Awal
01 - 12 - 2022
Jam : 10:00 Wib
a b d
1 kWh Produksi Energi Sisi Generator (11 kV)
1.1 PLTA KOTO PANJANG #01 32,008,165.63
1.2 PLTA KOTO PANJANG #02 53,113,517.55
1.3 PLTA KOTO PANJANG #03 31,869,880.10
Jumlah Produksi Energi Sisi Generator
2 kWh Produksi Energi Sisi Trafo (Export) 150 kV
2.1 PLTA KOTO PANJANG #01 184,280,671
2.2 PLTA KOTO PANJANG #02 231,552,699
2.3 PLTA KOTO PANJANG #03 198,872,544
JUMLAH EXPORT
3 kWh Produksi Energi Sisi Trafo (Import) 150 kV
3.1 PLTA KOTO PANJANG #01 215,960
3.2 PLTA KOTO PANJANG #02 736,714
3.3 PLTA KOTO PANJANG #03 715,177
JUMLAH IMPORT
Produksi Netto PLTA Kota Panjang
4 Pemakaian Sendiri (PS)
5.1 PS 1 7,227.710
5.2 PS 3 5,413.311
5.2 Supply dari Genset & Black Start
JUMLAH PS
Awal
01 - 12 - 2022
Jam : 10:00 Wib
a b d
1 kWh Produksi Energi Sisi Generator (11 kV)
1.1 PLTG TELUK LEMBU #01
1.2 PLTG TELUK LEMBU #02 1,043,683.30
1.3 PLTG TELUK LEMBU #03 303,028.00
1.4 PLTD TELUK LEMBU #01 (SULZER)
Jumlah Produksi Energi Sisi Generator
2 kWh Produksi Energi Sisi Trafo (Export) 150 kV
2.1 PLTG TELUK LEMBU #01
2.2 PLTG TELUK LEMBU #02 505,749,236.00
2.3 PLTG TELUK LEMBU #03 84,610,876.00
2.4 PLTD TELUK LEMBU #01 (SULZER)
JUMLAH EXPORT
3 kWh Produksi Energi Sisi Trafo (Import) 150 kV
3.1 PLTG TELUK LEMBU #01
3.2 PLTG TELUK LEMBU #02 3,733,319.00
PS Auxiliary PLTG di GI Teluk Lembu 37,945.00
PS Auxiliary PLTD di PL Teluk Lembu 4,910,050.00
Total kWh Import PLTG #2
3.3 PLTG TELUK LEMBU #03 782,807.00
3.4 PLTD TELUK LEMBU #01 (SULZER)
JUMLAH IMPORT
Produksi Netto PLTG Teluk Lembu
4 Pemakaian Sendiri (PS)
5.1 PS MCC 1 44,589
5.2 PS MCC 2 46,315.20
5.2 PS MCC 3 229,746.40
JUMLAH PS
LAPORAN PRODUKSI ENERGI kWh PEMBANGKIT
PLTG/PLTMG BALAI PUNGUT DURI
BULAN DESEMBER 2022
Awal
01 - 12 - 2022
Jam : 10:00 Wib
a b d
1 kWh Produksi Energi Sisi Generator (11 kV)
1.1 PLTG BALAI PUNGUT DURI #02 478,952,156.00
1.2 PLTMG BALAI PUNGUT DURI #01 722,017,000.00
1.3 PLTMG BALAI PUNGUT DURI #02 572,258,000.00
1.4 PLTMG BALAI PUNGUT DURI #03 647,380,000.00
1.5 PLTMG BALAI PUNGUT DURI #04 734,629,000.00
1.6 PLTMG BALAI PUNGUT DURI #05 727,683,000.00
1.7 PLTMG BALAI PUNGUT DURI #06 678,806,000.00
1.8 PLTMG BALAI PUNGUT DURI #07 638,216,000.00
Jumlah Produksi Energi Sisi Generator
2 kWh Produksi Energi Sisi Trafo 20 kV (Export)
2.1 PLTG BALAI PUNGUT DURI #02 465,803,280.00
2.2 PLTMG BALAI PUNGUT DURI #01
2.3 PLTMG BALAI PUNGUT DURI #02 935,977,440.00
2.4 PLTMG BALAI PUNGUT DURI #03
2.5 PLTMG BALAI PUNGUT DURI #04
2.6 PLTMG BALAI PUNGUT DURI #05 648,908,440.00
2.7 PLTMG BALAI PUNGUT DURI #06
2.8 PLTMG BALAI PUNGUT DURI #07
JUMLAH EXPORT
3 kWh Produksi Energi Sisi Trafo 20 kV (Import)
3.1 PLTG BALAI PUNGUT DURI #02 1,522,374.00
3.2 PLTMG BALAI PUNGUT DURI #01
3.3 PLTMG BALAI PUNGUT DURI #02 2,589,648.00
3.4 PLTMG BALAI PUNGUT DURI #03
3.5 PLTMG BALAI PUNGUT DURI #04
3.6 PLTMG BALAI PUNGUT DURI #05 1,546,512.00
3.7 PLTMG BALAI PUNGUT DURI #06
3.8 PLTMG BALAI PUNGUT DURI #07
JUMLAH IMPORT
PRODUKSI NETTO PLTG DAN PLTMG BALAI PUNGUT DURI
5 Pemakaian Sendiri (PS)
5.1 PLTG BALAI PUNGUT DURI #02 7,579,500.00
5.2 PLTMG BALAI PUNGUT DURI #01
5.3 PLTMG BALAI PUNGUT DURI #02 35,808,000.00
5.4 PLTMG BALAI PUNGUT DURI #03
5.5 PLTMG BALAI PUNGUT DURI #04
5.6 PLTMG BALAI PUNGUT DURI #05 27,436,000.00
5.7 PLTMG BALAI PUNGUT DURI #06
5.8 PLTMG BALAI PUNGUT DURI #07
JUMLAH PS
Awal
01 - 12 - 2022
Jam : 10:00 Wib
a b ;
1 kWh Produksi Energi Sisi Generator (13,8 kV)
1.1 PLTU TEMBILAHAN #01 32,991,890.000
1.2 PLTU TEMBILAHAN #02 41,194,560.000
JUMLAH EXPORT
3 kWh Produksi Energi Sisi Trafo (Import) 150 kV
3.1 PLTU TEMBILAHAN #01 1,252,443.97
3.2 PLTU TEMBILAHAN #02 267,172.37
JUMLAH IMPORT
PRODUKSI NETTO PLTU TEBILAHAN
4 Pemakaian Sendiri (PS)
4.1 TRAFO 1 PS 7,261,592.000
4.2 TRAFO 2 PS 7,961,884.000
J U M L A H P S UAT
-
-
J U M L A H P S SST (GI)
Awal
01 - 12 - 2022
Jam : 10:00 Wib
1 PLTGU SW RIAU #01 (GT 1.1) (PT RIAU POWER)
1 KWH EXPORT (LWBP) 6,355,677.00
2 KWH EXPORT (WBP) 30,867,987.00
NETTO
2 PLTG SW BALAI PUNGUT DURI (PT PJB)
1 KWH EXPORT 519,672,630
JUMLAH
1 KWH IMPORT 1,741,970
JUMLAH IMPOR
NETTO
3 PLTMG SW TELUK LEMBU I (KSO HUTAN ALAM)
1 KWH EXPORT 917,482,096.00
JUMLAH
1 KWH IMPORT 28,237.00
NETTO
4 PLTGU SW RIAU #02 (ST 1.0) (PT RIAU POWER)
1 KWH EXPORT (LWBP) 154,939,122.00
2 30,756,397.00
TOTAL
NETTO
5 PLTMG SW TELUK LEMBU I (PT PJBS)
1 KWH EXPORT 1 655,877.81
2 KWH EXPORT 2 772,066,949.00
JUMLAH
1 KWH IMPORT 1 52.50
2 KWH IMPORT 2 31,019.00
JUMLAH
NETTO
6 PLTMG SW TELUK LEMBU II (KSO HUTAN ALAM)
1 KWH EXPORT 1 827,493,087.00
2 KWH EXPORT 2 422,806,441.00
JUMLAH
1 KWH IMPORT 1 164,299.34
2 KWH IMPORT 2 125,118
JUMLAH
NETTO
7 PLTMG BALAI PUNGUT (PT MAX POWER)
1 KWH EXPORT 111,049.30
492,732.00
JUMLAH
2 KWH IMPORT 2.30
9.20
JUMLAH
NETTO
8 PLTMG SW TELUK LEMBU II (PT PJBS)
1 KWH EXPORT (WBP) 208,719.20
KWH EXPORT (LWBP) 946,649.00
KWH EXPORT 1,155,368.20000
JUMLAH
KWH IMPORT (WBP) 14.20
KWH IMPORT (LWBP) 78.10
KWH IMPORT 92.30
JUMLAH
NETTO
9 PLTG IPP MPP BALAI PUNGUT (PT PLN BATAM)
1 GSUT #1 KWH EXPORT (LWBP) 340,175,045.00
GSUT #1 KWH EXPORT (WBP) 125,518,788.00
JUMLAH GSUT #1 KWH EXPORT 465,693,833.00
GSUT #2 KWH EXPORT (LWBP) 800,870,375.00
GSUT #2 KWH EXPORT (WBP) 301,199,287.00
JUMLAH GSUT #2 KWH EXPORT 1,102,069,662.00
JUMLAH EXPORT
JUMLAH
NETTO
TOTAL KWH 20 KV
RGI kWh PEMBANGKIT
PANJANG
MBER 2022
Akhir
01 - 01- 2023 Selisih
Jam : 10:00 Wib
e f=e-d g h=fxg
253,716
Akhir
01 - 01- 2023 Selisih
Jam : 10:00 Wib
e f=e-d g h=fxg
1,043,683.30 - 1,000 -
303,028.00 - 1,000 -
505,749,236.00 - 1.00 -
84,610,876.00 - 1.00 -
(A) -
44,589 - 800.00 -
46,336.10 20.90 800.00 16,720.00
230,281.90 535.50 10 5,355.00
22,075.00
RGI kWh PEMBANGKIT
AI PUNGUT DURI
MBER 2022
Faktor Hasil
Pengali Pembacaan
Akhir
01 - 01- 2023 Selisih
Jam : 10:00 Wib
e f=e-d g h=fxg
478,952,156.00
724,775,000.00 2,758,000 1.00 2,758,000
575,242,000.00 2,984,000 1.00 2,984,000
650,264,000.00 2,884,000 1.00 2,884,000
738,393,000.00 3,764,000 1.00 3,764,000
729,619,000.00 1,936,000 1.00 1,936,000
681,681,000.00 2,875,000 1.00 2,875,000
641,643,000.00 3,427,000 1.00 3,427,000
20,628,000
465,803,280.00 - 1 -
(A) 19,840,884.00
(B) 192,414.00
(A-B) 19,648,470.00
7,579,500.00 - 1 -
415,000.00
MBER 2022
Akhir
01 - 01- 2023 Selisih
Jam : 10:00 Wib
e f=e-d g h=fxg
32,991,890.000 - 1 -
41,194,560.000 - 1 -
3,201,243.630 - 1 -
19,982,374.550 - 1 -
(A) -
1,252,443.97 - 1 -
267,172.37 - 1 -
(B) -
(A-B) -
7,261,592.000 - 1 -
7,961,884.000 - 1 -
-
- -
- -
-
FAKTOR
SELISIH HASIL
KALI
Akhir
01 - 01- 2023
Jam : 10:00 Wib
6,355,677.00 - 1 -
30,867,987.00 - 1 -
1 -
-
519,672,630 - 1 -
-
1,741,970 - 1 -
-
-
917,482,096.00 - 1 -
-
28,237.00 - 1 -
154,939,122.00 - 1 -
30,756,397.00 - 1 -
-
-
-
-
655,877.81 - 1000 -
772,066,949.00 - 1 -
-
52.50 - 1000 -
31,019.00 - 1 -
-
-
827,493,087.00 - 1 -
422,806,441.00 - 1 -
-
164,299.34 - 1 -
125,118 - 1 -
-
-
111,049.30 - 1000 -
492,732.00 - 1000 -
-
2.30 - 1000 -
9.20 - 1000 -
-
-
208,719.20 - 1000 -
946,649.00 - 1000 -
1,155,368.20000 - 1000 -
-
14.20 - 1000 -
78.10 - 1000
92.30 - 1000 -
-
-
340,358,109.00 183,064.00 1
126,352,301.00 833,513.00 1
466,710,410.00 1,016,577.00 1 1,016,577.00
801,152,521.00 282,146.00 1
302,977,618.00 1,778,331.00 1
1,104,130,139.00 2,060,477.00 1 2,060,477.00
3,077,054.00
19,550.736 - 21818.1818 -
- .0 - 21818.1818 -
- .0 - 21818.1818 -
- .0 - 21818.1818 -
- .0 - 21818.1818 -
-
19,550.736 - 21818.1818 -
-
30.226 - 21818.1818 -
- .0 - 21818.1818 -
- .0 - 21818.1818 -
- .0 - 21818.1818 -
- .0 - 21818.1818 -
30.226 - 21818.1818 -
-
-
-
EXPORT 3,077,054.00
IMPORT -
NETTO 3,077,054.00
EXPORT 66,963,406.00
IMPORT 349,556.00
TRANSFER 66,613,850.00
0
0
0
Hal. 1
KETERANGAN
-
Hal. 2
KETERANGAN
kWh generator
kWh Pembanding UPT
kWh Aktaris
kWh PS Unit
KETERANGAN
20,213,000.00
19,648,470.00
ST 1 BRUTO
ST 2 BRUTO
Hal. 1
KETERANGAN
i
Hal. 4
KETERANGAN
20 KV
TIDAK BEROPERASI
20 KV
17.370 Kwh Pengurangan Ketika Kalibrasi
20 KV
20 KV
20 KV
20 KV
20 KV
150 KV
Bayar ke UP3 Pekanbaru
150 KV
20 KV
20 KV dan 150 KV
TRANSFER KE UPT PKU
PT PLN ( PERSERO ) PEMBANGKITAN SUMATRA BAGIAN UTARA
SEKTOR PENGENDALIAN PEMBANGKITAN PEKANBARU
Jl.Tanjung Datuk No 74 Pekanbaru
Awal
01 - 12 - 2022
Jam : 10:00 Wib
I. PEMBANGKIT PT. PLN (PERSERO)
A PLTA KOTA PANJANG
EXPORT
Awal
01 - 12 - 2022
Jam : 10:00 Wib
IMPORT
Awal
01 - 12 - 2022
Jam : 10:00 Wib
EX.
JUMLAH EXPORT
IMP.
JUMLAH IMPORT
tto = Jumlah kWh Export - Jumlah kWh Import
E PLTU TEMBILAHAN
EXPORT
Awal
01 - 12 - 2022
Jam : 10:00 Wib
TOTAL 185,695,519.00
Awal
01 - 12 - 2022
Jam : 10:00 Wib
EX.
TRAFO 1 917,482,096.00
TRAFO 1 28,237.00
TRAFO 1 827,493,087.00
TRAFO 2 422,806,441.00
TRAFO 1 164,299.34
TRAFO 2 125,118.00
Awal
01 - 12 - 2022
Jam : 10:00 Wib
EXP.
TRAFO 1 655,877.81
TRAFO 2 772,066,949.00
TRAFO 1 52.50
TRAFO 2 31,019.00
TRAFO 1 1,155,368.20
TRAFO 1 92.30
Awal
01 - 12 - 2022
Jam : 10:00 Wib
EX.
TRAFO 1 603,781.30
TRAFO 1 9.20
TRAFO 1 519,672,630.00
TRAFO 1 1,741,970.00
TRAFO 1 465,693,833.00
PT PLN ( PERSERO ) PEMBANGKITAN SUMATRA BAGIAN UTARA
SEKTOR PENGENDALIAN PEMBANGKITAN PEKANBARU
Jl.Tanjung Datuk No 74 Pekanbaru
Awal
01 - 12 - 2022
Jam : 10:00 Wib
TRAFO 2 1,102,069,662.00
TRAFO 1 1,571,724.00
TRAFO 2 1,404,334.00
TRAFO 1 19,550.736
TRAFO 2 0.000
TRAFO 3 0.000
TRAFO 4 0.000
TRAFO 5 0.000
TRAFO 1 30.226
PT PLN ( PERSERO ) PEMBANGKITAN SUMATRA BAGIAN UTARA
SEKTOR PENGENDALIAN PEMBANGKITAN PEKANBARU
Jl.Tanjung Datuk No 74 Pekanbaru
Awal
01 - 12 - 2022
Jam : 10:00 Wib
TRAFO 2 0.000
TRAFO 3 0.000
TRAFO 4 0.000
TRAFO 5 0.000
III
JUMLAH KWH PEMBANGKIT PLN + SEWA
(I + II)
FAKTOR
SELISIH
KALI
Akhir
01 - 01- 2023
Jam : 10:00 Wib
198,098,160.00 13,817,489.00 1
248,821,827.00 17,269,128.00 1
211,831,395.00 12,958,851.00 1
241,656.00 25,696.00 1
755,228.00 18,514.00 1
757,531.00 42,354.00 1
505,749,236.00 0.00 1
84,610,876.00 0.00 1
FAKTOR
SELISIH
KALI
Akhir
01 - 01- 2023
Jam : 10:00 Wib
3,778,120.00 44,801.00 1
37,945.00 0.00 30
4,910,050.00 0.00 1
808,584.00 25,777.00 1
944,986,224.00 9,008,784.00 1
659,740,540.00 10,832,100.00 1
2,652,372.00 62,724.00 1
1,662,108.00 115,596.00 1
FAKTOR
SELISIH
KALI
Akhir
01 - 01- 2023
Jam : 10:00 Wib
465,803,280.00 0.00 1
1,536,468.00 14,094.00 1
3,201,243.63 0.00 1
19,982,374.55 0.00 1
1,252,443.97 0.00 1
267,172.37 0.00 1
EXPORT
B + C + D + E) IMPORT
NETTO
FAKTOR
SELISIH
KALI
Akhir
01 - 01- 2023
Jam : 10:00 Wib
6,355,677.00 0.00 1
30,867,987.00 0.00 1
154,939,122.00 0.00 1
30,756,397.00 0.00 1
185,695,519.00 0.00 1
x0,00275)
UK LEMBU
FAKTOR
SELISIH
KALI
Akhir
01 - 01- 2023
Jam : 10:00 Wib
917,482,096.00 0.00 1
28,237.00 0.00 1
UK LEMBU
827,493,087.00 0.00 1
422,806,441.00 0.00 1
164,299.34 0.00 1
125,118.00 0.00 1
FAKTOR
SELISIH
KALI
Akhir
01 - 01- 2023
Jam : 10:00 Wib
772,066,949.00 0.00 1
31,019.00 0.00 1
UNGUT
FAKTOR
SELISIH
KALI
Akhir
01 - 01- 2023
Jam : 10:00 Wib
519,672,630.00 0.00 1
1,741,970.00 0.00 1
466,710,410.00 1,016,577.00 1
FAKTOR
SELISIH
KALI
Akhir
01 - 01- 2023
Jam : 10:00 Wib
1,104,130,139.00 2,060,477.00 1
1,627,780.00 56,056.00 1
1,463,174.00 58,840.00 1
EXPORT
T SEWA IMPORT
H+I+J)
NETTO
EXPORT
LN + SEWA IMPORT
NETTO
Telepon : (0761) 41855-41856
Facsimele : (0761) 40336
E-Mail : operasi.spkb@gmail.com
Kode Pos : 28141
HASIL KETERANGAN
13,817,489.00 150 KV
17,269,128.00 150 KV
12,958,851.00 150 KV
44,045,468.00
25,696.00 150 KV
18,514.00 150 KV
42,354.00 150 KV
86,564.00
43,958,904.00
0.00 150 KV
0.00 150 KV
0.00
Telepon : (0761) 41855-41856
Facsimele : (0761) 40336
E-Mail : operasi.spkb@gmail.com
Kode Pos : 28141
HASIL KETERANGAN
44,801.00 150 KV
0.00 20 KV
0.00 20 KV
25,777.00 150 KV
70,578.00
-70,578.00
9,008,784.00 150 KV
10,832,100.00 150 KV
19,840,884.00
62,724.00 150 KV
115,596.00 150 KV
178,320.00
19,662,564.00
Telepon : (0761) 41855-41856
Facsimele : (0761) 40336
E-Mail : operasi.spkb@gmail.com
Kode Pos : 28141
HASIL KETERANGAN
0.00 150 KV
0.00
14,094.00 150 KV
14,094.00
-14,094.00
0.00 (ISOLTED)
0.00 (ISOLTED)
0.00
0.00 150 KV
0.00 150 KV
0.00
0.00
63,886,352.00
349,556.00
63,536,796.00
Telepon : (0761) 41855-41856
Facsimele : (0761) 40336
E-Mail : operasi.spkb@gmail.com
Kode Pos : 28141
HASIL KETERANGAN
0.00 20 KV
0.00 20 KV
0.00 .
