Anda di halaman 1dari 199

LAPORAN PRODUKSI ENERGI kWh PEMBANGKIT

PLTA KOTA PANJANG


BULAN DESEMBER 2022

No Uraian Stand kWh Meter

Awal
01 - 12 - 2022
Jam : 10:00 Wib
a b d
1 kWh Produksi Energi Sisi Generator (11 kV)
1.1 PLTA KOTO PANJANG #01 32,008,165.63
1.2 PLTA KOTO PANJANG #02 53,113,517.55
1.3 PLTA KOTO PANJANG #03 31,869,880.10
Jumlah Produksi Energi Sisi Generator
2 kWh Produksi Energi Sisi Trafo (Export) 150 kV
2.1 PLTA KOTO PANJANG #01 184,280,671
2.2 PLTA KOTO PANJANG #02 231,552,699
2.3 PLTA KOTO PANJANG #03 198,872,544
JUMLAH EXPORT
3 kWh Produksi Energi Sisi Trafo (Import) 150 kV
3.1 PLTA KOTO PANJANG #01 215,960
3.2 PLTA KOTO PANJANG #02 736,714
3.3 PLTA KOTO PANJANG #03 715,177
JUMLAH IMPORT
Produksi Netto PLTA Kota Panjang
4 Pemakaian Sendiri (PS)
5.1 PS 1 7,227.710
5.2 PS 3 5,413.311
5.2 Supply dari Genset & Black Start
JUMLAH PS

LAPORAN PRODUKSI ENERGI kWh PEMBANGKIT


PLTG TELUK LEMBU
BULAN DESEMBER 2022

No Uraian Stand kWh Meter

Awal
01 - 12 - 2022
Jam : 10:00 Wib
a b d
1 kWh Produksi Energi Sisi Generator (11 kV)
1.1 PLTG TELUK LEMBU #01
1.2 PLTG TELUK LEMBU #02 1,043,683.30
1.3 PLTG TELUK LEMBU #03 303,028.00
1.4 PLTD TELUK LEMBU #01 (SULZER)
Jumlah Produksi Energi Sisi Generator
2 kWh Produksi Energi Sisi Trafo (Export) 150 kV
2.1 PLTG TELUK LEMBU #01
2.2 PLTG TELUK LEMBU #02 505,749,236.00
2.3 PLTG TELUK LEMBU #03 84,610,876.00
2.4 PLTD TELUK LEMBU #01 (SULZER)
JUMLAH EXPORT
3 kWh Produksi Energi Sisi Trafo (Import) 150 kV
3.1 PLTG TELUK LEMBU #01
3.2 PLTG TELUK LEMBU #02 3,733,319.00
PS Auxiliary PLTG di GI Teluk Lembu 37,945.00
PS Auxiliary PLTD di PL Teluk Lembu 4,910,050.00
Total kWh Import PLTG #2
3.3 PLTG TELUK LEMBU #03 782,807.00
3.4 PLTD TELUK LEMBU #01 (SULZER)
JUMLAH IMPORT
Produksi Netto PLTG Teluk Lembu
4 Pemakaian Sendiri (PS)
5.1 PS MCC 1 44,589
5.2 PS MCC 2 46,315.20
5.2 PS MCC 3 229,746.40

JUMLAH PS
LAPORAN PRODUKSI ENERGI kWh PEMBANGKIT
PLTG/PLTMG BALAI PUNGUT DURI
BULAN DESEMBER 2022

No Uraian Stand kWh Meter

Awal
01 - 12 - 2022
Jam : 10:00 Wib
a b d
1 kWh Produksi Energi Sisi Generator (11 kV)
1.1 PLTG BALAI PUNGUT DURI #02 478,952,156.00
1.2 PLTMG BALAI PUNGUT DURI #01 722,017,000.00
1.3 PLTMG BALAI PUNGUT DURI #02 572,258,000.00
1.4 PLTMG BALAI PUNGUT DURI #03 647,380,000.00
1.5 PLTMG BALAI PUNGUT DURI #04 734,629,000.00
1.6 PLTMG BALAI PUNGUT DURI #05 727,683,000.00
1.7 PLTMG BALAI PUNGUT DURI #06 678,806,000.00
1.8 PLTMG BALAI PUNGUT DURI #07 638,216,000.00
Jumlah Produksi Energi Sisi Generator
2 kWh Produksi Energi Sisi Trafo 20 kV (Export)
2.1 PLTG BALAI PUNGUT DURI #02 465,803,280.00
2.2 PLTMG BALAI PUNGUT DURI #01
2.3 PLTMG BALAI PUNGUT DURI #02 935,977,440.00
2.4 PLTMG BALAI PUNGUT DURI #03
2.5 PLTMG BALAI PUNGUT DURI #04
2.6 PLTMG BALAI PUNGUT DURI #05 648,908,440.00
2.7 PLTMG BALAI PUNGUT DURI #06
2.8 PLTMG BALAI PUNGUT DURI #07
JUMLAH EXPORT
3 kWh Produksi Energi Sisi Trafo 20 kV (Import)
3.1 PLTG BALAI PUNGUT DURI #02 1,522,374.00
3.2 PLTMG BALAI PUNGUT DURI #01
3.3 PLTMG BALAI PUNGUT DURI #02 2,589,648.00
3.4 PLTMG BALAI PUNGUT DURI #03
3.5 PLTMG BALAI PUNGUT DURI #04
3.6 PLTMG BALAI PUNGUT DURI #05 1,546,512.00
3.7 PLTMG BALAI PUNGUT DURI #06
3.8 PLTMG BALAI PUNGUT DURI #07
JUMLAH IMPORT
PRODUKSI NETTO PLTG DAN PLTMG BALAI PUNGUT DURI
5 Pemakaian Sendiri (PS)
5.1 PLTG BALAI PUNGUT DURI #02 7,579,500.00
5.2 PLTMG BALAI PUNGUT DURI #01
5.3 PLTMG BALAI PUNGUT DURI #02 35,808,000.00
5.4 PLTMG BALAI PUNGUT DURI #03
5.5 PLTMG BALAI PUNGUT DURI #04
5.6 PLTMG BALAI PUNGUT DURI #05 27,436,000.00
5.7 PLTMG BALAI PUNGUT DURI #06
5.8 PLTMG BALAI PUNGUT DURI #07
JUMLAH PS

LAPORAN PRODUKSI ENERGI kWh PEMBANGKIT


PLTU TEMBILAHAN
BULAN DESEMBER 2022

No Uraian Stand kWh Meter

Awal
01 - 12 - 2022
Jam : 10:00 Wib
a b ;
1 kWh Produksi Energi Sisi Generator (13,8 kV)
1.1 PLTU TEMBILAHAN #01 32,991,890.000
1.2 PLTU TEMBILAHAN #02 41,194,560.000

JUMLAH PRODUKSI SISI GENERATOR


2 kWh Produksi Energi Sisi Trafo (Export) 150 kV
2.1 PLTU TEMBILAHAN #01 3,201,243.630
2.2 PLTU TEMBILAHAN #02 19,982,374.550

JUMLAH EXPORT
3 kWh Produksi Energi Sisi Trafo (Import) 150 kV
3.1 PLTU TEMBILAHAN #01 1,252,443.97
3.2 PLTU TEMBILAHAN #02 267,172.37

JUMLAH IMPORT
PRODUKSI NETTO PLTU TEBILAHAN
4 Pemakaian Sendiri (PS)
4.1 TRAFO 1 PS 7,261,592.000
4.2 TRAFO 2 PS 7,961,884.000
J U M L A H P S UAT

-
-
J U M L A H P S SST (GI)

LAPORAN PRODUKSI ENERGI kWh PEMBANGKIT


` MESIN SEWA PT PLN ( Persero ) SEKTOR PEMBANGKITAN PEKA
BULAN DESEMBER 2022

NO URAIAN STAND kWh

Awal
01 - 12 - 2022
Jam : 10:00 Wib
1 PLTGU SW RIAU #01 (GT 1.1) (PT RIAU POWER)
1 KWH EXPORT (LWBP) 6,355,677.00
2 KWH EXPORT (WBP) 30,867,987.00

NETTO
2 PLTG SW BALAI PUNGUT DURI (PT PJB)
1 KWH EXPORT 519,672,630
JUMLAH
1 KWH IMPORT 1,741,970
JUMLAH IMPOR
NETTO
3 PLTMG SW TELUK LEMBU I (KSO HUTAN ALAM)
1 KWH EXPORT 917,482,096.00
JUMLAH
1 KWH IMPORT 28,237.00

NETTO
4 PLTGU SW RIAU #02 (ST 1.0) (PT RIAU POWER)
1 KWH EXPORT (LWBP) 154,939,122.00
2 30,756,397.00
TOTAL

NETTO
5 PLTMG SW TELUK LEMBU I (PT PJBS)
1 KWH EXPORT 1 655,877.81
2 KWH EXPORT 2 772,066,949.00
JUMLAH
1 KWH IMPORT 1 52.50
2 KWH IMPORT 2 31,019.00
JUMLAH
NETTO
6 PLTMG SW TELUK LEMBU II (KSO HUTAN ALAM)
1 KWH EXPORT 1 827,493,087.00
2 KWH EXPORT 2 422,806,441.00
JUMLAH
1 KWH IMPORT 1 164,299.34
2 KWH IMPORT 2 125,118
JUMLAH
NETTO
7 PLTMG BALAI PUNGUT (PT MAX POWER)
1 KWH EXPORT 111,049.30
492,732.00
JUMLAH
2 KWH IMPORT 2.30
9.20
JUMLAH
NETTO
8 PLTMG SW TELUK LEMBU II (PT PJBS)
1 KWH EXPORT (WBP) 208,719.20
KWH EXPORT (LWBP) 946,649.00
KWH EXPORT 1,155,368.20000
JUMLAH
KWH IMPORT (WBP) 14.20
KWH IMPORT (LWBP) 78.10
KWH IMPORT 92.30
JUMLAH
NETTO
9 PLTG IPP MPP BALAI PUNGUT (PT PLN BATAM)
1 GSUT #1 KWH EXPORT (LWBP) 340,175,045.00
GSUT #1 KWH EXPORT (WBP) 125,518,788.00
JUMLAH GSUT #1 KWH EXPORT 465,693,833.00
GSUT #2 KWH EXPORT (LWBP) 800,870,375.00
GSUT #2 KWH EXPORT (WBP) 301,199,287.00
JUMLAH GSUT #2 KWH EXPORT 1,102,069,662.00
JUMLAH EXPORT

GSUT #1 KWH IMPORT (LWBP) 1,418,804.00


GSUT #1 KWH IMPORT (WBP) 152,920.00
JUMLAH GSUT #1 KWH IMPORT 1,571,724.00
GSUT #2 KWH IMPORT (LWBP) 1,311,310.00
GSUT #2 KWH IMPORT (WBP) 93,024.00
JUMLAH GSUT #2 KWH IMPORT 1,404,334.00
JUMLAH IMPORT
NETTO
10 PLTMG SW SIAK (PT. WIKA KOTO GASIB)
KWH EXPORT 1 19,550.736
KWH EXPORT 2 - .0
KWH EXPORT 3 - .0
KWH EXPORT 4 - .0
KWH EXPORT 5 - .0

KWH EXPORT 19,550.736


JUMLAH
KWH IMPORT 1 30.226
KWH IMPORT 2 - .0
KWH IMPORT 3 - .0
KWH IMPORT 4 - .0
KWH IMPORT 5 - .0
KWH IMPORT 30.226

JUMLAH
NETTO
TOTAL KWH 20 KV
RGI kWh PEMBANGKIT
PANJANG
MBER 2022

Faktor Hasil Pembacaan


Pengali (Realisasi)
kWh

Akhir
01 - 01- 2023 Selisih
Jam : 10:00 Wib
e f=e-d g h=fxg

46,154,322.60 14,146,156.97 1 14,146,156.97


70,689,174.87 17,575,657.32 1 17,575,657.32
45,238,708.12 13,368,828.02 1 13,368,828.02
45,090,642.31

198,098,160 13,817,489.00 1 13,817,489.00


248,821,827 17,269,128.00 1 17,269,128.00
211,831,395 12,958,851.00 1 12,958,851.00
(A) 44,045,468.00

241,656 25,696.00 1 25,696.00


755,228 18,514.00 1 18,514.00
757,531 42,354.00 1 42,354.00
(B) 86,564.00
(A-B) 43,958,904.00000

7,237.751 10.04 6000 60,246


5,445.556 32.24 6000 193,470

253,716

RGI kWh PEMBANGKIT


MBER 2022

Faktor Hasil Pembacaan


Pengali kWh

Akhir
01 - 01- 2023 Selisih
Jam : 10:00 Wib
e f=e-d g h=fxg

1,043,683.30 - 1,000 -
303,028.00 - 1,000 -

505,749,236.00 - 1.00 -
84,610,876.00 - 1.00 -

(A) -

3,778,120.00 44,801.00 1.00 44,801.00


37,945.00 - 30.00 -
4,910,050.00 - 1.00 -

808,584.00 25,777.00 1.00 25,777.00


- 1.00 -
(B) 70,578.00
(A-B) (70,578.00)

