RENCANA PERHITUNGAN TINGKAT KOMPONEN DALAM NEGERI (TKDN)

PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI


KEGIATAN : PENYELENGGARAAN INFRASTRUKTUR PADA PERMUKIMAN DI KAWASAN STRATEGIS DAERAH KABUPATEN / KOTA
PEKERJAAN : REHABILITASI WC DI RW 08 KELURAHAN TAMANJAYA
LOKASI : KOTA TASIKMALAYA
TAHUN : 2023

HARGA SATUAN JUMLAH TKDN KDN


NO. URAIAN PEKERJAAN VOLUME SAT. (Rp.) SATUAN % (RP.) KLN (RP.) KETERANGAN
(Rp.)
1 2 4 5 6 7 8 9 10 11
I BIAYA UMUM K3
A ALAT PELINDUNG DIRI
1 Sepatu Safety 5.00 pasang 75,000.00 375,000.00 72.18% 270,675.00 104,325.00 1742/SJ-IND.8/TKDN/12/2020
2 Helm Safety 5.00 bh 50,000.00 250,000.00 71.12% 177,800.00 72,200.00 6062/SJ-IND.8/TKDN/11/2022
3 Kacamata Safety - bh 50,000.00 - 31.80% - - 3732/SJ-IND.8/TKDN/8/2022
3 Rompi Safety 5.00 bh 40,000.00 200,000.00 42.94% 85,880.00 114,120.00 6469/SJ-IND.8/TKDN/7/2021
4 Sarung Tangan Safety 5.00 bh 10,000.00 50,000.00 80.04% 40,020.00 9,980.00 5487/SJ-IND.8/TKDN/7/2021
5 Masker - box 20,000.00 - 54.61% - - 8393/SJ-IND.8/TKDN/8/2021
JUMLAH 875,000.00 65.64% 574,375.00 300,625.00
B PROTOKOL COVID-19
1 Hand sanitizer - botol 100,000.00 - 37.22% - - 6252/SJ-IND.8/TKDN/7/2021
2 Bak Cuci Tangan - bh 2,000,000.00 - 64.68% - - 7560/SJ-IND.8/TKDN/8/2021
3 Sarung Tangan - box 250,000.00 - 25.13% - - 3415/SJ-IND.8/TKDN/6/2021
4 Thermo Gun - bh 1,500,000.00 - 44.97% - - 10536/SJ-IND.8/TKDN/10/2021
5 Masker Pekerja - Box 350,000.00 - 54.61% - - 8393/SJ-IND.8/TKDN/8/2021
6 Suplemen Vitamin - Ls 1,000,000.00 - 30.50% - - 1708/SJ-IND.8/TKDN/5/2022
JUMLAH - - -
JUMLAH TOTAL 875,000.00 65.64% 574,375.00 300,625.00
DAFTAR HARGA UPAH
KOTA TASIKMALAYA
TAHUN 2023

No JENIS TENAGA KERJA KODE SATUAN HARGA

(Rp)

1 Pekerja L.01 HOK 101,500.00


2 Mandor L.04 HOK 127,500.00
3 Operator Alat Besar L.08 HOK 159,000.00
4 Pembantu Operator / Mekanik L.09 HOK 101,500.00
5 Supir Truk L.10 HOK 127,000.00
DAFTAR HARGA BAHAN
KOTA TASIKMALAYA
TAHUN 2023

No JENIS BAHAN BANGUNAN KODE SATUAN HARGA

(Rp)

A. AGREGAT KASAR, BAHAN PEREKAT DAN BAHAN JADINYA


1 Abu Batu m3 180,000.00
2 Tanah Urug m3 90,000.00
3 Sirtu ( tersaring bergradasi ) m3 110,000.00

4 Pasir Urug /Bawah lantai m3 90,000.00


5 Pasir Pasang /gunung pilihan m3 180,000.00
6 Pasir Beton m3 220,000.00

7 Batu Belah m3 160,000.00


2 Batu Pecah ( tersaring bergradasi ) m3 200,000.00
3 Batu Pecah 0,5/1 ( Screen ) m3 205,000.00
4 Batu Pecah 1/2 m3 220,000.00
5 Batu Pecah 2/3 m3 185,000.00
6 Batu Pecah 3/5 m3 185,000.00
7 Batu Pecah 5/7 m3 175,000.00
8 Batu Pecah 10/15 m3 160,000.00

9 Bata Merah bh 800.00


10 Paving Block Natural 6 cm ( Cisangkan )* m2
16 Paving Block Natural 6 cm ( Setempat ) m2 80,000.00
17 Paving Block Warna 6 cm ( Cisangkan )* m2
17 Paving Block Warna 6 cm ( Setempat ) m2 95,000.00
18 Paving Block Natural 8 cm ( Cisangkan )* m2
18 Paving Block Natural 8 cm ( Setempat ) m2 100,000.00
19 Paving Block Warna 8 cm ( Cisangkan )* m2
19 Paving Block Warna 8 cm ( Setempat ) m2 115,000.00
20 Kanstin Taman Ukuran 11x20 cm - p=0,40 m' (Press) bh 0.00

21 Semen Portland ( PC ) /50 Kg (H) Zak 70,000.00


22 Semen Portland (PC) Putih Zak 0.00
DAFTAR HARGA BAHAN
KOTA TASIKMALAYA
TAHUN 2023

No JENIS BAHAN BANGUNAN KODE SATUAN HARGA

(Rp)

23 Semen Warna Kg 0.00


24 Sewa Molen 0,35 M3 hari 350,000.00
25 Redymix Beton K-300 , tanpa pompa ( Selang ) m3
25 Redymix Beton K-175 (14,5 MPa) m3 996,000.00
26 Redymix Beton K-200 (16,9 MPa) m3 0.00

26 Redymix Beton K-225 (19,3 MPa) m3 1,031,000.00


27 Redymix Beton K-250 (21,7 MPa) m3 1,106,000.00
28 Redymix Beton K-275 (24 MPa) m3 1,145,000.00

29 Redymix Beton K-300 (26,4 MPa) m3 1,171,000.00


30 Redymix Beton K-325 (28,8 MPa) m3 0.00
31 Redymix Beton K-350 (31,2 MPa) m3 1,194,000.00
32 Sewa Vibrator Pengecoran/ Hari

33 Sewa Pompa < 20 m3/M3


34 Sewa Mesin Potong Besi hari
<100 m3
Penambahan lebih dari 100 M3

B. BAHAN PENGIKAT KONSTRUKSI JALAN


1 Aspal Bitumen Kg 16,887.10
2 Aspal Congcrete (AC-BC) /Laston ton
3 Aspal Congcrete (AC-WC) /Laston # ton
4 HRS ( Hot Rolled Sheet ) /Lataston ton
5 ATB ( Aspalt Treatment Base ) ton
6 AC. Base ton
2 Minyak Tanah liter 13,000.00
3 Kayu Bakar m3 200,000.00

4 Aspal Cair Liter 12,300.00


DAFTAR HARGA BAHAN
KOTA TASIKMALAYA
TAHUN 2023

No JENIS BAHAN BANGUNAN KODE SATUAN HARGA

(Rp)

C. BAHAN LOGAM DAN BAHAN JADINYA


1 Besi Plat Kg 0.00
1 Besi Beton (ukuran rata rata) Kg 12,500.00
2 Besi Profil Kg 10,400.00
3 Kawat Beton Kg 20,000.00

D. BAHAN SALURAN AIR KOTOR /BERSIH


1 Grefel U-20 cm m' 45,000.00

2 Grefel U-30 cm m' 60,000.00


3 Grefel U-40 cm m' 75,000.00
4 Buis Beton Ø 20 cm ( 1 m') m'
5 Buis Beton Ø 30 cm ( 1 m') m'
6 Buis Beton Ø 40 cm ( 1 m') m'
7 Buis Beton Ø 50 cm ( 1 m') m' 150,000.00
8 Buis Beton Ø 60 cm ( 1 m') m' 195,000.00
9 Buis Beton Ø 70 cm ( 0,5 m') bh (0.5m1)

10 Buis Beton Ø 80 cm ( 0,5 m') bh (0.5m1) 200,000.00


11 Buis Beton Ø 100 cm ( 0,5 m') bh (0.5m1)
12 Ijuk KG

E. BAHAN PERPIPAAN
1 Pipa PVC type AW Ø 1/2", Kualitas Rucika btg ( 4 m ) 0.00
2 Pipa PVC type AW Ø 3/4", Kualitas Rucika btg ( 4 m ) 0.00
3 Pipa PVC type AW Ø 1", Kualitas Rucika btg ( 4 m ) 0.00
4 Pipa PVC type AW Ø 1 1/4", Kualitas Rucika btg ( 4 m ) 0.00
1 Pipa PVC type AW Ø 1 1/2", Kualitas Rucika btg ( 4 m ) 75,000.00

