TOTAL
1,160,878,400 - 149,550,700 149,550,700 1,011,327,700
PPN 10%
116,087,840 - 14,955,070 14,955,070 101,132,770
TAMBAHAN PPN 1%
11,608,784 - 1,495,507 1,495,507 10,113,277
TOTAL BIAYA
1,288,575,024 - 166,001,277 166,001,277 1,122,573,747
PENGAMBILAN / PENGEMBALIAN UANG MUKA
255,393,199 - 33,200,255 33,200,255 222,192,944
INVOICE BULAN INI
- 132,801,022 132,801,022 900,380,803
NILAI KONTRAK JUMLAH BIAYA BULAN LALU BULAN INI SAMPAI BULAN INI
No URAIAN SISA
(Rp) (Rp) (Rp) (Rp) (Rp)
A Profesional Staff
1 Team Leader 1 OB 5 28,130,000.00 140,650,000 - - 1.00 28,130,000 1.00 28,130,000 4.00 112,520,000
2 Ahli Jembatan 1 OB 5 26,650,000.00 133,250,000 - - 1.00 26,650,000 1.00 26,650,000 4.00 106,600,000
3 Ahli Geoteknik 1 OB 3 26,650,000.00 79,950,000 - - - - - - 3.00 79,950,000
4 Ahli Hidrologi 1 OB 3 26,650,000.00 79,950,000 - - - - - - 3.00 79,950,000
5 Ahli K3 Konstruksi 1 OB 3 26,650,000.00 79,950,000 - - 1.00 26,650,000 1.00 26,650,000 2.00 53,300,000
6 Ahli Kuantitas dan Biaya 1 OB 4 26,650,000.00 106,600,000 - - - - - - 4.00 106,600,000
1 Profesional Staff (6) PP 12 1,000,000 12,000,000 - - 3.00 3,000,000 3.00 3,000,000 9.00 9,000,000
2 Sub Profesional Staff (3) PP 6 700,000 4,200,000 - - 1.00 700,000 1.00 700,000 5.00 3,500,000
3 Supporting Staff (8) PP 16 400,000 6,400,000 - - 5.00 2,000,000 5.00 2,000,000 11.00 4,400,000
Volume Bulan Lalu Bulan Ini Sampai Bulan Ini Sisa Kontrak
Nilai Kontrak
No. Uraian Satuan Beban Biaya (Rp.) Jumlah Jumlah Biaya Jumlah Jumlah Biaya Jumlah Jumlah Biaya Jumlah Jumlah Biaya
(Rp.) Org/Bln (Rp) Org/Bln (Rp) Org/Bln (Rp) Org/Bln (Rp)
1 Perjalanan Dinas
Perjalanan Dinas ke Jakarta
-Tiket Pesawat Tim Leader dan Ahli Jembatan (6 kali) PP 12.00 1,000,000 12,000,000 - - - - - - 12.00 12,000,000
- Penginapan (2 malam per perjalanan dinas) OH 24.00 350,000 8,400,000 - - - - - - 24.00 8,400,000
2 Sewa Kendaraan Roda 4 & Biaya Operasional Bln 5.00 4,500,000 22,500,000 - - 1.00 4,500,000 1.00 4,500,000 4.00 18,000,000
3 Sewa Kendaraan Roda 2-1 & Biaya Operasional Bln 3.00 800,000 2,400,000 - - 1.00 800,000 1.00 800,000 2.00 1,600,000
4 Sewa Kendaraan Roda 2-2 & Biaya Operasional Bln 3.00 800,000 2,400,000 - - 1.00 800,000 1.00 800,000 2.00 1,600,000
5 Komunikasi Bln 5.00 800,000 4,000,000 - - 1.00 800,000 1.00 800,000 4.00 3,200,000
6 Komputer - 1 Bln 4.00 800,000 3,200,000 - - 1.00 800,000 1.00 800,000 3.00 2,400,000
7 Komputer - 2 Bln 4.00 800,000 3,200,000 - - 1.00 800,000 1.00 800,000 3.00 2,400,000
8 Sewa Printer A3 Bln 5.00 350,000 1,750,000 - - 1.00 350,000 1.00 350,000 4.00 1,400,000
9 Sewa Printer A4 Bln 5.00 300,000 1,500,000 - - 1.00 300,000 1.00 300,000 4.00 1,200,000
10 Biaya ATK Bln 5.00 1,750,000 8,750,000 - - 1.00 1,750,000 1.00 1,750,000 4.00 7,000,000
11 Sewa Kamera Bln 4.00 300,000 1,200,000 - - 1.00 300,000 1.00 300,000 3.00 900,000
12 Sewa Hand GPS Bln 3.00 600,000 1,800,000 - - 1.00 600,000 1.00 600,000 2.00 1,200,000
13 Sewa Kantor & Mess Bln 5.00 1,000,000 5,000,000 - - 1.00 1,000,000 1.00 1,000,000 4.00 4,000,000
14 Peralatan K3
- Rompi Pengaman Personil Buah 11.00 80,000 880,000 - - 11.00 880,000 11.00 880,000 - -
- Helm Pengaman Buah 11.00 40,000 440,000 - - 11.00 440,000 11.00 440,000 - -
- Sepatu Safety Buah 11.00 120,000 1,320,000 - - 11.00 1,320,000 11.00 1,320,000 - -
- Kaca Mata Safety Buah 11.00 20,000 220,000 - - 11.00 220,000 11.00 220,000 - -
- Alat Ukur (meteran) Buah 2.00 80,000 160,000 - - 2.00 160,000 2.00 160,000 - -
II.3 Jumlah Biaya Survei dan Penggunaan Peralatan dan Transportasi 118,100,000 - 9,000,000 9,000,000 109,100,000
0
KEGIATAN :
PEKERJAAN : PAKET 10 REVIEW DESAIN PEMBANGUNAN JEMBATAN S. RANTAU BERANGIN CS
NILAI PAGU : Rp -
SUMBER DANA : APBD PROVINSI RIAU
TAHUN ANGGARAN : 2011
Harga
No. Uraian Personil / Ahli Satuan Keterangan / Pengalaman
(Rp)
Jumlah Biaya
No. Uraian Personil / Ahli Keterangan
Orang Trip (Rp)
A Tenaga Ahli Profesional
1 Profesional Staff (6) 1 1 500,000.00
2 Sub Profesional Staff (3) 1 1 350,000.00
3 Err:509 1 1 350,000.00
4 Err:509 1 1 350,000.00
5 Err:509 1 1 350,000.00
6 Err:509 1 1 350,000.00
7 Err:509 1 1 350,000.00
8 Err:509 1 1 350,000.00
Harga Satuan
No. Susunan / Uraian Satuan Keterangan
(Rp)
Harga Satuan
No. Uraian Personil / Ahli Satuan Keterangan
(Rp)