PEKERJAAN ARSITEKTURAL
RUMAH R.M.T
SURABAYA - JAWA TIMUR
DAFTAR GAMBAR
01.GAMBARGENERAL 03.GAMBARFINISHING
04.GAMBARMEP
02.GAMBARSTRUKTUR
RUMAH R.M.T
SURABAYA - JAWA TIMUR
DAFTAR GAMBAR
05.GAMBARPINTU&JENDELA
06.GAMBARDETAIL
01
GAMBAR GENERAL
- STRUCTURE & MEP DRAWINGS REQUIRED
U
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
GAMBAR GENERAL
DENAH BANGUNAN
DENAH LANTAI DASAR
1:100
MARET 2023
HARAP MENYEDIAKAN GAMBAR DETAIL
HARUS MENYEDIAKAN MOCK UP MATERIAL MIN. 500 X 500 MM / 1000 X 1000 MM PADA SITE -
U
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
GAMBAR GENERAL
DENAH BANGUNAN
DENAH LANTAI 1
1:100
MARET 2023
HARAP MENYEDIAKAN GAMBAR DETAIL
HARUS MENYEDIAKAN MOCK UP MATERIAL MIN. 500 X 500 MM / 1000 X 1000 MM PADA SITE -
U
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
GAMBAR GENERAL
DENAH BANGUNAN
DENAH LANTAI ATAP
1:100
MARET 2023
HARAP MENYEDIAKAN GAMBAR DETAIL
HARUS MENYEDIAKAN MOCK UP MATERIAL MIN. 500 X 500 MM / 1000 X 1000 MM PADA SITE -
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
GAMBAR GENERAL
TAMPAK BANGUNAN
TAMPAK A
1:100
MARET 2023
HARAP MENYEDIAKAN GAMBAR DETAIL
HARUS MENYEDIAKAN MOCK UP MATERIAL MIN. 500 X 500 MM / 1000 X 1000 MM PADA SITE -
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
GAMBAR GENERAL
POTONGAN BANGUNAN
POTONGAN A
1:115
MARET 2023
HARAP MENYEDIAKAN GAMBAR DETAIL
HARUS MENYEDIAKAN MOCK UP MATERIAL MIN. 500 X 500 MM / 1000 X 1000 MM PADA SITE -
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
GAMBAR GENERAL
POTONGAN BANGUNAN
POTONGAN B
1:115
MARET 2023
HARAP MENYEDIAKAN GAMBAR DETAIL
HARUS MENYEDIAKAN MOCK UP MATERIAL MIN. 500 X 500 MM / 1000 X 1000 MM PADA SITE -
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
GAMBAR GENERAL
POTONGAN BANGUNAN
POTONGAN C
1:115
MARET 2023
HARAP MENYEDIAKAN GAMBAR DETAIL
HARUS MENYEDIAKAN MOCK UP MATERIAL MIN. 500 X 500 MM / 1000 X 1000 MM PADA SITE -
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
GAMBAR GENERAL
POTONGAN BANGUNAN
POTONGAN D
1:115
MARET 2023
HARAP MENYEDIAKAN GAMBAR DETAIL
HARUS MENYEDIAKAN MOCK UP MATERIAL MIN. 500 X 500 MM / 1000 X 1000 MM PADA SITE -
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
GAMBAR GENERAL
POTONGAN BANGUNAN
POTONGAN 1
1:100
MARET 2023
HARAP MENYEDIAKAN GAMBAR DETAIL
HARUS MENYEDIAKAN MOCK UP MATERIAL MIN. 500 X 500 MM / 1000 X 1000 MM PADA SITE -
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
GAMBAR GENERAL
POTONGAN BANGUNAN
POTONGAN 2
1:100
MARET 2023
HARAP MENYEDIAKAN GAMBAR DETAIL
HARUS MENYEDIAKAN MOCK UP MATERIAL MIN. 500 X 500 MM / 1000 X 1000 MM PADA SITE -
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
GAMBAR GENERAL
POTONGAN BANGUNAN
POTONGAN 3
1:100
MARET 2023
HARAP MENYEDIAKAN GAMBAR DETAIL
HARUS MENYEDIAKAN MOCK UP MATERIAL MIN. 500 X 500 MM / 1000 X 1000 MM PADA SITE -
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
GAMBAR GENERAL
POTONGAN BANGUNAN
POTONGAN 4
1:100
MARET 2023
HARAP MENYEDIAKAN GAMBAR DETAIL
HARUS MENYEDIAKAN MOCK UP MATERIAL MIN. 500 X 500 MM / 1000 X 1000 MM PADA SITE -
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
GAMBAR GENERAL
POTONGAN BANGUNAN