0.00 20 KV
0.00 20 KV
0.00
0.00
0.00
Telepon : (0761) 41855-41856
Facsimele : (0761) 40336
E-Mail : operasi.spkb@gmail.com
Kode Pos : 28141
HASIL KETERANGAN
0.00 20 KV
0.00
0.00 20 KV
0.00
0.00
0.00 20 KV
0.00 20 KV
0.00
0.00 20 KV
0.00 20 KV
0.00
0.00
Telepon : (0761) 41855-41856
Facsimele : (0761) 40336
E-Mail : operasi.spkb@gmail.com
Kode Pos : 28141
HASIL KETERANGAN
0.00 20 KV
0.00 20 KV
0.00
0.00 20 KV
0.00 20 KV
0.00
0.00
0.00 150 KV
0.00
0.00 150 KV
.00000
0.00
Telepon : (0761) 41855-41856
Facsimele : (0761) 40336
E-Mail : operasi.spkb@gmail.com
Kode Pos : 28141
HASIL KETERANGAN
0.00 20 KV
0.00
0.00 20 KV
0.00
.00
0.00 150 KV
.00000
0.00 150 KV
0.00
0.00
1,016,577.00 150 KV
Telepon : (0761) 41855-41856
Facsimele : (0761) 40336
E-Mail : operasi.spkb@gmail.com
Kode Pos : 28141
HASIL KETERANGAN
2,060,477.00 150 KV
3,077,054.00
56,056.00 150 KV
58,840.00 150 KV
114,896.00
2,962,158.00
0.00 20 KV (ISOLATED)
0.00 20 KV (ISOLATED)
0.00 20 KV (ISOLATED)
0.00 20 KV (ISOLATED)
0.00 20 KV (ISOLATED)
0.00
0.00
0.00 20 KV (ISOLATED)
Telepon : (0761) 41855-41856
Facsimele : (0761) 40336
E-Mail : operasi.spkb@gmail.com
Kode Pos : 28141
HASIL KETERANGAN
0.00 20 KV (ISOLATED)
0.00 20 KV (ISOLATED)
0.00 20 KV (ISOLATED)
0.00 20 KV (ISOLATED)
0.00 KOREKSI BULAN MEI 2021
0.00
.00
3,077,054.00 3,077,054.00 (UPT PKU)
0.00 0.00 (UPT PKU)
3,077,054.00 3,077,054.00 (UPT PKU)
DATA TRANSFER KWh YANG DITERIMA DAN DIKIRIM BERDASARKAN MEKANISME NIAGA SESUMATERA
PT.PLN (PERSERO) PEMBANGKITAN SUMATERA BAGIAN UTARA SEKTOR PENGENDALIAN PEMBANGKITAN PEKANBARU
DENGAN
PT.PLN (PERSERO) P3BS UPT PEKANBARU DAN PT PLN (PERSERO) WRKR AREA PEKANBARU
PERIODE BULAN DESEMBER 2022
ENERGI (Kwh)
DARI KE
NO URAIAN SELISIH KETERANGAN
PEMBANGKIT PEMBANGKIT
EXPORT IMPORT NETTO
1 PLTA KOTO PANJANG
TRAFO UNIT 1 13,817,489.00 25,696.00 13,791,793.00 150 KV
TRAFO UNIT 2 17,269,128.00 18,514.00 17,250,614.00 150 KV
TRAFO UNIT 3 12,958,851.00 42,354.00 12,916,497.00 150 KV
JUMLAH 44,045,468.00 86,564.00 43,958,904.00
2 PLTG TELUK LEMBU
TRAFO UNIT 2 - 44,801.00 (44,801.00) 150 KV
PS Auxiliary PLTG di GI TL - - 20 KV
PS Auxiliary PLTD Teluk Lembu - - 20 KV
TRAFO UNIT 3 - 25,777.00 (25,777.00) 150 KV
JUMLAH - 70,578.00 (70,578.00)
3 PLTMG BALAI PUNGUT
TRAFO I (UNIT 1, 2 ,3) 9,008,784.00 62,724.00 8,946,060.00 150 KV
TRAFO II (UNIT 4, 5, 6, 7) 10,832,100.00 115,596.00 10,716,504.00 150 KV
JUMLAH 19,840,884.00 178,320.00 19,662,564.00
4 PLTG BALAI PUNGUT
TRAFO UNIT 1 - 14,094.00 (14,094.00) 150 KV
JUMLAH - 14,094.00 (14,094.00)
5 PLTU TEMBILAHAN
TRAFO UNIT 1 - - - 20 KV (ISOLATED)
TRAFO UNIT 2 - - - 20 KV (ISOLATED)
JUMLAH - - -
TOTAL 63,886,352.00 349,556.00 63,536,796.00 Transfer
6 PLTG SW RIAU #01 (GT 1.1) (PT RIAU POWER) - - - 20 KV
7 PLTG SW RIAU #02 (ST 1.0) (PT RIAU POWER) - - - 20 KV
Catatan:
- Berita Acara akan di koreksi bila terjadi kesalahan.
- Data pengiriman energi diatas telah mendapat persetujuan dan di tanda tangani oleh:
1998 1998
A A
Kaplan /
Kaplan / KVAERNER
KVAERNER
2 3
38,000.00 38,000.00 114,000.00
16,593.82 41,198.903
40,975.85 57,917.453
172,051.98 172,921.923
- - -
- - -
131,733.33 5,700.00 172,266.67
- - -
- - -
- - -
- - -
76.17
728,194,831.00
76.52
755,997,536.00
193.71
186.66
-
186.66
27,802,705.00
10.92
79.28
80.50
77.04
78.55
76.17
76.39
692.22
40.26
193.71
692.22
99.42
186.66
-
-
-
PLTG #2 PLTG #3
NO DATA SATUAN TELUK TELUK JUMLAH
LEMBU LEMBU
1 Tahun Operasi 1976 1976
Jenis A/U/D/G G G
Tertinggi / Kw - - -
Puncak
Target
4 Produksi Produksi 83,160.00 83,160.00 166,320.00
Generator
(RKAP)
Prod. Kw - - -
Generator
GAS Kw - - -
HSD Kw - - -
5 Trafo EXPORT Kw - - -
IMPORT Kw 44,801.00 25,777.00 70,578.00
PS
6 Aux.PLTG Kw - -
DARI G I
PS
Aux.PLTD
di PLTD PL - -
Teluk
Lembu
PO ( Har
Terencana jam - - -
)
MO ( Har
Tdk
Terencana jam - - -
)
Jumlah
Jam jam 1,488.00
Standby 744.00 744.00
Standby jam 744.00 744.00 1,488.00
Gangguan
luar jam - - -
gangguan jam - - -
dalam
Sejak
GI/HGPI/S
O jam 166.70 5,289.33
(JSGI/HGPI
/SO)
Sejak
MO/MI jam 8,107.96 18,700.00
(JSMO/MI)
Sejak
Beroperasi jam 81,027.71 18,700.00
(JSB)
Energi tak
13 tersalur kWh - - -
akibat
gangguan
Ongkos Rp - -
Angkut
Persediaan
Stock Awal liter - 376,642.00
bulan
Penambah liter - -
an
Selisih
Penerimaa
n liter - -
(sounding)
Pemakaian liter 60.00 60.00
BBM Unit
Pemakaian
Lain Lain liter 40.00 160.00000
Selisih liter -
Pemakaian
Persediaan
Akhir liter ###
Bulan
SFC l/kwh
Bahan
15 Bakar Harga Gas $ 4.0 4.0 4.00
Gas
Supply
BBG dari mmBtu - - -
EMP Bentu
Pemakaian mmBtu -
BBG unit -
Selisih /
penalty mmBtu -
SGC mmbtu/
kwh
Pemakaian
16 Minyak Pelumas liter - -
Pelumas
Unit
Pemakaian
Lain Lain liter - - -
SLC liter/kwh
Pelumas
PLTG #2 BALAI
NO DATA SATUAN PUNGUT DURI
1 Tahun Operasi 1974
Jenis A/U/D/G G
ALSTHOM PG
Merek / Type Mesin 5341 P
No Series 226103
2 Daya Terpasang Kw 20,000.00
Mampu
Rata-rata
Bulan Ini -
3 BEBAN DMN Kw 15,000.00
Tertinggi /
Puncak Kw -
Target
Produksi Produksi
4 Generator (RKAP) Kw -
Jumlah Prod.
Generator -
Prod.
Generator
( GAS ) Kw -
Prod.
Generator
( HSD ) Kw -
5 Trafo EXPORT Kw -
IMPORT Kw 14,094.00
PS Aux.PLTG
6 DARI G I Kw
7 NETTO Kw (14,094.00)
Pemakaian
Sendiri (PS)
8 Unit Kw -
9 % Pemakaian Sendiri %
RUGI2
10 TRAFO Kw 14,094.00
11 Jam Periodik jam 744.00
Kerja
Pemeliharaa jam -
n jam -
PO ( Har
Terencana ) jam -
MO ( Har Tdk
Terencana ) jam -
Jumlah Jam
Standby jam 744.00
Standby jam 744.00
Gangguan -
luar jam
gangguan
dalam jam -
Sejak
YM/CI/TO
(JSYM/CI/TO
) jam 791.35
Sejak
GI/HGPI/SO
(JSGI/HGPI/S
O) jam 9,921.67
Sejak MO/MI
(JSMO/MI) jam 34,341.47
Sejak
Beroperasi
(JSB) jam 124,821.550
Jumlah Kali
12 Gangguan Luar kali -
Dalam kali -
Energi tak
tersalur
akibat
13 gangguan kWh -
Bahan Bakar Harga Solar /
14 Solar / HSD HSD Rp 5,693.05
Ongkos
Angkut Rp
Persediaan
Stock Awal
bulan Ltr 117,838.90
Penambahan Ltr -
Selisih
Penerimaan
(sounding) Ltr -
Pemakaian
BBM Unit Ltr -
Pemakaian
Lain Lain Ltr -
Selisih
Pemakaian Ltr -
Persediaan
Akhir Bulan Ltr 117,838.90
SFC Ltr/kwh
Bahan Bakar
15 Gas Harga Gas $ 4.57
Pemakaian
Mesin PS
CNG mmbtu -
Supply BBG
dari
PERTAMINA mmBtu 132,545.00
Pemakaian
BBG unit mmBtu -
Selisih /
penalty mmBtu (78,665.00)
mmBtu/
SGC kwh
Minyak Pemakaian
16 Pelumas Pelumas
Unit liter -
Pemakaian
Lain Lain liter -
Jumlah liter -
SLC
Pelumas liter/kwh
PLTMG # 1 PLTMG # 2 PLTMG # 3 PLTMG # 4 PLTMG # 5 PLTMG # 6 PLTMG # 7
NO DATA SATUAN DURI DURI DURI DURI DURI DURI DURI JUMLAH
Tahun Operasi 2007 2012 2013 2013 05 Juli 2012-1982 18-Dec-13 2014 2015 2016
Jenis A/U/D/G G DG DG ST G D 6246.5 175200000 G
1
Merek / Type Mesin Alsthom MS 5001 GE/FM 50001 148753.5 - 14600000 GE/TM2500
No Series P5001 FM 5001 538338.9165
2 Daya Terpasang Kw 21,600.00 17,000.00 30,000.00 8,000.00 20,000.00 40,000.00 50,000.00 4,798.50 30,000.00 25,000.00 75,000.00 321,398.50
DMN 18,000.00 7,000.00 18,000.00 8,000.00 17,000.00 26,000.00 40,000.00 12,000.00 20,000.00 50,000.00
3 Produksi Generator Target Produksi (RKAP) - - - - - -
Export kWh - - - - 3,077,054.00 3,077,054.00
4 Trafo
Import Kw - - - - 114,896.00 114,896.00
5 NETTO Kw - - - - 2,962,158.00 2,962,158.00
Harga Gas $ 4.00 4.00 4.00 4.00 4.57
Pemakaian BBG unit mmBtu 0.0000 0.0000 0.0000 0.0000 38,427.81000 38,427.8100000
7 Bahan Bakar Gas
Selisih / penalty mmBtu -
SGC mmbtu/kwh - - - - 0.012 0.013
Export kWh
Bahan Bakar Import Kw -
8 Minyak Pemakaian BBM MPP Ltr
PT PLN (PERSERO) PEMBANGKITAN SUMBAGUT
SEKTOR PEMBANGKITAN PEKANBARU
Jln. Dr. Tanjung Datuk No 74
Telp. (0761) 41855/41856
I. MESIN PLN
NO DATA SATUAN
PLTU #1
PLTU #2
% Pemakaian Sendiri
PLTU #1
PLTU #2
RUGI2 TRAFO
PLTU #1
PLTU #2
Harga Solar / HSD
Ongkos Angkut
Persediaan awal
Penambahan
Pemakaian
8 BAHAN BAKAR HSD/B30
PLTU #1
PLTU #2
Pemakaian Lain-lain
Selisih pemakaian
Persediaan Akhir
Harga BB
Ongkos Angkut
Persediaan awal
Penambahan
BAHAN BAKAR
9 Pemakaian
BATUBARA
PLTU #1
PLTU #2
Selisih pemakaian
Persediaan Akhir
Periodik
Kerja
PLTU #1
PLTU #2
Pemeliharaan
PLTU #1
PLTU #2
PO ( Har Terencana )
PLTU #1
PLTU #2
MO ( Har Terencana )
PLTU #1
PLTU #2
MO ( Har Tdk Terencana )
PLTU #1
PLTU #2
Jumlah Jam Standby
PLTU #1
PLTU #2
Standby
11 Jam
PLTU #1
PLTU #2
Gangguan luar
PLTU #1
PLTU #2
gangguan dalam
PLTU #1
PLTU #2
Gangguan luar (Kali)
PLTU #1
PLTU #2
gangguan dalam (kali)
PLTU #1
PLTU #2
Sejak MO
PLTU #1
PLTU #2
Sejak Beroperasi (JSB)
PLTU #1
PLTU #2
Pelumas Mesin
PLTU #1
PLTU #2
Pelumas alat bantu
12 Pemakaian Pelumas PLTU #1
PLTU #2
Pelumas trafo
PLTU #1
PLTU #2
PLTU #1
13 SCC
PLTU #2
PT PLN (PERSERO) PEMBANGKITAN SUMBAGUT
SEKTOR PEMBANGKITAN PEKANBARU
Jln. Dr. Tanjung Datuk No 74
Telp. (0761) 41855/41856 LAPORAN KUMUL
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
PLN UNIT PELAKSANA DALKIT
PEKANBARU
OPERASI & PEMELIHARAAN
DESEMBER
2022
LAPORAN
PENGUSAHAAN
PT PLN (PERSERO) UNIT INDUK
PEMBANGKITAN SUMBAGUT
LAPORAN PENGUSAHAAN
BULAN DESEMBER 2022
UPDK PEKANBARU
TINJAUAN UMUM
PT PLN (Persero) Unit Pelayanan Pengendalian Pembangkitan Pekanbaru merupakan salah satu unit kerja
di lingkungan PT. PLN (Persero) Pembangkitan Sumatera Bagian Utara, yang beralamat di Jl. Tanjung Datuk
No. 74 Kelurahan Tanjung Rhu Kecamatan Lima Puluh Kota Pekanbaru Provinsi Riau
Awal mula terbentuknya adalah dengan di tetapkannya Keputusan Direksi PT. PLN (Persero) No:
011.K/023/DIR/1996 Tanggal 07 Februari 1996 Tentang Pembentukan Unit Organisasi PT. PLN (Persero)
Sektor Pekanbaru dilingkungan PT. PLN (Persero) Pembangkitan dan Penyaluran Sumatera Bagian Utara.
Organisasi Unit Sektor Pekanbaru pada saat itu mengelola Unit Pembangkit Listrik Tenaga Air (PLTA) Kota
Panjang, Unit Pembangkit Listrik Tenaga Diesel dan Gas (PLTD/G) Teluk lembu serta Transmisi 150 KV dan
Gardu-gardu Induk.
Kemudian pada tahun 2005 PT. PLN (Persero) Sektor Pekanbaru, berubah nama menjadi PT PLN (Persero)
Unit Pelayanan Pengendalian Pembangkitan Pekanbaru, berdasarkan Keputusan Direksi Nomor
178.K/010/DIR/2004 dan Nomor 299.K/DIR/2005. Tugas pokok PT PLN (Persero) Unit Pelayanan
Pengendalian Pembangkitan Pekanbaru hanya mengelola Unit PLTA Kota Panjang dan Unit PLTD/G Teluk
Lembu saja, sedangkan Transmisi 150 KV dan Gardu-gardu Induk dialih kelola oleh Penyaluran dan Pusat
Pengatur Beban (P3B) Sumatera.
Saat ini PT PLN (Persero) Unit Pelayanan Pengendalian Pembangkitan Pekanbaru mengelola 3 pusat pembangk
3. PLTG dan PLTMG Balai Pungut, total kapasitas 120 MW yang terdiri dari
- PLTG kapasitas 21,6 MW ( DMN 17 MW ) terhubung di 150 KV
- PLTMG Kapasitasi 7 x 16 MW ( DMN 7 x 14,3 MW ) terhubung di 150 KV
Selain itu juga terdapat PLTG dan PLTMG Sewa yang pengelolaannya dibawah PT PLN (Persero) Unit
Pelayanan Pengendalian Pembangkitan Pekanbaru yaitu :
PLTD/G Teluk Lembu berdiri pada tahun 1987 dibawah kepengurusan PLN Cabang Pekanbaru dengan
6 unit PLTD dengan kapasitas 6,3 MW. Kemudian pada tahun 1990 mendapat tambahan 1 Unit PLTD
kapasitas 7 MW. Pada Tahun 1994 mendapat tambahan 2 unit PLTD kapasitas 7,6 MW. Tahun 1996
mendapat tambahan PLTG 2 X 21,6 MW (relokasi dari Pulo Gadung Jakarta). Pada tahun 1998
sebanyak 8 unit PLTD direlokasi ke Aceh dan Kalimantan.
Pada tahun 1996 PLTD/G Teluk Lembu di serahkan ke PT PLN (Persero) Unit Pelayanan Pengendalian
Pembangkitan Pekanbaru. Kemudian pada tahun 2010 mendapat tambahan 1 unit PLTG kapasitas
21,6 MW yang merupakan relokasi dari Gili Timur.
Sehubungan dengan kondisi PLTG (1 unit) dan PLTD (1 unit) mengalami gangguan, bila program
pemulihan memakan waktu lebih dari 1 (satu) tahun dan tidak efisien dari sisi biaya pemulihan
dibandingkan dengan pengadaan Unit Pembangkit baru serta layak dikeluarkan dari pengusahaan.
Berikut daftar Status Retired Unit (RU) & Mothballed yang memenuhi syarat :
Gangguan Rotor
1 PLTG # 1 Merk 1974 3-Apr-13 Kompresor dan
Alsthom Surat No : 0001/SK
Turbin
K.00.02/DIVORSUM/2015, tanggal 31
Desember 2015, perihal Penetapan Status
Gangguan Cylinder Pembangkit Keluar Pengusahaan (Retired)
2 PLTD #9 Merk 1994 2-Oct-14 Head dan Push
Sulzer
Road
PLTA Kota Panjang terletak di Desa Merangin, Kecamatan Bangkinang, Kabupaten Kampar, Propinsi
Riau, sekitar 20 km dari Bangkinang atau 87 km dari Pekanbaru yang dapat membangkitkan tenaga
listrik maksimum sebesar 114 MW atau dengan total Produksi 542 GWh pertahun terdiri dari 3 Unit
dengan kapasitas 38 MW.
PT PLN (PERSERO) UNIT INDUK
PEMBANGKITAN SUMBAGUT
LAPORAN PENGUSAHAAN
BULAN DESEMBER 2022
UPDK PEKANBARU
Daerah Tangkapan Air (catchment area) PLTA Kota Panjang sekitar 3.337 km2 dengan air tahunan
rata-rata 184,4 m3 /det.
Energi Listrik yang dihasilkan PLTA Kota Panjang disalurkan melalui jaringan Interkoneksi 150 kV yang
menghubungkan pembangkit-pembangkit besar di Sumatera Barat dan Riau sehingga keandalan
sistem tenaga listrik di daerah tersebut akan tinggi.
PLTG Unit 2 dan PLTMG terletak di Desa Balai Pungut Kec. Pinggir Kabupaten Bengkalis Propinsi Riau,
sekitar 100 km dari Pekanbaru dengan kapasitas PLTG unit 2 adalah 21,6 MW dam PLTMG 7x16,1
MW. PLTG #2 merupakan mesin relokasi dari PJB ( PL Madura ) dan PLTMG adalah mesin PLTD
berbahan bakar Dual Fuel (Gas dan HSD) pengadaan baru PLN dengan Kapasitas 7 X 16,1 MW.
