Paket
Nomor Kontrak
Tanggal Kontrak
No. Mata
Uraian
Pembayaran
1.2
1.8.(1)
1.17
1.17.(1a)
1.17.(1b)
1.17.(1c)
1.17.(1d)
1.17.(1e)
1.17.(1f)
1.17.(1g)
1.17.(1h)
1.17.(1i)
1.17.(1j)
1.17.(2a)
1.17.(2b)
1.17.(3a)
1.17.(3b)
1.17.(3c)
1.17.(3d)
1.17.(3f)
1.17.(3g)
1.19
1.21
2.1.(1)
2.3.(32)
3.1.(1)
3.1.(8)
3.1.(2a)
3.3.(1)
3.5.(2a)
SKh-1.3.(11)
5.1.(1)
6.1 (1)
6.1 (2)(a)
6.3(5a)
6.3(6a)
6.3(7a)
6.3.(8)
7.1 (5).a
7.1 (7).a
7.1.(8)
7.1.(10)
7.3.(1)
7.3.(2)
7.6.(1)
7.8.(19).a
7.10.(3a)
7.14.(1)
7.15.(1)
7.16.(2a)
8.7.(3b)
8.13.(1)
8.13.(2)
9.2.(1)
9.2.(5)
9.2.(7)
9.2.(14)
9.2.(22b)
10.1.(1)
10.1.(4)
10.1.(6)
10.1.(9)
10.1.(11)
10.1.(21)
10.1.(22)
SKH-1.9.4.(1)
SKH-1.9.4.(2)
Uraian
DIVISI 1. UMUM
Mobilisasi
Manajemen dan Keselamatan dan Lalu Lintas
Pengamanan Lingkungan Hidup
Pengujian PH
Pengujian Oksigen Terlarut (DO)
Pengujian Zat Padat Terlarut (TDS)
Pengujian Zat Tersuspensi (TSS)
Pengujian Biologikal Oxygen Demand (BOD)
Pengujian Chemical Oxygen Demand (COD)
Pengujian Coliform
Pengujian E. Coli
Pengujian Destruksi Cu, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn
Pengujian Temperatur (Suhu)
Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Kesehatan
Pengujian tingkat getaran kendaraan bermotor
Pengujian NoX
Pengujian Sulfur dioksida (SO2)
Pengujian Karbondioksida (CO2)
Pengujian Hidro Carbon (HC)-CH4
Pengujian Total Partikulatn (TSP) - Debu
Pengujian Timah Hitam (Pb)
Keselamatan dan Kesehatan Kerja
Manajemen Mutu
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 2. DRAINASE
Galian untuk Selokan Drainase dan Saluran Air
Saluran berbentuk U Tipe DS 6
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 7. STRUKTUR
Beton Struktur fc’30 Mpa
Beton Struktur fc’20 Mpa
Beton fc’15 Mpa
Beton fc’10 Mpa
Baja Tulangan Polos BjTP 280
Baja Tulangan Sirip BjTS 280
Fondasi Cerucuk, Penyediaan dan Pemancangan
Tiang Bor Beton diameter 800 mm
Beronjong dengan kawat yang dilapisi Galvanis
Papan Nama Jembatan
Pembongkaran Pasangan Batu
Pipa Drainase Baja diameter 150 mm
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
SURAN
Direktu
Rutin Jalan HASIL SURVEY
Harga Satuan
Satuan
(Rupiah)
Kuantitas Jumlah Harga Kuantitas
(Rp.)