POTONGAN 5
1:100
MARET 2023
HARAP MENYEDIAKAN GAMBAR DETAIL
HARUS MENYEDIAKAN MOCK UP MATERIAL MIN. 500 X 500 MM / 1000 X 1000 MM PADA SITE -
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
GAMBAR GENERAL
POTONGAN BANGUNAN
POTONGAN 6
1:100
MARET 2023
HARAP MENYEDIAKAN GAMBAR DETAIL
HARUS MENYEDIAKAN MOCK UP MATERIAL MIN. 500 X 500 MM / 1000 X 1000 MM PADA SITE -
F4 RUMAH R.M.T
F4 RUNGKUT MAPAN TENGAH
F4 F2
F4 F5
F4
F2
F4 F1
F6
F4
F6 F6
F6 F6
F6
F7 F6
F3 1:115
RUMAH R.M.T
F4 RUNGKUT MAPAN TENGAH
F4
F3
F4 SURABAYA - JAWA TIMUR
F5
F5
F4
F3
F4 F4
F5 F4
F7
F4 F3
F3 1:115
F8
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
F8
F8
F3 1:115
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
1:115
-
DT
DENAH FINISHING DINDING LANTAI DASAR - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
1:115
-
DT
DENAH FINISHING DINDING LANTAI 1 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
1:115
-
DT
DENAH FINISHING PLAFOND LANTAI DASAR - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
1:115
-
DT
DENAH FINISHING PLAFOND LANTAI 1 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
1:115
-
DT
DENAH FINISHING PLAFOND LANTAI ATAP - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
-
DT
DENAH FINISHING ATAP LANTAI 1 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
-
DT
DENAH FINISHING ATAP LANTAI ATAP - RUMAH R.M.T TE
04
GAMBAR MEP
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
RABIERHSDIAPRDIAM
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
MENUJUSALURANPEMBUANGANLIGKUNGAGN(OT)
MENUJUSALURANPEMBUANGANLIGKUNGAGN(OT)
MENUJUSALURANPEMBUANGANLIGKUNGAGN(OT)
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
MENUJUSALURANPEMBUANGANLIGKUNGAGN(OT)
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
A
SURABAYA - JAWA TIMUR
MENUJUSALURANPEMBUANGANLIGKUNGAGN(OT)
A RUMAH R.M.T
RUNGKUT MAPAN TENGAH
A RUMAH R.M.T
RUNGKUT MAPAN TENGAH
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
-
DT
DENAH TITIK ACMV LANTAI DASAR - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
-
DT
DENAH TITIK ACMV LANTAI 1 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
WIFI
MCB AC - SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
AC
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
AC
AC
REF.
REF.
1:115
HARUS MENDAPATKAN PERSETUJUAN DARI
MARET 2023
OWNER & DESIGNER SEBELUM MEMULAI PEKERJAAN
MCB
HARUS MENGACU PADA UKURAN DILAPANGAN -
000 / 000
SETIAP GAMBAR MEP HARAP DIDISKUSIKAN DENGAN SPESIALIS MEP -
DT
DENAH TITIK ELEKTRIKAL LANTAI DASAR - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
WIFI
AC
RUMAH R.M.T
MCB RUNGKUT MAPAN TENGAH
AC
AC
AC
1:115
HARUS MENDAPATKAN PERSETUJUAN DARI
MARET 2023
OWNER & DESIGNER SEBELUM MEMULAI PEKERJAAN
MCB
HARUS MENGACU PADA UKURAN DILAPANGAN -
000 / 000
SETIAP GAMBAR MEP HARAP DIDISKUSIKAN DENGAN SPESIALIS MEP -
DT
DENAH TITIK ELEKTRIKAL LANTAI 1 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
1:115
HARUS MENDAPATKAN PERSETUJUAN DARI
MARET 2023
OWNER & DESIGNER SEBELUM MEMULAI PEKERJAAN
MCB
HARUS MENGACU PADA UKURAN DILAPANGAN -
000 / 000
SETIAP GAMBAR MEP HARAP DIDISKUSIKAN DENGAN SPESIALIS MEP -
DT
