Electricity Consumption Consulting by Slidesgo
Electricity Consumption Consulting by Slidesgo
Pengampu Materi :
Ibu Ir. Rita Mindayani,M.Si
Penetapan Isu
Dalam menilai kualitas isu diatas digunakanlah metode teknik APKL
(Aktual, Problematik, Kekhalayakan,Kelayakan)
Aktual Kekhalayakan
Benar-benar terjadi dan sedang Isu yang menyangkut hajat hidup
hangat dibicarakan dalam orang banyak
masyarakat
Problematik Kelayakan
Memiliki dimensi masalah yang Isu yang masuk akal dan realistis
kompleks sehingga perlu dicari serta relevan untuk dimunculkan
solusinya inisiatif pemecahan masalahnya.
Identifikasi & Penetapan Isu
No Permasalahan Sumber Isu Kondisi Saat Ini Kondisi Yang di harapkan
1. Tidak terawatnya Manajemen dan Instalasi Listrik pada Dinas Melakukan rehabilitasi instalasi listrik
instalasi listrik pada stop Smart ASN Kependudukan Dan Pencatatan Sipil pada stop kontak di Dinas
kontak di Dinas sangat tidak layak. Kabel dan Stop Kependudukan dan Pencatatan Sipil
DUKCAPIL Kontak yang dipakai tidak sesuai sehingga di hasilkan kabel dan stop
dengan Standar Alat dan Bahan dan kontak yang sesuai dengan Standar
banyak yang sudah mengalami Alat dan Bahan, sehingga tidak akan
kerusakan dan bahkan sudah rusak mengalami kerusakan ataupun
dan terbakar. terbakar dalam penggunaanya.
2. Tidak tersedianya Mananjemen ASN Penggunaan Absensi manual Dengan adanya absensi dengan
perangkat Power dan Smart ASN mengakibatkan kurangnya kedisplinan perangkay elektronik, maka pegawai
Supply untuk printer pegawai Dinas Kependudukan Dan tidak dapat lagi merekaya absen
Cetak Pencatatan Sipil. Absen yang ditanda karena sudah terekam secara
tangani secara manual dapat otomatis secara elektronik. Dengan
direkayasa, sehingga pegawai bisa demikian, diharapkan kedisplina
dating terlambat dengan menitip absen pegawai semakin meningkat.
kepada teman sesame pegawai
3. Tidak Terawatnya Manajemen ASN dan Peralatan-peralatan pada Dinas Dengan adanya perawatan rutin alat,
peralatan- peralatan Smart ASN Dukcapil kerap mengalami kerusakan maka diharapkan alat-alat dapat
elektronik Pada Dinas akibat kurangnya perawatan dan terjaga dari kerusakan dan
DUKCAPIL displinan nya dalam penggunaanya, kedisplinan pemakaiannya dapat
alat digunakan secara semena dan terjaga, sehingga alat tetap dapat
tidak bertanggungjawab digunakan .
Berdasarkan hasil analisis di atas, isu yang
memenuhi syarat adalah “Tidak
terawatnya instalasi listrik pada stop
kontak di Dinas DUKCAPIL” dan “Tidak
tersedianya perangkat Power Supply
untuk printer Cetak”. Kedua isu tersebut
memenuhi syarat karena kelayakan
terpenuhi
Kedua isu yang valid ini kemudian di analisis lebih lanjut menggunakan
perangkat USG. Dalam menentukan prioritas masalah, saya menggunakan
analisis USG sebagai alat untuk mengetahui isu mana yang menjadi paling
prioritas dengan menggunakan kriteria Urgency (U), Seriousness (S), Growth (G),
atau yang biasa disebut identifikasi USG. Lebih jelasnya, kriteria USG dijelaslan
sebagai berikut :
Urgency Seriousness
Berarti seberapa mendesaknya Mengacu Pada penyelesaian
masalah tersebut untuk masalah dikaitkan dengan akibat,
diselesaikan berkaitan dengan bisa menimbulkan masalah baru
dimensi waktu
Growth
Berkaitan dengan kemungkinan
berkembang memburuknya kalau
tidak di selesaikan.
