TAHUN ANGGARAN 2018, STATUS S/D 31 DESEMBER 2018 SUMBER DANA APBD
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISASI
DASK/DIPA KONTRAK NAMA PERUSAHAAN/NOMOR MULAI SELESAI FISIK KEU. FISIK KEUANGA
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT FISIK KEU.
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%) (%)
1 2 4 5 6 8 9 10 11 12 13 14.00 15.00 16.00 17.00
- SMK Negeri 8 Selayar 1 Pkt 200,000,000 199,800,000 30.49 30.49 30.46 CV. PUTRA SOLO 11-04-2017 100.00 100.00 100.00 99.90
056/158/P2KP
SMAN 12 Bulukumba 1 PKT 95,000,000 94,800,000 6.13 6.13 6.11 CV. RAYYAN PUTRA 07-05-2018 04-08-2018 100.00 100.00 100.00 99.79
056/341/PLP
Pembangunan Air Limbah SMA/SMK se- Sulsel
SMA Negeri 8 Model Kabupaten Bulukumba 1 PKT 95,000,000 94,600,000 6.11 6.11 6.09 CV. FATIMAH MITRA PERKASA 8/31/2018 11/28/2018 100.00 100.00 100.00 99.58
056/583/PLP
SMA Negeri 1 Bulukumba Kabupaten Bulukumba 1 PKT 95,000,000 94,500,000 6.11 6.11 6.07 CV. NAUFAL PUTRA 8/31/2018 11/28/2018 100.00 100.00 100.00 99.47
056/583/PLP
Program Fasilitasi dan Pengembangan Infrastruktur Permukiman
Kegiatan : Pembangunan Sarana dan Prasarana Persampahan
> PPTK : Zunaifa Y. Slamet, ST. MT
Belanja Modal
Pembangunan Sarana Persampahan SMA/MK se-Sulsel 1 PKT 150,000,000 145,300,000 9.39 9.39 9.10 CV. HERLITA ABADI 18-05-2018 15-08-2018 100.00 100.00 100.00 96.87
- SMA Negeri 1 Bulukumba 056/203/PLP
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISASI
DASK/DIPA KONTRAK NAMA PERUSAHAAN/NOMOR MULAI SELESAI FISIK KEU. FISIK KEUANGA
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT FISIK KEU.
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00 17.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISASI
NAMA PERUSAHAAN/NOMOR
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT DASK/DIPA KONTRAK FISIK KEU. MULAI SELESAI FISIK KEU. FISIK KEUANGA
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00 17.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISASI
DASK/DIPA KONTRAK NAMA PERUSAHAAN/NOMOR MULAI SELESAI FISIK KEU. FISIK KEUANGA
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT FISIK KEU.
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00 17.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISASI
DASK/DIPA KONTRAK NAMA PERUSAHAAN/NOMOR MULAI SELESAI FISIK KEU. FISIK KEUANGA
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT FISIK KEU.
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK KONTRAK (%) (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00 17.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISASI
NAMA PERUSAHAAN/NOMOR
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT DASK/DIPA KONTRAK FISIK KEU. MULAI SELESAI FISIK KEU. FISIK KEUANGA
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00 17.00
- SMA Negeri 2 Sinjai Kabupaten Sinjai 1 PKT 95,000,000 94,300,000 10.56 10.56 10.49 CV. MUSTIKA MITRA SELARAS 8/31/2018 11/28/2018 100.00 100.00 100.00 99.26
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISASI
NAMA PERUSAHAAN/NOMOR
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT DASK/DIPA KONTRAK FISIK KEU. MULAI SELESAI FISIK KEU. FISIK KEUANGA
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00 17.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISASI
NAMA PERUSAHAAN/NOMOR
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT DASK/DIPA KONTRAK FISIK KEU. MULAI SELESAI FISIK KEU. FISIK KEUANGA
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00 17.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISASI
NAMA PERUSAHAAN/NOMOR
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT DASK/DIPA KONTRAK FISIK KEU. MULAI SELESAI FISIK KEU. FISIK KEUANGA
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00 17.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISASI
NAMA PERUSAHAAN/NOMOR
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT DASK/DIPA KONTRAK FISIK KEU. MULAI SELESAI FISIK KEU. FISIK KEUANGA
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00 17.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISASI
DASK/DIPA KONTRAK NAMA PERUSAHAAN/NOMOR MULAI SELESAI FISIK KEU. FISIK KEUANGA
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT FISIK KEU.
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00 17.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISASI
NAMA PERUSAHAAN/NOMOR
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT DASK/DIPA KONTRAK FISIK KEU. MULAI SELESAI FISIK KEU. FISIK KEUANGA
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00 17.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISASI
NAMA PERUSAHAAN/NOMOR
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT DASK/DIPA KONTRAK FISIK KEU. MULAI SELESAI FISIK KEU. FISIK KEUANGA
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00 17.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISASI
DASK/DIPA KONTRAK NAMA PERUSAHAAN/NOMOR MULAI SELESAI FISIK KEU. FISIK KEUANGA
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT FISIK KEU.
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00 17.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISASI
DASK/DIPA KONTRAK NAMA PERUSAHAAN/NOMOR MULAI SELESAI FISIK KEU. FISIK KEUANGA
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT FISIK KEU.
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00 17.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISASI
DASK/DIPA KONTRAK NAMA PERUSAHAAN/NOMOR MULAI SELESAI FISIK KEU. FISIK KEUANGA
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT FISIK KEU.
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00 17.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISASI
DASK/DIPA KONTRAK NAMA PERUSAHAAN/NOMOR MULAI SELESAI FISIK KEU. FISIK KEUANGA
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT FISIK KEU.
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00 17.00
- -
JUMLAH APBD 0 0 - - -
DAFTAR PAKET PEKERJAAN DALAM LINGKUP DINAS PERUMAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
TAHUN ANGGARAN 2018, STATUS S/D 31 DESEMBER 2018 SUMBER DANA APBD
LOKASI : KABUPATEN TORAJA UTARA
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISASI
DASK/DIPA KONTRAK NAMA PERUSAHAAN/NOMOR MULAI SELESAI FISIK KEU. FISIK KEUANGA
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT FISIK KEU.
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00 17.00
SMA NEGERI 1 RANTEPAO 130,000,000 129,900,000 11.89 11.89 11.88 CV. HAJJAH BANSUHARI 1-11-2018 100.00 100.00 100.00 99.92
056/655/P2KP
SMK Negeri 1 Kesu 1 Pkt 184,000,000 183,900,000 16.83 16.83 16.83 CV. RULMADHANI PRIMA 7/5/2018 11/1/2018 100.00 100.00 100.00 99.95
SMA Negeri 2 Rantepao 1 Pkt 184,000,000 183,900,000 16.83 16.83 16.83 CV. ZAHRA UTAMA KONSTRUKSI 7/5/2018 11/1/2018 100.00 100.00 100.00 99.95
SMA Negeri 1 Rantepao 1 Pkt 165,600,000 165,300,000 15.13 15.13 15.10 CV. MAHKAMA KOSNTRUKSI 7/5/2018 11/1/2018 100.00 100.00 100.00 99.82
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISASI
NAMA PERUSAHAAN/NOMOR
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT DASK/DIPA KONTRAK FISIK KEU. MULAI SELESAI FISIK KEU. FISIK KEUANGA
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00 17.00
SMK Negeri 10 Rumajiu Kab. Luwu 1 Pkt 186,000,000 185,700,000 13.59 13.59 13.57 CV. INTRA KONSTRUKSI 02-11-2018 16-12-2018 100.00 100.00 100.00 99.84
056/685/PLP
SMA Negeri 17 Luwu Kab. Luwu 1 Pkt 186,000,000 185,800,000 13.60 13.60 13.58 CV. ZIDANE BERSAUDARA 02-11-2018 16-12-2018 100.00 100.00 100.00 99.89
056/691/PLP
