Anda di halaman 1dari 1

NO URAIAN VOLUME HARGA JUMLAH

SARANA DAN PRASARANA SATUAN


1 2 1600000 3,200,000.00
Batu Belah
2 Batu Split 2 1300000 2,600,000.00
3 Semen 3 Roda 100 65000 6,500,000.00
4 Pasir Pasang 2 1500000 3,000,000.00
5 Besi ukuran 12 40 80000 3,200,000.00
6 Besi Cincin 200 4000 800,000.00
7 Bata Putih/Selkon 10 850000 8,500,000.00
8 GRC 30 50000 1,500,000.00
9 Asbes/Atap 30 90000 2,700,000.00
10 Kusen+Pintu 5 1500000 7,500,000.00
11 Jendela Dan Kusen 5 800000 4,000,000.00
12 Paku Payung Asbes 10 40000 400,000.00
13 Cat Tembok 3 250000 750,000.00
14 Engsel Pintu 5 60000 300,000.00
15 Engsel Jendela 1 50000 50,000.00
16 Ongkos 2 Tukang & 2 Laden 30 500000 15,000,000.00
Jumlah Total Rp: 60.000.000

RENCANA ANGGARAN BIAYA REHAB RUANG MI AL IHSANIYAH TAHUN 2023