Rekomendasi Program Infrastruktur PUPR Tahun 2022-2024 Di Provinsi Aceh Berdasarkan Evaluasi Tahunan 2020 Dan Evaluasi Jangka Menengah 2015-2019
SATKER / PROGRAM / KEGIATAN / KRO / RO / KOMPONEN / SUB
PROVINSI/KODE VOLUME HARGA SATUAN JUMLAH BIAYA
KOMPONEN / AKUN / DETIL
A. PROVINSI ACEH
08 Program Penyelenggaraan Jalan 471.994.243.000
2409.CBC.001.338.ID Pembangunan Jalan Menuju Makam Pahlawan Nasional Cut Mutia Kab. Aceh 4 KM 30.000.000.000
Utara (Pembangunan Jalan)
2409.CBC.002.328.FD PELEBARAN JALAN BIREUEN - TAKENGON (Pelebaran Jalan Menambah Lajur) 1.5 KM 28.651.000.000
2409.CBC.005.328.BF Pelebaran Jalan Menambah Lajur (Bts. Kota Lhokseumawe - Aceh Utara) 1.1 KM 23.876.238.000
2409.CDC.001.320.DC PRESERVASI JALAN BTS. KOTA LHOKSEUMAWE/ACEH UTARA - PEUREULAK 102,16 KM 5.929.780.000
2409.CDC.001.320.EC PRESERVASI JALAN PEUREULAK - BTS. PROV. SUMUT, JLN. KUALA LANGSA 103,76 KM 6.295.254.000
(LANGSA) (BTS. KOTA LANGSA - KUALA LANGSA)
2409.CDC.001.320.FC PRESERVASI JALAN KOTA BIREUEN - SP. UNING 95,96 KM 5.394.393.000
2409.CDC.001.329.AC PRESERVASI JALAN LAMBARO - BTS. KOTA SIGLI 2,7 KM 388.034.000
2409.CDC.001.329.BC PRESERVASI JALAN BTS. KOTA SIGLI - KOTA BIREUEN 0,4 KM 216.009.000
2409.CDC.001.329.CC PRESERVASI JALAN KOTA BIREUEN - BTS. KOTA LHOKSEUMAWE/ACEH 3.63 KM 613.325.000
UTARA, KRUENG MANE - BUKET RATA, SP. KRUENG GEUKEUEH - PEL.
KRUENG GEUKEUEH (PEL. LHOKSEUMAWE)
2409.CDC.001.329.DC PRESERVASI JALAN BTS. KOTA LHOKSEUMAWE/ACEH UTARA - PEUREULAK 2,9 KM 439.546.000
2409.CDC.001.329.EC PRESERVASI JALAN PEUREULAK - BTS. PROV. SUMUT, JLN. KUALA LANGSA 4,1 KM 637.699.000
(LANGSA) (BTS. KOTA LANGSA - KUALA LANGSA)
2409.CDC.001.329.FC PRESERVASI JALAN KOTA BIREUEN - SP. UNING 7,56 1.167.639.000
2409.CDC.002.321.FC PRESERVASI JALAN KOTA BIREUEN - SP. UNING 1.7 KM 860.736.000
2409.CDC.002.323.DA PRESERVASI JALAN KOTA BIREUEN - KOTA TAKENGON (Rehabilitasi Mayor 1.39 KM 5.262.128.000
Jalan)
2409.CDC.002.331.FC PRESERVASI JALAN KOTA BIREUEN - SP. UNING 290 M 15.218.035.000
2409.CDC.008.321.AC PRESERVASI JALAN LAMBARO - BTS. KOTA SIGLI 2.5 KM 904.134.000
2409.CDC.008.321.BC PRESERVASI JALAN BTS. KOTA SIGLI - KOTA BIREUEN 2.5 KM 1.084.961.000
2409.CDC.008.321.CC PRESERVASI JALAN KOTA BIREUEN - BTS. KOTA LHOKSEUMAWE/ACEH 2.5 KM 1.084.961.000
UTARA, KRUENG MANE - BUKET RATA, SP. KRUENG GEUKEUEH - PEL.
KRUENG GEUKEUEH (PEL. LHOKSEUMAWE)
2409.CDC.008.321.DC PRESERVASI JALAN BTS. KOTA LHOKSEUMAWE/ACEH UTARA - PEUREULAK 3.5 KM 1.518.946.000
2409.CDC.008.321.EC PRESERVASI JALAN PEUREULAK - BTS. PROV. SUMUT, JLN. KUALA LANGSA 2.2 KM 954.766.000
(LANGSA) (BTS. KOTA LANGSA - KUALA LANGSA)
2409.CDC.008.322.AB PRESERVASI JALAN LAMBARO - BATAS PIDIE (Rehabilitasi Minor Jalan) 0.24 KM 1.347.000.000
SATKER / PROGRAM / KEGIATAN / KRO / RO / KOMPONEN / SUB
PROVINSI/KODE VOLUME HARGA SATUAN JUMLAH BIAYA
KOMPONEN / AKUN / DETIL
2409.CDC.008.323.AB PRESERVASI JALAN LAMBARO - BATAS PIDIE (Rehabilitasi Mayor Jalan) 0.97 KM 2.200.000.000
2409.CDC.008.323.AE PRESERVASI JALAN BTS. PIDIE JAYA/BIREUEN - KOTA BIREUEN (Rehabilitasi 0.5 KM 1.885.190.000
Mayor Jalan)
2409.CDC.008.323.CD PRESERVASI JALAN IDI RAYEUK - KOTA LANGSA (Rehabilitasi Mayor Jalan) 0.9 KM 3.595.554.000
2409.CDC.008.323.CG PRESERVASI JALAN KOTA LANGSA - BTS. SUMUT (Rehabilitasi Mayor Jalan) 1 KM 3.182.852.000
2409.CDC.008.323.EC PRESERVASI JALAN PEUREULAK - BTS. PROV. SUMUT, JLN. KUALA LANGSA 2.5 KM 11.001.435.000
(LANGSA) (BTS. KOTA LANGSA - KUALA LANGSA) (Rehabilitasi Mayor Jalan)
2409.CDC.008.324.AA PRESERVASI JALAN BTS. PIDIE - SIGLI - BEUREUNUN - BTS. PIDIE 0.8 KM 8.321.386.000