2 Pipa PVC type AW Ø 2", Kualitas Rucika btg ( 4 m ) 90,000.00


3 Pipa PVC type AW Ø 2 1/2", Kualitas Rucika btg ( 4 m ) 0.00
DAFTAR HARGA BAHAN
KOTA TASIKMALAYA
TAHUN 2023

No JENIS BAHAN BANGUNAN KODE SATUAN HARGA

(Rp)

3 Pipa PVC type AW Ø 3", Kualitas Rucika btg ( 4 m ) 160,000.00


4 Pipa PVC type AW Ø 4", Kualitas Rucika btg ( 4 m ) 300,000.00
5 Pipa PVC type AW Ø 6", Kualitas Rucika btg ( 4 m ) 700,000.00
6 Pipa PVC type AW Ø 8", Kualitas Rucika btg ( 4 m ) 1,200,000.00
7 Sambungan Pipa PVC Ø 8" , Kualitas Rucika bh 35,000.00

8 Knee Pipa PVC Ø 8" , Kualitas Rucika bh 115,000.00

F. BAHAN KAYU BERIKUT BAHAN JADINYA

1 Bambu Diameter 5 s/d 7 cm btg 8,000.00


2 Bambu Diameter 7 s/d 10 cm btg 8,000.00
3 Kayu Balok/Papan /Kayu Gunung Klas III ( Albasia )* m3 1,300,000.00
4 Kayu Bekisting m3 1,300,000.00
5 Blockboard ( 15 mm 120 x 240 ) lbr 175,000.00
6 Blockboard ( 15 mm 120 x 240 ) m3 4,051,000.00
7 Batang kelapa (Ø 30 cm p=6 m) btg 360,000.00

G. BAHAN FINISHING : LABURAN, PENGISIAN DAN ALATNYA


1 Ampelas Lbr 5,000.00
2 Cat Besi Kg 68,000.00
3 Cat Tembok setara Sanlex Kg 0.00
4 Kuas 3 " bh 12,500.00
5 Meni Kayu /Besi Kg 40,000.00
6 Terpentin Ltr 7,000.00
7 Air Ltr 100.00

H. BAHAN PAKU DAN MUR-BAUT

1 Paku (berbagai macam ukuran /rata-rata) Kg 20,000.00


DAFTAR HARGA BAHAN
KOTA TASIKMALAYA
TAHUN 2023

No JENIS BAHAN BANGUNAN KODE SATUAN HARGA

(Rp)

I. ALAT TUKANG
1 Cangkul bh 99,000.00
2 Karbit Kg 0.00
2 Linggis bh 99,800.00
3 Palu bh 161,700.00

4 Pengki bh 21,160.00
5 Rool Meter 30 Meter ( Bahan besi ) bh
6 Rool Meter 5 Meter ( Bahan besi ) bh

5 Singkup bh 90,300.00
6 Slang Plastik untuk Water Pas di.0.5cm m' 0.00
7 Water Pass Alumunium bh 0.00
6 Ember bh 46,200.00
7 Gacok bh 50,050.00
8 Gergaji bh

C. STANDAR SEWA ALAT BERAT, TRUK, KENDARAAN RODA EMPAT, DLL

1 Aspalt Finisher Jam


2 Aspalt Miixing Plant Jam
3 Aspalt mileting Kalte Jam
1 Aspalt Spayer Jam 71,429.00
2 Exavator Backoe ( Short ) Jam
3 Exavator Backoe ( Long ) Jam
4 Buldozer 100 - 150 HP( E.04 ) Jam
5 Concrete Mixer 0.125 M3 Jam
6 Concrete Mixer 0.3-0.6 m ( E. 06 ) Jam
7 Concrete Vibrator ( E.20 ) Jam

2 Tree Wheel Roller Jam 46,900.00


3 Tandam Roller Jam 71,429.00
DAFTAR HARGA BAHAN
KOTA TASIKMALAYA
TAHUN 2023

No JENIS BAHAN BANGUNAN KODE SATUAN HARGA

(Rp)

4 Tire Roller 8-10 Ton Jam


5 Roller Vibrator 5-8 Ton Jam
6 Pedestrian Roller Jam
7 Roller Pneumatic 8-15 Ton Jam
4 Wheel Loader 1-1,6 m3 Jam 0.00

5 Crane 10 15 Ton Jam


6 Genset Jam
7 Draklint Jam

8 Track Loader 75 100 HP Jam


9 Motor Grader 100 HP Jam
10 Pneumatic Drill Hammer Jam
11 Ship Foot Roller Jam
12 Stone Crusher Jam
13 Teractor Equipnment Jam
14 Screening Plent Jam
15 Spreyer,Self - Proop 1001 Jam

16 Tamper, Viberator Plate Jam


17 Crusher / SCB Jam
18 Concerate Viberator Jam
19 Pick Up Jam
4 Dump Truck 4-6 ton Jam 87,100.00
5 Dump Truck 5 Ton 125 HP Jam
6 Flatbad Truck 3,5 Ton Jam
7 Truck 3/4 Jam
8 Truck Fuso Jam
9 Mesin Las Listrik 18 PK Jam

10 Mesin Pompa Air 3" Jam


11 Jack Hammer Jam
DAFTAR HARGA BAHAN
KOTA TASIKMALAYA
TAHUN 2023

No JENIS BAHAN BANGUNAN KODE SATUAN HARGA

(Rp)

6 Compressor Jam 37,028.57


7 Aspal Distributor Jam 47,571.43
8 Power Broom Jam 0.00
9 Penyangraian Manual Jam 8,571.43
7 Pump Water 70 100 mm Jam

8 Trailler, Towed 1 Ton Jam


9 Water Tank 3000 - 4500 Liter Jam

K. HARGA BBM
1 Premium Ltr
2 Minyak Solar Ltr
3 Residu /Ter Ltr
4 Plux Oil Ltr
5 Minyak Bakar Ltr
6 Olie SAE (Mesran, Pertamina) Ltr
7 Oli Bekas Ltr
Item Pembayaran No. : 6.3 (3)
Jenis Pekerjaan :LATASTON LAPIS AUS (HRS-WC)
Satuan Pembayaran : Ton URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L -
5 Tebal Lapis (HRS-WC) padat t 0.03 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilangan material : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Komposisi campuran HRS-WC :
- Agregat Kasar (10 - 20 mm) CA 42.15 % Gradasi harus -
- Agregat Sedang (1 - 10 mm) FA 44.45 % memenuhi -
- Agregat Halus (0 - 5 mm) FF 6.60 % Spesifikasi
- Aspal As 6.80 %
- Kayu Bakar Kb 55.00 %
9 Berat jenis bahan :
- HRS-WC D1 2.170 ton / M3
- Agregat Kasar (10 - 20 mm) D2 1.25 ton / M3
- Agregat Sedang (1 - 10 mm) D3 1.35 ton / M3
- Agregat Halus (0 - 5 mm) D4 1.45 ton / M3
- Aspal D5 1.029 ton / M3
- Kayu Bakar D6 0.60 ton / M3
II. URUTAN KERJA

1 Agregat dan Asphalt diakut ke penggorengan


2 Agregat dan aspal dicampur dan dipanaskan dengan
manual dimuat langsung kedalam Roda Dorong
dan diangkut ke lokasi pekerjaan.
3 Campuran panas AC dihampar dengan manual dan
dipadatkan dengan Tandem Roller.
4 Selama pemadatan, sekelompok pekerja akan
merapikan tepi hamparaan dengan menggunakan Alat
Bantu.

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Agregat Kasar = (CA x (D1 x Fh1)) : D2 (A01) 0.7683 M3
1.b. Agregat Sedang = (FA x (D1 x Fh1)) : D3 (A02) 0.7502 M3
1.c. Agregat Halus = (FF x( D1 x Fh1)) : D4 (A03) 0.1037 M3
1.d. Aspal = AS x D4 x Fh2 x 1000 (A04) 72.071 Kg
1.e. Kayu Bakar = (Kb x 1) : D6 (A05) 0.917 m3

2. ALAT
2.a. Pencampuran Aspal Manual (B02)
Kapasitas produksi V 3.0 ton / Jam
Faktor Efisiensi alat Fa 0.83 -
Kap.Prod. / jam = V x Fa Q2 1.15 Ton
D1
Koefisien Alat/ton = 1 : Q2 (B02) 0.8715 Jam

2.b. TANDEM ROLLER (B06)


Kecepatan rata-rata alat v 2.50 Km / Jam
Lebar efektif pemadatan b 1.20 M
Jumlah lintasan n 4.00 lintasan
Faktor Efisiensi alat Fa 0.83 -

Berlanjut ke hal. berikut.


