PEMILIK : SAB SAS

PROYEK : KANTOR SAB SAS Banda Aceh


LOKASI : Banda Aceh, NAD - INDONESIA
Kode Proyek : 8502

REKAPITULASI
Jumlah Harga
No. URAIAN PEKERJAAN
(RP)
I. PRELIMINARY Rp. 40,000,000.00

II. OFFICE
A. PEKERJAAN PERSIAPAN Rp. 1,852,800.00
B. PEKERJAAN TANAH Rp. 12,934,073.53
C. PEKERJAAN STRUKTUR Rp. 325,525,590.01
D. PEKERJAAN ARCHITECTURAL Rp. 648,474,540.54
E. PEKERJAAN MECANICAL & ELEKTRICAL Rp. 76,305,833.33

III. LABORATORIUM & WORKSHOP


A. PEKERJAAN PERSIAPAN Rp. 1,621,200.00
B. PEKERJAAN TANAH Rp. 11,513,690.81
C. PEKERJAAN STRUKTUR Rp. 213,916,879.17
D. PEKERJAAN ARCHITECTURAL Rp. 456,393,767.09
E. PEKERJAAN MECANICAL & ELEKTRICAL Rp. 46,435,000.00

IV TRAINING
A. PEKERJAAN PERSIAPAN Rp. 1,312,400.00
B. PEKERJAAN TANAH Rp. 6,942,114.69
C. PEKERJAAN STRUKTUR Rp. 159,225,679.42
D. PEKERJAAN ARCHITECTURAL Rp. 343,281,521.83
E. PEKERJAAN MECANICAL & ELEKTRICAL Rp. 37,333,333.33

V. LANDSCAPING
1 SELASAR
A. PEKERJAAN PERSIAPAN Rp. 1,698,400.00
B. PEKERJAAN TANAH Rp. 4,258,826.76
C. PEKERJAAN STRUKTUR Rp. 60,881,358.08
D. PEKERJAAN ARCHITECTURAL Rp. 103,866,892.85

2 SECURITY
A. PEKERJAAN PERSIAPAN Rp. 322,310.00
B. PEKERJAAN TANAH Rp. 151,970.61
C. PEKERJAAN STRUKTUR Rp. 5,523,236.63
D. PEKERJAAN ARCHITECTURAL Rp. 25,208,858.34

3 BANGSAL Rp. 28,468,773.61

4 PAGAR
B. PEKERJAAN TANAH Rp. 2,924,567.75
C. PEKERJAAN STRUKTUR Rp. 149,864,702.82

5 LAMPU TAMAN Rp. 86,796,200.00

6 JALAN & DRAINAGE Rp. 232,476,070.46

7 GENSET Rp. 3,848,500.00


T O T A L ........................................................................... Rp. 3,089,359,091.68
PPN 10 % ........................................................................... Rp. 308,935,909.17
T O T A L ............................................................................ Rp. 3,398,295,000.85
Terbilang :
Tiga Milyar Tiga Ratus Sembilan Puluh Delapan Juta Dua Ratus Sembilan Puluh Lima Ribu Delapan Puluh Lima Rupiah

Medan, 23 Desember 2008


CV. JASA BEURATA

T. JAMALUDDIN
Direktur
CLIENT : SAB SAS
PROJECT : KANTOR PT. TIRTA SAB SAS Banda Aceh
LOCATION : Banda Aceh, NAD - INDONESIA
Kode Proyek : 8502

Volume Satuan Satuan Harga Total Harga


No. DESCRIPTION
Rp Rp
I. PRELIMINARY
1 Mobilization and Demobilisation 1.00 Is 3,000,000.00 3,000,000.00

2 Asuransi Tenaga Kerja 1.00 Is 3,000,000.00 3,000,000.00

3 Papan Nama Kerja 1.00 ls 1,000,000.00 1,000,000.00

4 Pagar Pengamanan Sementara 250.00 m' 55,000.00 13,750,000.00

5 Peralatam Kerja untuk Client dan Konsultant meliputi, 1.00 ls 1,000,000.00 1,000,000.00

5 Safety helm dan 5 pasang Safety Boot yang selalu tersedia di direksikeet

6 Direksikeet dan perlengkapan, perabot, meja kerja, komputer, air minum, dll. 1.00 ls 8,000,000.00 8,000,000.00

7 Shop Drawing dan as built drawing 1.00 Is 2,000,000.00 2,000,000.00

8 Air Kerja 1.00 Is 1,000,000.00 1,000,000.00

9 Listrik Kerja 1.00 Is 2,000,000.00 2,000,000.00

10 Laporan dan Dokumentasi

- Laporan Harian 1.00 Is 2,000,000.00 2,000,000.00

- Laporan Mingguan 1.00 Is 1,000,000.00 1,000,000.00

- Laporan Bulanan 1.00 Is 750,000.00 750,000.00

- Foto Dokumentasi 1.00 Is 1,500,000.00 1,500,000.00

TOTAL PRELIMINARY 40,000,000.00


CLIENT : SAB SAS
PROJECT : KANTOR PT. TIRTA SAB SAS Banda Aceh
LOCATION : Banda Aceh, NAD - INDONESIA
Kode Proyek : 8502

Volume Satuan Satuan Harga Total Harga


No. DESCRIPTION
Rp Rp
II. OFFICE

A. EARTH WORKS
Bowplank / Pengukuran 96.00 m' 19,300.00 1,852,800.00
Sub Total Pekerjaan Persiapan (A.) 1,852,800.00
B. STRUKTUR
B.1 PEKERJAAN TANAH
Pek. galian pondasi dan sloof 86.20 m3 17,800.00 1,534,343.98
Pek. Pasir Urug di bawah pondasi dan Sloof t = 50mm 3.21 m3 96,450.00 309,353.73
Pek. Pasir Urug di bawah lantai t = 50mm 21.00 m3 96,450.00 2,025,450.00
Pek. Urugan tanah kembali 86.20 m3 8,535.00 735,709.32
Pek. Timbunan tanah peninggian lantai 152.97 m3 54,450.00 8,329,216.50
Sub Total Pek. Tanah (B.1) 12,934,073.53
B.2 PEKERJAAN STRUKTUR
I. Pekerjaan Pondasi
Pek. Lantai Kerja di bawah pondasi dan Sloof (beton 1:3:5) 6.00 m3 729,350.00 4,375,954.13
Pek. Lantai Kerja di bawah lantai (beton 1:3:5) 21.00 m3 729,350.00 15,316,350.00
Pek. Pondasi Menerus Pas. Batu kali 1:4 14.00 m3 516,940.00 7,236,002.05
Pek. Pondasi Setempat
Bekisting 24.52 m2 112,800.00 2,765,856.00
Besi 799.86 kg 14,138.00 11,308,409.37
Beton Cor K-225 5.68 m3 868,100.00 4,926,467.50
Pek. Rolag bata 12.60 m2 143,900.00 1,813,140.00
Sub Total 47,742,179.05
II. Pekerjaan Sloof
Pek. Sloof uk. 40 x 40 cm
Beton Cor K-225 1.79 m3 868,100.00 1,555,635.20
Besi 173.37 kg 14,138.00 2,451,100.31
Bekisting 8.96 m2 112,800.00 1,010,688.00
Pek. Sloof uk. 25 x 40 cm
Beton Cor K-225 1.55 m3 868,100.00 1,345,555.00
Besi 267.35 kg 14,138.00 3,779,793.03
Bekisting 12.40 m2 112,800.00 1,398,720.00
Pek. Sloof uk. 20 x 35 cm
Beton Cor K-225 6.61 m3 868,100.00 5,736,404.80
Besi 1,072.92 kg 14,138.00 15,168,966.17
Bekisting 66.08 m2 112,800.00 7,453,824.00
Pek. Sloof uk. 15 x 15 cm
Beton Cor K-225 0.26 m3 868,100.00 224,620.88
Besi 57.50 kg 14,138.00 812,935.00
Bekisting 3.45 m2 112,800.00 389,160.00
Sub Total 41,327,402.39
III. Pekerjaan Kolom
Pek. Kolom Uk. 40 x 40 cm
Beton Cor K-225 3.65 m3 868,100.00 3,166,828.80
Besi 1,056.00 kg 14,138.00 14,929,728.00
Bekisting 36.48 m2 112,800.00 4,114,944.00
Pek. Kolom Uk. 30 x 30 cm
Beton Cor K-225 7.18 m3 868,100.00 6,234,694.20
Besi 1,280.90 kg 14,138.00 18,109,364.20
Bekisting 95.76 m2 112,800.00 10,801,728.00
Pek. Kolom Praktis Uk. 15 x 15 cm
Beton Cor K-225 2.43 m3 868,100.00 2,109,483.00
Besi 396.14 kg 14,138.00 5,600,697.80
Bekisting 35.10 m2 112,800.00 3,959,280.00
Pek. Kolom Uk. 10 x 15 cm
Beton Cor K-225 1.04 m3 868,100.00 898,483.50
Besi 267.34 kg 14,138.00 3,779,592.21
Bekisting 2.00 m2 112,800.00 225,600.00
Sub Total 73,930,423.71
CLIENT : SAB SAS
PROJECT : KANTOR PT. TIRTA SAB SAS Banda Aceh
LOCATION : Banda Aceh, NAD - INDONESIA
Kode Proyek : 8502

Volume Satuan Satuan Harga Total Harga


No. DESCRIPTION
Rp Rp
IV. Pekerjaan Balok
Pek. Balok Uk.20/40
Beton Cor K-225 7.04 m3 868,100.00 6,111,424.00
Besi 1,140.48 kg 14,138.00 16,124,106.24
Bekisting 105.60 m2 112,800.00 11,911,680.00
Pek. Balok Uk.15/25
Beton Cor K-225 0.86 m3 868,100.00 742,225.50
Besi 147.33 kg 14,138.00 2,083,002.44
Bekisting 16.71 m2 112,800.00 1,884,888.00
Balok 12 x 40
Beton Cor K-225 0.86 m3 868,100.00 742,225.50
Besi 147.49 kg 14,138.00 2,085,178.28
Bekisting 8.15 m2 112,800.00 919,432.80
Pek. Ring balok Uk.20/40
Beton Cor K-225 0.47 m3 868,100.00 406,270.80
Besi 75.82 kg 14,138.00 1,071,886.61
Bekisting 6.14 m2 112,800.00 692,874.00
Pek. Ring balok Uk.15/30
Beton Cor K-225 6.38 m3 868,100.00 5,539,346.10
Besi 835.20 kg 14,138.00 11,808,085.88
Bekisting 121.74 m2 112,800.00 13,731,741.84
Pek. Ring balok Uk.15/20
Beton Cor K-225 2.36 m3 868,100.00 2,048,933.03
Besi 410.80 kg 14,138.00 5,807,890.40
Bekisting 43.70 m2 112,800.00 4,929,806.97
Sub Total 88,640,998.37
V. Pekerjaan Plat Lantai
Beton Cor K-225 2.40 m3 868,100.00 2,083,440.00
Besi 413.35 kg 14,138.00 5,843,970.58
Bekisting 20.00 m2 112,800.00 2,256,000.00
Sub Total 10,183,410.58
VI. Pekerjaan Canopy
Beton Cor K-225 12.98 m3 868,100.00 11,266,120.89
Besi 2,232.20 kg 14,138.00 31,558,843.17
Bekisting 185.07 m2 112,800.00 20,876,211.84
Sub Total 63,701,175.90
Total Pekerjaan Struktur 325,525,590.01
C. ARCHITECTURAL WORKS
I. Pekerjaan Dinding
Pekerjaan Dinding & Pelapis Dinding
Pasangan 1/2 Bata (1 : 2) 171.33 m2 96,350.00 16,507,163.75
Pasangan 1/2 Bata (1 : 4) 653.51 m2 86,910.00 56,796,275.99
Pasangan 1 Bata (1 : 2) 9.00 m2 143,900.00 1,295,100.00
Plesteran Dinding (1 : 2) 342.65 m2 37,945.00 13,001,854.25
Plesteran Dinding (1 : 4) 1,307.01 m2 34,820.00 45,510,213.55
Plesteran Motif Garis-garis 24.25 m2 40,945.00 992,711.53
Pasangan dinding Partisi 22.78 m2 86,910.00 1,979,549.07
Pasangan Lovers 2.87 m2 89,910.00 258,221.52
Acian Beton 1,220.51 m2 7,945.00 9,696,980.55
Batu Alam Susun Sirih 86.50 m2 119,910.00 10,372,215.00
List Dinding 174.40 m' 10,000.00 1,744,000.00
Sirip Vertikal Kayu 1.00 Ls 500,000.00 500,000.00

Sub Total Pek. Dinding Sub Total 158,654,285.21


II. Pekerjaan Kusen
Pekerjaan Kusen, Pintu dan Jendela lengkap Assesoris
Pekerjaan Pintu
Pintu Type P1 (ex YKK Aluminium) 1.00 unit 8,650,000.00 8,650,000.00
Pintu Type P2 (ex YKK Aluminium) 1.00 unit 600,000.00 600,000.00
Pintu Type P4 (ex YKK Aluminium) 4.00 unit 460,000.00 1,840,000.00
CLIENT : SAB SAS
PROJECT : KANTOR PT. TIRTA SAB SAS Banda Aceh
LOCATION : Banda Aceh, NAD - INDONESIA
Kode Proyek : 8502