PLN UNIT PELAKSANA DALKIT
PEKANBARU
OPERASI & PEMELIHARAAN
DESEMBER
2022
I. LAPORAN PUSAT
PT. PLN ( PERSERO) UNIT INDUK LAPORAN PENGUSAHAAN
PEMBANGKITAN SUMBAGUT HALAMAN : ii
BULAN DESEMBER 2022
UPDK PEKANBARU
EXECUTIVE SUMMARY
1. PRODUKSI ENERGI
Target Produksi
Realisasi Produksi
No Pembangkit (RKAP) Keterangan
kWh kWh
1 PLTA KOTO PANJANG #01 18,027,840.0 14,146,156.97 Base Load
2 PLTA KOTO PANJANG #02 18,027,840.0 17,575,657.32 Base Load
2. TRANSFER ENERGI
Selama dalam bulan OKTOBER 2022 PT PLN (Persero) Unit Pelayanan Pengendalian Pembangkitan Pekanbaru mengirim
energi ke PT PLN P3BS UPT PEKANBARU DAN PT PLN UIWRKR UP3 PEKANBARU sebesar = 145.374.812
Wh (Export), dan menerima energi dari UPT Pekanbaru = 335.121 kWh (Import).
1 Supply Bahan Bakar Gas dari EMP Bentu untuk Teluk Lembu & TGI = - MMBTU
2 Supply Bahan Bakar Gas dari PT. Pertamina untuk Duri = 132,545.00 MMBTU
15 Pemakaian Gas PLTG SW MPP BALAI PUNGUT (PT PLN BATAM) = 38,427.81 MMBTU
6. PEMELIHARAAN PEMBANGKIT
7 PLTMG BALAI PUNGUT DURI #01 = Pemeliharaan Compact Gas Rampt (CGR)
8 PLTMG BALAI PUNGUT DURI #02 = Pemeliharaan Compact Gas Rampt (CGR)
9 PLTMG BALAI PUNGUT DURI #03 = Pemeliharaan 45000 Jam & Compact Gas Rampt (CGR)
10 PLTMG BALAI PUNGUT DURI #04 = Pemeliharaan Compact Gas Rampt (CGR)
11 PLTMG BALAI PUNGUT DURI #05 = Pemeliharaan 49000 Jam & Compact Gas Rampt (CGR)
12 PLTMG BALAI PUNGUT DURI #06 = Pemeliharaan 48000 Jam
13 PLTMG BALAI PUNGUT DURI #07 = Pemeliharaan Compact Gas Rampt (CGR)
7. NERACA DAYA
8. REALISASI KINERJA
Mengetahui,
PT. PLN ( PERSERO) UNIT INDUK LAPORAN PENGUSAHAAN
PEMBANGKITAN SUMBAGUT HALAMAN : ii
BULAN DESEMBER 2022
UPDK PEKANBARU
YUSKAR RADIANTO
LAPORAN INDIKATOR UNJUK KERJA PEMBANGKIT
UNIT PELAYANAN DALKIT PEKANBARU
BULAN DESEMBER 2022
Unit Beban
Jumlah Tahun
No Pembang Daya (MW) Puncak Produksi kWh
Mesin Operasi
kit (MW)
Mampu
Terpasang Generator Trafo
Rata-rata
Eksport Import
1.1 PLTA #1 1 1998 38 27.18 35.92 ### ### ###
1.2 PLTA #2 1 1998 38 27.80 36.42 ### ### ###
1.3 PLTA #3 1 1998 38 26.42 36.28 ### ### ###
JUMLAH 3 114 81.40 108.62 ### ### ###
2. PLTG TELUK LEMBU 0
Unit Beban
Jumlah Tahun Daya (MW)
No Pembang Puncak Produksi kWh
Mesin Operasi
kit (MW)
Mampu
Terpasang Generator Trafo
Rata-rata
Eksport Import
JUMLAH 0 0 - - - - -
5. PLTG TELUK LEMBU 0
Unit Beban
Jumlah Tahun
No Pembang Daya (MW) Puncak Produksi kWh
Mesin Operasi
kit (MW)
Terpasang Mampu Generator Trafo
Eksport Import
5.1 PLTG Riau 1 2007 21.60 18.00 19.00 - -
PLTMG
KSO
Hutan
5.2 25 2012 28.00 25.00 17.00 - -
Alam 1
Teluk
Lembu
PLTMG PT
PJBS 1
5.3 11 2013 30.00 30.00 32.00 - -
Teluk
Lembu
ST Riau
Power
5.4 1 2013 10.00 8.00 9.00 - -
Teluk
Lembu
PLTG #1
PT PJB
5.5 Balai 1 2012 21.60 17.00 17.00 - -
Pungut
PLTMG PT
Max
5.6 Power 16 2014 40.00 40.00 42.00 - -
Balai
Pungut
PLTMG
KSO
5.7 Hutan 7 2014 50.00 50.00 52.00 - -
Alam 2
Teluk
Lembu
PLTMG PT
PJBS 2
5.8 11 2015 30.00 30.00 32.00 - -
Teluk
Lembu
PLTG PT
WIKA KSO
5.9 14 2016 25.00 18.50 18.50 - -
Rawa
Minyak
PLTG MPP
5.10 Batam (3 3 2016 75.00 52.50 25.00 ### -
x 25 MW)
JUMLAH 90 331.20 289.00 263.50 - ### -
CF Sdof SOF
Kerja Gangguan Har Periodik Stand By
% kali %
PS Netto
### ### 556.12 0.92 5.13 744.00 181.84 50.04 0.00 0.01
### ### 686.68 3.47 7.00 744.00 46.85 62.17 0.00 0.01
### ### 519.57 0.15 40.00 744.00 184.28 47.29 0.00 0.05
### ### 1,762.37 4.53 52.13 412.97 53.16 - 0.02
CF Sdof SOF
Kerja Gangguan Har Periodik Stand By
% kali %
PS Netto
### ### - - - 744.00 744.00 0.00 0.00 0.00
-
-
5,355.00 ### - - - 744.00 744.00 0.00 0.00 0.00
### ### - - - 1,488.00 0.00 - 0.00
CF Sdof SOF
Kerja Gangguan Har Periodik Stand By
% kali %
PS Netto
- - - - - - 0.00 - 0.00
- - 744.00
- - 744.00
- - 744.00
- - 744.00
- 744.00
- - 744.00
- 744.00
- 744.00
### 744.00
- ### - - - 6,696.00 - - - -
EAF EFOR
% %
98.56 0.16
99.06 0.50
99.44 0.03
99.02 0.26
EAF EFOR
% %
100.00 0.00
100.00 0.00
100.00 0.00
EAF EFOR
% %
100.00 0.00
98.17 0.00
80.25 0.00
99.25 0.00
89.87 0.00
99.62 0.00
99.54 0.00
98.17 0.00
95.61 1.51
EAF EFOR
% %
618.73 0.00
LF EFOR
- -
PT PLN (PERSERO) UIK SUMBAGUT
UPDK PEKANBARU
Jln. Dr. Tanjung Datuk No 74
Telp. (0761) 41855/41856
SISTEM RIAU
1 Pembangkitan sendiri PLTA Air (kWh) 45,090,642.31
PLTG Gas (kWh) -
Minyak (kWh) -
PLTD Gas (kWh) 18,496,170.00
Minyak (kWh) 2,131,830.00
PLTU Minyak (kWh)
Batu Bara (kWh) -
NO URAIAN
1 2
1 PLTG
1.1 PLTG TELU
1.2 PLTG TELU
1.3 PLTG TELUK
1.4 PLTG BALAI
2 PLTD
2.1 PLTD TELUK
3 PLTA
3.1 PLTA KOTA
3.2 PLTA KOTA
3.3 PLTA KOTA
4 PLTMG
4.1 PLTMG BAL
4.2 PLTMG BAL
4.3 PLTMG BAL
4.4 PLTMG BAL
4.5 PLTMG BAL
4.6 PLTMG BAL
4.7 PLTMG BAL
5 PLTU
5.1 PLTU TEMB
5.2 PLTU TEMB
TOTAL
BERITA ACARA LAPORAN PRODUKSI PEMBANGKIT SENDIRI
JUNI 2022
BRUTO
PS SENTRAL LOSSES
NON SEWA
3 4 5
- 22,911.0 43,574.0
- - -
- 18,992.0 24,820.0
- 3,805.0 4,808.0
- 114.0 13,946.0
- - -
- - -
36,307,610.0 225,924.0 976,307.0
12,686,290.00 78,940.40 225,743.60
9,657,360.00 60,092.90 258,954.10
13,963,960.00 86,890.70 491,609.30
20,421,000.0 442,000.0 85,498.0
3,085,000.0 71,210.6 12,916.2
1,863,000.0 43,003.3 7,799.9
2,850,000.0 65,786.1 11,932.3
2,601,000.0 53,985.7 10,889.8
3,451,000.0 71,628.1 14,448.5
3,868,000.0 80,283.3 16,194.4
2,703,000.0 56,102.8 11,316.8
- - -
- - -
- - -
6 7 8 9 10
(66,485.0) - 144,412 235,490 (379,902)
- - - - -
(43,812.00) - 112,032.00 153,044.00 (265,076.00)
(8,613.00) - 31,722.00 (1,946.00) (29,776.00)
(14,060.00) - 658.00 84,392.00 (85,050.00)
- - - - -
- - - - -
35,105,379.0 247,115,890 1,436,502 6,482,097 239,197,291
12,381,606.00 89,043,360.00 518,581.26 1,612,335.74 86,912,443.00
9,338,313.00 75,628,160.00 434,674.64 1,949,595.36 73,243,890.00
13,385,460.00 82,444,370.00 483,246.10 2,920,165.90 79,040,958.00
19,893,502.0 150,346,000 3,046,000 349,584 146,950,416
3,000,873.25 20,289,000.00 400,962.95 45,199.38 19,842,837.67
1,812,196.72 20,509,000.00 405,108.07 44,582.67 20,059,309.26
2,772,281.61 19,234,000.00 382,928.98 44,603.33 18,806,467.69
2,536,124.47 19,359,000.00 401,779.68 48,437.57 18,908,782.75
3,364,923.32 24,564,000.00 505,339.96 58,949.48 23,999,710.56
3,771,522.29 24,497,000.00 505,694.48 59,217.98 23,932,087.54
2,635,580.34 21,894,000.00 444,185.88 48,593.59 21,401,220.53
- - - - -
- - - - -
- - - - -
Form 12/RB
Jumlah bulan ini Jumlah kumulatip s/d bulan ini
NO URAIAN Bulan ini Sisi TR Sisi TM Sisi TT s/d Bulan ini Sisi TR Sisi TM Sisi TT
(kWh) (kWh) (kWh) (kWh) (kWh) (kWh) (kWh) (kWh)
1 2 3 = 4+5+6 4 5 6 7 = 8+9+10 8 9 10
1 Produksi Sendiri 68,211,650.000 - - 68,211,650.000 136,423,300.000 - - 136,423,300.000
1.1. PLTA 46,258,650.00 - - 46,258,650.00000 92,517,300.000 - - 92,517,300.000
1.2. PLTD Minyak - - - - - - - -
1.3. PLTD Gas Alam - - - - - - - -
1.4. PLTU Batu Bara - - - - - - - -
1.5. PLTU Minyak - - - - - - - -
1.6. PLTU Gas Alam - - - - - - - -
1.7. PLTG Minyak - - - - - - - -
1.8. PLTG Gas Alam - - - - - .0 - - - .0
1.9. PLTGU Minyak - - - - - - - -
1.10. PLTGU Gas Alam - - - - - - - -
1.11. PLTP - - - - - - - -
1.12. PLTS (Surya) - - - - - - - -
1.13. PLT Bayu - - - - - - - -
1.14. Biodiesel - - - - - - - -
1.15. Olein - - - - - - - -
1.16. Biomass - - - - - - - -
1.17. Bio Fame - - - - -
1.18. CPO - - - - -
1.19. PLTMG Minyak - - - - - - - -
1.20. PLTMG Gas 21,953,000.00 - - 21,953,000.00000 43,906,000.00 - - 43,906,000.00
2 Pemakaian Sentral - - - - 1,635,928.00 - - 1,635,928.00
3 Rugi-Rugi Trafo - - - - 1,527,110.00 - - 1,527,110.00
4 Produksi Sendiri Netto (1 - 2 - 3) 68,211,650.00 - - 68,211,650.00 68,211,650.00 - - 68,211,650.00
5 Diterima dari 62,047,331.54 - 47,703,999.54 14,343,332.00 62,047,331.54 - 47,703,999.54 14,343,332.00
5.1. PLN Unit Induk P3B Sumatera 247,870.000 - - 247,870.00000 495,740.00 - - 495,740.00
5.2. PLN Unit Induk Wilayah Sumut - - - - - - - -
5.3. PLN Unit Induk Wilayah Riau Dan Kepulauan Riau - - - - - -
5.4. Luar PLN (dibeli) 61,799,461.540 - 47,703,999.540 14,095,462.000 123,598,923.08 - 95,407,999.08 28,190,924.00
- PLTD SW BELAWAN (PT AKE) (SEWA/RELOKASI DARI UPHK MEDAN) - - - - - - - -
- PLTD SW BELAWAN (PT BBS) (RELOKASI DARI UPHK MEDAN) - - - - - - - -
- PLTG IPP MPP PAYA PASIR (PT PLN BATAM) (RELOKASI DARI UPHK MEDAN) - - - - - - - -
- PLTD SW TELUK DALAM (PT. BGP) (RELOKASI DARI AREA NIAS) - - - - - - - -
- PLTD SW GUNUNG SITOLI (PT. BGP) (RELOKASI DARI AREA NIAS) - - - - - - - -
- PLTD SW GUNUNG SITOLI (PT. ASJ) (RELOKASI DARI AREA NIAS) - - - - - - - -
- PLTG IPP MPP NIAS (PT. PLN BATAM) (RELOKASI DARI AREA NIAS) - - - - - - - -
- PLTGU SW RIAU #01 (GT 1.1) (PT RIAU POWER) - - - - - - - -
- PLTGU SW RIAU #02 (ST 1.0) (PT RIAU POWER) - - - - - - - -
- PLTMG SW TELUK LEMBU I (KSO HUTAN ALAM) 7,620,777.000 - 7,620,777.00000 - 15,241,554.00 - 15,241,554.00 -
- PLTMG SW TELUK LEMBU II (KSO HUTAN ALAM) 21,527,005.000 - 21,527,005.000 - 43,054,010.00 - 43,054,010.00 -
- PLTMG SW TELUK LEMBU I (PT PJBS) 8,556,443.000 - 8,556,443.00000 - 17,112,886.00 - 17,112,886.00 -
- PLTMG SW TELUK LEMBU II (PT PJBS) 7,238,300.000 - - 7,238,300.00000 14,476,600.00 - - 14,476,600.00
- PLTG SW BALAI PUNGUT DURI (PT PJB) - - - - - - - -
- PLTMG SW BALAI PUNGUT (PT MAX POWER) - - - - - - - -
- PLTMG SW SIAK (PT WIKA RAWA MINYAK) 9,999,774.540 - 9,999,774.54000 - 19,999,549.08 - 19,999,549.08 -
- PLTG IPP MPP BALAI PUNGUT (PT PLN BATAM) 6,857,162.000 - - 6,857,162.00000 13,714,324.00 - - 13,714,324.00
6 Produksi Total Netto (4 + 5) 130,258,981.54 - 47,703,999.54 82,554,982.00 130,258,981.54 - 47,703,999.54 82,554,982.00
7 Dikirim ke : 130,258,981.54 - 47,703,999.54 82,554,982.00 130,258,981.54 - 47,703,999.54 82,554,982.00
7.1. PLN Unit Induk Wilayah Sumut : - - - - - - - -
- UPDK Pandan (PLTMH) - - - - - - - -
- UPK Belawan (NIAS) - - - - - - - -
7.3. PLN Unit Induk P3B Sumatera 120,259,207.00 - 37,704,225.00 82,554,982.00 120,259,207.00 - 37,704,225.00 82,554,982.00
- UPK Nagan Raya - - - - - - - -
- UPK Belawan - - - - - - - -
- UPDK Pekanbaru 120,259,207.00 - 37,704,225.00 82,554,982.00 120,259,207.00 - 37,704,225.00 82,554,982.00
- UPDK Pandan - - - - - - - -
- UPK Labuhan Angin - - - - - - - -
- UPK P. Susu - - - - - - - -
- PLTU P. Susu Unit #01 dan 02 - - - - - - - -
- PLTMG Arun - - - - - - - -
- PLTU Tenayan - - - - - - - -
8 Susut Transmisi - - - - - - - -
Jumlah
Pemakai Biaya Harga
Harga Harga
Pusat Listrik/Nama Sentral Jenis Produksi Bruto Sebenarnya Susut Jumlah an Rata- Surveyor/Ong Satuan
Satuan Loco
Rata kos Angkut Total
Sentral
Nilai Kalor
Bahan Bakar (kg, liter, (kg, liter, (Rp/liter, (Rp/liter, (Rp/liter,
KIT (DUAG) Total (kWh) (Kcal/Liter/M (kg, liter, mmbtu) (Rp)
(kWh) mmbtu) mmbtu) mmbtu) mmbtu) mmbtu)
MBTU)
1 2 3 4 5 6 7 8=6+7 9=8/5 10 11 12=10+11 13=8*12
PLTG TELUK LEMBU
1 PLTG TELUK LEMBU #1 G GAS
HSD
2 PLTG TELUK LEMBU #2 G GAS - 252,000.00 - - - -
HSD - 9,060.00 75.00 - 75.00 -
3 PLTG TELUK LEMBU #3 G GAS - 252,000.00 - - - -
HSD - 9,060.00 120.00 - 75.00 -
JUMLAH GAS - - - -
HSD - 150.00 150.00 -
PLTD TELUK LEMBU
4 PLTD SULZER TELUK LEMBU D GAS - 252,000.00 - - - -
HSD - 9,060.00 - - - -
JUMLAH GAS
HSD
PLTA KOTO PANJANG
5 PLTA KOTO PANJANG #1 A AIR 12,686,290.00 - - - -
6 PLTA KOTO PANJANG #2 A AIR 9,657,360.00 - - - -
7 PLTA KOTO PANJANG #3 A AIR 13,963,960.00 - - - -
JUMLAH 36,307,610.00
PLTMG DURI
8 PLTMG BALAI PUNGUT DURI #1 G GAS 3,085,000.00 27,302.06 - 27,302.06 0.01
HSD - 5,676.19 - 5,676.19 -
9 PLTMG BALAI PUNGUT DURI #2 G GAS 1,863,000.00 16,541.04 - 16,541.04 0.01
HSD - 5,165.50 - 5,165.50 -
10 PLTMG BALAI PUNGUT DURI #3 G GAS 2,850,000.00 25,220.35 - 25,220.35 0.01
HSD - 5,160.88 - 5,160.88 -
11 PLTMG BALAI PUNGUT DURI #4 G GAS 2,601,000.00 22,745.05 - 22,745.05 0.01
HSD - 11,344.67 - 11,344.67 -
12 PLTMG BALAI PUNGUT DURI #5 G GAS 3,451,000.00 30,856.32 - 30,856.32 0.01
HSD - 6,393.62 - 6,393.62 -
13 PLTMG BALAI PUNGUT DURI #6 G GAS 3,868,000.00 34,462.82 - 34,462.82 0.01
HSD - 7,342.48 - 7,342.48 -
14 PLTMG BALAI PUNGUT DURI #7 G GAS 2,703,000.00 23,865.20 - 23,865.20 0.01
HSD - 5,545.05 - 5,545.05 -
JUMLAH GAS 20,421,000.00 180,992.84 - 180,992.84 0.01
HSD - 46,628.40 - 46,628.40 -
PLTG
15 PLTG BALAI PUNGUT #2 G GAS
HSD
JUMLAH GAS - - - - -
HSD - - - - -
PLTU TEMBILAHAN
16 PLTU TEMBILAHAN 1 U BBARA
HSD
BIO HSD
BIO FAME
17 PLTU TEMBILAHAN 2 U BBARA
HSD
BIO HSD
JUMLAH BBARA - - - - 0
HSD - - -
BIO HSD - - - 0
BIO FAME - - - - 0
PEMBANGKIT SEWA
1 PLTG SEWA PT RIAU POWER D GAS
HSD
2 ST SEWA PT RIAU POWER D GAS
3 PLTMG SEWA 12 MW KSO HUTAN AL D GAS 4,499,502.00 252,000.00 48,790.96 - 48,790.96 0.01
4 PLTMG 50 MW KSO HUTAN ALAM 2 D GAS 16,597,944.00 252,000.00 148,560.80 - 148,560.80 0.01
5 PLTMG SEWA 30 MW PT PJBS 1 TL. D GAS 6,981,646.00 252,000.00 69,724.83 - 69,724.83 0.01
6 PLTMG SEWA 30 MW PT PJBS 2 TL. D GAS 5,645,300.00 252,000.00 55,231.13 - 55,231.13 0.01
7 PLTG UNIT 1 PJB BALAI PUNGUT D GAS
8 PLTMG SEWA 40 MW PT MAX POWE D GAS
9 PLTMG SEWA 25 MW PT WIKA RAWA D GAS
10 PLTG MPP BATAM 3X25 MW BALAI D GAS 7,050,822.00 252,000.00 78,111.16 78,111.16 0.01
HSD - 9,060.00 50,557.57 - 50,557.57 -
LAIN-LAIN
LAIN-LAIN
Keterangan:
PT PLN (PERSERO) No. Formulir :
PEMBANGKITAN SUMATERA BAGIAN UTARA LAPORAN PEMAKAIAN BAHAN PELUMAS No. Revisi :
SEKTOR PEMBANGKITAN PEKANBARU BULAN JUNI 2022 Tanggal :
Halaman :
Formulir 14
PEMAKAIAN MINYAK PELUMAS BIAYA MINYAK PELUMAS
NO. Pusat Listrik/Nama Sentral Produksi kWh Pemakaian rata- Harga Dasar Ongkos Angkut Harga Loco Sentral Jumlah Harga Loco
sebenarnya (liter) susut (liter) Jumlah (liter)
rata (cc/kWh) (Rp/liter) (Rp/liter) (Rp/liter) Sentral
1 2 3 4 5 5=4+5 6=5/3*1000 7 8 9 10
PLTG - - - - - - - - -
1 PLTG TELUK LEMBU 1 (ALSTHOM)
2 PLTG TELUK LEMBU 2 (ALSTHOM) - - - - -
3 PLTG TELUK LEMBU 3 (EX GILI TIMUR) - - - - -
4 PLTG BALAI PUNGUT 2 DURI IP
PLTD
5 PLTD TELUK LEMBU SULZER
PLTA 36,307,610.00 418.00 - 418.00 0.04 - - - -
6 PLTA KOTA PANJANG 1 12,686,290.00 - - - -
7 PLTA KOTA PANJANG 2 9,657,360.00 418.00 - 418.0 0.0
8 PLTA KOTA PANJANG 3 13,963,960.00 - - - -
PLTMG 20,421,000.00 3,600.00 - 3,600.00 1.28 - - - -
9 PLTMG BALAI PUNGUT DURI 1 3,085,000.00 - - - -
10 PLTMG BALAI PUNGUT DURI 2 1,863,000.00 600.00 - 600.0 0.3
11 PLTMG BALAI PUNGUT DURI 3 2,850,000.00 600.00 - 600.0 0.2
12 PLTMG BALAI PUNGUT DURI 4 2,601,000.00 600.00 - 600.0 0.2
13 PLTMG BALAI PUNGUT DURI 5 3,451,000.00 1,800.00 - 1,800.0 0.5
14 PLTMG BALAI PUNGUT DURI 6 3,868,000.00 - - - -
15 PLTMG BALAI PUNGUT DURI 7 2,703,000.00 - - - -
Keterangan:
LAPORAN PEMAKAIAN PELUMAS
JUNI TAHUN 2022
FORM 14
PEMAKAIAN PELUMAS
PLT
Jumlah
NO UNIT PELAKSANA UNIT LAYANAN Produksi Sebenarnya Susut/Lain2 Jumlah SLC
Unit
kWh liter liter liter liter / kWh
1 2 3 4 5 8 9 10 11
PLTG TELUK LEMBU #01 G 1
PLTG TELUK LEMBU #02 G 1 - 10 - 10.00 -
PLTG TELUK LEMBU #03 G 1 - 50 - 50.00 -
PLTG TELUK LEMBU G 3 - 60 - 60.00 -
PLTA KOTO PANJANG #01 A 1 89,043,360 - - - -
PLTA KOTO PANJANG #02 A 1 75,628,160 418 - 418.00 0.000006
PLTA KOTO PANJANG #03 A 1 82,444,370 - - - -
PLTA KOTO PANJANG A 3 247,115,890 418 - 418.00 0.000002
PLTMG BALAI PUNGUT DURI #01 DG 1 20,289,000 3,300 - 3,300.00 0.000163
PLTMG BALAI PUNGUT DURI #02 DG 1 20,509,000 3,400 - 3,400.00 0.000166
PLTMG BALAI PUNGUT DURI #03 DG 1 19,234,000 4,400 - 4,400.00 0.000229
3 UPDK PEKANBARU PLTMG BALAI PUNGUT DURI #04 DG 1 19,359,000 3,000 - 3,000.00 0.000155
PLTMG BALAI PUNGUT DURI #05 DG 1 24,564,000 9,800 - 9,800.00 0.000399
PLTMG BALAI PUNGUT DURI #06 DG 1 24,497,000 8,100 - 8,100.00 0.000331
PLTMG BALAI PUNGUT DURI #07 DG 1 21,894,000 2,800 - 2,800.00 0.000128
PLTMG DURI DG 7 150,346,000 34,800.00 - 34,800.00 0.000231
PLTG BALAI PUNGUT DURI #02 G 1 50 - 50.00 -
PLTG DURI G 1 - 50.00 - 50.00 -
PLTU TEMBILAHAN #01 U 1
PLTU TEMBILAHAN #02 U 1
PLTU TEMBILAHAN 2
- - - -
Keterangan:
PT PLN (persero) SEKTOR PEMBANGKITAN PEKANBARU
Pengusahaan Pembangkitan
LAPORAN NOVEMBER 2022
No.