SMA Negeri 16 Luwu Kab. Luwu 1 Pkt 93,000,000 92,836,000 6.79 6.79 6.78 CV. FIKRI JAYA TEKNIK 02-11-2018 16-12-2018 100.00 100.00 100.00 99.82
056/700/PLP
SMA Negeri 1 Bajo Kab. Luwu 1 Pkt 93,000,000 92,739,000 6.79 6.79 6.77 CV. PIGO UTAMA 02-11-2018 16-12-2018 100.00 100.00 100.00 99.72
056/709/PLP
SMA Negeri 2 Bajo Kab. Luwu 1 Pkt 93,000,000 92,662,000 6.78 6.78 6.76 CV. SENI KARYA 02-11-2018 16-12-2018 100.00 100.00 100.00 99.64
056/748/PLP
SMA Negeri 18 Luwu Kab. Luwu 1 Pkt 93,000,000 92,934,000 6.80 6.80 6.80 CV. CAHAYA TIMUR UTARA 02-11-2018 16-12-2018 100.00 100.00 100.00 99.93
056/745/PLP
SMA Negeri 1 Palopo Kota Palopo 1 Pkt 140,000,000 139,900,000 7.35 7.35 7.34 CV. ALIF PUTRA 9/5/2018 12/3/2018 100.00 100.00 100.00 99.93
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISASI
NAMA PERUSAHAAN/NOMOR
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT DASK/DIPA KONTRAK FISIK KEU. MULAI SELESAI FISIK KEU. FISIK KEUANGA
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00 17.00
Anggaran Perubahan
SMAN 1 Malili 1 Pkt 93,000,000 92,781,000 8.45 8.45 8.43 CV. AMALIA UTAMA 02-11-2018 16-12-2018 100.00 100.00 100.00 99.76
056/718/PLP
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISASI
DASK/DIPA KONTRAK FISIK KEU. NAMA PERUSAHAAN/NOMOR MULAI SELESAI FISIK KEU. FISIK KEUANGA
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00 17.00
1. Program Fasilitasi dan Pengembangan Infrastruktur Permukiman
Kegiatan : Pembangunan Sarana dan Prasarana Persampahan
> PPTK : Zunaifa Y. Slamet, ST. MT
Belanja Modal
Pembangunan Sarana Persampahan SMA/MK se-Sulsel
- SMA Negeri 17 Makassar 1 PKT 150,000,000 149,624,000 13.63 13.63 13.59 CV. ARMILA BAKTI KENCANA 18-04-2018 16-07-2018 100.00 100.00 100.00 99.75
056/13/PLP
Kegiatan :
> PPTK : Yosep Sulle, S.Sos. M.Si
Belanja Modal
Penataan Ruang Terbuka Hijau SMA/SMK Se-SulSel
- - SMA Negeri 9 Makassar 1 Pkt 140,000,000 139,900,000 12.74 12.74 12.73 CV. SAHIRA JAYA PRATAMA 09-05-2018 100.00 100.00 100.00 99.93
056/409/P2KP
- SMA Negeri 13 Makassar 1 Pkt 78,000,000 77,750,000 7.08 7.08 7.06 CV. PAMULANG UTAMA MANDIRI 11-04-2018 100.00 100.00 100.00 99.68
056/311/P2KP
- SMA Negeri 19 Makassar 1 Pkt 52,000,000 51,900,000 4.73 4.73 4.72 CV. MITRA GEMILANG PERSADA 09-05-2018 100.00 100.00 100.00 99.81
056/688/P2KP
- Pekerjaan Konstruksi Penataan Ruang Terbuka Hijau Eks. Kantor Dinas
1 Pkt
2,675,000,000 - - - 0.00 0.00 0.00 0.00
Perhubungan
- Pakaian Batik Tradisional 1 Thn 86,500,000 86,500,000 0.76 0.76 0.68 100.00 100.00 100.00 89.13
- Pakaian Olahraga 1 Thn 95,150,000 95,150,000 0.83 0.83 0.75 100.00 100.00 100.00 89.33
- Belanja Pemeliharaan
- Pemeliharaan Alat Kantor 1 Thn 15,000,000 14,950,000 0.13 0.13 0.13 100.00 100.00 100.00 99.67
- Pemeliharaan Komputer 1 Thn 15,000,000 14,985,000 0.13 0.13 0.13 100.00 100.00 100.00 99.90
- Belanja Pemeliharaan Aset Tak Terwujud 1 Thn 6,600,000 - - - - 100.00 100.00 0.00 0.00
Belanja Modal Pengadaan Komputer NoteBook 3 Unit 50,000,000 49,600,000 0.44 0.44 0.43 CV. AYAM JANTANG KOMUNIKA 100.00 100.00 100.00 99.20
Pengadaan Printer 2 Pkt 47,500,000 47,240,000 0.41 0.41 0.41 CV. PUTRA BIRU SEJAHTERA 100.00 100.00 100.00 99.45
- Pengadaan Kursi Kerja 75 Unit 62,500,000 62,000,000 0.54 0.54 0.54 CV. SENTOSA UTAMA 100.00 100.00 100.00 99.20
Pemasangan Vinyl Lantai Gedung Kantor Lantai 2 1 Pkt 200,000,000 199,334,000 1.75 1.75 1.74 CV. Ute Utama 100.00 100.00 100.00 99.67
Penggantian Tegel/Keramik Lantai 1 1 Pkt 100,000,000 99,540,000 0.87 0.87 0.87 CV. Maco Utama 100.00 100.00 100.00 99.54
Pekerjaan Interior Ruang Tamu 1 Pkt 74,300,000 68,660,000 0.60 0.60 0.56 CV. Agrima 100.00 100.00 100.00 92.41
- Sosialisasi Media Elektronik 1 Kali 50,000,000 49,500,000 0.43 0.43 0.43 100.00 100.00 100.00 99.00
- Sosialisasi Media Elektronik 1 Kali 40,000,000 39,900,000 0.35 0.35 0.35 100.00 100.00 100.00 99.75
Pr anwar
Kegiatan : Penatausahaan Adminstrasi Kepegawaian
> PPTK : Drs. Anwar, M.Si
Belanja Kursus Singkat
Diklat PIM III 88,500,000 88,500,000 0.78 0.78 0.78 100.00 100.00 100.00 100.00
Diklat PIM IV 161,840,000 161,840,000 1.42 1.42 1.42 100.00 100.00 100.00 100.00
Diklat Keuangan 18,000,000 18,000,000 0.16 0.16 0.16 100.00 100.00 100.00 100.00
Sosialisasi Peningkatan Kapasitas Kelembagaan Pokja Perumahan (PKP) 200,000,000 199,900,000 1.75 1.75 1.75 CV. KHALIFAH 20-11-2018 100.00 100.00 100.00 99.95
Se Sulawesi Selatan 056/763/PERUMAHAN
Penyusunan DED Drainase SMA/SMK Negeri Kab. Enrekang dan Kab. Sidrap 125,000,000 124,500,000 1.09 1.09 1.09 PT. GEMA TEKNIK KONSULTAN 7/10/2018 10/8/2018 100.00 100.00 100.00 99.60
Tahun 2019 056/364/PLP
Penyusunan DED Drainase SMA/SMK Negeri Kab. Bantaeng dan Kab. Sinjai 125,000,000 124,050,000 1.09 1.09 1.08 CV. D'LUNA ENGINEERING 7/23/2018 21-10-20182 100.00 100.00 100.00 99.24
Tahun 2019 056/421/PLP
Wilayah II 50,000,000 49,900,000 0.44 0.44 0.44 PT. GEMA TEKNIK KONSULTAN 03-05-2018 31-07-2018 100.00 100.00 100.00 99.80
Wilayah III 50,000,000 49,900,000 0.44 0.44 0.44 PT. VERTIKAL HORIZON 20-04-2018 18-07-2018 100.00 100.00 100.00 99.80
Sosialisasi Kelembagaan Pengelolaan Sampah Bagi Kab/Kota 200,000,000 199,900,000 1.75 1.75 1.75 CV. MINNA SEJAHTERA 29-11-2018 07-12-2018 100.00 100.00 100.00 99.95
056/768/PLP
Penyusunan DED Revitalisasi Kawasan Permukiman Kab. Gowa 1 Dok 150,000,000 148,475,000 1.30 1.30 1.29 100.00 100.00 100.00 98.98
Penyusunan DED Revitalisasi Kawasan Permukiman Kab. Takalar 1 Dok 150,000,000 149,050,000 1.31 1.31 1.30 100.00 100.00 100.00 99.37
Penyusunan DED Revitalisasi Kawasan Permukiman Kab. Bone 1 Dok 150,000,000 149,000,000 1.31 1.31 1.30 100.00 100.00 100.00 99.33
Penyusunan DED Sistem Penyediaan Air Minum SMA/SMK Negeri 200,000,000 196,900,000.00 1.73 1.73 1.70 CV. GRADASI GARISARCH 05-07-2018 03-10-2018 100.00 100.00 100.00 98.45
Se Sulsel 056/490/P2KP
- Identifikasi Prasarana dan Sarana Jalan Lingkungan Permukiman 100,000,000 98,900,000 0.87 0.87 0.86 CV. MANDALA PRIMA 7/10/2018 9/7/2018 100.00 100.00 100.00 98.90
Pada Kawasan Kumuh Perkotaan di Kota Palopo 056/353/P2KP
- Identifikasi Prasarana dan Sarana Jalan Lingkungan Permukiman 350,000,000 340,500,000 2.99 2.99 2.91 PT. MEDIA SPASIAL 7/20/2018 11/23/2018 100.00 100.00 100.00 97.29
Pada Kawasan Kumuh Perkotaan di Kab. Luwu , Luwu Utara dan Luwu Timur 056/494/P2KP
Identifikasi Prasarana dan Sarana Jalan Lingkungan Permukiman 200,000,000 197,300,000 1.73 1.73 1.71 CV. MATRA DESAIN 7/10/2018 9/7/2018 100.00 100.00 100.00 98.65
Pada Kawasan Kumuh Perkotaan di Kab. Sinjai dan Bulukumba 056/350/P2KP
Pengawasan Konstruksi
Perencanaan Lapangan Upacara dan Parkir (SMA/SMK Negeri di Kab. Toraja Utara, 21,000,000 20,900,000 0.18 0.18 0.18 CV. ULFA CONSULTANT 13/4/2018 100.00 100.00 100.00 99.52
Luwu Utara dan Luwu Timur) 056/29/PKP2
- SMK Negeri 4 166,250,000 166,100,000 1.46 1.46 1.46 CV. ZAHRA UTAMA 01-11-2018 100.00 100.00 100.00 99.91
- SMK Negeri 5 166,250,000 166,150,000 1.46 1.46 1.46 CV. AMI JAYA 01-11-2018 100.00 100.00 100.00 99.94
- SMA Negeri 6 166,250,000 166,150,000 1.46 1.46 1.46 CV. SAHIRA JAYA 01-11-2018 100.00 100.00 100.00 99.94
- SMA Negeri 7 142,500,000 142,300,000 1.25 1.25 1.25 CV. HANIFAH RESKI 01-11-2018 100.00 100.00 100.00 99.86
- SMA Negeri 8 142,500,000 142,400,000 1.25 1.25 1.25 CV. BAHTERA ANUGRAH 01-11-2018 100.00 100.00 100.00 99.93
Pengawasan Penataan Ruang Terbuka Hijau SMA/SMK Negeri se Sulsel (Perubahan) 50,000,000 49,900,000 0.44 0.44 0.44 CV. DELTA DIMENSI CONSULTANT 11-04-2018 100.00 100.00 100.00 99.80
Perencanaan Konstruksi
Perencanaan Lapangan Upacara dan parkir (SMA/SMK Negeri 33,840,000 33,840,000 0.30 0.30 0.30 CV. AMALIA DAYA CONSULTANT 13-04-2018 100.00 100.00 100.00 100.00