Item Pembayaran No. : 6.3 (3)
Jenis Pekerjaan :LATASTON LAPIS AUS (HRS-WC)
Satuan Pembayaran : Ton URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

Kap. Prod. / jam = v x 1000 x b x t x Fa Q6 18.68 Ton


n
Koefisien Alat/ton = 1 : Q6 (B06) 0.0535 Jam

2.c. ALAT BANTU


- Rambu = 2 buah Lump Sum
- Kereta dorong = 2 buah
- Sekop = 3 buah
- Garpu = 2 buah
- Tongkat Kontrol ketebalan hanparan

3. TENAGA
Produksi menentukan : Pencampuran Aspal Manual Q2 1.15 Ton / Jam
Produksi HRS-WC / hari = Tk x Q2 Qt 8.03 Ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang

Koefisien Tenaga / ton :


- Pekerja = (Tk x P) / Qt (C01) 8.7149 Jam
- Mandor = (Tk x M) / Qt (C02) 0.8715 Jam

Berlanjut ke hal. berikut.


FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

NAMA PEKERJAAN : REHABILITASI WC DI RW 08 KELURAHAN TAMANJAYA


PROP / KAB / KOTA : TASIKMALAYA
TAHUN : 2023

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Jam 8.7149 14,500.00


2. Mandor Jam 0.8715 18,214.29

JUMLAH HARGA TENAGA

B. BAHAN

1. Agregat Kasar M3 0.7683 220,000.00


2. Agregat Sedang M3 0.7502 205,000.00
3 Agregat Halus M3 0.1037 180,000.00
4 Aspal Kg 72.0712 16,887.10
5 Kayu Bakar M3 0.917 200,000.00

JUMLAH HARGA BAHAN

C. PERALATAN

1 Penggorengan Manual Jam 0.8715 8,571.43


2 Tandem Roller Jam 0.0535 71,429.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
6.3(3)

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

JUMLAH
HARGA
(Rp.)

126,365.46
15,873.49

142,238.96

169,028.24
153,794.53
18,667.99
1,217,072.65
183,333.33

1,741,896.75

7,469.88
3,824.85

11,294.73

1,895,430.43
284,314.56
2,179,744.99
ITEM PEMBAYARAN NO. : 6.1 (1) Analisa EI-611a
JENIS PEKERJAAN : LAPIS RESAP PENGIKAT - ASPAL CAIR
SATUAN PEMBAYARAN : Liter URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan Cara Manual
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 7.25 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.03 -
6 Bahan :
- Kadar Residu Aspal Cair As 60 %

7 Berat isi bahan :


- Aspal Cair D1 1.01 Kg / liter

8 Bahan dasar (aspal emulsi) semuanya diterima di lokasi pekerjaan

II. URUTAN KERJA


1 Aspal Cair dimasukkan ke dalam distributor aspal
2 Permukaan yang akan dilapis dibersihkan dari debu dan kotoran
dengan Air Compressor
3 Campuran aspal cair disemprotkan dengan Asphalt Distributor
ke atas permukaan yang akan dilapis.

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Untuk mendapatkan 1 liter Lapis Perekat
diperlukan : ( 1 liter x Fh ) PC 1.03 liter

1.a. Aspal = PC (M102) 1.7167 Liter


Ae

2. ALAT
2.a. ASPHALT DISTRIBUTOR (E41)
Lebar penyemprotan b 3.50 M
Kecepatan penyemprotan v 30.00 M/menit
Kapasitas pompa aspal pas 100 liter/menit
Faktor effesiensi kerja Fa 0.70
Kadar aplikasi 0.25 liter/m2 Table 6.1.4.1
Kap. Prod. / jam = pas x Fa x 60 Q1 4,200.00 liter

Koefisien Alat / Ltr = 1 : Q1 (E41) 0.00024 Jam

2.b. AIR COMPRESSOR (E05)


Kecepatan v1 2.00 km/jam maju + kiri &
Lebar penyemprotan b 3.50 m kanan
Faktor efisiensi alat = 1 : Q2 Fa 0.70

Kadar Aspal yang digunakan Kdr 0.165 liter/m2 0,12-0,21


Kap. Prod. / jam = v1 x 1000 x b x Fa x Kdr Q2 808.50 liter

Koefisien Alat / Ltr = 1 : Q2 (E05) 0.00124 Jam

Berlanjut ke hal. berikut.

ITEM PEMBAYARAN NO. : 6.1 (1) Analisa EI-611a


JENIS PEKERJAAN LAPIS RESAP PENGIKAT - ASPAL CAIR
SATUAN PEMBAYARAN Liter URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

3. TENAGA
Produksi menentukan : ASPAL DISTRIBUTOR Q4 808.50 liter
Produksi Lapis Perekat / hari = Tk x Q4 Qt 5,659.50 liter
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / liter :


- Pekerja = (Tk x P) : Qt (L01) 0.0025 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0012 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 33,470.80 / liter.

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan
7. VOLUME PEKERJAAN YANG DIPERLUKAN
Volume pekerjaan : 0.00 Liter
Analisa EI-611a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

NAMA PAKET REHABILITASI WC DI RW 08 KELURAHAN TAMANJAYA

PROP / KAB / KOTA KOTA TASIKMALAYA


ITEM PEMBAYARAN NO. 6.1 (1)
JENIS PEKERJAAN LAPIS RESAP PENGIKAT - ASPAL CAIR
SATUAN PEMBAYARAN Liter

PERKIRAAN HARGA JUMLAH VOLUME JUMLAH HARGA


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA PEKRJAAN SATUAN TKDN KDN KLN KETERANGAN
(Rp.) (Rp.) (RP.) % (Rp.) (Rp.)

A. TENAGA
23.40
1. Pekerja (L01) Jam 0.0025 14,500.00 35.87 839.33 100.00% 839.33 -
2. Mandor (L03) Jam 0.0012 18,214.29 22.53 527.17 100.00% 527.17 -

JUMLAH HARGA TENAGA 58.40 1,366.50 100.00% 1,366.50 -

B. BAHAN

1. Aspal Cair (M31b) Liter 1.7167 16,887.10 28,989.52 678,354.68 32.48% 220,329.60 458,025.08 10953/SJ-IND.8/TKDN/11/2021

JUMLAH HARGA BAHAN 28,989.52 678,354.68 32.48% 220,329.60 458,025.08

C. PERALATAN

1. Asp. Distributor E41 Jam 0.0002 47,571.43 11.33 265.04 32.48% 86.09 178.96 Produksi DN. Saham LN
2. Compressor E05 Jam 0.0012 37,028.57 45.80 1,071.70 32.48% 348.09 723.61 Produksi DN. Saham LN

JUMLAH HARGA PERALATAN 57.13 1,336.74 32.48% 434.17 902.57

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 29,105.04 681,057.92 32.62% 222,130.27 458,927.64
E. OVERHEAD & PROFIT 15.0 % x D 4,365.76
F. HARGA SATUAN PEKERJAAN ( D + E ) 33,470.80
ITEM PEMBAYARAN NO. : 6.6.(1) Analisa EI-661
JENIS PEKERJAAN : 'Lapis Penetrasi Macadam ( Tanpa Screen )
SATUAN PEMBAYARAN : Meter Kubik URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan Cara Manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 7.25 KM
5 Tebal rata2 Lapen t 0.050 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilangan - Agregat Fh1 1.05 -
Fator kehilangan - Aspal Fh2 1.03 -
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak 80.00 Kg/M2 25
- Agregat Pengunci Ap1 25.00 Kg/M2 19
- Agregat Penutup Ap2 14.00 Kg/M2 12.5
- Aspal : - Paska Agregat Pokok As1 2.50 Kg/M2 (Ld dalam mm)
- Paska Agregat Pengunci As2 1.50 Kg/M2
As 80.00 Kg/M3
9 Lebar : Lbr 3.50 M'
Berat isi bahan Agregat : D1 1.45 ton / M3
Berat isi bahan Aspal : D2 1.03 ton / M3