(kW)
2 3 4 5
PRODUKSI SENDIRI 0 GAS TT - 21,600
PRODUKSI SENDIRI 0 GAS TT 13,860 21,600
PRODUKSI SENDIRI 0 GAS TT 15,000 20,000
PRODUKSI SENDIRI 0 HSD TM - 7,800
PRODUKSI SENDIRI 0 NON TT 38,000 38,000
PRODUKSI SENDIRI 0 NON TT 38,000 38,000
PRODUKSI SENDIRI 0 NON TT 38,000 38,000
PRODUKSI SENDIRI 0 GAS TT 14,850 20,000
PRODUKSI SENDIRI 0 GAS TT 14,320 16,100
PRODUKSI SENDIRI 0 GAS TT 14,320 16,100
PRODUKSI SENDIRI 0 GAS TT 14,320 16,100
PRODUKSI SENDIRI 0 GAS TT 14,320 16,100
PRODUKSI SENDIRI 0 GAS TT 14,320 16,100
PRODUKSI SENDIRI 0 GAS TT 14,320 16,100
PRODUKSI SENDIRI 0 GAS TT 14,320 16,100
SEWA 0 GAS TM 12,000 12,000
SEWA 0 GAS TM 50,000 50,000
SEWA 0 GAS TM 18,000 30,000
SEWA 0 GAS TT 20,000 30,000
SEWA 0 GAS TM 20,000 25,000
BELI GAS TT 82,500 90,000.00
KINERJA UNIT MESIN
6 7 8 9 10
- RUSAK PERMANEN RP EXISTING 01 - -
13,860 BEROPERASI OP EXISTING 01 - -
15,000 BEROPERASI OP EXISTING 01 - -
- RUSAK PERMANEN RP EXISTING 01 -
38,000 BEROPERASI OP EXISTING 01 571.67 5.13
38,000 BEROPERASI OP EXISTING 01 686.68 7.00
38,000 BEROPERASI OP EXISTING 01 524.90 40.00
14,850 BEROPERASI OP EXISTING 01 - -
14,320 BEROPERASI OP EXISTING 01 219.13 19.97
14,320 BEROPERASI OP EXISTING 01 230.08 14.38
14,320 PEMELIHARAAN OP EXISTING 01 231.47 7.52
14,320 BEROPERASI OP EXISTING 01 208.23 11.00
14,320 BEROPERASI OP EXISTING 01 149.28 3.55
14,320 BEROPERASI OP EXISTING 01 209.10 5.63
14,320 BEROPERASI OP EXISTING 01 260.83 123.30
12,000 BEROPERASI OP EXISTING 01 - -
50,000 BEROPERASI OP EXISTING 01 - -
18,000 BEROPERASI OP EXISTING 01 - -
20,000 BEROPERASI OP EXISTING 01 - -
20,000 BEROPERASI OP EXISTING 1
82,500.00 BEROPERASI OP EXISTING 01
KAPASITAS TANGKI TIMBUN
11 12 13 14 15 16
- - - - - -
- 6,000,000 - - TERPAKAI -
- - - - - -
- - - - - -
0.92 - - - - -
3.47 - - - - -
0.15 - - - - -
- 626,000 - - TERPAKAI -
- 2,300,000 - - TERPAKAI 125,590.00
- - - - TERPAKAI 183,290.00
- - - - TERPAKAI 234,760.00
- - - - TERPAKAI 1,229,600.00
- - - - TERPAKAI 27,280.00
- - - - TERPAKAI 51,520.00
- - - - TERPAKAI 279,790.00
- - - - - -
- - - - - -
- - - - - -
- - - - - -
Bruto
68,795,696.31
Export
BA UPT 66,963,406.00
BA KWH 66,963,406.00
BIO
MFO IDO OLEIN
DIESEL
17 18 19 20
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
349,556.00 66,613,850.00
SELISIH -
PRODUKSI (KWH)
GAS PANAS
BATUBARA GBB AIR
ALAM BUMI
FORM 12
21 22 23 24 25
- - - - -
- - - - -
- - - - -
- - - - -
- - - - 14,146,157
- - - - 17,575,657
- - - - 13,368,828
- - - - -
- 2,632,410.00 - - -
- 2,800,710.00 - - -
- 2,649,240.00 - - -
- 2,534,400.00 - - -
- 1,908,720.00 - - -
- 2,823,480.00 - - -
- 3,147,210.00 - - -
- - - - -
- - - - -
- - - - -
- - - - -
-
3,077,054.00
- 18,496,170 45,090,642
26 27 28 29 30 31 32
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
63,586,812
NOMINASI/PEMESA
33 34 35 36 37
- - - - -
16,720 28,081.00 - - -
5,355 20,422.00 - - -
- - - - -
79,597.59 274,766.38 - - -
98,894.70 226,148.62 - - -
75,223.71 377,107.31 - - -
- 14,094.00 - - -
43,163.69 73,594.26 1,632,000 -
46,700.67 79,624.83 - - -
45,135.64 76,956.44 - - -
87,812.03 100,438.29 1,632,000 - -
45,165.81 51,660.08 - - -
67,072.15 76,716.28 - - -
79,950.01 91,445.81 - - -
- - - - -
- - - - -
- - - - -
- - - - -
690,791 1,491,055
805607 415,000.00 390,607.00
NOMINASI/PEMESANAN BAHAN BAKAR
38 39 40 41 42 43 44
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - 132,545.00 - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
PEMAKAIAN BAHAN BAKAR
BIO GAS
HSD MFO IDO OLEIN BATUBARA
DIESEL ALAM
45 46 47 48 49 50 51
- - - - -
755.00 - - - -
60.00 - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
18,583.39 - - - 24,247.11177
27,121.18 - - - 26,406.24928
34,737.13 - - - 26,074.82161
181,942.31 - - - 23,083.42861
4,036.59 - - - 17,753.61066
7,623.35 - - - 25,742.39401
41,400.16 - - - 29,474.57406
- - - - -
- - - - -
- - - - -
- - - - -
-
- 38,427.81000
316,259 211,210
- -
AHAN BAKAR SUSU
LAIN-
GBB BIOMASS HFO BIO HSD CPO BIO FAME HSD MFO
LAIN
52 53 54 55 56 57 58 59 60
- - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
BAHAN BAKAR
61 62 63 64 65 66 67 68
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
BAHAN BAKAR
PERSEDIAAN AWAL
BIO GAS
HSD MFO IDO OLEIN BATUBARA
DIESEL ALAM
FORM 13
69 70 71 72 73 74 75
- - - - - - -
376,642.00 - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
117,838.90 - - - - - -
795,340.00 - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
-
SUPPLY/PENERIMAAN BAHAN BAKAR
LAIN- BIO
GBB BIOMASS HSD MFO IDO OLEIN BATUBARA
LAIN DIESEL
FORM 13
76 77 78 79 80 81 82 83 84
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - 1,632,000 - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
-
BAHAN BAKAR HARGA DASAR (BELUM DI KALI PEMA
85 86 87 88 89 90 91 92 93
- - - - - - - - -
- - - - 8,228.00 - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
132,545 - - - 8,228.00 - - - -
- - - - 8,228.00 - - - -
- - - - 8,228.00 - - - -
- - - - 8,228.00 - - - -
- - - - 8,228.00 - - - -
- - - - 8,228.00 - - - -
- - - - 8,228.00 - - - -
- - - - 8,228.00 - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
8,228.00
AR (BELUM DI KALI PEMAKAIAN) ONGKOS ANGK
(Kg) MMBTU PER LITER PER LITER PER LITER PER LITER
PERSEDIA
BATUBAR GAS LAIN-
OLEIN GBB BIOMASS PEMAKAIAN SUSUT AN
A ALAM LAIN
AWAL
PER
PER LITER PER (Kg) LITER LITER LITER
MMBTU
FORM 14
103 104 105 106 107 108 109 110 111
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - 0.47 - - - - - -
- - 0.47 - - - - - -
- - 0.47 - - - - - -
- - 0.47 - - - 600.00 - -
- - 0.47 - - - 600.00 - -
- - 0.47 - - - - - -
- - 0.47 - - - 700.00 - -
- - 0.47 - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
0.47
1,900
-
NILAI KALOR
RATA RATA
PELUMAS
ONGKOS BIO
SUPPLY HARGA HSD MFO IDO OLEIN BATUBARA
ANGKUT DIESEL
LITER PER LITER PER LITER K cal / Liter K cal / Liter K cal / Liter K cal / Liter K cal / Liter K cal / Kg
FORM 14
112 113 114 115 116 117 118 119 120
- - - - - - - - -
- - - 9,060 - - - - -
- - - 9,060 - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - 9,060 - - - - -
- - - 9,060 - - - - -
- - - 9,060 - - - - -
- - - 9,060 - - - - -
- - - 9,060 - - - - -
- - - 9,060 - - - - -
- - - 9,060 - - - - -
- - - 9,060 - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
9060
GAS LAIN-
GBB BIOMASS HFO BIO HSD CPO BIO FAME
ALAM LAIN
Kcal /
Kcal / MMBTU K cal / Liter K cal / Liter K cal / Liter K cal / Liter K cal / Liter
MMBTU
PILIHAN
PILIHAN DISALURKA
SKEMA N
Pengusahaan Pembangkitan
LAPORAN FEBRUARI 2017
PILIHAN PILIHAN
SKEMA DISALURKA
N
PLTGU SW
RIAU #01
(GT 1.1) (PT
RIAU
POWER)
20 KV
PLTGU SW
RIAU #02
(ST 1.0) (PT
RIAU
POWER)
20 KV
PLTG SW
BALAI
PUNGUT
DURI (PT
PJB)
150 kV
PLTMG SW
BALAI
PUNGUT (PT
MAX
POWER)
20 KV
PLTMG SW
TELUK
LEMBU I
(KSO HUTAN
ALAM)
20 KV
PLTMG SW
TELUK
LEMBU II
(KSO HUTAN
ALAM)
20 KV
PLTMG SW
TELUK
LEMBU I (PT
PJBS)
20 kV
PLTMG SW
TELUK
LEMBU II (PT
PJBS)
150 kV
PLTMG SW
SIAK (PT
WIKA RAWA
MINYAK)
20 KV
PLTG SW
MPP BALAI
PUNGUT (PT
PLN BATAM)
150 kV
Pengusahaan Pembangkitan
LAPORAN MARET 2017
PILIHAN PILIHAN
DISALURKA
SKEMA N
0 20 KV
0 20 KV
0 150 kV
0 20 KV
PLTMG SW
TELUK
LEMBU I
(KSO HUTAN
ALAM)
20 KV
PLTMG SW
TELUK
LEMBU II
(KSO HUTAN
ALAM)
20 KV
PLTMG SW
TELUK
LEMBU I (PT
PJBS)
20 kV
PLTMG SW
TELUK
LEMBU II (PT
PJBS)
150 kV
PLTMG
SEWA (PT
WIKA RAWA
MINYAK
SIAK)
20 KV
PLTG IPP
MPP BALAI
PUNGUT (PT
PLN BATAM)
150 kV
DAYA
MAMPU
JUMLAH DAYA DISALURKA SISTEM BERDASARK MULAI KONTRAK
UNIT TERPASANG N SEWA
AN
KONTRAK
AWAL
DD/MM/ NO AKHIR
YYYY) KONTRAK (DD/MM/YY (DD/MM/YYYY)
YY)
(kW) (kW)
PILIHAN HSD MFO IDO BIO DIESEL OLEIN BATUBARA GAS ALAM
SISTEM
ISOLATED -
ISOLATED -
ISOLATED 45,198,778.00
ISOLATED 143,766,671.00
ISOLATED 54,121,128.00
GRID 44,539,100.00
GRID - - -
ISOLATED - - -
ISOLATED 14,527,178.17
(PT PLN BATAM) 91,124,211.00
DAYA
MAMPU
JUMLAH DAYA DISALURKA SISTEM BERDASARK MULAI KONTRAK
UNIT TERPASANG N SEWA
AN
KONTRAK
AWAL
DD/MM/ NO AKHIR
YYYY) KONTRAK (DD/MM/YY (DD/MM/YYYY)
YY)
(kW) (kW)
KWH NETTO
PILIHAN
SISTEM HSD MFO IDO BIO DIESEL OLEIN BATUBARA GAS ALAM
11,231,985.00
ISOLATED
ISOLATED
-
GRID
21,033,638.00
ISOLATED
8,112,718.00
ISOLATED
27,018,440.00
ISOLATED
11,125,604.00
ISOLATED - -
14,822,900.00
GRID - -
370,778.18
ISOLATED
GRID 3,300,704
DAYA
MAMPU
JUMLAH DAYA DISALURKA SISTEM BERDASARK MULAI KONTRAK
UNIT TERPASANG N AN SEWA
KONTRAK
AWAL
DD/MM/ NO (DD/MM/YY AKHIR
YYYY) KONTRAK YY) (DD/MM/YYYY)
(kW) (kW)
KWH NETTO
PILIHAN
HSD MFO IDO BIO DIESEL OLEIN BATUBARA GAS ALAM
SISTEM
ISOLATED -
ISOLATED -
GRID -
ISOLATED -
ISOLATED
ISOLATED
ISOLATED - -
GRID - -
-
ISOLATED
3,077,054.00
GRID -
SKEMA TOTAL PRODUKSI VOLUME KETERANGA
(BOO, BOT) BAHAN BAKAR N
TARA
KALOR
(kKal/kWh)
CF (%) /
SFC
(ltr/kWh)
(LITER, MMBTU,
PILIIH NILAI (kWH)
KG)
GBB PANAS BUMI AIR SURYA BIOMASS LAIN- HSD MFO IDO
LAIN
-
-
- -
-
SKEMA TOTAL PRODUKSI VOLUME KETERANGA
(BOO, BOT) BAHAN BAKAR N
TARA
KALOR
(kKal/kWh)
CF (%) /
SFC
(ltr/kWh)
(LITER, MMBTU,
PILIIH NILAI (kWH)
KG)
LAIN-
GBB PANAS BUMI AIR SURYA BIOMASS LAIN HSD MFO IDO
-
### -
-
LAIN-
GBB PANAS BUMI AIR SURYA BIOMASS HSD MFO IDO
LAIN
-
-
Err:509 0
TARA KALOR BOO 20 kV ISOLATED
SFC BOT 70 kV GRID
150 kV
-
-
594,628.57
###
606,521.04
832,062.37
- 222,561.83
- 735,864.22
601,509.50
###
TARA KALOR BOO 20 kV ISOLATED
LAIN-
BIO DIESEL OLEIN BATUBARA GAS ALAM GBB BIOMASS LAIN
-
-
-
TARA KALOR BOO 20 kV ISOLATED
LAIN-
BIO DIESEL OLEIN BATUBARA GAS ALAM GBB BIOMASS
LAIN
-
-
-
-
-
-
38,427.81
0 0
0 0
0 0
0 0
0 0
0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
PT PLN (PERSERO) PEMBANGKITAN SUMBAGUT
SEKTOR PEMBANGKITAN PEKANBARU
Jln. Dr. Tanjung Datuk No 74
LAPORAN KUMULATIF JAM41855/41856
Telp. (0761) KERJA , JAM GANGGUAN, JAM PEMELIHARAAN PEMBANGKIT
PT PLN (PERSERO) UNIT INDUK PEMBANGKITAN SUMBAGUT SEKTOR PEMBANGKITAN PEKANBARU
UNIT PELAKSANA PENGENDALIAN PEMBANGKITAN PEKANBARU
TAHUN 2022
Jln. Dr. Tanjung Datuk No 74
Telp. (0761) 41855/41856
Hal. 8
I. PL KOTA PANJANG
PLTA UNIT 1
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 672.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,760.00
2 Kerja 641.15 641.15 696.08 630.98 489.37 500.55 413.63 540.43 445.87 366.53 477.77 556.12 6,399.63
3 Pemeliharaan 5.90 12.58 9.70 1.75 3.48 4.10 - 6.60 7.33 7.32 6.60 5.13 70.49
4 PO ( Har Terencana ) - - - - - - - - - - - - -
5 MO ( Har Tdk Terencana ) 5.90 12.58 9.70 1.75 3.48 4.10 - 6.60 7.33 7.32 6.60 5.13 70.50
6 Jumlah Jam Standby 23.60 89.27 13.18 111.00 227.15 233.05 279.30 196.20 290.80 343.13 259.63 181.84 2,248.15
7 Standby 23.60 89.27 13.18 111.00 227.15 233.05 279.30 196.20 290.80 343.13 259.63 181.84 2,248.16
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam 1.35 1.00 1.03 0.27 - 6.30 51.07 0.77 - 3.02 - 0.92 65.72
10 Sejak YM/CI/TO (JSYM/CI/TO) 1,629.03 2,247.17 2,943.25 3,574.23 4,063.60 4,564.15 4,977.78 5,518.22 6,409.95 6,330.62 6,808.38 7,364.50
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) 1,629.03 2,247.17 2,943.25 3,574.23 4,063.60 4,564.15 4,977.78 5,518.22 6,409.95 6,330.62 6,808.38 7,364.50
12 Sejak MO/MI (JSMO/MI) 1,629.03 2,247.17 2,943.25 3,574.23 4,063.60 4,564.15 4,977.78 5,518.22 6,409.95 6,330.62 6,808.38 7,364.50
13 Sejak Beroperasi (JSB) 161,996.58 162,614.71 163,310.80 163,941.78 164,431.15 164,931.70 165,345.33 165,885.76 166,777.50 166,698.16 167,175.93 167,732.05
PLTA UNIT 2
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 672.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,760.00
2 Kerja 691.43 691.43 643.07 354.05 340.45 358.43 466.30 474.75 632.82 716.80 651.55 686.68 6,707.77
3 Pemeliharaan 3.78 4.67 24.70 4.18 7.53 6.58 134.52 5.82 6.95 5.08 6.83 7.00 217.64
4 PO ( Har Terencana ) - - - - - - 134.52 - - - - - 134.52
5 MO ( Har Tdk Terencana ) 3.78 4.67 24.70 4.18 7.53 6.58 - 5.82 6.95 5.08 6.83 7.00 83.13
6 Jumlah Jam Standby (23.21) 47.90 52.23 376.85 372.02 378.84 91.63 260.91 95.65 (1.88) 85.62 46.85 1,783.41
7 Standby (23.21) 47.90 52.23 376.85 372.02 378.84 91.63 260.91 95.65 (1.88) 85.62 46.85 1,783.41
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam - - - 8.92 - 0.15 51.55 2.52 8.58 - - 3.47 75.18
10 Sejak YM/CI/TO (JSYM/CI/TO) 4,845.93 5,207.06 5,850.13 6,204.14 6,544.59 6,903.03 466.30 941.05 2,206.68 2,290.67 2,942.22 3,628.90
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) 10,907.82 11,268.95 11,912.02 12,266.03 12,606.48 12,964.92 13,431.22 13,905.97 15,171.60 15,255.58 15,907.13 16,593.82
12 Sejak MO/MI (JSMO/MI) 35,289.85 35,650.98 36,294.05 36,648.07 36,988.52 37,346.95 37,813.25 38,288.00 39,553.63 39,637.62 40,289.17 40,975.85
13 Sejak Beroperasi (JSB) 166,365.98 166,727.11 167,370.18 167,724.20 168,064.65 168,423.08 168,889.38 169,364.13 170,629.76 170,713.75 171,365.30 172,051.98
PLTA UNIT 3
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 672.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,760.00
2 Kerja 221.92 221.92 510.45 330.30 649.27 542.92 461.45 461.25 486.08 450.98 355.92 519.57 5,212.02
3 Pemeliharaan 5.23 5.55 19.00 4.05 38.75 4.03 7.50 7.50 - 4.62 3.92 40.00 140.15
4 PO ( Har Terencana ) - - - - - - - - - - - 40.00 40.00
5 MO ( Har Tdk Terencana ) 5.23 5.55 19.00 4.05 38.75 4.03 7.50 7.50 - 4.62 3.92 - 100.15
6 Jumlah Jam Standby 442.25 506.93 190.12 409.33 30.73 197.05 235.37 235.57 257.73 264.40 383.50 184.28 3,337.26
7 Standby 442.25 506.93 190.12 409.33 30.73 197.05 235.37 235.57 257.73 264.40 383.50 184.28 3,337.27
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam 2.60 9.60 0.43 0.32 1.25 - 39.68 39.68 0.18 - 0.67 0.15 94.57
10 Sejak YM/CI/TO (JSYM/CI/TO) 1,460.37 1,877.94 2,388.39 2,718.69 3,367.95 3,910.87 4,372.32 4,833.57 5,805.74 5,770.64 6,126.55 6,646.12
