Anda di halaman 1dari 3

Project Zulu Port, PT.MIC - PT.MIA, Kec.

Panjang, Bandar Lampung

NO ITEM PERIODE LALU


BEGESTING BESI COR C / LISH
92.04 7202.48 49.155 89.6
A Precast Area
1 Precast Fender LP 1 ( 4 Unit )
2 Precast Fender BD 1 ( 2 unit )
B Trestle Area
1 Join HS TR 5
2 Join HS TR 4
3 Join HS TR 3
4 Top Slab TR,5 s/d TR,3+2,4 mtr
C Loading Platform 1
1 Bongkar pasang lantai LP ,1
& penutup tiang pancang LP,1

D Tidak Ada Dikontrak


1 Pemasangan Anchor Fender

Disetujui Oleh Diketahui

Mr Siao Mr Asrin
Project manager Site Manager
ng

PERIODE SEKARANG TOTAL KESELURUHAN


Unit BEGESTING BESI COR C / LISH BEGESTING BESI
543.74 43,069

157.80 9,976.76 28.64 107.20


78.90 12.40 53.60

15.73 2,885.81 18.70


9.50 2,914.87 13.04
10.34 2,845.40 18.70
22.40 17,243.45

157.03

48.00

451.70 35,866.30 41.04 211.24

Di periksa

Dukha Prathama / Fuadi Asza


Engineering / QA.QC
TOTAL KESELURUHAN KETERANGAN
COR C / LISH
90.20 300.84

Bandar Lampung, 14 Februari 2022

Dibuat Oleh

Wahyuto
Pemborong

Anda mungkin juga menyukai