II. URUTAN KERJA


1 Permukaan dasar dibersihkan dan disemprot aspal cair bilamana diperlukan
2 Agregat Pokok, Pengunci dan Penutup, masing-masing dimuat ke dalam Dump
Truck menggunakan Wheel Loader (di Base Camp)
3 Masing-masing agregat dibawa dengan Dump Truck menuju lokasi pekerjaan
4 Agregat Pokok ditumpahkan dan disusun (manual) sesuai tebal yang diperlukan
5 Aspal disemprotkan dengan aspal distributor di atas agregat pokok
6 Agregat Pengunci ditumpahkan dan disusun (manual) sesuai tebal yang diperlukan
7 Pemadatan dilakukan dengan Three Wheel Roller (6-8 Ton) minimum 6 lintasan
8 Aspal disemprotkan dengan aspal distributor di atas agregat pengunci
9 Agregat Penutup ditumpahkan dan disusun (manual) sesuai tebal yang diperlukan
10 Pemadatan dilakukan dengan Three Wheel Roller (6-8 Ton) minimum 6 lintasan

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Agregat Pokok = {(Ak/1000 : t M3) x Fh1} : D1 (M92) 1.1586 M3
1.b. Agregat Pengunci = {(Ap1/1000 : t M3) x Fh1} : D1 (M92) 0.3621 M3
1.c. Agregat Penutup = {(Ap2/1000 : t M3) x Fh1} : D1 (M92) 0.2028 M3
1.d. Aspal = {((As1+As2) : t M3) x Fh2} (M10) 82.40 Kg

2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.70 -
Waktu Siklus Ts1 0.45 lihat tabel
V - Loading

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 119.00 M3


Ts1

Koefisien Alat/M3 = 1 : Q1 (E15) 0.0084 Jam


Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 6.6.(1) Analisa EI-661
JENIS PEKERJAAN 'Lapis Penetrasi Macadam ( Tanpa Screen )
SATUAN PEMBAYARAN Meter Kubik URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.b. DUMP TRUCK 1 (DT1) (untuk Agregat Pokok) (E09)


Kapasitas bak V 8.00 M3
Faktor Efisiensi alat Fa 0.70 -
Kecepatan rata-rata bermuatan v1 40.00 KM / Jam
Kecepatan rata-rata kosong v2 60.00 KM / Jam
Kecepatan penghamparan v3 5.00 Km / Jam
Waktu Siklus Ts2
- Mengisi Bak = (V x 60)/(Q1) T1 4.03 menit
- Angkut = (L : v1) x 60 menit T2 10.88 menit
- Menumpahkan = V / (Lbr x Ld1/1000) : (v3 x 1000 / 60) T3 1.10 menit
- Kembali = (L : v2) x 60 menit T4 7.25 menit
Ts2 23.26 menit

Kap.Prod. / jam = V x Fa x 60 Q2 14.45 M3


Ts2

Koefisien Alat / M3 = 1 = 1 : Q2 (E09) 0.0692 Jam

2.c. DUMP TRUCK 2 (DT2) (untuk Agregat Pengunci) (E09)


Kapasitas bak V 8.00 M3
Faktor Efisiensi alat Fa 0.70 -
Kecepatan rata-rata bermuatan v1 40.00 KM / Jam
Kecepatan rata-rata kosong v2 60.00 KM / Jam
Kecepatan penghamparan v3 5.00 Km / Jam
Waktu Siklus Ts2
- Mengisi Bak = (V x 60)/(Q1) T1 4.03 menit
- Angkut = (L : v1) x 60 menit T2 10.88 menit
- Menumpahkan = V / (Lbr x Ld2/1000) : (v3 x 1000 / 60) T3 1.44 menit
- Kembali = (L : v2) x 60 menit T4 7.25 menit
Ts2 23.60 menit

Kap.Prod. / jam = V x Fa x 60 Q2 14.24 M3


Ts2

Koefisien Alat / M3 = 1 = 1 : Q2 (E09) 0.0702 Jam

2.d. DUMP TRUCK 3 (DT3) (untuk Agregat Penutup) (E09)


Kapasitas bak V 8.00 M3
Faktor Efisiensi alat Fa 0.70 -
Kecepatan rata-rata bermuatan v1 40.00 KM / Jam
Kecepatan rata-rata kosong v2 60.00 KM / Jam
Kecepatan penghamparan v3 5.00 Km / Jam
Waktu Siklus Ts2
- Mengisi Bak = (V x 60)/(Q1) T1 4.03 menit
- Angkut = (L : v1) x 60 menit T2 10.88 menit
- Menumpahkan = V / (Lbr x Ld3/1000) : (v3 x 1000 / 60) T3 2.19 menit
- Kembali = (L : v2) x 60 menit T4 7.25 menit
Ts2 24.35 menit

Kap.Prod. / jam = V x Fa x 60 Q2 13.80 M3


Ts2

Koefisien Alat / M3 = 1 = 1 : Q2 (E09) 0.0725 Jam

2.e. TANDEM ROLLER (E17)


Kecepatan rata-rata alat v 4.00 Km / Jam
Lebar efektif pemadatan b 1.68 M
Jumlah lintasan n 12.00 lintasan 2 fase @ 6 lintas
Lajur lintasan = w / ( b-bo ) N 3.00
Faktor Efisiensi alat Fa 0.70 -
Lebar Overlap bo 0.20 M
Apabila N > 1
Kap. Prod. / jam = (v x 1000) x (N(b-bo)+bo) x t x Fa Q3 18.0444 M3
nxN `

Koefisien Alat / M3 = 1 : Q3 (E16) 0.0554 Jam

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 6.6.(1) Analisa EI-661
JENIS PEKERJAAN 'Lapis Penetrasi Macadam ( Tanpa Screen )
SATUAN PEMBAYARAN Meter Kubik URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.f. ASPHALT DISTRIBUTOR (E41)


Lebar penyemprotan b 3.50 M
Kecepatan penyemprotan V 30.00 Km/jam
Kapasitas pompa aspal pas 100 liter/menit pemakaian efektif 2 %
Faktor effisiensi kerja Fa 0.70
Kadar total aspal yang digunakan (M10) / D2 Kdr 80.00 liter/m3
Kap. Prod. / jam = pas x Fa x 60 / Kdr Q1 52.50 liter

Koefisien Alat / M3 = 1 : Q1 (E41) 0.01905 Jam

2.g.
ALAT BANTU Lump Sum
- Kereta dorong
- Sekop
- Sapu
- Sikat
- Karung
- Cerek Aspal
- Kaleng Aspal

3. TENAGA
Produksi menentukan (Roller) Q1 18.04 M3/Jam
Produksi Lapen / hari = Q1 x Tk Qt 126.31 M3
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 2.00 orang

Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 1.1084 Jam
- Mandor = (Tk x M) / Qt (L03) 0.1108 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 2,022,672.74 / M3.

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-661

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

NAMA PAKET REHABILITASI WC DI RW 08 KELURAHAN TAMANJAYA

PROP / KAB / KOTA : Kota Tasikmalaya


ITEM PEMBAYARAN NO. 6.6.(1)
JENIS PEKERJAAN 'Lapis Penetrasi Macadam ( Tanpa Screen )
SATUAN PEMBAYARAN Meter Kubik

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 1.1084 14,500.00 16,071.43

2. Mandor (L03) Jam 0.1108 18,214.29 2,018.82

JUMLAH HARGA TENAGA 18,090.25

B. BAHAN

1. Agg Pokok (M92) M3 1.1586 185,000.00 214,344.83


2. Agg Pengunci (M92) M3 0.3621 185,000.00 66,982.76
3 Agg Penutup (M92) Kg 0.2028 220,000.00 44,606.90
4 Aspal (M10) Kg 82.4000 16,887.10 1,391,496.77

JUMLAH HARGA BAHAN 1,717,431.26

C. PERALATAN
1. Wheel Loader E15 Jam 0.0084 - 0.00
2. Dump Truck 1 E09 Jam 0.2119 87,100.00 18,459.72
3 Tandem Roller E17 Jam 0.0554 71,429.00 3,958.50
4 Asphalt Distributor E41 Jam 0.0190 47,571.43 906.12

JUMLAH HARGA PERALATAN 23,324.35

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,758,845.86


E. OVERHEAD & PROFIT 15.0 % x D 263,826.88
F. HARGA SATUAN PEKERJAAN ( D + E ) 2,022,672.74
ANALISA HARGA SATUAN
TAHUN ANGGARAN

KODE PEK URAIAN KOEF SATUAN HARGA (Rp) HARGA SATUAN(Rp)

PEKERJAAN TANAH
1.7.7.1.1.c ( a ) PENGGALIAN 1M3 TANAH BIASA SEDALAM 1 M'
A. TENAGA
Pekerja 0.7500 OH 101,500.00 76,125.00
Mandor 0.0250 OH 127,500.00 3,187.50

Jumlah Harga Tenaga, Bahan dan Peralatan 79,312.50


Profit 15.0000 % 11,896.88
Harga Satuan Pekerjaan 91,209.38
1.7.15.1.j ( a ) 1 M3 MENGANGKUT TANAH SEJAUH 500 METER
A. TENAGA
Pekerja 1.0938 HOK 101,500.00 111,020.70
Mandor 0.0546 HOK 127,500.00 6,961.50