JAYA/BIREUEN
2409.CDC.008.324.EC PRESERVASI JALAN PEUREULAK - BTS. PROV. SUMUT, JLN. KUALA LANGSA 0.6 KM 7.811.668.000
(LANGSA) (BTS. KOTA LANGSA - KUALA LANGSA)
2409.CDC.008.331.AC PRESERVASI JALAN LAMBARO - BTS. KOTA SIGLI 59 M 3.000.000.000
2409.CDF.001 Preservasi Rutin Jembatan 7148.55 m 3.570.775.000
> ACEH BESAR
- KR.LAMPREH (01.002.008.0 ) 31.8 M 500.000 15.900.000
- LAM TEUNGOH (01.002.009.0 ) 14.8 M 500.000 7.400.000
- LHUNG GLONG (01.002.011.0 ) 6.7 M 500.000 3.350.000
- LHOUNG IE (01.002.012.0 ) 14.9 M 500.000 7.450.000
- ALUE SABANG 1 (01.002.013.0 ) 6 M 500.000 3.000.000
- ALUE SABANG 2 (01.002.014.0 ) 11 M 500.000 5.500.000
- KR.JREU (01.002.015.0 ) 171 M 500.000 85.500.000
- KR.KEUMIREU (01.002.017.0 ) 51.5 M 500.000 25.750.000
- ALUE LAMTEH (01.002.018.0 ) 16.7 M 500.000 8.350.000
- ALUE LEUPUNG (01.002.019.0 ) 11 M 500.000 5.500.000
- A.MNS LAMPAKUK (01.002.020.0 ) 6 M 500.000 3.000.000
- ALUE BITHAK (01.002.021.0 ) 11 M 500.000 5.500.000
- KR.INONG (01.002.024.0 ) 165 M 500.000 82.500.000
- KR.BUGA (01.002.025.0 ) 70.4 M 500.000 35.200.000
- ALUE GLONG (01.002.026.0 ) 20.6 M 500.000 10.300.000
- LAMBARIH TUNONG (01.002.027.0 ) 30.4 M 500.000 15.200.000
- ALUE BUBU (01.002.028.0 ) 20.5 M 500.000 10.250.000
- KR.TUI PANAH (01.002.030.0 ) 53.5 M 500.000 26.750.000
- ALUE MON (01.002.031.0 ) 9 M 500.000 4.500.000
- KR.SILAN (01.002.032.0 ) 32 M 500.000 16.000.000
- ALUE IE MANGAT (01.002.033.0 ) 31.6 M 500.000 15.800.000
- KR.GEUNAPET (01.002.034.A ) 49 M 500.000 24.500.000
- KR.GEUNAPET (01.002.034.B ) 55 M 500.000 27.500.000
- KR.KALE (01.002.035.0 ) 14.6 M 500.000 7.300.000
- ALUE GEULIMA (01.002.036.0 ) 14.8 M 500.000 7.400.000
> KAB. P I D I E
- ALUE NIBONG I (01.003.005.0 ) 20.5 M 500.000 10.250.000
- ALUE NIBONG II (01.003.006.0 ) 14.8 M 500.000 7.400.000
- ALUE BAROT (01.003.007.0 ) 7 M 500.000 3.500.000
- KR.BLANG PETEK (01.003.008.A ) 46.8 M 500.000 23.400.000
- KR.BLANG PETEK (01.003.008.B ) 33.6 M 500.000 16.800.000
- ALUE PANAH (01.003.009.0 ) 16.6 M 500.000 8.300.000
- ALUE BAROH (01.003.010.0 ) 28.5 M 500.000 14.250.000
SATKER / PROGRAM / KEGIATAN / KRO / RO / KOMPONEN / SUB
PROVINSI/KODE VOLUME HARGA SATUAN JUMLAH BIAYA
KOMPONEN / AKUN / DETIL
- KR.TANJUNG (01.003.011.0 ) 37.5 M 500.000 18.750.000
- ALUE GRUM GRUM (01.003.012.0 ) 8 M 500.000 4.000.000
- ALUE ARON BUNDET (01.003.012.8 ) 8 M 500.000 4.000.000
- KR.UTUE (01.003.015.0 ) 19.6 M 500.000 9.800.000
- LUENG MURONG (01.003.016.0 ) 25.6 M 500.000 12.800.000
- LUENG CAMCA (01.003.018.0 ) 10.8 M 500.000 5.400.000
- LUENG NACA (01.003.019.0 ) 39.5 M 500.000 19.750.000
- KR.DOY BANGGALANG (01.003.020.0 ) 22.8 M 500.000 11.400.000
- PAYA TIBANG (01.003.021.0 ) 10.9 M 500.000 5.450.000
- LUENG BARO (01.003.022.0 ) 10.7 M 500.000 5.350.000
- KR.BARO KOTA (01.003.026.0 11) 25.6 M 500.000 12.800.000
- KR.TUKAIH (01.004.001.A 11) 42.1 M 500.000 21.050.000
- KR.TUKAIH (01.004.001.B 11) 40.6 M 500.000 20.300.000
> KAB. P I D I E
- LUENG BUBUE (01.004.003.0 ) 8 M 500.000 4.000.000
- LUENG BINTANG (01.004.004.0 ) 19.5 M 500.000 9.750.000
- LUENG LILEU (01.004.005.0 ) 15.3 M 500.000 7.650.000
- LUENG LILEU II (01.004.006.0 ) 15 M 500.000 7.500.000
- LUENG JAMAN (01.004.007.0 ) 8.5 M 500.000 4.250.000
- KR.BEUREUNUEN (01.005.001.A 1) 94.5 M 500.000 47.250.000
- KR.BEUREUNUEN (01.005.001.B 1) 96 M 500.000 48.000.000
- ALUE SEUMET (01.005.002.0 1) 17.5 M 500.000 8.750.000
- LUENG PUNTUNG (01.005.004.0 1) 19.7 M 500.000 9.850.000
- L.JERAT MANYANG (01.005.005.0 1) 9.5 M 500.000 4.750.000
