(Rp)
(Rp)
(Rp)
(Rp)
E. BAHAN PERPIPAAN
1 Pipa PVC type AW Ø 1/2", Kualitas Rucika btg ( 4 m ) 0.00
2 Pipa PVC type AW Ø 3/4", Kualitas Rucika btg ( 4 m ) 0.00
3 Pipa PVC type AW Ø 1", Kualitas Rucika btg ( 4 m ) 0.00
4 Pipa PVC type AW Ø 1 1/4", Kualitas Rucika btg ( 4 m ) 0.00
1 Pipa PVC type AW Ø 1 1/2", Kualitas Rucika btg ( 4 m ) 75,000.00
(Rp)
(Rp)
I. ALAT TUKANG
1 Cangkul bh 99,000.00
2 Karbit Kg 0.00
2 Linggis bh 99,800.00
3 Palu bh 161,700.00
4 Pengki bh 21,160.00
5 Rool Meter 30 Meter ( Bahan besi ) bh
6 Rool Meter 5 Meter ( Bahan besi ) bh
5 Singkup bh 90,300.00
6 Slang Plastik untuk Water Pas di.0.5cm m' 0.00
7 Water Pass Alumunium bh 0.00
6 Ember bh 46,200.00
7 Gacok bh 50,050.00
8 Gergaji bh
(Rp)
(Rp)
K. HARGA BBM
1 Premium Ltr
2 Minyak Solar Ltr
3 Residu /Ter Ltr
4 Plux Oil Ltr
5 Minyak Bakar Ltr
6 Olie SAE (Mesran, Pertamina) Ltr
7 Oli Bekas Ltr
Item Pembayaran No. : 6.3 (3)
Jenis Pekerjaan :LATASTON LAPIS AUS (HRS-WC)
Satuan Pembayaran : Ton URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L -
5 Tebal Lapis (HRS-WC) padat t 0.03 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilangan material : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Komposisi campuran HRS-WC :
- Agregat Kasar (10 - 20 mm) CA 42.15 % Gradasi harus -
- Agregat Sedang (1 - 10 mm) FA 44.45 % memenuhi -
- Agregat Halus (0 - 5 mm) FF 6.60 % Spesifikasi
- Aspal As 6.80 %
- Kayu Bakar Kb 55.00 %
9 Berat jenis bahan :
- HRS-WC D1 2.170 ton / M3
- Agregat Kasar (10 - 20 mm) D2 1.25 ton / M3
- Agregat Sedang (1 - 10 mm) D3 1.35 ton / M3
- Agregat Halus (0 - 5 mm) D4 1.45 ton / M3
- Aspal D5 1.029 ton / M3
- Kayu Bakar D6 0.60 ton / M3
II. URUTAN KERJA
1. BAHAN
1.a. Agregat Kasar = (CA x (D1 x Fh1)) : D2 (A01) 0.7683 M3
1.b. Agregat Sedang = (FA x (D1 x Fh1)) : D3 (A02) 0.7502 M3
1.c. Agregat Halus = (FF x( D1 x Fh1)) : D4 (A03) 0.1037 M3
1.d. Aspal = AS x D4 x Fh2 x 1000 (A04) 72.071 Kg
1.e. Kayu Bakar = (Kb x 1) : D6 (A05) 0.917 m3
2. ALAT
2.a. Pencampuran Aspal Manual (B02)
Kapasitas produksi V 3.0 ton / Jam
Faktor Efisiensi alat Fa 0.83 -
Kap.Prod. / jam = V x Fa Q2 1.15 Ton
D1
Koefisien Alat/ton = 1 : Q2 (B02) 0.8715 Jam
3. TENAGA
Produksi menentukan : Pencampuran Aspal Manual Q2 1.15 Ton / Jam
Produksi HRS-WC / hari = Tk x Q2 Qt 8.03 Ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH
HARGA
(Rp.)