Volume Satuan Satuan Harga Total Harga


No. DESCRIPTION
Rp Rp
Pintu Type P5 (ex YKK Aluminium) 2.00 unit 450,000.00 900,000.00
Pintu Type P6 (ex YKK Aluminium) 3.00 unit 1,650,000.00 4,950,000.00
Pintu Type P7 (ex YKK Aluminium) 2.00 unit 1,650,000.00 3,300,000.00
Pintu Type P8 (ex YKK Aluminium) 1.00 unit 1,000,000.00 1,000,000.00
Pintu Type P9 (ex YKK Aluminium) 4.00 unit 900,000.00 3,600,000.00
Pekerjaan jendela
Jendela Type J1 (ex YKK Aluminium) 19.00 unit 1,520,000.00 28,880,000.00
Jendela Type J2 (ex YKK Aluminium) 6.00 unit 3,160,000.00 18,960,000.00
Jendela Type J3 (ex YKK Aluminium) 2.00 unit 5,050,000.00 10,100,000.00
Jendela Type J4 (ex YKK Aluminium) 5.00 unit 700,000.00 3,500,000.00
Sub Total Pek. Kusen, jendela Sub Total 86,280,000.00
III. Pekerjaan Lantai
Pekerjaan Lantai & Keramik
Keramik Lantai Uk. 60 x 60 cm Ex.Roman atau Setara 214.00 m2 132,907.00 28,442,098.00
Keramik Lantai Uk. 40 x 40 cm Ex.Roman atau Setara 211.10 m2 122,907.00 25,945,667.70
Keramik Lantai Uk. 30 x 30 cm Ex.Roman atau Setara 19.90 m2 112,907.00 2,246,849.30
Keramik Lantai Uk. 20 x 20 cm Ex.Roman atau Setara 17.00 m2 102,907.00 1,749,419.00
Keramik Dinding KM Uk. 20 x 25 cm Ex Roman atau Setara 62.00 m2 115,877.00 7,184,374.00
Plint Keramik Uk. 10 x 60 cm Ex. Roman atau Setara 160.50 m' 42,210.00 6,774,705.00
Plint Keramik Uk. 10 x 40 cm Ex. Roman atau Setara 119.50 m' 42,377.00 5,064,051.50
Bombom KM Keramik Uk. 2 cm 7.00 m' 10,000.00 70,000.00
Sub Total Pek. Lantai Sub Total 77,477,164.50
IV. Pekerjaan Atap
Pekerjaan Atap
Ornamen tradisional Aceh 1.00 Ls 25,000,000.00 25,000,000.00
Kuda - kuda + rangka Atap Baja ringan Ex. Smart Truss atau Setara 463.00 m2 165,000.00 76,395,000.00
List plank Ragam Hias Aceh 101.00 m' 117,229.00 11,840,129.00
Penutup atap Genteng Metal Ex. Multi Roof atau Setara 463.00 m2 104,700.00 48,476,100.00
Rabung Metal Ex. Multi Roof atau Setara 33.50 m' 42,765.00 1,432,627.50
Penutup atap Polycarbonat untuk Canteen 54.20 m2 175,000.00 9,485,000.00
Rangka atap Hollow 3/6 " 54.20 m2 275,000.00 14,905,000.00

Sub Total Pek. Atap Sub Total 187,533,856.50


V. Pekerjaan Plafond
Pekerjaan Plafon
Plafond Gypsum Board 9 mm + Rangka Boral system (Ex Jaya Board) atau Setara 443.88 m2 134,125.00 59,535,405.00
List Plafon gypsum (Cornice) 10 cm Ex. Jaya Board atau Setara 310.00 m' 10,000.00 3,100,000.00
List Plafon gypsum (Cornice) 5 cm Ex. Jaya Board atau Setara 221.50 m' 7,000.00 1,550,500.00
Sub Total Pek. Plafon Sub Total 64,185,905.00
VI. Pekerjaan Pengecatan
Pekerjaan Pengecatan
Cat Kosen Bee Brand atau Setara 155.01 m2 32,225.00 4,995,043.45
Cat Dinding Dulux atau Setara 1,220.51 m2 23,065.00 28,151,146.18
Cat Plafond Dulux atau Setara 443.88 m2 23,065.00 10,238,092.20
Cat List Plafond/ Cornice Dulux atau Setara 531.50 m' 23,065.00 12,259,047.50
Sub Total Pek. Pengecatan Sub Total 55,643,329.33
CLIENT : SAB SAS
PROJECT : KANTOR PT. TIRTA SAB SAS Banda Aceh
LOCATION : Banda Aceh, NAD - INDONESIA
Kode Proyek : 8502

Volume Satuan Satuan Harga Total Harga


No. DESCRIPTION
Rp Rp
VII. Pekerjaan Sanitasi
Pekerjaan Sanitary
Kloset Duduk Komplit Assesories Ex. TOTO, atau Setara 2.00 unit 1,850,000.00 3,700,000.00
Kloset Jongkok Komplit Assesories Ex. TOTO, atau Setara 4.00 unit 250,000.00 1,000,000.00
Washtafel Komplit dengan Assesories Ex. TOTO, atau Setara 4.00 unit 1,200,000.00 4,800,000.00
Meja Pantry beton dilapis keramik, lengkap 1.00 unit 2,000,000.00 2,000,000.00
Tempat Sabun American Standard atau Setara 4.00 unit 145,000.00 580,000.00
Urinor Ex.TOTO, atau Setara 2.00 unit 1,900,000.00 3,800,000.00
Kran tape 1/2 " Ex. TOTO, atau Setara 6.00 unit 195,000.00 1,170,000.00
Floor drain 3 " mEx. TOTO, atau Setara 6.00 unit 275,000.00 1,650,000.00
Sub Total Pek. Sanitasi Sub Total 18,700,000.00
Total Pekerjaan Architectural 648,474,540.54
D. PEKERJAAN MEKANICAL & ELEKTRICAL
D.I ELEKTRICAL
1 Panel distribution board
Spesifikasi panel menggunakan steel plate dia 1.8 mm, dan cot coating powder
dengan Componen MCM & MCCB Ex. Merlin Gerin, Sesuai dengan gambar
DISTRIBUTION BOARD LIGHTING & RECEPTACLE OFFICE (DB-L & R OFFICE) 1.00 Unit 1,500,000.00 1,500,000.00
2 Pekerjaan Instalasi Penerangan & Stop Kontak
Spesifikasi kabel menggunakan NYA 2,5 mm (Supreme) dan Conduit dia 20 mm
(Clipsal) berikut dengan Fitting & Accessories/ material bantu
Instalasi Penerangan 150.00 Ttk 40,000.00 6,000,000.00
Instalasi Stop Kontak 1 pole/ 13 A 55.00 Ttk 30,000.00 1,650,000.00
3 Armatur, lampu, Stop kontak & Saklar Building
RLMO 2 X 36 W / M2 Ex.METOSU 15.00 Pcs 70,000.00 1,050,000.00
RT 1 X 36W Ex. METOSU atau Setatra 4.00 Pcs 60,000.00 240,000.00
GSM 2 X 36 W Ex. Metosu atau Setara 2.00 Pcs 70,000.00 140,000.00
DRMH . HAL 50 W Ex. METOSU atau Setara 32.00 Pcs 80,000.00 2,560,000.00
DRM dia 4'' / E18 W Ex. METOSU atau Setara 65.00 Pcs 55,000.00 3,575,000.00
DRM dia 5'' / E 23 W Ex. METOSU atau Setara 22.00 Pcs 70,000.00 1,540,000.00
ROSSET E 18 W Ex. METOSU atau Setara 8.00 Pcs 25,000.00 200,000.00
DECORATIVE LAMP 2.00 Pcs 110,000.00 220,000.00
RECEPTACLE 13 A / 1P (Clipsal) 55.00 Pcs 50,000.00 2,750,000.00
Switch 1 Gang Clipsal atau Setara 12.00 Pcs 20,000.00 240,000.00
Switch 2 Gang Clipsal atau Setara 7.00 Pcs 25,000.00 175,000.00
Switch 3 Gang Clipsal atau Setara 6.00 Pcs 30,000.00 180,000.00
Sub Total 22,020,000.00
D.II TELEPHONE
Unit PABX TDA 100 / Complete
Component Unit ( PANASONIC) Plus Key Telephone 1.00 Unit 400,000.00 400,000.00
Instalasi kabel telephone 0,6 x 40 parc (Supreme)
Include Conduit dia 20 mm (Clipsal) plus Fitting & Accessories. 15.00 Ttk 20,000.00 300,000.00
PABX ke Unit telephone Office
- Out let telephon Ex. Clipsal atau Setara
- Unit Pesawat telephon (Extention)
- Unit Pesawat telephon Direct
Pengujian Instalasi Listrik (Comissioning Test) 1.00 Lot 150,000.00 150,000.00
Sub Total 850,000.00
D.III AIR CONDITION
SPLIT WALL MOUNTED TYPE 8.00 unit 3,500,000.00 28,000,000.00
MS - C SERIES (MITSUBISHI) 2,5 PK
Install
- Cooper Pipe dia 1/2
- Cooper Pipe dia 1/4
- ARMAFLEX dia 1/2 8.00 set 250,000.00 2,000,000.00
- ARMAFLEX dia 1/4
- Duck tape
- Drainse PVC 1 "
CLIENT : SAB SAS
PROJECT : KANTOR PT. TIRTA SAB SAS Banda Aceh
LOCATION : Banda Aceh, NAD - INDONESIA
Kode Proyek : 8502

Volume Satuan Satuan Harga Total Harga


No. DESCRIPTION
Rp Rp
Install Cabel Power
NYM 3 x 2,5 mm plus Conduit (Clipsal) dia 20 mm Include fitting & Accessories 8.00 Ttk 250,000.00 2,000,000.00
Install Cabel Control
NYM 3 x 1,5 mm 8.00 Ttk 200,000.00 1,600,000.00
Pengujian Instalasi Listrik (Comissioning Test) 1.00 Lot 250,000.00 250,000.00
Sub Total 33,850,000.00
D.IV PLUMBING
I. Instalasi air bersih
External
Spesifikasi material menggunakan PVC Class AW (FINLON) BERIKUT FITTING &
Accessories sesuai dengan Gambar tender
PVC dia 11/4'' (INVILON) atau Setara 225.00 m' 41,666.67 9,375,000.00
PVC dia 1 '' (INVILON) atau Setara 24.00 m' 10,833.33 260,000.00
PVC dia 3/4 '' (INVILON) atau Setara 28.00 m' 5,833.33 163,333.33
Armatur
- Pompa air sanyo dia 11/4 '' 1.00 Unit 750,000.00 750,000.00
- Kran tape type T.26 - 13 (TOTO) atau Setara 8.00 Unit 195,000.00 1,560,000.00
Installasi Pipa
PVC dia 1'' (INVILON) atau Setara 29 m' 10,833.33 314,166.67
PVC dia 3/4 '' (INVILON) atau Setara 60 m' 5,833.33 350,000.00
PVC dia 1/2 '' (INVILON) atau Setara 8 m' 4,166.67 33,333.33
material bantu (Fitting material bantu (Fitting & Accossories) 1 lot 150,000.00 150,000.00
II. Instalasi air kotor
PVC dia 4 '' AW (INVILON) atau Setara 19.00 m' 41,666.67 791,666.67
PVC dia 3 '' AW (INVILON) atau Setara 15.00 m' 30,000.00 450,000.00
PVC dia 2 '' AW (INVILON) atau Setara 8.00 m' 22,500.00 180,000.00
material bantu (Fitting & Accossories) 1.00 lot 150,000.00 150,000.00
III. Instalasi air tinja
PVC dia 4 '' 53.00 m' 41,666.67 2,208,333.33
Material bantu (Fitting & Accossories) 1.00 lot 150,000.00 150,000.00
Sub Total 16,885,833.33
D.V. Install Kabel Data
Instalasi 9.00 Ttk 150,000.00 1,350,000.00
Outlet 9.00 Pcs 150,000.00 1,350,000.00
Sub Total 2,700,000.00
Total Pekerjaan Mecanikal & Elektrical (D.) 76,305,833.33

TOTAL SELURUH PEKERJAAN 1,065,092,837.41


CLIENT : SAB SAS
PROJECT : KANTOR PT. TIRTA SAB SAS Banda Aceh
LOCATION : Banda Aceh, NAD - INDONESIA
Kode Proyek : 8502

Volume Satuan Satuan Harga Total Harga


No. DESCRIPTION
Rp Rp
III. LAB & WORKSHOP

A. EARTH WORKS
Bowplank / Pengukuran 84.00 m' 19,300.00 1,621,200.00
Sub Total Pekerjaan Persiapan 1,621,200.00
B SRUKTUR
B.1 PEKERJAAN TANAH
Pek. galian pondasi dan sloof 111.00 m3 17,800.00 1,975,800.00
Pek. Urug Pasir di bawah pondasi dan Sloof t = 50mm 5.60 m3 96,450.00 539,758.31
Pek. Urug Pasir di bawah lantai t = 50mm 17.25 m3 96,450.00 1,663,762.50
Pek. Urugan tanah kembali 111.00 m3 8,535.00 947,385.00
Pek. Penimbuan Tanah peninggian lantai 117.30 m3 54,450.00 6,386,985.00
Sub Total Pekerjaan Tanah Sub Total 11,513,690.81