3 4 5 6 =4x5
LS 144,497,858.65
LS 62,320,000.00
Buah 60,000.00
Buah 65,000.00
Buah 70,000.00
Buah 90,000.00
Buah 200,000.00
Buah 100,000.00
Buah 225,000.00
Buah 160,000.00
Buah 475,000.00
Buah 250,000.00
Buah 1,200,000.00
Buah 650,000.00
Buah 250,000.00
Buah 250,000.00
Buah 300,000.00
Buah 1,450,000.00
Buah 250,000.00
Buah 250,000.00
LS 291,525,000.00
LS 69,300,000.00
Harga Pekerjaan)
M3 36,528.80
M3 1,365,523.06
Harga Pekerjaan)
M3 21,039.49
M3 530,591.62
M3 283,793.26
M2 4,140.98
M2 26,566.68
M2 24,696.68
Harga Pekerjaan)
M3 819,088.80
Harga Pekerjaan)
Liter 16,083.18
Ton 17,466.58
Ton 1,527,652.45
Ton 1,481,341.02
Ton 1,331,777.17
Kg 90,000.00
Harga Pekerjaan)
M3 2,015,943.18
M3 1,775,323.68
M3 1,601,438.70
M3 1,178,301.93
Kg 18,345.03
Kg 20,345.03
M 8,782.14
M 1,922,661.03
M3 1,001,751.88
M 1,895,006.00
M3 478,750.69
M 477,500.00
Harga Pekerjaan)
M2 97,607.74
M2 84,450.12
Buah 317,250.14
Harga Pekerjaan)
M2 232,786.57
Buah 254,230.25
M 784,568.15
Buah 25,000,000.00
M2 19,178.13
Harga Pekerjaan)
M3
M3 804,320.41
M3 612,140.53 238.26 145,848,602.68 238.26
M3 3,523,708.06
M3 613,417.33
M 15,416.77 4,777.29 73,650,381.15 4,777.29
M2 747.95 376,000.00 281,229,200.00 376,000.00
SURANTO
Direktur
DAFTAR K
500,728,183.83 1,939,752,636.19
533,572,134.81
533,572,134.81
Sub Lingk
HASIL SURVEY Penanganan Longsoran HASIL SURVEY
532,464,526.78
411,416,725.65
161,057,430.74
499,186,764.76
2,682,554,678.18
279,343,884.00 306,641,684.92
320,787,109.12
1,314,864,889.84
24,756,753.23
1,660,408,752.19
144,497,858.65
62,320,000.00
240,000.00
260,000.00
280,000.00
360,000.00
800,000.00
400,000.00
900,000.00
640,000.00
1,900,000.00
1,000,000.00
4,800,000.00
2,600,000.00
1,000,000.00
1,000,000.00
1,200,000.00
5,800,000.00
1,000,000.00
1,000,000.00
291,525,000.00
69,300,000.00
592,822,858.65
27,425,823.04
505,038,703.74
532,464,526.78
28,531,021.20
27,298,938.85
269,728,466.03
4,094,393.98
27,709,047.24
54,054,858.35
411,416,725.65
161,057,430.74
161,057,430.74
6,573,999.83
8,069,559.96
154,170,685.25
224,245,403.61
101,028,616.12
5,098,500.00
499,186,764.76
236,712,048.20
569,862,923.37
76,869,057.60
114,036,060.79
403,957,560.60
527,126,299.58
715,229,903.16
17,273,324.90
21,487,500.00
2,682,554,678.18
12,151,458.95
290,290,215.50
4,200,010.47
306,641,684.92
3,224.42 257,955,212.21 -
1,337.81 1,464,127,906.51 m3
1,722,083,118.72
12,881,853.31
2,020,480.22
2,383,512.35
-
#VALUE!
#VALUE!