DENAH TITIK ELEKTRIKAL LANTAI ATAP - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
WL-1
ARCHITECT'S APPROVAL
SP-1 SP-1
IL-1
SP-1
SP-1
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
WL-1 WL-1
IL-1 SURABAYA - JAWA TIMUR
SP-1
WL-1
SP-1
WL-1
WL-1 WL-1
IL-1
IL-1 -
DT
SP-1
DENAH TITIK LAMPU LOWER LEVEL LANTAI DASAR - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
IL-1
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
WL-1 WL-1
SURABAYA - JAWA TIMUR
IL-1
IL-1
WL-1
WL-1
WL-1
IL-1 -
DT
SP-1
DENAH TITIK LAMPU LOWER LEVEL LANTAI 1 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
IL-1
ARCHITECT'S APPROVAL
IL-1 IL-1
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
IL-1 IL-1
IL-1 IL-1
IL-1
IL-1 -
DT
SP-1
DENAH TITIK LAMPU LOWER LEVEL LANTAI ATAP - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
DL-3 DL-3
DL-2
DL-2
PL DL-1
DL-3 DL-3
DL-2 DL-2
SURABAYA - JAWA TIMUR
DL-2
PL
DL-4 DL-4
DL-3 DL-3
DL-2
PL PL DL-2
DL-3 DL-3
DL-2 DL-1
DL-4 DL-4
DL-2
DL-2 DL-2
DL-2 DL-2
DL-1
HARUS MENDAPATKAN PERSETUJUAN DARI OWNER & 1:115
DL-2 DESIGNER SEBELUM MEMULAI PEKERJAAN
MARET 2023
DL-3
HARUS MENGACU PADA UKURAN DILAPANGAN
-
DL-4
SETIAP GAMBAR MEP HARAP DIDISKUSIKAN DENGAN SPESIALIS MEP 000 / 000
SL-1 -
DT
PL
DENAH TITIK LAMPU UPPER LEVEL LANTAI DASAR - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
DL-3 DL-3
ARCHITECT'S APPROVAL
DL-3 DL-3
DL-2 DL-2
DL-2
DL-2
DL-2 DL-2
DL-2
DL-2
DL-2 DL-2
DL-2 SL-1
DL-1
HARUS MENDAPATKAN PERSETUJUAN DARI OWNER & 1:115
DL-2 DESIGNER SEBELUM MEMULAI PEKERJAAN
MARET 2023
DL-3
HARUS MENGACU PADA UKURAN DILAPANGAN
-
DL-4
SETIAP GAMBAR MEP HARAP DIDISKUSIKAN DENGAN SPESIALIS MEP 000 / 000
SL-1 -
DT
PL
DENAH TITIK LAMPU UPPER LEVEL LANTAI 1 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
WL-1
ARCHITECT'S APPROVAL
SP-1 SP-1
IL-1
SP-1
SP-1
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
WL-1 WL-1
IL-1 SURABAYA - JAWA TIMUR
SP-1
WL-1
SP-1
WL-1
WL-1 WL-1
IL-1
IL-1 -
DT
SP-1
GROUPING TITIK LAMPU LOWER LEVEL LANTAI DASAR - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
IL-1
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
WL-1 WL-1
SURABAYA - JAWA TIMUR
IL-1
IL-1
WL-1
WL-1
WL-1
IL-1 -
DT
SP-1
GROUPING TITIK LAMPU LOWER LEVEL LANTAI 1 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
IL-1
ARCHITECT'S APPROVAL
IL-1 IL-1
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
IL-1 IL-1
IL-1 IL-1
IL-1
IL-1 -
DT
SP-1
GROUPING TITIK LAMPU LOWER LEVEL LANTAI ATAP - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
DL-3 DL-3
DL-2
DL-2
PL DL-1
DL-3 DL-3
DL-2 DL-2
SURABAYA - JAWA TIMUR
DL-2
PL
DL-4 DL-4
DL-3 DL-3
DL-2
PL PL DL-2
DL-3 DL-3
DL-2 DL-1
DL-4 DL-4
DL-2
DL-2 DL-2
DL-2 DL-2
DL-1
HARUS MENDAPATKAN PERSETUJUAN DARI OWNER & 1:115
DL-2 DESIGNER SEBELUM MEMULAI PEKERJAAN
MARET 2023
DL-3
HARUS MENGACU PADA UKURAN DILAPANGAN
-
DL-4
SETIAP GAMBAR MEP HARAP DIDISKUSIKAN DENGAN SPESIALIS MEP 000 / 000
SL-1 -
DT
PL
GROUPING TITIK LAMPU UPPER LEVEL LANTAI DASAR - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
DL-3 DL-3
ARCHITECT'S APPROVAL
DL-3 DL-3
DL-2 DL-2
DL-2
DL-2
DL-2 DL-2
DL-2
DL-2
DL-2 DL-2
DL-2 SL-1
DL-1