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) 36,013.15 36,430.72 36,941.17 37,271.47 37,920.74 38,463.65 38,925.10 39,386.35 40,358.52 40,323.42 40,679.34 41,198.90
12 Sejak MO/MI (JSMO/MI) 52,731.70 53,149.27 53,659.72 53,990.02 54,639.29 55,182.20 55,643.65 56,104.90 57,077.07 57,041.97 57,397.89 57,917.45
13 Sejak Beroperasi (JSB) 167,736.17 168,153.74 168,664.19 168,994.49 169,643.76 170,186.67 170,648.12 171,109.37 172,081.54 172,046.44 172,402.36 172,921.92
TOTAL PLTA
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 2,232.00 2,016.00 2,232.00 2,160.00 2,232.00 2,160.00 2,232.00 2,232.00 2,160.00 2,232.00 2,160.00 2,232.00 26,280.00
2 Kerja 1,554.50 1,554.50 1,849.60 1,315.33 1,479.08 1,401.90 1,341.38 1,476.43 1,564.77 1,534.32 1,485.23 1,762.37 18,319.42
3 Pemeliharaan 14.91 22.80 53.40 9.98 49.76 14.71 142.02 19.92 14.28 17.02 17.35 52.13 428.28
4 PO ( Har Terencana ) - - - - - - 134.52 - - - - 40.00 174.52
5 MO ( Har Tdk Terencana ) 14.92 22.80 53.40 9.98 49.77 14.72 7.50 19.92 14.28 17.02 17.35 12.13 253.78
6 Jumlah Jam Standby 442.64 644.10 255.53 897.18 629.90 808.94 606.30 692.68 644.18 605.65 728.75 412.97 7,368.82
7 Standby 442.64 644.10 255.53 897.19 629.91 808.94 606.30 692.68 644.19 605.65 728.75 412.97 7,368.84
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam 3.95 10.60 1.47 9.50 1.25 6.45 142.30 42.97 8.77 3.02 0.67 4.53 235.47
II. PL TELUK LEMBU Hal. 8
PLTG UNIT 2
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 672.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,760.00
2 Kerja - - - - - - - - - - - - -
3 Pemeliharaan - - - - - - - - - - - - -
4 PO ( Har Terencana ) - - - - - - - - - - - - -
5 MO ( Har Tdk Terencana ) - - - - - - - - - - - - -
6 Jumlah Jam Standby 672.00 744.00 720.00 744.00 720.00 744.00 744.00 744.00 744.00 720.00 744.00 744.00 8,784.00
7 Standby - - - - - - - - - - - - -
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam - - - - - - - - - - - - -
10 Sejak YM/CI/TO (JSYM/CI/TO) 5,558.13 5,558.13 5,558.13 5,558.13 5,558.13 5,558.13 5,558.13 5,558.13 5,558.13 5,558.13 5,558.13 5,558.13
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) 166.70 166.70 166.70 166.70 166.70 166.70 166.70 166.70 166.70 166.70 166.70 166.70
12 Sejak MO/MI (JSMO/MI) 8,107.96 8,107.96 8,107.96 8,107.96 8,107.96 8,107.96 8,107.96 8,107.96 8,107.96 8,107.96 8,107.96 8,107.96
13 Sejak Beroperasi (JSB) 81,027.71 81,027.71 81,027.71 81,027.71 81,027.71 81,027.71 81,027.71 81,027.71 81,027.71 81,027.71 81,027.71 81,027.71
PLTG UNIT 3
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 672.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,760.00
2 Kerja - - - - - - - - - - - - -
3 Pemeliharaan - - - - - - - - - - - - -
4 PO ( Har Terencana ) - - - - - - - - - - - - -
5 MO ( Har Tdk Terencana ) - - - - - - - - - - - - -
6 Jumlah Jam Standby 672.00 744.00 720.00 744.00 720.00 744.00 744.00 744.00 744.00 720.00 744.00 744.00 8,784.00
7 Standby - - - - - - - - - - - - -
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam - - - - - - - - - - - - -
10 Sejak YM/CI/TO (JSYM/CI/TO) 92.90 92.90 92.90 92.90 92.90 92.90 92.90 92.90 92.90 92.90 92.90 92.90
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) 5,289.33 5,289.33 5,289.33 5,289.33 5,289.33 5,289.33 5,289.33 5,289.33 5,289.33 5,289.33 5,289.33 5,289.33
12 Sejak MO/MI (JSMO/MI) 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00
13 Sejak Beroperasi (JSB) 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00
TOTAL PLTG
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 1,488.00 1,344.00 1,488.00 1,440.00 1,488.00 1,440.00 1,488.00 1,488.00 1,440.00 1,488.00 1,440.00 1,488.00 17,520.00
2 Kerja - - - - - - - - - - - - -
3 Pemeliharaan - - - - - - - - - - - - -
4 PO ( Har Terencana ) - - - - - - - - - - - - -
5 MO ( Har Tdk Terencana ) - - - - - - - - - - - - -
6 Jumlah Jam Standby 1,344.00 1,488.00 1,440.00 1,488.00 1,440.00 1,488.00 1,488.00 1,488.00 1,488.00 1,440.00 1,488.00 1,488.00 17,568.00
7 Standby - - - - - - - - - - - - -
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam - - - - - - - - - - - - -
III. PL BALAI PUNGUT Hal. 8
PLTG UNIT 2
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 672.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,760.00
2 Kerja - - - - - - - - - - - - -
3 Pemeliharaan - - - - - - - - - - - - -
4 PO ( Har Terencana ) - - - - - - - - - - - - -
5 MO ( Har Tdk Terencana ) - - - - - - - - - - - - -
6 Jumlah Jam Standby 672 744 720 744 720 744 744 744 744 720 744 744 8,784.00
7 Standby 672 744 720 744 720 744 744 744 744 720 744 744 8,784.00
8 Gangguan luar 744.00 672.00 - - - - - - - - - - 1,416.00
9 gangguan dalam - - - - - - - - - - - - -
10 Sejak YM/CI/TO (JSYM/CI/TO) 791.35 791.35 791.35 791.35 791.35 791.35 791.35 791.35 791.35 791.35 791.35 791.35 791.35
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) 9,921.67 9,921.67 9,921.67 9,921.67 9,921.67 9,921.67 9,921.67 9,921.67 9,921.67 9,921.67 9,921.67 9,921.67 9,921.67
12 Sejak MO/MI (JSMO/MI) 34,341.47 34,341.47 34,341.47 34,341.47 34,341.47 34,341.47 34,341.47 34,341.47 34,341.47 34,341.47 34,341.47 34,341.47
13 Sejak Beroperasi (JSB) 124,821.55 124,821.55 124,821.55 124,821.55 124,821.55 124,821.55 124,821.55 124,821.55 124,821.55 124,821.55 124,821.55 124,821.55
PLTMG UNIT 1
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 672.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,760.00
2 Kerja 217.00 217.00 345.00 220.15 417.83 230.93 378.00 461.00 426.00 426.00 316.00 215.00 3,869.92
3 Pemeliharaan 6.10 - 9.18 108.30 10.13 13.00 4.63 16.28 8.28 16.78 4.97 19.97 217.62
4 PO ( Har Terencana ) - - - 105.22 - 13.00 - 7.18 - - - - 125.40
5 MO ( Har Tdk Terencana ) 6.10 - 9.18 3.08 10.13 - 4.63 9.10 8.28 16.78 4.97 19.97 92.22
6 Jumlah Jam Standby 447.03 442.83 356.64 415.55 292.04 499.88 360.04 265.30 305.52 277.22 420.63 509.03 4,591.71
7 Standby 447.03 442.83 356.64 415.55 292.04 499.88 360.04 265.30 305.52 277.22 420.63 509.03 4,591.71
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam 1.87 84.17 9.18 - - 0.18 1.33 1.42 4.20 - 2.40 - 104.75
10 Sejak YM/CI/TO (JSYM/CI/TO) - - - - - - - - - - - - -
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) - - - - - - - - - - - - -
12 Sejak MO/MI (JSMO/MI) - - - - - - - - - - - - -
13 Sejak Beroperasi (JSB) 52,268.00 52,499.00 52,844.00 53,067.00 53,492.00 53,724.00 54,102.00 54,563.00 54,989.00 54,989.00 55,493.00 55,708.00 53,724.00
PLTMG UNIT 2
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 672.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,760.00
2 Kerja 220.00 220.00 327.00 262.03 426.50 153.30 477.00 562.00 349.00 349.00 295.00 232.00 3,872.83
3 Pemeliharaan - 10.05 - 7.88 5.20 1.98 4.57 7.68 - 18.42 11.22 14.38 81.38
4 PO ( Har Terencana ) 34.10 - 14.08 - 136.00 136.67 40.02 - 107.80 - - - 468.67
5 MO ( Har Tdk Terencana ) - 10.05 - 7.88 5.20 1.98 4.57 7.68 - 18.42 11.22 14.38 81.38
6 Jumlah Jam Standby 417.90 511.55 378.92 470.34 151.75 448.48 222.41 171.19 283.13 352.58 432.71 497.62 4,338.58
7 Standby 417.90 511.55 378.92 470.34 151.75 448.48 222.41 171.19 283.13 352.58 432.71 497.62 4,338.58
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam - 2.40 - 3.75 0.55 3.57 - 3.13 4.07 - 5.07 - 22.54
10 Sejak YM/CI/TO (JSYM/CI/TO) - - - - - - - - - - - - -
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) - - - - - - - - - - - - -
12 Sejak MO/MI (JSMO/MI) - - - - - - - - - - - - -
13 Sejak Beroperasi (JSB) 40,513.00 40,826.00 41,153.00 41,411.00 41,818.00 41,966.00 42,443.00 43,005.00 43,354.00 43,354.00 43,874.00 44,106.00 41,818.00
PLTMG UNIT 3
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 672.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,760.00
2 Kerja 208.00 208.00 304.00 245.20 371.10 213.27 376.00 135.00 182.00 182.00 378.00 237.00 2,802.57
3 Pemeliharaan 40.12 3.13 70.10 5.53 8.75 5.40 5.00 527.93 569.73 - 7.40 7.52 1,243.09
4 PO ( Har Terencana ) 40.12 3.13 64.05 - - - - 527.93 569.73 - - - 1,204.96
5 MO ( Har Tdk Terencana ) - - 6.05 5.53 8.75 5.40 5.00 - - - 7.40 7.52 38.13
6 Jumlah Jam Standby 423.88 508.50 345.90 493.27 340.15 525.33 360.75 81.07 (7.73) 538.00 357.55 499.48 3,966.67
7 Standby 423.88 508.50 345.90 493.27 340.15 525.33 360.75 81.07 (7.73) 538.00 357.55 499.48 3,966.67
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam - 24.37 - - - - 2.25 - - - 1.05 - 27.67
10 Sejak YM/CI/TO (JSYM/CI/TO) - - - - - - - - - - - - -
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) - - - - - - - - - - - - -
12 Sejak MO/MI (JSMO/MI) - - - - - - - - - - - - -
13 Sejak Beroperasi (JSB) 47,210.00 47,471.00 47,775.00 48,012.00 48,388.00 48,603.00 48,979.00 49,114.00 49,296.00 49,296.00 49,933.00 50,170.00 48,388.00
PLTMG UNIT 4
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 696.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,784.00
2 Kerja 323.00 323.00 236.00 261.63 431.20 221.70 500.00 568.00 414.00 414.00 362.00 210.00 4,264.53
3 Pemeliharaan 18.23 - 342.90 6.45 6.60 17.08 7.58 9.17 5.73 7.62 7.43 11.00 439.79
4 PO ( Har Terencana ) 14.53 - 342.90 - - 15.25 - - - - 7.43 - 380.11
5 MO ( Har Tdk Terencana ) 3.70 - - 6.45 6.60 1.83 7.58 9.17 5.73 7.62 - 11.00 59.68
6 Jumlah Jam Standby 330.77 421.00 141.10 474.09 280.92 449.38 236.42 166.83 319.02 298.38 371.89 523.00 4,012.80
7 Standby 330.77 421.00 141.10 474.09 280.92 449.38 236.42 166.83 319.02 298.38 371.89 523.00 4,012.80
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam - - - 1.83 1.28 55.84 - - 5.25 - 2.68 - 66.88
10 Sejak YM/CI/TO (JSYM/CI/TO) - - - - - - - - - - - - -
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) - - - - - - - - - - - - -
12 Sejak MO/MI (JSMO/MI) - - - - - - - - - - - - -
13 Sejak Beroperasi (JSB) 53,952.00 54,119.00 54,355.00 54,612.00 55,046.00 55,266.00 55,766.00 56,334.00 56,748.00 56,748.00 57,387.00 57,597.00 55,266.00
PLTMG UNIT 5
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 672.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,760.00
2 Kerja 354.00 354.00 342.00 270.58 475.28 269.08 463.00 472.00 451.00 451.00 337.00 147.00 4,385.95
3 Pemeliharaan 13.17 8.22 2.97 45.55 10.08 2.73 44.60 8.17 8.90 64.78 5.75 3.55 218.47
4 PO ( Har Terencana ) 13.17 - - 40.10 - - 41.60 - - - - - 94.87
5 MO ( Har Tdk Terencana ) - 8.22 2.97 5.45 10.08 2.73 3.00 8.17 8.90 64.78 5.75 3.55 123.60
6 Jumlah Jam Standby 304.53 379.41 375.03 427.87 234.64 472.19 236.40 259.85 282.37 204.22 400.00 593.45 4,169.96
7 Standby 304.53 379.41 375.03 427.87 234.64 472.19 236.40 259.85 282.37 204.22 400.00 593.45 4,169.95
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam 0.30 2.37 - - - - - 3.98 1.73 - 1.25 - 9.63
10 Sejak YM/CI/TO (JSYM/CI/TO) - - - - - - - - - - - - -
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) - - - - - - - - - - - - -
12 Sejak MO/MI (JSMO/MI) - - - - - - - - - - - - -
13 Sejak Beroperasi (JSB) 52,199.00 52,529.00 52,871.00 53,141.00 53,619.00 53,887.00 54,350.00 54,822.00 55,273.00 55,273.00 55,824.00 55,971.00 53,887.00
PLTMG UNIT 6
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 672.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,760.00
2 Kerja 355.00 355.00 354.00 251.73 439.62 294.78 502.00 572.00 488.00 488.00 318.00 217.00 4,635.13
3 Pemeliharaan 4.00 2.38 6.50 45.63 6.25 3.33 1.67 8.13 112.73 6.00 33.50 5.63 235.75
4 PO ( Har Terencana ) - - - 38.75 - - - - 112.73 - 29.47 - 180.95
5 MO ( Har Tdk Terencana ) 4.00 2.38 6.50 6.88 6.25 3.33 1.67 8.13 - 6.00 4.03 5.63 54.80
6 Jumlah Jam Standby 313.00 344.79 359.50 446.64 274.13 445.89 240.33 163.87 141.54 226.00 391.03 521.37 3,868.09
7 Standby 313.00 344.79 359.50 446.64 274.13 445.89 240.33 163.87 141.54 226.00 391.03 521.37 3,868.09
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam - 41.83 - - - - - - 1.73 - 1.47 - 45.03
10 Sejak YM/CI/TO (JSYM/CI/TO) - - - - - - - - - - - - -
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) - - - - - - - - - - - - -
12 Sejak MO/MI (JSMO/MI) - - - - - - - - - - - - -
13 Sejak Beroperasi (JSB) 50,132.00 50,428.00 50,781.00 51,033.00 51,479.00 51,776.00 52,278.00 52,850.00 53,338.00 53,338.00 53,935.00 54,152.00 51,776.00
PLTMG UNIT 7
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 672.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,760.00
2 Kerja 254.00 254.00 363.00 231.73 373.62 202.70 386.00 495.00 468.00 468.00 108.00 259.00 3,863.05
3 Pemeliharaan 3.73 3.80 19.61 7.22 5.40 4.87 7.35 13.55 3.57 527.90 635.43 123.30 1,355.73
4 PO ( Har Terencana ) - - 16.23 - - - - 5.73 - 527.90 635.43 119.33 1,304.62
5 MO ( Har Tdk Terencana ) 3.73 3.80 3.38 7.22 5.40 4.87 7.35 7.82 3.57 - - 3.97 51.11
6 Jumlah Jam Standby 414.27 409.98 337.39 505.05 340.98 528.11 350.65 234.63 269.30 (275.90) 0.57 361.70 3,476.73
7 Standby 414.27 409.98 337.39 505.05 340.98 528.11 350.65 234.63 269.30 (275.90) 0.57 361.70 3,476.73
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam - 4.22 - - - 8.32 - 0.82 3.13 - - - 16.49
10 Sejak YM/CI/TO (JSYM/CI/TO) - - - - - - - - - - - - -
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) - - - - - - - - - - - - -
12 Sejak MO/MI (JSMO/MI) - - - - - - - - - - - - -
13 Sejak Beroperasi (JSB) 46,253.00 46,621.00 46,984.00 47,212.00 47,592.00 47,798.00 48,184.00 48,679.00 49,147.00 49,147.00 49,336.00 49,595.00 49,595.00
TOTAL PLTMG
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 5,208.00 4,728.00 5,208.00 5,040.00 5,208.00 5,040.00 5,208.00 5,208.00 5,040.00 5,208.00 5,040.00 5,208.00 61,344.00
2 Kerja 1,931.00 1,931.00 2,271.00 1,743.07 2,935.15 1,585.77 3,082.00 3,265.00 2,778.00 2,778.00 2,114.00 1,517.00 27,930.98