FITRIANSYAH
NIP. 19691128200
HASIL SURVEY Pemeliharaan Berkala Jembatan HASIL SURVEY
12,881,853.31 16,030,541.89
2,020,480.22 20,966,320.19
55,084,605.00
2,383,512.35 8,351,943.76
FITRIANSYAH, ST
NIP. 196911282002121007
HASIL SURVEY Jumlah
Kuantitas TOTAL Kuantitas
TOTAL KONTRAK
KONTRAK TOTAL MC 0
Jumlah Harga Harga-Harga
(Rp.) (Rupiah)
17 18 = 4 x 17
532,464,526.78
411,416,725.65
161,057,430.74
499,186,764.76
16,030,541.89 2,711,467,073.38
20,966,320.19 22,986,800.41
55,084,605.00 361,726,289.92
-
398.83 398.83 320,787,109.12
238.26 238.26 145,848,602.68
2,466,595.64 380.12 373.85 1,339,431,907.77
459.72 40.36 282,000,214.95
2,547,621.24 4,989.15 4,989.15 76,916,578.05
3,337,726.88 382,688.50 382,688.50 286,231,863.58
8,351,943.76 2,451,216,276.13
2,255,655,253.53
100,433,410.84 9,999,999,999.97
9,999,999,999.97
1,000,000,000.00
10,999,999,999.97
11,000,000,000.00
Jumlah
TOTAL MC-0
Harga-Harga
(Rupiah)
18 = 4 x 17
144,497,858.65
62,320,000.00
240,000.00
260,000.00
280,000.00
360,000.00
800,000.00
400,000.00
900,000.00
640,000.00
1,900,000.00
1,000,000.00
4,800,000.00
2,600,000.00
1,000,000.00
1,000,000.00
1,200,000.00
5,800,000.00
1,000,000.00
1,000,000.00
291,525,000.00
69,300,000.00
592,822,858.65
27,425,823.04
505,038,703.74
532,464,526.78
28,531,021.20
27,298,938.85
269,728,466.03
4,094,393.98
27,709,047.24
54,054,858.35
411,416,725.65
161,057,430.74
161,057,430.74
6,573,999.83
8,069,559.96
154,170,685.25
224,245,403.61
101,028,616.12
5,098,500.00
499,186,764.76
236,712,048.20
579,376,882.97
76,869,057.60
114,036,060.79
403,957,560.60
527,126,299.58
1,475,399.52
715,229,903.16
16,028,030.08
1,895,006.00
17,273,324.90
21,487,500.00
2,711,467,073.38
21,379,999.37
337,800.48
1,269,000.56
22,986,800.41
291,495,342.95
5,084,605.00
290,290,215.50
50,000,000.00
4,200,010.47
641,070,173.92
-
320,787,109.12
145,848,602.68
1,317,331,485.49
24,756,753.23
76,916,578.05
286,231,863.58
2,171,872,392.13
533,572,134.81
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
11,000,000,000.00
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL IX BANJARMASIN
SNVT PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALIMANTAN TENGAH
PEJABAT PEMBUAT KOMITMEN 3.4 KALAHIEN - BUNTOK - AMPAH
Jl. Tjilik Riwut KM 3 No. 14 Telp. (0536) 3222915 Fax (0536) 3242747 Palangka Raya, Kalteng 73112
BACK UP MC - 0
Kegiatan : PRESERVASI JALAN P.CAHU - P. PUNJUNG Divisi : 10. PEKERJAAN PEMELIHARAAN KINERJA
No. & Tanggal Kontrak - No.Item : 10.1.(6)
Konsultan : Item Pekerjaan : Perbaikan Lapis Pondasi Agregat Kelas S
Kontraktor : PT. BOGA JAYA TIRTA MARGA Lokasi : P. CAHU - P. PUNJUNG
GAMBAR SKET
PERHITUNGAN
238.26
. ........