Hasil Identifikasi isu menggunakan Teknik USG
No. Teknik
Isu yang teridentifikasi Keterangan
A P K L
2. Tidak tersedianya
perangkat Power Supply
untuk printer Cetak
Penetapan Isu
Berdasarkan tabel diatas, maka
penetapan isu prioritas dengan
menggunakan metode USG diatas,
diketahui bahwa isu “Tidak terawatnya
instalasi listrik pada stop kontak di
Dinas DUKCAPIL” memiliki jumlah nilai
tertinggi dari isu lainnya tersebut. Maka
dapat disimpulkan bahwa penulis
menetapkan isu “Tidak terawatnya
instalasi listrik pada stop kontak di
Dinas DUKCAPIL” sebagai isu prioritas
yang akan diselesaikan.
Akar penyebab masalah selanjutnya di diagnose menggunakan Fishbone Diagram, sehingga hasilnya
dirumuskan sebagai berikut :
MAN METHOD
Penggunaan daya
Kurangya perhatian listrik pada stop kontak
pegawai terhadap melebihi dari daya yang
instalasi stop kontak ada pada alat
yang sudah tidak layak
Kurangnya Penarikan daya dari satu stop
kontak untuk banyak stop
pengetahuan ASN
kontak menimbulkan panas
perihal standarisasi pada komponen bahan stop Tidak
alat dan bahan pada kontak Terawatnya
instalasi listrik
Instalasi Listrik
SEBAB pada Stop
Kontak di Dinas
Kabel yang digunakan Mesin-mesin yang DUKCAPIL
kabel yang tidak digunakan berdaya besar
sesuai dengan Daya dan tidak memiliki
listrik yang digunakan pengaman jika
mengalami short circuit.
MATERIAL MACHINE
Fishbone Diagram
Berdasarkan diagram fishbone dapat kita lihat beberapa penyebab isu bisa terjadi
diantaranya :
1. Kabel yang digunakan kabel yang tidak sesuai dengan Daya listrik yang
MATERIAL digunakan.
2. Kabel yang digunakan kabel yang tidak sesuai dengan Daya listrik yang
digunakan
1. Penarikan daya dari satu stop kontak untuk banyak stop kontak
METHODE menimbulkan panas pada komponen bahan stop kontak.
2. Penggunaan daya listrik pada stop kontak melebihi dari daya yang ada pada
alat
KEGIATAN
Gagasan Kreatif : Melakukan Rehabilitas
Instalasi Listrik Pada Stop Kontak Di
Dinas Kependudukan Dan Pencatatan
Sipil Kabupaten Nias Selatan
01
PROJECT &
STRATEGY
You can enter a subtitle here if you need it
STRATEGIC PROJECT PLANNING
STEPS 1 2 3 4 5 6 7 8 9 10 11 12
1 Kick-off
5 Strategic map
6 Balanced scorecard
8 First report
STRATEGIC MAP & SCORECARD
PERSPECTIVES STRATEGIC OBJECTIVES
LEARNING & L1-Insert your L2-Insert your L3-Insert your L4-Insert your
GROWTH own text own text own text own text
STRATEGIC OPTIONS: RISKS
MARKET
DIVERSIFICATION
DEVELOPMENT
New
Use a different
STRATEGY
MARKET
PENETRATION DEVELOPMENT
STRATEGY STRATEGY
Current New
PRODUCTS
IMPACT OF THE RISKS
EARTH MARS
10% Earth is the only Despite is red, Mars is
45%
planet with life actually very cold
NEPTUNE SATURN
20% Neptune is very far Saturn is a gas giant
25%
from Earth with several rings
Follow the link in the graph to modify its data and then paste the new one here. For more info, click here
CORPORATE STRATEGIES
DESCRIPTION EXAMPLE
Our company has been selling
Provide a neutral description with
its products in the US for 10
THE SITUATION facts that you know your
years, with an annual profit
audience will agree on
growth above 10%
DESIRABILITY
What is the potential demand
for our product in this market?
PROFITABILIT
Y FEASIBILITY
What will be the profitability of What is the feasibility to enter
this strategic initiative? this new market?