B.2 PEKERJAAN STRUKTUR


I Pekerjaan Pondasi
Pek. Lantai Kerja di bawah pondasi dan Sloof (beton 1:3:5) 5.60 m3 729,350.00 4,081,624.94
Pek. Lantai Kerja di bawah lantai (beton 1:3:5) 17.25 m3 729,350.00 12,581,287.50
Pek. Pondasi Menerus Pas. Batu kali 1:4 32.38 m3 516,940.00 16,735,932.50
Pek. Rolag 2.00 m2 143,900.00 287,800.00
Sub Total 33,686,644.94
II Pekerjaan Sloof
Pek. Sloof uk. 15 x 15 cm
Beton Cor K-225 5.58 m3 868,100.00 4,843,998.00
Besi 967.20 kg 14,138.00 13,674,273.60
Bekisting 55.50 m2 112,800.00 6,260,400.00
Sub Total 24,778,671.60
III Pekerjaan Kolom
Pek. Kolom Uk. 20 x 20 cm
Beton Cor K-225 2.40 m3 868,100.00 2,083,440.00
Besi 354.00 kg 14,138.00 5,004,852.00
Bekisting 48.00 m2 112,800.00 5,414,400.00
Pek. Kolom Praktis Uk. 15 x 15 cm
Beton Cor K-225 2.79 m3 868,100.00 2,421,999.00
Besi 592.01 kg 14,138.00 8,369,877.21
Bekisting 37.20 m2 112,800.00 4,196,160.00
Sub Total 27,490,728.21
IV. Pekerjaan balok
Pek. Balok Canopy Uk. 20 x 40 cm
Beton Cor K-225 5.92 m3 868,100.00 5,139,152.00
Besi 988.64 kg 14,138.00 13,977,392.32
Bekisting 88.80 m2 112,800.00 10,016,640.00
Pek. Balok Uk. 15 x 25 cm
Beton Cor K-225 0.68 m3 868,100.00 585,967.50
Besi 116.44 kg 14,138.00 1,646,193.38
Bekisting 11.70 m2 112,800.00 1,319,760.00
Pek. Ring balok Uk. 15 x 30 cm
Beton Cor K-225 5.40 m3 868,100.00 4,687,740.00
Besi 928.80 kg 14,138.00 13,131,374.40
Bekisting 77.55 m2 112,800.00 8,747,640.00
Pek. Ring balok Uk. 15 x 20 cm
Beton Cor K-225 1.39 m3 868,100.00 1,205,790.90
Besi 241.69 kg 14,138.00 3,416,956.67
Bekisting 18.52 m2 112,800.00 2,089,056.00
Sub Total 65,963,663.16
V. Pekerjaan Canopy
Beton Cor K-225 11.34 m3 868,100.00 9,844,896.39
Besi 1,953.22 kg 14,138.00 27,614,562.86
Bekisting 165.10 m2 112,800.00 18,623,280.00
Sub Total 56,082,739.26
VI. Plat Lantai
Beton Cor K-225 1.94 m3 868,100.00 1,684,114.00
Besi 231.00 kg 14,138.00 3,265,878.00
Bekisting 8.55 m3 112,800.00 964,440.00
Sub Total 5,914,432.00
Total Pekerjaan Struktur 213,916,879.17
CLIENT : SAB SAS
PROJECT : KANTOR PT. TIRTA SAB SAS Banda Aceh
LOCATION : Banda Aceh, NAD - INDONESIA
Kode Proyek : 8502

Volume Satuan Satuan Harga Total Harga


No. DESCRIPTION
Rp Rp
C. ARCHITECTURAL WORKS
I. Pekerjaan Dinding
Pekerjaan Dinding & Pelapis Dinding
Pasangan 1/2 Bata (1 : 2) 123.30 m2 96,350.00 11,879,955.00
Pasangan 1/2 Bata (1 : 4) 552.80 m2 86,910.00 48,043,848.00
Plesteran Dinding (1 : 2) 123.30 m2 37,945.00 4,678,618.50
Plesteran Dinding (1 : 4) 552.80 m2 34,820.00 19,248,496.00
List untuk Dinding & Jendela 217.94 m2 89,910.00 19,594,985.40
Acian Beton 485.59 m2 7,945.00 3,858,022.08
Batu Alam Susun Sirih 100.41 m2 119,910.00 12,040,019.21
Sub Total 119,343,944.19
II. Pekerjaan Kusen
Pekerjaan Kusen, Pintu dan Jendela lengkap Assesoris
Pekerjaan Pintu
Pintu Type P2 (ex YKK Aluminium) 2.00 unit 600,000.00 1,200,000.00
Pintu Type P4 (ex YKK Aluminium) 4.00 unit 460,000.00 1,840,000.00
Pintu Type P5 (ex YKK Aluminium) 4.00 unit 450,000.00 1,800,000.00
Pintu Type P8 (ex YKK Aluminium) 2.00 unit 1,000,000.00 2,000,000.00
Pintu Type P9 (ex YKK Aluminium) 4.00 unit 900,000.00 3,600,000.00
Pintu Type P10 (ex YKK Aluminium) 1.00 unit 450,000.00 450,000.00
Pekerjaan Jendela
Jendela Type J1 (ex YKK Aluminium) 11.00 unit 1,520,000.00 16,720,000.00
Jendela Type J2 (ex YKK Aluminium) 14.00 unit 3,160,000.00 44,240,000.00
Jendela Type J4 (ex YKK Aluminium) 4.00 unit 700,000.00 2,800,000.00
Sub Total 74,650,000.00
III. Pekerjaan Lantai
Pekerjaan Lantai & Keramik
Keramik Lantai Uk. 60 x 60 cm Ex.Roman atau Setara 158.00 m2 132,907.00 20,999,306.00
Keramik Lantai Uk. 40 x 40 cm Ex.Roman atau Setara 87.00 m2 122,907.00 10,692,909.00
Keramik Lantai Uk. 30 x 30 cm Ex.Roman atau Setara 10.40 m2 112,907.00 1,174,232.80
Keramik Lantai Uk. 20 x 20 cm Ex.Roman atau Setara 2.20 m2 102,907.00 226,395.40
Keramik Dinding KM Uk. 20 x 25 cm Ex Roman atau Setara 31.00 m2 115,877.00 3,592,187.00
Plint Keramik Uk. 10 x 60 cm Ex. Roman atau Setara 153.00 m' 42,210.00 6,458,130.00
Bombom KM keramik Uk. 2 cm 2.00 m' 10,000.00 20,000.00

Sub Total 43,163,160.20


IV. Pekerjaan Atap
Pekerjaan Atap
Ornamen tradisional Aceh 1.00 Ls 25,000,000.00 25,000,000.00
Kuda - kuda + rangka Atap Baja ringan Ex. Smart Truss atau Setara 350.00 m2 165,000.00 57,750,000.00
List plank Ragam Hias Aceh 62.60 m' 117,229.00 7,338,535.40
Penutup atap Genteng Metal Ex. Multi Roof atau Setara 350.00 m2 104,700.00 36,645,000.00
Rabung Metal Ex. Multi Roof atau Setara 26.50 m' 42,765.00 1,133,272.50
Sub Total 127,866,807.90
V. Pekerjaan Plafond
Pekerjaan Plafon
Plafond Gypsum Board 9 mm + Rangka Boral system (Ex Jaya Board) atau Setara 349.77 m2 134,125.00 46,912,901.25
List Plafon gypsum (Cornice) 10 cm Ex. Jaya Board atau Setara 281.50 m' 10,000.00 2,815,000.00
Sub Total 49,727,901.25
VI. Pekerjaan Pengecatan
Pekerjaan Pengecatan
Cat Kosen Bee Brand atau Setara 135.22 m2 32,225.00 4,357,464.50
Cat Dinding Dulux atau Setara 676.10 m2 23,065.00 15,594,246.50
Cat Plafond Dulux atau Setara 349.77 m2 23,065.00 8,067,445.05
Cat List Plafond/ Cornice Dulux atau Setara 281.50 m' 23,065.00 6,492,797.50
Sub Total 34,511,953.55
CLIENT : SAB SAS
PROJECT : KANTOR PT. TIRTA SAB SAS Banda Aceh
LOCATION : Banda Aceh, NAD - INDONESIA
Kode Proyek : 8502

Volume Satuan Satuan Harga Total Harga


No. DESCRIPTION
Rp Rp
VII. Pekerjaan Sanitasi
Pekerjaan Sanitary
Kloset Jongkok Komplit Assesories Ex. TOTO atau Setara 2.00 unit 250,000.00 500,000.00
Washtafel Komplit dengan Assesories Ex. TOTO atau Setara 2.00 unit 1,200,000.00 2,400,000.00
Tempat Sabun American Standard atau Setara 2.00 unit 145,000.00 290,000.00
Urinal Ex. TOTO atau Setara 1.00 unit 1,900,000.00 1,900,000.00
Shower mandi Ex. TOTO atau Setara 2.00 unit 275,000.00 550,000.00
Kran tape Ex. TOTO atau Setara 2.00 unit 195,000.00 390,000.00
Floor Drain Ex. TOTO atau Setara 4.00 unit 275,000.00 1,100,000.00
Sub Total 7,130,000.00
Total Pekerjaan Architectural 456,393,767.09
D. PEKERJAAN ELEKTRICAL & MEKANICAL
D.1 ELEKTRICAL
I PANEL/ DISTRIBUTION BOARD
Spesifikasi panel meguunakan steel dia 1,8 mm dan cat coating podwer.
Include dengan Component MCCB / MCB Ex MERLIN GERIN. Sesuai Gbr tender
Distribution Board Lighting & Receptacle 1.00 Unit 1,500,000.00 1,500,000.00
II. Pekerjaan Instalasi Penerangan & Stop Kontak
Instalasi Penerangan 64.00 Ttk 40,000.00 2,560,000.00
Instalasi Stop Kontak 1 pole/ 13 A 46.00 Ttk 30,000.00 1,380,000.00
Instalasi Stop Kontak 3 pole/ 13 A 4.00 Ttk 30,000.00 120,000.00
III. Armatur, lampu, Stop kontak & Saklar Building
RLMO 2 X 36 W / M2 Ex. METOSU atau Setara 26.00 Pcs 70,000.00 1,820,000.00
RT 1 X 36 W Ex. METOSU atau Setara 6.00 Pcs 60,000.00 360,000.00
DRM dia 4'' / E18W Ex.METOSU atau Setara 16.00 Pcs 55,000.00 880,000.00
DRM dia 5'' / E 23W Ex.METOSU atau Setara 16.00 Pcs 70,000.00 1,120,000.00
Stop Kontak 13 A/ 1 P 46.00 Pcs 20,000.00 920,000.00
Stop Kontak 16 A/ 1 P 4.00 Pcs 20,000.00 80,000.00
Switch 1 Gang Clipsal atau Setara 7.00 Pcs 20,000.00 140,000.00
Switch 2 Gang Clipsal atau Setara 8.00 Pcs 25,000.00 200,000.00
Commitioning Test 1.00 lot 150,000.00 150,000.00
Sub Total 11,230,000.00
D.2 TELEPON
TERMINAL BOX 1.00 Unit 200,000.00 200,000.00
Suplay kaber Fedeer Telepon 45.00 m' 5,000.00 225,000.00
dari TB . LSB ke PABX Office 0,6 x 40 Pore
Instalasi kabel telepon 4 x 0,6 mm Include dia 20 mm (Clipsal)
berikut Fitting & Assecories 11.00 Tttk 120,000.00 1,320,000.00
Armatur
Outlet telepon (Clipsal) 11.00 Pcs 250,000.00 2,750,000.00
Unit Pesawat telepon Extention (Indirect) 11.00 Pcs 350,000.00 3,850,000.00
CommitioningTest 1.00 Lot 150,000.00 150,000.00
Sub Total 8,495,000.00
D.3 AIR CONDITION
SPLIT WALL MOUNTED TYPE 1.00 unit 2,500,000.00 2,500,000.00
MS - C SERIES (MITSUBISHI) 1 PK
Install
- Cooper Pipe dia 3/8''
- Cooper Pipe dia 1/4 ''
- ARMAFLEX dia 3/8 '' 1.00 set 250,000.00 250,000.00
- ARMAFLEX dia 1/4 ''
- Drainse PVC dia 3/4 "
SPLIT WALL MOUNTED TYPE 3.00 unit 500,000.00 1,500,000.00
MS - C SERIES (MITSUBISHI) 2.5 PK
Install
- Cooper Pipe dia 5/8''
- Cooper Pipe dia 1/4 ''
- ARMAFLEX dia 5/8 '' 3.00 set 250,000.00 750,000.00
- ARMAFLEX dia 1/4 ''
- Drainse PVC dia 3/4 "
PL - 2 KAKD / KAKL (Mitsubishi) 2.00 unit 750,000.00 1,500,000.00
CLIENT : SAB SAS
PROJECT : KANTOR PT. TIRTA SAB SAS Banda Aceh
LOCATION : Banda Aceh, NAD - INDONESIA
Kode Proyek : 8502

Volume Satuan Satuan Harga Total Harga


No. DESCRIPTION
Rp Rp
Install
- Cooper Pipe dia 5/8''
- Cooper Pipe dia 3/8 ''
- ARMAFLEX dia 5/8 ''
- ARMAFLEX dia 3/8 '' 2.00 set 250,000.00 500,000.00
- Drainse PVC dia 3/4 "
- Drainse PVC dia 3/4 "
PL - 1.6 KAKD / KAKL (Mitsubishi) 1.00 unit 750,000.00 750,000.00
Install
- Cooper Pipe dia 1/2 ''
- Cooper Pipe dia 1/4 ''
- ARMAFLEX dia 1/2 ''
- ARMAFLEX dia 1/4 '' 1.00 Set 250,000.00 250,000.00
- Drainse PVC dia 3/4 "
- Install kabel power AC
NYM 3 x 2,5 mm Plus Conduit dia 20 mm (Clipsal) berikut Fitting & Accessories 7.00 Ttk 40,000.00 280,000.00
- Install kabel Control wall mounted
NYM 3 x 1,5 mm Plus (Clipsal) 4.00 Ttk 40,000.00 160,000.00
- Install kabel Control PL - KAKD
NYM 4 x 1,5 mm (Clipsal) 3.00 Ttk 40,000.00 120,000.00
Commitioning test 1.00 lot 150,000.00 150,000.00
Sub Total 8,710,000.00
D.4 PLUMBING
I. Instalasi air bersih
External
Spesifikasi material menggunakan PVC Class AW (INVILON) BERIKUT FITTING &
Accessories sesuai dengan Gambar tender
Instalasi Pipa
PVC dia 11/4'' (INVILON) atau Setara 26.00 m' 41,666.67 1,083,333.33
PVC dia 1 '' (INVILON) atau Setara 24.00 m' 10,833.33 260,000.00
PVC dia 3/4 '' (INVILON) atau Setara 7.00 m' 5,833.33 40,833.33
material bantu (Fitting & Accossories) 1.00 lot 150,000.00 150,000.00
Armatur
- Pompa air sanyo dia 1 '' 1.00 Unit 600,000.00 600,000.00
- Pompa air sanyo dia 11/4 '' 1.00 Unit 750,000.00 750,000.00
- Kran tape type T.26 - 13 (TOTO) 9.00 Unit 195,000.00 1,755,000.00
Installasi Pipa
PVC dia 1'' (INVILON) atau Setara 35.00 Pcs 10,833.33 379,166.67
PVC dia 3/4 '' (INVILON) atau Setara 42.00 Pcs 5,833.33 245,000.00
PVC dia 1/2 '' (INVILON) atau Setara 10.00 Pcs 4,166.67 41,666.67
material bantu (Fitting material bantu (Fitting & Accossories) 1.00 Pcs 150,000.00 150,000.00
Instalasi air kotor
PVC dia 4 '' AW (INVILON) atau Setara 6.00 Pcs 41,666.67 250,000.00
PVC dia 3 '' AW (INVILON) atau Setara 12.00 Pcs 30,000.00 360,000.00
PVC dia 2 '' AW (INVILON) atau Setara 6.00 Pcs 22,500.00 135,000.00
material bantu (Fitting & Accossories) 1.00 lot 150,000.00 150,000.00
Sub Total 6,350,000.00
II. Instalasi air tinja
PVC dia 4 '' 6.00 m' 41,666.67 250,000.00
Material bantu (Fitting & Accossories) 1.00 lot 150,000.00 150,000.00
Sub Total 400,000.00
III. Install Kabel Data
Instalasi 5.00 Ttk 150,000.00 750,000.00
Outlet 5.00 Ttk 150,000.00 750,000.00
Suply kabel dari server Office ke LAB (feeder) 0,4 x 60 Core 65.00 Pcs 150,000.00 9,750,000.00
Sub Total 11,250,000.00
Total Pekerjaan Mecanikal & Elektrical 46,435,000.00