44,589 - 800.00 -
46,336.10 20.90 800.00 16,720.00
230,281.90 535.50 10 5,355.00

22,075.00
RGI kWh PEMBANGKIT
AI PUNGUT DURI
MBER 2022

Faktor Hasil
Pengali Pembacaan

Akhir
01 - 01- 2023 Selisih
Jam : 10:00 Wib
e f=e-d g h=fxg

478,952,156.00
724,775,000.00 2,758,000 1.00 2,758,000
575,242,000.00 2,984,000 1.00 2,984,000
650,264,000.00 2,884,000 1.00 2,884,000
738,393,000.00 3,764,000 1.00 3,764,000
729,619,000.00 1,936,000 1.00 1,936,000
681,681,000.00 2,875,000 1.00 2,875,000
641,643,000.00 3,427,000 1.00 3,427,000
20,628,000

465,803,280.00 - 1 -

944,986,224.00 9,008,784.00 1 9,008,784.00

659,740,540.00 10,832,100.00 1 10,832,100.00

(A) 19,840,884.00

1,536,468.00 14,094.00 1 14,094.00

2,652,372.00 62,724.00 1 62,724.00


1,662,108.00 115,596.00 1 115,596.00

(B) 192,414.00
(A-B) 19,648,470.00

7,579,500.00 - 1 -

35,943,000.00 135,000.00 1 135,000.00

27,716,000.00 280,000.00 1 280,000.00

415,000.00

RGI kWh PEMBANGKIT

MBER 2022

Faktor Hasil Pembacaan


(Realisasi)
Pengali kWh

Akhir
01 - 01- 2023 Selisih
Jam : 10:00 Wib
e f=e-d g h=fxg

32,991,890.000 - 1 -
41,194,560.000 - 1 -

3,201,243.630 - 1 -
19,982,374.550 - 1 -

(A) -
1,252,443.97 - 1 -
267,172.37 - 1 -

(B) -
(A-B) -

7,261,592.000 - 1 -
7,961,884.000 - 1 -
-

- -
- -
-

RGI kWh PEMBANGKIT


OR PEMBANGKITAN PEKANBARU
MBER 2022

FAKTOR
SELISIH HASIL
KALI
Akhir
01 - 01- 2023
Jam : 10:00 Wib

6,355,677.00 - 1 -
30,867,987.00 - 1 -
1 -
-
519,672,630 - 1 -
-
1,741,970 - 1 -
-
-

917,482,096.00 - 1 -
-
28,237.00 - 1 -

154,939,122.00 - 1 -
30,756,397.00 - 1 -
-
-
-
-

655,877.81 - 1000 -
772,066,949.00 - 1 -
-
52.50 - 1000 -
31,019.00 - 1 -
-
-

827,493,087.00 - 1 -
422,806,441.00 - 1 -
-
164,299.34 - 1 -
125,118 - 1 -
-
-

111,049.30 - 1000 -
492,732.00 - 1000 -
-
2.30 - 1000 -
9.20 - 1000 -
-
-

208,719.20 - 1000 -
946,649.00 - 1000 -
1,155,368.20000 - 1000 -
-
14.20 - 1000 -
78.10 - 1000
92.30 - 1000 -
-
-

340,358,109.00 183,064.00 1
126,352,301.00 833,513.00 1
466,710,410.00 1,016,577.00 1 1,016,577.00
801,152,521.00 282,146.00 1
302,977,618.00 1,778,331.00 1
1,104,130,139.00 2,060,477.00 1 2,060,477.00
3,077,054.00

1,467,540.00 48,736.00 1 48,736.00


160,240.00 7,320.00 1 7,320.00
1,627,780.00 56,056.00 1 56,056.00
1,361,760.00 50,450.00 1 50,450.00
101,414.00 8,390.00 1 8,390.00
1,463,174.00 58,840.00 1 58,840.00
114,896.00
2,962,158.00

19,550.736 - 21818.1818 -
- .0 - 21818.1818 -
- .0 - 21818.1818 -
- .0 - 21818.1818 -
- .0 - 21818.1818 -
-
19,550.736 - 21818.1818 -
-
30.226 - 21818.1818 -
- .0 - 21818.1818 -
- .0 - 21818.1818 -
- .0 - 21818.1818 -
- .0 - 21818.1818 -
30.226 - 21818.1818 -
-
-
-
EXPORT 3,077,054.00
IMPORT -
NETTO 3,077,054.00

EXPORT 66,963,406.00
IMPORT 349,556.00
TRANSFER 66,613,850.00

0
0

0
Hal. 1

KETERANGAN

-
Hal. 2

KETERANGAN

kWh generator
kWh Pembanding UPT

kWh PS dari GI = kWh Import


kWh PS dari GI = kWh Import

kWh Aktaris

TRANSFER KE UPT PKU

kWh PS Unit

kWh PS dari GI = kWh Import


Hal. 3

KETERANGAN

20,213,000.00
19,648,470.00

ST 1 BRUTO

ST 2 BRUTO

Hal. 1

KETERANGAN

i
Hal. 4

KETERANGAN

20 KV
TIDAK BEROPERASI
20 KV
17.370 Kwh Pengurangan Ketika Kalibrasi

Bayar ke UP3 Pekanbaru

20 KV

Bayar ke UP3 Pekanbaru

20 KV

20 KV

Bayar ke UP3 Pekanbaru

20 KV

Bayar ke UP3 Pekanbaru

20 KV

Bayar ke UP3 Pekanbaru

150 KV
Bayar ke UP3 Pekanbaru

150 KV

Bayar ke UP3 Dumai

20 KV

20 KV dan 150 KV
TRANSFER KE UPT PKU
PT PLN ( PERSERO ) PEMBANGKITAN SUMATRA BAGIAN UTARA
SEKTOR PENGENDALIAN PEMBANGKITAN PEKANBARU
Jl.Tanjung Datuk No 74 Pekanbaru

DAN DIKIRIM BERDASARKAN MEKANISME NIAGA SESUMATERA


BAGIAN UTARA SEKTOR PENGENDALIAN PEMBANGKITAN PEKANBARU
DENGAN
NBARU DAN PT PLN (PERSERO) WRKR AREA PEKANBARU
ODE BULAN DESEMBER 2022

NO URAIAN STAND kWh

Awal
01 - 12 - 2022
Jam : 10:00 Wib
I. PEMBANGKIT PT. PLN (PERSERO)
A PLTA KOTA PANJANG
EXPORT

TRAFO UNIT 1 184,280,671.00

TRAFO UNIT 2 231,552,699.00


TRAFO UNIT 3 198,872,544.00
JUMLAH KWH EXPORT
IMPORT

TRAFO UNIT 1 215,960.00

TRAFO UNIT 2 736,714.00


TRAFO UNIT 3 715,177.00
JUMLAH KWH IMPOR
tto = Jumlah kWh Export - Jumlah kWh Import
B PLTG TELUK LEMBU
EXPORT

TRAFO UNIT 2 505,749,236.00

TRAFO UNIT 3 84,610,876.00


JUMLAH EXPORT
PT PLN ( PERSERO ) PEMBANGKITAN SUMATRA BAGIAN UTARA
SEKTOR PENGENDALIAN PEMBANGKITAN PEKANBARU
Jl.Tanjung Datuk No 74 Pekanbaru

DAN DIKIRIM BERDASARKAN MEKANISME NIAGA SESUMATERA


BAGIAN UTARA SEKTOR PENGENDALIAN PEMBANGKITAN PEKANBARU
DENGAN
NBARU DAN PT PLN (PERSERO) WRKR AREA PEKANBARU
ODE BULAN DESEMBER 2022

NO URAIAN STAND kWh

Awal
01 - 12 - 2022
Jam : 10:00 Wib
IMPORT

TRAFO UNIT 2 3,733,319.00

PS Auxiliary PLTG di GI TL 37,945.00


PS Auxiliary PLTD Teluk Lembu 4,910,050.00
TRAFO UNIT 3 782,807.00
JUMLAH IMPOR
tto = Jumlah kWh Export - Jumlah kWh Import
C PLTMG BALAI PUNGUT
EXPORT

TRAFO I (UNIT 1, 2 ,3) 935,977,440.00

TRAFO II (UNIT 4, 5, 6, 7) 648,908,440.00


JUMLAH EXPORT
IMPORT

TRAFO I (UNIT 1, 2 ,3) 2,589,648.00

TRAFO II (UNIT 4, 5, 6, 7) 1,546,512.00


JUMLAH IMPORT
tto = Jumlah kWh Export - Jumlah kWh Import
D PLTG BALAI PUNGUT
PT PLN ( PERSERO ) PEMBANGKITAN SUMATRA BAGIAN UTARA
SEKTOR PENGENDALIAN PEMBANGKITAN PEKANBARU
Jl.Tanjung Datuk No 74 Pekanbaru

DAN DIKIRIM BERDASARKAN MEKANISME NIAGA SESUMATERA


BAGIAN UTARA SEKTOR PENGENDALIAN PEMBANGKITAN PEKANBARU
DENGAN
NBARU DAN PT PLN (PERSERO) WRKR AREA PEKANBARU
ODE BULAN DESEMBER 2022

NO URAIAN STAND kWh

Awal
01 - 12 - 2022
Jam : 10:00 Wib
EX.

TRAFO UNIT 1 465,803,280.00

JUMLAH EXPORT
IMP.

PLTG UNIT 2 BALAI PUNGUT D 1,522,374.00

JUMLAH IMPORT
tto = Jumlah kWh Export - Jumlah kWh Import
E PLTU TEMBILAHAN
EXPORT

TRAFO UNIT 1 3,201,243.63

TRAFO UNIT 2 19,982,374.55


JUMLAH KWH EXPORT
IMPORT

TRAFO UNIT 1 1,252,443.97

TRAFO UNIT 2 267,172.37


JUMLAH KWH IMPOR
tto = Jumlah kWh Export - Jumlah kWh Import
I.
JUMLAH KWH PEMBANGKIT PLN (A + B + C + D + E)
PT PLN ( PERSERO ) PEMBANGKITAN SUMATRA BAGIAN UTARA
SEKTOR PENGENDALIAN PEMBANGKITAN PEKANBARU
Jl.Tanjung Datuk No 74 Pekanbaru

DAN DIKIRIM BERDASARKAN MEKANISME NIAGA SESUMATERA


BAGIAN UTARA SEKTOR PENGENDALIAN PEMBANGKITAN PEKANBARU
DENGAN
NBARU DAN PT PLN (PERSERO) WRKR AREA PEKANBARU
ODE BULAN DESEMBER 2022

NO URAIAN STAND kWh

Awal
01 - 12 - 2022
Jam : 10:00 Wib

II. PEMBANGKIT SEWA


A PLTG RIAU POWER TELUK LEMBU
NETTO

TRAFO 1 (LWBP) 6,355,677.00

TRAFO 1 (WBP) 30,867,987.00

Jumlah kWh Netto


B ST RIAU POWER TELUK LEMBU
NETTO

TRAFO 1 (LWBP) 154,939,122.00

TRAFO 1 (WBP) 30,756,397.00

TOTAL 185,695,519.00

Faktor Pengurang Untuk Looses (x0,00275)


Jumlah kWh Netto
C PLTMG 12 MW KSO HUTAN ALAM 1 TELUK LEMBU
PT PLN ( PERSERO ) PEMBANGKITAN SUMATRA BAGIAN UTARA
SEKTOR PENGENDALIAN PEMBANGKITAN PEKANBARU
Jl.Tanjung Datuk No 74 Pekanbaru

DAN DIKIRIM BERDASARKAN MEKANISME NIAGA SESUMATERA


BAGIAN UTARA SEKTOR PENGENDALIAN PEMBANGKITAN PEKANBARU
DENGAN
NBARU DAN PT PLN (PERSERO) WRKR AREA PEKANBARU
ODE BULAN DESEMBER 2022

NO URAIAN STAND kWh

Awal
01 - 12 - 2022
Jam : 10:00 Wib
EX.

TRAFO 1 917,482,096.00

JUMLAH KWH EXPORT


IMP.

TRAFO 1 28,237.00

JUMLAH KWH IMPOR


Jumlah kWh Export - Jumlah kWh Import
D PLTMG 50 MW KSO HUTAN ALAM 2 TELUK LEMBU
EXP.