3 Pemeliharaan 85.35 27.58 451.26 226.56 52.41 48.39 75.40 590.91 708.94 641.50 705.70 185.35 3,799.35
4 PO ( Har Terencana ) 101.92 3.13 437.26 184.07 136.00 164.92 81.62 540.84 790.26 527.90 672.33 119.33 3,759.58
5 MO ( Har Tdk Terencana ) 17.53 24.45 28.08 42.49 52.41 20.14 33.80 50.07 26.48 113.60 33.37 66.02 508.44
6 Jumlah Jam Standby 2,651.38 3,018.06 2,294.48 3,232.81 1,914.61 3,369.26 2,007.00 1,342.74 1,593.15 1,620.50 2,374.38 3,505.65 28,924.02
7 Standby 2,651.38 3,018.06 2,294.48 3,232.79 1,914.61 3,369.26 2,007.00 1,342.74 1,593.15 1,620.50 2,374.38 3,505.65 28,924.01
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam 2.17 159.36 9.18 5.58 1.83 67.91 3.58 9.35 20.11 - 13.92 - 292.99
LEMBAR DATA REALISASI ( L D R ) DATA PRODUKSI
JUNI 2022
MISIP
Hal. 9
I. PL KOTA PANJANG
PLTA KOTO PANJANG UNIT 1
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 18,027,840.00 16,189,696.00 12,808,768.00 12,113,408.00 12,289,696.00 12,113,408.00 15,049,696.00 11,173,408.00 18,087,840.00 12,751,552.00 16,708,768.00 18,027,840.00 175,341,920.00
2 GENERATOR 10,181,680.00 15,460,690.00 20,372,900.00 17,455,780.00 12,886,020.00 12,686,290.00 10,091,520.00 14,504,720.00 12,526,766.23 10,172,345.98 13,105,063.42 14,146,156.97 163,589,932.60
3 EXPORT 9,945,451.00 15,084,167.00 19,892,153.00 17,046,002.00 12,565,545.00 12,382,429.00 9,830,807.00 14,138,784.00 15,309,551.00 6,858,063.00 12,749,409.00 13,817,489.00 159,619,850.00
4 IMPORT 1,183.00 140.00 157.00 309.00 692.00 823.00 2,427.00 14,028.00 66,277.00 13,615.00 34,405.00 25,696.00 159,752.00
5 PS DARI GI - - - - - - - - - - - - -
6 NETTO 9,944,268.00 15,084,027.00 19,891,996.00 17,045,693.00 12,564,853.00 12,381,606.00 9,828,380.00 14,124,756.00 15,243,274.00 6,844,448.00 12,715,004.00 13,791,793.00 159,460,098.00
7 PS UNIT 58,634.19 97,244.16 100,028.52 103,715.53 80,018.45 78,940.40 66,004.64 88,192.41 66,231.23 53,166.47 70,225.03 79,597.59 941,998.63
8 % PEMAKAIAN SENDIRI 0.006 0.006 0.005 0.006 0.006 0.006 0.007 0.006 0.005 0.005 0.005 0.006 0.006
9 RUGI TRAFO 178,777.81 279,418.84 380,875.48 306,371.47 241,148.55 225,743.60 197,135.36 291,771.59 (2,782,739.00) 3,274,731.51 319,834.39 274,766.38 3,187,835.97
PLTA KOTO PANJANG UNIT 2
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 18,027,840.00 16,189,696.00000 12,808,768.00000 12,113,408.00 12,289,696.00 12,113,408.00 7,649,696.00 10,973,408.00 18,087,840.00 19,725,924.00 16,708,768.00 18,027,840.00 174,716,292.00
2 GENERATOR 18,972,460.00 9,204,270.00 18,910,550.00 9,993,490.00 8,890,030.00 9,657,360.00 12,215,770.00 12,236,720.00 17,997,356.60 20,482,435.16 18,458,815.79 17,575,657.32 174,594,914.87
3 EXPORT 18,390,663.00 8,972,032.00 18,465,020.00 9,768,028.00 8,668,875.00 9,449,177.00 11,916,408.00 11,951,617.00 17,635,453.00 20,063,382.00 18,065,745.00 17,269,128.00 170,615,528.00
4 IMPORT 1,070.00 89,845.00 28,261.00 109,198.00 130,667.00 110,864.00 50,738.00 86,737.00 18,212.00 15,501.00 26,510.00 18,514.00 686,117.00
5 PS DARI GI - - - - - - - - - - - - -
6 NETTO 18,389,593.00 8,882,187.00 18,436,759.00 9,658,830.00 8,538,208.00 9,338,313.00 11,865,670.00 11,864,880.00 17,617,241.00 20,047,881.00 18,039,235.00 17,250,614.00 169,929,411.00
7 PS UNIT 109,258.47 57,892.73 92,848.56 59,377.47 55,204.51 60,092.90 79,898.52 74,402.39 95,155.21 107,052.86 98,913.75 98,894.70 988,992.07
8 % PEMAKAIAN SENDIRI 0.006 0.006 0.005 0.006 0.006 0.006 0.007 0.006 0.005 0.005 0.005 0.006 0.006
9 RUGI TRAFO 473,608.53 264,190.27 380,942.44 275,282.53 296,617.49 258,954.10 270,201.48 297,437.61 284,960.39 327,501.30 320,667.04 226,148.62 3,676,511.80
PLTA KOTO PANJANG UNIT 3
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 18,027,840.00 16,189,696.00 12,808,768.00 12,113,408.00 12,289,696.00 12,113,408.00 15,049,696.00 11,173,408.00 - 411,552.00 16,708,768.00 18,027,840.00 144,914,080.00
2 GENERATOR 17,104,510.00 10,043,790.00 15,023,360.00 9,144,820.00 17,163,930.00 13,963,960.00 11,537,290.00 11,811,870.00 13,245,924.64 12,652,787.48 9,548,957.98 13,368,828.02 154,610,028.12
3 EXPORT 17,043,875.00 9,085,446.00 14,468,821.00 8,814,381.00 16,550,336.00 13,434,802.00 11,147,230.00 11,389,909.00 12,835,858.00 12,239,311.00 9,283,833.00 12,958,851.00 149,252,653.00
4 IMPORT 20,084.00 78,543.00 73,921.00 106,423.00 28,390.00 49,342.00 62,548.00 79,111.00 54,836.00 77,302.00 53,779.00 42,354.00 726,633.00
5 PS DARI GI - - - - - - - - - - - - -
6 NETTO 17,023,791.00 9,006,903.00 14,394,900.00 8,707,958.00 16,521,946.00 13,385,460.00 11,084,682.00 11,310,798.00 12,781,022.00 12,162,009.00 9,230,054.00 12,916,497.00 148,526,020.00
7 PS UNIT 98,501.34 63,173.11 73,762.92 54,335.00 106,583.04 86,890.70 75,460.85 71,819.20 70,033.55 66,130.67 51,169.22 75,223.71 893,083.30
8 % PEMAKAIAN SENDIRI 0.006 0.006 0.005 0.006 0.006 0.006 0.007 0.006 0.005 0.005 0.005 0.006 0.006
9 RUGI TRAFO (17,782.34) 973,713.89 554,697.08 382,527.00 535,400.96 491,609.30 377,147.15 429,252.80 394,869.09 424,647.81 267,734.76 377,107.31 5,190,924.82
TOTAL PLTA
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 54,083,520.00000 48,569,088.00000 38,426,304.00 36,340,224.00 36,869,088.00 36,340,224.00 37,749,088.00 33,320,224.00 36,175,680.00 32,889,028.00 50,126,304.00 54,083,520.00 494,972,292.00
2 GENERATOR 46,258,650.00 34,708,750.00 54,306,810.00 36,594,090.00 38,939,980.00 36,307,610.00 33,844,580.00 38,553,310.00 43,770,047.47 43,307,568.62 41,112,837.19 45,090,642.31 492,794,875.59
3 EXPORT 45,379,989.00 33,141,645.00 52,825,994.00 35,628,411.00 37,784,756.00 35,266,408.00 32,894,445.00 37,480,310.00 45,780,862.00 39,160,756.00 40,098,987.00 44,045,468.00 479,488,031.00
4 IMPORT 22,337.00 168,528.00 102,339.00 215,930.00 159,749.00 161,029.00 115,713.00 179,876.00 139,325.00 106,418.00 114,694.00 86,564.00 1,572,502.00
5 PS DARI GI - - - - - - - - - - - - -
6 NETTO 45,357,652.00 32,973,117.00 52,723,655.00 35,412,481.00 37,625,007.00 35,105,379.00 32,778,732.00 37,300,434.00 45,641,537.00 39,054,338.00 39,984,293.00 43,958,904.00 477,915,529.00
7 PS UNIT 266,394.00 218,310.00 266,640.00 217,428.00 241,806.00 225,924.00 221,364.00 234,414.00 231,420.00 226,350.00 220,308.00 253,716.00 2,824,074.00
8 % PEMAKAIAN SENDIRI 0.006 0.006 0.005 0.006 0.006 0.006 0.007 0.006 0.005 0.005 0.005 0.006 0.0057
9 RUGI TRAFO 634,604.00 1,517,323.00 1,316,515.00 964,181.00 1,073,167.00 976,307.00 844,484.00 1,018,462.00 (2,102,909.53) 4,026,880.62 908,236.19 878,022.31 12,055,272.59
II. PL TELUK LEMBU Hal. 9
PLTG TELUK LEMBU UNIT 2
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 83,160 83,160.00000 83,160.00000 83,160.00000 83,160.00000 83,160 83,160 83,160 83,160 83,160 83,160 83,160 997,920.00
2 GENERATOR - - - - - - - - - - - - -
3 - KWHGAS - - - - - - - - - - - - -
4 - KWH HSD - - - - - - - - - - - - -
5 EXPORT - - - - - - - - - - - - -
6 IMPORT 46,573.00000 41,545.00000 45,337.00000 45,648.00000 42,161.00000 43,812.00000 46,536.00000 48,263.00000 48,507.00000 49,301.00000 46,510.00000 44,801.00000 548,994.00
7 PS DARI GI - - - - - - - - - - - - -
8 PS Aux.PLTD di PLTD PL Tel - - - - - - - - - - - - -
9 NETTO (46,573.00000) (41,545.00000) (45,337.00000) (45,648.00000) (42,161.00000) (43,812.00000) (46,536.00000) (48,263.00000) (48,507.00000) (49,301.00000) (46,510.00000) (44,801.00000) (548,994.00)
10 PS UNIT 19,040.00000 17,200.00000 19,760.00000 18,480.00000 18,560.00000 18,992.00000 19,088.00000 17,760.00000 17,600.00000 17,280.00000 16,880.00000 16,720.00000 217,360.00
11 % PEMAKAIAN SENDIRI - - - - - - - - - - - - -
12 RUGI TRAFO 27,533.00000 24,345.00000 25,577.00000 27,168.00000 23,601.00000 24,820.00000 27,448.00000 30,503.00000 30,907.00000 32,021.00000 29,630.00000 28,081.00000 331,634.00
PLTG TELUK LEMBU UNIT 3
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 83,160 83,160.00000 83,160.00000 83,160.00000 83,160 83,160 83,160 83,160 83,160 83,160 83,160 83,160 997,920.00
2 GENERATOR - - - - - - - - - - - - -
3 - KWH GAS - - - - - - - - - - - - -
4 - KWH HSD - - - - - - - - - - - - -
5 EXPORT - - - - - - - - - - - - -
6 IMPORT 5,896 3,041 4,101 4,840 3,285 8,613 23,868 26,625 26,931 29,770 25,577 25,777 188,324.00
7 PS DARI GI - - - - - - - - - - - - -
8 NETTO (5,896) (3,041) (4,101) (4,840) (3,285) (8,613) (23,868) (26,625) (26,931) (29,770) (25,577) (25,777) (188,324.00)
9 PS UNIT 4,429 5,918 5,839 5,183 6,548 3,805 4,885 3,984 4,599 5,259 5,654 5,355 61,458.00
10 % PEMAKAIAN SENDIRI - - - - - - - - - - - - -
11 RUGI TRAFO 1,467 (2,877) (1,738) (343) (3,263) 4,808 18,983 22,641 22,332 24,511 19,923 20,422 126,866.00
TOTAL TELUK LEMBU PLTG
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 166,320.00 166,320.00000000 166,320.00 166,320.00 166,320.00 166,320.00 166,320.00 166,320.00 166,320.00 166,320.00 166,320.00 166,320.00 1,995,840.00
2 GENERATOR - - - - - - - - - - - - -
3 - KWH GAS - - - - - - - - - - - - -
4 - KWH HSD - - - - - - - - - - - - -
5 EXPORT - - - - - - - - - - - - -
6 IMPORT 52,469.00 44,586.00 49,438.00 50,488.00 45,446.00 52,425.00 70,404.00 74,888.00 75,438.00 79,071.00 72,087.00 70,578.00 737,318.00
7 PS DARI GI - - - - - - - - - - - - -
8 PS Aux.PLTD di PLTD PL Tel (5,896.00) (3,041.00) (4,101.00) (4,840.00) (3,285.00) (8,613.00) (23,868.00) (26,625.00) (26,931.00) (29,770.00) (25,577.00) (25,777.00) (188,324.00)
9 NETTO (52,469.00) (44,586.00) (49,438.00) (50,488.00) (45,446.00) (52,425.00) (70,404.00) (74,888.00) (75,438.00) (79,071.00) (72,087.00) (70,578.00) (737,318.00)
10 PS UNIT 23,469.00 23,118.00 25,599.00 23,663.00 25,108.00 22,797.00 23,973.00 21,744.00 22,199.00 22,539.00 22,534.00 22,075.00 278,818.00
11 % PEMAKAIAN SENDIRI - - - - - - - - - - - - -
12 RUGI TRAFO 29,000.00 21,468.00 23,839.00 26,825.00 20,338.00 29,628.00 46,431.00 53,144.00 53,239.00 56,532.00 49,553.00 48,503.00 458,500.00
III. PL BALAI PUNGUT Hal. 9
PLTG BALAI PUNGUT UNIT 2
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI -
2 GENERATOR - - - - - - - - - - - - -
- KWH GAS - - - - - - - - - - - - -
- KWH HSD - - - - - - - - - - - - -
3 EXPORT - - - - - - - - - - - - -
4 IMPORT 13,670.00 - 27,840.00 12,680.00 16,800.00 14,060.00 17,880.00 19,210.00 16,030.00 14,086.00 16,878.00 14,094.00 183,228.00
5 PS DARI GI - - - - - - - - - - - - -
6 NETTO (13,670.00) - (27,840.00) (12,680.00) (16,800.00) (14,060.00) (17,880.00) (19,210.00) (16,030.00) (14,086.00) (16,878.00) (14,094.00) (183,228.00)
7 PS UNIT 101.00 86.00 96.00 92.00 169.00 114.00 401.00 - - - - - 1,059.00
8 % PEMAKAIAN SENDIRI - - - - - - - - - - - - -
9 RUGI TRAFO 13,569.00 (86.00) 27,744.00 12,588.00 16,631.00 13,946.00 17,479.00 19,210.00 16,030.00 14,086.00 16,878.00 14,094.00 182,169.00
PLTMG BALAI PUNGUT UNIT 1
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 2,108,266.00 1,918,266.00000 2,108,266.00000 2,019,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,108,266.00 2,019,266.00 2,019,266.00 2,019,266.00 2,108,266.00 24,664,192.00
2 GENERATOR 2,596,000.00 3,604,000.00 4,158,000.00 2,969,000.00 5,319,000.00 1,863,000.00 5,837,000.00 7,483,000.00 4,809,000.00 3,019,000.00 3,683,000.00 2,984,000.00 48,324,000.00
- KWH GAS 80,070.00 80,070.00 80,070.00 80,070.00 80,070.00 80,070.00 80,070.00 80,070.00 80,070.00 80,070.00 80,070.00 80,070.00 960,840.00
- KWH HSD - - - - - - - - - - - - -
3 EXPORT - - - - - - - - - - - - -
4 IMPORT - - - - - - - - - - - - -
5 PS DARI GI - - - - - - - - - - - - -
6 NETTO - - - - - - - - - - - - -
7 PS UNIT - - - - - - - - - - - - -
8 % PEMAKAIAN SENDIRI 434,000.00 254,000.00 298,000.00 264,000.00 345,000.00 262,000.00 403,000.00 114,000.00 612,000.00 268,000.00 306,000.00 280,000.00 3,840,000.00
9 RUGI TRAFO 9,530.23 5,664.88 (1,679.61) 9,501.22 9,266.47 12,916.18 7,903.98 51,606.00 26,636.06 31,900.91 9,471.25 73,594.26 246,311.84
PLTMG BALAI PUNGUT UNIT 2
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 2,108,266.00 1,918,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,019,266.00 2,108,266.00 24,753,192.00
2 GENERATOR 2,596,000.00 3,604,000.00 4,158,000.00 2,969,000.00 5,319,000.00 1,863,000.00 5,837,000.00 7,483,000.00 4,809,000.00 3,019,000.00 3,683,000.00 2,984,000.00 48,324,000.00
- KWH GAS 2,596,000.00 3,604,000.00 4,158,000.00 2,969,000.00 5,319,000.00 1,863,000.00 5,837,000.00 7,483,000.00 4,530,000.00 103,000.00 995,000.00 2,800,710.00 42,257,710.00
- KWH HSD - - - - - - - - 279,000.00 2,916,000.00 2,688,000.00 183,290.00 6,066,290.00
3 EXPORT 7,259,772.00 8,862,000.00 11,750,208.00 8,128,524.00 15,545,724.00 7,690,488.00 14,881,284.00 14,964,732.00 11,340,828.00 8,575,668.00 13,526,916.00 9,008,784.00 131,534,928.00
4 IMPORT 61,884.00 77,028.00 67,704.00 77,232.00 59,316.00 94,896.00 43,440.00 45,120.00 49,692.00 73,236.00 42,180.00 62,724.00 754,452.00
5 PS DARI GI 33,382.22 82,519.06 86,225.00 65,833.88 94,144.58 43,003.33 87,564.69 128,082.95 92,773.12 51,130.35 45,679.36 46,700.67 857,039.22
6 NETTO - - - - - - - - - - - - -
7 PS UNIT 94,000.00 206,000.00 247,000.00 183,000.00 279,000.00 180,000.00 226,000.00 260,000.00 238,000.00 155,000.00 169,000.00 135,000.00 2,372,000.00
8 % PEMAKAIAN SENDIRI 0.01 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.01 0.02 0.22
9 RUGI TRAFO 10,214.90 8,353.62 (1,656.90) 11,006.29 8,864.81 7,799.95 9,938.71 63,945.64 23,289.60 38,462.00 7,924.27 79,624.83 267,767.72
PLTMG BALAI PUNGUT UNIT 3
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 2,108,266.00 1,918,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,019,266.00 2,108,266.00 - - 2,108,266.00 2,019,266.00 2,108,266.00 20,625,660.00