Jumlah Harga Tenaga, Bahan dan Peralatan 117,982.20


Profit 15.0000 % 17,697.33
Harga Satuan Pekerjaan 135,679.53
1.7.2.a PENGURUGAN KEMBALI 1 M3 GALIAN
A. TENAGA
Pekerja 0.5000 OH 101,500.00 50,750.00
Mandor 0.0500 OH 127,500.00 6,375.00

Jumlah Harga Tenaga, Bahan dan Peralatan 57,125.00


Profit 15.0000 % 8,568.75
Harga Satuan Pekerjaan 65,693.75
1.7.2.e PENGURUGAN 1M3 SIRTU PADAT
A. TENAGA
Pekerja 0.2500 OH 101,500.00 25,375.00
Mandor 0.0250 OH 127,500.00 3,187.50

B. BAHAN
Sirtu 1.2000 kg 110,000.00 132,000.00

Jumlah Harga Tenaga, Bahan dan Peralatan 160,562.50


Profit 15.0000 % 24,084.38
Harga Satuan Pekerjaan 184,646.88
PEKERJAAN PONDASI
2.1.2.a.3.b (c) PEMASANGAN 1 M3 PONDASI BATU BELAH
A. TENAGA
Pekerja 1.5000 HOK 101,500.00 152,250.00
Tukang batu 0.7500 HOK 122,500.00 91,875.00
Kepala tukang 0.0750 HOK 125,000.00 9,375.00
Mandor 0.0750 HOK 127,500.00 9,562.50
KODE PEK URAIAN KOEF SATUAN HARGA (Rp) HARGA SATUAN(Rp)

B. BAHAN
Batu belah 15/20 cm 1.2000 m3 160,000.00 192,000.00
Semen Portland 163.0000 Kg 1,400.00 228,200.00
Pasir pasang 0.5200 m3 180,000.00 93,600.00

Jumlah Harga Tenaga, Bahan dan Peralatan 776,862.50


Profit 15.0000 % 116,529.38
Harga Satuan Pekerjaan 893,391.88
PEKERJAAN BETON
D.I. PEMBUATAN CAMPURAN BETON
D.02 1 M3 BETON 1 PC : 2 PB : 3KR MANUAL
A. TENAGA
Pekerja 1.6500 HOK 101,500.00 167,475.00
Tukang batu 0.2750 HOK 122,500.00 33,687.50
Kepala tukang 0.0280 HOK 125,000.00 3,500.00
Mandor 0.0830 HOK 127,500.00 10,582.50

B. BAHAN
Semen portland 232.0000 kg 1,400.00 324,800.00
Pasir beton 0.5200 m3 220,000.00 114,400.00
Koral beton 0.7800 m3 185,000.00 144,300.00
Air 215.0000 L 100.00 21,500.00

Jumlah Harga Tenaga, Bahan dan Peralatan 820,245.00


Profit 15.0000 % 123,036.75
Harga Satuan Pekerjaan 943,281.75
D-03 1 M3 BETON 1 PC : 2 PB : 3 KR MOLEN
A. TENAGA
Pekerja 1.3200 HOK 101,500.00 133,980.00
Tukang batu 0.2050 HOK 122,500.00 25,112.50
Kepala tukang 0.0200 HOK 125,000.00 2,500.00
Mandor 0.0600 HOK 127,500.00 7,650.00

B. BAHAN
Semen portland 232.0000 kg 1,400.00 324,800.00
Pasir beton 0.5200 m3 220,000.00 114,400.00
Koral beton 0.7800 m3 185,000.00 144,300.00
Air 215.0000 L 100.00 21,500.00

C. PERALATAN
Molen 0,35 m3 0.2000 hari 350,000.00 70,000.00

Jumlah Harga Tenaga, Bahan dan Peralatan 844,242.50


Profit 15.0000 % 126,636.38
Harga Satuan Pekerjaan 970,878.88
D-04 1 M3 BETON 1 PC : 3 PB : 5 KR MANUAL
A. TENAGA
Pekerja 1.6500 HOK 101,500.00 167,475.00
Tukang batu 0.2750 HOK 122,500.00 33,687.50
Kepala tukang 0.0280 HOK 125,000.00 3,500.00
KODE PEK URAIAN KOEF SATUAN HARGA (Rp) HARGA SATUAN(Rp)

Mandor 0.0830 HOK 127,500.00 10,582.50

B. BAHAN
Semen portland 218.0000 kg 1,400.00 305,200.00
Pasir beton 0.5200 m3 220,000.00 114,400.00
Koral beton 0.8700 m3 185,000.00 160,950.00
Air 215.0000 L 100.00 21,500.00

Jumlah Harga Tenaga, Bahan dan Peralatan 817,295.00


Profit 15.0000 % 122,594.25
Harga Satuan Pekerjaan 939,889.25
D-05 1 M3 BETON 1 PC : 3 PB : 5 KR MOLEN
A. TENAGA
Pekerja 1.3200 HOK 101,500.00 133,980.00
Tukang batu 0.2050 HOK 122,500.00 25,112.50
Kepala tukang 0.0200 HOK 125,000.00 2,500.00
Mandor 0.0600 HOK 127,500.00 7,650.00

B. BAHAN
Semen portland 218.0000 kg 1,400.00 305,200.00
Pasir beton 0.5200 m3 220,000.00 114,400.00
Koral beton 0.8700 m3 185,000.00 160,950.00
Air 215.0000 L 100.00 21,500.00

C. PERALATAN
Molen 0,35 m3 0.2000 hari 350,000.00 70,000.00

Jumlah Harga Tenaga, Bahan dan Peralatan 841,292.50


Profit 15.0000 % 126,193.88
Harga Satuan Pekerjaan 967,486.38
D-14 1 M3 BETON F'c = 14,5 Mpa (K175), SLUMP (12±2), W/C=0,66 REDYMIX ( TANPA POMPA )
A. TENAGA
Pekerja 1.0000 HOK 101,500.00 101,500.00
Tukang batu 0.1380 HOK 122,500.00 16,905.00
Kepala tukang 0.0180 HOK 125,000.00 2,250.00
Mandor 0.0500 HOK 127,500.00 6,375.00

B. BAHAN
Beton Readymix K-175 1.0500 M3 996,000.00 1,045,800.00

C. PERALATAN
Pompa Beton 0.1200 hari 0.00 -

Jumlah Harga Tenaga, Bahan dan Peralatan 1,172,830.00


Profit 15.0000 % 175,924.50
Harga Satuan Pekerjaan 1,348,754.50
D.III. PEKERJAAN PEMBESIAN BETON
2.2.6.1.d (a) PEMBESIAN 1 KG BESI POLOS ATAU ULIR
A. TENAGA
Pekerja 0.0160 OH 101,500.00 1,624.00
KODE PEK URAIAN KOEF SATUAN HARGA (Rp) HARGA SATUAN(Rp)

Tukang Besi 0.0160 OH 122,500.00 1,960.00


Kepala Tukang Besi 0.0016 OH 125,000.00 200.00
Mandor 0.0016 OH 127,500.00 204.00

B. BAHAN
Besi Beton (Polos / Ulir) 1.0500 kg 12,500.00 13,125.00
Kawat Beton 0.0280 kg 20,000.00 560.00

Jumlah Harga Tenaga, Bahan dan Peralatan 17,673.00


Profit 15.0000 % 2,650.95
Harga Satuan Pekerjaan 20,323.95
A.4.1.1.19 1 m2 PASANG BEKISTING UNTUK SLOOF (2x PAKAI)
A. TENAGA
Pekerja 0.5200 OH 101,500.00 52,780.00
Tukang Besi 0.2600 OH 122,500.00 31,850.00
Kepala Tukang Besi 0.0260 OH 125,000.00 3,250.00
Mandor 0.0260 OH 127,500.00 3,315.00

B. BAHAN
Kayu Kelas III (Papan) 0.0225 m3 1,300,000.00 29,250.00
Paku biasa 2'-5" 0.3000 Kg 20,000.00 6,000.00
Minyak bekisting 0.0500 Ltr 0.00 -

Jumlah Harga Tenaga, Bahan dan Peralatan 63,222.50


Profit 15.0000 % 9,483.38
Harga Satuan Pekerjaan 72,705.88
A.4.1.1.19 (a) 1 m2 PASANG BEKISTING UNTUK SLOOF (3x PAKAI)
A. TENAGA
Pekerja 0.5200 OH 101,500.00 52,780.00
Tukang Besi 0.2600 OH 122,500.00 31,850.00
Kepala Tukang Besi 0.0260 OH 125,000.00 3,250.00
Mandor 0.0260 OH 127,500.00 3,315.00

