Anda di halaman 1dari 8

REKAPITULASI KEMAJUAN PENGADAAN BARANG DAN JASA KONSULTANSI

FORMAT 3.B RSUD I LAGALIGO KABUPATEN LUWU TIMUR


SAMPAI DENGAN SEPTEMBER 2021

WAKTU KONTRAK REALISASI


PAGU ANGGARAN
FISIK KEUANGAN
SUMBER NILAI KONTRAK KONTRAKTOR Jenis
NO NAMA PAKET KEGIATAN VOL PPTK NO. KONTRAK
DANA (Rp) PELAKSANA MULAI AKHIR Pengadaan
SATUAN TOTAL (%) ( Rp ) (%)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Yohanis
II Peralatan dan Perlengkapan RS 2,224,263,366 Siahaya, BLUD 367 1% 337,596,500 15% Langsung
S.Kep
1 AC Split 1 PK 5 unit 4,500,000 22,500,000
No. 12d /NP/RSUD-ILG 46,096,500 Toko Sumber Elektronik 19/01/2021 20/01/2021 100% 46,096,500 100% Langsung
AC Split 2 PK 3 unit 7,865,500 23,596,500
2 Kulkas Vaksin 2 unit 24,800,000 49,600,000 12e/NP/RSUD-ILG 49,600,000 UD. Karya Celebes 19/01/2021 20/01/2021 100% 49,600,000 100% Langsung
3 PC AIO 21,5" 26 bh 8,300,000 215,800,000 010.D-001/SPK/PNJ/RSUD-ILG 215,800,000 UD. Karya Celebes 29/01/2021 02/02/2021 100% 215,800,000 100% Langsung
4 Kipas Angin Regency TW 20 2 bh 950,000 1,900,000 25/NP/RSUD-ILG 1,900,000 CV. Aldi Utama 04/02/2021 04/02/2022 100% 1,900,000 100% Langsung
5 Meja 1/2 Biro 3 Buah 2,350,000 7,050,000
29c/NP/RSUD-ILG 8,850,000 UD. Karya Celebes 09/02/2021 17/02/2022 100% 8,850,000 100% Langsung
Lemari Bufet 1 Buah 1,800,000 1,800,000
6 Kulkas 1 pintu 1 Buah 1,850,000 1,850,000
Kursi Pegawai 12 Unit 500,000 6,000,000 No. 052 /NP/RSUD-ILG 15,350,000 UD. Karya Celebes 09/03/2021 15/03/2021 100% 15,350,000 100% Langsung
Dyspenser 3 Unit 2,500,000 7,500,000
3 079a/NP/RSUD-ILG 30,000,000 Toko Senter Meubel 09/04/2021 12/04/2022 100% 100% Langsung
7 Sofa Ruang Tunggu unit 10,000,000 30,000,000 Wotu 30,000,000
8 Mesin Penghancur 2 Unit Rp 4,000,000 Rp 8,000,000 No. 081 /NP/RSUD-ILG 47,600,000 UD. Karya Celebes 13/04/2021 19/04/2021 100% 47,600,000 100% Langsung
Printer 11 Unit Rp 3,600,000 Rp 39,600,000
9 PC AIO 4 Unit Rp 8,300,000 Rp 33,200,000 No. 092/NP/RSUD-ILG 43,400,000 UD. Karya Celebes 27/04/2021 03/05/2021 100% 43,400,000 100% Langsung
Printer SEP 3 Unit Rp 3,400,000 Rp 10,200,000
10 Tabung Gas 5,5 Kg 1 Buah Rp 400,000 Rp 400,000 No. 092/NP/RSUD-ILG 400,000 CV. Aldi Utama 30/03/2021 01/04/2021 100% 400,000 100% Langsung