- GLP.MINYEUK (01.005.006.0 1) 31.9 M 500.000 15.950.000
- PAYA MAMPLAM (01.005.007.0 1) 33.2 M 500.000 16.600.000
- KR.TEUPIN RAYA (01.005.008.0 1) 46.5 M 500.000 23.250.000
- LUENG COIH 1 (01.005.009.0 1) 12 M 500.000 6.000.000
> KAB. PIDIE JAYA
- LUENG COIH 2 (01.005.010.0 2) 30.5 M 500.000 15.250.000
- POHROH (01.005.011.0 2) 11 M 500.000 5.500.000
- LUENG PANYANG (01.005.012.0 2) 25.5 M 500.000 12.750.000
- KR.PANTE RAJA (01.005.015.0 2) 113.5 M 500.000 56.750.000
- KR.SEUMA (01.005.016.0 2) 17.8 M 500.000 8.900.000
- KRUENG BIENG (01.005.017.0 2) 16.7 M 500.000 8.350.000
- LHOK GUDA (01.005.018.0 2) 31.7 M 500.000 15.850.000
- KR.PANGWA (01.005.020.0 2) 16 M 500.000 8.000.000
- KR.BEURACAN (01.005.021.0 2) 42.5 M 500.000 21.250.000
- LUENG PAYA (01.005.022.0 2) 10.7 M 500.000 5.350.000
- L.BEUREUNIH (01.005.023.0 2) 13.35 M 500.000 6.675.000
- LUENG TEUNGOH (01.005.024.0 2) 6 M 500.000 3.000.000
- KR.MEUREUDU (01.005.025.0 2) 61.8 M 500.000 30.900.000
- L.MEUNASAH BIE (01.005.026.0 2) 7.2 M 500.000 3.600.000
- LUENG MEURIA (01.005.027.0 3) 16.6 M 500.000 8.300.000
- TUTUE ARA (01.005.029.0 3) 39.4 M 500.000 19.700.000
- LUENG TEUNGOH (01.005.030.0 3) 10.5 M 500.000 5.250.000
- LUENG PUNTONG (01.005.031.0 3) 9 M 500.000 4.500.000
- KUTANG KU HO (01.005.032.0 3) 10.8 M 500.000 5.400.000
- DRIEN BUNGONG (01.005.033.0 3) 22.7 M 500.000 11.350.000
> KAB. BIREUEN
- BATEE ILIEK (01.006.002.0 ) 46 M 500.000 23.000.000
SATKER / PROGRAM / KEGIATAN / KRO / RO / KOMPONEN / SUB
PROVINSI/KODE VOLUME HARGA SATUAN JUMLAH BIAYA
KOMPONEN / AKUN / DETIL
- A.MTG JAREUNG 2 (01.006.003.0 ) 6.7 M 500.000 3.350.000
- ALUE CEUREUCOK (01.006.005.0 ) 12.8 M 500.000 6.400.000
- A.GEULUMPANG 2 (01.006.007.0 ) 7.5 M 500.000 3.750.000
- KR.SURIEN I (01.006.009.0 ) 6.5 M 500.000 3.250.000
- A.BLG TAMBUE (01.006.011.0 ) 6.7 M 500.000 3.350.000
- KR.PANDRAH (01.006.012.0 ) 33.1 M 500.000 16.550.000
- ALUE CICEM (01.006.013.0 ) 6 M 500.000 3.000.000
- KR.JEUNIB TUHA (01.006.014.0 ) 7 M 500.000 3.500.000
- KR.JEUNIB BARU (01.006.015.0 ) 20 M 500.000 10.000.000
- LUENG KAPITAN (01.006.016.0 ) 6.3 M 500.000 3.150.000
- KR.NALAN (01.006.017.0 ) 41.5 M 500.000 20.750.000
- LUENG RAYA 1 (01.006.018.0 ) 10 M 500.000 5.000.000
- A.PEULIMBANG (01.006.019.0 ) 7 M 500.000 3.500.000
- LUENG RAYA 2 (01.006.020.0 ) 6.5 M 500.000 3.250.000
- LUENG PEUDADA (01.006.024.0 ) 8.7 M 500.000 4.350.000
- ALUE AWE (01.006.025.0 ) 11.7 M 500.000 5.850.000
- IKU ALUE (01.006.026.0 ) 6 M 500.000 3.000.000
- ALUE RHEENG (01.006.028.0 ) 20 M 500.000 10.000.000
- ALUE ULEE CEUE (01.006.029.0 ) 6 M 500.000 3.000.000
- TEUPOK TUNONG (01.006.030.0 ) 7 M 500.000 3.500.000
- BLANG BLADEH (01.006.031.0 ) 23.6 M 500.000 11.800.000
- LUENG MEURIA (01.006.032.0 ) 10.3 M 500.000 5.150.000
> KAB. BIREUEN
- ALUE CUREH (01.007.001.0 1) 10.8 M 500.000 5.400.000
- A.COT MURONG (01.007.003.0 1) 19.7 M 500.000 9.850.000
- KR.PANJAU (01.007.004.0 1) 9.4 M 500.000 4.700.000
- KR.PANCALANG (01.007.006.0 1) 16 M 500.000 8.000.000
- LUENG KUTA (01.007.007.0 1) 16.3 M 500.000 8.150.000
- L.COT PANAH (01.007.008.0 1) 10.2 M 500.000 5.100.000
- L.GEUREUGOK (01.007.009.0 1) 7.6 M 500.000 3.800.000
- LAPANG TIMU (01.007.010.0 1) 16 M 500.000 8.000.000
- L.TGK.DIBLANG (01.007.011.0 1) 16 M 500.000 8.000.000
> KOTA LHOKSEUMAWE
- KR.MANE (01.007.012.0 2) 100 M 500.000 50.000.000
- MANE TUNONG (01.007.013.0 2) 16 M 500.000 8.000.000
- A.BLANG MANE (01.007.014.0 2) 10.8 M 500.000 5.400.000
- KR.BUNGKAIH (01.007.015.0 2) 25.4 M 500.000 12.700.000
- KR.GEUKUH (01.007.016.0 2) 48 M 500.000 24.000.000