di Kab. Toraja Utara, Luwu Utara dan Luwu Timur
Pengawasan Konstruksi
Perencanaan Lapangan Upacara dan parkir (SMA/SMK Negeri 20,900,000 20,900,000 0.18 0.18 0.18 CV. ULFA CONSULTANT 13-04-2018 100.00 100.00 100.00 100.00
di Kab. Toraja Utara, Luwu Utara dan Luwu Timur
Sosialisasi Sistem Pengelolaan Air Limbah Rumah Tangga 200,000,000 199,900,000 1.75 1.75 1.75 100.00 100.00 100.00 99.95
Sosialisasi Teknis Pengelolaan dan Operasional IPAL dan IPLT 200,000,000 199,900,000 1.75 1.75 1.75 100.00 100.00 100.00 99.95
Sosialisasi Pengadaan Tanah 1 Pkt 150,000,000 149,900,000 1.32 1.32 1.31 CV. KHALIFAH 7/4/2018 100.00 100.00 100.00 99.93
056/16/PERTNAHAN
Sosialisasi Tentang Status Hak Atas Tanah, Antara Tanah Negara dan Tanah Hak, 1 Pkt 100,000,000 99,900,000 0.88 0.88 0.88 CV. NUR INDAH KARYA 7/4/2018 100.00 100.00 100.00 99.90
dalam Pengadaa Tanah 056/453/PERTNAHAN
Sosialisasi Penggunaan, Pemanfaatan dan Penguasaan Tanah Negara 1 pkt 100,000,000 99,900,000 0.88 0.88 0.88 CV. NI'MAT KARYA 14-11-2018 100.00 100.00 100.00 100.00
056/771/PERTNAHAN
Workshop Penyusunan Dokumen Perencanaan Pengadaan Tanah 200,000,000 199,900,000 1.75 1.75 1.75 CV. NI'MAT KARYA 7/4/2018 100.00 100.00 100.00 99.95
Penyusunan SOP bidang Pertanahan 50,000,000 49,900,000 0.44 0.44 0.44 CV. PAINDO RAYA 11/9/2018 100.00 100.00 100.00 99.80
056/744/PERTANAHAN
REALISASI
KEUANGAN SISA ANGGARAN KET
(Rp) (Rp)
18 19 20
139,840,000 160,000
139,810,000 190,000
175,850,000 150,000
199,800,000 200,000
HAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
TUS S/D 31 DESEMBER 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(Rp) (Rp)
18 19 20
134,863,000 137,000
94,800,000 200,000
94,600,000 400,000
94,500,000 500,000
145,300,000 4,700,000
139,100,000 400,000
137,800,000 200,000
137,850,000 150,000
199,900,000 100,000
168,900,000 100,000
199,800,000 200,000
HAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
TUS S/D 31 DESEMBER 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(Rp) (Rp)
18 19 20
179,800,000 200,000
179,500,000 500,000
91,900,000 100,000
183,800,000 200,000
183,800,000 200,000
183,900,000 100,000
199,800,000 200,000
167,900,000 100,000
126,800,000 200,000
HAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
TUS S/D 31 DESEMBER 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(Rp) (Rp)
18 19 20
100,800,000 200,000
100,900,000 100,000
139,300,000 200,000
139,200,000 300,000
134,700,000 300,000
134,700,000 300,000
136,900,000 100,000
REALISASI
KEUANGAN SISA ANGGARAN KET
(Rp) (Rp)
18 19 20
142,500,000 7,500,000
142,500,000 7,500,000
109,900,000 100,000
83,900,000 100,000
72,900,000 100,000
HAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
TUS S/D 31 DESEMBER 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(Rp) (Rp)
18 19 20
149,711,000 289,000
149,631,000 369,000
134,800,000 200,000
134,600,000 400,000
185,693,000 307,000
92,873,000 127,000
91,900,000 100,000
183,800,000 200,000
197,900,000 100,000
96,750,000 250,000
79,800,000 200,000
154,900,000 100,000
85,700,000 300,000
77,900,000 100,000
139,900,000 100,000
64,200,000 800,000
-
REALISASI
KEUANGAN SISA ANGGARAN KET
(Rp) (Rp)
18 19 20
189,500,000 500,000
134,700,000 300,000
94,300,000 700,000
94,300,000 700,000
149,492,000 508,000
149,485,000 515,000
80,900,000 100,000
REALISASI
KEUANGAN SISA ANGGARAN KET
(Rp) (Rp)
18 19 20
238,855,000 11,145,000
24,850,000 150,000
14,950,000 50,000
129,900,000 100,000
183,900,000 100,000
78,900,000 100,000
HAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
TUS S/D 31 DESEMBER 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(Rp) (Rp)
18 19 20
191,600,000 400,000
147,900,000 100,000
199,900,000 100,000
88,900,000 100,000
HAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
TUS S/D 31 DESEMBER 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(Rp) (Rp)
18 19 20
163,850,000 150,000
185,220,000 780,000
185,360,000 640,000
HAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
TUS S/D 31 DESEMBER 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(Rp) (Rp)
18 19 20
45,900,000 100,000
152,800,000 200,000
HAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
TUS S/D 31 DESEMBER 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(Rp) (Rp)
18 19 20
94,700,000 300,000
139,500,000 500,000
139,700,000 300,000
149,697,000 303,000
185,470,000 530,000
183,900,000 100,000
183,900,000 100,000
133,900,000 100,000
HAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
TUS S/D 31 DESEMBER 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(Rp) (Rp)
18 19 20
92,640,000 360,000
HAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
TUS S/D 31 DESEMBER 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(Rp) (Rp)
18 19 20
94,680,000 320,000
94,700,000 300,000
94,750,000 250,000
94,800,000 200,000
94,650,000 350,000
145,294,000 4,706,000
145,500,000 4,500,000
HAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
TUS S/D 31 DESEMBER 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(Rp) (Rp)
18 19 20
152,900,000 -
79,900,000 -
94,600,000 400,000
94,700,000 300,000
185,700,000 300,000
92,700,000 300,000
92,900,000 100,000
-
185,410,000 590,000
185,500,000 500,000
-
HAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
TUS S/D 31 DESEMBER 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(Rp) (Rp)
18 19 20
145,325,000 4,675,000
145,298,000 4,702,000
117,900,000 -
HAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
TUS S/D 31 DESEMBER 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(Rp) (Rp)
18 19 20
189,790,000 210,000
185,600,000 400,000
199,800,000 200,000
123,900,000 100,000
HAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
TUS S/D 31 DESEMBER 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(Rp) (Rp)
18 19 20
HAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
TUS S/D 31 DESEMBER 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(Rp) (Rp)
18 19 20
- -
61,800,000 200,000
183,800,000 200,000
129,900,000 100,000
183,800,000 200,000
183,900,000 100,000
183,900,000 100,000
165,300,000 300,000
HAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
TUS S/D 31 DESEMBER 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(Rp) (Rp)
18 19 20
134,800,000 200,000
189,600,000 400,000
185,700,000 300,000
185,800,000 200,000
92,836,000 164,000
92,739,000 261,000
92,662,000 338,000
92,934,000 66,000
149,697,000 303,000
149,671,000 329,000
HAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
TUS S/D 31 DESEMBER 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(Rp) (Rp)
18 19 20
113,200,000 500,000
113,300,000 400,000
185,860,000 140,000
185,700,000 300,000
92,780,000 220,000
127,900,000 200,000
139,900,000 100,000
139,900,000 100,000
149,673,000 327,000
139,050,000 450,000
183,900,000 100,000
132,300,000 100,000
199,900,000 100,000
-
HAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
TUS S/D 31 DESEMBER 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(Rp) (Rp)
18 19 20
140,900,000 100,000
157,900,000 100,000
199,900,000 100,000
129,800,000 60,200,000
134,700,000 300,000
-
185,892,000 108,000
92,862,000 138,000
185,855,000 145,000
-
HAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
TUS S/D 31 DESEMBER 2018 SUMBER DANA APBD
REALISASI
(Rp) (Rp)
18 19 20
94,830,000 170,000
94,900,000 100,000
92,781,000 219,000
149,576,000 424,000
149,565,000 435,000
174,900,000 100,000
49,900,000 100,000
149,900,000 100,000
141,900,000 100,000
-
HAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