14,908,630 Toko Sumber Elektronik 06/04/2021 08/04/2021 100% 14,908,630 100% Langsung
11 Spring Bed Olympic 180 PLT 1 Buah Rp 4,802,030 Rp 4,802,030 No. 076e/NP/RSUD-ILG
AC 1 PK Split 1 Buah Rp 4,467,006 Rp 4,467,006
Kulkas 1 pintu 1 Buah Rp 2,121,827 Rp 2,121,827
Lemari Pakaian 2 pintu 1 Buah Rp 893,401 Rp 893,401
Rak piring 1 Buah Rp 614,213 Rp 614,213
Rice Cooker 1 Buah Rp 335,025 Rp 335,025
Kompor Gas + selang 1 Buah Rp 502,538 Rp 502,538
Meja 1/2 Biro 1 Buah Rp 893,402 Rp 893,402
Kursi Kerja 1 Buah Rp 279,188 Rp 279,188
12 Kursi Tunggu 40 Buah Rp 5,395,000 Rp 215,800,000 Rp 215,800,000 CV. Badrah Rp 215,800,000 100% Langsung
13 AC Split 0,5 PK 1 Unit Rp 4,300,000 Rp 4,300,000 No. 097a/NP/RSUD-ILG 12,870,000 UD. Karya Celebes 04/05/2021 10/05/2021 100% 12,870,000 100% Langsung
AC Split 1 PK 1 Unit Rp 4,500,000 Rp 4,500,000
Rice Cooker 2 Unit Rp 335,000 Rp 670,000
Kompor Gas + Selang + Regulator + Tabung 1 Set Rp 900,000 Rp 900,000
Dyspenser Hot & Cool Bottom Loading 1 Unit Rp 2,500,000 Rp 2,500,000
WAKTU KONTRAK REALISASI
PAGU ANGGARAN
FISIK KEUANGAN
SUMBER NILAI KONTRAK KONTRAKTOR Jenis
NO NAMA PAKET KEGIATAN VOL PPTK NO. KONTRAK
DANA (Rp) PELAKSANA MULAI AKHIR Pengadaan
SATUAN TOTAL (%) ( Rp ) (%)

14 Spring Bed 1 Buah Rp 4,800,000 Rp 4,800,000 No. 097/NP/RSUD-ILG 14,398,000 Toko Pashya 04/05/2021 10/05/2021 100% 14,398,000 100% Langsung
Kulkas 1 pintu 2 Unit Rp 2,120,000 Rp 4,240,000
Lemari Pakaian 2 Buah Rp 893,000 Rp 1,786,000
Rak Piring 2 Buah Rp 614,000 Rp 1,228,000
Meja 1/2 biro 2 Buah Rp 893,000 Rp 1,786,000
Kursi Kerja 2 Buah Rp 279,000 Rp 558,000
15 TV LED 32" + Breket + Pasang 2 Buah Rp 3,200,000 Rp 6,400,000 No. 108/NP/RSUD-ILG 3,200,000 CV. Aldi Utama 21/05/2021 24/05/2021 100% 3,200,000 100% Langsung
16 AC 1 PK 13 Unit Rp 5,310,000 Rp 69,030,000 010.D-008/SPK/PNJ/RSUD-ILG 153,030,000 UD. Karya Celebes 28/05/2021 03/06/2021 100% 153,030,000 100% Langsung
AC 2 PK 5 Unit Rp 8,000,000 Rp 40,000,000
AC 1/2 PK 7 Unit Rp 4,500,000 Rp 31,500,000
Dispenser 5 Buah Rp 2,500,000 Rp 12,500,000
17 Kipas Angin Regency TW 20 2 Buah Rp 950,000 Rp 1,900,000 No. 119a/NP/RSUD-ILG 1,900,000 CV. Aldi Utama 07/06/2021 08/06/2021 100% 1,900,000 100% Langsung