2 GENERATOR 2,292,000.00 2,949,000.00 3,538,000.00 2,721,000.00 4,884,000.00 2,850,000.00 4,586,000.00 1,668,000.00 2,028,000.00 3,629,000.00 5,541,000.00 2,884,000.00 39,570,000.00
- KWH GAS 2,292,000.00 2,949,000.00 3,538,000.00 2,721,000.00 4,884,000.00 2,850,000.00 4,586,000.00 1,668,000.00 1,721,000.00 1,249,000.00 1,611,000.00 2,649,240.00 32,718,240.00
- KWH HSD - - - - - - - - 307,000.00 2,380,000.00 3,930,000.00 234,760.00 6,851,760.00
3 EXPORT - - - - - - - - - - - - -
4 IMPORT - - - - - - - - - - - - -
5 PS DARI GI 29,473.05 67,521.84 73,367.98 60,334.79 86,445.22 65,786.10 68,797.61 28,550.36 39,123.29 61,461.43 68,723.69 45,135.64 694,720.99
6 NETTO 21,338,618.00 21,654,622.00 27,181,044.00 19,354,322.00 37,528,308.00 19,893,502.00 37,067,704.00 41,854,032.00 34,792,546.00 20,000,448.00 28,516,488.00 19,662,564.00 328,844,198.00
7 PS UNIT - - - - - - - - - - - - -
8 % PEMAKAIAN SENDIRI 21,953,000.00 22,166,000.00 27,715,000.00 19,875,000.00 38,216,000.00 20,421,000.00 37,761,000.00 42,592,000.00 35,816,000.00 20,687,000.00 29,054,000.00 20,628,000.00 336,884,000.00
9 RUGI TRAFO 9,018.70 6,835.41 (1,409.84) 10,086.94 8,139.83 11,932.29 7,808.62 14,253.82 9,821.44 46,233.39 11,921.90 76,956.44 211,598.95
PLTMG BALAI PUNGUT UNIT 4
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI - 1,218,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,019,266.00 2,108,266.00 21,944,926.00
2 GENERATOR 3,633,000.00 1,958,000.00 2,781,000.00 2,865,000.00 5,521,000.00 2,601,000.00 6,200,000.00 7,469,000.00 5,622,000.00 3,774,000.00 4,603,000.00 3,764,000.00 50,791,000.00
- KWH GAS 3,633,000.00 1,958,000.00 2,781,000.00 2,865,000.00 5,521,000.00 2,601,000.00 6,200,000.00 7,469,000.00 5,335,000.00 126,000.00 1,040,000.00 2,534,400.00 42,063,400.00
- KWH HSD - - - - - - - - 287,000.00 3,648,000.00 3,563,000.00 1,229,600.00 8,727,600.00
3 EXPORT - - - - - - - - - - - - -
4 IMPORT - - - - - - - - - - - - -
5 PS DARI GI 107,677.53 37,765.36 52,438.50 65,080.02 84,832.54 53,985.74 110,089.88 31,073.13 146,542.19 87,683.75 91,296.21 87,812.03 956,276.87
6 NETTO - - - - - - - - - - - - -
7 PS UNIT - - - - - - - - - - - - -
8 % PEMAKAIAN SENDIRI - - - - - - - - - - - - -
9 RUGI TRAFO 14,295.35 4,538.40 (1,108.19) 10,620.75 9,201.47 10,889.78 10,556.80 63,826.00 27,226.89 48,080.69 9,903.72 100,438.29 308,469.97
Hal. 9
PLTMG BALAI PUNGUT UNIT 5
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 2,108,266.00 1,918,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,019,266.00 2,108,266.00 24,753,192.00
2 GENERATOR 3,995,000.00 3,684,000.00 4,169,000.00 3,167,000.00 6,098,000.00 3,451,000.00 5,570,000.00 6,023,000.00 5,810,000.00 2,897,000.00 4,645,000.00 1,936,000.00 51,445,000.00
- KWH GAS 3,995,000.00 3,684,000.00 4,169,000.00 3,167,000.00 6,098,000.00 3,451,000.00 5,570,000.00 6,023,000.00 5,608,000.00 149,000.00 1,114,000.00 1,908,720.00 44,936,720.00
- KWH HSD - - - - - - - - 202,000.00 2,748,000.00 3,531,000.00 27,280.00 6,508,280.00
3 EXPORT 14,238,240.00 12,932,690.00 15,559,870.00 11,391,890.00 22,095,710.00 12,392,180.00 22,285,430.00 26,966,080.00 23,544,800.00 11,614,206.00 15,106,464.00 10,832,100.00 198,959,660.00
4 IMPORT 97,510.00 63,040.00 61,330.00 88,860.00 53,810.00 94,270.00 55,570.00 31,660.00 43,390.00 116,190.00 74,712.00 115,596.00 895,938.00
5 PS DARI GI 118,406.75 71,055.96 78,610.60 71,940.11 93,698.39 71,628.14 98,903.33 25,057.37 151,442.57 67,307.85 92,129.25 45,165.81 985,346.12
6 NETTO - - - - - - - - - - - - -
7 PS UNIT 434,000.00 254,000.00 298,000.00 264,000.00 345,000.00 262,000.00 403,000.00 114,000.00 612,000.00 268,000.00 306,000.00 280,000.00 3,840,000.00
8 % PEMAKAIAN SENDIRI 0.04 0.03 0.03 0.03 0.02 0.03 0.02 0.01 0.04 0.03 0.02 0.03 0.31
9 RUGI TRAFO 15,719.77 8,539.05 (1,661.28) 11,740.29 10,163.12 14,448.54 9,484.09 51,469.27 28,137.36 36,907.73 9,994.09 51,660.08 246,602.10
PLTMG BALAI PUNGUT UNIT 6
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 2,108,266.00 1,918,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,019,266.00 2,108,266.00 24,753,192.00
2 GENERATOR 4,061,000.00 3,401,000.00 4,315,000.00 3,003,000.00 5,849,000.00 3,868,000.00 6,185,000.00 7,531,000.00 5,994,000.00 3,762,000.00 4,778,000.00 2,875,000.00 55,622,000.00
- KWH GAS 4,061,000.00 3,401,000.00 4,315,000.00 3,003,000.00 5,849,000.00 3,868,000.00 6,185,000.00 7,531,000.00 5,687,000.00 110,000.00 1,679,000.00 2,823,480.00 48,512,480.00
- KWH HSD - - - - - - - - 307,000.00 3,652,000.00 3,099,000.00 51,520.00 7,109,520.00
3 EXPORT - - - - - - - - - - - - -
4 IMPORT - - - - - - - - - - - - -
5 PS DARI GI 120,362.90 65,597.54 81,363.58 68,214.77 89,872.40 80,283.29 109,823.54 31,331.07 156,238.68 87,404.94 94,767.18 67,072.15 1,052,332.04
6 NETTO - - - - - - - - - - - - -
7 PS UNIT - - - - - - - - - - - - -
8 % PEMAKAIAN SENDIRI - - - - - - - - - - - - -
9 RUGI TRAFO 15,979.47 7,883.09 (1,719.46) 11,132.33 9,748.13 16,194.42 10,531.26 64,355.82 29,028.46 47,927.81 10,280.25 76,716.28 298,057.85
PLTMG BALAI PUNGUT UNIT 7
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 2,108,266.00 1,918,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,019,266.00 388,266.00 23,033,192.00
2 GENERATOR 2,954,000.00 4,126,000.00 4,539,000.00 2,587,000.00 4,985,000.00 2,703,000.00 4,741,000.00 6,379,000.00 6,053,000.00 1,102,000.00 1,402,000.00 3,427,000.00 44,998,000.00
- KWH GAS 2,954,000.00 4,126,000.00 4,539,000.00 2,587,000.00 4,985,000.00 2,703,000.00 4,741,000.00 6,379,000.00 5,770,000.00 10,000.00 1,374,000.00 3,147,210.00 43,315,210.00
- KWH HSD - - - - - - - - 283,000.00 1,092,000.00 28,000.00 279,790.00 1,682,790.00
3 EXPORT - - - - - - - - - - - - -
4 IMPORT - - - - - - - - - - - - -
5 PS DARI GI 87,552.82 79,581.14 85,587.32 58,765.10 76,596.67 56,102.83 84,183.25 26,538.43 157,776.57 25,603.47 27,807.36 79,950.01 846,044.96
6 NETTO - - - - - - - - - - - - -
7 PS UNIT - - - - - - - - - - - - -
8 % PEMAKAIAN SENDIRI - - - - - - - - - - - - -
9 RUGI TRAFO 11,623.58 9,563.55 (1,808.72) 9,590.19 8,308.16 11,316.84 8,072.54 54,511.45 29,314.19 14,039.46 3,016.51 91,445.81 248,993.56
TOTAL BALAI PUNGUT PLTMG
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 12,649,596.00 12,727,862.00 14,757,862.00 14,134,862.00 14,757,862.00 14,134,862.00 14,757,862.00 12,649,596.00 12,115,596.00 14,668,862.00 14,134,862.00 13,037,862.00 164,527,546.00
2 GENERATOR 22,127,000.00 23,326,000.00 27,658,000.00 20,281,000.00 37,975,000.00 19,199,000.00 38,956,000.00 44,036,000.00 35,125,000.00 21,202,000.00 28,335,000.00 20,854,000.00 339,074,000.00
- KWH GAS 19,611,070.00 19,802,070.00 23,580,070.00 17,392,070.00 32,736,070.00 17,416,070.00 33,199,070.00 36,633,070.00 28,731,070.00 1,827,070.00 7,893,070.00 15,943,830.00 254,764,600.00
- KWH HSD - - - - - - - - 1,665,000.00 16,436,000.00 16,839,000.00 2,006,240.00 36,946,240.00
3 EXPORT 21,498,012.00 21,794,690.00 27,310,078.00 19,520,414.00 37,641,434.00 20,082,668.00 37,166,714.00 41,930,812.00 34,885,628.00 20,189,874.00 28,633,380.00 19,840,884.00 330,494,588.00
4 IMPORT 159,394.00 140,068.00 129,034.00 166,092.00 113,126.00 189,166.00 99,010.00 76,780.00 93,082.00 189,426.00 116,892.00 178,320.00 1,650,390.00
5 PS DARI GI 496,855.27 404,040.90 457,592.98 390,168.67 525,589.80 370,789.43 559,362.30 270,633.31 743,896.41 380,591.78 420,403.05 371,836.31 5,391,760.21
6 NETTO 21,338,618.00 21,654,622.00 27,181,044.00 19,354,322.00 37,528,308.00 19,893,502.00 37,067,704.00 41,854,032.00 34,792,546.00 20,000,448.00 28,516,488.00 19,662,564.00 328,844,198.00
7 PS UNIT 528,000.00 460,000.00 545,000.00 447,000.00 624,000.00 442,000.00 629,000.00 374,000.00 850,000.00 423,000.00 475,000.00 415,000.00 6,212,000.00
8 % PEMAKAIAN SENDIRI 22,387,000.05 22,420,000.05 28,013,000.05 20,139,000.05 38,561,000.04 20,683,000.05 38,164,000.04 42,706,000.02 36,428,000.05 20,955,000.04 29,360,000.03 20,908,000.05 340,724,000.53
9 RUGI TRAFO 86,382.00 51,378.00 (11,044.00) 73,678.00 63,692.00 85,498.00 64,296.00 363,968.00 173,454.00 263,552.00 62,512.00 550,436.00 1,827,802.00
V. PLTU TEMBILAHAN #01
PLTU TEMBILAHAN #01
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI -
2 GENERATOR -
3 EXPORT -
4 IMPORT -
5 PS DARI GI -
6 NETTO -
7 PS UNIT -
8 % PEMAKAIAN SENDIRI -
9 RUGI TRAFO -
PLTU TEMBILAHAN #02
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI -
2 GENERATOR -
3 EXPORT -
4 IMPORT -
5 PS DARI GI -
6 NETTO -
7 PS UNIT -
8 % PEMAKAIAN SENDIRI -
9 RUGI TRAFO -
TOTAL PLTU TEMBILAHAN
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI -
2 GENERATOR -
3 EXPORT -
4 IMPORT -
5 PS DARI GI -
6 NETTO -
7 PS UNIT -
8 % PEMAKAIAN SENDIRI -
9 RUGI TRAFO -
IV. PEMBANGKIT SEWA PL TELUK LEMBU Hal. 9
PLTG RIAU POWER
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
TARGET PRODUKSI -
EXPORT -
1
IMPORT -
NETTO -
ST RIAU POWER
TARGET PRODUKSI -
2 EXPORT -
IMPORT -
NETTO -
PLTMG KSO HUTAN ALAM 1
TARGET PRODUKSI 6,428,160.00 6,428,160.00 12,856,320.00
3 EXPORT 7,620,777.00 7,744,923.00 7,781,585.00 8,157,270.00 8,429,943.00 4,499,502.00 964,778.00 - - - - - 45,198,778.00
IMPORT 32.00 258.00 1.00 94.00 - 4,028.00 7,034.00 1,674.00 1.00 4.00 7.00 - 13,133.00
NETTO 7,620,745.00 7,744,665.00 7,781,584.00 8,157,176.00 8,429,943.00 4,495,474.00 957,744.00 (1,674.00) (1.00) (4.00) (7.00) - 45,185,645.00
PLTMG KSO HUTAN ALAM 2
TARGET PRODUKSI 25,013,280.00 25,013,280.00 50,026,560.00
4 EXPORT 21,527,005.00 25,290,593.00 25,544,599.00 26,120,463.00 26,723,167.00 16,597,944.00 1,962,900.00 - - - - - 143,766,671.00
IMPORT 86.59 - - - - 5,035.41 7,772.00 2,805.00 503.00 573.00 140.34 - 16,915.34
NETTO 21,526,918.41 25,290,593.00 25,544,599.00 26,120,463.00 26,723,167.00 16,592,908.59 1,955,128.00 (2,805.00) (503.00) (573.00) (140.34) - 143,749,755.66
PLTMG PT PJBS 1
TARGET PRODUKSI 3,571,200.00 3,571,200.00 7,142,400.00
5 EXPORT 8,556,443.00 8,373,566.00 8,798,083.00 9,954,455.00 10,261,631.00 6,981,646.00 1,195,304.00 - - - - - 54,121,128.00
IMPORT 132.00 404.00 176.00 60.00 266.00 3,722.00 7,680.00 240.00 - - - - 12,680.00
NETTO 8,556,311.00 8,373,162.00 8,797,907.00 9,954,395.00 10,261,365.00 6,977,924.00 1,187,624.00 (240.00) - - - - 54,108,448.00
PLTMG PT PJBS 2
TARGET PRODUKSI 8,035,200.00 8,035,200.00 16,070,400.00
6 EXPORT 7,238,300.00 7,042,800.00 6,929,600.00 8,293,100.00 8,213,600.00 5,645,300.00 1,176,400.00 - - - - - 44,539,100.00
IMPORT - 200.00 - - - 13,300.00 27,700.00 23,300.00 - - - - 64,500.00
NETTO 7,238,300.00 7,042,600.00 6,929,600.00 8,293,100.00 8,213,600.00 5,632,000.00 1,148,700.00 (23,300.00) - - - - 44,474,600.00
PLTMG PT WIKA SIAK TRANSFER KE WRKR SIAK
TARGET PRODUKSI 14,880,000.00 14,880,000.00 29,760,000.00
7 EXPORT 9,999,774.54 4,527,403.63 14,527,178.17
IMPORT 21.82 21.82 21.82
NETTO 9,999,752.72 4,527,381.81 9,999,752.72
V. PEMBANGKIT SEWA PL BALAI PUNGUT
PLTG PT PJB UNIT 1
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
TARGET PRODUKSI 948,600.00 948,600.00 1,897,200.00
EXPORT - - -
1
IMPORT - - -
NETTO - - -
PLTMG MAX POWER
TARGET PRODUKSI 7,440,000.00 7,440,000.00 14,880,000.00
2 EXPORT - - -
IMPORT - - -
NETTO - - -
PLTG SEWA MPP BALAI PUNGUT
TARGET PRODUKSI 9,300,000.00 9,300,000.00 9,300,000.00 9,000,000.00 9,300,000.00 9,000,000.00 9,300,000.00 9,300,000.00 9,000,000.00 9,300,000.00 9,000,000.00 9,300,000.00 110,400,000.00
2 EXPORT 6,857,162.00 11,360,603.00 6,090,291.00 4,517,268.00 16,320,281.00 7,050,822.00 8,558,316.00 11,079,169.00 5,317,243.00 7,056,456.00 3,839,546.00 3,077,054.00 91,124,211.00
IMPORT 101,361.00 84,627.00 110,623.00 109,646.00 85,233.00 103,839.00 101,246.00 82,204.00 109,316.00 106,820.00 109,806.00 114,896.00 1,219,617.00
NETTO 6,755,801.00 11,275,976.00 5,979,668.00 4,407,622.00 16,235,048.00 6,946,983.00 8,457,070.00 10,996,965.00 5,207,927.00 6,949,636.00 3,729,740.00 2,962,158.00 89,904,594.00
DESEMBER
2022
II. OPERASI &
PEMELIHARAAN
PT PLN (PERSERO) PEMBANGKITAN SUMBAGUT
SEKTOR PEMBANGKITAN PEKANBARU
Jln. Dr. Tanjung Datuk No 74
Telp. (0761) 41855/41856
PT PLN (PERSERO) UNIT INDUK PEMBANGKITAN SUMBAGUT LAPORAN KUMULATIF PEMAKAIAN AIR , ELAVASI DAN SWC PLTA KOTA PANJANG
UNIT PELAKSANA PENGENDALIAN PEMBANGKITAN PEKANBARU
Jln. Dr. Tanjung Datuk No 74
SEKTOR PEMBANGKITAN PEKANBARU
Telp. (0761) 41855/41856
TAHUN 2022
Hal. 6
PL KOTA PANJANG
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Produksi Generator 46,258,650.00000 34,708,750.00000 54,306,810.00000 36,594,090.00000 38,939,980.00000 36,307,610.00000 33,844,580.00000 38,553,310.00000 43,770,047.47000 43,307,568.62000 41,112,837.19000 45,090,642.31000 447,704,233.28
2 Jam Periodik 744 672 744 720 744 720 744 744 744 744 744 744 8,808.00
4 Volume Air Danau Awal Bulan 770,296,070 957,288,680 980,315,530 938,867,200 1,004,787,120 911,892,890 930,314,370 830,969,960 784,594,594 675,766,883 709,924,498 728,194,831 10,223,212,626.01
6 Volume Air Danau Akhir Bulan 957,288,680 980,315,530 938,867,200 1,004,787,120 905,971,700 930,314,370 830,969,960 784,594,584 675,766,883 709,924,498 728,194,831 755,997,536 10,202,992,892.01
7 Inflow Rata Rata 258.43 164.63 207.38 178.70 123.14 160.50 111.76 139.64 143.13 189.89 180.19 193.71 2,051.08
8 Out Flow Turbine Rata rata 186.09 155.11 219.83 153.27 158.86 153.39 136.47 158.12 185.11 178.37 173.66 186.66 2,044.95
10 Out Flow Total 186 155 220 153 159 153 149 158 185 178 174 187 2,057.33
11 Perubahan Volume Air Danau 186,992,610 23,026,850 (41,448,330) 65,919,920 (98,815,420) 18,421,480 (99,344,410) (46,375,376) (108,827,711) 34,157,615 18,270,333 27,802,705 (20,219,734.00)
