makan siang pelaksana 16,000 176,900
26-Aug-22 makan siang pelaksana 17,000 159,900
bensin pertalite 20,000 139,900
27-Aug-22
makan siang pelaksana 16,000 123,900
cat tembok oplosan cream 125,000 -1,100
2-Sep-22
bensin pertalite 20,000 -21,100
5-Sep-22 bensin pertalite 20,000 -41,100
8-Sep-22 bensin pertalite 20,000 -61,100
10-Sep-22 bensin pertalite 20,000 -81,100
13-Sep-22 makan siang 15,000 -96,100
ti & Ditlantas
Keterangan
di kantor logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
di kantor logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
tambahan kas dari sisa saldo tahti
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
transfer bca
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk listplang
project kabluk listplang
project kabluk listplang
project kabluk listplang
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
transfer bca
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk gudang logistik
project kabluk listplang
project kabluk listplang
project kabluk listplang
project kabluk listplang
transfer bca

project kabluk listplang

project kabluk listplang


project kabluk listplang
project kabluk listplang
project kabluk listplang

project kabluk listplang ( 16 lembar ukuran 20x3 ditukar


dengan 19 lembar ukuran 30x3) tambah 500.000

project kabluk listplang


project kabluk listplang
project kabluk listplang
project kabluk listplang ( kantor logistik dikunci)
project kabluk listplang
project kabluk listplang ( nota diserahkan di nakulo ms iwan) kirim senin
project kabluk listplang
project kabluk listplang
project kabluk listplang
project kabluk listplang
project kabluk listplang
project kabluk listplang
project kabluk listplang
project kabluk listplang
project kabluk listplang
project kabluk listplang
transfer bca
project kabluk listplang
project kabluk listplang
project kabluk listplang
project kabluk listplang
project kabluk listplang
project kabluk ( buat lampu lorong )
project kabluk ( buat lampu lorong )
project kabluk listplang
project kabluk listplang
project kabluk listplang
project kabluk listplang
project polda mas iwan titip (nota di ms iwan ilang)
project polda mas iwan titip (nota di ms iwan ilang)
project polda mas iwan titip (nota di ms iwan ilang)
project kabluk listplang
project kabluk listplang
Project perataan tanah
Project perataan tanah
Project perataan tanah
Project perataan tanah
pengecatan depan ruang KABAROLOG
pengecatan depan ruang KABAROLOG
survey plan rumdin aspol
survey plan rumdin aspol
logistik
perbaikan rumah jabatan karorena aspol kabluk
minggu ke tgl nominal jumlah liter total penggunaan
4 29-Jul-22 20,000 2.6 2.6
1 5-Aug-22 10,000 1.3 1.3
8-Aug-22 20,000 2.6
2 10-Aug-22 20,000 2.6 7.8
13-Aug-22 20,000 2.6
17-Aug-22 20,000 2.6
3 5.2
19-Aug-22 20,000 2.6
22-Aug-22 20,000 2.6
4 24-Aug-22 20,000 2.6 7.8
27-Aug-22 20,000 2.6
Tgl Keterangan
27-Jul-22 makan siang bareng mas iwan angkringan
28-Jul-22 makan siang sendiri
29-Jul-22 makan siang sendiri
4-Aug-22 makan siang sendiri
5-Aug-22 makan siang bareng mas iwan angkringan
6-Aug-22 makan siang sendiri
8-Aug-22 makan siang sendiri
9-Aug-22 makan siang sendiri
10-Aug-22 makan siang bareng mas iwan angkringan
11-Aug-22 makan siang sendiri
12-Aug-22 makan siang sendiri
13-Aug-22 makan siang sendiri
15-Aug-22 makan siang sendiri
16-Aug-22 makan siang sendiri
17-Aug-22 makan siang sendiri
18-Aug-22 makan siang sendiri
19-Aug-22 makan siang sendiri
20-Aug-22 makan siang bareng mas iwan angkringan
22-Aug-22 makan siang sendiri
23-Aug-22 makan siang sendiri
24-Aug-22 makan siang bareng mas iwan angkringan pake kas
25-Aug-22 makan siang sendiri
26-Aug-22 makan siang sendiri
27-Aug-22 makan siang sendiri
Tgl Jumlah Bon ket
27-Jul-22 1,000,000 diberikan lewat mas iwan di gedung aspol
17-Aug-22 1,000,000 transfer BCA
3-Sep-22 1,000,000 transfer BCA

Anda mungkin juga menyukai