TRAFO 1 827,493,087.00

TRAFO 2 422,806,441.00

JUMLAH KWH EXPORT


IMP.

TRAFO 1 164,299.34

TRAFO 2 125,118.00

JUMLAH KWH IMPOR


Jumlah kWh Export - Jumlah kWh Import
E PLTMG 30 MW PT PJBS 1 TELUK LEMBU
PT PLN ( PERSERO ) PEMBANGKITAN SUMATRA BAGIAN UTARA
SEKTOR PENGENDALIAN PEMBANGKITAN PEKANBARU
Jl.Tanjung Datuk No 74 Pekanbaru

DAN DIKIRIM BERDASARKAN MEKANISME NIAGA SESUMATERA


BAGIAN UTARA SEKTOR PENGENDALIAN PEMBANGKITAN PEKANBARU
DENGAN
NBARU DAN PT PLN (PERSERO) WRKR AREA PEKANBARU
ODE BULAN DESEMBER 2022

NO URAIAN STAND kWh

Awal
01 - 12 - 2022
Jam : 10:00 Wib
EXP.

TRAFO 1 655,877.81

TRAFO 2 772,066,949.00

JUMLAH KWH EXPORT


IMP.

TRAFO 1 52.50

TRAFO 2 31,019.00

JUMLAH KWH IMPOR


Jumlah kWh Export - Jumlah kWh Import
F PLTMG 30 MW PT PJBS 2 TELUK LEMBU
EX.

TRAFO 1 1,155,368.20

JUMLAH KWH EXPORT


IMP.

TRAFO 1 92.30

JUMLAH KWH IMPOR


Jumlah kWh Export - Jumlah kWh Import
G PLTMG 40 MW PT MAX POWER BALAI PUNGUT
PT PLN ( PERSERO ) PEMBANGKITAN SUMATRA BAGIAN UTARA
SEKTOR PENGENDALIAN PEMBANGKITAN PEKANBARU
Jl.Tanjung Datuk No 74 Pekanbaru

DAN DIKIRIM BERDASARKAN MEKANISME NIAGA SESUMATERA


BAGIAN UTARA SEKTOR PENGENDALIAN PEMBANGKITAN PEKANBARU
DENGAN
NBARU DAN PT PLN (PERSERO) WRKR AREA PEKANBARU
ODE BULAN DESEMBER 2022

NO URAIAN STAND kWh

Awal
01 - 12 - 2022
Jam : 10:00 Wib
EX.

TRAFO 1 603,781.30

JUMLAH KWH EXPORT


IMP.

TRAFO 1 9.20

JUMLAH KWH IMPOR


Jumlah kWh Export - Jumlah kWh Import
H PLTG 18 MW PT PJB BALAI PUNGUT
EX.

TRAFO 1 519,672,630.00

JUMLAH KWH EXPORT


IMP.

TRAFO 1 1,741,970.00

JUMLAH KWH IMPOR


Jumlah kWh Export - Jumlah kWh Import
I PLTG 3 X 25 MW MPP BATAM BALAI PUNGUT
EXP.

TRAFO 1 465,693,833.00
PT PLN ( PERSERO ) PEMBANGKITAN SUMATRA BAGIAN UTARA
SEKTOR PENGENDALIAN PEMBANGKITAN PEKANBARU
Jl.Tanjung Datuk No 74 Pekanbaru

DAN DIKIRIM BERDASARKAN MEKANISME NIAGA SESUMATERA


BAGIAN UTARA SEKTOR PENGENDALIAN PEMBANGKITAN PEKANBARU
DENGAN
NBARU DAN PT PLN (PERSERO) WRKR AREA PEKANBARU
ODE BULAN DESEMBER 2022

NO URAIAN STAND kWh

Awal
01 - 12 - 2022
Jam : 10:00 Wib
TRAFO 2 1,102,069,662.00

JUMLAH KWH EXPORT


IMP.

TRAFO 1 1,571,724.00

TRAFO 2 1,404,334.00

JUMLAH KWH IMPOR


Jumlah kWh Export - Jumlah kWh Import
J PLTMG 25 MW RAWA MINYAK SIAK
EXP.

TRAFO 1 19,550.736

TRAFO 2 0.000

TRAFO 3 0.000

TRAFO 4 0.000

TRAFO 5 0.000

JUMLAH KWH EXPORT


IMP.

TRAFO 1 30.226
PT PLN ( PERSERO ) PEMBANGKITAN SUMATRA BAGIAN UTARA
SEKTOR PENGENDALIAN PEMBANGKITAN PEKANBARU
Jl.Tanjung Datuk No 74 Pekanbaru

DAN DIKIRIM BERDASARKAN MEKANISME NIAGA SESUMATERA


BAGIAN UTARA SEKTOR PENGENDALIAN PEMBANGKITAN PEKANBARU
DENGAN
NBARU DAN PT PLN (PERSERO) WRKR AREA PEKANBARU
ODE BULAN DESEMBER 2022

NO URAIAN STAND kWh

Awal
01 - 12 - 2022
Jam : 10:00 Wib
TRAFO 2 0.000

TRAFO 3 0.000

TRAFO 4 0.000

TRAFO 5 0.000

JUMLAH KWH IMPOR


Jumlah kWh Export - Jumlah kWh Import
II.
JUMLAH KWH PEMBANGKIT SEWA
(A + B + C + D + E + F + G + H + I + J )

III
JUMLAH KWH PEMBANGKIT PLN + SEWA
(I + II)
FAKTOR
SELISIH
KALI
Akhir
01 - 01- 2023
Jam : 10:00 Wib

198,098,160.00 13,817,489.00 1

248,821,827.00 17,269,128.00 1
211,831,395.00 12,958,851.00 1

241,656.00 25,696.00 1

755,228.00 18,514.00 1
757,531.00 42,354.00 1

505,749,236.00 0.00 1

84,610,876.00 0.00 1
FAKTOR
SELISIH
KALI
Akhir
01 - 01- 2023
Jam : 10:00 Wib

3,778,120.00 44,801.00 1

37,945.00 0.00 30
4,910,050.00 0.00 1
808,584.00 25,777.00 1

944,986,224.00 9,008,784.00 1

659,740,540.00 10,832,100.00 1

2,652,372.00 62,724.00 1

1,662,108.00 115,596.00 1
FAKTOR
SELISIH
KALI
Akhir
01 - 01- 2023
Jam : 10:00 Wib
465,803,280.00 0.00 1

1,536,468.00 14,094.00 1

3,201,243.63 0.00 1

19,982,374.55 0.00 1

1,252,443.97 0.00 1

267,172.37 0.00 1

EXPORT
B + C + D + E) IMPORT
NETTO
FAKTOR
SELISIH
KALI
Akhir
01 - 01- 2023
Jam : 10:00 Wib

6,355,677.00 0.00 1

30,867,987.00 0.00 1

154,939,122.00 0.00 1

30,756,397.00 0.00 1
185,695,519.00 0.00 1

x0,00275)

UK LEMBU
FAKTOR
SELISIH
KALI
Akhir
01 - 01- 2023
Jam : 10:00 Wib

917,482,096.00 0.00 1

28,237.00 0.00 1

UK LEMBU
827,493,087.00 0.00 1

422,806,441.00 0.00 1

164,299.34 0.00 1

125,118.00 0.00 1
FAKTOR
SELISIH
KALI
Akhir
01 - 01- 2023
Jam : 10:00 Wib

655,877.81 0.00 1000

772,066,949.00 0.00 1

52.50 0.00 1000

31,019.00 0.00 1

1,155,368.20 0.00 1000

92.30 0.00 1000

UNGUT
FAKTOR
SELISIH
KALI
Akhir
01 - 01- 2023
Jam : 10:00 Wib

603,781.30 0.00 1000

9.20 0.00 1000

519,672,630.00 0.00 1

1,741,970.00 0.00 1

466,710,410.00 1,016,577.00 1
FAKTOR
SELISIH
KALI
Akhir
01 - 01- 2023
Jam : 10:00 Wib
1,104,130,139.00 2,060,477.00 1

1,627,780.00 56,056.00 1

1,463,174.00 58,840.00 1

19,550.736 0.000 21818.1818

0.000 0.000 21818.1818


0.000 0.000 21818.1818
0.000 0.000 21818.1818
0.000 0.000 21818.1818

30.226 0.000 21818.1818


FAKTOR
SELISIH
KALI
Akhir
01 - 01- 2023
Jam : 10:00 Wib
0.000 0.000 21818.1818
0.000 0.000 21818.1818
0.000 0.000 21818.1818
0.000 0.000 21818.1818

EXPORT
T SEWA IMPORT
H+I+J)
NETTO

EXPORT
LN + SEWA IMPORT
NETTO
Telepon : (0761) 41855-41856
Facsimele : (0761) 40336
E-Mail : operasi.spkb@gmail.com
Kode Pos : 28141

HASIL KETERANGAN

13,817,489.00 150 KV

17,269,128.00 150 KV
12,958,851.00 150 KV
44,045,468.00

25,696.00 150 KV

18,514.00 150 KV
42,354.00 150 KV
86,564.00
43,958,904.00

0.00 150 KV

0.00 150 KV
0.00
Telepon : (0761) 41855-41856
Facsimele : (0761) 40336
E-Mail : operasi.spkb@gmail.com
Kode Pos : 28141

HASIL KETERANGAN

44,801.00 150 KV

0.00 20 KV
0.00 20 KV
25,777.00 150 KV
70,578.00
-70,578.00

9,008,784.00 150 KV

10,832,100.00 150 KV
19,840,884.00

62,724.00 150 KV

115,596.00 150 KV
178,320.00
19,662,564.00
Telepon : (0761) 41855-41856
Facsimele : (0761) 40336
E-Mail : operasi.spkb@gmail.com
Kode Pos : 28141

HASIL KETERANGAN

0.00 150 KV
0.00

14,094.00 150 KV

14,094.00
-14,094.00

0.00 (ISOLTED)

0.00 (ISOLTED)
0.00

0.00 150 KV

0.00 150 KV
0.00
0.00
63,886,352.00
349,556.00
63,536,796.00
Telepon : (0761) 41855-41856
Facsimele : (0761) 40336
E-Mail : operasi.spkb@gmail.com
Kode Pos : 28141

HASIL KETERANGAN

0.00 20 KV

0.00 20 KV
0.00 .

0.00 20 KV

0.00 20 KV
0.00
0.00
0.00
Telepon : (0761) 41855-41856
Facsimele : (0761) 40336
E-Mail : operasi.spkb@gmail.com
Kode Pos : 28141

HASIL KETERANGAN

0.00 20 KV

0.00

0.00 20 KV

0.00
0.00

0.00 20 KV

0.00 20 KV
0.00

0.00 20 KV

0.00 20 KV
0.00
0.00
Telepon : (0761) 41855-41856
Facsimele : (0761) 40336
E-Mail : operasi.spkb@gmail.com
Kode Pos : 28141

HASIL KETERANGAN

0.00 20 KV

0.00 20 KV
0.00

0.00 20 KV

0.00 20 KV
0.00
0.00

0.00 150 KV

0.00

0.00 150 KV

.00000
0.00
Telepon : (0761) 41855-41856
Facsimele : (0761) 40336
E-Mail : operasi.spkb@gmail.com
Kode Pos : 28141

HASIL KETERANGAN

0.00 20 KV

0.00

0.00 20 KV

0.00
.00

0.00 150 KV

.00000

0.00 150 KV

0.00
0.00

1,016,577.00 150 KV
Telepon : (0761) 41855-41856
Facsimele : (0761) 40336
E-Mail : operasi.spkb@gmail.com
Kode Pos : 28141

HASIL KETERANGAN

2,060,477.00 150 KV
3,077,054.00

56,056.00 150 KV

58,840.00 150 KV
114,896.00
2,962,158.00

0.00 20 KV (ISOLATED)

0.00 20 KV (ISOLATED)
0.00 20 KV (ISOLATED)
0.00 20 KV (ISOLATED)
0.00 20 KV (ISOLATED)
0.00
0.00

0.00 20 KV (ISOLATED)
Telepon : (0761) 41855-41856
Facsimele : (0761) 40336
E-Mail : operasi.spkb@gmail.com
Kode Pos : 28141

HASIL KETERANGAN

0.00 20 KV (ISOLATED)
0.00 20 KV (ISOLATED)
0.00 20 KV (ISOLATED)
0.00 20 KV (ISOLATED)
0.00 KOREKSI BULAN MEI 2021
0.00
.00
3,077,054.00 3,077,054.00 (UPT PKU)
0.00 0.00 (UPT PKU)
3,077,054.00 3,077,054.00 (UPT PKU)

66,963,406.00 66,963,406.00 (UPT PKU)