TOTAL SELURUH PEKERJAAN 729,880,537.07


CLIENT : SAB SAS
PROJECT : KANTOR PT. TIRTA SAB SAS Banda Aceh
LOCATION : Banda Aceh, NAD - INDONESIA
Kode Proyek : 8502

Volume Satuan Satuan Harga Total Harga


No. DESCRIPTION
Rp Rp
IV. TRANNING
A. EARTH WORKS
Bowplank / Pengukuran 68.00 m' 19,300.00 1,312,400.00
Sub Total Pekerjaan Persiapan (A.) 1,312,400.00
B. STRUKTUR
B.1 PEKERJAAN TANAH
Pek. Galian pondasi dan sloof 77.75 m3 17,800.00 1,383,878.80
Pek. Urug Pasir di bawah pondasi dan Sloof t = 50mm 2.36 m3 96,450.00 227,573.78
Pek. Urug Pasir di bawah lantai t = 50mm 10.00 m3 96,450.00 964,500.00
Pek. Urug tanah kembali 77.75 m3 8,535.00 663,562.11
Pek. Timbunan tanah dibawah lantai 68.00 m3 54,450.00 3,702,600.00
Sub Total Pekerjaan Tanah 6,942,114.69

B.2 PEKERJAAN STRUKTUR


II Pekerjaan Pondasi
Pek. Lantai Kerja di bawah pondasi dan Sloof (beton 1:3:5) 2.55 m3 729,350.00 1,863,124.58
Pek. Lantai Kerja di bawah lantai (beton 1:3:5) 10.00 m3 729,350.00 7,293,500.00
Pek. Pondasi Menerus Pas. Batu kali 1:4 20.53 m3 516,940.00 10,614,716.73
Pek. Rolag 1.80 m2 143,900.00 259,020.00
Sub Total 20,030,361.30
II. Pekerjaan Sloof
Pek. Sloof uk. 15 x 15 cm
Beton Cor K-225 3.06 m3 868,100.00 2,654,432.78
Besi 650.69 kg 14,138.00 9,199,405.74
Bekisting 40.50 m3 112,800.00 4,568,400.00
Sub Total 16,422,238.51
III. Pekerjaan Kolom
Pek. Kolom Uk. 20 x 20 cm
Beton Cor K-225 1.76 m3 868,100.00 1,527,856.00
Besi 259.60 kg 14,138.00 3,670,224.80
Bekisting 35.20 m3 112,800.00 3,970,560.00
Pek. Kolom Praktis Uk. 15 x 15 cm
Beton Cor K-225 2.97 m3 868,100.00 2,578,257.00
Besi 636.64 kg 14,138.00 9,000,759.77
Bekisting 39.60 m3 112,800.00 4,466,880.00
Sub Total 25,214,537.57
IV. Pekerjaan Balok
Pek. Balok Canopy Uk. 20 x 40 cm
Beton Cor K-225 4.80 m3 868,100.00 4,166,880.00
Besi 801.60 kg 14,138.00 11,333,020.80
Bekisting 60.00 m2 112,800.00 6,768,000.00
Pek. Balok Uk. 15 x 25
Beton Cor K-225 0.68 m3 868,100.00 585,967.50
Besi 116.34 kg 14,138.00 1,644,761.90
Bekisting 11.70 m2 112,800.00 1,319,760.00
Pek. Ring Balok Uk. 15 x 30
Beton Cor K-225 2.84 m3 868,100.00 2,461,063.50
Besi 371.07 kg 14,138.00 5,246,187.66
Bekisting 37.80 m3 112,800.00 4,263,840.00
Pek. Ring Balok Uk. 15 x 20
Beton Cor K-225 2.45 m3 868,100.00 2,130,317.40
Besi 409.00 kg 14,138.00 5,782,442.00
Bekisting 32.72 m3 112,800.00 3,690,816.00
Sub Total 49,393,056.76
V. Pekerjaan Canopy
Beton Cor K-225 9.15 m3 868,100.00 7,938,774.50
Besi 1,575.04 kg 14,138.00 22,267,962.88
Bekisting 133.00 m3 112,800.00 15,002,400.00
Sub Total 45,209,137.38
VI. Plat Lantai
Beton Cor K-225 0.97 m3 868,100.00 841,188.90
Besi 115.50 kg 14,138.00 1,632,939.00
Bekisting 4.28 m3 112,800.00 482,220.00
Sub Total 2,956,347.90
Total Pekerjaan Struktur 159,225,679.42
CLIENT : SAB SAS
PROJECT : KANTOR PT. TIRTA SAB SAS Banda Aceh
LOCATION : Banda Aceh, NAD - INDONESIA
Kode Proyek : 8502

Volume Satuan Satuan Harga Total Harga


No. DESCRIPTION
Rp Rp
C. ARCHITECTURAL WORKS
I Pekerjaan Dinding
Pekerjaan Dinding & Pelapis Dinding
Pasangan 1/2 Bata (1 : 2) 105.98 m2 96,350.00 10,211,173.00
Pasangan 1/2 Bata (1 : 4) 307.73 m2 86,910.00 26,744,822.99
Plesteran Dinding (1 : 2) 211.96 m2 37,945.00 8,042,822.20
Plesteran Dinding (1 : 4) 537.34 m2 34,820.00 18,710,325.04
Dinding Partisi 9.96 m2 86,910.00 865,623.60
Acian Beton 567.34 m2 7,945.00 4,507,549.67
Batu Alam Susun Sirih 78.12 m2 119,910.00 9,366,889.56
Profil jendela & dinding 117.43 m3 185,000.00 21,725,290.00
Batu Kacang 1.80 m2 119,910.00 215,838.00
Sub Total 100,390,334.06
II. Pekerjaan Kusen
1 Pekerjaan Kusen, Pintu dan Jendela lengkap Assesoris
Pekerjaan Pintu
Pintu Type P2 (ex YKK Aluminium) 2.00 unit 600,000.00 1,200,000.00
Pintu Type P4 (ex YKK Aluminium) 3.00 unit 460,000.00 1,380,000.00
Pintu Type P5 (ex YKK Aluminium) 3.00 unit 450,000.00 1,350,000.00
Pintu Type P7 (ex YKK Aluminium) 2.00 unit 1,650,000.00 3,300,000.00
Pintu Type P9 (ex YKK Aluminium) 4.00 unit 900,000.00 3,600,000.00
Pekerjaan Jendela
Jendela Type J1 (ex YKK Aluminium) 11.00 unit 1,520,000.00 16,720,000.00
Jendela Type J2 (ex YKK Aluminium) 7.00 unit 3,160,000.00 22,120,000.00
Jendela Type J4 (ex YKK Aluminium) 5.00 unit 700,000.00 3,500,000.00
Sub Total 53,170,000.00
III. Pekerjaan Lantai
Pekerjaan Lantai & Keramik
Keramik Lantai Uk. 60 x 60 cm Ex.Roman atau Setara 66.00 m2 132,907.00 8,771,862.00
Keramik Lantai Uk. 40 x 40 cm Ex.Roman atau Setara 36.50 m2 122,907.00 4,486,105.50
Keramik Lantai Uk. 30 x 30 cm Ex.Roman atau Setara 9.38 m2 112,907.00 1,058,503.13
Keramik Lantai Uk. 20 x 20 cm Ex.Roman atau Setara 4.00 m2 102,907.00 411,628.00
Keramik Dinding KM Uk. 20 x 25 cm Ex Roman atau Setara 80.00 m2 115,877.00 9,270,160.00
Plint Keramik Uk. 10 x 60 cm Ex. Roman atau Setara 35.20 m' 42,210.00 1,485,792.00
Plint Keramik Uk. 10 x 40 cm Ex. Roman atau Setara 27.30 m' 42,377.00 1,156,892.10
Plint Keramik Uk. 10 x 30 cm Ex. Roman atau Setara 14.80 m' 42,210.00 624,708.00
Sub Total 27,265,650.73
IV. Pekerjaan Atap
Pekerjaan Atap
Ornamen tradisional Aceh 1.00 Ls 12,000,000.00 12,000,000.00
Kuda - kuda + rangka Atap Baja ringan Ex. Smart Truss atau Setara 306.00 m2 165,000.00 50,490,000.00
List plank Ragam Hias Aceh 71.30 m' 117,229.00 8,358,427.70
Penutup atap Genteng Metal Ex. Multi Roof atau Setara 306.00 m2 104,700.00 32,038,200.00
Rabung Metal Ex. Multi Roof atau Setara 23.50 m' 42,765.00 1,004,977.50
Sub Total 103,891,605.20
V. Pekerjaan Plafond
Pekerjaan Plafon
Plafond Gypsum Board 9 mm + Rangka Boral system (Ex Jaya Board) atau Setara 128.30 m2 134,125.00 17,208,237.50
List Plafon gypsum (Cornice) 10 cm Ex. Jaya Board atau Setara 95.00 m' 10,000.00 950,000.00
List Plafon gypsum (Cornice) 5 cm Ex. Jaya Board atau Setara 63.50 m' 7,000.00 444,500.00
Sub Total 18,602,737.50
VI. Pekerjaan Pengecatan
Pekerjaan Pengecatan
Cat Kosen Bee Brand atau Setara 113.47 m2 32,225.00 3,656,533.37
Cat Dinding Dulux atau Setara 567.34 m2 23,065.00 13,085,793.97
Cat Plafond Dulux atau Setara 128.30 m2 23,065.00 2,959,239.50
Cat List Plafond/ Cornice Dulux atau Setara 63.50 m' 23,065.00 1,464,627.50
Sub Total 21,166,194.34
CLIENT : SAB SAS
PROJECT : KANTOR PT. TIRTA SAB SAS Banda Aceh
LOCATION : Banda Aceh, NAD - INDONESIA
Kode Proyek : 8502

Volume Satuan Satuan Harga Total Harga


No. DESCRIPTION
Rp Rp
VII. Pekerjaan Sanitasi
Pekerjaan Sanitary
Kloset Jongkok Komplit Assesories Ex. TOTO atau Setara 2.00 unit 1,850,000.00 3,700,000.00
Kloset Duduk Komplit Assesories Ex. TOTO atau Setara 1.00 unit 250,000.00 250,000.00
Washtafel Toilet Komplit dengan Assesories Ex. TOTO atau Setara 6.00 unit 1,200,000.00 7,200,000.00
Meja Pantry beton dilapis keramik lengkap 1.00 unit 2,000,000.00 2,000,000.00
Urinal Ex. TOTO, atau Setara 2.00 unit 1,900,000.00 3,800,000.00
Tempat Sabun American Standard atau Setara 3.00 unit 145,000.00 435,000.00
Kran Air Ex. TOTO atau Setara 3.00 unit 195,000.00 585,000.00
Floor Drain Ex. TOTO atau Setara 3.00 unit 275,000.00 825,000.00
Sub Total 18,795,000.00
Total Pekerjaan Architectural 343,281,521.83
D. PEKERJAAN ELEKTRICAL & MECHANICAL
I. ELEKTRICAL
Panel / Distribution Board
Spesifikasi panel menggunakan steel plate dia 1,8 mm dan Cat coating powder
Include dengan Component MCCB/MCB Ex. MERLIN GERIN ,sesuai dengan 1.00 Unit 1,500,000.00 1,500,000.00
gambar tender
Distribution Board Tranning (DB - L & R)
Suplay Kabel Feeder 1.00 m' 100,000.00 100,000.00
Instalasi Penerangan & Stop kontak
Instalasi penerangan 55.00 Ttk 40,000.00 2,200,000.00
Instalasi stop kontak 13 A / IP 24.00 Ttk 30,000.00 720,000.00
ARMATUR LAMPU
RLMO/ M2 2 X 36 W / M2 Ex. METOSU atau Setara 12.00 Pcs 70,000.00 840,000.00
RD 4/ E 18 WATT ex. METUSO atau Setara 24.00 Pcs 55,000.00 1,320,000.00
RD 5/ E 23 WATT Ex.METUSO atau Setara 19.00 Pcs 70,000.00 1,330,000.00
Stop kontak 13 A / IP Ex.Clipsal atau Setara 24.00 Pcs 50,000.00 1,200,000.00
Saklar Tunggal Ex. Clipsal atau Setara 7.00 Pcs 20,000.00 140,000.00
Saklar Ganda Ex. Clipsal atau Setara 7.00 Pcs 25,000.00 175,000.00
Pengujian Instalasi Listrik (Comissioning Test) 1.00 Include 150,000.00 150,000.00
Sub Total 9,675,000.00
II. TELEPON
TERMINAL BOX 1.00 Unit 200,000.00 200,000.00
Suplay kaber Fedeer Telephone 0,6 x 20 Pore 55.00 m' 5,000.00 275,000.00
Instalasi kabel teleponberikut Conduit dia 20 mm lengkap Accessories Clipsal atau Setara 3.00 Ttk 120,000.00 360,000.00
Armatur
Outlet telepon (Clipsal) atau Setara 3.00 Pcs 250,000.00 750,000.00
Unit Pesawat telepon Extention (Indirect) 3.00 Unit 350,000.00 1,050,000.00
CommitioningTest 1.00 Include 150,000.00 150,000.00
Sub Total 2,785,000.00
III. AIR CONDITION
SPLIT WALL MOUNTED TYPE 3.00 unit 3,500,000.00 10,500,000.00
MS - C SERIES 2,5 PK (MITSUBISHI)
Install
- Cooper Pipe dia 5/8''
- Cooper Pipe dia 1/4 ''
- ARMAFLEX dia 5/8 '' 3.00 set 250,000.00 750,000.00
- ARMAFLEX dia 1/4 ''
- Drainse PVC dia 3/4 "
- Install kabel power AC
NYM 3 x 2,5 mm Plus Conduit dia 20 mm (Clipsal) berikut Fitting & Accessories 3.00 Ttk 250,000.00 750,000.00
- Install kabel Control wall mounted
NYM 3 x 1,5 mm Plus (Clipsal) 3.00 Ttk 200,000.00 600,000.00
Commitioning test 1.00 Include 250,000.00 250,000.00
Sub Total 12,850,000.00
CLIENT : SAB SAS
PROJECT : KANTOR PT. TIRTA SAB SAS Banda Aceh
LOCATION : Banda Aceh, NAD - INDONESIA
Kode Proyek : 8502