TUS S/D 31 DESEMBER 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(Rp) (Rp)
18 19 20
149,624,000 376,000
139,900,000 100,000
77,750,000 250,000
51,900,000 100,000
2,675,000,000
200,000,000
80,000,000
74,700,000 300,000
181,000,000 1,000,000
180,700,000 1,300,000
181,500,000 500,000
33,500,000 250,000
20,050,000 200,000
7,250,000 250,000
HAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
TUS S/D 31 DESEMBER 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(Rp) (Rp)
18 19 20
256,600,000 26,400,000
77,100,000 9,400,000
85,000,000 10,150,000
14,950,000 50,000
14,985,000 15,000
- 6,600,000
52,635,000 233,000
23,760,000 240,000
99,570,000 430,000
49,600,000 400,000
47,240,000 260,000
122,320,000 680,000
62,000,000 500,000
199,800,000 200,000
199,334,000 666,000
99,540,000 460,000
68,660,000 5,640,000
-
99,900,000 100,000
99,550,000 450,000
49,500,000 500,000
39,900,000 100,000
100,000,000 -
88,500,000 -
161,840,000 -
18,000,000 -
149,200,000 800,000
49,960,000 40,000
49,900,000 100,000
99,700,000 300,000
199,850,000 150,000
147,700,000 2,300,000
100,000,000
99,800,000 200,000
445,456,000 4,544,000
199,900,000 100,000
100,000,000
199,900,000 100,000
99,900,000 100,000
115,650,000 9,350,000
124,000,000
1,000,000
124,500,000 500,000
124,050,000 950,000
49,900,000 100,000
49,900,000 100,000
49,900,000 100,000
-
38,440,000 60,000
38,340,000 160,000
-
19,800,000 200,000
81,700,000 50,000
81,650,000 100,000
49,923,000 77,000
49,923,000 77,000
42,405,000 95,000
38,690,000 60,000
31,200,000 50,000
199,800,000 200,000
199,900,000 100,000
150,000,000
148,800,000 1,200,000
148,475,000 1,525,000
149,050,000 950,000
149,000,000 1,000,000
196,900,000.00 3,100,000
49,840,000 160,000
44,870,000 130,000
49,800,000 200,000
44,870,000 130,000
199,900,000 100,000
345,900,000 4,100,000
98,900,000 1,100,000
340,500,000 9,500,000
197,300,000 2,700,000
219,000,000 -
99,750,000 250,000
99,650,000 350,000
99,770,000 230,000
99,760,000 240,000
99,780,000 220,000
99,820,000 180,000
99,840,000 160,000
99,730,000 270,000
99,830,000 170,000
99,850,000 150,000
75,000,000
100,000,000
43,850,000 -
47,820,000 -
39,860,000
-
26,820,000 -
24,820,000 -
33,840,000 160,000
20,900,000 100,000
166,100,000 150,000
166,100,000 150,000
166,150,000 100,000
166,150,000 100,000
142,300,000 200,000
142,400,000 100,000
49,900,000 100,000
33,840,000 -
20,900,000 -
199,900,000 100,000
199,900,000 100,000
199,900,000 100,000
200,000,000
150,000,000
99,900,000 100,000
149,900,000 100,000
99,900,000 100,000
99,900,000 100,000
199,900,000 100,000
49,900,000 100,000
No Kegiatan
1 Penatausahaan Administrasi dan Pemeliharaan
Prasarana - Sarana Perkantoran
Belanja Pakaian Dinas Harian (PDH)
Pakaian PDH dan Perlengkapannya 173
Pakaian Putih Hitam dan Perlengkapannya 173
Pakaian satpol PP/Pengamanan dan Perlengkapannya 6
Pakaian PDL Satpol/Pengamanan 6
Pakaian PDH Honorarium/PTT 52
Belanja Pakaian Batik
Belanja Pakaian Batik Tradisional 173
Belanja Pkaian Olahraga
Belanja Pkaian Olahraga 173
Belanja Modal
Belanja Modal Pengadaan Alat- laat angkutan Darat Bermotor
Pengadaan Sepeda Motor 1
Belanja Modal Generator
Pengadaan Genset 1
Belanja Modal Pengadaan AC & Perlengkapannya
Pengadaan AC & Perlengkapannya 4
Belanja Modal Pengadaan komputer/PC
Belanja Modal Pengadaan komputer/PC 5
Belanja Modal Pengadaan Laptop 5
Belanja Modal Pengadaan Printer 5
Belanja Modal Pengadaan Printer 2
Belanja Modal Pengadaan Meja Kerja
Meja Kerja Eselon III 6
Meja Kerja Eselon IV 3
Kursi Kerja Staf 10
Belanja Modal Pengadaan Kursi Kerja
Kursi Kerja Eselon III 3
Kursi Kerja Eselon IV 3
Kursi Kerja Staf 20
Belanja Modal Pengadaan Alat - Alat Studio
Belanja Modal Pengadaan Kamera
Pengadaan Kamera 2
Belanja Modal Pengadaan LCD/Proyektor
Pengadaan LCD/ Proyektor 1
Belanja Modal Pengadaan Konstruksi/ Bangunan
Belanja Modal Pengadaan Konstruksi/Pembelian Gedung Kantor
Pemeliharaan Rutin Gedung Kantor 1
Pemasangan Vinyl Lantai Gedung Kantor Lantai 2 1
Pekerjaan Anti rayap Gedung Kantor 1
Penggantian Tegel/Keramik Lantai 1 1
Pekerjaan Interior Ruang Tamu 1
Org Rp 86,500,000
Psg Rp 95,150,000
unit Rp 32,000,000
Paket Rp 52,868,000
Unit Rp 24,000,000
Unit Rp 75,000,000
Unit Rp 50,000,000
Unit Rp 37,500,000
Unit Rp 10,000,000
Unit Rp 36,000,000
Unit Rp 12,000,000
Set Rp 75,000,000
Unit Rp 13,500,000
Unit Rp 9,000,000
Set Rp 40,000,000
Unit Rp 10,000,000
Unit Rp 15,000,000
Paket Rp 200,000,000
Paket Rp 200,000,000
Paket Rp 200,000,000
Paket Rp 100,000,000
Paket Rp 74,300,000
kali Rp 100,000,000
Kali Rp 50,000,000
Kali Rp 100,000,000
Kali Rp 60,000,000
Org Rp 180,000,000
Org Rp 230,000,000
kali Rp 150,000,000
Rp 100,000,000
Rp 100,000,000
Rp 9,000,000
kali Rp 100,000,000
Kali Rp 100,000,000
an Perumahan
Dok Rp 100,000,000
Dok Rp 150,000,000
Dok Rp 450,000,000
Kali Rp 100,000,000
Dok Rp 270,000,000
Kali Rp 200,000,000
Dok Rp 125,000,000
Dok Rp 125,000,000
Dok Rp 125,000,000
Dok Rp 125,000,000
Paket Rp 135,000,000
Paket Rp 135,000,000
Paket Rp 180,000,000
Paket Rp 180,000,000
Paket Rp 101,000,000
Paket Rp 101,000,000
Paket Rp 135,000,000
Paket Rp 95,000,000
Paket Rp 190,000,000
Paket Rp 135,000,000
Paket Rp 192,000,000
Paket Rp 95,000,000
Paket Rp 140,000,000
Paket Rp 140,000,000
Paket Rp 95,000,000
Paket Rp 95,000,000
Paket Rp 95,000,000
Paket Rp 95,000,000
Paket Rp 95,000,000
Paket
Paket Rp 95,000,000
Paket Rp 95,000,000
Paket
Paket Rp 190,000,000
Paket Rp 113,700,000
Paket Rp 113,700,000
Paket
Paket Rp 135,000,000
Paket Rp 190,000,000
Paket
Paket Rp 95,000,000
Paket Rp 95,000,000
Paket
Paket Rp 190,000,000
Paket Rp 135,000,000
Dok Rp 50,000,000
Dok Rp 50,000,000
Dok Rp 50,000,000
Paket Rp 135,000,000
Paket Rp 135,000,000
Paket
Paket Rp 95,000,000
Paket Rp 95,000,000
Paket
Paket Rp 95,000,000
Paket Rp 95,000,000
Paket
Paket Rp 135,000,000
Paket Rp 135,000,000
Paket
Paket Rp 140,000,000
Paket Rp 140,000,000
Paket
Paket Rp 142,500,000
Paket Rp 142,500,000
Dok Rp 38,500,000
Paket Rp 38,500,000
Dok Rp 20,000,000
DAFTAR PAKET PEKERJAAN DALAM LINGKUP DINAS PERUMAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
TAHUN ANGGARAN 2018, STATUS S/D 31 MARET 2018 SUMBER DANA APBD
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISA
DASK/DIPA KONTRAK NAMA PERUSAHAAN/NOMOR MULAI SELESAI FISIK KEU. FISIK
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT FISIK KEU.
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%)
1 2 4 5 6 8 9 10 11 12 13 14.00 15.00 16.00
P A L S U
Pembangunan Sarana Persampahan SMA/MK se-Sulsel
- SMA Negeri 1 Selayar 1 PKT 150,000,000 `
SMK Neg. 2 Benteng 1 Pkt 183,750,000 183,750,000 33.34 33.34 33.34 CV. GARUDA MERAH 20-04-2017 18-07-2017 100.00 100.00 100.00
NUSANTARA
056/217/P2KP
SMK Neg. 3 Benteng 1 Pkt 183,750,000 183,750,000 33.34 33.34 33.34 20-04-2017 18-07-2017 100.00 100.00 100.00
CV. ZAHRA UTAMA KONSTRUKSI
056/229/P2KP
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISA
DASK/DIPA KONTRAK NAMA PERUSAHAAN/NOMOR MULAI SELESAI FISIK KEU. FISIK
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT FISIK KEU.
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISA
NAMA PERUSAHAAN/NOMOR
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT DASK/DIPA KONTRAK FISIK KEU. MULAI SELESAI FISIK KEU. FISIK
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISA
DASK/DIPA KONTRAK NAMA PERUSAHAAN/NOMOR MULAI SELESAI FISIK KEU. FISIK
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT FISIK KEU.
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISA
DASK/DIPA KONTRAK NAMA PERUSAHAAN/NOMOR MULAI SELESAI FISIK KEU. FISIK
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT FISIK KEU.