126,365.46
15,873.49
142,238.96
169,028.24
153,794.53
18,667.99
1,217,072.65
183,333.33
1,741,896.75
7,469.88
3,824.85
11,294.73
1,895,430.43
284,314.56
2,179,744.99
ITEM PEMBAYARAN NO. : 6.1 (1) Analisa EI-611a
JENIS PEKERJAAN : LAPIS RESAP PENGIKAT - ASPAL CAIR
SATUAN PEMBAYARAN : Liter URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan Cara Manual
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 7.25 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.03 -
6 Bahan :
- Kadar Residu Aspal Cair As 60 %
1. BAHAN
Untuk mendapatkan 1 liter Lapis Perekat
diperlukan : ( 1 liter x Fh ) PC 1.03 liter
2. ALAT
2.a. ASPHALT DISTRIBUTOR (E41)
Lebar penyemprotan b 3.50 M
Kecepatan penyemprotan v 30.00 M/menit
Kapasitas pompa aspal pas 100 liter/menit
Faktor effesiensi kerja Fa 0.70
Kadar aplikasi 0.25 liter/m2 Table 6.1.4.1
Kap. Prod. / jam = pas x Fa x 60 Q1 4,200.00 liter
3. TENAGA
Produksi menentukan : ASPAL DISTRIBUTOR Q4 808.50 liter
Produksi Lapis Perekat / hari = Tk x Q4 Qt 5,659.50 liter
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
A. TENAGA
23.40
1. Pekerja (L01) Jam 0.0025 14,500.00 35.87 839.33 100.00% 839.33 -
2. Mandor (L03) Jam 0.0012 18,214.29 22.53 527.17 100.00% 527.17 -
B. BAHAN
1. Aspal Cair (M31b) Liter 1.7167 16,887.10 28,989.52 678,354.68 32.48% 220,329.60 458,025.08 10953/SJ-IND.8/TKDN/11/2021
C. PERALATAN
1. Asp. Distributor E41 Jam 0.0002 47,571.43 11.33 265.04 32.48% 86.09 178.96 Produksi DN. Saham LN
2. Compressor E05 Jam 0.0012 37,028.57 45.80 1,071.70 32.48% 348.09 723.61 Produksi DN. Saham LN
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 29,105.04 681,057.92 32.62% 222,130.27 458,927.64
E. OVERHEAD & PROFIT 15.0 % x D 4,365.76
F. HARGA SATUAN PEKERJAAN ( D + E ) 33,470.80
ITEM PEMBAYARAN NO. : 6.6.(1) Analisa EI-661
JENIS PEKERJAAN : 'Lapis Penetrasi Macadam ( Tanpa Screen )
SATUAN PEMBAYARAN : Meter Kubik URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan Cara Manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 7.25 KM
5 Tebal rata2 Lapen t 0.050 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilangan - Agregat Fh1 1.05 -
Fator kehilangan - Aspal Fh2 1.03 -
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak 80.00 Kg/M2 25
- Agregat Pengunci Ap1 25.00 Kg/M2 19
- Agregat Penutup Ap2 14.00 Kg/M2 12.5
- Aspal : - Paska Agregat Pokok As1 2.50 Kg/M2 (Ld dalam mm)
- Paska Agregat Pengunci As2 1.50 Kg/M2
As 80.00 Kg/M3
9 Lebar : Lbr 3.50 M'
Berat isi bahan Agregat : D1 1.45 ton / M3
Berat isi bahan Aspal : D2 1.03 ton / M3
1. BAHAN
1.a. Agregat Pokok = {(Ak/1000 : t M3) x Fh1} : D1 (M92) 1.1586 M3
1.b. Agregat Pengunci = {(Ap1/1000 : t M3) x Fh1} : D1 (M92) 0.3621 M3
1.c. Agregat Penutup = {(Ap2/1000 : t M3) x Fh1} : D1 (M92) 0.2028 M3
1.d. Aspal = {((As1+As2) : t M3) x Fh2} (M10) 82.40 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.70 -
Waktu Siklus Ts1 0.45 lihat tabel
V - Loading
2.g.