- A.BLANG PULO (01.007.017.0 21) 6.5 M 500.000 3.250.000
- ALUE PALOH (01.007.018.0 21) 6 M 500.000 3.000.000
- ALUE PANGGOI (01.007.019.0 21) 7 M 500.000 3.500.000
- A.MNS.MESJID (01.007.021.0 21) 10 M 500.000 5.000.000
- SAWANG KEUPULA (01.009.001.A 1) 28.6 M 500.000 14.300.000
- SAWANG KEUPULA (01.009.001.B 1) 28.7 M 500.000 14.350.000
- ALUE SEUMAKEM (01.009.002.0 1) 12 M 500.000 6.000.000
- ALUE AWE (01.009.003.0 1) 14 M 500.000 7.000.000
- ALUE RAYA (01.009.004.A 2) 26 M 500.000 13.000.000
- ALUE RAYA (01.009.004.B 2) 25.5 M 500.000 12.750.000
- BLANG PEURIA (01.009.007.0 2) 7 M 500.000 3.500.000
- KR.PASE GEUDONG (01.009.009.0 2) 70 M 500.000 35.000.000
- PELABUHAN I (01.041.001.0 ) 7 M 500.000 3.500.000
SATKER / PROGRAM / KEGIATAN / KRO / RO / KOMPONEN / SUB
PROVINSI/KODE VOLUME HARGA SATUAN JUMLAH BIAYA
KOMPONEN / AKUN / DETIL
- PELABUHAN II (01.041.002.0 ) 95 M 500.000 47.500.000
> KAB. ACEH UTARA
- A.LAGANG II (01.008.002.0 1) 11.5 M 500.000 5.750.000
- KR.TINGKEUM (01.008.003.0 1) 13 M 500.000 6.500.000
- KR.BINJE (01.008.007.0 1) 23 M 500.000 11.500.000
- KR.BEUREUGANG (01.008.012.0 1) 16.5 M 500.000 8.250.000
- COT PUSU RAYEUK (01.008.012.3 1) 7 M 500.000 3.500.000
- KR.BULOH (01.008.013.0 1) 20.5 M 500.000 10.250.000
- OVER PASS (01.008.018.0 2) 49 M 500.000 24.500.000
- ALUE AWE (01.008.018.6 2) 12 M 500.000 6.000.000
- ALUE AWE 1 (01.008.019.0 2) 12 M 500.000 6.000.000
- ALUE AWE 2 (01.008.020.0 2) 10 M 500.000 5.000.000
> KAB. ACEH UTARA
- BLG.TEUPIN PUNTI (01.009.010.0 3) 10 M 500.000 5.000.000
- PAYA BAKOI (01.009.011.0 3) 6.5 M 500.000 3.250.000
- SEUMET REUDEUP (01.009.013.0 3) 6 M 500.000 3.000.000
- ALUE KUMBANG (01.009.015.0 3) 13.4 M 500.000 6.700.000
- ALUE GUNTO (01.009.016.0 3) 32.6 M 500.000 16.300.000
- ALUE BUNGO (01.009.017.0 3) 6.6 M 500.000 3.300.000
- A.SP.DAMAR (01.009.018.0 3) 8.7 M 500.000 4.350.000
- ALUE DRIEN (01.009.021.0 3) 8.1 M 500.000 4.050.000
- ALUE MUDEEM (01.009.022.0 3) 14 M 500.000 7.000.000
- A.MNS.TUTONG (01.009.023.0 3) 7 M 500.000 3.500.000
- A.MNS.GEUMATA (01.009.024.0 3) 7 M 500.000 3.500.000
- A.MNS.DAYAH (01.009.025.0 3) 13.5 M 500.000 6.750.000
- KR.KEUREUTOE (01.009.026.A 3) 90.4 M 500.000 45.200.000
- KR.KEUREUTOE (01.009.026.B 3) 90 M 500.000 45.000.000
- ALUE LHOKSUKON (01.009.027.0 3) 8 M 500.000 4.000.000
- ALUE BUKIT (01.009.028.0 3) 24 M 500.000 12.000.000
- ALUE KUTA I (01.009.029.0 3) 10.3 M 500.000 5.150.000
- A.MNS.REUDEUP (01.009.030.0 3) 16 M 500.000 8.000.000
- ALUE KUTA DUA (01.009.031.0 3) 10.2 M 500.000 5.100.000
- ALUE NGA I (01.009.033.0 3) 10 M 500.000 5.000.000
- A.BINTANG HU 1 (01.009.034.0 3) 6.5 M 500.000 3.250.000
- BLANG CIBREK (01.009.012.0 3) 7 M 200.000 1.400.000
- ALUE NGA II (01.009.035.0 4) 6 M 500.000 3.000.000
- A.BINTANG HU IV (01.009.037.0 4) 24 M 500.000 12.000.000
- KR.DO (01.009.038.0 4) 32.3 M 500.001 16.150.000
- A.MTG.PANYANG 1 (01.009.039.0 4) 6 M 500.000 3.000.000
- A.MTG.PANYANG 2 (01.009.040.0 4) 10 M 500.000 5.000.000
- KR.SAMPOINIET (01.009.041.0 4) 40 M 500.000 20.000.000
- ALUE DUA (01.009.042.A 4) 24 M 500.000 12.000.000
- ALUE DUA (01.009.042.B 4) 25.7 M 500.000 12.850.000
- ALUE IE PUTEH (01.009.044.0 4) 16 M 500.000 8.000.000
> KAB. ACEH TIMUR
- KR.PANTON LABU (01.010.001.0 1) 90 M 500.000 45.000.000
- PAYA NADEN I (01.010.001.3 1) 6 M 500.000 3.000.000
- A.PAYA DAMAN (01.010.004.0 1) 6 M 500.000 3.000.000
- LUENG PEULALU (01.010.005.0 1) 6 M 500.000 3.000.000
- LUENG PEULALU II (01.010.005.5 1) 8 M 500.000 4.000.000
- LUENG MATANG KEMBANG (01.010.005.6 1) 10 M 500.000 5.000.000