HARUS MENDAPATKAN PERSETUJUAN DARI OWNER & 1:115
DL-2 DESIGNER SEBELUM MEMULAI PEKERJAAN
MARET 2023
DL-3
HARUS MENGACU PADA UKURAN DILAPANGAN
-
DL-4
SETIAP GAMBAR MEP HARAP DIDISKUSIKAN DENGAN SPESIALIS MEP 000 / 000
SL-1 -
DT
PL
GROUPING TITIK LAMPU UPPER LEVEL LANTAI 1 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
IL-1 IL-1 IL-1 ARCHITECT'S APPROVAL
DL-4 DL-4
HARUS MENDAPATKAN
KETERANGAN TITIK LAMPU LOWER LEVEL
DL-1
1:100
DL-2 PERSETUJUAN DARI OWNER & DESIGNER SEBELUM MEMULAI PEKERJAAN
MARET 2023
DL-3 TIPE KETERANGAN HARUS MENGACU PADA UKURAN DILAPANGAN
-
DL-4 WL-1
SETIAP GAMBAR MEP HARAP DIDISKUSIKAN DENGAN SPESIALIS MEP 000 / 000
SL-1 IL-1 -
DT
PL SP-1
TITIK LAMPU TAMPAK BANGUNAN A - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
WL-1 WL-1
WL-1
HARUS MENDAPATKAN
KETERANGAN TITIK LAMPU LOWER LEVEL
DL-1
1:100
DL-2 PERSETUJUAN DARI OWNER & DESIGNER SEBELUM MEMULAI PEKERJAAN
MARET 2023
DL-3 TIPE KETERANGAN HARUS MENGACU PADA UKURAN DILAPANGAN
-
DL-4 WL-1
SETIAP GAMBAR MEP HARAP DIDISKUSIKAN DENGAN SPESIALIS MEP 000 / 000
SL-1 IL-1 -
DT
PL SP-1
TITIK LAMPU TAMPAK BANGUNAN A - RUMAH R.M.T TE
05
GAMBAR PINTU & JENDELA
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
JA.03 PJK.01
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
PA.02 PH.01
SURABAYA - JAWA TIMUR
JA.02
PJA.01 PK.01
JA.01
PA.03 PH.02
PJA.02
PK.01 RUMAH R.M.T
JA.06 RUNGKUT MAPAN TENGAH
PK.01
PA.01 SURABAYA - JAWA TIMUR
JA.07 JA.05
PA.01
PK.01 PJA.02
PK.01
PA.02 JA.09
PJA.03
JA.08
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
-
DT
DETAIL PINTU KAYU - PK.01 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
-
DT
DETAIL PINTU KAYU - PK.02 - RUMAH R.M.T TE
PEKERJAAN KAYU
DETAIL PINTU JENDELA KAYU (PJK)
DETAIL PINTU JENDELA KAYU - PJK.01
RUMAH R.M.T
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
SURABAYA - JAWA TIMUR
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
-
DT
DETAIL PINTU JENDELA KAYU - PJK.01 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
1:20
MARET 2023
-
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
-
DT
DETAIL PINTU ALUMINIUM - PA.01 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
-
DT
DETAIL PINTU ALUMINIUM - PA.02 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
-
DT
DETAIL PINTU ALUMINIUM - PA.03 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
-
DT
DETAIL PINTU ALUMINIUM - PA.04 - RUMAH R.M.T TE
PEKERJAAN ALUMINIUM
DETAIL PINTU JENDELA
ALUMINIUM
(PJA)
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
1:20
MARET 2023
-
000 / 000
-
DT
DETAIL PINTU JENDELA ALUMINIUM - PJA.01 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
1:20
MARET 2023
-
000 / 000
-
DT
DETAIL PINTU JENDELA ALUMINIUM - PJA.01 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
-
DT
DETAIL PINTU JENDELA ALUMINIUM - PJA.01 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
-
DT
DETAIL PINTU JENDELA ALUMINIUM - PJA.02 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
-
DT
DETAIL PINTU JENDELA ALUMINIUM - PJA.02 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
-
DT
DETAIL PINTU JENDELA ALUMINIUM - PJA.03 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
-