B. BAHAN
Blockboard 0.0225 m3 4,051,000.00 91,147.50
Paku biasa 2'-5" 0.3000 Kg 20,000.00 6,000.00

Jumlah Harga Tenaga, Bahan dan Peralatan 62,780.83


Profit 15.0000 % 9,417.13
Harga Satuan Pekerjaan 72,197.96
PEKERJAAN PLESTERAN
3.2.2. ( c ) PEMASANGAN 1 m2 PLESTERAN 1 PC : 4 Ps, TEBAL 15 mm
A. TENAGA
Pekerja 0.3000 HOK 101,500.00 30,450.00
Tukang Batu 0.1500 HOK 122,500.00 18,375.00
Kepala tukang 0.0150 HOK 125,000.00 1,875.00
Mandor 0.0150 HOK 127,500.00 1,912.50

B. BAHAN
Semen Portland 6.2400 kg 1,400.00 8,736.00
KODE PEK URAIAN KOEF SATUAN HARGA (Rp) HARGA SATUAN(Rp)

Pasir pasang 0.0240 m3 180,000.00 4,320.00

Jumlah Harga Tenaga, Bahan dan Peralatan 65,668.50


Profit 15.0000 % 9,850.28
Harga Satuan Pekerjaan 75,518.78
5.1.1.1.1 PEMASANGAN 1 m2 FINISHING SIAR PASANGAN BATU KALI, 1 PC : 2 Ps
A. TENAGA
Pekerja 0.2000 HOK 101,500.00 20,300.00
Tukang Batu 0.2000 HOK 122,500.00 24,500.00
Kepala tukang 0.0200 HOK 125,000.00 2,500.00
Mandor 0.0200 HOK 127,500.00 2,550.00

B. BAHAN
Semen Portland 2.3400 kg 1,400.00 3,276.00
Pasir pasang 0.0050 m3 180,000.00 900.00

Jumlah Harga Tenaga, Bahan dan Peralatan 54,026.00


Profit 15.0000 % 8,103.90
Harga Satuan Pekerjaan 62,129.90
3.2.8.( c ) 1 m2 ACIAN
A. TENAGA
Pekerja 0.2000 HOK 101,500.00 20,300.00
Tukang Batu 0.1000 HOK 122,500.00 12,250.00
Kepala tukang 0.0100 HOK 125,000.00 1,250.00
Mandor 0.0100 HOK 127,500.00 1,275.00

B. BAHAN
Semen Portland 3.2500 kg 1,400.00 4,550.00

Jumlah Harga Tenaga, Bahan dan Peralatan 39,625.00


Profit 15.0000 % 5,943.75
Harga Satuan Pekerjaan 45,568.75
PEKERJAAN SANITASI
1.6.3 ( a ) MEMASANG 1 METER PIPA SULING-SULING Ø 1 1/2"
A. TENAGA
Pekerja 0.0100 HOK 101,500.00 1,015.00
Mandor 0.0010 HOK 127,500.00 127.50

B. BAHAN
Pipa PVC dia.1,5" 1.0500 M' 18,750.00 19,687.50

Jumlah Harga Tenaga, Bahan dan Peralatan 20,830.00


Profit 15.0000 % 3,124.50
Harga Satuan Pekerjaan 23,954.50
PEKERJAAN BESI DAN ALUMUNIUM
A.4.2.1.1. 1 Kg PASANG BESI PROFIL
A. TENAGA
Pekerja 0.0600 HOK 101,500.00 6,090.00
Tukang Las Konstruksi 0.0600 HOK 122,500.00 7,350.00
Kepala Tukang 0.0060 HOK 125,000.00 750.00
KODE PEK URAIAN KOEF SATUAN HARGA (Rp) HARGA SATUAN(Rp)

Mandor 0.0030 HOK 127,500.00 382.50

B. BAHAN
Besi Profil 1.1500 kg 10,400.00 11,960.00

Jumlah Harga Tenaga, Bahan dan Peralatan 26,532.50


Profit 15.0000 % 3,979.88
Harga Satuan Pekerjaan 30,512.38
PEKERJAAN PENUTUP LANTAI
A.4.4.3.63. PEMASANGAN 1 M2 PAVING BLOCK NATURAL TEBAL 6 CM
A. TENAGA
Pekerja 0.2500 HOK 101,500.00 25,375.00
Tukang Batu 0.5000 HOK 122,500.00 61,250.00
Kepala Tukang 0.0500 HOK 125,000.00 6,250.00
Mandor 0.0013 HOK 127,500.00 165.75

B. BAHAN
Paving Block 6 cm 1.0100 M2 80,000.00 80,800.00
Pasir Beton 0.0500 M3 220,000.00 11,000.00

C. PERALATAN
Peralatan 10%

Jumlah Harga Tenaga, Bahan dan Peralatan 184,840.75


Profit 15.0000 % 27,726.11
Harga Satuan Pekerjaan 212,566.86
A.4.4.3.65. PEMASANGAN 1 M2 PAVING BLOCK BERWARNA TEBAL 6 CM
A. TENAGA
Pekerja 0.2500 Kg 101,500.00 25,375.00
Tukang Batu 0.5000 HOK 122,500.00 61,250.00
Kepala Tukang 0.0500 HOK 125,000.00 6,250.00
Mandor 0.0013 HOK 127,500.00 165.75

B. BAHAN
Paving Block 6 cm Warna 1.0100 M2 95,000.00 95,950.00
Pasir Beton 0.0500 M3 220,000.00 11,000.00

C. PERALATAN
Peralatan 10%

Jumlah Harga Tenaga, Bahan dan Peralatan 199,990.75


Profit 15.0000 % 29,998.61
Harga Satuan Pekerjaan 229,989.36
PEKERJAAN PENGECATAN
3.3.10.( c ) PENGECATAN 1 m2 TEMBOK BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 2 Lapis Cat Penutup)
A. TENAGA
Pekerja 0.0200 HOK 101,500.00 2,030.00
Tukang cat 0.0630 HOK 122,500.00 7,717.50
Kepala tukang 0.0063 HOK 125,000.00 787.50
Mandor 0.0030 HOK 127,500.00 382.50
KODE PEK URAIAN KOEF SATUAN HARGA (Rp) HARGA SATUAN(Rp)

B. BAHAN
Plamuur 0.1000 kg 0.00 -
Cat dasar 0.1000 kg 0.00 -
Cat Penutup 0.2600 kg 0.00 -

Jumlah Harga Tenaga, Bahan dan Peralatan 10,917.50


Profit 15.0000 % 1,637.63
Harga Satuan Pekerjaan 12,555.13
HARGA SATUAN PEKERJAAN

WILAYAH KOTA TASIKMALAYA

TAHUN ANGGARAN 2023

KODE
NO ITEM SATUAN PEKERJAAN HARGA SATUAN
ANALIS SNI

PEKERJAAN PERSIAPAN

1 1.1.f ( c ) 1 M2 PEKERJAAN MEMBERSIHKAN LAPANGAN DAN PERATAAN 12,405.63

2 2.2.10.a.( a ) 1 M3 BONGKARAN BETON DENGAN JACK HAMMER 26,277.50

PEKERJAAN TANAH

1 1.7.7.1.1.c ( a ) PENGGALIAN 1M3 TANAH BIASA SEDALAM 1 M' 91,209.38

2 1.7.7.1.1.e ( a ) PENGGALIAN 1M3 TANAH BIASA SEDALAM 2 M' 111,650.63

3 1.7.15.1.c ( a ) 1 M3 MENGANGKUT 1 M3 TANAH SEJAUH 30 M 29,312.29

4 1.7.15.1.j ( a ) 1 M3 MENGANGKUT TANAH SEJAUH 500 METER 135,679.53

5 1.7.2.a PENGURUGAN KEMBALI 1 M3 GALIAN 65,693.75

6 1.7.2.c PEMADATAN TANAH 1 M3 TANAH (PER 20 CM) 65,693.75

7 1.7.2.d PENGURUGAN 1 M3 PASIR URUG 160,683.75

8 1.7.2.e PENGURUGAN 1M3 SIRTU PADAT 184,646.88

PEKERJAAN PONDASI

1 2.1.2.a.3.b (c) PEMASANGAN 1 M3 PONDASI BATU BELAH 893,391.88

PEKERJAAN BETON

1 D.02 1 M3 BETON 1 PC : 2 PB : 3KR MANUAL 943,281.75

2 D-03 1 M3 BETON 1 PC : 2 PB : 3 KR MOLEN 970,878.88

3 D-04 1 M3 BETON 1 PC : 3 PB : 5 KR MANUAL 939,889.25

4 D-05 1 M3 BETON 1 PC : 3 PB : 5 KR MOLEN 967,486.38

5 D-12 1 M3 BETON F'c = 14,5 Mpa (K175), SLUMP (12±2), W/C=0,66 MANUAL 1,096,622.38

6 D-13 1 M3 BETON F'c = 14,5 Mpa (K175), SLUMP (12±2), W/C=0,66 MOLEN 1,124,219.51

7 D-14 1 M3 BETON F'c = 14,5 Mpa (K175), SLUMP (12±2), W/C=0,66 REDYMIX ( TANPA POMPA ) 1,348,754.50

8 D-18 1 M3 BETON F'c = 19,3 Mpa (K225), SLUMP (12±2), W/C=0,58 MANUAL 1,160,704.77

9 D-19 1 M3 BETON F'c = 19,3 Mpa (K225), SLUMP (12±2), W/C=0,58 MOLEN 1,188,301.89
10 D-20 1 M3 BETON F'c = 19,3 Mpa (K225), SLUMP (12±2), W/C=0,58 REDYMIX ( TANPA POMPA ) 1,391,017.00