5,025,500 Toko Sumber Elektronik 03/06/2021 04/06/2021 100% 5,025,500 100% Langsung
18 AC 1 PK Split 1 Buah Rp 5,025,500 Rp 5,025,500 No. 116/NP/RSUD-ILG
19 Tirai Pasien 445 Meter Rp 500,000.00 Rp 222,500,000 010.D-007/SPK/PNJ/RSUD-ILG 222,500,000 CV. Karebbe Furniture 29/04/2021 28/05/2021 100% 222,500,000 100% Langsung
20 AC Standing 5 PK 2 Unit Rp 19,300,000 Rp 38,600,000 010.D-009/SPK/PNJ/RSUD-ILG 140,910,000 UD. Karya Celebes 28/06/2021 02/07/2021 100% 140,910,000 100% Langsung
Printer Laser 9 Unit Rp 1,756,000 Rp 15,804,000
Laptop 1 Unit Rp 8,856,000 Rp 8,856,000
Komputer PC 2 Unit Rp 8,300,000 Rp 16,600,000
Kursi Rapat 6 Buah Rp 500,000 Rp 3,000,000
Kursi Pegawai 3 Buah Rp 500,000 Rp 1,500,000
Tempat Tidur Lipat 5 Unit Rp 1,750,000 Rp 8,750,000
Rice Cooker 2 Buah Rp 340,000 Rp 680,000
Tempat Tidur No 1 3 Buah Rp 4,800,000 Rp 14,400,000
Tempat Tidur No 3 3 Unit Rp 2,900,000 Rp 8,700,000
Tempat Tidur No 3 susun 1 Unit Rp 3,850,000 Rp 3,850,000
Tempat Tidur Sofa 1 Unit Rp 3,300,000 Rp 3,300,000
Kulkas 1 Pintu 2 Unit Rp 2,200,000 Rp 4,400,000
Lemari Pakaian 2 Unit Rp 895,000 Rp 1,790,000
Meja Kantor 2 Unit Rp 900,000 Rp 1,800,000
Kompor Gas (+ Selang & Regulator) 2 Unit Rp 900,000 Rp 1,800,000
Rak Piring 2 Unit Rp 640,000 Rp 1,280,000
Dispenser 2 Unit Rp 2,500,000 Rp 5,000,000
Tabung Gas 5 Kg 2 Buah Rp 400,000 Rp 800,000
21 HP 1 Unit Rp 4,400,000 Rp 4,400,000 No. 176a/NP/RSUD-ILG 39,096,000 UD. Karya Celebes 12/08/2021 23/08/2021 100% 39,096,000 100% Langsung
Exhouse Fan 5 Unit Rp 1,083,200 Rp 5,416,000
Loker Petugas 1 Unit Rp 7,500,000 Rp 7,500,000
Rice Cooker 1 buah Rp 340,000 Rp 340,000
Kompor Gas + Selang + Regulator 4 buah Rp 900,000 Rp 3,600,000
Tabung Gas 5 Kg 4 buah Rp 450,000 Rp 1,800,000
WAKTU KONTRAK REALISASI
PAGU ANGGARAN
FISIK KEUANGAN
SUMBER NILAI KONTRAK KONTRAKTOR Jenis
NO NAMA PAKET KEGIATAN VOL PPTK NO. KONTRAK
DANA (Rp) PELAKSANA MULAI AKHIR Pengadaan
SATUAN TOTAL (%) ( Rp ) (%)