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK KONTRAK (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISA
NAMA PERUSAHAAN/NOMOR
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT DASK/DIPA KONTRAK FISIK KEU. MULAI SELESAI FISIK KEU. FISIK
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISA
NAMA PERUSAHAAN/NOMOR
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT DASK/DIPA KONTRAK FISIK KEU. MULAI SELESAI FISIK KEU. FISIK
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISA
NAMA PERUSAHAAN/NOMOR
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT DASK/DIPA KONTRAK FISIK KEU. MULAI SELESAI FISIK KEU. FISIK
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISA
NAMA PERUSAHAAN/NOMOR
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT DASK/DIPA KONTRAK FISIK KEU. MULAI SELESAI FISIK KEU. FISIK
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISA
NAMA PERUSAHAAN/NOMOR
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT DASK/DIPA KONTRAK FISIK KEU. MULAI SELESAI FISIK KEU. FISIK
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00
JUMLAH APBD 0 0 - - -
DAFTAR PAKET PEKERJAAN DALAM LINGKUP DINAS PERUMAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
TAHUN ANGGARAN 2018, STATUS S/D 31 MARET 2018 SUMBER DANA APBD
LOKASI : KABUPATEN BONE
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISA
DASK/DIPA KONTRAK NAMA PERUSAHAAN/NOMOR MULAI SELESAI FISIK KEU. FISIK
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT FISIK KEU.
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00
056/304/PLP
Program Fasilitasi dan Pengembangan Infrastruktur Permukiman
Kegiatan : Pembangunan dan Pengembangan Sistem Jaringan Air Minum
> PPTK : Zubhan Adjeng, ST. M.Si
Pembangunan Jaringan SPAM SMA/SMK Negeri se- SULSEL
p a l s u
- SMAN 1 Lamuru 1 PKT 184,000,000 183,850,000 50.03 50.03 50.03 CV. PUTRA BALLE 20-06-2017 100.00 100.00 100.00
056/363/P2KP
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISA
NAMA PERUSAHAAN/NOMOR
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT DASK/DIPA KONTRAK FISIK KEU. MULAI SELESAI FISIK KEU. FISIK
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISA
NAMA PERUSAHAAN/NOMOR
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT DASK/DIPA KONTRAK FISIK KEU. MULAI SELESAI FISIK KEU. FISIK
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISA
DASK/DIPA KONTRAK NAMA PERUSAHAAN/NOMOR MULAI SELESAI FISIK KEU. FISIK
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT FISIK KEU.
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISA
DASK/DIPA KONTRAK NAMA PERUSAHAAN/NOMOR MULAI SELESAI FISIK KEU. FISIK
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT FISIK KEU.
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISA
DASK/DIPA KONTRAK NAMA PERUSAHAAN/NOMOR MULAI SELESAI FISIK KEU. FISIK
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT FISIK KEU.
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISA
DASK/DIPA KONTRAK NAMA PERUSAHAAN/NOMOR MULAI SELESAI FISIK KEU. FISIK
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT FISIK KEU.
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00
Program Fasilitasi dan Pengembangan Infrastruktur Permukiman - - - 20-04-2018 18-07-2018 35.00 30.00 35.00
Kegiatan : Pembangunan Sarana dan Prasarana Persampahan
> PPTK : Zunaifa Y. Slamet, ST. MT 07-05-2018 04-08-2018
Belanja Modal
Pembangunan Sarana Persampahan SMA/MK se-Sulsel
- SMA Neg. 1 Mangkendek 1 Pkt 184,000,000 183,800,000 12.51 - - CV. KARYA TEKNIK 19-06-2017 16-09-2017 0.00 0.00 0.00
056/295/PLP
- SMA Neg. 1 Rantetayo 1 Pkt 184,000,000 183,870,000 12.51 12.51 12.51 CV. EKA UTAMA 19-06-2017 16-09-2017 100.00 95.00 100.00
056/298/PLP
- SMA Neg. 1 Saluputti 1 Pkt 184,000,000 183,871,000 12.51 12.51 12.51 CV. MALPIN 19-06-2017 16-09-2017 100.00 95.00 100.00
056/301/PLP
Kegiatan : Pembangunan dan Pengembangan Sistem Jaringan Air Minum
> PPTK : Zubhan Adjeng, ST. M.Si
Pembangunan Jaringan SPAM SMA/SMK Negeri se- SULSEL
SMA Negeri 1 Makale 184,000,000 183,800,000 12.51 12.51 12.51 CV. RULMADHANI PRIMA 20-06-2017 100.00 100.00 100.00
056/346/P2KP
- -
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISA
DASK/DIPA KONTRAK NAMA PERUSAHAAN/NOMOR MULAI SELESAI FISIK KEU. FISIK
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT FISIK KEU.
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISA
NAMA PERUSAHAAN/NOMOR
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT DASK/DIPA KONTRAK FISIK KEU. MULAI SELESAI FISIK KEU. FISIK
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISA
NAMA PERUSAHAAN/NOMOR
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT DASK/DIPA KONTRAK FISIK KEU. MULAI SELESAI FISIK KEU. FISIK
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00
JMLH DANA DLM NILAI BOBOT TERTIMBANG TGL. TGL. RENCANA REALISA
DASK/DIPA KONTRAK FISIK KEU. NAMA PERUSAHAAN/NOMOR MULAI SELESAI FISIK KEU. FISIK
NO NAMA PROGRAM/KEGIATAN/URAIAN PEKERJAAN DAN NAMA PPTK VOL SAT
KONTRAK
( Rp.) ( Rp.) (%) (%) (%) KONTRAK KONTRAK (%) (%) (%)
1 2 4 5 6 7 8 9 10 11 12 13 14.00 15.00 16.00
1. Program Fasilitasi dan Pengembangan Infrastruktur Permukiman
Kegiatan : Pembangunan Sarana dan Prasarana Persampahan
> PPTK : Zunaifa Y. Slamet, ST. MT
Belanja Modal
Pembangunan Sarana Persampahan SMA/MK se-Sulsel
- SMA Negeri 17 Makassar 1 PKT 150,000,000
Kegiatan :
> PPTK : Yosep Sulle, S.Sos. M.Si
Belanja Modal
Pengadaan Alat-alat Olahraga
- Pekerjaan Konstruksi Rehab Panjat tebing Taman Lapangan Upacara 1 Pkt 200,000,000 199,850,000 1.32 1.32 1.32 CV. SAHIRA JAYA KONSTRUKSI 05-05-17 17-08-17 100.00 100.00 100.00
Lingkup ke PU-an 056/162/P2KP
- Pengawasan Konstruksi Rehab Panjat tebing Taman Lapangan Upacara 1 Dok 7,000,000 6,940,000 0.05 0.05 0.05 CV. SAFITRI 05-05-2017 11-11-2017 100.00 100.00 100.00
Lingkup ke PU-an 056/587/P2KP
- Pengawasan Konstruksi Pembangunan Atap Membran dan Accesoris Taman 1 Dok 30,000,000 29,800,000 0.20 0.20 0.20 PT. MATRA DESAIN 13-07-2017 09-12-2017 100.00 100.00 100.00
Lapangan Upacara Lingkup ke Puan 056/566/P2KP
PEMBAYARAN SILFA
Pekerjaan Konstruksi Pembangunan Gedung Serbaguna kws. Rujab Gubernur 681,822,120 681,822,120 4.49 4.49 4.49 PT. CIPTA BENING DEWATA 23-06-2017 31-12-2016 100.00 100.00 100.00
056/61/TABALING
Pengawasan Konstruksi Pembangunan Gedung Serbaguna Kws. Rujab Gubernur 16,800,000 16,800,000 0.11 0.11 0.11 PT. CIPTA BENING DEWATA 23-06-2017 31-12-2016 100.00 100.00 100.00
056/61/TABALING
Pengawasan Kontruksi
- Pek. Lanjutan Jogging Track Pengecetan paving Blok Taman Pakui Sayang 1 Dok 7,000,000 6,840,000 0.05 0.05 0.05 CV. GRADASI GARIS ARCH 100.00 100.00 100.00
056/ /P2KP/2017
- lanjutan Penataan Parkir Dinas PKP2SS 10,000,000 9,700,000 0.06 0.06 0.06 PT. GALAKSI PRIMA KONSULTAN 100.00 100.00 100.00
056/ 596/P2KP/2017
