Anda di halaman 1dari 1

PEMBANGUNAN CEK DAM FURIA

VOLUME SEDIMEN = 1449.3 m3

FURIA

PEMBANGUNAN DECKER
PEMBANGUNAN CEK DAM ORGANDA
500/100 meter (Patok A57 s/d A62)
VOLUME SEDIMEN = 115.102 m3
PEMBANGUNAN DECKER
JALUR A
650/100 meter (Patok R0 s/d R6+50)
PENGERUKAN SEDIMEN & DRAIN INLET
JALUR O SEPANJANG 600 METER

JALUR R PERUMNAS 4
PERUMNAS 1
JALUR T

JALUR U

KOLAM TAMPUNGAN PERUMNAS 4 KOLAM TAMPUNGAN ORGANDA


VOLUME TAMPUNGAN = 1788.542 m3 VOLUME TAMPUNGAN = 24258.475 m3
OTONOM
AKES
KOLAM TAMPUNGAN AKES
VOLUME TAMPUNGAN = 5580.331 m3

ORGANDA
PEMBANGUNAN SALURAN KIRI JALAN ALE ALE LEGENDA
SEPANJANG 1650 METER PEMBANGUNAN SALURAN KE ARAH HOTEL 77
SEPANJANG 1250 METER JALUR BA

JALUR S
JALUR K
JALUR D ALE ALE RAWA

JALAN
RAWA

JALUR W NORMALISASI PENAMPANG SUNGAI


KONTUR
RAWA
SEPANJANG 1150 METER

DESA

JALUR M
MAKAM
NORMALISASI DAN PEMASANGAN SHEET PILE
JALUR J KANAN & KIRI SEPANJANG 2100 METER
JALUR L
JALUR I SAWAH

JALUR P
PEMBANGUNAN SALURAN KANAN JALAN ALE ALE TEGALAN
JALUR N
SEPANJANG 2700 METER
SAGA KEBUN
JALUR G
YOUTEFA
JALUR CC JALUR EE
KALI
JALUR F

JALUR E Pas
ar
Yau
tefa
JEMBATAN
JALUR DD Pasar Yautefa
JALUR FF
B. SADAP
PEMBANGUNAN CROSS DRAIN Teluk Yautefa

SEPANJANG 14 METER JALUR A


GORONG - GORONG
A

JALUR C
B
BB

D
C

L
M
JALUR BB

Provinsi :
PAPUA

O
P
N
Kota :

Q
JAYAPURA

R
(Lokasi Gambar : Distrik Abepura) Pekerjaan :

PETA RENCANA PEKERJAAN DETAIL DESAIN PENGENDALIAN


(Skala 1: 175) BANJIR DISTRIK ABEPURA
KOTA JAYAPURA

Ketua Tim : Ir. Gunawan Wibisono, Dpl.SE., Ph.D. No. Register :

Direktur : Joko Purcahyono, ST., M.MT. No. Lembar : PR-01

Diperiksa : Direksi Pekerjaan Heru Mukti Wijaya, ST.


Nomor Kontrak :
no. tgl. yang direvisi digambar diperiksa disetujui HK.02.03/bws20/PKT.01/2018
Tanggal : 17 April 2018
Disetujui : PPK Perencanaan & Program Raja Pardamean Nalom H. Pakpahan, ST., MT.
note : Gambar ini berlaku apabila ada stempel legalisir

Anda mungkin juga menyukai