12 SWC Air Waduk 10.77 10.81 10.84 10.86 10.93 10.95 10.80 10.99 10.99 11.32 10.95 10.92 131.13
0
PT PLN (PERSERO) PEMBANGKITAN SUMBAGUT
SEKTOR PEMBANGKITAN PEKANBARU
Jln. Dr. Tanjung Datuk No 74
Telp. (0761) 41855/41856
0
PT PLN (PERSERO) LAPORAN PEMBANGKIT TENAGA LISTRIK No. Formulir :
SEKTOR PEMBANGKITAN SUMATERA BAGIAN UTARA KALORI RATA-RATA BATUBARA No. Revisi :
SEKTOR PEMBANGKITAN PEKANBARU TAHUN 2018 Tanggal :
Halaman :
NO TANGGAL TERIMA PENERIMAAN (kg) PEMASOK PERSEDIAAN AWAL (kg) PEMAKAIAN (kg) PERSEDIAAN AKHIR (kg) NILAI KALOR (Kcal/kg) NILAI KALOR RATA - RATA (Kcal/kg)
1 2 3a 3b 4 5 6 7 8'=((3a'*7')+(6"*8")) - (5'*8")) / 6'
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
- -
PT PLN (PERSERO) UNIT INDUK PEMBANGKITAN SUMBAGUT
UNIT PELAKSANA PENGENDALIAN PEMBANGKITAN PEKANBARU
PEMANTAUAN WADUK PEMBANGKIT HIDRO
Jln. Dr. Tanjung Datuk No 74
Telp. (0761) 41855/41856 BULAN DESEMBER 2022
Hal. 13
ELEVASI WADUK BEBAN RATA-RATA BEBAN TERTINGGI OUTFLOW
TOTAL OUTFLOW INFLOW WADUK
TANGGAL AWAL AKHIR SELISIH UNIT (MW) UNIT (MW) SPILLWAY TURBINE
(m3/det) (m3/det)
(M) (M) (M) UNIT #1 UNIT #2 UNIT #3 UNIT #1,2,3 UNIT #1 UNIT #2 UNIT #3 (m3/det) (M3/DET)
1 76.17 76.68 0.51 28.05 28.96 29.43 73.48 35.12 35.18 35.54 - 223.33 223.33 692.22
2 76.68 76.82 0.14 24.69 26.05 26.68 61.57 35.96 36.62 36.94 - 190.94 190.94 319.66
3 76.82 76.86 0.04 27.38 27.51 27.96 51.81 34.98 36.76 35.95 - 157.33 157.33 194.11
4 76.86 76.88 0.02 25.82 25.98 22.35 55.87 36.05 36.65 29.77 - 175.10 175.10 193.49
5 76.88 76.93 0.05 25.15 24.49 27.14 57.96 35.66 35.81 35.74 - 177.48 177.48 223.45
6 76.93 76.81 (0.12) 28.44 28.75 28.83 80.10 35.27 35.57 35.87 - 244.85 244.85 134.52
7 76.81 76.71 (0.10) 26.23 28.27 28.55 78.67 35.09 35.86 36.12 - 240.36 240.36 148.42
8 76.71 76.62 (0.09) 27.46 27.13 27.37 78.52 34.97 34.99 35.48 - 235.14 235.14 152.40
9 76.62 76.55 (0.07) 25.98 26.67 27.40 77.77 35.01 34.84 35.36 - 244.09 244.09 179.73
10 76.55 76.49 (0.06) 27.94 25.50 25.46 65.24 35.09 36.23 35.13 - 201.32 201.32 146.16
11 76.49 76.48 (0.01) 22.83 23.98 23.35 52.71 34.52 35.27 35.53 - 170.28 170.28 161.08
12 76.48 76.39 (0.09) 24.71 24.76 24.96 68.22 35.94 34.68 34.91 - 205.78 205.78 123.03
13 76.39 76.39 0.00 23.27 23.12 22.83 52.00 36.11 35.20 35.47 - 159.87 159.87 159.87
14 76.39 76.39 0.00 22.10 20.08 22.42 46.88 35.43 30.16 35.31 - 145.34 145.34 145.34
15 76.39 76.29 (0.10) 24.27 23.54 24.46 63.13 34.36 34.52 34.72 - 200.89 200.89 108.95
16 76.29 76.19 (0.10) 30.10 28.63 29.20 70.69 35.67 35.73 34.72 - 220.58 220.58 128.64
17 76.19 76.26 0.07 20.60 21.23 21.68 43.91 34.38 35.89 34.42 - 137.31 137.31 201.67
18 76.26 76.34 0.08 21.33 22.42 21.75 51.17 29.26 30.16 29.15 - 148.48 148.48 222.03
19 76.34 76.30 (0.04) 26.88 26.27 26.20 69.51 35.81 34.58 34.99 - 215.33 215.33 178.56
20 76.30 76.42 0.12 26.15 26.00 27.12 75.88 34.98 34.67 35.16 - 235.30 235.30 345.62
21 76.42 76.58 0.16 26.88 26.60 27.10 78.33 34.98 35.16 36.06 - 242.07 242.07 389.18
22 76.58 76.59 0.01 26.85 25.82 26.28 71.17 34.83 34.79 35.31 - 215.00 215.00 224.19
23 76.59 76.55 (0.04) 21.97 23.40 22.41 62.24 34.70 36.14 35.05 - 194.51 194.51 157.74
24 76.55 76.50 (0.05) 26.67 26.97 27.02 58.31 34.74 36.63 35.79 - 177.45 177.45 131.48
25 76.50 76.46 (0.04) 23.95 25.86 21.82 50.83 35.62 36.30 35.08 - 153.09 153.09 116.31
26 76.46 76.37 (0.09) 24.43 25.27 25.65 60.84 34.70 35.51 36.08 - 158.37 158.37 75.62
27 76.37 76.29 (0.08) 25.23 25.69 25.51 55.37 34.28 36.20 35.64 - 167.31 167.31 93.76
28 76.29 76.31 0.02 24.82 22.35 21.75 46.07 35.94 34.55 34.79 - 140.79 140.79 159.18
29 76.31 76.33 0.02 23.00 22.57 23.91 40.27 35.90 35.09 34.97 - 122.81 122.81 141.20
30 76.33 76.40 0.07 19.88 20.43 36.17 32.02 29.96 36.17 84.06 - 99.42 99.42 163.78
31 76.40 76.52 0.12 19.68 21.04 36.05 27.60 25.08 36.05 - 87.09 87.09 197.42
RATA2 76.50 76.51 0.01 24.93 25.01 26.09 59.94 34.53 35.22 36.64 0.00 183.45 183.45 193.83
TOTAL - 5,687.02 5,687.02 6,008.81
PT PLN (PERSERO) UNIT INDUK PEMBANGKITAN SUMBAGUT
UNIT PELAKSANA PENGENDALIAN PEMBANGKITAN PEKANBARU REKAPITULASI PENGUSAHAAN WADUK
Jln. Dr. Tanjung Datuk No 74 PLTA KOTAPANJANG
Telp. (0761) 41855/41856
BULAN DESEMBER 2022
Hal. 14
ELEVASI (m) INFLOW WADUK OUTFLOW TURBIN OUTFLOW SPILWAY
BULAN TGL (m3/det) (m3/det) (m3/det) SWC KETERANGAN
IDEAL (M3/DET)
REAL
PUWL PLWL PLWL+1 MAX MIN RATE MAX MIN RATE MAX MIN RATE
RIDWAN SAPUTRA
DATA BEBAN PEMBANGKIT
BULAN DESEMBER 2022
PLTA KPJ #01 PLTA KPJ #02 PLTA KPJ #03 PLTG T. LEMBU #02 PLTG T. LEMBU #03 PLTG B. PUNGUT #02 PLTMG B. PUNGUT #01 PLTMG B. PUNGUT #02 PLTMG B. PUNGUT #03 PLTMG B. PUNGUT #04 PLTMG B. PUNGUT #05 PLTMG B. PUNGUT #06 PLTMG B. PUNGUT #07
Tgl RATA- RATA- RATA- RATA- RATA- RATA- RATA- RATA- RATA- RATA-
MIN MAX MIN MAX MIN MAX MIN MAX MIN MAX MIN MAX MIN MAX RATA-RATA MIN MAX MIN MAX MIN MAX MIN MAX RATA-RATA MIN MAX RATA-RATA MIN MAX
RATA RATA RATA RATA RATA RATA RATA RATA RATA RATA
Daya (MW)
1 28.05 18.61 35.12 28.96 19.68 35.18 29.43 19.16 35.54 - - - - - - - - - 14.00 10.00 14.50 14.50 14.50 14.50 13.69 4.00 14.50 14.50 14.50 14.50 14.50 14.50 14.50 14.46 14.00 14.50 14.50 14.50 14.50
2 24.69 18.90 35.96 26.05 18.84 36.62 26.68 19.20 36.94 - - - - - - - - - 13.14 10.00 14.50 7.86 14.50 14.50 13.81 4.00 14.50 12.18 14.50 14.50 12.00 14.50 14.50 13.81 14.00 14.50 13.60 14.50 14.50
3 27.38 18.87 34.98 27.51 19.23 36.76 27.96 19.16 35.95 - - - - - - - - - 13.65 10.00 14.50 12.67 14.50 14.50 13.54 4.00 14.50 12.57 14.50 14.50 12.67 14.50 14.50 13.50 14.00 14.50 13.60 14.50 -
4 25.82 18.89 36.05 25.98 19.53 36.65 22.35 19.14 29.77 - - - - - - - - - 13.75 10.00 14.50 13.60 14.50 14.50 13.21 4.00 14.50 13.00 14.50 14.50 13.60 14.50 14.50 13.21 14.00 14.50 13.60 14.50 -
5 25.15 18.73 35.66 24.49 18.95 35.81 27.14 19.02 35.74 - - - - - - - - - 13.93 10.00 14.50 13.91 14.50 14.50 14.16 4.00 14.50 14.03 14.50 14.50 13.98 14.50 14.50 13.42 14.00 14.50 13.25 14.50 14.50
6 28.44 8.59 35.27 28.75 19.75 35.57 28.83 19.95 35.87 - - - - - - - - - 14.48 10.00 14.50 14.50 14.50 14.50 14.08 4.00 14.50 14.46 14.50 14.50 14.00 14.50 14.50 14.00 14.00 14.50 14.42 14.50 14.50
7 26.23 18.76 35.09 28.27 19.45 35.86 28.55 19.74 36.12 - - - - - - - - - 14.50 10.00 14.51 14.50 14.50 14.50 14.50 4.00 14.50 14.50 14.50 14.50 13.00 14.50 14.50 13.00 14.00 14.50 14.50 14.50 14.50
8 27.46 18.90 34.97 27.13 19.75 34.99 27.37 20.10 35.48 - - - - - - - - - 12.50 10.00 14.50 12.50 14.50 14.50 13.68 4.00 14.50 13.05 14.50 14.50 13.86 14.50 14.50 13.38 14.00 14.50 13.68 14.50 14.50
9 25.98 18.54 35.01 26.67 18.74 34.84 27.40 19.04 35.36 - - - - - - - - - 14.40 10.00 14.50 11.60 14.50 14.50 13.45 4.00 14.50 11.60 14.50 14.50 14.50 14.50 14.50 14.50 14.00 14.50 12.58 14.50 14.50
10 27.94 18.53 35.09 25.50 18.33 36.23 25.46 18.07 35.13 - - - - - - - - - 14.50 10.00 14.50 11.83 14.50 14.50 14.25 4.00 14.50 14.29 14.50 14.50 13.20 14.50 14.50 12.42 14.00 14.50 14.50 14.50 14.50
11 22.83 18.47 34.52 23.98 18.29 35.27 23.35 18.28 35.53 - - - - - - - - - 14.50 10.00 14.50 11.63 14.50 14.50 14.10 4.00 14.50 14.50 14.50 14.50 11.63 14.50 14.50 14.50 14.00 14.50 14.50 14.50 14.50
12 24.71 18.74 35.94 24.76 18.92 34.68 24.96 19.01 34.91 - - - - - - - - - 154.64 10.00 1,010.00 13.60 14.50 14.50 13.75 4.00 14.50 13.58 14.50 14.50 13.75 14.50 14.50 13.58 14.00 14.50 13.50 14.50 14.50
13 23.27 18.81 36.11 23.12 18.83 35.20 22.83 19.02 35.47 - - - - - - - - - 13.75 10.00 14.50 13.60 14.50 14.50 13.75 4.00 14.50 14.18 14.50 14.50 13.60 14.50 14.50 13.36 14.00 14.50 14.15 14.50 14.50
14 22.10 18.38 35.43 20.08 18.49 30.16 22.42 18.71 35.31 - - - - - - - - - 12.70 10.00 14.50 10.88 14.50 14.50 12.12 4.00 14.50 12.70 14.50 14.50 13.38 14.50 14.50 12.63 14.00 14.50 11.25 14.50 14.50
15 24.27 18.25 34.36 23.54 18.31 34.52 24.46 18.79 34.72 - - - - - - - - - 10.75 10.00 14.50 11.13 14.50 14.50 10.75 4.00 14.50 10.90 14.50 14.50 10.90 14.50 14.50 11.13 14.00 14.50 10.75 14.50 14.50
16 30.10 18.39 35.67 28.63 18.12 35.73 29.20 18.82 34.72 - - - - - - - - - 213.60 10.00 10.00 14.09 14.50 14.50 13.60 4.00 14.50 13.60 14.50 14.50 13.60 14.50 14.50 13.60 14.00 14.50 14.09 14.50 14.50
17 20.60 18.31 34.38 21.23 18.66 35.89 21.68 18.89 34.42 - - - - - - - - - 11.93 10.00 14.50 12.01 14.50 14.50 13.20 4.00 14.50 11.93 14.50 14.50 12.88 14.50 14.50 11.88 14.00 14.50 12.22 14.50 14.50
18 21.33 18.33 29.26 22.42 18.53 30.16 21.75 18.72 29.15 - - - - - - - - - 12.70 10.00 14.50 13.38 14.50 14.50 12.70 4.00 14.50 13.38 14.50 14.50 13.38 14.50 14.50 13.38 14.00 14.50 12.70 14.50 14.50
19 26.88 18.69 35.81 26.27 18.16 34.58 26.20 18.92 34.99 - - - - - - - - - 13.64 10.00 14.50 13.22 14.50 14.50 13.22 4.00 14.50 13.55 14.50 14.50 14.50 14.50 14.50 13.06 14.00 14.50 14.50 14.50 14.50
20 26.15 18.73 34.98 26.00 18.74 34.67 27.12 18.82 35.16 - - - - - - - - - 14.11 10.00 14.50 13.57 14.50 14.50 13.42 4.00 14.50 14.46 14.50 14.50 13.75 14.50 14.50 13.71 14.00 14.50 13.42 14.50 14.50
21 26.88 18.49 34.98 26.60 19.42 35.16 27.10 19.08 36.06 - - - - - - - - - 13.50 10.00 14.50 14.15 14.50 14.50 13.75 4.00 14.50 14.00 14.50 14.50 14.00 14.50 14.50 14.00 14.00 14.50 13.79 14.50 14.50
22 26.85 18.52 34.83 25.82 19.28 34.79 26.28 19.19 35.31 - - - - - - - - - 13.38 10.00 14.50 13.21 14.50 14.50 13.38 4.00 14.50 13.75 14.50 14.50 13.38 14.50 14.50 13.60 14.00 14.50 13.00 14.50 14.50
23 21.97 18.55 34.70 23.40 19.64 36.14 22.41 19.14 35.05 - - - - - - - - - 10.00 10.00 10.00 11.29 14.50 14.50 10.00 4.00 10.00 10.00 14.50 10.00 10.00 14.50 10.00 8.75 14.00 10.00 11.29 14.50 14.50
24 26.67 18.68 34.74 26.97 19.88 36.63 27.02 19.30 35.79 - - - - - - - - - 13.00 10.00 14.50 14.50 14.50 14.50 13.00 4.00 14.50 12.13 14.50 14.50 12.63 14.50 14.50 12.13 14.00 14.50 14.50 14.50 14.50
25 23.95 18.41 35.62 25.86 19.81 36.30 21.82 19.07 35.08 - - - - - - - - - 11.33 10.00 14.00 10.90 14.50 14.50 10.90 4.00 14.50 10.90 14.50 14.50 11.50 14.50 14.50 11.50 14.00 14.50 10.90 14.50 14.50
26 24.43 18.82 34.70 25.27 19.12 35.51 25.65 19.11 36.08 - - - - - - - - - 13.75 10.00 14.50 13.75 14.50 14.50 13.60 4.00 14.50 13.38 14.50 14.50 13.38 14.50 14.50 13.38 14.00 14.50 13.75 14.50 14.50
27 25.23 18.10 34.28 25.69 18.22 36.20 25.51 18.54 35.64 - - - - - - - - - 13.00 10.00 14.50 13.86 14.50 14.50 13.38 4.00 14.50 11.33 14.50 14.50 13.00 14.50 14.50 14.50 14.00 14.50 13.71 14.50 14.50
28 24.82 18.15 35.94 22.35 20.04 34.55 21.75 18.84 34.79 - - - - - - - - - 13.38 10.00 14.50 14.09 14.50 14.50 13.38 4.00 14.50 13.00 14.50 14.50 13.00 14.50 14.50 14.00 14.00 14.50 14.09 14.50 14.50
29 23.00 18.82 35.90 22.57 18.02 35.09 23.91 18.95 34.97 - - - - - - - - - 13.00 10.00 14.50 14.09 14.50 14.50 9.67 4.00 14.50 14.50 14.50 14.50 14.50 14.50 14.50 13.00 14.00 14.50 11.93 14.50 14.50
30 19.88 18.91 29.96 20.43 18.89 36.17 - - - - - - - - - - - - 10.00 10.00 10.00 14.09 14.50 10.00 10.00 4.00 10.00 10.00 14.50 10.00 10.00 14.50 10.00 10.00 14.00 10.00 11.93 14.50 10.00
31 19.68 18.68 25.08 21.04 18.95 36.05 - - - - - - - - - - - - 10.00 10.00 14.50 11.00 14.50 14.50 10.00 4.00 14.50 10.00 14.50 14.50 11.00 14.50 14.50 13.00 14.00 14.50 11.93 14.50 14.50
PT PLN (PERSERO) LAPORAN PEMBANGKIT TENAGA LISTRIK No. Formulir :
PEMBANGKITAN SUMATERA BAGIAN UTARA JAM KERJA UNIT PEMBANGKIT No. Revisi :
SEKTOR PEMBANGKITAN BELAWAN JUNI 2022 Tanggal :
Halaman :
NO PUSAT LISTRIK MEREK MESIN JAM KERJA JSAI/JSTO/JSCI JSGI/JSSO/JSHGPI JSMI/JSMO JSIB JSYI JSME JSSE JSB
1 PLTG TELUK LEMBU 1 (ALSTHOM) Alsthom
2 PLTG TELUK LEMBU 2 (ALSTHOM) Alsthom - 5,558.13 166.70 8,107.96 - 81,027.71
3 PLTG TELUK LEMBU 3 (EX GILI TIMUR) GE - 92.90 5,289.33 18,700.00 - 18,700.00
4 PLTD TELUK LEMBU SULZER Sulzer
5 PLTA KOTA PANJANG 1 Kaplan 500.55 4,564.15 4,564.15 4,564.15 - - - - 164,931.70
6 PLTA KOTA PANJANG 2 Kaplan 358.43 6,903.03 12,964.92 37,346.95 - - - - 168,423.08
7 PLTA KOTA PANJANG 3 Kaplan 542.92 3,910.87 38,463.65 55,182.20 - - - - 170,186.67
8 PLTG BALAI PUNGUT 2 DURI IP Alsthom - 791.35 9,921.67 34,341.47 - - - - 124,821.55
9 PLTMG BALAI PUNGUT DURI 1 WARTSILLA 230.93 53,724.00
10 PLTMG BALAI PUNGUT DURI 2 WARTSILLA 153.30 41,966.00
11 PLTMG BALAI PUNGUT DURI 3 WARTSILLA 213.27 48,603.00
12 PLTMG BALAI PUNGUT DURI 4 WARTSILLA 221.70 55,266.00
13 PLTMG BALAI PUNGUT DURI 5 WARTSILLA 269.08 53,887.00
14 PLTMG BALAI PUNGUT DURI 6 WARTSILLA 294.78 51,776.00
15 PLTMG BALAI PUNGUT DURI 7 WARTSILLA 202.70 47,798.00
16 PLTU TEMBILAHAN #01
17 PLTU TEMBILAHAN #02
JAM KERJA : Jam Kerja Mesin
JSAI.JSTO/JSCI : Jam Kerja Setelah Annual Insp/Top Ov.haul/Comb.Insp
JSGI/JSSO/JSHGPI : Jam Kerja Setelah General Insp/Semi Ov.haul/HGPI
JSMI/JSMO : Jam Kerja Setelah Major Insp/Major Ov.haul
JSIB : Jam kerja setelah Inspeksi Boiler
JSYI : Jam Kerja Setelah Yearly Inspection
JSME : Jam Kerja Setelah Mean Inspection
JSSE : Jam Kerja Setelah Serious Inspection
JSB : Jam Sejak Beroperasi
PLN UNIT PELAKSANA DALKIT
PEKANBARU
OPERASI & PEMELIHARAAN
DESEMBER
2022
III. EVALUASI DATA
PENGUSAHAAN
LAPORAN INDIKATOR UNJUK KERJA P
BULAN DESEMBER 2022
PRODUKSI
PUSAT LISTRIK / TERPASANG MAMPU RENC/SES NON GENERAT PS+TRAFO KERJA
( SH )
OR
UNIT (KW) (KW) (KW) (KW) (KW) (KW) (KW)
PEKANBARU
1. PLTG TELUK LEMBU 516,400 242,228 472,190 - - - ### -
4. PLTU TEMBILAHAN - - - - - - - -
1 PLTU TEMB - - - - - -
2 PLTU TEMB - - - - - -
-
- - 1,488.00 - - - - - - -
- - 744.00 - - - -
- - 744.00 - - - -
- - - - - - - - - -
- - - - - - -
- - - - - - -
SOF EFOR
- -
- 21,471,840 0.00% - - 0%
- 10,311,840.00 - - - -
- 11,160,000.00 - - - -
- - - - - -
- - - - - -
- - - - - -
EAF CF
- - 6.19 - -
- - - - -
- - - - -
DESEMBER
2022
IV. LAMPIRAN