- lanjutan Penataan Parkir Dinas PKP2SS 10,000,000 5,900,000 0.04 0.04 0.04 CV. MULTILINE TATA RANCANA 10-11-2017 24-12-2017 100.00 100.00 100.00
056/ 911/P2KP/2017
- SMA Negeri 18 89,900,000 89,800,000 0.59 0.59 0.59 CV. BUANA MARGA 100.00 100.00 100.00
056/ 869/P2KP
- SMA Negeri 12 184,000,000 183,950,000 1.21 1.21 1.21 CV. KATHREE HUTAMA 100.00 100.00 100.00
056/ 869/P2KP
- Pakaian Batik Tradisional 185 Psg 92,400,000 92,400,000 0.36 0.36 0.20 UD. VIVID TAILOR 100.00 100.00 100.00
- Pakaian Olahraga 185 Psg 100,391,000 100,391,000 0.40 0.40 0.34 CV. AQILAH PERDANA 100.00 100.00 100.00
- Belanja Pemeliharaan
- Pemeliharaan Bangunan Gedung Tempat Kerja 1 Thn 100,000,000 99,800,000 0.39 0.39 0.39 100.00 100.00 100.00
- Pemeliharaan Alat Kantor 1 Thn 20,000,000 19,980,000 0.08 0.08 0.08 100.00 100.00 100.00
- Pemeliharaan Komputer 1 Thn 20,000,000 20,000,000 0.08 0.08 0.08 100.00 100.00 100.00
- Belanja Pemeliharaan Aset Tak Terwujud 1 Thn 3,600,000 3,600,000 0.01 - - 100.00 100.00 0.00
- Belanja Modal
- Pengadaan Mesin Hitung Uang 1 Unit 7,500,000 - - - 100.00 100.00 0.00
Pengadaan Printer 1 Pkt 27,000,000 26,700,000 0.11 0.11 0.11 CV. NUR MAGFIRAH 100.00 100.00 100.00
- Pengadaan Kursi Kerja 75 Unit 206,250,000 199,900,000 0.79 0.79 0.79 CV. SENTOSA UTAMA 100.00 100.00 100.00
- Pengadaan Sofa 1 Set 83,250,000 83,160,000 0.33 0.33 0.33 CV. DUA APRIL 100.00 100.00 100.00
- Pengadaan Kain Gorden 1 Pkt 30,000,000 29,910,000 0.12 0.12 0.12 CV. HERLITA ABADI 100.00 100.00 100.00
- Pemasangan Stiker Kaca Jendela dan Pintu 1 Pkt 30,000,000 29,910,000 0.12 0.12 0.12 CV. HERLITA ABADI 100.00 100.00 100.00
- Penataan Interior Ruang Kerja Gedung Lama 1 Pkt 741,000,000 739,065,000 2.91 2.91 2.91 CV. SERBA TEKNIK 18-08-2017 17-11-2017 100.00 100.00 100.00
056/440/SEKRETARIAT
- Perbaikan Plafon Kantor 1 Pkt 200,000,000 197,930,000 0.78 0.78 0.78 CV. AGRIMA 100.00 100.00 100.00
- Perencanaan konstruksi
- Perbaikan Atap Kantor 1 Pkt 50,000,000 49,870,000 0.20 0.20 0.20 CV. TUJUH LIMA 100.00 100.00 100.00
- Penataan Interior Ruang Kerja Gedung Lama 1 Pkt 50,000,000 49,800,000 0.20 0.20 0.20 CV. ICHSAN KONSULTAN 100.00 100.00 100.00
- Pengawasan konstruksi
- Perbaikan Atap Kantor 1 Pkt 50,000,000 49,800,000 0.20 0.20 0.20 CV. HERLITA ABADI 100.00 100.00 100.00
- Penataan Interior Ruang Kerja Gedung Lama 1 Pkt 50,000,000 49,900,000 0.20 0.20 0.20 CV. SERBA TEKNIK 100.00 100.00 100.00
Bangunan/Alat-alat Informasi
- Belanja Modal papan Bicara/nama Instansi 1 Pkt 30,000,000 29,900,000 0.12 0.12 0.12 CV. ZHAKIRA PUTRA MANDIRI 100.00 100.00 100.00
Belanja BIMTEK
Workshop Peningkatan Manajemen Mutu III 1 Pkt 100,000,000 98,800,000 0.39 0.39 0.39 100.00 100.00 100.00
056/860/SEKRETARIAT
Workshop Pemanfaatan Teknologi Informasi 1 Pkt 200,000,000 199,800,000 0.79 0.79 0.79 100.00 100.00 100.00
- - - 056/843/SEKRETARIAT
Workshop peningkatan SDM aparatur 1 Pkt 150,000,000 149,700,000 0.59 0.59 0.59 100.00 100.00 100.00
056/199/SEKRETARIAT
Workshop Pengelolaan Barang Daerah 1 Pkt 150,000,000 149,900,000 0.59 0.59 0.59 100.00 100.00 100.00
056/312/SEKRETARIAT
Workshop Analisis Jabatan 1 Pkt 100,000,000 99,900,000 0.39 0.39 0.39 100.00 100.00 100.00
056/368/SEKRETARIAT
Pengadaan Aplikasi Kesekretariatan dan Persuratan 1 Pkt 200,000,000 198,000,000 0.78 0.78 0.78 100.00 100.00 100.00
Berbasis Android Sistem Smart office Ver. 1.2 056/875/SEKRETARIAT
Pengadaan aplikasi Kesekretariatan dan Persuratan 1 Pkt 200,000,000 199,690,000 0.79 0.79 0.79 100.00 100.00 100.00
056/877/SEKRETARIAT
Fasilitas Pendukung untuk persuratan Dekorasi ke ikut sertaan Pameran 1 Pkt 70,000,000 69,300,000 0.27 0.27 0.27 100.00 100.00 100.00
056/907/SEKRETARIAT
Workshop Penyusunan Program dan Kegiatan Tahun 2018 1 Pkt 200,000,000 199,700,000 0.79 0.79 0.79 100.00 100.00 100.00
Penyusunan Data dan informasi Bidang Permukiman 1 Dok 147,970,000 147,970,000 0.58 0.58 0.57 100.00 100.00 100.00
Penyusunan Data dan informasi Bidang Pertanahan 1 Dok 144,485,000 144,485,000 0.57 0.57 0.57 100.00 100.00 100.00
Penyusunan SOP informasi Perencanaan 1 Dok 50,000,000 49,700,000 0.20 0.20 0.20 100.00 100.00 100.00
Penyusunan SOP informasi Monitoring 1 Dok 50,000,000 49,800,000 0.20 0.20 0.20 100.00 100.00 100.00
Belanja Modal
Belanja Modal aset tak berwujud 1 Pkt 100,000,000 99,900,000 0.39 0.39 0.39 100.00 100.00 100.00
- Belanja Pakaian Khusus Untuk Panitia Pameran Pembangunan Daerah 30 Psg 9,000,000 9,000,000 0.04 0.04 0.04 100.00 100.00 100.00
- Belanja Bahan Percontohan 87,200,000 82,400,000 0.32 0.32 0.32 CV. GAMEPRO INDONESIA 100.00 100.00 100.00
056/498/UPT. PIP2
- Belanja Dekorasi 116,800,000 116,800,000 0.46 0.46 0.46 CV. DEBINDO MEGA PROMO 100.00 100.00 100.00
Penyusunan DED Penyedian Rumah Bagi Masyarakat Terkena Relokasi 1 Dok 100,000,000 99,850,000 0.39 0.39 0.39 PT. BINA KREASI NUSANTARA 19-09-2017 100.00 100.00 100.00
Wilayah II (Kab. Pangkep dan Maros) 056/574/Bid. Perumahan
Penyusunan DED Penyedian Rumah Bagi Masyarakat Terkena Relokasi 1 Dok 100,000,000 99,550,000 0.39 0.39 0.39 CV. SUKMA LESTARI 19-09-2017 100.00 100.00 100.00
Wilayah III (Kota Makassar) 056/577/Bid. Perumahan
Workshop Pengelolaan Informasi Bidang Permukiman 1 Pkt 200,000,000 199,600,000 0.79 0.79 0.79 100.00 100.00 100.00
Workshop Pembinaan Teknis Perumahan 1 Kl 50,000,000 49,600,000 0.20 0.20 0.20 CV. NUR MAGFIRAH 12-05-2017 20-07-2017 100.00 100.00 100.00
Penyusunan Sistem Informasi Sertifikasi dan Registrasi Orang atau 1 Dok 50,000,000 49,740,000 0.20 0.20 0.20 CV. KARAENG PANRITAYA
KONSULTAN 100.00 100.00 100.00
Badan yang Melakukan Perencanaan Wilayah Selatan
Pemb. Landasan Container Sampah 20,000,000 19,800,000 0.08 0.08 0.08 CV. REZA ANDIKA PUTRA 100.00 100.00 100.00
D. Penyusunan DED Drainase Tahun 2018 1 DOK 373,331,000 360,000,000 1.42 1.42 1.42 PT. TRIKONS INDOPRATAMA 12-07-2017 08-11-2017 100.00 100.00 100.00
056/329/PLP
Belanja Modal
Pengadaan Mobile Toilet 1 Unit 800,000,000 - - - 0.00 0.00 0.00
- PERENCANAAN KONSTRUKSI (Wilayah I) 1 DOK 50,000,000 49,720,000 0.20 0.20 0.20 CV. MATRA DESAIN 06-03-2017 04-04-2017 100.00 95.00 100.00
056/18/PLP
- PERENCANAAN KONSTRUKSI (Wilayah 2) 1 DOK 50,000,000 49,720,000 0.20 0.20 0.20 CV. LATUSIWA ENGINEERING 06-03-2017 04-04-2017 100.00 95.00 100.00
056/33/PLP
- PENGAWASAN KONSTRUKSI (Wilayah I) 1 DOK 50,000,000 49,900,000 0.20 0.20 0.20 CV. GEMA TEKNIK 14-07-2017 11-10-2017 100.00 95.00 100.00
- PENGAWASAN KONSTRUKSI (Wilayah 2) 1 DOK 38,000,000 37,700,000 0.15 0.15 0.15 CV. SERIGALA JAYA 14-07-2017 11-10-2017 100.00 95.00 100.00
- PENGAWASAN KONSTRUKSI (Wilayah 3) 1 DOK 25,500,000 25,482,000 0.10 0.08 0.10 CV. MATRA DESAIN 31-10-2017 14-12-2017 80.00 75.00 80.00
- Pengawasan Konstruksi Wil. II 1 DOK 30,000,000 29,900,000 0.12 0.12 0.12 CV. ALIF ENGINEERING KONSULTAN 19-06-2017 16-09-2017 100.00 100.00 100.00