SWEET SPOT
STRATEGIC PERSPECTIVES
POLITICAL TECHNOLOGICAL
Replace the text with P T Replace the text with
your own here your own here
ECONOMICAL LEGAL
Replace the text with E PESTLE L Replace the text with
your own here your own here
SOCIAL ENVIRONMENTAL
Replace the text with S E Replace the text with
your own here your own here
STRONG BUSINESS CASE
PROJECT COSTS $4M TANGIBLE BENEFITS $14M NET PRESENT VALUE $8M
INC MODEL 2014 2015 2016 2017 2018 2019 2020 2021 2022
BALANCE SHEET
ASSETS
Cash xx xx xx xx xx xx xx xx xx
Accounts xx xx xx xx xx xx xx xx xx
Inventory xx xx xx xx xx xx xx xx xx
Current assets xx xx xx xx xx xx xx xx xx
Property xx xx xx xx xx xx xx xx xx
Goodwill xx xx xx xx xx xx xx xx xx
TOTAL xx xx xx xx xx xx xx xx xx
FINANCIAL MODEL
60%
40%
MARS SATURN
Despite is red, Mars is Saturn is a gas giant
actually very cold with several rings
Follow the link in the graph to modify its data and then paste the new one here. For more info, click here
PRICING STRATEGY
IMPACT EFFORT
An initiative with a high impact would The “effort” criteria is assessed based on
mean one of the following: the following concepts:
● They’re simple
● You can organize your ideas clearly
● You’ll never forget to buy milk!
PLAN
HERE
Hobby 3 XX%
Hobby 4 XX%
60%
40%
NAME: Joe Wilson
VENUS
Venus has a beautiful name and is the
AGE: XX years old
second planet from the Sun. It’s terribly
hot, even hotter than Mercury. It’s the
MERCURY
JOB: Engineer
second-brightest natural object in the Mercury is quite a
INCOME: $1.500-$1.800 small planet
night sky after the Moon
IMPLEMENT, TRACK & MANAGE
CHANGE COMPLEXITY
EXTREME
the change the change the change
Insert name of
MEDIUM
the change
MODERATE
LOW
1 team
1 business unit 1 division Half company Extreme
impacted
04
IMPLEMENTING
CHANGES
You can enter a subtitle here if you need it
SALES & STRATEGY PLAN
1 2 3
INTERNAL EXTERNAL
IMPLEMENTATION
ANALYSIS ANALYSIS
5 4
$500,000
Big numbers catch your audience’s attention
ABOUT THE TERMS OF THE
AGREEMENT
SATURN
Saturn is a gas giant
with several rings
MARS
Despite is red, Mars
is a very cold planet
Follow the link in the graph to modify its data and then paste the new one here. For more info, click here
$20,000 $15,000
Mars is actually a very cold place Venus has such a beautiful name
$10,000 $45,000
Mercury is a very small planet Saturn is a gas giant with several rings
MANAGEMENT APPROACH
FEBRUAR
JANUARY MARCH APRIL
Y
Saturn is a gas giant Neptune is very far
with several rings from the Sun
STRATEGIC ALLIANCES
OUR ALLIANCES
Despite being red, Mars is actually
a very cold place. It’s full of iron
oxide dust which gives the planet
its reddish cast
ANSWERS & ARGUMENTS
WRITE YOUR QUESTION
PHOTOS:
● Close up woman changing lightbulb
● Close up on sustainable light bulb alternatives
● Happy young man laughing
● Portrait of a beautiful woman engineer
● Man posing with helmet medium shot
VECTORS:
● Flat design energy reduce poster template
● Flat design energy reduce youtube cover template
Instructions for use
If you have a free account, in order to use this template, you must credit Slidesgo by keeping the Thanks slide. Please
refer to the next slide to read the instructions for premium users.
For more information about editing slides, please read our FAQs or visit our blog:
https://slidesgo.com/faqs and https://slidesgo.com/slidesgo-school
Instructions for use (premium users)
As a Premium user, you can use this template without attributing Slidesgo or keeping the Thanks slide.
For more information about editing slides, please read our FAQs or visit our blog:
https://slidesgo.com/faqs and https://slidesgo.com/slidesgo-school
Fonts & colors used
This presentation has been made using the following fonts:
Raleway
(https://fonts.google.com/specimen/Raleway)
Open Sans
(https://fonts.google.com/specimen/Open+Sans)
PHASE 1
Task 1
Task 2
PHASE 2
Task 1
Task 2
PHASE 1
Task 1
Task 2
...and our sets of editable icons
You can resize these icons without losing quality.
You can change the stroke and fill color; just select the icon and click on the paint bucket/pen.
In Google Slides, you can also use Flaticon’s extension, allowing you to customize and add even more icons.
Educational Icons Medical Icons
Business Icons Teamwork Icons
Help & Support Icons Avatar Icons
Creative Process Icons Performing Arts Icons
Nature Icons
SEO & Marketing Icons