. General Superintendent
RENCANA ANGGARAN BIAYA AGGREGAT S
KUANTITAS /
No.. ITEM PANJANG LEBAR TEBAL HARI HARGA (Rp.) VOLUME (M3) / (M2) / TON / HARI TOTAL HARGA
ORANG
OPSI 1 > TANAH DI AMBIL DARI LOKASI GALIAN ; PASIR DI AMBIL DARI BAHU JALAN (5 HARI) ; AGGREGAT HALUS(BATU 1-2) AMBIL DARI STOKPILE ; TARGET HAMPAR 1 HARI = 100 M
TANAH 794.2 2 0.13 1 Rp - 206.492 Rp -
PASIR 794.2 2 0.02 1 Rp - 31.768 Rp -
1
AGGREGAT HALUS 794.2 2 0.01 1 Rp - 15.884 Rp -
UPAH 5 10 Rp 50,000.00 50 Rp 2,500,000.00
TOTAL RENCANA ANGGARAN BIAYA Rp 2,500,000.00
HARGA TOTAL KONTRAK (BELUM PPN) Rp 145,848,602.68
KEUNTUNGAN PERUSAHAAN Rp 143,348,602.68
OPSI 2 > TANAH DI AMBIL DARI LOKASI GALIAN ; PASIR BELI ; AGGREGAT HALUS(BATU 1-2) AMBIL DARI STOKPILE ; TARGET KERJA 1 HARI = 100 M
TANAH 794.2 2 0.13 1 Rp - 206.492 Rp -
PASIR 794.2 2 0.02 1 Rp 75,000.00 31.768 Rp 2,382,600.00
1
AGGREGAT HALUS 794.2 2 0.01 1 Rp - 15.884 Rp -
UPAH 5 5 Rp 50,000.00 25 Rp 1,250,000.00
TOTAL RENCANA ANGGARAN BIAYA Rp 3,632,600.00
HARGA TOTAL KONTRAK (BELUM PPN) Rp 145,848,602.68
KEUNTUNGAN PERUSAHAAN Rp 142,216,002.68
ITEM PEK
BERKALA
ITEM PEKERJAAN
VOLUME
4.1 M3 10.25
84 M 21 21 4
8 M3 8 8 2
1 M
0 M
0 M
0 BUAH 20
0 BUAH 2
0 M3 3.9
RLAKSANA
TOTAL
LEBAR (M) TEBAL (M) SAT. KETERANGAN
VOLUME
168 M
1 0.5 16 M3
TOTAL KOMULAT
STATION
PAR (PILIHAN 1)
440.000 17.600 40.128
37+150
Back Up Data Quantity
Perhitungan Volume Penyedia Jasa
CAMPURAN ASPAL PANAS
4,50
5,50m
1,25 6,00
12,00 – 18,00
Berat
STATION PANJANG LEBAR TEBAL LUAS VOLUME Jenis VOLUME
(m) (m) (m) (m) (m2) (m3) (Ton/M3) (Ton)
Penanganan Jalan Aus & Rusak
40+500 200.00 4.50 0.040 900.000 36.000 2.230 80.280
4,50
5,50m
6,00 1,25
12,00 – 18,00
Harga Total
Satuan Harga FOTO DOKUMENTASI
(Rp.) (Rp.)
3,523,708.06 126,853,490.16
3,523,708.06 253,706,980.32
3,523,708.06 209,308,258.76
3,523,708.06 475,700,588.10
1,065,569,317.34
O DOKUMENTASI
LP A TERLAKSANA
TOTAL KOMUL
LP A BELUM TERLAKSA
A
LUAS VOLUME
(m2) (m3)
550.000 110.000
125.000 25.000
24.000 4.800
115.000 17.250
300.000 60.000
0.000 0.000
217.05
TOTAL KOMULATIF
KUANTITAS KUANTITAS
KETERANGAN TANGGAL
(Sak) (Ton)
TERLAKSANA
PENGAMBILAN I 150.00 6.00
PENGAMBILAN II 150.00 6.00
PENGAMBILAN III 150.00 6.00
450.00 18.00
BACK
VOLUME Berat
STATION STATION PANJANG LEBAR TEBAL LUAS HAMPAR Jenis
(m) (m) (m) (m) (m2) (m3) (Ton/M3)
38+290 38+306 16.00 2.30 0.120 36.800 4.416 2.234
BACKUP TERLAKSANA
Harga Total
VOLUME Satuan Harga DOKUMENTASI PEKERJAAN
(Ton) (Rp.) (Rp.)
9.867 613,417.33 2,708,850.93