349,556.00 349,556.00 (UPT PKU)
66,613,850.00 66,613,850.00 (UPT PKU)
PT PLN ( PERSERO ) KITSBU
SEKTOR PENGENDALIAN PEMBANGKITAN PEKANBARU
Jl.Tanjung Datuk No 74 Pekanbaru

DATA TRANSFER KWh YANG DITERIMA DAN DIKIRIM BERDASARKAN MEKANISME NIAGA SESUMATERA
PT.PLN (PERSERO) PEMBANGKITAN SUMATERA BAGIAN UTARA SEKTOR PENGENDALIAN PEMBANGKITAN PEKANBARU
DENGAN
PT.PLN (PERSERO) P3BS UPT PEKANBARU DAN PT PLN (PERSERO) WRKR AREA PEKANBARU
PERIODE BULAN DESEMBER 2022

ENERGI (Kwh)
DARI KE
NO URAIAN SELISIH KETERANGAN
PEMBANGKIT PEMBANGKIT
EXPORT IMPORT NETTO
1 PLTA KOTO PANJANG
TRAFO UNIT 1 13,817,489.00 25,696.00 13,791,793.00 150 KV
TRAFO UNIT 2 17,269,128.00 18,514.00 17,250,614.00 150 KV
TRAFO UNIT 3 12,958,851.00 42,354.00 12,916,497.00 150 KV
JUMLAH 44,045,468.00 86,564.00 43,958,904.00
2 PLTG TELUK LEMBU
TRAFO UNIT 2 - 44,801.00 (44,801.00) 150 KV
PS Auxiliary PLTG di GI TL - - 20 KV
PS Auxiliary PLTD Teluk Lembu - - 20 KV
TRAFO UNIT 3 - 25,777.00 (25,777.00) 150 KV
JUMLAH - 70,578.00 (70,578.00)
3 PLTMG BALAI PUNGUT
TRAFO I (UNIT 1, 2 ,3) 9,008,784.00 62,724.00 8,946,060.00 150 KV
TRAFO II (UNIT 4, 5, 6, 7) 10,832,100.00 115,596.00 10,716,504.00 150 KV
JUMLAH 19,840,884.00 178,320.00 19,662,564.00
4 PLTG BALAI PUNGUT
TRAFO UNIT 1 - 14,094.00 (14,094.00) 150 KV
JUMLAH - 14,094.00 (14,094.00)
5 PLTU TEMBILAHAN
TRAFO UNIT 1 - - - 20 KV (ISOLATED)
TRAFO UNIT 2 - - - 20 KV (ISOLATED)
JUMLAH - - -
TOTAL 63,886,352.00 349,556.00 63,536,796.00 Transfer
6 PLTG SW RIAU #01 (GT 1.1) (PT RIAU POWER) - - - 20 KV
7 PLTG SW RIAU #02 (ST 1.0) (PT RIAU POWER) - - - 20 KV

8 PLTMG SW TELUK LEMBU I (KSO HUTAN ALAM) - - - 20 KV

9 PLTMG SW TELUK LEMBU II (KSO HUTAN ALAM) - - - 20 KV


10 PLTMG SW TELUK LEMBU I (PT PJBS) - - - 20 KV

11 PLTMG SW TELUK LEMBU II (PT PJBS) - - - 150 KV

12 PLTMG SW BALAI PUNGUT (PT MAX POWER) - - - 20 KV

14 PLTG SW BALAI PUNGUT DURI (PT PJB) - - - 150 KV


15 PLTG IPP MPP BALAI PUNGUT (PT PLN BATAM) 3,077,054.00 - 3,077,054.00 150 KV

16 PLTMG SW SIAK (PT WIKA RAWA MINYAK) - - - 20 KV (ISOLATED)


JUMLAH 3,077,054.00 - 3,077,054.00
TRANSFER KWH KE UPT PEKANBARU 66,963,406.00 349,556.00 66,613,850.00
TRANSFER KWH KE UP3 PEKANBARU & UP3 RENGAT - - -
TOTAL KWH PEMBANGKIT PLN + SEWA 66,963,406.00 349,556.00 66,613,850.00

Catatan:
- Berita Acara akan di koreksi bila terjadi kesalahan.
- Data pengiriman energi diatas telah mendapat persetujuan dan di tanda tangani oleh:

PEKANBARU, SEPTEMBER 2022

PT PLN (Persero) WRKR AREA


PT PLN (Persero) P3BS UPT PEKANBARU PT PLN (Persero) UPDK PEKANBARU
PEKANBARU
ASMAN RENEV ASMAN TRANSAKSI ENERGI ASMAN OPHAR

ELFI YENDRI MUCHSIS ZULFIKAR RAMBE


NO DATA SATUAN PLTA #1

Tahun Operasi 1998


Jenis A/U/D/G A
1 Kaplan /
Merek / Type Mesin
KVAERNER
No Series 1
Terpasang kW 38,000.00
2 Daya Mampu Rata-rata
kW 27.18
Bulan Ini
DMN kW 37,920.00
3 BEBAN
Tertinggi / Puncak kW 35.92
Produksi Target Produksi RKAP 18,027,840.00
4
Generator Prod. Generator 14,146,156.97000
EXPORT kW 13,817,489.00
5 Trafo
IMPORT kW 25,696.00
6 PS Aux.PLTG DARI G I kW
7 NETTO kW 13,791,793.00
8 Pemakaian Sendiri (PS) Unit kW 79,597.59
9 % Pemakaian Sendiri % 0.56%
10 RUGI2 TRAFO kW 274,766.38
Periodik jam 744.00
Kerja jam 556.12
Pemeliharaan jam 5.13000
PO ( Har Terencana ) jam -
MO ( Har Tdk Terencana ) jam 5.13
Jumlah Jam Standby jam 181.84
Standby jam 181.84
11 Jam
Gangguan luar jam -
gangguan dalam jam 0.92
Sejak YM/CI/TO (JSYM/CI/TO) jam 7,364.50
Sejak GI/HGPI/SO
jam 7,364.50
(JSGI/HGPI/SO)
Sejak MO/MI (JSMO/MI) jam 7,364.50
Sejak Beroperasi (JSB) jam 167,732.05
Jumlah Luar kali -
12
Gangguan /Trip Dalam kali -
13 Energi tak tersalur akibat gangguan kWh 34,833.33
16 Pemakaian Pelumas Unit liter -
Pemakaian Lain Lain liter -
Minyak Pelumas
jumlah -
SLC Pelumas liter/kWh -
Elevasi Awal Bulan m
Volume Air Danau Awal Bulan m³
Elevasi Akhir Bulan m DPL
Volume Air Danau Akhir

Bulan
Potensi Tenaga Inflow Rata Rata m³/s
17
Air Waduk
Out Flow Turbine Rata rata m³/s
Potensi Tenaga
17
Air Waduk

Out Flow Spill Way Rata rata m³/s


Out Flow Total m³
17
Air Waduk

Perubahan Volume Air Danau m³


SWC Air Waduk m³/kWh
ELEVASI
TGL 1
PUWL
TGL 15
Ideal
18 TGL 1
PLWL
TGL 15
TGL 1
Real
TGL 15
MAX m³/s
19 Inflow Waduk MIN m³/s
RATE m³/s
MAX m³/s
20 Outflow Turbin MIN m³/s
RATE m³/s
MAX m³/s
21 Outflow Spilway MIN m³/s
RATE m³/s
PLTA #2 PLTA #3 JUMLAH

1998 1998
A A
Kaplan /
Kaplan / KVAERNER
KVAERNER
2 3
38,000.00 38,000.00 114,000.00

27.80 26.42 81,402.55

37,920.00 37,920.00 113,760.00


-
36.42 36.28 108.62
18,027,840.00 18,027,840.00 54,083,520.00
17,575,657.32000 13,368,828.02000 45,090,642.31
17,269,128.00 12,958,851.00 44,045,468.00
18,514.00 42,354.00 86,564.00

17,250,614.00 12,916,497.00 43,958,904.00


98,894.70 75,223.71 253,716.00
0.56% 0.56% 0.017
226,148.62 377,107.31 878,022.31
744.00 744.00 2,232.00
686.68 519.57 1,762.37
7.00 40.00 52.13
- 40.00 40.00
7.00 - 12.13
46.85 184.28 412.97
46.85 184.28 412.97
- - -
3.47 0.15 4.53
3,628.90 6,646.12

16,593.82 41,198.903

40,975.85 57,917.453
172,051.98 172,921.923
- - -
- - -
131,733.33 5,700.00 172,266.67
- - -
- - -
- - -
- - -
76.17
728,194,831.00
76.52

755,997,536.00

193.71

186.66
-
186.66
27,802,705.00
10.92

79.28
80.50
77.04
78.55
76.17
76.39
692.22
40.26
193.71
692.22
99.42
186.66
-
-
-
PLTG #2 PLTG #3
NO DATA SATUAN TELUK TELUK JUMLAH
LEMBU LEMBU
1 Tahun Operasi 1976 1976
Jenis A/U/D/G G G

Merek / Type Mesin Alsthom Gen. Electric


PG 5341 P NP169487
No Series 244396 / 96 244351
2 Daya Terpasang Kw 21,600.00 21,600.00 43,200.00
Mampu
Rata-rata Kw - - -
Bulan Ini
3 BEBAN DMN Kw 14,000.00 16,000.00 30,000.00

Tertinggi / Kw - - -
Puncak

Target
4 Produksi Produksi 83,160.00 83,160.00 166,320.00
Generator
(RKAP)

Prod. Kw - - -
Generator
GAS Kw - - -
HSD Kw - - -
5 Trafo EXPORT Kw - - -
IMPORT Kw 44,801.00 25,777.00 70,578.00

PS
6 Aux.PLTG Kw - -
DARI G I

PS
Aux.PLTD
di PLTD PL - -
Teluk
Lembu

7 NETTO Kw (44,801.00) (25,777.00) (70,578.00)


Pemakaian
8 Sendiri (PS) Kw 16,720.00 5,355.00 22,075.00
Unit
- -
9 % Pemakaian Sendiri % 0.000 0.000
RUGI2
10 TRAFO kw 28,081.00 20,422.00 48,503.00

11 Jam Periodik jam 744.00 744.00 1,488.00


Kerja jam - - -
Pemelihara jam -
an - -

PO ( Har
Terencana jam - - -
)
MO ( Har
Tdk
Terencana jam - - -
)
Jumlah
Jam jam 1,488.00
Standby 744.00 744.00
Standby jam 744.00 744.00 1,488.00
Gangguan
luar jam - - -

gangguan jam - - -
dalam

Sejak JANGAN LUPA


YM/CI/TO TAMBAH JAM
jam 5,558.13 92.90 START, STOP
(JSYM/CI/T
O) DAN TRIP
(KOMULATIF)

Sejak
GI/HGPI/S
O jam 166.70 5,289.33
(JSGI/HGPI
/SO)

Sejak
MO/MI jam 8,107.96 18,700.00
(JSMO/MI)

Sejak
Beroperasi jam 81,027.71 18,700.00
(JSB)

12 Jumlah Kali Luar kali - - -


Gangguan
Dalam kali - - -

Energi tak
13 tersalur kWh - - -
akibat
gangguan

Bahan Harga Solar


14 Bakar Rp 5,693.05 5,693.05 5,693.05
Solar / HSD / HSD

Ongkos Rp - -
Angkut

Persediaan
Stock Awal liter - 376,642.00
bulan

Penambah liter - -
an

Selisih
Penerimaa
n liter - -
(sounding)
Pemakaian liter 60.00 60.00
BBM Unit
Pemakaian
Lain Lain liter 40.00 160.00000

Selisih liter -
Pemakaian
Persediaan
Akhir liter ###
Bulan
SFC l/kwh
Bahan
15 Bakar Harga Gas $ 4.0 4.0 4.00
Gas

Supply
BBG dari mmBtu - - -
EMP Bentu

Pemakaian mmBtu -
BBG unit -

Selisih /
penalty mmBtu -

SGC mmbtu/
kwh

Pemakaian
16 Minyak Pelumas liter - -
Pelumas
Unit

Pemakaian
Lain Lain liter - - -

SLC liter/kwh
Pelumas
PLTG #2 BALAI
NO DATA SATUAN PUNGUT DURI
1 Tahun Operasi 1974
Jenis A/U/D/G G
ALSTHOM PG
Merek / Type Mesin 5341 P
No Series 226103
2 Daya Terpasang Kw 20,000.00

Mampu
Rata-rata
Bulan Ini -
3 BEBAN DMN Kw 15,000.00

Tertinggi /
Puncak Kw -

Target
Produksi Produksi
4 Generator (RKAP) Kw -
Jumlah Prod.
Generator -

Prod.
Generator
( GAS ) Kw -

Prod.
Generator
( HSD ) Kw -
5 Trafo EXPORT Kw -
IMPORT Kw 14,094.00
PS Aux.PLTG
6 DARI G I Kw
7 NETTO Kw (14,094.00)