ALAT BANTU Lump Sum
- Kereta dorong
- Sekop
- Sapu
- Sikat
- Karung
- Cerek Aspal
- Kaleng Aspal
3. TENAGA
Produksi menentukan (Roller) Q1 18.04 M3/Jam
Produksi Lapen / hari = Q1 x Tk Qt 126.31 M3
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 1.1084 Jam
- Mandor = (Tk x M) / Qt (L03) 0.1108 Jam
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0084 - 0.00
2. Dump Truck 1 E09 Jam 0.2119 87,100.00 18,459.72
3 Tandem Roller E17 Jam 0.0554 71,429.00 3,958.50
4 Asphalt Distributor E41 Jam 0.0190 47,571.43 906.12
PEKERJAAN TANAH
1.7.7.1.1.c ( a ) PENGGALIAN 1M3 TANAH BIASA SEDALAM 1 M'
A. TENAGA
Pekerja 0.7500 OH 101,500.00 76,125.00
Mandor 0.0250 OH 127,500.00 3,187.50
B. BAHAN
Sirtu 1.2000 kg 110,000.00 132,000.00
B. BAHAN
Batu belah 15/20 cm 1.2000 m3 160,000.00 192,000.00
Semen Portland 163.0000 Kg 1,400.00 228,200.00
Pasir pasang 0.5200 m3 180,000.00 93,600.00
B. BAHAN
Semen portland 232.0000 kg 1,400.00 324,800.00
Pasir beton 0.5200 m3 220,000.00 114,400.00
Koral beton 0.7800 m3 185,000.00 144,300.00
Air 215.0000 L 100.00 21,500.00
B. BAHAN
Semen portland 232.0000 kg 1,400.00 324,800.00
Pasir beton 0.5200 m3 220,000.00 114,400.00
Koral beton 0.7800 m3 185,000.00 144,300.00
Air 215.0000 L 100.00 21,500.00
C. PERALATAN
Molen 0,35 m3 0.2000 hari 350,000.00 70,000.00
B. BAHAN
Semen portland 218.0000 kg 1,400.00 305,200.00
Pasir beton 0.5200 m3 220,000.00 114,400.00
Koral beton 0.8700 m3 185,000.00 160,950.00
Air 215.0000 L 100.00 21,500.00
B. BAHAN
Semen portland 218.0000 kg 1,400.00 305,200.00
Pasir beton 0.5200 m3 220,000.00 114,400.00
Koral beton 0.8700 m3 185,000.00 160,950.00
Air 215.0000 L 100.00 21,500.00
C. PERALATAN
Molen 0,35 m3 0.2000 hari 350,000.00 70,000.00
B. BAHAN
Beton Readymix K-175 1.0500 M3 996,000.00 1,045,800.00
C. PERALATAN
Pompa Beton 0.1200 hari 0.00 -
B. BAHAN
Besi Beton (Polos / Ulir) 1.0500 kg 12,500.00 13,125.00
Kawat Beton 0.0280 kg 20,000.00 560.00
B. BAHAN
Kayu Kelas III (Papan) 0.0225 m3 1,300,000.00 29,250.00
Paku biasa 2'-5" 0.3000 Kg 20,000.00 6,000.00
Minyak bekisting 0.0500 Ltr 0.00 -
B. BAHAN
Blockboard 0.0225 m3 4,051,000.00 91,147.50
Paku biasa 2'-5" 0.3000 Kg 20,000.00 6,000.00
B. BAHAN
Semen Portland 6.2400 kg 1,400.00 8,736.00
KODE PEK URAIAN KOEF SATUAN HARGA (Rp) HARGA SATUAN(Rp)
B. BAHAN
Semen Portland 2.3400 kg 1,400.00 3,276.00