Volume Satuan Satuan Harga Total Harga


No. DESCRIPTION
Rp Rp
IV. PLUMBING
Instalasi air bersih
External
Spesifikasi material menggunakan PVC Class AW (INVILON) BERIKUT FITTING &
Accessories sesuai dengan Gambar tender
Installasi Pipa
PVC dia 1'' (INVILON) atau Setara 18.00 m' 10,833.33 195,000.00
PVC dia 3/4 '' (INVILON) atau Setara 44.00 m' 5,833.33 256,666.67
PVC dia 1/2 '' (INVILON) atau Setara 6.00 m' 25,000.00 150,000.00
material bantu (Fitting & Accossories) 1.00 Ls 150,000.00 150,000.00
Instalasi air kotor
PVC dia 3 '' AW (INVILON) atau Setara 14.00 m' 30,000.00 420,000.00
PVC dia 2 '' AW (INVILON) atau Setara 26.00 m' 22,500.00 585,000.00
material bantu (Fitting & Accossories) 1.00 Ls 150,000.00 150,000.00
Instalasi air tinja
PVC dia 4 '' AW (INVILON) atau Setara 16.00 m' 41,666.67 666,666.67
material bantu (Fitting & Accossories) 1.00 Ls 150,000.00 150,000.00
Commitioning test 1.00 Include 150,000.00 150,000.00
Sub Total 2,873,333.33
Install Kabel Data
Instalasi 3.00 Ttk 150,000.00 450,000.00
Outlet 3.00 Ttk 150,000.00 450,000.00
Suply kabel dari server Office ke LAB (feeder) 0,4 x 60 Core 55.00 Pcs 150,000.00 8,250,000.00
Sub Total 9,150,000.00
Total Pekerjaan Mecanikal & Elektrical 37,333,333.33

TOTAL SELURUH PEKERJAAN 548,095,049.27


CLIENT : SAB SAS
PROJECT : KANTOR PT. TIRTA SAB SAS Banda Aceh
LOCATION : Banda Aceh, NAD - INDONESIA
Kode Proyek : 8502

Volume Satuan Satuan Harga Total Harga


No. DESCRIPTION
Rp Rp
V. LANDSCAPING
1 SELASAR
A. EARTH WORKS
Bowplank / Pengukuran 88.00 m' 19,300.00 1,698,400.00
Sub Total Pekerjaan Persiapan 1,698,400.00
B. STRUKTUR
B.1 PEKERJAAN TANAH
Pek. Galian pondasi dan sloof 51.43 m3 17,800.00 915,365.00
Pek. Urug Pasir di bawah Pondasi t = 50 mm 3.72 m3 96,450.00 358,794.00
Pek. Urug Pasir di bawah lantai t = 50 mm 6.39 m3 96,450.00 616,315.50
Pek. Urugan tanah kembali 51.43 m3 8,535.00 438,912.38
Pek. Timbunan tanah dibawah lantai 35.44 m3 54,450.00 1,929,439.89
Sub Total Pek. Tanah 4,258,826.76
B.2 PEKERJAAN STRUKTUR
I. Pekerjaan Pondasi
Pek. Lantai Kerja di bawah pondasi dan Sloof (beton 1:3:5) t = 50 mm 3.72 m3 729,350.00 2,713,182.00
Pek. Lantai Kerja di bawah lantai (beton 1:3:5) t = 100 mm 18.65 m3 729,350.00 13,602,406.67
Pek. Pondasi Menerus Pas. Batu kali 1:4 13.45 m3 516,940.00 6,951,292.18
Sub Total 23,266,880.85
II. Pekerjaan Sloof
Pek. Sloof uk.15 x 15 cm
Beton Cam 1: 3 : 5 3.91 m3 729,350.00 2,851,758.50
Besi 499.20 kg 14,138.00 7,057,689.60
Bekisting 27.09 m2 112,800.00 3,055,752.00
Sub Total 12,965,200.10
III. Pekerjaan Kolom
Pek. Kolom Praktis Uk. 15 x 15 cm
Beton Cam 1: 3 : 5 2.15 m3 729,350.00 1,565,549.78
Besi 496.08 kg 14,138.00 7,013,579.04
Bekisting 64.26 m2 112,800.00 7,248,528.00
Sub Total 15,827,656.82
IV. Pekerjaan Ring balok
Pek. Ring balok Uk. 10 x 15 cm
Beton Cam 1: 3 : 5 1.44 m3 729,350.00 1,053,546.08
Besi 492.48 kg 14,138.00 6,962,682.24
Bekisting 7.14 m2 112,800.00 805,392.00
Sub Total 8,821,620.32
Total Pekerjaan Struktur 60,881,358.08
C. ARCHITECTURAL WORKS
I. Pekerjaan dinding
Pek. Pasangan 1/2 bata 1:2 136.72 m2 96,350.00 13,173,309.23
Plesteran (1 ; 2) 136.81 m2 37,945.00 5,191,388.26
Pasangan Batu Mangga 100.80 m2 89,910.00 9,062,928.00
Pasangan Batu Kacang 29.70 m2 119,910.00 3,561,327.00
Acian 44.11 m2 7,945.00 350,481.76
Sub Total 31,339,434.24
II. Pekerjaan Lantai
Pekerjaan Lantai
Batu kali yang di pipihkan 186.50 m2 121,350.00 22,631,823.54
Sub Total 22,631,823.54
III. Pekerjaan Atap
Pekerjaan Atap
Kuda - kuda + rangka Atap Baja ringan Ex. Smart Truss atau Setara 124.94 m2 165,000.00 20,615,782.44
List plank Ragam Hias Aceh 110.35 m' 117,229.00 12,936,220.15
Penutup atap Genteng Metal Ex. Multi Roof atau Setara 124.94 m2 104,700.00 13,081,651.04
Rabung Metal Ex. Multi Roof atau Setara 40.50 m' 42,765.00 1,732,153.56
Kayu lambersering 4.10 m2 125,000.00 512,350.00
Sub Total 48,878,157.19
IV. Pekerjaan Pengecatan
Cat Dinding 44.11 m2 23,065.00 1,017,477.88
Sub Total 1,017,477.88
Total Pekerjaan Architectural 103,866,892.85
TOTAL PEKERJAAN SELASAR 170,705,477.69
CLIENT : SAB SAS
PROJECT : KANTOR PT. TIRTA SAB SAS Banda Aceh
LOCATION : Banda Aceh, NAD - INDONESIA
Kode Proyek : 8502

Volume Satuan Satuan Harga Total Harga


No. DESCRIPTION
Rp Rp
2 SECURITY
A. EARTH WORKS
Bowplank / Pengukuran 16.70 m' 19,300.00 322,310.00
Sub Total Pekerjaan Persiapan 322,310.00
B. STRUKTUR
B.1 PEKERJAAN TANAH
Pek. Galian pondasi dan sloof 3.33 m3 17,800.00 59,315.65
Pek. Urug Pasir di bawah pondasi t = 50 mm 0.22 m3 96,450.00 21,545.00
Pek. Urug Pasir di bawah lantai t = 50 mm 0.21 m3 96,450.00 20,616.19
Pek. Urugan tanah kembali 3.33 m3 8,535.00 28,441.52
Pek. Timbunan tanah dibawah lantai 0.41 m3 54,450.00 22,052.25
Sub Total Pek. Tanah 151,970.61
B.2 PEKERJAAN STRUKTUR
I. Pekerjaan Pondasi
Pek. Lantai Kerja di bawah pondasi dan Sloof (beton 1:3:5) 0.23 m3 729,350.00 171,105.51
Pek. Lantai Kerja di bawah lantai (beton 1:3:5) 0.21 m3 729,350.00 155,898.56
Pek. Pondasi Menerus Pas. Batu kali 1:4 0.77 m3 516,940.00 395,459.10
Pek. Rolag 1.49 m2 143,900.00 213,691.50
Sub Total 936,154.67
II. Pekerjaan Sloof
Pek. Sloof uk.15 x 15 cm
Beton Cam 1: 3 : 5 0.23 m3 729,350.00 167,385.83
Besi 49.16 kg 14,138.00 695,080.63
Bekisting 3.06 m2 112,800.00 345,168.00
Sub Total 1,207,634.46
III. Pekerjaan Kolom
Pek. Kolom Praktis Uk. 15 x 15 cm
Beton Cam 1: 3 : 5 0.36 m3 729,350.00 265,848.08
Besi 92.16 kg 14,138.00 1,302,958.08
Bekisting 4.86 m2 112,800.00 548,208.00
Sub Total 2,117,014.16
IV. Pekerjaan Ring balok
Pek. Ring balok Uk. 15 x 15 cm
Beton Cam 1: 3 : 5 0.23 m3 729,350.00 167,385.83
Besi 53.04 kg 14,138.00 749,879.52
Bekisting 3.06 m2 112,800.00 345,168.00
Sub Total 1,262,433.35
Total Pekerjaan Struktur 5,523,236.63
C. ARCHITECTURAL WORKS
I. Pekerjaan dinding
Pek. Pasangan 1/2 bata 1:4 14.18 m2 86,910.00 1,232,644.53
Plesteran Dinding (1 : 4) 14.18 m2 34,820.00 493,852.06
Pasangan Lovers 1.76 m2 89,910.00 158,241.60
Acian 16.38 m2 7,945.00 130,131.16
Sub Total 2,014,869.35
II. Pekerjaan Lantai
Pekerjaan Lantai
Keramik lantai Uk.30 x 30 cm Ex. TOTO atau Setara 4.68 m2 112,907.00 528,404.76
Sub Total 528,404.76
III. Pekerjaan Jendela
Pekerjaan Jendela
J1 3.00 bh 1,520,000.00 4,560,000.00
J2 3.00 bh 3,160,000.00 9,480,000.00
Sub Total 14,040,000.00
IV. Pekerjaan Atap
Pekerjaan Atap
Kuda - kuda + rangka Atap Baja ringan Ex. Smart Truss atau Setara 13.50 m2 165,000.00 2,227,500.00
List plank Ragam Hias Aceh 15.00 m' 117,229.00 1,758,435.00
Penutup atap Genteng Metal Ex. Multi Roof atau Setara 13.50 m2 104,700.00 1,413,450.00
Rabung Metal Ex. Multi Roof atau Setara 1.80 m' 42,765.00 76,977.00
Sub Total 5,476,362.00
CLIENT : SAB SAS
PROJECT : KANTOR PT. TIRTA SAB SAS Banda Aceh
LOCATION : Banda Aceh, NAD - INDONESIA
Kode Proyek : 8502

Volume Satuan Satuan Harga Total Harga


No. DESCRIPTION
Rp Rp
V. Pekerjaan Plafond
Pekerjaan Plafon
Plafond Gypsum Board 9 mm + Rangka Boral system (Ex Jaya Board) atau Setara 13.34 m2 134,125.00 1,789,227.50
List Plafon gypsum (Cornice) 10 cm Ex. Jaya Board atau Setara 20.40 m' 10,000.00 204,000.00
Sub Total 1,993,227.50
VI. Pekerjaan Pengecatan
Cat Dinding Dulux atau Setara 16.38 m2 23,065.00 377,781.64
Cat Plafond Dulux atau Setara 13.34 m2 23,065.00 307,687.10
Cat List Plafond/ Cornice Dulux atau Setara 20.40 m2 23,065.00 470,526.00
Sub Total 1,155,994.74
Total Pekerjaan Architectural 25,208,858.34
TOTAL PEKERJAAN SECURITY 31,206,375.58