Pemakaian
Sendiri (PS)
8 Unit Kw -
9 % Pemakaian Sendiri %
RUGI2
10 TRAFO Kw 14,094.00
11 Jam Periodik jam 744.00
Kerja
Pemeliharaa jam -
n jam -
PO ( Har
Terencana ) jam -
MO ( Har Tdk
Terencana ) jam -
Jumlah Jam
Standby jam 744.00
Standby jam 744.00
Gangguan -
luar jam
gangguan
dalam jam -
Sejak
YM/CI/TO
(JSYM/CI/TO
) jam 791.35

Sejak
GI/HGPI/SO
(JSGI/HGPI/S
O) jam 9,921.67

Sejak MO/MI
(JSMO/MI) jam 34,341.47

Sejak
Beroperasi
(JSB) jam 124,821.550

Jumlah Kali
12 Gangguan Luar kali -
Dalam kali -

Energi tak
tersalur
akibat
13 gangguan kWh -
Bahan Bakar Harga Solar /
14 Solar / HSD HSD Rp 5,693.05
Ongkos
Angkut Rp

Persediaan
Stock Awal
bulan Ltr 117,838.90
Penambahan Ltr -

Selisih
Penerimaan
(sounding) Ltr -
Pemakaian
BBM Unit Ltr -
Pemakaian
Lain Lain Ltr -
Selisih
Pemakaian Ltr -
Persediaan
Akhir Bulan Ltr 117,838.90
SFC Ltr/kwh
Bahan Bakar
15 Gas Harga Gas $ 4.57

Pemakaian
Mesin PS
CNG mmbtu -

Supply BBG
dari
PERTAMINA mmBtu 132,545.00
Pemakaian
BBG unit mmBtu -
Selisih /
penalty mmBtu (78,665.00)
mmBtu/
SGC kwh

Minyak Pemakaian
16 Pelumas Pelumas
Unit liter -
Pemakaian
Lain Lain liter -
Jumlah liter -
SLC
Pelumas liter/kwh
PLTMG # 1 PLTMG # 2 PLTMG # 3 PLTMG # 4 PLTMG # 5 PLTMG # 6 PLTMG # 7
NO DATA SATUAN DURI DURI DURI DURI DURI DURI DURI JUMLAH

Tahun Operasi 2013 2013 2013 2013 2013 2013 2013


Jenis A/U/D/G D D D D D D D
1
Merek / Type Mesin WARTSILLA WARTSILLA WARTSILLA WARTSILLA WARTSILLA WARTSILLA WARTSILLA
No Series 1 2 3 4 5 6 7
Terpasang Kw 16,100.00 16,100.00 16,100.00 16,100.00 16,100.00 16,100.00 16,100.00 112,700.00
2 Daya Mampu Rata-rata
Bulan Ini 13.20 12.70 12.90 12.90 13.10 13.20 13.20 91,200.00
DMN Kw 14,320.00 14,320.00 14,320.00 14,320.00 14,320.00 14,320.00 14,320.00 100,240.00
3 BEBAN -
Tertinggi / Puncak Kw 14,500.00 14,500.00 14,500.00 14,500.00 14,500.00 14,500.00 14,500.00 87,000.00
Target Produksi (RKAP) Kw 2,108,266.00 2,108,266.00 2,108,266.00 2,108,266.00 2,108,266.00 2,108,266.00 388,266.00 13,037,862.00
Produksi Jumlah Prod. Generator 2,758,000.00 2,984,000.00 2,884,000.00 3,764,000.00 1,936,000.00 2,875,000.00 3,427,000.00 20,628,000.00
4
Generator Prod. Generator ( GAS ) Kw 2,632,410.00 2,800,710.00 2,649,240.00 2,534,400.00 1,908,720.00 2,823,480.00 3,147,210.00 18,496,170.00
Prod. Generator ( HSD ) Kw 125,590.00 183,290.00 234,760.00 1,229,600.00 27,280.00 51,520.00 279,790.00 2,131,830.00
EXPORT Kw 9,008,784.00 10,832,100.00 19,840,884.00
5 Trafo
IMPORT Kw 62,724.00 115,596.00 178,320.00
6 PS Rata-rata Kw 43,163.69 46,700.67 45,135.64 87,812.03 45,165.81 67,072.15 79,950.01 415,000.00
Losis Rata-rata Kw 73,594.26 79,624.83 76,956.44 100,438.29 51,660.08 76,716.28 91,445.81 550,436.00
7 NETTO Kw 19,662,564.00 19,662,564.00000
8 Pemakaian Sendiri (PS) Unit Kw 135,000.00 280,000.00 415,000.00
9 % Pemakaian Sendiri % 8,626,000.00 1.57% 20,628,000.00 12,002,000.00 3.27% 0.05
10 RUGI2 TRAFO Kw 550,436.00 550,436.00
Periodik jam 744.00 744.00 744.00 744.00 744.00 744.00 744.00 5,208.00
Kerja jam 215.00 232.00 237.00 210.00 147.00 217.00 259.00 1,517.00
Pemeliharaan jam 19.97 14.38 7.52 11.00 3.55 5.63 123.30 185.35
PO ( Har Terencana ) jam - - - - - - 119.33 119.33
MO ( Har Tdk Terencana ) jam 19.97 14.38 7.52 11.00 3.55 5.63 3.97 66.02
Jumlah Jam Standby jam 509.03 497.62 499.48 523.00 593.45 521.37 361.70 3,505.65
11 Jam Standby jam 509.03 497.62 499.48 523.00 593.45 521.37 361.70 3,505.65
Gangguan luar jam - - - - - - - -
gangguan dalam jam - - - - - - - -
Sejak YM/CI/TO (JSYM/CI/TO) jam
Sejak GI/HGPI/SO (JSGI/HGPI/SO) jam JANGAN LUPA TAMBAH
JAM START, STOP DAN
Sejak MO/MI (JSMO/MI) jam TRIP (KOMULATIF)
Sejak Beroperasi (JSB) jam 55,708.00 44,106.00 50,170.00 57,597.00 55,971.00 54,152.00 49,595.00
Jumlah Kali Luar kali - - - - - - - -
12
Gangguan Dalam kali 1 - - - - - - 1.00
13 Energi tak tersalur akibat gangguan kWh - - - - - - - -
Harga Solar / HSD Rp 5,693.05 5,693.05 5,693.05 5,693.05 5,693.05 5,693.05 5,693.05 5,693.05
Ongkos Angkut Rp - - - - - - - 90.53
Persediaan Stock Awal bulan Ltr 795,340.00
Penambahan Ltr 1,632,000.00
Bahan Bakar Selisih Penerimaan (sounding) Ltr -
14
Solar / HSD Pemakaian BBM Unit Ltr 18,583.39 27,121.18 34,737.13 181,942.31 4,036.59 7,623.35 41,400.16 315,444.10
Pemakaian Lain Lain Ltr -
Selisih Pemakaian Ltr -
Persediaan Akhir Bulan Ltr 2,111,895.90
SFC Ltr/kwh 0 0.0091 0.0120 0.0483 0.0021 0.0027 0.0121 0.01
Harga Gas $ 4.57 4.57 4.57 4.57 4.57 4.57 4.57 4.57
Bahan Bakar Pemakaian BBG unit mmBtu 24,247.1118 26,406.2493 26,074.8216 23,083.4286 17,753.6107 25,742.3940 29,474.5741 172,782.19000
15
Gas Selisih / penalty mmBtu
SGC mmBtu/ 0.00921 0.00943 0.00984 0.00911 0.00930 0.00912 0.00937 0.00934
kwh
Pemakaian Pelumas Unit liter 0.00 0.00 600.00 600.00 0.00 700.00 0.00 1,900.00
Pemakaian Lain Lain liter - - - - - - - -
Minyak Pelumas
Jumlah liter - - 600.00 600.00 - 700.00 - 1,900.00
SLC Pelumas liter/kwh - - 0.00023 0.00024 - 0.00025 - 0.00010
PLTG 18 MW PLTMG 12 MW PLTMG 30 MW ST PLTG 17 MW PLTMG 40 MW PLTMG 50 MW PLTMG 30 MW PLTMG 25 MW
NO DATA SATUAN RIAU POWER HUTAN ALAM 1 PT PJBS 1 RIAU POWER PT PJB PT MAX POWER HUTAN ALAM 2 PS CNG PT PJBS 2 RAWA MINYAK PLTG JUMLAH
BALAI PUNGUT TELUK LEMBU MPP BATAM
TELUK LEMBU TELUK LEMBU TELUK LEMBU TELUK LEMBU BALAI PUNGUT BALAI PUNGUT TELUK LEMBU 150 KV SIAK

Tahun Operasi 2007 2012 2013 2013 05 Juli 2012-1982 18-Dec-13 2014 2015 2016
Jenis A/U/D/G G DG DG ST G D 6246.5 175200000 G
1
Merek / Type Mesin Alsthom MS 5001 GE/FM 50001 148753.5 - 14600000 GE/TM2500
No Series P5001 FM 5001 538338.9165
2 Daya Terpasang Kw 21,600.00 17,000.00 30,000.00 8,000.00 20,000.00 40,000.00 50,000.00 4,798.50 30,000.00 25,000.00 75,000.00 321,398.50
DMN 18,000.00 7,000.00 18,000.00 8,000.00 17,000.00 26,000.00 40,000.00 12,000.00 20,000.00 50,000.00
3 Produksi Generator Target Produksi (RKAP) - - - - - -
Export kWh - - - - 3,077,054.00 3,077,054.00
4 Trafo
Import Kw - - - - 114,896.00 114,896.00
5 NETTO Kw - - - - 2,962,158.00 2,962,158.00
Harga Gas $ 4.00 4.00 4.00 4.00 4.57
Pemakaian BBG unit mmBtu 0.0000 0.0000 0.0000 0.0000 38,427.81000 38,427.8100000
7 Bahan Bakar Gas
Selisih / penalty mmBtu -
SGC mmbtu/kwh - - - - 0.012 0.013
Export kWh
Bahan Bakar Import Kw -
8 Minyak Pemakaian BBM MPP Ltr
PT PLN (PERSERO) PEMBANGKITAN SUMBAGUT
SEKTOR PEMBANGKITAN PEKANBARU
Jln. Dr. Tanjung Datuk No 74
Telp. (0761) 41855/41856

I. MESIN PLN
NO DATA SATUAN

1 Tahun Operasi 2016


2 Jenis A/U/D/G U
3 Merek / Type Mesin DONGFANG
4 No Series #1, #2
Terpasang
PLTU #1
PLTU #2
Daya Mampu Netto
PLTU #1
PLTU #2
Puncak Siang
5 Daya PLTU #1
PLTU #2
Puncak Malam
PLTU #1
PLTU #2
Tertinggi / Puncak
PLTU #1
PLTU #2
Target Produksi
PLTU #1
PLTU #2
6 Produksi Generator
Jumlah Prod. Generator
PLTU #1
PLTU #2
EXPORT
PLTU #1
PLTU #2
IMPORT
PLTU #1
PLTU #2
Pemakaian Sendiri (PS)
PLTU #1
PLTU #2
NETTO
7 Trafo
7 Trafo PLTU #1
PLTU #2

PLTU #1
PLTU #2
% Pemakaian Sendiri
PLTU #1
PLTU #2
RUGI2 TRAFO
PLTU #1
PLTU #2
Harga Solar / HSD
Ongkos Angkut
Persediaan awal
Penambahan
Pemakaian
8 BAHAN BAKAR HSD/B30
PLTU #1
PLTU #2
Pemakaian Lain-lain
Selisih pemakaian
Persediaan Akhir
Harga BB
Ongkos Angkut
Persediaan awal
Penambahan
BAHAN BAKAR
9 Pemakaian
BATUBARA
PLTU #1
PLTU #2
Selisih pemakaian
Persediaan Akhir
Periodik
Kerja
PLTU #1
PLTU #2
Pemeliharaan
PLTU #1
PLTU #2
PO ( Har Terencana )
PLTU #1
PLTU #2
MO ( Har Terencana )
PLTU #1
PLTU #2
MO ( Har Tdk Terencana )
PLTU #1
PLTU #2
Jumlah Jam Standby
PLTU #1
PLTU #2
Standby
11 Jam
PLTU #1
PLTU #2
Gangguan luar
PLTU #1
PLTU #2
gangguan dalam
PLTU #1
PLTU #2
Gangguan luar (Kali)
PLTU #1
PLTU #2
gangguan dalam (kali)
PLTU #1
PLTU #2
Sejak MO
PLTU #1
PLTU #2
Sejak Beroperasi (JSB)
PLTU #1
PLTU #2
Pelumas Mesin
PLTU #1
PLTU #2
Pelumas alat bantu
12 Pemakaian Pelumas PLTU #1
PLTU #2
Pelumas trafo
PLTU #1
PLTU #2
PLTU #1
13 SCC
PLTU #2
PT PLN (PERSERO) PEMBANGKITAN SUMBAGUT
SEKTOR PEMBANGKITAN PEKANBARU
Jln. Dr. Tanjung Datuk No 74
Telp. (0761) 41855/41856 LAPORAN KUMUL

