Kebutuhan Bahan Baku
Kebutuhan Bahan Baku
5202.9100 14 395,55
TCC Kan Cl. 5202.9100
P.ggira TRC
Ka r / Kaos Pth Tulang PDly
930 691,33
97 922,54 113100,53
TCC Ka n
23 605.304,07
'roraL xEBUTuHAN BAITAN sAXU yaNG A(AN D MpoRT/TAHuN sEBANyAX 60% KARENA 40% DTAMBTL DARrsupprER LoKAL
TOTALRENCANA IMPORT2Ol3