DT
DETAIL PINTU JENDELA ALUMINIUM - PJA.03 - RUMAH R.M.T TE
PEKERJAAN ALUMINIUM
DETAIL JENDELA ALUMINIUM (JA)
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
-
DT
DETAIL JENDELA ALUMINIUM - JA.01 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
-
DT
DETAIL JENDELA ALUMINIUM - JA.01 - RUMAH R.M.T TE
DETAIL JENDELA ALUMINIUM - JA.02
RUMAH R.M.T
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
SURABAYA - JAWA TIMUR
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
SURABAYA - JAWA TIMUR
DILAPANGAN
GAMBAR PINTU & JENDELA
DETAIL JENDELA ALUMINIUM (JA)
DETAIL JA.03
1:20
MARET 2023
-
000 / 000
-
DT
TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
-
DT
DETAIL JENDELA ALUMINIUM - JA.04 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
1:20
MARET 2023
-
000 / 000
-
DT
DETAIL JENDELA ALUMINIUM - JA.05 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
1:20
MARET 2023
-
000 / 000
-
DT
DETAIL JENDELA ALUMINIUM - JA.05 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
HARUS MENDAPATKAN
PERSETUJUAN DARI OWNER & DESIGNER SEBELUM MEMULAI PEKERJAAN
HARUS MENGACU PADA UKURAN DILAPANGAN
1:20
MARET 2023
-
000 / 000
-
DT
DETAIL JENDELA ALUMINIUM - JA.05 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
-
DT
DETAIL JENDELA ALUMINIUM - JA.06 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
-
DT
DETAIL JENDELA ALUMINIUM - JA.06 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
1:20
MARET 2023
-
000 / 000
-
DT
DETAIL JENDELA ALUMINIUM - JA.07 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
1:20
MARET 2023
-
000 / 000
-
DT
DETAIL JENDELA ALUMINIUM - JA.07 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
HARUS MENDAPATKAN
PERSETUJUAN DARI OWNER & DESIGNER SEBELUM MEMULAI PEKERJAAN
HARUS MENGACU PADA UKURAN DILAPANGAN
1:20
MARET 2023
-
000 / 000
-
DT
DETAIL JENDELA ALUMINIUM - JA.07 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
-
DT
DETAIL JENDELA ALUMINIUM - JA.08 - RUMAH R.M.T TE
DETAIL JENDELA ALUMINIUM - JA.09
HARUS MENDAPATKAN
RUMAH R.M.T
HARUS MENGACU PADA UKURAN DILAPANGAN
PERSETUJUAN DARI OWNER & DESIGNER SEBELUM MEMULAI PEKERJAAN
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
SURABAYA - JAWA TIMUR
GAMBAR PINTU & JENDELA
DETAIL JENDELA ALUMINIUM (JA)
DETAIL JA.09
1:20
MARET 2023
-
000 / 000
-
DT
TE
PEKERJAAN PVC
DETAIL PINTU PVC (PV)
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
-
DT
DETAIL PINTU PVC - PV.01 - RUMAH R.M.T TE
PEKERJAAN HOLLOW METAL
DETAIL PINTU
HOLLOW METAL (PH)
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
-
DT
DETAIL PINTU HOLLOW METAL - PH.01 - RUMAH R.M.T TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
1:25
MARET 2023
-
000 / 000
-
DT
DETAIL PINTU HOLLOW METAL - PH.02 - SL RESIDENCE TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
SL RESIDENCE
1:20
MARET 2023
-
000 / 000
-
DT
DETAIL PINTU HOLLOW METAL - PH.02 - SL RESIDENCE TE
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
SL RESIDENCE
1:20
MARET 2023
-
000 / 000
-
DT
DETAIL PINTU HOLLOW METAL - PH.02 - SL RESIDENCE TE
06
GAMBAR DETAIL
DETAIL GAMBAR GENERAL
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