3 BANGSAL
PEKERJAAN TANAH
Pasangan Bowplank 29.80 m1 19,300.00 575,140.00
Pek. Galian pondasi dan sloof 7.12 m3 17,800.00 126,772.67
Pek. Urug Pasir di bawah pondasi t = 50 mm 0.48 m3 96,450.00 46,047.16
Pek. Urug Pasir di bawah lantai t = 50 mm 1.44 m3 96,450.00 138,417.81
Timbunan untuk Peninggian Lantai 2.87 m3 54,450.00 156,285.11
Pek. Urugan tanah kembali 7.12 m3 8,535.00 60,786.78
Sub Total Pek. Tanah 1,103,449.53
F.2 PEKERJAAN STRUKTUR
I. Pekerjaan Pondasi
Pek. Lantai Kerja di bawah pondasi dan Sloof (beton 1:3:5) 0.50 m3 729,350.00 365,696.09
Pek. Lantai Kerja di bawah Lantai (beton 1:3:5) 1.44 m3 729,350.00 1,046,708.42
Pek. Pondasi Menerus Pas. Batu kali 1:4 1.64 m3 516,940.00 845,196.90
Pasangan Rolag 0.67 m3 143,900.00 95,693.50
Sub Total 2,353,294.91
II. Pekerjaan Sloof
Pek. Sloof uk.15 x 15 cm
Beton Cam 1: 3 : 5 0.49 m3 729,350.00 357,746.18
Besi 113.36 kg 14,138.00 1,602,683.68
Bekisting 6.54 m2 112,800.00 737,712.00
Sub Total 2,698,141.86
III. Pekerjaan Kolom
Pek. Kolom Praktis Uk. 15 x 15 cm
Beton Cam 1: 3 : 5 0.28 m3 729,350.00 204,218.00
Besi 62.40 kg 14,138.00 882,211.20
Bekisting 3.60 m2 112,800.00 406,080.00
Sub Total 1,492,509.20
III. Pekerjaan Ring Balok
Pek. Kolom Praktis Uk. 15 x 15 cm
Beton Cam 1: 3 : 5 0.49 m3 729,350.00 357,746.18
Besi 62.40 kg 14,138.00 882,211.20
Bekisting 6.54 m2 112,800.00 737,712.00
Sub Total 1,977,669.38
IV. Pekerjaan Lantai
Lantai Keramik 30 x 30 cm 30.14 m2 112,907.00 3,403,299.25
Sub Total 3,403,299.25
IV. Pekerjaan Dinding
Pasangan Bata 1 : 4 0.90 m2 86,910.00 78,219.00
Plesteran 1 : 4 1.80 m2 34,820.00 62,676.00
Acian 9.00 m2 7,945.00 71,505.00
Sub Total 212,400.00
IV. Pekerjaan Atap
Pekerjaan Atap
Kuda - kuda + rangka Atap Baja ringan Ex. Smart Truss atau Setara 52.90 m2 165,000.00 8,728,500.00
List plank Ragam Hias Aceh 29.00 m' 117,229.00 3,399,641.00
Penutup atap Genteng Metal Ex. Multi Roof atau Setara 8.00 m2 104,700.00 837,600.00
Rabung Metal Ex. Multi Roof atau Setara 52.90 m' 42,765.00 2,262,268.50
Sub Total 15,228,009.50
Total Pekerjaan Struktur 27,365,324.09
TOTAL PEKERJAAN BANGSAL 28,468,773.61
CLIENT : SAB SAS
PROJECT : KANTOR PT. TIRTA SAB SAS Banda Aceh
LOCATION : Banda Aceh, NAD - INDONESIA
Kode Proyek : 8502

Volume Satuan Satuan Harga Total Harga


No. DESCRIPTION
Rp Rp
4 PAGAR
PEKERJAAN TANAH
Pek. Galian pondasi dan sloof 88.03 m3 17,800.00 1,566,845.00
Pek. Urug Pasir di bawah pondasi t = 50 mm 6.29 m3 96,450.00 606,429.38
Pek. Urugan tanah kembali 88.03 m3 8,535.00 751,293.38
Sub Total Pek. Tanah 2,924,567.75
F.2 PEKERJAAN STRUKTUR
I. Pekerjaan Pondasi
Pek. Lantai Kerja di bawah pondasi dan Sloof (beton 1:3:5) 6.29 m3 729,350.00 4,585,788.13
Pek. Pondasi Menerus Pas. Batu kali 1:4 56.59 m3 516,940.00 29,252,342.25
Sub Total 33,838,130.38
II. Pekerjaan Sloof
Pek. Sloof uk.15 x 15 cm
Beton Cam 1: 3 : 5 5.66 m3 729,350.00 4,127,209.31
Besi 1,290.20 kg 14,138.00 18,240,776.91
Bekisting 75.45 m2 112,800.00 8,510,760.00
Sub Total 30,878,746.22
III. Pekerjaan Kolom
Pek. Kolom Praktis Uk. 15 x 20 cm
Beton Cam 1: 3 : 5 2.20 m3 729,350.00 1,604,570.00
Besi 351.00 kg 14,138.00 4,962,438.00
Bekisting 47.25 m2 112,800.00 5,329,800.00
Sub Total 11,896,808.00
IV. Pekerjaan Dinding dan Pelapis dinding
Pasangan 1/2 bata (1 : 2) 366.35 m2 96,350.00 35,297,822.50
Plesteran dinding (1 : 2) 687.68 m2 37,945.00 26,093,827.88
Pasangan Batu Alam (Palimanan) 60.15 m2 119,910.00 7,211,986.95
Pasangan Batu Alam (Susun sirih) 6.48 m2 119,910.00 777,016.80
Pasangan Batu Kacang 10.00 m2 119,910.00 1,199,100.00
List Profil 1.51 m3 89,910.00 135,764.10
Pagar Hollow 23.05 m2 110,000.00 2,535,500.00
Sub Total 73,251,018.23
Total Pekerjaan Struktur 149,864,702.82
TOTAL PEKERJAAN PAGAR 152,789,270.57
5 LAMPU TAMAN
Instalasi Lampu Jalan
- NYFGBY 4 X 4 mm (Supreme) 335.00 m' 40,000.00 13,400,000.00
- NYFGBY 3X 4 mm (Supreme) 38.00 m' 27,000.00 1,026,000.00
- NYFGBY 2 X 4 mm (Supreme) 70.00 m' 17,000.00 1,190,000.00
- NYFGBY 3 X 2.5 mm (Supreme) 102.00 m' 17,000.00 1,734,000.00
Pondasi Tiang Lampu Jalan 6.00 m' 500,000.00 3,000,000.00
Pondasi Tiang Lampu Taman 9.00 m' 500,000.00 4,500,000.00
Galian Kabel berikut Pengurangan 258.00 m' 8,900.00 2,296,200.00
ARMATUR
- Lampu Jalan Type Hamburg S828/ Son - T 400 W Hannocw\s 8.00 Unit 7,000,000.00 56,000,000.00
include tiang lampu tinggi 9 mtr segi delapan oktagonal Galvanis
- Lampu Taman yang disesuaikan oelh Pihak Owner dengan Budgat 10.00 Unit 350,000.00 3,500,000.00
Pengujian Instalasi Listrik (Comissionint Test) 1.00 Include 150,000.00 150,000.00
TOTAL PEKERAAN LAMPU TAMAN 86,796,200.00
6 JALAN & DRAINAGE
JALAN
Pemasangan Paving Block
Pemadatan Permukaan Yang akan di timbun (Compacted Dry Density) 1,010.41 m2 2,000.00 2,020,816.80
Pasir Sirtu 151.56 m3 132,450.00 20,074,288.89
Pasir Urug 7.58 m3 96,450.00 730,904.18
Batu Pecah dipadatkan 37.89 m3 220,000.00 8,335,869.30
Paving Block Setara Beton K 300 1,010.41 m2 70,000.00 70,728,588.00
Kansteen Setara Beton K 300 266.00 m' 70,000.00 18,620,000.00
120,510,467.16
CLIENT : SAB SAS
PROJECT : KANTOR PT. TIRTA SAB SAS Banda Aceh
LOCATION : Banda Aceh, NAD - INDONESIA
Kode Proyek : 8502

Volume Satuan Satuan Harga Total Harga


No. DESCRIPTION
Rp Rp

DRAINAGE
TYPE - A
Galian Pondasi 112.10 m3 17,800.00 1,995,380.00
Pasir Urug 6.91 m3 96,450.00 666,469.50
Lantai Kerja 6.91 m3 729,350.00 5,039,808.50
Urugan Tanah 112.10 m3 54,450.00 6,103,845.00
Pasangan 1/2 Bata (1 : 4) 228.00 m2 86,910.00 19,815,480.00
Pesteran (1 : 4) 252.40 m2 34,820.00 8,788,568.00
42,409,551.00
TYPE - B
Galian Pondasi 69.00 m3 17,800.00 1,228,200.00
Pasir Urug 5.72 m3 96,450.00 551,694.00
Lantai Kerja 5.72 m3 729,350.00 4,171,882.00
Urugan Tanah 69.00 m3 54,450.00 3,757,050.00
Pasangan 1/2 Bata (1 : 4) 163.30 m2 86,910.00 14,192,403.00
Pesteran (1 : 4) 212.30 m2 34,820.00 7,392,286.00
31,293,515.00
TYPE - C
Galian Pondasi 11.05 m3 17,800.00 196,690.00
Pasir Urug 0.91 m3 96,450.00 87,769.50
Lantai Kerja 0.91 m3 729,350.00 663,708.50
Urugan Tanah 11.05 m3 54,450.00 601,672.50
Beton Cor K225 9.36 m2 868,100.00 8,125,416.00
Besi 1,731.60 m2 14,138.00 24,481,360.80
Bekisting 36.4 m3 112,800.00 4,105,920.00

38,262,537.30
TOTAL PEKERAAN JALAN & DRAINAGE 232,476,070.46
7 GENSET
PANEL & FIDER untuk semua Genset
PANEL PSD / AMF System 1.00 Unit 1,000,000.00 1,000,000.00
Instalasi Lampu & Stop Kontak
Instalasi Lampu 5.00 Titik 40,000.00 200,000.00
Instalasi Stop Kontak 1.00 Titik 30,000.00 30,000.00
ARMATUR
RT 1 x 36 W 1.00 Pcs 60,000.00 60,000.00
DRM dia 4 " / E 18 W 4.00 Pcs 55,000.00 220,000.00
Receptacle 1P/13 A 1.00 Pcs 50,000.00 50,000.00
SUPLAY KABEL FIDER
Dari KWh ke SDp
- Nyy 4 x 50 mm 30.00 mtr 4,000.00 120,000.00
Dari SDP ke Office
- Nyy 4 x 35 mm 63.00 mtr 3,500.00 220,500.00
- BC Drat 10 mm 63.00 mtr 3,000.00 189,000.00
Dari SDP ke LAB
- Nyy 4 x 16 mm 30.00 mtr 2,800.00 84,000.00
- BC Drat 10 mm 30.00 mtr 3,000.00 90,000.00
Dari DB. LAB ke 0.00 -
Guard House 34.00 mtr 2,500.00 85,000.00
NFGBY 4 x 4 mm
GROUNDING SYSTEM
- Cooper Root (Tembok Tembaga)
- Pipa Galvanize dia 20 mm
- Box Control dengan terminal (Panel Box) 1.00 Lot 1,500,000.00 1,500,000.00
- Box Control pada titik Pengeboran dengan pasangan bata
- BC Drat 16 mm dari titik ke SDP
TOTAL PEKERJAAN GENSET 3,848,500.00
DAFTAR UPAH DAN BAHAN
A. UPAH
HARGA
NO. JENIS PEKERJA SATUAN KET.
(Rp.)
1 Pekerja OH 40,000.00
2 Tukang OH 48,000.00
3 Kepala Tukang OH 55,000.00
4 Mandor OH 45,000.00
Instalasi Penerangan Titik 40,000.00
Instalasi Stop Kontak 1P/ 13 A Titik 30,000.00

B. BAHAN
HARGA
NO. JENIS BARANG SATUAN KET.
(Rp.)

a. Bahan Galian
Batu Pecah 1 - 2 cm (Stone Crusher) M3 165,000.00 Stone Crusher
Batu Pecah 2 - 3 cm (Stone Crusher) M3 140,000.00 Stone Crusher
Batu Pecah 1 - 2 cm M3 200,000.00
Pasir Pasang M 3
90,000.00
Pasir Urug M3 70,000.00
Sirtu Darat M3 100,000.00
Tanah Timbun M 3
35,000.00
Batu Kali/Gunung M 3
100,000.00

Batu Lainnya
1 Batu Bata :
Batu bata kecil Bh 450.00
7 Paving Blok Bh 70,000.00
8 Lobang Angin Semen uk. 15 x 15 cm Bh 10,000.00

b. Bahan Adukan
1 Semen putih 50 Kg Zak 115,000.00
2 Portland Semen (PC) 40 Kg Zak 41,000.00

c. Bahan Atap
3 Genteng :
Genteng Metal tebal 0,3 mm ( Multi Roof) M2 52,000.00
Rabung Genteng Metal (Multi Roof) m' 30,000.00
Rangka Kuda-kuda ( Smart Truss) M2 165,000.00
DAFTAR UPAH DAN BAHAN
A. UPAH
HARGA
NO. JENIS PEKERJA SATUAN KET.
(Rp.)
1 Pekerja OH 40,000.00
2 Tukang OH 48,000.00
d. Bahan Plafon dan Besi Hollow
Gipsum:
- Gipsum t = 9 mm (Jaya Board) Lbr 130,000.00
- Rangka Hollow Lbr 110,000.00
- Tepung Gipsum Zak/15 Kg 95,000.00
- Kasa Gipsum Gulung 15,000.00
- List Plafond (jaya Board) m' 10,000.00
e. Bahan Pabrikasi
Besi
Besi Tulangan Polos : Kg 12,000.00
Besi Tulangan Ulir : Kg 15,000.00
Baja Propil :
Kawat :
Kawat beton Kg 14,000.00
Paku biasa Kg 14,000.00
Keramik :
Keramik 60x60 cm Kotak 70,000.00
Keramik 40x40 cm Kotak 60,000.00
Keramik 30x30 cm Kotak 50,000.00
Keramik 20x20 cm Kotak 40,000.00
Keramik 20x25 cm Kotak 40,000.00
Bonbon Keramik m' 10,000.00
Plin Keramik 10 x 30 cm Bh 2,500.00
Plin Keramik 10 x 40 cm Bh 4,000.00
Plin Keramik 10 x 60 cm Bh 5,000.00
6 Bahan Listrik
RLMO 2 X 36 W / M2 (METOSU) Pcs 70,000.00
RT 1 X 36 (METOSU) Pcs 60,000.00
GSM 2 X 36 W (Metosu) Pcs 70,000.00
DRMH . HAL 50 W Pcs 80,000.00
DRM dia 4'' / E18 W Pcs 55,000.00
DRM dia 5'' / E 23 W Pcs 70,000.00
ROSSET E 18 W Pcs 25,000.00
DECORATIVE LAMP Pcs 110,000.00
RECEPTACLE 13 A / 1P (Clipsal) Pcs 50,000.00
Switch 1 Gang Clipsal Pcs 20,000.00
Switch 2 Gang Clipsal Pcs 25,000.00
Switch 3 Gang Clipsal Pcs 30,000.00
DAFTAR UPAH DAN BAHAN
A. UPAH
HARGA
NO. JENIS PEKERJA SATUAN KET.
(Rp.)
1 Pekerja OH 40,000.00
2 Tukang OH 48,000.00
Instalasi Penerangan Titik 40,000.00
Instalasi Stop Kontak 1P/ 13 A Titik 30,000.00
f. Bahan Pipa
NYFGBY 4 X 4 mm (Supreme) m' 3,000.00
NYFGBY 3 X 4 mm (Supreme) m' 2,500.00
NYFGBY 2 X 4 mm (Supreme) m' 2,000.00
NYFGBY 3 X 2.5 mm (Supreme) m' 1,700.00
Telephon
Pesawat Telephon Type Kx. (Direct) Pcs 400,000.00
Pesawat Telephon Type Kx. (Indirect) Pcs 350,000.00