Pasir pasang 0.0050 m3 180,000.00 900.00
B. BAHAN
Semen Portland 3.2500 kg 1,400.00 4,550.00
B. BAHAN
Pipa PVC dia.1,5" 1.0500 M' 18,750.00 19,687.50
B. BAHAN
Besi Profil 1.1500 kg 10,400.00 11,960.00
B. BAHAN
Paving Block 6 cm 1.0100 M2 80,000.00 80,800.00
Pasir Beton 0.0500 M3 220,000.00 11,000.00
C. PERALATAN
Peralatan 10%
B. BAHAN
Paving Block 6 cm Warna 1.0100 M2 95,000.00 95,950.00
Pasir Beton 0.0500 M3 220,000.00 11,000.00
C. PERALATAN
Peralatan 10%
B. BAHAN
Plamuur 0.1000 kg 0.00 -
Cat dasar 0.1000 kg 0.00 -
Cat Penutup 0.2600 kg 0.00 -
KODE
NO ITEM SATUAN PEKERJAAN HARGA SATUAN
ANALIS SNI
PEKERJAAN PERSIAPAN
PEKERJAAN TANAH
PEKERJAAN PONDASI
PEKERJAAN BETON
5 D-12 1 M3 BETON F'c = 14,5 Mpa (K175), SLUMP (12±2), W/C=0,66 MANUAL 1,096,622.38
6 D-13 1 M3 BETON F'c = 14,5 Mpa (K175), SLUMP (12±2), W/C=0,66 MOLEN 1,124,219.51
7 D-14 1 M3 BETON F'c = 14,5 Mpa (K175), SLUMP (12±2), W/C=0,66 REDYMIX ( TANPA POMPA ) 1,348,754.50
8 D-18 1 M3 BETON F'c = 19,3 Mpa (K225), SLUMP (12±2), W/C=0,58 MANUAL 1,160,704.77
9 D-19 1 M3 BETON F'c = 19,3 Mpa (K225), SLUMP (12±2), W/C=0,58 MOLEN 1,188,301.89
10 D-20 1 M3 BETON F'c = 19,3 Mpa (K225), SLUMP (12±2), W/C=0,58 REDYMIX ( TANPA POMPA ) 1,391,017.00
11 D-21 1 M3 BETON F'c = 21,7 Mpa (K250), SLUMP (12±2), W/C=0,56 MANUAL 1,179,289.74
12 D-22 1 M3 BETON F'c = 21,7 Mpa (K250), SLUMP (12±2), W/C=0,56 MOLEN 1,206,886.86
13 D-23 1 M3 BETON F'c = 21,7 Mpa (K250), SLUMP (12±2), W/C=0,56 REDYMIX ( TANPA POMPA ) 1,481,579.50
14 D-24 1 M3 BETON F'c = 24 Mpa (K275), SLUMP (12±2), W/C=0,53 MANUAL 1,211,215.32
15 D-25 1 M3 BETON F'c = 24 Mpa (K275), SLUMP (12±2), W/C=0,53 MOLEN 1,238,812.45
16 D-26 1 M3 BETON F'c = 24 Mpa (K275), SLUMP (12±2), W/C=0,53 REDYMIX ( TANPA POMPA ) 1,528,672.00
17 D-27 1 M3 BETON F'c = 26,4 Mpa (K300), SLUMP (12±2), W/C=0,52 MANUAL 1,221,155.22
18 D-28 1 M3 BETON F'c = 26,4 Mpa (K300), SLUMP (12±2), W/C=0,52 MOLEN 1,248,752.34
19 D-29 1 M3 BETON F'c = 26,4 Mpa (K300), SLUMP (12±2), W/C=0,52 REDYMIX ( TANPA POMPA ) 1,560,067.00
PEKERJAAN DINDING
PEKERJAAN PLESTERAN
PEK. SANITASI
PEKERJAAN PENGECATAN
1 3.3.10.( c ) PENGECATAN 1 m2 TEMBOK BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 2 Lapis Cat Penutup) 12,555.13
PEKERJAAN JALAN
II PEKERJAAN PELAKSANAAN
JUMLAH 5,575,000.00
PPN 11 % 613,250.00
PPH 4(2) 97,562.50