- Pengawasan Konstruksi Wil. III 1 Dok 46,000,000 45,980,000 0.18 0.18 0.18 CV. GRADASI GARISARCH 31-10-2017 14-12-2017 100.00 100.00 100.00
056/853/PLP
Pemb. Landasan Container pada Kawasan MOI 1 pkt 30,000,000 29,560,000 0.12 0.12 0.12 CV. ERSYA 04-09-2017 18-10-2017 100.00 95.00 100.00
056/531/PLP
Bimbingan Teknis
Pembinaan Teknik Pengelolaan Air Limbah dan Persampahan 150,000,000 149,685,000 0.59 0.59 0.59 CV. TALI INDOMEDIA SEJAHTERA 19-04-2017 18-05-2017 100.00 100.00 100.00
056/208/PLP
Bintek, Sosialisasi , Diklat bagi aparat pengelola teknis drainase dan air limbah 150,000,000 149,430,000 0.59 0.59 0.59 CV.XSYS PROMOTION 15-03-2017 31-03-2017 100.00 100.00 100.00
056/15/PLP
Bintek, Sosialisasi , Diklat bagi Kelompok Swadaya Masyarakat (KSM) Pengelola
150,000,000 149,420,000 CV.XSYS PROMOTION 23-10-2017 11/6/2017 100.00 100.00 100.00
Teknis 0.59 0.59 0.59
056/635/PLP
Workshop Masyarakat, Kelompok Swadaya Makassar/Lembaga Non Formal 150,000,000 149,600,000 0.59 0.59 0.59 CV. ICE BOX MEDIA PRODUCTION08-05-2017 22-05-2017 100.00 100.00 100.00
tentang pengelolaan persampahan 056/12/PLP
Workshop Aparat pengelola Persampahan tentang pengelolaan persampahan 150,000,000 149,500,000 0.59 0.59 0.59 CV. AMAL ABADI 28-04-2017 18-05-2017 100.00 100.00 100.00
Kab/kota 056/211/PLP
Workshop Penyiapan Kegiatan Persampahan Tahun 2018 200,000,000 199,600,000 0.79 0.79 0.79 CV. DAVA ANUGERAH 18-09-2017 02-10-2017 100.00 100.00 100.00
056/528/PLP
Workshop Penyiapan Kegiatan Drainase dan Air Limbah Tahun 2018 200,000,000 199,650,000 0.79 0.79 0.79 CV. TAMBANG SARANG BETON 28-08-2017 11-09-2017 100.00 100.00 100.00
056/484/PLP
Workshop Penyiapan Kegiatan Revitaisasi Kawasan Permukiman Tahun 2018 - - - 0.00 0.00 0.00
Workshop Pengelolaan persampahan 200,000,000 199,400,000 0.79 0.79 0.79 CV. DWI DARMA 21-11-2017 11-12-2017 100.00 100.00 100.00
Workshop Pengelolaan Sanitasi 200,000,000 199,500,000 0.79 0.79 0.79 CV. KHALIFAH 27-10-2017 13-11-2017 100.00 100.00 100.00
056/747/PLP
Workshop Peningkatan Peran Serta Guru tentang pengelolaan sampah lingkup 200,000,000 199,100,000 0.78 - - CV.XSYS PROMOTION 13-11-2017 27-11-2017 0.00 0.00 0.00
SMA/SMK 056/855/PLP
Workshop Sanitasi Berbasis Masyarakat 200,000,000 199,500,000 0.79 - - CV. ALIF PRATAMA 21-11-2017 07-12-2017 0.00 0.00 0.00
Penyusunan Identifikasi Potensi penyediaan sistem Penyediaan Air Minum 198,000,000 198,000,000 0.78 0.78 0.78 CV. BIAS MONARCHY KONSULTAN 03-04-2017 01-07-2017 100.00 100.00 100.00
di Kawasan Permukiman Kab. Maros dan Pangkep 056/67/P2KP
BELANJA MODAL
Pengadaan Alat- alat angkutan Darat Bermotor tangki (air, minyak, tin) 800,000,000 772,130,700 3.04 3.04 3.04 PT. KUMALA MOTOR SEJAHTERA 100.00 100.00 100.00
056/788/P2KP
Pembangunan Jaringan SPAM SMA/SMK Negeri se- SULSEL
PT. SYAFITRI PERDANA
Perencanaan Konstruksi Wil I 50,000,000 49,850,000 0.20 0.20 0.20 20-04-2017 100.00 100.00 100.00
KONSULTAN
056/271/Disperkimtan
Perencanaan Konstruksi Wil II 40,000,000 39,800,000 0.16 0.16 0.16 CV. AFDAN CIPTA CONSULTANT 20-04-2017 100.00 100.00 100.00
` 056/274/Disperkimtan
Pengawasan Konstruksi Wil I 35,000,000 34,760,000 0.14 0.14 0.14 CV. GRADASI GARISARCH 20-06-2017 100.00 100.00 100.00
056/623/P2KP
Pengawasan Konstruksi Wil II 27,000,000 26,800,000 0.11 0.11 0.11 CV. MULTILINE TATARANCANA 20-06-2017 100.00 100.00 100.00
056/621/P2KP
- Sosialisasi Penataan dan Peningkatan Jalan Permukiman Pada Kawasan Pesisir 1 PKT 200,000,000 199,600,000 0.79 0.79 0.79 CV. MUTIARA BIRU 20-07-2017 30-07-2017 100.00 100.00 100.00
056/331/P2KP
Belanja Bimtek
- Sosialisasi Penataan dan Peningkatan Jalan Permukiman Pada Kawasan 1 PKT 200,000,000 199,650,000 0.79 0.79 0.79 CV. NUR MAGFIRAH 14-09-2017 23-09-2017 100.00 100.00 100.00
Kumuh Perkotaan 056/493/P2KP
- Sosialisasi Penataan dan Peningkatan Jalan Permukiman Pada Kawasan 1 PKT 100,000,000 99,600,000 0.39 0.39 0.39 CV. DWI DHARMA 10-11-2017 19-11-2017 100.00 100.00 100.00
KSN Metropolitan 056/750/P2KP
- Identifikasi Prasarana dan Sarana Jalan Lingkungan Permukiman 1 Dok 197,604,000 197,604,000 0.78 0.78 0.78 PT. GEO INTI SPASIAL 21-04-2017 19-07-2017 100.00 100.00 100.00
Pada Kawasan Kumuh Di Kab. Maros dan Pangkep 056/132/P2KP
- Penyusunan DED Jalan SMA/SMK Negeri se Sulsel 1 Dok 298,100,000 298,100,000 1.17 1.17 1.17 PT. ABITAMA KARYA 20-04-2017 16-09-2017 100.00 100.00 100.00
056/129/P2KP
Belanja Modal
Pembangunan Jalan Lingkungan Pada SMA/SMK se Sulsel
- Perencanaan Konstruksi Pembangunan Jalan Lingkungan Pada 1 Dok 10,000,000 9,875,000 0.04 0.04 0.04 CV. MATRA DESIGN 27-02-2017 28-03-2017 100.00 100.00 100.00
SMA/SMK se Sulsel 056/766/P2KP
- Pengawasan Konstruksi Pembangunan Jalan Lingkungan Pada 1 Dok 6,000,000 5,850,000 0.02 0.02 0.02 CV. MULTI LINE TATARANCANA 23-05-2017 20-08-2017 100.00 100.00 100.00
SMA/SMK se Sulsel 056/765/P2KP
- Bintek Pengelolaan Penataan Ruang Terbuka Hijau Wilayah Selatan 1 Pkt 200,000,000 199,800,000 0.79 0.79 0.79 CV. WIRA MAS 23-03-2015 25-03-2015 100.00 100.00 100.00
Kota Makassar, Kab. Maros 056/.../P2KP/2017
- Sosialiasi Mekanisme Pnyusunan Program Kegiatan Fasilitas Umum 1 Pkt 150,000,000 149,900,000 0.59 0.59 0.59 CV. KHALIFAH 04-05-2017 06-05-2017 100.00 100.00 100.00
dan Pertamanan 056/139/P2KP
Perencanaan Konstruksi
- Kab. Selayar dan Sidrap 29,600,000 29,600,000 0.12 0.12 0.12 PT. GALAXY PRIMA KONSULTAN 27-02-2017 28-03-2017 100.00 100.00 100.00
056/ 178/P2KP/2017
- Kab. Tana Toraja dan Toraja Utara 35,600,000 35,500,000 0.14 0.14 0.14 PT. MULTICIPTA ADHIRENCANA 27-02-2017 28-03-2017 100.00 100.00 100.00
056/175/P2KP/2017
- Kab. Luwu Utara dan Luwu Timur 27,150,000 27,000,000 0.11 0.11 0.11 CV. MATRA DESIGN 27-02-2017 28-03-2017 100.00 100.00 100.00
056/172/P2KP/2017
Pengawasan Konstruksi
- Kota makassar, Kab. Luwu 25,280,000 20,850,000 0.08 0.08 0.08 CV. AFDAN CIPTA KONSULTAN 10-11-2017 24-12-2017 100.00 100.00 100.00
056/ /P2KP/2017
CV. SAFRTRI PERDANA
17,790,000 17,550,000 0.07 0.07 0.07 20-04-2017 28-03-2017 100.00 100.00 100.00
- Kab. Selayar dan Sidrap KONSULTAN
056/590/P2KP/2017
- Kab. Tana Toraja dan Toraja Utara 21,400,000 21,170,000 0.08 0.08 0.08 CV. MATRA DESIGN 20-04-2017 28-03-2017 100.00 100.00 100.00
056/591/P2KP/2017
- Kab. Luwu Utara dan Luwu Timur 16,310,000 16,100,000 0.06 0.06 0.06 CV. GRADASI GARIS ARCH 20-04-2017 28-03-2017 100.00 100.00 100.00
056/592/P2KP/2017
- Sosialisasi Penanganan PSU Permukiman Disabilitas Pada kawasan Permukiman 1 Kali 200,000,000 199,700,000 0.79 0.79 0.79 CV. MEGA RIA 17-05-2017 26-05-2017 100.00 100.00 100.00
056/632/P2KP
Kegiatan : Pembinaan Pengembangan Kawasan Permukiman
> PPTK : Saktiyani, A.Md
Belanja Kursus, Pelatihan, Sosialisasi dan BIMTEK
Sosialisasi Peningkatan dan Pengembangan PSU Kawasan Permukiman 1 Kali 100,000,000 99,900,000 0.39 0.39 0.39 100.00 100.00 100.00
Kumuh di