SATKER / PROGRAM / KEGIATAN / KRO / RO / KOMPONEN / SUB
PROVINSI/KODE VOLUME HARGA SATUAN JUMLAH BIAYA
KOMPONEN / AKUN / DETIL
- KR.ARA KUNDO (01.010.006.0 1) 210 M 493.334 103.600.000
- A.TJG.SEUMANTOK-1 (01.010.007.0 1) 8.4 M 500.000 4.200.000
- A.TJG.SEUMANTOK 2 (01.010.009.0 1) 14 M 500.000 7.000.000
- A.CEK DOI PESANTRE (01.010.010.0 1) 7.5 M 500.000 3.750.000
- ALUE LIPAH I (01.010.011.0 1) 7 M 500.000 3.500.000
- ALUE LIPAH II (01.010.012.0 1) 6 M 500.000 3.000.000
- ALUE JULUK CUT (01.010.013.0 1) 25.5 M 500.000 12.750.000
- KR.PUNTIE (01.010.014.0 1) 10.2 M 500.000 5.100.000
- ALUE NIRAH (01.010.015.0 1) 12 M 500.000 6.000.000
- A.BLANG PAUH (01.010.016.0 1) 14 M 500.000 7.000.000
- KR.BAGOK (01.010.018.0 1) 21 M 500.000 10.500.000
- KR.TGK.ASYEK (01.010.019.0 1) 11 M 500.000 5.500.000
- KR.TENGKU MUSA (01.010.020.0 1) 19 M 500.000 9.500.000
- KR.BAGOK PANAH (01.010.021.0 1) 8.4 M 500.000 4.200.000
- ALUE SIREN (01.010.022.0 1) 10 M 500.000 5.000.000
- ALUE SEUNEUBOK (01.010.023.0 1) 10.3 M 500.000 5.150.000
- KR.PUNTIE (01.010.025.0 1) 20.6 M 500.000 10.300.000
- ALUE PUNTIE I (01.010.026.0 1) 10.3 M 500.000 5.150.000
- A.KAMPUNG BARO (01.010.028.0 1) 6.5 M 500.000 3.250.000
- ALUE RAMBUT (01.010.029.0 1) 14 M 500.000 7.000.000
- A.KEUTAPANG 1 (01.010.030.0 1) 7 M 500.000 3.500.000
- ALUE LIPAH (01.010.032.0 1) 16 M 500.000 8.000.000
- KR.IDI RAYEUK (01.010.033.0 1) 62 M 500.000 31.000.000
- ALUE BACEE (01.010.034.0 2) 16 M 500.000 8.000.000
- ALUE BACEE (01.010.034.A 2) 17 M 500.000 8.500.000
- ALUE IE SIJUK (01.010.035.0 2) 7.8 M 500.000 3.900.000
- A.PEUDAWA PUNTUNG (01.010.036.0 2) 16.5 M 500.000 8.250.000
- KR.PEUDAWA RAYEUK (01.010.038.0 2) 46.7 M 500.000 23.350.000
- ALUE BATEE (01.010.039.0 2) 6.4 M 500.000 3.200.000
- ALUE BU (01.010.040.0 2) 6 M 500.000 3.000.000
- KR.PAYA GAJAH (01.010.041.0 2) 24 M 500.000 12.000.000
- ALUE SEUMEJID (01.010.042.0 2) 20.2 M 500.000 10.100.000
> KAB. ACEH TIMUR
- KR.PEUREULAK (01.011.001.0 1) 146 M 500.000 73.000.000
- A.TEUPIN CEURADEH (01.011.002.0 1) 6 M 500.000 3.000.000
- ALUE NIREIH (01.011.003.0 1) 62.4 M 500.000 31.200.000
- PAYA RUMPUN (01.011.006.0 1) 6.2 M 500.000 3.100.000
- KR.RANTAU PANJANG (01.011.007.0 1) 100 M 500.000 50.000.000
- DAMAR TUTONG (01.011.008.0 1) 20 M 500.000 10.000.000
- KR.BAYEUN (01.011.009.0 1) 90 M 500.000 45.000.000
- ALUE ITAM (01.011.010.0 1) 20.5 M 500.000 10.250.000
- BIREIM RAYEUK (01.011.011.0 1) 20.3 M 500.000 10.150.000
- LUENG ALUR DUA (01.011.012.9 1) 6 M 500.000 3.000.000
> KOTA LANGSA
- ALUE DUA (01.011.013.0 2) 8.5 M 500.000 4.250.000
- TEUPIN SIREN (01.011.101.0 21) 7 M 500.000 3.500.000
- DM BAHRUM (01.011.103.0 21) 6.8 M 500.000 3.400.000
- MATANG SEULIMENG (01.011.105.0 21) 6 M 500.000 3.000.000
- PAYA BUJOK TUNONG (01.011.016.0 22) 6.5 M 500.000 3.250.000
- TITI KANGKUNG (01.012.001.0 1) 6 M 500.000 3.000.000
- A.LANGSA CS I (01.012.002.A 1) 20 M 500.000 10.000.000
SATKER / PROGRAM / KEGIATAN / KRO / RO / KOMPONEN / SUB
PROVINSI/KODE VOLUME HARGA SATUAN JUMLAH BIAYA
KOMPONEN / AKUN / DETIL
- A.LANGSA CS I (01.012.002.B 1) 18.5 M 500.000 9.250.000
- A.LANGSA CS II (01.012.003.A 1) 50 M 500.000 25.000.000
- A.LANGSA CS II (01.012.003.B 1) 47.2 M 500.000 23.600.000
- SUNGAI LUNG (01.012.004.0 1) 32.2 M 500.000 16.100.000
- ALUR PINANG (01.012.005.0 1) 10.7 M 500.000 5.350.000
- ALUE BAKAU I (01.047.002.0 ) 46.5 M 500.000 23.250.000
- ALUE BAKAU II (01.047.003.0 ) 45.8 M 500.000 22.900.000
> KAB. ACEH TAMIANG
- ALUR PUNTI I (01.012.007.0 2) 12.7 M 500.000 6.350.000
- ALUR PUNTI II (01.012.008.0 2) 25.5 M 500.000 12.750.000