f. Bahan Pipa
1 PVC dia 1'' (INVILON) Btg / 6 m' 65,000.00
PVC dia 3/4 '' (INVILON) Btg / 6 m' 35,000.00
PVC dia 1/2 '' (INVILON) Btg / 6 m' 25,000.00
PVC dia 4 '' AW (INVILON) Btg / 6 m' 250,000.00
PVC dia 3 '' AW (INVILON) Btg / 6 m' 180,000.00
PVC dia 2 '' AW (INVILON) Btg / 6 m' 135,000.00
Bahan Kayu
Kayu Damar Laut M3 4,800,000.00
Kayu Sembarang Keras M 3
1,800,000.00
List Plank M' 100,000.00
Play Wood Lbr 125,000.00
Bahan Cair
Cat Menie Besi Kg 18,000.00
Cat Minyak Kg 40,000.00
Cat Tembok dasar Dulux Kg 12,000.00
Cat Tembok Dalam Dulux Kg 12,000.00
Cat Tembok Luar Dulux Kg 12,000.00
Dempul Cat Kg 13,000.00
Kertas Amplas Lbr 4,000.00

l. Bahan Lainnya
1 Alat Perlengkapan Pipa :
Kran Tape Unit 195,000.00
Closet Jongkok TOTO Unit 250,000.00
Closet Duduk TOTO Set 1,850,000.00
Wastafel TOTO Set 1,200,000.00
Floor Drain TOTO Unit 275,000.00
DAFTAR ANALISA HARGA SATUAN

SK-SNI-T-01-02 1 M' Pengukuran dan Pemasangan Bowplank


0.004 M³ Kayu Rangka Bowplank @ Rp 1,800,000.00 Rp 7,200.00
0.004 M³ Papan Bowplank @ Rp 1,800,000.00 Rp 7,200.00
0.050 Orang Pekerja @ Rp 40,000.00 Rp 2,000.00
0.005 Orang Kepala Tukang @ Rp 55,000.00 Rp 275.00
0.005 Orang Mandor @ Rp 45,000.00 Rp 225.00
0.050 Orang Tukang @ Rp 48,000.00 Rp 2,400.00
Jumlah Rp 19,300.00
Dibulatkan Rp 19,300.00

SK-SNI-T-01-03 1 M³ Galian Tanah Biasa


0.040 Orang Mandor @ Rp 45,000.00 Rp 1,800.00
0.400 Orang Pekerja @ Rp 40,000.00 Rp 16,000.00
Jumlah Rp 17,800.00
Dibulatkan Rp 17,800.00

SK-SNI-T-01-04 1 M³ Timbunan Kembali Tanah Bekas Galian


0.019 Orang Mandor @ Rp 45,000.00 Rp 855.00
0.192 Orang Pekerja @ Rp 40,000.00 Rp 7,680.00
Jumlah Rp 8,535.00
Dibulatkan Rp 8,535.00

Anl. A. 18 1 M³ Pasir Urug


1.200 M³ Pasir Urug @ Rp 70,000.00 Rp 84,000.00
0.300 Orang Pekerja @ Rp 40,000.00 Rp 12,000.00
0.010 Orang Mandor @ Rp 45,000.00 Rp 450.00
Jumlah Rp 96,450.00
Dibulatkan Rp 96,450.00

Anl. A. 18a 1 M³ Tanah Urug


1.200 M³ Tanah Urug @ Rp 35,000.00 Rp 42,000.00
0.300 Orang Pekerja @ Rp 40,000.00 Rp 12,000.00
0.010 Orang Mandor @ Rp 45,000.00 Rp 450.00
Jumlah Rp 54,450.00
Dibulatkan Rp 54,450.00

Anl. A. 18b 1 M³ Sirtu


1.200 M³ Sirtu @ Rp 100,000.00 Rp 120,000.00
0.300 Orang Pekerja @ Rp 40,000.00 Rp 12,000.00
0.010 Orang Mandor @ Rp 45,000.00 Rp 450.00
Jumlah Rp 132,450.00
Dibulatkan Rp 132,450.00

Anl. G.2 1 M³ Pasangan Batu Kosong


1.200 M³ Batu kali/Batu gunung @ Rp 100,000.00 Rp 120,000.00
1.500 Orang Pekerja @ Rp 40,000.00 Rp 60,000.00
1.075 Orang Mandor @ Rp 45,000.00 Rp 48,375.00
Jumlah Rp 228,375.00
Dibulatkan Rp 228,375.00

Anl. G.32h 1 M³ Pasangan Pondasi Menerus


1.200 M³ Batu kali/Batu gunung @ Rp 100,000.00 Rp 120,000.00
0.522 M³ Pasir Pasangan @ Rp 90,000.00 Rp 46,980.00
3.260 Zak Semen @ Rp 41,000.00 Rp 133,660.00
3.600 Orang Pekerja @ Rp 40,000.00 Rp 144,000.00
0.120 Orang Kepala Tukang @ Rp 55,000.00 Rp 6,600.00
0.180 Orang Mandor @ Rp 45,000.00 Rp 8,100.00
1.200 Orang Tukang @ Rp 48,000.00 Rp 57,600.00
Jumlah Rp 516,940.00
Dibulatkan Rp 516,940.00
SK-SNI-T-03-01 1 M² Pasangan Bata 1 Pc : 2 Ps
0.480 Orang Pekerja @ Rp 40,000.00 Rp 19,200.00
0.016 Orang Kepala Tukang @ Rp 55,000.00 Rp 880.00
0.048 Orang Mandor @ Rp 45,000.00 Rp 2,160.00
0.160 Orang Tukang @ Rp 48,000.00 Rp 7,680.00
80.000 Buah Batu Bata @ Rp 450.00 Rp 36,000.00
0.042 M³ Pasir Pasangan @ Rp 90,000.00 Rp 3,780.00
0.650 Zak Semen @ Rp 41,000.00 Rp 26,650.00
Jumlah Rp 96,350.00
Dibulatkan Rp 96,350.00

SK-SNI-T-03-02 1 M² Pasangan Bata 1 Pc : 4 Ps


0.480 Orang Pekerja @ Rp 40,000.00 Rp 19,200.00
0.016 Orang Kepala Tukang @ Rp 55,000.00 Rp 880.00
0.048 Orang Mandor @ Rp 45,000.00 Rp 2,160.00
0.160 Orang Tukang @ Rp 48,000.00 Rp 7,680.00
80.000 Buah Batu Bata @ Rp 450.00 Rp 36,000.00
0.051 M³ Pasir Pasangan @ Rp 90,000.00 Rp 4,590.00
0.400 Zak Semen @ Rp 41,000.00 Rp 16,400.00
Jumlah Rp 86,910.00
Dibulatkan Rp 86,910.00

SK-SNI-T-03-03 1 M² Pasangan 1 Bata 1 Pc : 2 Ps


0.480 Orang Pekerja @ Rp 40,000.00 Rp 19,200.00
0.016 Orang Kepala Tukang @ Rp 55,000.00 Rp 880.00
0.048 Orang Mandor @ Rp 45,000.00 Rp 2,160.00
0.160 Orang Tukang @ Rp 48,000.00 Rp 7,680.00
160.000 Buah Batu Bata @ Rp 450.00 Rp 72,000.00
0.102 M³ Pasir Pasangan @ Rp 90,000.00 Rp 9,180.00
0.800 Zak Semen @ Rp 41,000.00 Rp 32,800.00
Jumlah Rp 143,900.00
Dibulatkan Rp 143,900.00

Anl. G.50h 1 M² Plesteran 1 Pc : 2 Ps


0.400 Orang Pekerja @ Rp 40,000.00 Rp 16,000.00
0.020 Orang Kepala Tukang @ Rp 55,000.00 Rp 1,100.00
0.020 Orang Mandor @ Rp 45,000.00 Rp 900.00
0.200 Orang Tukang @ Rp 48,000.00 Rp 9,600.00
0.017 M³ Pasir Pasangan @ Rp 90,000.00 Rp 1,530.00
0.215 Zak Semen @ Rp 41,000.00 Rp 8,815.00
Jumlah Rp 37,945.00
Dibulatkan Rp 37,945.00

Anl. G.50q 1 M² Plesteran 1 Pc : 4 Ps


0.400 Orang Pekerja @ Rp 40,000.00 Rp 16,000.00
0.020 Orang Kepala Tukang @ Rp 55,000.00 Rp 1,100.00
0.020 Orang Mandor @ Rp 45,000.00 Rp 900.00
0.200 Orang Tukang @ Rp 48,000.00 Rp 9,600.00
0.021 M³ Pasir Pasangan @ Rp 90,000.00 Rp 1,890.00
0.130 Zak Semen @ Rp 41,000.00 Rp 5,330.00
Jumlah Rp 34,820.00
Dibulatkan Rp 34,820.00

Anl. G.16 1 M³ Perekat 1 : 3


1.080 M³ Pasir Pasangan @ Rp 90,000.00 Rp 97,200.00
9.000 Zak Semen @ Rp 41,000.00 Rp 369,000.00
Jumlah Rp 466,200.00
Dibulatkan Rp 466,200.00

Supl. III c 1 M² Lantai Keramik 20 x 20 cm


1.000 M² Keramik 20 x 20 cm @ Rp 40,000.00 Rp 40,000.00
0.020 Zak Semen Putih @ Rp 115,000.00 Rp 2,300.00
Jumlah (b) Rp 42,300.00

Perekat + Upah Pekerja


0.030 M³ Perekat (Anl. G.16) @ Rp 466,200.00 Rp 13,986.00
0.500 Orang Pekerja @ Rp 40,000.00 Rp 20,000.00
0.025 Orang Kepala Tukang @ Rp 55,000.00 Rp 1,375.00
0.025 Orang Mandor @ Rp 45,000.00 Rp 1,125.00
0.250 Orang Tukang @ Rp 48,000.00 Rp 12,000.00
Jumlah Rp 48,486.00
Diambil 1,25 x Perekat + Upah Pekerja Jumlah (a) Rp 60,607.50
Jumlah (b) + (a) Rp 102,907.50
Dibulatkan Rp 102,907.00
Supl. III c 1 M² Lantai Keramik 30 x 30 cm
1.000 M² Keramik 30 x 30 cm @ Rp 50,000.00 Rp 50,000.00
0.020 Zak Semen Putih @ Rp 115,000.00 Rp 2,300.00
Jumlah (b) Rp 52,300.00

Perekat + Upah Pekerja


0.030 M³ Perekat (Anl. G.16) @ Rp 466,200.00 Rp 13,986.00
0.500 Orang Pekerja @ Rp 40,000.00 Rp 20,000.00
0.025 Orang Kepala Tukang @ Rp 55,000.00 Rp 1,375.00
0.025 Orang Mandor @ Rp 45,000.00 Rp 1,125.00
0.250 Orang Tukang @ Rp 48,000.00 Rp 12,000.00
Jumlah Rp 48,486.00
Diambil 1,25 x Perekat + Upah Pekerja Jumlah (a) Rp 60,607.50
Jumlah (b) + (a) Rp 112,907.50
Dibulatkan Rp 112,907.00

Supl. III f 1 M² Lantai Keramik 40 x 40 cm


1.000 M² Keramik 40 x 40 cm @ Rp 60,000.00 Rp 60,000.00
0.020 Zak Semen Putih @ Rp 115,000.00 Rp 2,300.00
Jumlah (b) Rp 62,300.00

Perekat + Upah Pekerja


0.030 M³ Perekat (Anl. G.16) @ Rp 466,200.00 Rp 13,986.00
0.500 Orang Pekerja @ Rp 40,000.00 Rp 20,000.00
0.025 Orang Kepala Tukang @ Rp 55,000.00 Rp 1,375.00
0.025 Orang Mandor @ Rp 45,000.00 Rp 1,125.00
0.250 Orang Tukang @ Rp 48,000.00 Rp 12,000.00
Jumlah Rp 48,486.00
Diambil 1,25 x Perekat + Upah Pekerja Jumlah (a) Rp 60,607.50
Jumlah (b) + (a) Rp 122,907.50
Dibulatkan Rp 122,907.00

Supl. III d 1 M² Lantai Keramik 60 x 60 cm


1.000 M² Keramik 60 x 60 cm @ Rp 70,000.00 Rp 70,000.00
0.020 Zak Semen Putih @ Rp 115,000.00 Rp 2,300.00
Jumlah (b) Rp 72,300.00