JANUARI FEBRUARI MARET APRIL


LAPORAN KUMULATIF PEMAKAIAN HSD, BATUBARA, SFC DAN SCC PLTU TEMBILAH
SEKTOR PEMBANGKITAN PEKANBARU
TAHUN 2019

MEI JUNI JULI AGUSTUS


N SCC PLTU TEMBILAHAN PEKANBARU
ANBARU

SEPTEMBER OKTOBER NOVEMBER DESEMBER


JUMLAH

-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-

-
-
-
-

-
-

-
PLN UNIT PELAKSANA DALKIT
PEKANBARU
OPERASI & PEMELIHARAAN

DESEMBER

2022
LAPORAN
PENGUSAHAAN
PT PLN (PERSERO) UNIT INDUK
PEMBANGKITAN SUMBAGUT
LAPORAN PENGUSAHAAN
BULAN DESEMBER 2022
UPDK PEKANBARU

TINJAUAN UMUM

PT PLN (Persero) Unit Pelayanan Pengendalian Pembangkitan Pekanbaru merupakan salah satu unit kerja
di lingkungan PT. PLN (Persero) Pembangkitan Sumatera Bagian Utara, yang beralamat di Jl. Tanjung Datuk
No. 74 Kelurahan Tanjung Rhu Kecamatan Lima Puluh Kota Pekanbaru Provinsi Riau

Awal mula terbentuknya adalah dengan di tetapkannya Keputusan Direksi PT. PLN (Persero) No:
011.K/023/DIR/1996 Tanggal 07 Februari 1996 Tentang Pembentukan Unit Organisasi PT. PLN (Persero)
Sektor Pekanbaru dilingkungan PT. PLN (Persero) Pembangkitan dan Penyaluran Sumatera Bagian Utara.
Organisasi Unit Sektor Pekanbaru pada saat itu mengelola Unit Pembangkit Listrik Tenaga Air (PLTA) Kota
Panjang, Unit Pembangkit Listrik Tenaga Diesel dan Gas (PLTD/G) Teluk lembu serta Transmisi 150 KV dan
Gardu-gardu Induk.

Kemudian pada tahun 2005 PT. PLN (Persero) Sektor Pekanbaru, berubah nama menjadi PT PLN (Persero)
Unit Pelayanan Pengendalian Pembangkitan Pekanbaru, berdasarkan Keputusan Direksi Nomor
178.K/010/DIR/2004 dan Nomor 299.K/DIR/2005. Tugas pokok PT PLN (Persero) Unit Pelayanan
Pengendalian Pembangkitan Pekanbaru hanya mengelola Unit PLTA Kota Panjang dan Unit PLTD/G Teluk
Lembu saja, sedangkan Transmisi 150 KV dan Gardu-gardu Induk dialih kelola oleh Penyaluran dan Pusat
Pengatur Beban (P3B) Sumatera.

Saat ini PT PLN (Persero) Unit Pelayanan Pengendalian Pembangkitan Pekanbaru mengelola 3 pusat pembangk

1. PLTG Teluk Lembu, total kapsitas 43,2 MW yang terdiri dari :


-     PLTG kapasitas 2 x 21,6 MW ( DMN 1x14 , 1x16 MW ) terhubung di 150 KV

2. PLTA Kota Panjang, total kapasitas 114 MW yang terdiri dari


-     PLTA kapasitas 3 x 38 MW terhubung di 150 KV

3. PLTG dan PLTMG Balai Pungut, total kapasitas 120 MW yang terdiri dari
-     PLTG kapasitas 21,6 MW ( DMN 17 MW ) terhubung di 150 KV
-     PLTMG Kapasitasi 7 x 16 MW ( DMN 7 x 14,3 MW ) terhubung di 150 KV

Selain itu juga terdapat PLTG dan PLTMG Sewa yang pengelolaannya dibawah PT PLN (Persero) Unit
Pelayanan Pengendalian Pembangkitan Pekanbaru yaitu :

I. Lokasi Teluk Lembu Pekanbaru


a.     PLTG Riau Power, kapasitas 21,6 ( DMN 18 MW ) terhubung di 20 KV (Berakhir 31 Desember 2018)
b.     ST Riau Power, kapasitas 10 MW ( DMN 8 MW ) terhubung di 20 KV (Berakhir 31 Desember 2018)
c.     PLTMG KSO Hutan Alam 1, kapasitas 18 MW terhubung di 20 KV
d.     PLTMG KSO Hutan Alam 2, kapasitas 50 MW terhubung di 20 KV
e.     PLTMG PT PJBS 1, kapasitas 30 MW terhubung di 20 KV
f.      PLTMG PT PJBS 2, kapasitas 30 MW terhubung di 150 KV

II. Lokasi Balai Pungut Duri


PT PLN (PERSERO) UNIT INDUK
PEMBANGKITAN SUMBAGUT
LAPORAN PENGUSAHAAN
BULAN DESEMBER 2022
UPDK PEKANBARU
a.     PLTG Unit 1 PJB , kapasitas 21,6 MW ( DMN 17 MW ) terhubung di 150 KV
b.     PLTMG PT Max Power, kapasitas 40 MW terhubung di 20 KV
c. PLTMG MPP Batam, Kapasitas 75 MW terhubung di 150 KV

I.          PLTD/G TELUK LEMBU

PLTD/G Teluk Lembu berdiri pada tahun 1987 dibawah kepengurusan PLN Cabang Pekanbaru dengan
6 unit PLTD dengan kapasitas 6,3 MW. Kemudian pada tahun 1990 mendapat tambahan 1 Unit PLTD
kapasitas 7 MW. Pada Tahun 1994 mendapat tambahan 2 unit PLTD kapasitas 7,6 MW. Tahun 1996
mendapat tambahan PLTG 2 X 21,6 MW (relokasi dari Pulo Gadung Jakarta). Pada tahun 1998
sebanyak 8 unit PLTD direlokasi ke Aceh dan Kalimantan.

Pada tahun 1996 PLTD/G Teluk Lembu di serahkan ke PT PLN (Persero) Unit Pelayanan Pengendalian
Pembangkitan Pekanbaru. Kemudian pada tahun 2010 mendapat tambahan 1 unit PLTG kapasitas
21,6 MW yang merupakan relokasi dari Gili Timur.

Sehubungan dengan kondisi PLTG (1 unit) dan PLTD (1 unit) mengalami gangguan, bila program
pemulihan memakan waktu lebih dari 1 (satu) tahun dan tidak efisien dari sisi biaya pemulihan
dibandingkan dengan pengadaan Unit Pembangkit baru serta layak dikeluarkan dari pengusahaan.

Berikut daftar Status Retired Unit (RU) & Mothballed yang memenuhi syarat :

NAMA TAHUN TANGGAL IZIN DARI PT PLN (Persero) KANTOR


NO PEMBANGKIT OPERASI MULAI KETERANGAN PUSAT
GANGGUAN

Gangguan Rotor
1 PLTG # 1 Merk 1974 3-Apr-13 Kompresor dan
Alsthom Surat No : 0001/SK
Turbin
K.00.02/DIVORSUM/2015, tanggal 31
Desember 2015, perihal Penetapan Status
Gangguan Cylinder Pembangkit Keluar Pengusahaan (Retired)
2 PLTD #9 Merk 1994 2-Oct-14 Head dan Push
Sulzer
Road

Surat No. 0451/KIT.04.03/


3 PLTG # 3 Merk 1974 21-Nov-15 DIVORSUM/2016 tanggal 30 Desember
Alsthom 2016 tentang penetapan status pembangkit
Mothballed Unit KITSBU

II.          PLTA KOTA PANJANG

PLTA Kota Panjang terletak di Desa Merangin, Kecamatan Bangkinang, Kabupaten Kampar, Propinsi
Riau, sekitar 20 km dari Bangkinang atau 87 km dari Pekanbaru yang dapat membangkitkan tenaga
listrik maksimum sebesar 114 MW atau dengan total Produksi 542 GWh pertahun terdiri dari 3 Unit
dengan kapasitas 38 MW.
PT PLN (PERSERO) UNIT INDUK
PEMBANGKITAN SUMBAGUT
LAPORAN PENGUSAHAAN
BULAN DESEMBER 2022
UPDK PEKANBARU
Daerah Tangkapan Air (catchment area) PLTA Kota Panjang sekitar 3.337 km2 dengan air tahunan
rata-rata 184,4 m3 /det.

Energi Listrik yang dihasilkan PLTA Kota Panjang disalurkan melalui jaringan Interkoneksi 150 kV yang
menghubungkan pembangkit-pembangkit besar di Sumatera Barat dan Riau sehingga keandalan
sistem tenaga listrik di daerah tersebut akan tinggi.

III.        PLTG /PLTMG BALAI PUNGUT DURI

PLTG Unit 2 dan PLTMG terletak di Desa Balai Pungut Kec. Pinggir Kabupaten Bengkalis Propinsi Riau,
sekitar 100 km dari Pekanbaru dengan kapasitas PLTG unit 2 adalah 21,6 MW dam PLTMG 7x16,1
MW. PLTG #2 merupakan mesin relokasi dari PJB ( PL Madura ) dan PLTMG adalah mesin PLTD
berbahan bakar Dual Fuel (Gas dan HSD) pengadaan baru PLN dengan Kapasitas 7 X 16,1 MW.
PLN UNIT PELAKSANA DALKIT
PEKANBARU
OPERASI & PEMELIHARAAN

DESEMBER

2022
I. LAPORAN PUSAT
PT. PLN ( PERSERO) UNIT INDUK LAPORAN PENGUSAHAAN
PEMBANGKITAN SUMBAGUT HALAMAN : ii
BULAN DESEMBER 2022
UPDK PEKANBARU

EXECUTIVE SUMMARY
1. PRODUKSI ENERGI
Target Produksi
Realisasi Produksi
No Pembangkit (RKAP) Keterangan
kWh kWh
1 PLTA KOTO PANJANG #01 18,027,840.0 14,146,156.97 Base Load
2 PLTA KOTO PANJANG #02 18,027,840.0 17,575,657.32 Base Load

3 PLTA KOTO PANJANG #03 18,027,840.0 13,368,828.02 Base Load

4 PLTG TELUK LEMBU #02 83,160.0 - Peak Load

5 PLTG TELUK LEMBU #03 83,160.0 - Peak Load

6 PLTG BALAI PUNGUT DURI #02 - - PROSES RU

7 PLTMG BALAI PUNGUT DURI #01 2,108,266.0 2,758,000.00 Base Load

8 PLTMG BALAI PUNGUT DURI #02 2,108,266.0 2,984,000.00 Base Load

9 PLTMG BALAI PUNGUT DURI #03 2,108,266.0 2,884,000.00 Base Load

10 PLTMG BALAI PUNGUT DURI #04 2,108,266.0 3,764,000.00 Base Load


11 PLTMG BALAI PUNGUT DURI #05 2,108,266.0 1,936,000.00 Base Load

12 PLTMG BALAI PUNGUT DURI #06 2,108,266.0 2,875,000.00 Base Load

13 PLTMG BALAI PUNGUT DURI #07 388,266.0 3,427,000.00 Base Load


PLTMG SW TELUK LEMBU I
14 - - Base Load
(PT PJBS)
PLTMG SW TELUK LEMBU I (KSO
15 - - Base Load
HUTAN ALAM)
PLTMG SW TELUK LEMBU II
16 - - Base Load
(KSO HUTAN ALAM)
PLTMG SW TELUK LEMBU II
17 - - Base Load
(PT PJBS)
PLTG SW IPP MPP BALAI PUNGUT
18 - 3,077,054.00 Base Load
(PT PLN BATAM)

2. TRANSFER ENERGI
Selama dalam bulan OKTOBER 2022 PT PLN (Persero) Unit Pelayanan Pengendalian Pembangkitan Pekanbaru mengirim
energi ke PT PLN P3BS UPT PEKANBARU DAN PT PLN UIWRKR UP3 PEKANBARU sebesar = 145.374.812
Wh (Export), dan menerima energi dari UPT Pekanbaru = 335.121 kWh (Import).