JUMLAH TOTAL 6,285,812.50
DIBULATKAN 6,285,812.00
TERBILANG : TIGA BELAS JUTA SEERATUS TIGA PULUH EMPAT RIBU TIGA PULUH SEMBILAN RUPIAH
Tasikmalaya, 2023
Dibuat Oleh
Konsultan Perencana
CV. ABDURROHMAN KONSULTAN
I PEKERJAAN PERSIAPAN
1 Pengukuran/uitzet - 1.00 Ls 500,000.00 500,000.00
2 Papan nama proyek - 1.00 Ls 300,000.00 300,000.00
3 Pengadaan/ Sewa Direksikeet - 1.00 Ls 300,000.00 300,000.00
4 Pekerjaan Bongkaran - 1.00 Ls 1,500,000.00 1,500,000.00
5 SMKK - 1.00 PAKET 875,000.00 875,000.00
JUMLAH 3,475,000.00
II PEKERJAAN PELAKSANAAN
A PEK. JALAN TYPE A, Pj = 63 M' , L = 1 M' 58.50 1.00
1 Pek. Plat Kaki
a. Bekisting A.4.1.1.20.( a ) M2 103,845.86 -
b. Besi Beton Polos Ø10 - 200 mm 2.2.6.1.d (a) KG 20,323.95 -
c. Beton Tumbuk, adk. 1pc : 2pb : 3krl, Manual D.02 M3 943,281.75 -
2 Pek. Kolom Beton, KB 30 / 30 cm
a. Bekisting A.4.1.1.20.( a ) M2 103,845.86 -
b. Besi Beton Polos Ø10 - 200 mm 2.2.6.1.d (a) KG 20,323.95 -
c. Beton Tumbuk, adk. 1pc : 3pb : 5krl, Manual D.02 M3 943,281.75 -
3 Plat Beton, T = 12 cm
a. Bekisting A.4.1.1.22.( a ) M2 113,045.86 -
b. Besi Beton Polos Ø10 - 200 mm 2.2.6.1.d (a) KG 20,323.95 -
c. Beton Tumbuk, adk. 1pc : 3pb : 5krl, Manual D.02 M3 943,281.75 -
4 Torn 500 Lt (Setara Penguin) Upah + Bahan 1.00 BH 950,000.00 950,000.00
5 Penambahan KWH Baru (1 Paket) Upah + Bahan 1.00 LS 1,150,000.00 1,150,000.00
6
7
2 Pek. Lataston Lapis Aus (HRS-WC),Tebal Rata-rata 3 cm 6.3 (3) - TON 2,179,744.99 -
JUMLAH 2,100,000.00
PERHITUNGAN RENCANA TKDN PEKERJAAN INFRASTRUKTUR
KEGIATAN : PENYELENGGARAAN INFRASTRUKTUR PADA PERMUKIMAN DI KAWASAN STRATEGIS DAERAH KABUPATEN / KOTA
PEKERJAAN : REHABILITASI WC DI RW 08 KELURAHAN TAMANJAYA
LOKASI : KOTA TASIKMALAYA
TAHUN : 2023
0.10
Pembesian bh kg/m'
Ø 10 - 20 10.00 9.00 0.616 55.46 10.00 9.00
Ø 10 - 20 51.00 2.00 0.616 62.86 0.80 Stoot 3.33 3.00
Ø 10 3.20 3.00 0.616 5.92
Ø 10 3.00 0.20 0.616 2 0.74
124.98 Kg
0.10
Pembesian bh kg/m'
Ø 10 - 20 - 9.00 0.616 - 11.00 9.00
Ø 10 - 20 1.00 2.20 0.616 1.36 0.80 Stoot -
Ø 10 3.20 - 0.616 -
Ø 10 - 0.20 0.616 2 -
1.36 Kg
0.10
Pembesian bh kg/m'
Ø 10 - 20 - 9.00 0.616 - 9.00 9.00
Ø 10 - 20 1.00 1.80 0.616 1.11 0.80 Stoot -
Ø 10 3.20 - 0.616 -
Ø 10 - 0.20 0.616 2 -
1.11 Kg
m'
bh
bh
m'
m'
bh
bh
m'
m'
bh
bh
#VALUE!
1 1
SALURAN TERBUKA
2 3 3 7
SALURAN + BESI GRILL
10
11
12
13
14
4 3 7
#REF!
1
#REF!