Perekat + Upah Pekerja


0.030 M³ Perekat (Anl. G.16) @ Rp 466,200.00 Rp 13,986.00
0.500 Orang Pekerja @ Rp 40,000.00 Rp 20,000.00
0.025 Orang Kepala Tukang @ Rp 55,000.00 Rp 1,375.00
0.025 Orang Mandor @ Rp 45,000.00 Rp 1,125.00
0.250 Orang Tukang @ Rp 48,000.00 Rp 12,000.00
Jumlah Rp 48,486.00
Diambil 1,25 x Perekat + Upah Pekerja Jumlah (a) Rp 60,607.50
Jumlah (b) + (a) Rp 132,907.50
Dibulatkan Rp 132,907.00

Anl. G.14 1 M³ Perekat 1 : 2


0.950 M³ Pasir Pasangan @ Rp 90,000.00 Rp 85,500.00
14.688 Zak Semen @ Rp 41,000.00 Rp 602,208.00
Jumlah Rp 687,708.00
Dibulatkan Rp 687,708.00

Anl. G.69 Upah Pekerja


0.500 Orang Pekerja @ Rp 40,000.00 Rp 20,000.00
0.025 Orang Kepala Tukang @ Rp 55,000.00 Rp 1,375.00
0.025 Orang Mandor @ Rp 45,000.00 Rp 1,125.00
0.250 Orang Tukang @ Rp 48,000.00 Rp 12,000.00
Jumlah Rp 34,500.00
Dibulatkan Rp 34,500.00

Supl. IV d 1 M² Dinding Keramik 20 x 25 cm


1.000 M² Keramik 20 x 25 cm @ Rp 40,000.00 Rp 40,000.00
0.010 M³ Perekat G. 14 @ Rp 687,708.00 Rp 6,877.08
2.000 Kali Upah Pekerja G 69 @ Rp 34,500.00 Rp 69,000.00
Jumlah Rp 115,877.08
Dibulatkan Rp 115,877.00

Supl. IV d1 1 M' Plin Keramik 10 x 30 cm


0.333 Bh Plin Keramik 10 x 30 cm @ Rp 2,500.00 Rp 833.33
0.010 M³ Perekat G. 14 @ Rp 687,708.00 Rp 6,877.08
1.000 Kali Upah Pekerja G 69 @ Rp 34,500.00 Rp 34,500.00
Jumlah Rp 42,210.41
Dibulatkan Rp 42,210.00

Supl. IV d2 1 M' Plin Keramik 10 x 40 cm


0.250 Bh Plin Keramik 10 x 40 cm @ Rp 4,000.00 Rp 1,000.00
0.010 M³ Perekat G. 14 @ Rp 687,708.00 Rp 6,877.08
1.000 Kali Upah Pekerja G 69 @ Rp 34,500.00 Rp 34,500.00
Jumlah Rp 42,377.08
Dibulatkan Rp 42,377.00

Supl. IV d3 1 M' Plin Keramik 10 x 60 cm


0.167 Bh Plin Keramik 10 x 60 cm @ Rp 5,000.00 Rp 833.33
0.010 M³ Perekat G. 14 @ Rp 687,708.00 Rp 6,877.08
1.000 Kali Upah Pekerja G 69 @ Rp 34,500.00 Rp 34,500.00
Jumlah Rp 42,210.41
Dibulatkan Rp 42,210.00

Anl. G.43a 1 M³ Beton Cor 1 : 3 : 5


1.000 M³ Kerikil (Beton) @ Rp 200,000.00 Rp 200,000.00
0.540 M³ Pasir Beton @ Rp 90,000.00 Rp 48,600.00
5.000 Zak Semen @ Rp 41,000.00 Rp 205,000.00
6.000 Orang Pekerja @ Rp 40,000.00 Rp 240,000.00
0.200 Orang Mandor @ Rp 45,000.00 Rp 9,000.00
0.050 Orang Kepala Tukang @ Rp 55,000.00 Rp 2,750.00
0.500 Orang Tukang Batu @ Rp 48,000.00 Rp 24,000.00
Jumlah Rp 729,350.00
Dibulatkan Rp 729,350.00

Anl. G.41 1 M³ Beton Cor K-225


(1) Bahan
0.820 M³ Kerikil (Beton) @ Rp 200,000.00 Rp 164,000.00
0.540 M³ Pasir (Beton) @ Rp 90,000.00 Rp 48,600.00
8.500 Zak Semen @ Rp 41,000.00 Rp 348,500.00
Jumlah (1) Rp 561,100.00

(2) Upah Pekerja


6.000 Orang Pekerja @ Rp 40,000.00 Rp 240,000.00
0.100 Orang Kepala Tukang @ Rp 55,000.00 Rp 5,500.00
0.300 Orang Mandor @ Rp 45,000.00 Rp 13,500.00
1.000 Orang Tukang @ Rp 48,000.00 Rp 48,000.00
Jumlah (2) Rp 307,000.00
Jumlah (1) + (2) Rp 868,100.00

(a). I.2 Pekerjaan untuk 1 kg Besi Polos


(1) Bahan
1.105 Kg Besi Beton Polos @ Rp 12,000.00 Rp 13,260.00
0.015 Kg Kawat Beton @ Rp 14,000.00 Rp 210.00
Jumlah (1) Rp 13,470.00
(2) Upah Pekerja Besi
0.007 Orang Pekerja @ Rp 40,000.00 Rp 280.00
0.0007 Orang Kepala Tukang @ Rp 55,000.00 Rp 38.50
0.0003 Orang Mandor @ Rp 45,000.00 Rp 13.50
0.007 Orang Tukang @ Rp 48,000.00 Rp 336.00
Jumlah (2) Rp 668.00
Jumlah (1) + (2) Rp 14,138.00

(b). Bekisting 10 M²
(1) Bahan
0.400 M³ Papan Bekisting @ Rp 1,800,000.00 Rp 720,000.00
4.000 Kg Paku Kayu @ Rp 14,000.00 Rp 56,000.00
Jumlah (1) Rp 776,000.00

(2) Upah Pekerja Kayu


2.000 Orang Pekerja @ Rp 40,000.00 Rp 80,000.00
0.500 Orang Kepala Tukang @ Rp 55,000.00 Rp 27,500.00
0.100 Orang Mandor @ Rp 45,000.00 Rp 4,500.00
5.000 Orang Tukang @ Rp 48,000.00 Rp 240,000.00
Jumlah (2) Rp 352,000.00
Jumlah (1) + (2) Rp 1,128,000.00
0.100 Untuk 1 M² (1/10) @ Rp 1,128,000.00 Rp 112,800.00
Supl. VII b 1 M² Plafond Gypsum
0.500 Orang Pekerja @ Rp 40,000.00 Rp 20,000.00
0.025 Orang Mandor @ Rp 45,000.00 Rp 1,125.00
0.450 Lbr Gypsum @ Rp 130,000.00 Rp 58,500.00
0.450 Lbr Rangka @ Rp 110,000.00 Rp 49,500.00
10.000 Bh Paku Ulir Gypsum @ Rp 500.00 Rp 5,000.00
Jumlah Rp 134,125.00
Dibulatkan Rp 134,125.00

Anl. F.37 1 M' Papan Lisplank


0.084 Orang Pekerja @ Rp 40,000.00 Rp 3,360.00
0.024 Orang Kepala Tukang @ Rp 55,000.00 Rp 1,320.00
0.004 Orang Mandor @ Rp 45,000.00 Rp 189.00
0.240 Orang Tukang @ Rp 48,000.00 Rp 11,520.00
1.000 M' Papan Lisplank @ Rp 100,000.00 Rp 100,000.00
0.060 Kg Paku @ Rp 14,000.00 Rp 840.00
Jumlah Rp 117,229.00
Dibulatkan Rp 117,229.00

Anl. H.8a 1 M² Atap Genteng Metal


0.400 Orang Pekerja @ Rp 40,000.00 Rp 16,000.00
0.040 Orang Kepala Tukang @ Rp 55,000.00 Rp 2,200.00
0.020 Orang Mandor @ Rp 45,000.00 Rp 900.00
0.400 Orang Tukang @ Rp 48,000.00 Rp 19,200.00
1.200 M² Seng Metal Zincalum BJLS 0,30 mm @ Rp 52,000.00 Rp 62,400.00
4.000 Buah Paku Ulir @ Rp 1,000.00 Rp 4,000.00
Jumlah Rp 104,700.00
Dibulatkan Rp 104,700.00

Anl. H.10a 10 M' Rabung Genteng Metal


0.350 Orang Pekerja @ Rp 40,000.00 Rp 14,000.00
0.030 Orang Kepala Tukang @ Rp 55,000.00 Rp 1,650.00
0.250 Orang Tukang @ Rp 48,000.00 Rp 12,000.00
12.000 M' Bubungan Seng Metal Zincalum BJLS 0,30 mm @ Rp 30,000.00 Rp 360,000.00
40.000 Buah Paku Ulir @ Rp 1,000.00 Rp 40,000.00
Jumlah Rp 427,650.00
Untuk 1 M' (1/10) @ Rp 427,650.00 Rp 42,765.00
Dibulatkan Rp 42,765.00

Anl. IXa 10 M² Mengecat Tembok


1.000 Kg Cat Dasar @ Rp 12,000.00 Rp 12,000.00
0.800 Kg Dempul Cat @ Rp 13,000.00 Rp 10,400.00
4.250 Kg Cat Tembok (Warna) @ Rp 12,000.00 Rp 51,000.00
2.000 Lbr Kertas Amplas @ Rp 4,000.00 Rp 8,000.00
2.000 Orang Tukang Cat @ Rp 48,000.00 Rp 96,000.00
0.200 Orang Kepala Tukang @ Rp 55,000.00 Rp 11,000.00
1.000 Orang Pekerja @ Rp 40,000.00 Rp 40,000.00
0.050 Orang Mandor @ Rp 45,000.00 Rp 2,250.00
Jumlah Rp 230,650.00
Untuk 1 M² (1/10) @ Rp 230,650.00 Rp 23,065.00
Dibulatkan Rp 23,065.00

Anl. IXb 10 M² Mengecat Minyak


0.500 Kg Pekerja @ Rp 40,000.00 Rp 20,000.00
0.075 Kg Kepala Tukang @ Rp 55,000.00 Rp 4,125.00
0.025 Kg Mandor @ Rp 45,000.00 Rp 1,125.00
0.750 Lbr Tukang @ Rp 48,000.00 Rp 36,000.00
6.000 Orang Cat Minyak (Warna) @ Rp 40,000.00 Rp 240,000.00
1.000 Orang Dempul @ Rp 13,000.00 Rp 13,000.00
2.000 Orang Kertas Amplas @ Rp 4,000.00 Rp 8,000.00
Jumlah Rp 322,250.00
Untuk 1 M² (1/10) @ Rp 322,250.00 Rp 32,225.00
Dibulatkan Rp 32,225.00
JADWAL WAKTU PELAKSANAAN

Jumlah Harga BULAN I BULAN II BULAN III BULAN IV BULAN V


No Uraian Pekerjaan BOBOT (%) KET
(Rupiah) I II III IV I II III IV I II III IV I II III IV I II III IV

1 PRELIMINARY 40,000,000.00 1.29 0.43 0.43 0.43

2 OFFICE 1,065,092,837.41 34.48 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31

3 LABORATORIUM & WORKSHOP 729,880,537.07 23.63 3.38 3.38 3.38 3.38 3.38 3.38 3.38

4 TRAINING 548,095,049.27 17.74 3.55 3.55 3.55 3.55 3.55

5 LANDSCAPING 706,290,667.93 22.86 3.27 3.27 3.27 3.27 3.27 3.27 3.27

Jumlah 3,089,359,091.68 100

Kemajuan Pekerjaan Mingguan (%) 0.43 0.43 4.31 4.31 4.31 7.68 7.68 7.68 7.68 7.68 6.92 6.92 6.81 6.81 6.81 3.27 3.27 3.27 3.27 0.43

Kemajuan Pekerjaan Kumulatif (%) 0.43 0.86 5.17 9.48 13.79 21.48 29.16 36.85 44.53 52.21 59.14 66.06 72.88 79.69 86.50 89.77 93.04 96.30 99.57 100.00

Medan, 23 Desember 2008


CV. JASA BEURATA

T. JAMALUDDIN
Direktur
DAFTAR PERALATAN UTAMA

Jumlah Merk & Tahun Ukuran / Milik Lokasi


No Nama Alat Daya (Kw) Sewa
Alat Type Pembuatan Kapasitas Sendiri Sekarang

1 Molen 3 Tiga Berlian 2005 0,5 m3 - Milik - Banda Aceh

2 Dump Truck 2 Mitshubisi 2001 4 m3 - Milik - Banda Aceh

3 Genset 1 Honda 2003 - 5000 watt Milik - Banda Aceh

4 Pompa Air 1 Honda 2005 - 6 Hp Milik - Banda Aceh

Aceh Besar, 23 Desember 2008


CV. JASA BEURATA

T. JAMALUDDIN
Direktur
Neraca Perusahaan Terakhir Per Tanggal 31 Desember 2007

AKTIVA PASIVA
I Aktiva Lancar : IV Utang Jangka Pendek
Kas : Rp. 35,000,000.00 Utang Dagang : Rp -
Bank : Rp. 175,000,000.00 Utang Pajak : Rp -
Piutang *) : Rp. Utang Lainnya : Rp -
Persediaan Barang : Rp. Jumlah (d) Rp -
Pekerjaan dalam : Rp.
Proses : Rp.
Jumlah (a) Rp 210,000,000.00 V Utang Jangka Panjang (e) Rp -

II Aktiva Tetap : VI Kekayaan Bersih


Peralatan dan Mesin : Rp. 250,000,000.00 (a+b+c) - (d+e) Rp 1,010,000,000.00
: Rp.
Inventaris : Rp. 250,000,000.00
Gedung : Rp. 300,000,000.00
Jumlah (B) Rp 800,000,000.00
III Aktiva Lainnya ( c )

Jumlah Rp 1,010,000,000.00 Jumlah Rp 1,010,000,000.00

*) Piutang jangka pendek (sampai dengan enam bulan) : Rp. -


Piutang Jangka panjang ( lebih dari enam bulan) : Rp. -
Jumlah : Rp. -

Aceh Besar, 23 Desember 2008


CV. JASA BEURATA

T. JAMALUDDIN
Direktur