- ALUR PUNTI III (01.012.009.0 2) 26 M 500.000 13.000.000
- ALUR BUJUK I (01.012.010.0 2) 16 M 500.000 8.000.000
- A.SEUNEUBUK BARU (01.012.012.0 2) 12 M 500.000 6.000.000
- A.MEDANG ARA 1 (01.012.013.0 2) 8 M 500.000 4.000.000
- A.MEDANG ARA 2 (01.012.014.0 2) 28.7 M 500.000 14.350.000
- ALUR IE BINTAH (01.012.015.0 2) 16 M 500.000 8.000.000
- ALUR ITAM (01.012.016.0 2) 12 M 500.000 6.000.000
- ALUR JOHAR I (01.012.017.0 2) 12 M 500.000 6.000.000
- ALUR JOHAR II (01.012.018.0 2) 14 M 500.000 7.000.000
- KR.TAMIANG (01.012.020.0 3) 230 M 500.000 115.000.000
- ALUR MINURAN (01.012.021.0 3) 24 M 500.000 12.000.000
- A.KBN TENGAH 2 (01.012.023.0 3) 34 M 500.000 17.000.000
- ALUR GANTUNG (01.012.025.0 3) 16.3 M 500.000 8.150.000
- ALUR GANTUNG VI (01.012.025.5 3) 6 M 500.000 3.000.000
- A.BKT SEUMADAM (01.012.026.0 3) 16 M 500.000 8.000.000
- KEBUN TIGA (01.012.027.0 3) 14 M 500.000 7.000.000
> KAB. BIREUEN
- KEUDE DUA (01.042.001.0 ) 7 M 500.000 3.500.000
- ALUE BINUENG 2 (01.042.004.0 ) 7 M 500.000 3.500.000
- L.PANTE BARU (01.042.005.0 ) 14.6 M 500.000 7.300.000
- A.PAYA LANGET (01.042.006.0 ) 12.2 M 500.000 6.100.000
- A.PAYA BUNYOT (01.042.007.0 ) 18 M 500.000 9.000.000
- TEUPIN MANE (01.042.008.0 ) 116 M 500.000 58.000.000
- ALUE JATI (01.042.009.0 ) 13 M 500.000 6.500.000
- ALUE IGEUEH (01.042.010.0 ) 8 M 500.000 4.000.000
- ALUE PHON (01.042.011.0 ) 31.6 M 500.000 15.800.000
- ALUE TEUNGOH (01.042.012.0 ) 22.5 M 500.000 11.250.000
- A.LHOK KALA 1 (01.042.013.0 ) 16.7 M 500.000 8.350.000
- A.LHOK KALA 3 (01.042.015.0 ) 7 M 500.000 3.500.000
- ALUE BATE BROK (01.042.016.0 ) 13 M 500.000 6.500.000
- ALUE BRUK (01.042.017.0 ) 25.6 M 500.000 12.800.000
- ALUE LUR (01.042.018.0 ) 6 M 500.000 3.000.000
- ALUE ENTOH (01.042.019.0 ) 18 M 500.000 9.000.000
- ALUE BATE PANO (01.042.020.0 ) 12.2 M 500.000 6.100.000
- ALUE TAMBO (01.042.021.0 ) 26 M 500.000 13.000.000
> KAB. BENER MERIAH
- ALUE BENGAT (01.043.001.0 1) 8.5 M 500.000 4.250.000
- ALUE TAKAR (01.043.002.0 1) 10.5 M 500.000 5.250.000
- WEIHNI ALI-ALI (01.043.003.0 1) 32 M 500.000 16.000.000
- W.TIMANG GAJAH (01.043.004.0 1) 20 M 500.000 10.000.000
- ALUE KULUS (01.043.005.0 1) 16 M 500.000 8.000.000
SATKER / PROGRAM / KEGIATAN / KRO / RO / KOMPONEN / SUB
PROVINSI/KODE VOLUME HARGA SATUAN JUMLAH BIAYA
KOMPONEN / AKUN / DETIL
- ALUE CINCIN (01.043.006.0 1) 15 M 500.000 7.500.000
- ALUE RUSA (01.043.007.0 1) 25.5 M 500.000 12.750.000
- TATOR MIRING (01.043.008.0 1) 6 M 500.000 3.000.000
- WEIHNI ENANG-ENANG (01.043.009.0 1) 40 M 500.000 20.000.000
- ALUE GADENG 1 (01.043.010.0 1) 6 M 500.000 3.000.000
- ALUE GADENG 2 (01.043.011.0 1) 7.1 M 500.000 3.550.000
- ALUE GADENG 3 (01.043.012.0 1) 7.1 M 500.000 3.550.000
- ALUE ASAM WAQ (01.043.013.0 1) 6 M 500.000 3.000.000
- KR.RONGKA (01.043.016.0 1) 12.5 M 500.000 6.250.000
- A.TANAH ILANG (01.043.018.0 1) 20 M 500.000 10.000.000
- WEHNI RONGKA (01.043.019.0 1) 35 M 500.000 17.500.000
- W.TENGE BESI II (01.043.020.0 1) 6 M 500.000 3.000.000
- TIMANG GAJAH (01.043.021.0 1) 20 M 500.000 10.000.000
- WEIHNI RONGKA II (01.043.022.0 1) 15 M 500.000 7.500.000
- WEIHNI LAMPAHAN (01.043.023.0 1) 7 M 500.000 3.500.000
- ALUR DALAM (01.043.024.0 1) 6 M 500.000 3.000.000
- KR.SUKAJADI (01.043.026.0 1) 20 M 500.000 10.000.000
- ALUE REMESAN I (01.043.027.0 1) 6 M 500.000 3.000.000
- ALUE REMESAN II (01.043.028.0 1) 12.5 M 500.000 6.250.000
- ALUE EMPAN (01.043.029.0 1) 6 M 500.000 3.000.000
- JAMUR UJUNG (01.043.030.0 1) 30.6 M 500.000 15.300.000
- ALUE SUKA RAMAI (01.043.031.0 1) 6 M 500.000 3.000.000