11 D-21 1 M3 BETON F'c = 21,7 Mpa (K250), SLUMP (12±2), W/C=0,56 MANUAL 1,179,289.74

12 D-22 1 M3 BETON F'c = 21,7 Mpa (K250), SLUMP (12±2), W/C=0,56 MOLEN 1,206,886.86

13 D-23 1 M3 BETON F'c = 21,7 Mpa (K250), SLUMP (12±2), W/C=0,56 REDYMIX ( TANPA POMPA ) 1,481,579.50

14 D-24 1 M3 BETON F'c = 24 Mpa (K275), SLUMP (12±2), W/C=0,53 MANUAL 1,211,215.32

15 D-25 1 M3 BETON F'c = 24 Mpa (K275), SLUMP (12±2), W/C=0,53 MOLEN 1,238,812.45

16 D-26 1 M3 BETON F'c = 24 Mpa (K275), SLUMP (12±2), W/C=0,53 REDYMIX ( TANPA POMPA ) 1,528,672.00

17 D-27 1 M3 BETON F'c = 26,4 Mpa (K300), SLUMP (12±2), W/C=0,52 MANUAL 1,221,155.22

18 D-28 1 M3 BETON F'c = 26,4 Mpa (K300), SLUMP (12±2), W/C=0,52 MOLEN 1,248,752.34

19 D-29 1 M3 BETON F'c = 26,4 Mpa (K300), SLUMP (12±2), W/C=0,52 REDYMIX ( TANPA POMPA ) 1,560,067.00

20 2.2.6.1.d (a) PEMBESIAN 1 KG BESI POLOS ATAU ULIR 20,323.95

21 A.4.1.1.19 1 m2 PASANG BEKISTING UNTUK SLOOF (2x PAKAI) 72,705.88

22 A.4.1.1.19 (a) 1 m2 PASANG BEKISTING UNTUK SLOOF (3x PAKAI) 72,197.96

23 A.4.1.1.20.( a ) 1 m2 PASANG BEKISTING UNTUK KOLOM (2X PAKAI) 103,845.86

24 A.4.1.1.21.( a ) 1 m2 PASANG BEKISTING UNTUK BALOK (2X PAKAI) 104,967.11

25 A.4.1.1.22.( a ) 1 m2 PASANG BEKISTING PLAT LANTAI (2X PAKAI) 113,045.86

26 DIHITUNG 1 m3 MEMBUAT PLAT BETON T = 7 CM 5,967,138.17

27 DIHITUNG 1 m3 MEMBUAT PLAT BETON T = 10 CM 4,414,502.80

28 DIHITUNG 1 m3 MEMBUAT PLAT BETON T = 15 CM 6,508,153.23

29 DIHITUNG 1 m3 MEMBUAT BALOK BETON BERTULANG 20/30 2,961,324.01

30 DIHITUNG 1 m3 MEMBUAT KOLOM BETON BERTULANG 15/15 5,070,811.98

PEKERJAAN DINDING

1 A.4.4.1.10. 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 5 Ps 142,041.68

PEKERJAAN PLESTERAN

1 3.2.2. ( c ) PEMASANGAN 1 m2 PLESTERAN 1 PC : 4 Ps, TEBAL 15 mm 75,518.78

2 5.1.1.1.1 PEMASANGAN 1 m2 FINISHING SIAR PASANGAN BATU KALI, 1 PC : 2 Ps 62,129.90

3 3.2.8.( c ) 1 m2 ACIAN 45,568.75

PEK. SANITASI

1 1.6.3 ( a ) MEMASANG 1 METER PIPA SULING-SULING Ø 1 1/2" 23,954.50

PEKERJAAN BESI DAN ALUMINIUM

1 A.4.2.1.1. 1 Kg PASANG BESI PROFIL 30,512.38


PEKERJAAN PENUTUP LANTAI

1 A.4.4.3.63. PEMASANGAN 1 M2 PAVING BLOCK NATURAL TEBAL 6 CM 212,566.86

2 A.4.4.3.65. PEMASANGAN 1 M2 PAVING BLOCK BERWARNA TEBAL 6 CM 229,989.36

PEKERJAAN PENGECATAN

1 3.3.10.( c ) PENGECATAN 1 m2 TEMBOK BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 2 Lapis Cat Penutup) 12,555.13

PEKERJAAN JALAN

1 6.3 (3) 1 TON HAMPARAN LATASTON ( HRS - WC ) 2,179,744.99

2 6.1 (1) 1 LITER LAPIS PEREKAT PENGIKAT - ASPAL CAIR 33,470.80

3 6.6.(1) 1 M3 LAPIS PENETRASI MACADAM ( TANPA SCREEN ) 2,022,672.74


REKAPITULASI RENCANA ANGGARAN BIAYA (EE)
KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA KELURAHAN DI KELURAHAN TAMANJAYA
PEKERJAAN : REHABILITASI WC DI RW 08 KELURAHAN TAMANJAYA
LOKASI : KELURAHAN TAMANJAYA
TAHUN : 2023

NO. URAIAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN 3,475,000.00

II PEKERJAAN PELAKSANAAN

A PEK. JALAN TYPE A, Pj = 63 M' , L = 1 M' 2,100,000.00

JUMLAH 5,575,000.00
PPN 11 % 613,250.00
PPH 4(2) 97,562.50
JUMLAH TOTAL 6,285,812.50
DIBULATKAN 6,285,812.00

TERBILANG : TIGA BELAS JUTA SEERATUS TIGA PULUH EMPAT RIBU TIGA PULUH SEMBILAN RUPIAH

Tasikmalaya, 2023
Dibuat Oleh
Konsultan Perencana
CV. ABDURROHMAN KONSULTAN

Ir. FIRMAN ABDURROHMAN, ST., MT.


Direktur
RINCIAN RENCANA ANGGARAN BIAYA (EE)
KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA KELURAHAN DI KELURAHAN TAMANJAYA
PEKERJAAN : REHABILITASI WC DI RW 08 KELURAHAN TAMANJAYA
LOKASI : KELURAHAN TAMANJAYA
TAHUN : 2023

KODE HARGA SAT JUMLAH


NO URAIAN PEKERJAAN VOLUME SAT
ANALIS ( RP ) ( RP )
1 2 3 4 5 6 7

I PEKERJAAN PERSIAPAN
1 Pengukuran/uitzet - 1.00 Ls 500,000.00 500,000.00
2 Papan nama proyek - 1.00 Ls 300,000.00 300,000.00
3 Pengadaan/ Sewa Direksikeet - 1.00 Ls 300,000.00 300,000.00
4 Pekerjaan Bongkaran - 1.00 Ls 1,500,000.00 1,500,000.00
5 SMKK - 1.00 PAKET 875,000.00 875,000.00
JUMLAH 3,475,000.00
II PEKERJAAN PELAKSANAAN
A PEK. JALAN TYPE A, Pj = 63 M' , L = 1 M' 58.50 1.00
1 Pek. Plat Kaki
a. Bekisting A.4.1.1.20.( a ) M2 103,845.86 -
b. Besi Beton Polos Ø10 - 200 mm 2.2.6.1.d (a) KG 20,323.95 -
c. Beton Tumbuk, adk. 1pc : 2pb : 3krl, Manual D.02 M3 943,281.75 -
2 Pek. Kolom Beton, KB 30 / 30 cm
a. Bekisting A.4.1.1.20.( a ) M2 103,845.86 -
b. Besi Beton Polos Ø10 - 200 mm 2.2.6.1.d (a) KG 20,323.95 -
c. Beton Tumbuk, adk. 1pc : 3pb : 5krl, Manual D.02 M3 943,281.75 -
3 Plat Beton, T = 12 cm
a. Bekisting A.4.1.1.22.( a ) M2 113,045.86 -
b. Besi Beton Polos Ø10 - 200 mm 2.2.6.1.d (a) KG 20,323.95 -
c. Beton Tumbuk, adk. 1pc : 3pb : 5krl, Manual D.02 M3 943,281.75 -
4 Torn 500 Lt (Setara Penguin) Upah + Bahan 1.00 BH 950,000.00 950,000.00
5 Penambahan KWH Baru (1 Paket) Upah + Bahan 1.00 LS 1,150,000.00 1,150,000.00
6
7

