Anda di halaman 1dari 3

HASIL NEGOSIASI RENCANA ANGGARAN BIA

PEKERJAAN MANAJEMEN KONSTRUKSI PEMBANGUNAN G


RS PELNI JAKARTA

HARGA PERKIRAAN SENDIRI (HPS)


NO URAIAN HARGA SATUAN JUMLAH
(Rp.) (Rp.)

A BIAYA PERSONIL 1,877,450,000.00


I Tenaga Ahli 936,750,000.00
II Tenaga Pendukung 940,700,000.00

B BIAYA LANGSUNG NON PERSONIL 538,750,000.00


I Biaya Sewa Kantor dan Peralatan 228,000,000.00
II Biaya Operasional Kantor 88,000,000.00
III Biaya Transportasi 148,000,000.00
IV Biaya Rapat Koordinasi 48,000,000.00
V Biaya Penggandaan Dokumen/Laporan 26,750,000.00

SUB TOTAL BIAYA 2,416,200,000.00


DIBULATKAN 2,416,200,000.00
PPN 10% 241,620,000.00
TOTAL BIAYA 2,657,820,000.00
HASIL NEGOSIASI RENCANA ANG
PEKERJAAN MANAJEMEN KONSTRUKSI PEMBA
RS PELNI JAKAR

HARGA PERKIRAAN SENDIRI (HPS)


NO URAIAN HARGA SATUAN
VOLUME & SATUAN JUMLAH
(Rp.) (Rp.)

A BIAYA PERSONIL
I Tenaga Ahli
1 Team Leader 1 Orang 4.00 Bulan 30,750,000.00 123,000,000
2 Site Manager 1 1 Orang 8.00 Bulan 24,750,000.00 198,000,000
3 Site Manager 2 1 Orang 8.00 Bulan 18,750,000.00 150,000,000
4 Ahli Arsitektur 1 Orang 2.50 Bulan 24,750,000.00 61,875,000
5 Ahli Interior 1 Orang 1.50 Bulan 24,750,000.00 37,125,000
6 Ahli Sipil/Struktur 1 Orang 3.00 Bulan 24,750,000.00 74,250,000
7 Ahli Mekanikal 1 Orang 2.50 Bulan 24,750,000.00 61,875,000
8 Ahli Elektrikal 1 Orang 2.50 Bulan 24,750,000.00 61,875,000
9 Ahli K3 Konstruksi 1 Orang 6.00 Bulan 18,750,000.00 112,500,000
10 Quantity Surveyor 1 Orang 3.00 Bulan 18,750,000.00 56,250,000
JUMLAH A.I 936,750,000

II Tenaga Pendukung
1 Office Manager 1 Orang 9.00 Bulan 9,450,000.00 85,050,000
2 Computer Operator 1 Orang 9.00 Bulan 5,200,000.00 46,800,000
3 CAD Drafter 2 Orang 8.00 Bulan 9,700,000.00 155,200,000
4 Pengawas 8 Orang 8.00 Bulan 9,700,000.00 620,800,000
5 Driver 1 Orang 9.00 Bulan 3,650,000.00 32,850,000
JUMLAH A.II 940,700,000
JUMLAH BIAYA LANGSUNG PERSONIL 1,877,450,000
HASIL NEGOSIASI
PEKERJAAN MANAJEMEN KONS

HARGA PERKIRAAN SENDIRI (HPS)


HARGA
NO URAIAN VOLUME & JUMLAH
SATUAN
SATUAN
(Rp.) (Rp.)

B BIAYA LANGSUNG NON PERSONIL


I Biaya Sewa Kantor dan Peralatan
1 Sewa Laptop/Notebook 6 unit 16 Bulan 1,500,000 144,000,000
2 Sewa Personal Computer 4 unit 16 Bulan 1,000,000 64,000,000
3 Sewa Printer Colour A3 1 unit 16 Bulan 750,000 12,000,000
4 Sewa Printer Laser A4 1 unit 16 Bulan 500,000 8,000,000
JUMLAH B.I 228,000,000

II Biaya Operasional Kantor


1 ATK 1 ls 16 Bulan 1,500,000 24,000,000
2 Komunikasi (Pulsa HP & Internet) 1 ls 16 Bulan 3,000,000 48,000,000
3 Operasional Kantor 1 ls 16 Bulan 1,000,000 16,000,000
JUMLAH B.II 88,000,000

III Biaya Transportasi


1 Sewa Kendaraan Roda 4 + O&M 1 unit 16 Bulan 8,000,000 128,000,000
2 Sewa Kendaraan Roda 2 + O&M 1 unit 16 Bulan 1,250,000 20,000,000
JUMLAH B.III 148,000,000

IV Biaya Rapat Koordinasi (Konsumsi & Materi Rapat)


1 Rapat Mingguan 48 kali 10 orang 100,000 48,000,000

JUMLAH B.IV 48,000,000

V Biaya Penggandaan Dokumen/Laporan


1 Laporan Pendahuluan 1 kali 5 buku 250,000 1,250,000
2 Laporan Perencanaan 1 kali 5 buku 200,000 1,000,000
3 Laporan Pelelangan 1 kali 5 buku 200,000 1,000,000
4 Laporan Mingguan Pengawasan 48 kali 5 buku 50,000 12,000,000
5 Laporan Bulanan Pengawasan 12 kali 5 buku 150,000 9,000,000
6 Laporan Akhir 1 kali 5 buku 500,000 2,500,000
JUMLAH B.V 26,750,000
JUMLAH BIAYA LANGSUNG NON PERSONIL 538,750,000

Anda mungkin juga menyukai