- WEIHNI TELONG (01.043.032.0 1) 46 M 500.000 23.000.000
- W.TELONG UBIE (01.043.033.0 1) 6 M 500.000 3.000.000
> KAB. ACEH TENGAH
- KRUENG BALEE (01.043.001.0 14) 55.7 M 500.000 27.850.000
- TAN SARIL (01.019.001.A 21) 25.7 M 500.000 12.850.000
- TAN SARIL (01.019.001.B 21) 26.5 M 500.000 13.250.000
2409.CDF.006.326.AC PRESERVASI JALAN LAMBARO - BTS. KOTA SIGLI (Rehabilitasi Jembatan) 135 M 1.714.284.000
2409.CDF.006.326.BC PRESERVASI JALAN BTS. KOTA SIGLI - KOTA BIREUEN (Rehabilitasi Jembatan) 126,5 M 1.338.036.000
2409.CDF.006.326.DC PRESERVASI JALAN BTS. KOTA LHOKSEUMAWE/ACEH UTARA - PEUREULAK 50,8 M 670.361.000
(Rehabilitasi Jembatan)
2409.CDF.006.326.EC PRESERVASI JALAN PEUREULAK - BTS. PROV. SUMUT, JLN. KUALA LANGSA 76,5 M 1.455.412.000
(LANGSA) (BTS. KOTA LANGSA - KUALA LANGSA) (Rehabilitasi Jembatan)
2409.CDF.006.345.CC PRESERVASI JALAN KOTA BIREUEN - BTS. KOTA LHOKSEUMAWE/ACEH 10.8 M 4.119.253.000
UTARA, KRUENG MANE - BUKET RATA, SP. KRUENG GEUKEUEH - PEL.
KRUENG GEUKEUEH (PEL. LHOKSEUMAWE) (Rehabilitasi Jembatan)
2409.CDF.006.345.DC PRESERVASI JALAN BTS. KOTA LHOKSEUMAWE/ACEH UTARA - PEUREULAK 12,2 M 3.831.445.000
(Pelebaran Jembatan)
2409.CBF.001.339.DG Pembangunan Jembatan Gantung Desa Subarang (Gampong Teungoh) 36 M 1.851.891.000
SATKER / PROGRAM / KEGIATAN / KRO / RO / KOMPONEN / SUB
PROVINSI/KODE VOLUME HARGA SATUAN JUMLAH BIAYA
KOMPONEN / AKUN / DETIL
2409.CBF.001.339.DH Pembangunan Jembatan Gantung Pasie Merapat Kecamatan Kluet Selatan 100 M 4.000.000.000
2409.CDC.001.319.GA PRESERVASI JALAN BTS. ACEH TENGAH/NAGAN RAYA - LHOK SEUMOT - 79,96 5.398.698.000
JEURAM - SP. PEUT
2409.CDC.001.320.AA PRESERVASI JALAN BTS. KOTA BANDA ACEH - CALANG 140,04 8.584.830.000
2409.CDC.001.320.BA PRESERVASI JALAN CALANG - SIMPANG PEUT 109,15 6.478.466.000
2409.CDC.001.320.CA PRESERVASI JALAN SIMPANG PEUT - BTS. ABDYA/ACEH SELATAN 119,25 7.025.256.000
2409.CDC.001.320.DA PRESERVASI JALAN BTS. ABDYA/ACEH SELATAN - BAKONGAN 106,1 6.114.751.000
2409.CDC.001.320.EA PRESERVASI JALAN BAKONGAN - KOTA SUBULUSSALAM 84,87 4.695.207.000
2409.CDC.001.320.FA PRESERVASI JALAN KOTA SUBULUSSALAM - BATAS PROV. SUMUT DAN 86,11 4.246.172.000
PENANGGALAN - LIPAT KAJANG - BTS. PROV. SUMUT
2409.CDC.001.329.AA PRESERVASI JALAN BTS. KOTA BANDA ACEH - CALANG 5,3 KM 875.002.000
2409.CDC.001.329.BA PRESERVASI JALAN CALANG - SIMPANG PEUT 2,97 408.399.000
2409.CDC.001.329.CA PRESERVASI JALAN SIMPANG PEUT - BTS. ABDYA/ACEH SELATAN 2,9 KM 404.655.000
2409.CDC.001.329.DA PRESERVASI JALAN BTS. ABDYA/ACEH SELATAN - BAKONGAN 5,4 KM 785.753.000
2409.CDC.001.329.EA PRESERVASI JALAN BAKONGAN - KOTA SUBULUSSALAM 3,08 KM 422.021.000
2409.CDC.001.329.FA PRESERVASI JALAN KOTA SUBULUSSALAM - BATAS PROV. SUMUT DAN 6,5 KM 830.151.000
PENANGGALAN - LIPAT KAJANG - BTS. PROV. SUMUT
2409.CDC.002 Preservasi Rekonstruksi, Rehabilitasi Jalan 24.18 km 63.207.030.000
2409.CDC.002.321.AA PRESERVASI JALAN BTS. KOTA BANDA ACEH - CALANG 2 KM 1.012.631.000
2409.CDC.002.321.BA PRESERVASI JALAN CALANG - SIMPANG PEUT 3,6 KM 2.091.659.000
2409.CDC.002.321.DA PRESERVASI JALAN BTS. ABDYA/ACEH SELATAN - BAKONGAN 2 KM 1.012.631.000
2409.CDC.002.321.EA PRESERVASI JALAN BAKONGAN - KOTA SUBULUSSALAM 2.7 KM 1.178.991.000
2409.CDC.002.321.FA PRESERVASI JALAN KOTA SUBULUSSALAM - BATAS PROV. SUMUT DAN 1,2 KM 911.368.000
PENANGGALAN - LIPAT KAJANG - BTS. PROV. SUMUT
2409.CDC.002.321.GA PRESERVASI JALAN BTS. ACEH TENGAH/NAGAN RAYA - LHOK SEUMOT - 4,5 KM 3.166.362.000
JEURAM - SP. PEUT
2409.CDC.002.322.DF PRESERVASI JALAN TAPAK TUAN - BTS. ACEH SELATAN/SUBULUSSALAM 1.54 KM 5.148.836.000