Dyspenser Galon bawah 3 buah Rp 2,500,000 Rp 7,500,000


Rak Piring 1 buah Rp 640,000 Rp 640,000
Meja 1/2 biro 1 buah Rp 900,000 Rp 900,000
Springbed No 1 1 buah Rp 4,800,000 Rp 4,800,000
Kulkas 1 pintu 1 buah Rp 2,200,000 Rp 2,200,000
22 Gorden 1 paket Rp 12,571,404 Rp 12,571,404 No. 233a/NP/RSUD-ILG 12,675,000 CV. Mulya Ashari 12/10/2021 18/10/2021 100% 12,675,000 101% Langsung
23 Kipas Angin Regency TW 20 2 buah Rp 950,000 Rp 1,900,000 No. 241/NP/RSUD-ILG 1,900,000 CV. Aldi Utama 21/10/2021 21/10/2021 100% 1,900,000 100% Langsung
24 Kipas Angin Regency TW 20 1 buah Rp 950,000 Rp 950,000 No. 255d/NP/RSUD-ILG 1,900,001 CV. Aldi Utama 05/11/2021 05/11/2021 100% 950,000 100% Langsung
25 Panel Induk-SDP 1 Set Rp 155,000,000 Rp 155,000,000 010.D-010/SPK/PNJ/RSUD-ILG 155,000,000 CV. General Electrik 15/11/2020 21/11/2020 100% 147,000,000 100% Langsung
26 Stavolt 82 Unit Rp 1,010,000 Rp 82,820,000 010.D-011/SPK/PNJ/RSUD-ILG 90,800,000 UD. Karya Celebes 15/11/2021 19/11/2021 100% 89,670,000 100% Langsung
Printer Label 2 Unit Rp 3,425,000 Rp 6,850,000
27 TV 60" Android TV 1 Buah Rp 14,700,000 Rp 14,700,000 No. 294c/NP/RSUD-ILG 22,400,000 UD. Karya Celebes 22/12/2021 27/12/2021 100% 22,400,000 100% Langsung
Breket Standing Mobile 1 Buah Rp 2,500,000 Rp 2,500,000
Printer Thermal + Kertas 2 Buah Rp 2,600,000 Rp 5,200,000
KET (Kendala/ Permasalahan)

16
KET (Kendala/ Permasalahan)
KET (Kendala/ Permasalahan)

Tidak Cukup Pagu Anggaran


PAGU ANGGARAN
NAMA
SUMBER NO.
NO PAKET VOL PPTK
DANA KONTRAK
KEGIATAN
SATUAN TOTAL

Yohanis 14a/NP/
Cetak Rekam Medis 125,000,000 Siahaya, BLUD
S.Kep RSUD-ILG

Yohanis
Siahaya, BLUD
S.Kep
Yohanis
Siahaya, BLUD
S.Kep
Yohanis
Siahaya, BLUD
S.Kep
TOTAL
Yohanis 010.D-002/
Belanja Jasa Pengembangan SIMRS 503,422,500 Siahaya, BLUD SPK/PNJ/
S.Kep RSUD-ILG

TOTAL
WAKTU KONTRAK REALISASI
KONTRAK KET
FISIK KEUANGAN Jenis
NILAI TOR (Kendala/
Pengadaa
KONTRAK (Rp) PELAKSA Permasalah
MULAI AKHIR n
NA an)
(%) ( Rp ) (%)

Perc. 02 Jan 24 Des Pencairan


AGHI 2021 2021 18% 24,437,500 20% Langsung Triwulan 1
(Jan-Mar)

Perc. 01 Jan 24 Des Pencairan


AGHI 2020 2020 32% 25,701,000 21% Langsung Triwulan 2
(Apr-Jun)

Perc. 01 Jan 24 Des Pencairan


50% 13,536,000 11% Langsung Triwulan 3
AGHI 2020 2020
(Jul- Sep)

Perc. 25 Des Pencairan


2 Jan 2020 #DIV/0! Langsung Triwulan 4
AGHI 2020 (Okt- Des)
50% 63,674,500 51%

499,000,000 PT. 0% 99,800,000 20% Langsung Pencairan


Entliven Termin 1

PT. Pencairan
Entliven 50% 124,750,000 25% Langsung Termin 2
29 Jan 28 Des
2021 2021
PT. 75% 0% Langsung Pencairan
Entliven Termin 3

PT. Pencairan
Entliven 100% 0% Langsung Termin 4

100% 224,550,000 45%

Anda mungkin juga menyukai