PELAKSANA
KODE JUMLAH SUMBER DANA
NO Vol Sat Harga Sat TW 1 TW 2
SNP
(Rp) BOS BPOPP PMP 1 2 3 4 5
1 2 4 5 6 7 8 9 10 11 12 13 14 15
SNP2 Unit Dynamo Meter 1 unit 49,400,000 49,400,000 V 49,400,000
SNP2 Unit Procesing and Display Data Meter 1 unit 48,100,000 48,100,000 V 48,100,000
SNP2 Blower Dinamo Meter 1 unit 2,600,000 2,600,000 V 2,600,000
NIP.
Verifikator
Bendahara
ULIN NUHA
NIP.
Keterangan :
SNP 1
SNP 2
SNP 3
SNP 4
SNP 5
SNP 6
SNP 7
SNP 8
PELAKSANAAN
TOTAL
2 TW 3 TW 4
6 7 8 9 10 11 12
16 17 18 19 20 21 22
49,400,000
48,100,000
2,600,000
100,100,000