(Rehabilitasi Minor Jalan)
2409.CDC.002.323.DE PRESERVASI JALAN SIMPANG PEUT - BLANGPIDIE - TAPAKTUAN (Rehabilitasi 0.57 KM 2.091.449.000
Mayor Jalan)
2409.CDC.002.324.AE PRESERVASI JALAN BTS. KOTA BANDA ACEH - CALANG (Rekonstruksi Jalan) 0.54 KM 6.458.362.000
2409.CDC.002.324.BA PRESERVASI JALAN CALANG - SIMPANG PEUT (Rekonstruksi Jalan) 0.57 KM 7.421.084.000
2409.CDF.002.326.CA PRESERVASI JALAN SIMPANG PEUT - BTS. ABDYA/ACEH SELATAN (Preservasi 12 M 659.342.000
Jembatan)
2409.CDF.002.326.DA PRESERVASI JALAN BTS. ABDYA/ACEH SELATAN - BAKONGAN (Preservasi 123,3 M 1.965.330.000
Jembatan)
SATKER / PROGRAM / KEGIATAN / KRO / RO / KOMPONEN / SUB
PROVINSI/KODE VOLUME HARGA SATUAN JUMLAH BIAYA
KOMPONEN / AKUN / DETIL
2409.CDF.002.326.EA PRESERVASI JALAN BAKONGAN - KOTA SUBULUSSALAM (Preservasi 220,3 M 2.315.139.000
Jembatan)
2409.CDF.002.326.FA PRESERVASI JALAN KOTA SUBULUSSALAM - BATAS PROV. SUMUT DAN 461,4 M 5.509.803.000
PENANGGALAN - LIPAT KAJANG - BTS. PROV. SUMUT (Preservasi Jembatan)
4253.CBJ.001 Pembangunan, Rehabilitasi dan Renovasi Sarana Prasarana Perguruan Tinggi 1 unit 9.844.800.000
Negeri
4253.CBJ.001.101.A Pembangunan Universitas Malikussaleh 1 PKT 5.000.000.000
4840.CBB.004 Sistem Pengelolaan Air Limbah Domestik Setempat Skala Kota 1 unit 1.000.000.000
4840.CBB.007 Sistem Pengelolaan Persampahan Skala Kota 10000 unit 26.300.000.000
4840.CBB.007.101.A Pembangunan TPA Kabupaten Aceh Barat 1 PKT 25.000.000.000
4840.CBB.010 Sistem Pengelolaan Air Limbah Domestik Terpusat Berbasis Masyarakat 188 unit 47.250.000.000
5040.CBG.100.074.A Pembangunan ABSAH di Provinsi Aceh; 10 buah; 0.0005 m3/detik; F; S; SYC 2.500.000.000
SATKER / PROGRAM / KEGIATAN / KRO / RO / KOMPONEN / SUB
PROVINSI/KODE VOLUME HARGA SATUAN JUMLAH BIAYA
KOMPONEN / AKUN / DETIL
5040.CBS.069.074.A Pembangunan Sarana dan Prasarana JIAT di Kabupaten Aceh Barat; Aceh; 1 Pkt 3.000.000.000
Kab. Aceh Barat; 1.5 km; 20 hektar; F; K; SYC
5040.CBS.070.074.A Pembangunan Sarana dan Prasarana JIAT di Kabupaten Aceh Besar dan 1 Pkt 611.500.000
Kabupaten Aceh Barat; 0.6 km; 10 hektar; F; K; SYC
5040.CBS.096.074.A Rehabilitasi Intake dan Jaringan Pipa Transmisi Air Baku di Kabupaten Pidie 1 Km 8.838.500.000
Jaya; Aceh; Kab. Pidie; 1 km; 0.05 m3/detik; F; K; SYC
5040.CBS.123.074.A Rehabilitasi Sumur Produksi (Redrill) di Kabupaten Aceh Besar; 1 titik; 1 titik; 0.001 Km 1.100.000.000
F; K; SYC
5040.CBS.124.074.A Rehabilitasi Sumur Produksi (Redrill) di Kabupaten Aceh Tamiang; 2 titik; 2 0.001 Km 2.500.000.000
titik; F; K; SYC
5040.CBS.125.074.A Rehabilitasi Sumur Produksi (Redrill) di Kabupaten Pidie dan Kabupaten Pidie 0.001 Km 1.200.000.000
Jaya; Aceh; Kab. Pidie; 2 titik; 2 titik; F; K; SYC
5040.CBS.126.074.A Rehabilitasi Sumur Produksi (Redrill) di Kabupaten Aceh Timur; Aceh; Kab. 0.001 Km 2.500.000.000
Aceh Timur; 2 titik; 2 titik; F; K; SYC
5040.CBS.140.074.A Rehabilitasi Sarana dan Prasarana JIAT di Wilayah Barat Provinsi Aceh; Aceh; 0.001 Km 500.000.000
Kab. Aceh Barat; 0.5 km; 10 hektar; F; K; SYC
5040.CBS.141.074.A Rehabilitasi Sarana dan Prasarana JIAT di Wilayah Timur Provinsi Aceh; 1 Pkt 1.500.000.000
Aceh; Kab. Aceh Besar; 1.5 km; 30 hektar; F; K; SYC
5039.CBS.001 Jalan Akses Bendungan Rajui ke Bendung Pengarah Kabupaten Pidie 3.2 Km 18.000.000.000
4978.CBB.005.100.A - Pembangunan Rumah Susun Politeknik Negeri Lhokseumawe 1 PKT 10.778.000.000
4978.CBB.005.100.A - Pembangunan Rumah Susun Universitas Abulyatama 1 PKT 10.778.000.000
4978.CBB.005.100.A - Pembangunan Rumah Susun Ponpes Muhammadiyah 1 PKT 4.231.000.000