Sosialisasi Peningkatan dan Pengembangan PSU Kawasan Permukiman Nelayan 1 Kali 100,000,000 99,900,000 0.39 0.39 0.39 100.00 100.00 100.00
Pembuatan SOP Peningkatan dan Pengembangan Kawasan Permukiman 50,000,000 49,900,000 0.20 0.20 0.20 100.00 100.00 100.00
Sosialisasi Monev. Dan Pelaporan Pengembangan Kawasan Permukiman 1 Kali 100,000,000 99,900,000 0.39 0.39 0.39 CV. BERKAT JAYA ABADI 10-07-2017 100.00 100.00 100.00
Kumuh Perkotaan 056/343/P2KP
Sosialisasi Monev. Dan Pelaporan Pengembangan Kawasan Permukiman 1 Kali 100,000,000 99,900,000 0.39 0.39 0.39 CV. KHALIFAH 23-10-2017 100.00 100.00 100.00
Metropolitan (KSN MAMMINASATA) 056/590/P2KP
Belanja Modal
Pembuatan Website Dinas Perumahan, Kawasan Permukiman dan Pertanahan 1 Pkt 50,000,000 - - - 0.00 0.00 0.00
Sosialisasi Aturan Pengadaan Tanah Bagi Pembangunan Untuk Kepentingan Umum 1 Dok 100,000,000 99,900,000 0.39 0.39 0.39 100.00 100.00 100.00
Sosialisasi Pengadaan Tanah 1 Pkt 150,000,000 149,950,000 0.59 0.59 0.59 100.00 100.00 100.00
Sosialisasi Pembebasan Lahan Untuk Kepentingan Publik 1 Pkt 200,000,000 199,900,000 0.79 0.79 0.79 100.00 100.00 100.00
Sosialisasi Kebijakan Pengadaan Tanah Sesuai Undang - undang No. 2 Tahun 2012 1 Pkt 200,000,000 199,900,000 0.79 0.79 0.79 100.00 100.00 100.00
Sosialisasi Implementasi Kebijakan Pengadaan tanah untuk Kepentingan Umum 1 Pkt 200,000,000 199,900,000 0.79 0.79 0.79 100.00 100.00 100.00
REALISASI
KEUANGAN SISA ANGGARAN KET
(%) (Rp) (Rp)
17.00 18 19 20
- 150,000,000
- 150,000,000
100.00 183,750,000 -
100.00 183,750,000 -
MAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
STATUS S/D 31 MARET 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(%) (Rp) (Rp)
17.00 18 19 20
- 135,000,000
- 95,000,000
- 95,000,000
- 95,000,000
- 150,000,000
MAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
STATUS S/D 31 MARET 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(%) (Rp) (Rp)
17.00 18 19 20
0.00 - 180,000,000
0.00 - 180,000,000
REALISASI
KEUANGAN SISA ANGGARAN KET
(%) (Rp) (Rp)
17.00 18 19 20
- 101,000,000
- 135,000,000
REALISASI
KEUANGAN SISA ANGGARAN KET
(%) (Rp) (Rp)
17.00 18 19 20
- 150,000,000
- 150,000,000
MAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
STATUS S/D 31 MARET 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(%) (Rp) (Rp)
17.00 18 19 20
- 150,000,000
- 150,000,000
0.00 - 135,000,000
0.00 - 135,000,000
REALISASI
KEUANGAN SISA ANGGARAN KET
(%) (Rp) (Rp)
17.00 18 19 20
- 190,000,000
- 135,000,000
- 95,000,000
- 95,000,000
- 150,000,000
- 150,000,000
REALISASI
KEUANGAN SISA ANGGARAN KET
(%) (Rp) (Rp)
17.00 18 19 20
REALISASI
KEUANGAN SISA ANGGARAN KET
(%) (Rp) (Rp)
17.00 18 19 20
- 192,000,000
MAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
STATUS S/D 31 MARET 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(%) (Rp) (Rp)
17.00 18 19 20
0.00 - -
MAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
STATUS S/D 31 MARET 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(%) (Rp) (Rp)
17.00 18 19 20
MAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
STATUS S/D 31 MARET 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(%) (Rp) (Rp)
17.00 18 19 20
- 95,000,000
- 140,000,000
- 140,000,000
- 150,000,000
REALISASI
KEUANGAN SISA ANGGARAN KET
(%) (Rp) (Rp)
17.00 18 19 20
- -
REALISASI
KEUANGAN SISA ANGGARAN KET
(%) (Rp) (Rp)
17.00 18 19 20
- 95,000,000
- 95,000,000
- 95,000,000
- 95,000,000
- 95,000,000
- 150,000,000
- 150,000,000
MAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
STATUS S/D 31 MARET 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(%) (Rp) (Rp)
17.00 18 19 20
100.00 183,750,000 -
- 95,000,000
- 95,000,000
- 135,000,000
- 135,000,000
- -
MAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
STATUS S/D 31 MARET 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(%) (Rp) (Rp)
17.00 18 19 20
- 150,000,000
- 150,000,000
MAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
STATUS S/D 31 MARET 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(%) (Rp) (Rp)
17.00 18 19 20
- 190,000,000
MAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
STATUS S/D 31 MARET 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(%) (Rp) (Rp)
17.00 18 19 20
0.00 - -
0.00 - 184,000,000
100.00 183,350,000 -
100.00 183,450,000 -
REALISASI
KEUANGAN SISA ANGGARAN KET
(%) (Rp) (Rp)
17.00 18 19 20
- -
100.00 91,450,000 -
100.00 183,250,000 -
REALISASI
KEUANGAN SISA ANGGARAN KET
(%) (Rp) (Rp)
17.00 18 19 20
- 135,000,000
- 190,000,000
- 150,000,000
- 150,000,000
MAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
STATUS S/D 31 MARET 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(%) (Rp) (Rp)
17.00 18 19 20
- 113,700,000
- 113,700,000
- 150,000,000
-
MAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
STATUS S/D 31 MARET 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
(%) (Rp) (Rp)
17.00 18 19 20
APBD-P
100.00 183,800,000 200,000
APBD-P
100.00 140,520,000 480,000
- 190,000,000
- 135,000,000
-
- 142,500,000
- 142,500,000
- -
100.00 137,150,000 -
100.00 183,650,000 -
REALISASI
- 95,000,000
- 95,000,000
- 150,000,000
- 150,000,000
-
MAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN PROVINSI SULAWESI SELATAN
STATUS S/D 31 MARET 2018 SUMBER DANA APBD
REALISASI
KEUANGAN SISA ANGGARAN KET
150,000,000
100.00
12,850,000 150,000
0.00 - 100,000,000
100.00 753,040,000 -
100.00 681,822,120 -
100.00 16,800,000 -
100.00 10,693,360,000 -
100.00 538,900,000 -
100.00 305,220,000 -
100.00 13,000,000 -
- 92,500,000
100.00 455,000,000 -
REALISASI
KEUANGAN SISA ANGGARAN KET
(%) (Rp) (Rp)
17.00 18 19 20
100.00 204,140,000 -
100.00 20,000,000 -
0.00 - 3,600,000
0.00 - 7,500,000
100.00 468,938,000 -
0.00 - 10,000,000
100.00 56,000,000 -
100.00
100.00 147,510,000 -
100.00 144,485,000 -
100.00 9,000,000 -
100.00 116,800,000 -
0.00 - 150,000,000
0.00 - 50,000,000
100.00 99,550,000 -
100.00 124,520,000 -
100.00 122,250,000 -
100.00 124,610,000
-
100.00 124,610,000
-
100.00 123,300,000 -
100.00 124,300,000 -
100.00 124,700,000 -
100.00 124,500,000 -
100.00 124,500,000 -
100.00 124,500,000 -
100.00 124,190,000 -
100.00 124,400,000 -
100.00 124,481,000 -
100.00 299,125,000 -
100.00 99,725,000 -
100.00 123,970,000 -
100.00 123,420,000 -
100.00 122,750,000 -
100.00 123,150,000 -
100.00 123,200,000 -
100.00 123,970,000 -
100.00 123,950,000 -
100.00 123,300,000 -
100.00 292,520,000 -
0.00 - 125,000,000
100.00 98,300,000 -
100.00 123,940,000 -
100.00 123,455,000 -
100.00 123,500,000 -
100.00 123,700,000 -
100.00 123,695,000 -
100.00 124,025,000 -
100.00 495,800,000 -
100.00 99,700,000 300,000
0.00 - -
0.00 - 200,000,000
0.00 - 200,000,000
100.00 195,400,000 -
100.00 198,000,000 -
100.00 195,625,000 -
100.00 197,604,000 -
100.00 298,100,000 -
100.00 498,000,000 -
100.00 298,200,000 -
100.00 29,600,000 -
0.00 - 50,000,000
100.00 16,000,000 -
02-11-2018 31-12-2018
0.00 0.00 0.00 - ###