3. KOMPOSISI/ PEMAKAIAN ENERGI PRIMER

1 Supply Bahan Bakar Gas dari EMP Bentu untuk Teluk Lembu & TGI = - MMBTU
2 Supply Bahan Bakar Gas dari PT. Pertamina untuk Duri = 132,545.00 MMBTU

Rincian pemakaian Bahan Bakar Gas sebagai berikut :


PT. PLN ( PERSERO) UNIT INDUK LAPORAN PENGUSAHAAN
PEMBANGKITAN SUMBAGUT HALAMAN : ii
BULAN DESEMBER 2022
UPDK PEKANBARU

1 Pemakaian Gas PLTG Teluk Lembu #02 = - MMBTU


2 Pemakaian Gas PLTG Teluk Lembu #03 = - MMBTU
3 Pemakaian Gas PLTG Balai Pungut Duri #02 = - MMBTU
4 Pemakaian Gas PLTMG Balai Pungut Duri #01 = 24,247.11 MMBTU
5 Pemakaian Gas PLTMG Balai Pungut Duri #02 = 26,406.25 MMBTU
6 Pemakaian Gas PLTMG Balai Pungut Duri #03 = 26,074.82 MMBTU
7 Pemakaian Gas PLTMG Balai Pungut Duri #04 = 23,083.43 MMBTU
8 Pemakaian Gas PLTMG Balai Pungut Duri #05 = 17,753.61 MMBTU
9 Pemakaian Gas PLTMG Balai Pungut Duri #06 = 25,742.39 MMBTU
10 Pemakaian Gas PLTMG Balai Pungut Duri #07 = 29,474.57 MMBTU
11 Pemakaian Gas PLTMG SW Teluk Lembu I (KSO HUTAN ALAM) = - MMBTU
12 Pemakaian Gas PLTMG SW Teluk Lembu II (KSO HUTAN ALAM) = - MMBTU
13 Pemakaian Gas PLTMG SW Teluk Lembu I (PT PJBS) = - MMBTU

14 Pemakaian Gas PLTMG SW Teluk Lembu II (PT PJBS) = - MMBTU

15 Pemakaian Gas PLTG SW MPP BALAI PUNGUT (PT PLN BATAM) = 38,427.81 MMBTU

4. PEMAKAIAN BBM UNTUK PLTG/D & PLTD SEWA

A. PLTD/G TELUK LEMBU


PLTG TELUK LEMBU #02 = 60.00 Liter
PLTG TELUK LEMBU #03 = 60.00 Liter

B. PLTG & PLTMG BALAI PUNGUT


PLTG BALAI PUNGUT DURI #02 = 0.00 Liter
PLTMG BALAI PUNGUT DURI #01 = 18,583.39 Liter
PLTMG BALAI PUNGUT DURI #02 = 27,121.18 Liter
PLTMG BALAI PUNGUT DURI #03 = 34,737.13 Liter
PLTMG BALAI PUNGUT DURI #04 = 181,942.31 Liter
PLTMG BALAI PUNGUT DURI #05 = 4,036.59 Liter
PLTMG BALAI PUNGUT DURI #06 = 7,623.35 Liter
PLTMG BALAI PUNGUT DURI #07 = 41,400.16 Liter

5. JAM GANGGUAN INTERNAL DAN JAM PEMELIHARAAN

Jam Gangguan internal untuk masing masing unit adalah :

1 PLTA KOTO PANJANG #01 = 0.92 Jam


2 PLTA KOTO PANJANG #02 = 3.47 Jam
3 PLTA KOTO PANJANG #03 = 0.15 Jam
4 PLTG TELUK LEMBU #02 = 0.00 Jam
5 PLTG TELUK LEMBU #03 = 0.00 Jam
6 PLTG BALAI PUNGUT DURI #02 = 0.00 Jam
7 PLTMG BALAI PUNGUT DURI #01 = 0.00 Jam
PT. PLN ( PERSERO) UNIT INDUK LAPORAN PENGUSAHAAN
PEMBANGKITAN SUMBAGUT HALAMAN : ii
BULAN DESEMBER 2022
UPDK PEKANBARU

8 PLTMG BALAI PUNGUT DURI #02 = 0.00 Jam


9 PLTMG BALAI PUNGUT DURI #03 = 0.00 Jam
10 PLTMG BALAI PUNGUT DURI #04 = 0.00 Jam
11 PLTMG BALAI PUNGUT DURI #05 = 0.00 Jam
12 PLTMG BALAI PUNGUT DURI #06 = 0.00 Jam
13 PLTMG BALAI PUNGUT DURI #07 = 0.00 Jam

Jam Pemeliharaan untuk masing masing unit adalah :


1 PLTA KOTO PANJANG #01 = 5.13 Jam
2 PLTA KOTO PANJANG #02 = 7.00 Jam
3 PLTA KOTO PANJANG #03 = 40.00 Jam
4 PLTG TELUK LEMBU #02 = 0.00 Jam
5 PLTG TELUK LEMBU #03 = 0.00 Jam
6 PLTG BALAI PUNGUT DURI #02 = 0.00 Jam
7 PLTMG BALAI PUNGUT DURI #01 = 0.00 Jam
8 PLTMG BALAI PUNGUT DURI #02 = 14.38 Jam
9 PLTMG BALAI PUNGUT DURI #03 = 7.52 Jam
10 PLTMG BALAI PUNGUT DURI #04 = 11.00 Jam
11 PLTMG BALAI PUNGUT DURI #05 = 3.55 Jam
12 PLTMG BALAI PUNGUT DURI #06 = 5.63 Jam
13 PLTMG BALAI PUNGUT DURI #07 = 123.30 Jam

6. PEMELIHARAAN PEMBANGKIT

Realisasi pemeliharaan unit

1 PLTA KOTO PANJANG #01 = Pemeliharaan Rutin Bulanan


2 PLTA KOTO PANJANG #02 = Pemeliharaan Rutin Bulanan
3 PLTA KOTO PANJANG #03 = Pemeliharaan Rutin Bulanan
4 PLTG TELUK LEMBU #02 = -
5 PLTG TELUK LEMBU #03 = -
6 PLTG BALAI PUNGUT DURI #02 = -

7 PLTMG BALAI PUNGUT DURI #01 = Pemeliharaan Compact Gas Rampt (CGR)

8 PLTMG BALAI PUNGUT DURI #02 = Pemeliharaan Compact Gas Rampt (CGR)
9 PLTMG BALAI PUNGUT DURI #03 = Pemeliharaan 45000 Jam & Compact Gas Rampt (CGR)
10 PLTMG BALAI PUNGUT DURI #04 = Pemeliharaan Compact Gas Rampt (CGR)
11 PLTMG BALAI PUNGUT DURI #05 = Pemeliharaan 49000 Jam & Compact Gas Rampt (CGR)
12 PLTMG BALAI PUNGUT DURI #06 = Pemeliharaan 48000 Jam
13 PLTMG BALAI PUNGUT DURI #07 = Pemeliharaan Compact Gas Rampt (CGR)

7. NERACA DAYA

Beban rata - rata :


PT. PLN ( PERSERO) UNIT INDUK LAPORAN PENGUSAHAAN
PEMBANGKITAN SUMBAGUT HALAMAN : ii
BULAN DESEMBER 2022
UPDK PEKANBARU

1 PLTA KOTO PANJANG #01 = 27.18 kW


2 PLTA KOTO PANJANG #02 = 27.80 kW
3 PLTA KOTO PANJANG #03 = 26.42 kW
4 PLTG TELUK LEMBU #02 = 0.00 kW
5 PLTG TELUK LEMBU #03 = 0.00 kW
6 PLTG BALAI PUNGUT DURI #02 = 0.00 kW
7 PLTMG BALAI PUNGUT DURI #01 = 13.20 kW
8 PLTMG BALAI PUNGUT DURI #02 = 12.70 kW
9 PLTMG BALAI PUNGUT DURI #03 = 12.90 kW
10 PLTMG BALAI PUNGUT DURI #04 = 12.90 kW
11 PLTMG BALAI PUNGUT DURI #05 = 13.10 kW
12 PLTMG BALAI PUNGUT DURI #06 = 13.20 kW
13 PLTMG BALAI PUNGUT DURI #07 = 13.20 kW

8. REALISASI KINERJA

NO PEMBANGKIT CF SOF EAF EFOR

1 PLTA KOTO PANJANG #01 50.04% 0.69% 98.56 0.16%


2 PLTA KOTO PANJANG #02 62.17% 0.94% 99.06 0.50%
3 PLTA KOTO PANJANG #03 47.29% 5.38% 99.44 0.03%
4 PLTG TELUK LEMBU #02 0.00% 0.00% 100.00 0.00%
5 PLTG TELUK LEMBU #03 0.00% 0.00% 100.00 0.00%
6 PLTG BALAI PUNGUT DURI #02 0.00% 0.00% 100.00 0.00%
7 PLTMG BALAI PUNGUT DURI #01 23.02% 2.68% 98.17 0.00%
8 PLTMG BALAI PUNGUT DURI #02 24.91% 1.93% 80.25 0.00%
9 PLTMG BALAI PUNGUT DURI #03 24.08% 1.01% 99.25 0.00%
10 PLTMG BALAI PUNGUT DURI #04 31.42% 1.48% 89.87 0.00%
11 PLTMG BALAI PUNGUT DURI #05 16.16% 0.48% 99.62 0.00%
12 PLTMG BALAI PUNGUT DURI #06 24.00% 0.76% 99.54 0.00%
13 PLTMG BALAI PUNGUT DURI #07 28.61% 16.57% 98.17 0.00%

9. POLA PENGUSAHAAN PLTA KOTA PANJANG


Realisasi pemakaian air waduk Out Flow Turbine rata - rata sebesar 153,39 m3/detik,sementara untuk inflow rata – rata
sebesar 160,50 m3/det.
Elavasi awal bulan : 78,79 mdpl dan Elavasi akhir bulan : 79,07 mdpl.

Pekanbaru, November 2022


Disetujui Oleh, Dirangkum Oleh,
Manajer Operasi & Pemeliharaan AE Rendal Operasi

ZULFIKAR RAMBE MINAR GRACE AYU

Mengetahui,
PT. PLN ( PERSERO) UNIT INDUK LAPORAN PENGUSAHAAN
PEMBANGKITAN SUMBAGUT HALAMAN : ii
BULAN DESEMBER 2022
UPDK PEKANBARU

Manajer Unit Pelaksana

YUSKAR RADIANTO
LAPORAN INDIKATOR UNJUK KERJA PEMBANGKIT
UNIT PELAYANAN DALKIT PEKANBARU
BULAN DESEMBER 2022

1. PLTA KOTA PANJANG

Unit Beban
Jumlah Tahun
No Pembang Daya (MW) Puncak Produksi kWh
Mesin Operasi
kit (MW)

Mampu
Terpasang Generator Trafo
Rata-rata
Eksport Import
1.1 PLTA #1 1 1998 38 27.18 35.92 ### ### ###
1.2 PLTA #2 1 1998 38 27.80 36.42 ### ### ###
1.3 PLTA #3 1 1998 38 26.42 36.28 ### ### ###
JUMLAH 3 114 81.40 108.62 ### ### ###
2. PLTG TELUK LEMBU 0
Unit Beban
Jumlah Tahun Daya (MW)
No Pembang Puncak Produksi kWh
Mesin Operasi
kit (MW)

Terpasang Mampu Generator Trafo


Rata-rata
Eksport Import
2.1 PLTG #2 1 1976 21.60 - - - - ###
2.2 PS AUX DI GI
2.3 PS Aux.PLTD di PLTD PL Teluk Lembu
2.4 PLTG #3 1 1976 21.60 15,000 - - - ###
JUMLAH 2 43.2 15000 0 - - ###
3. PLTG/PLTMG BALAI PUNGUT DURI
Unit Beban
Jumlah Tahun
No Pembang Daya (MW) Puncak Produksi kWh
Mesin Operasi
kit (MW)

Terpasang Mampu Generator Trafo


Rata-rata
Eksport Import
4.1 PLTG #2 1 2012 21.60 - - - - ###
4.2 PLTMG #1 1 2013 16.10 13.20 ### ### ### ###
4.3 PLTMG #2 1 2013 16.10 12.70 ### ###
4.4 PLTMG #3 1 2013 16.10 12.90 ### ###
4.5 PLTMG #4 1 2013 16.10 12.90 ### ### ### ###
4.6 PLTMG #5 1 2013 16.10 13.10 ### ###
4.7 PLTMG #6 1 2013 16.10 13.20 ### ###
4.8 PLTMG #7 1 2013 16.10 13.20 ### ###
JUMLAH 8 134.30 91.20 ### ### ### ###
4. PLTU TEMBILAHAN
Unit Beban
Jumlah Tahun
No Pembang Daya (MW) Puncak Produksi kWh
Mesin Operasi
kit (MW)