GAMBAR DETAIL
DETAIL GAMBAR GENERAL
DETAIL A
1:25
HARAP MENYEDIAKAN GAMBAR DETAIL MARET 2023
HARUS MENYEDIAKAN MOCK UP MATERIAL MIN. 500 X 500 MM /
-
1000 X 1000 MM PADA SITE
HARUS MENDAPATKAN PERSETUJUAN DARI 000 / 000
-
-
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
DETAIL C
GAMBAR DETAIL
DETAIL D DETAIL GAMBAR GENERAL
DETAIL C & DETAIL D
1:25
HARAP MENYEDIAKAN GAMBAR DETAIL MARET 2023
HARUS MENYEDIAKAN MOCK UP MATERIAL MIN. 500 X 500 MM /
-
1000 X 1000 MM PADA SITE
HARUS MENDAPATKAN PERSETUJUAN DARI 000 / 000
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
DETAIL E
GAMBAR DETAIL
DETAIL GAMBAR GENERAL
DETAIL E & DETAIL F
DETAIL F 1:25
HARAP MENYEDIAKAN GAMBAR DETAIL MARET 2023
HARUS MENYEDIAKAN MOCK UP MATERIAL MIN. 500 X 500 MM /
-
1000 X 1000 MM PADA SITE
HARUS MENDAPATKAN PERSETUJUAN DARI 000 / 000
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
1:35
MARET 2023
HARAP MENYEDIAKAN GAMBAR DETAIL
HARUS MENYEDIAKAN MOCK UP MATERIAL MIN. 500 X 500 MM / 1000 X 1000 MM PADA SITE -
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
GAMBAR DETAIL
DETAIL SECONDARY SKIN
DENAH
1:35
MARET 2023
HARAP MENYEDIAKAN GAMBAR DETAIL
HARUS MENYEDIAKAN MOCK UP MATERIAL MIN. 500 X 500 MM / 1000 X 1000 MM PADA SITE -
-
- STRUCTURE & MEP DRAWINGS REQUIRED
FOR COORDINATION & CONSTRUCTION
- ALL STRUCTURE MEMBERS & DIMENSIONS
ARE INDICATIVE ONLY AND SHOULD
REFER TO ENGINEER'S DETAIL
- ALL DIMENSIONS SHOULD BE VERIFIED
ON SITE
- SHOP DRAWINGS ARE REQUIRED FOR
ARCHITECT'S APPROVAL
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
1:35
MARET 2023
HARAP MENYEDIAKAN GAMBAR DETAIL
HARUS MENYEDIAKAN MOCK UP MATERIAL MIN. 500 X 500 MM / 1000 X 1000 MM PADA SITE -
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
GAMBAR DETAIL
DETAIL PERGOLA CARPORT
TAMPAK ATAS
1:50
MARET 2023
HARAP MENYEDIAKAN GAMBAR DETAIL
HARUS MENYEDIAKAN MOCK UP MATERIAL MIN. 500 X 500 MM / 1000 X 1000 MM PADA SITE -
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
GAMBAR DETAIL
DETAIL PERGOLA CARPORT
POTONGAN 1
1:50
MARET 2023
HARAP MENYEDIAKAN GAMBAR DETAIL
HARUS MENYEDIAKAN MOCK UP MATERIAL MIN. 500 X 500 MM / 1000 X 1000 MM PADA SITE -
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
GAMBAR DETAIL
DETAIL PLANTER BOX
PLANTER BOX 1
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
GAMBAR DETAIL
POTONGAN 1 PLANTER BOX 1 DETAIL PLANTER BOX
PLANTER BOX 1
1:25
HARAP MENYEDIAKAN GAMBAR DETAIL MARET 2023
HARUS MENYEDIAKAN MOCK UP MATERIAL MIN. 500 X 500 MM /
-
1000 X 1000 MM PADA SITE
HARUS MENDAPATKAN PERSETUJUAN DARI 000 / 000
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
GAMBAR DETAIL
POTONGAN 3 PLANTER BOX 1 DETAIL PLANTER BOX
PLANTER BOX 1
1:25
HARAP MENYEDIAKAN GAMBAR DETAIL MARET 2023
HARUS MENYEDIAKAN MOCK UP MATERIAL MIN. 500 X 500 MM /
-
1000 X 1000 MM PADA SITE
HARUS MENDAPATKAN PERSETUJUAN DARI 000 / 000
RUMAH R.M.T
RUNGKUT MAPAN TENGAH
GAMBAR DETAIL
DETAIL PLANTER BOX
PLANTER BOX 2
1:25
HARAP MENYEDIAKAN GAMBAR DETAIL POTONGAN 1 PLANTER BOX 2 MARET 2023
HARUS MENYEDIAKAN MOCK UP MATERIAL MIN. 500 X 500 MM /
-
1000 X 1000 MM PADA SITE
HARUS MENDAPATKAN PERSETUJUAN DARI 000 / 000