2 Pek. Lataston Lapis Aus (HRS-WC),Tebal Rata-rata 3 cm 6.3 (3) - TON 2,179,744.99 -
JUMLAH 2,100,000.00
PERHITUNGAN RENCANA TKDN PEKERJAAN INFRASTRUKTUR
KEGIATAN : PENYELENGGARAAN INFRASTRUKTUR PADA PERMUKIMAN DI KAWASAN STRATEGIS DAERAH KABUPATEN / KOTA
PEKERJAAN : REHABILITASI WC DI RW 08 KELURAHAN TAMANJAYA
LOKASI : KOTA TASIKMALAYA
TAHUN : 2023

Total Harga Biaya


Uraian Pekerjaan
Pekerjaan KDN KLN
I. Material Langsung (Bahan Baku) 5,100,856.33 2,556,445.86 2,544,410.47
II. Peralatan (Barang Jadi) 30,012.92 11,833.06 18,179.86
III. Manajemen Proyek dan Perekayasaan 875,000.00 574,375.00 300,625.00
IV. Alat Kerja/Fasilitas Kerja - - -
V. Konstruksi dan Fabrikasi (Tenaga Kerja) 362,496.98 362,496.98 -
VI. Jasa Lainnya (Persiapan) 2,600,000.00 2,600,000.00 -
JUMLAH 8,968,366.23 6,105,150.90 2,863,215.33
NILAI 100.00% 68.07% 31.93%

Biaya Gabungan Barang dan Jasa (Rp.) TKDN (%)


Uraian Pekerjaan
KDN KLN Total Barang/Jasa Gabungan
(1) (2) (3) (4) (5) (6)
BARANG
I. Material Langsung (Bahan Baku) 2,556,445.86 2,544,410.47 5,100,856.33 49.82%
II. Peralatan (Barang Jadi) 11,833.06 18,179.86 30,012.92 0.23%
A. Sub Total Barang 2,568,278.92 2,562,590.33 5,130,869.25 50.06%
JASA
III. Manajemen Proyek dan Perekayasaan 574,375.00 300,625.00 875,000.00 14.97%
IV. Alat Kerja/Fasilitas Kerja - - - 0.00%
V. Konstruksi dan Fabrikasi (Tenaga Kerja) 362,496.98 - 362,496.98 9.45%
VI. Jasa Lainnya (Persiapan) 2,600,000.00 - 2,600,000.00 67.75%
B. Sub Total Jasa 3,536,871.98 300,625.00 3,837,496.98 92.17%
C. Total Biaya (A + B) 6,105,150.90 2,863,215.33 8,968,366.23 68.07%
LITER / M2
No PEKERJAAN STASIONING PANJANG LEBAR LUAS TINGGI BERAT JENIS JUMLAH SATUAN KETERANGAN
0.4

1 Pekerjaan Pasangan Hotmix STA 0+000 Rp6,848,227

58.50 1.00 58.50 23.40 0.02 2.17 2.539 Ton

JUMLAH 23.40 2.54 Ton


No PEKERJAAN STASIONING PANJANG LEBAR LUAS TEBAL % RUSAK VOLUME KETERANGAN

1 Pekerjaan Patching Lapen STA 0+000 Rp6,848,227

58.50 1.00 58.50 0.05 70% 2.05 ###

JUMLAH 58.5 M2 JUMLAH


Perhitungan Volume Parit Beton
Panjang Parit 10.00 M'

Panjang Lebar Tinggi


Item Pekerjaan Koef. Volume Satuan
m m m
0.15 0.50 0.15
Ø 10 - 0.200

Galian Tanah 10.00 0.80 0.60 0.48 4.80 M³ Ø 10 - 0.200


0.05
Pas. Beton
a 10.00 0.15 0.60 0.09 0.90
0.50
b 10.00 0.15 0.60 0.09 0.90 a b
0.60 0.60
c 10.00 0.50 0.10 0.05 0.50
Stoot/bh 3.00 0.50 0.10 0.10 0.02
0.23 2.32 M³ c

0.10
Pembesian bh kg/m'
Ø 10 - 20 10.00 9.00 0.616 55.46 10.00 9.00
Ø 10 - 20 51.00 2.00 0.616 62.86 0.80 Stoot 3.33 3.00
Ø 10 3.20 3.00 0.616 5.92
Ø 10 3.00 0.20 0.616 2 0.74
124.98 Kg

Bekisting 10.00 0.50 0.50 1.00 10.00


Err:509
3.00 0.50 0.34 0.84 2.52
12.52 m2

Galian Tanah untuk Konstruksi 4.80 M3


Buangan sisa Galian Tanah 4.80 M3
Pasangan beton 2.32 M3
Penulangan Beton ( pembesian ) 124.98 KG
Perancah bekisting untuk beton 2x Paka 12.52 M2
Acian Saluran 10.80 M2
Perhitungan Volume Parit Beton
Panjang Parit 0.00 M'

Panjang Lebar Tinggi


Item Pekerjaan Koef. Volume Satuan
m m m
0.15 0.50 0.15
Ø 10 - 0.200

Galian Tanah - 0.80 0.70 0.56 - M³ Ø 10 - 0.200


0.05
Pas. Beton
a - 0.15 0.70 0.11 -
0.60
b - 0.15 0.70 0.11 - a b
0.70 0.70
c - 0.50 0.10 0.05 -
Stoot/bh - 0.50 0.10 0.10 -
0.26 - M³ c

0.10
Pembesian bh kg/m'
Ø 10 - 20 - 9.00 0.616 - 11.00 9.00
Ø 10 - 20 1.00 2.20 0.616 1.36 0.80 Stoot -
Ø 10 3.20 - 0.616 -
Ø 10 - 0.20 0.616 2 -
1.36 Kg

Bekisting 0.00 0.60 0.60 1.20 0.00


Err:509
0.00 0.50 0.34 0.84 0.00
0.00 m2

Galian Tanah untuk Konstruksi - M3


Buangan sisa Galian Tanah - M3
Pasangan beton - M3
Penulangan Beton ( pembesian ) 1.36 KG
Perancah bekisting untuk beton 2x Paka 0.00 M2
Acian Saluran 0.80 M2
Perhitungan Volume Parit Beton
Panjang Parit 0.00 M'

Panjang Lebar Tinggi


Item Pekerjaan Koef. Volume Satuan
m m m
0.15 0.50 0.15
Ø 10 - 0.200

Galian Tanah - 0.80 0.50 0.40 - M³ Ø 10 - 0.200


0.05
Pas. Beton
a - 0.15 0.50 0.08 -
0.40
b - 0.15 0.50 0.08 - a b
0.50 0.50
c - 0.50 0.10 0.05 -
Stoot/bh - 0.50 0.10 0.10 -
0.20 - M³ c

0.10
Pembesian bh kg/m'
Ø 10 - 20 - 9.00 0.616 - 9.00 9.00
Ø 10 - 20 1.00 1.80 0.616 1.11 0.80 Stoot -
Ø 10 3.20 - 0.616 -
Ø 10 - 0.20 0.616 2 -
1.11 Kg

Bekisting 0.00 0.40 0.40 0.80 0.00


Err:509
0.00 0.50 0.34 0.84 0.00
0.00 m2

Galian Tanah untuk Konstruksi - M3


Buangan sisa Galian Tanah - M3
Pasangan beton - M3
Penulangan Beton ( pembesian ) 1.11 KG
Perancah bekisting untuk beton 2x Paka 0.00 M2
Acian Saluran 0.80 M2
m'

m'

bh
bh
m'

m'

bh
bh
m'

m'

bh
bh
#VALUE!

NO PJ SAL. PJ.CANAL 65 JMLH.CANAL 80 KET.

1 1
SALURAN TERBUKA

2 3 3 7
SALURAN + BESI GRILL

10

11

12

13

14

4 3 7
#REF!

1
#REF!