Mampu
Terpasang Generator Trafo
Rata-rata
Eksport Import

JUMLAH 0 0 - - - - -
5. PLTG TELUK LEMBU 0
Unit Beban
Jumlah Tahun
No Pembang Daya (MW) Puncak Produksi kWh
Mesin Operasi
kit (MW)
Terpasang Mampu Generator Trafo
Eksport Import
5.1 PLTG Riau 1 2007 21.60 18.00 19.00 - -

PLTMG
KSO
Hutan
5.2 25 2012 28.00 25.00 17.00 - -
Alam 1
Teluk
Lembu

PLTMG PT
PJBS 1
5.3 11 2013 30.00 30.00 32.00 - -
Teluk
Lembu

ST Riau
Power
5.4 1 2013 10.00 8.00 9.00 - -
Teluk
Lembu

PLTG #1
PT PJB
5.5 Balai 1 2012 21.60 17.00 17.00 - -
Pungut

PLTMG PT
Max
5.6 Power 16 2014 40.00 40.00 42.00 - -
Balai
Pungut
PLTMG
KSO
5.7 Hutan 7 2014 50.00 50.00 52.00 - -
Alam 2
Teluk
Lembu

PLTMG PT
PJBS 2
5.8 11 2015 30.00 30.00 32.00 - -
Teluk
Lembu

PLTG PT
WIKA KSO
5.9 14 2016 25.00 18.50 18.50 - -
Rawa
Minyak

PLTG MPP
5.10 Batam (3 3 2016 75.00 52.50 25.00 ### -
x 25 MW)
JUMLAH 90 331.20 289.00 263.50 - ### -

Catatan : T O T A LEKSPORT = ### 20 KV dan 150 KV


IMPORT = ###
NETTO = ###
JAM FAKTOR INDOKATOR UNJUK KERJA (%)

CF Sdof SOF
Kerja Gangguan Har Periodik Stand By
% kali %
PS Netto
### ### 556.12 0.92 5.13 744.00 181.84 50.04 0.00 0.01
### ### 686.68 3.47 7.00 744.00 46.85 62.17 0.00 0.01
### ### 519.57 0.15 40.00 744.00 184.28 47.29 0.00 0.05
### ### 1,762.37 4.53 52.13 412.97 53.16 - 0.02

JAM FAKTOR INDOKATOR UNJUK KERJA (%)

CF Sdof SOF
Kerja Gangguan Har Periodik Stand By
% kali %
PS Netto
### ### - - - 744.00 744.00 0.00 0.00 0.00
-
-
5,355.00 ### - - - 744.00 744.00 0.00 0.00 0.00
### ### - - - 1,488.00 0.00 - 0.00

JAM FAKTOR INDOKATOR UNJUK KERJA (%)

Kerja Gangguan Har Periodik Stand By CF Sdof SOF


% kali %
PS Netto
- ### - - - 744.00 744.00 0.00 0.00 0.00
### ### 215.00 - 19.97 744.00 509.03 23.02 1.00 0.03
232.00 - 14.38 744.00 497.62 24.91 0.00 0.02
237.00 - 7.52 744.00 499.48 24.08 0.00 0.01
### ### 210.00 - 11 744.00 523.00 31.42 0.00 0.01
147.00 - 4 744.00 593.45 16.16 0.00 0.00
217.00 - 6 744.00 521.37 24.00 0.00 0.01
259.00 - 123 744.00 361.70 28.61 0.00 0.17
### ### 1,517.00 - 185.35 4,249.65 20.74 1.00 0.04

JAM FAKTOR INDOKATOR UNJUK KERJA (%)

CF Sdof SOF
Kerja Gangguan Har Periodik Stand By
% kali %
PS Netto

- - - - - - 0.00 - 0.00

JAM FAKTOR INDOKATOR UNJUK KERJA (%)

Kerja Gangguan Har Periodik Stand By CF EAF POF


PS Netto
- - - - - 744.00 -

- - 744.00

- - 744.00

- - 744.00

- - 744.00

- 744.00
- - 744.00

- 744.00

- 744.00

### 744.00

- ### - - - 6,696.00 - - - -

KV dan 150 KV GEN-PS-RUGI=NETTO


Hal. 1

EAF EFOR
% %

98.56 0.16
99.06 0.50
99.44 0.03
99.02 0.26

EAF EFOR
% %

100.00 0.00

100.00 0.00
100.00 0.00

EAF EFOR
% %

100.00 0.00
98.17 0.00
80.25 0.00
99.25 0.00
89.87 0.00
99.62 0.00
99.54 0.00
98.17 0.00
95.61 1.51

EAF EFOR
% %

618.73 0.00

LF EFOR
- -
PT PLN (PERSERO) UIK SUMBAGUT
UPDK PEKANBARU
Jln. Dr. Tanjung Datuk No 74
Telp. (0761) 41855/41856

DATA LAPORAN PENGUSAHAAN ( LPKAP )


BULAN DESEMBER 2022
Hal. 2

NO URAIAN BESARNYA KETERANGAN

SISTEM RIAU
1 Pembangkitan sendiri PLTA Air (kWh) 45,090,642.31
PLTG Gas (kWh) -
Minyak (kWh) -
PLTD Gas (kWh) 18,496,170.00
Minyak (kWh) 2,131,830.00
PLTU Minyak (kWh)
Batu Bara (kWh) -

2 Pembelian PLTG SW Riau #01 PT RIAU POWER Gas (kWh) -


PLTMG Sewa Teluk Lembu #01 KSO Hutan
Alam Gas (kWh) -
PLTMG Sewa Teluk Lembu #01 PT PJBS Gas (kWh) -
PLTGU Sewa Riau #01 ST PT Riau Power Gas (kWh) -
PLTG Sewa Balai Pungut Duri #01 PT PJB Gas (kWh) -
PLTMG Sewa Balai Pungut #01 PT Max
Power Gas (kWh) -
PLTMG Sewa Teluk Lembu #02 KSO Hutan
Alam Gas (kWh) -
PLTMG Sewa Teluk Lembu #02 PT PJBS Gas (kWh) -
PLTG Sewa Siak #01 PT WIKA KSO RAWA
MINYAK GAS (kWh) -
PLTG Sewa IPP Balai Pungut PT PLN Batam Gas (kWh) 3,077,054.00
HSD (kWh)

3 Pemakaian sendiri Unit PLTA/PLTG/PLTD/PLTMG/PLTU (kWh) 3,936,079.00


Rugi-rugi Trafo (kWh) 5,961,792.00
Diterima dari P3B Sumatera (UPT PKU) (kWh) 349,556.00

4 Pemakaian bahan bakar HSD PLTD (liter) 315,444.10 liter lain-lain


PLTG (liter) - 160 liter lain-lain
PLTU (liter) - - liter lain-lain

GAS PLTD (MMBtu) 172,782.190 - MMBTu lain-lain


PLTG (MMBtu) 38,427.810 - MMBTu lain-lain

BATU BARA PLTU (Kg) - - Kg Lain-lain

5 Pemakaian minyak pelumas PLTA (liter) - - liter lain-lain


PLTD (liter) 1,900.00 - liter lain-lain
PLTG (liter) - - liter lain-lain

6 Daya terpasang PLTA 38,000.00 (kW) 114,000.00


PLTG 21,600.00 (kW) 64,800.00
PLTD 7,600.00 (kW) 7,600.00
PLTMG 16,100.00 (kW) 112,700.00
PLTU - (kW) -
PT PLN (PERSERO)
PEMBANGKITAN SUMATE
SEKTOR PEMBANGKITAN

NO URAIAN

1 2
1 PLTG
1.1 PLTG TELU
1.2 PLTG TELU
1.3 PLTG TELUK
1.4 PLTG BALAI
2 PLTD
2.1 PLTD TELUK
3 PLTA
3.1 PLTA KOTA
3.2 PLTA KOTA
3.3 PLTA KOTA
4 PLTMG
4.1 PLTMG BAL
4.2 PLTMG BAL
4.3 PLTMG BAL
4.4 PLTMG BAL
4.5 PLTMG BAL
4.6 PLTMG BAL
4.7 PLTMG BAL
5 PLTU
5.1 PLTU TEMB
5.2 PLTU TEMB

TOTAL
BERITA ACARA LAPORAN PRODUKSI PEMBANGKIT SENDIRI

JUNI 2022

JUMLAH BULAN INI

BRUTO
PS SENTRAL LOSSES
NON SEWA

3 4 5
- 22,911.0 43,574.0
- - -
- 18,992.0 24,820.0
- 3,805.0 4,808.0
- 114.0 13,946.0
- - -
- - -
36,307,610.0 225,924.0 976,307.0
12,686,290.00 78,940.40 225,743.60
9,657,360.00 60,092.90 258,954.10
13,963,960.00 86,890.70 491,609.30
20,421,000.0 442,000.0 85,498.0
3,085,000.0 71,210.6 12,916.2
1,863,000.0 43,003.3 7,799.9
2,850,000.0 65,786.1 11,932.3
2,601,000.0 53,985.7 10,889.8
3,451,000.0 71,628.1 14,448.5
3,868,000.0 80,283.3 16,194.4
2,703,000.0 56,102.8 11,316.8
- - -
- - -
- - -

56,728,610.0 690,835.0 1,105,379.0


No. Formulir :
No. Revisi :
Tanggal :
Halaman :

KUMULATIF s.d BULAN INI

NETTO BRUTO NETTO


PS SENTRAL LOSSES
NON SEWA NON SEWA NON SEWA

6 7 8 9 10
(66,485.0) - 144,412 235,490 (379,902)
- - - - -
(43,812.00) - 112,032.00 153,044.00 (265,076.00)
(8,613.00) - 31,722.00 (1,946.00) (29,776.00)
(14,060.00) - 658.00 84,392.00 (85,050.00)
- - - - -
- - - - -
35,105,379.0 247,115,890 1,436,502 6,482,097 239,197,291
12,381,606.00 89,043,360.00 518,581.26 1,612,335.74 86,912,443.00
9,338,313.00 75,628,160.00 434,674.64 1,949,595.36 73,243,890.00
13,385,460.00 82,444,370.00 483,246.10 2,920,165.90 79,040,958.00
19,893,502.0 150,346,000 3,046,000 349,584 146,950,416
3,000,873.25 20,289,000.00 400,962.95 45,199.38 19,842,837.67
1,812,196.72 20,509,000.00 405,108.07 44,582.67 20,059,309.26
2,772,281.61 19,234,000.00 382,928.98 44,603.33 18,806,467.69
2,536,124.47 19,359,000.00 401,779.68 48,437.57 18,908,782.75
3,364,923.32 24,564,000.00 505,339.96 58,949.48 23,999,710.56
3,771,522.29 24,497,000.00 505,694.48 59,217.98 23,932,087.54
2,635,580.34 21,894,000.00 444,185.88 48,593.59 21,401,220.53
- - - - -
- - - - -
- - - - -

54,932,396.0 397,461,890 4,626,914 7,067,171 385,767,805


UPDK PEKAN BARU 2022

PLTA KOTO PANJANG


(TT)
BULAN

AIR PS RUGI TRAFO NETTO

JANUARI 46,258,650.00 266,394.00 634,604.00 45,357,652.00


FEBRUARI 34,708,750.00 218,310.00 1,517,323.00 32,973,117.00
MARET 54,306,810.00 266,640.00 1,316,515.00 52,723,655.00
APRIL 36,594,090.00 217,428.00 964,181.00 35,412,481.00
MEI 38,939,980.00 241,806.00 1,073,167.00 37,625,007.00
JUNI 36,307,610.00 225,924.00 976,307.00 35,105,379.00
JULI 33,844,580.00 221,364.00 844,484.00 32,778,732.00
AGUSTUS 38,553,310.00 234,414.00 1,018,462.00 37,300,434.00
SEPTEMBER 43,770,047.47 231,420.00 (2,102,909.53) 45,641,537.00
OKTOBER 43,307,568.62 226,350.00 4,026,880.62 39,054,338.00
NOVEMBER 41,112,837.19 220,308.00 908,236.19 39,984,293.00
DESEMBER 45,090,642.31 253,716.00 878,022.31 43,958,904.00
Jumlah 492,794,875.59 2,824,074.00 12,055,272.59 477,915,529.00
PT PLN (PERSERO)
PEMBANGKITAN
SUMATERA BAGIAN UTARA
LAPORAN KWH UPDK PEKANBARU
JANUARI TAHUN 2022

Form 12/RB
Jumlah bulan ini Jumlah kumulatip s/d bulan ini
NO URAIAN Bulan ini Sisi TR Sisi TM Sisi TT s/d Bulan ini Sisi TR Sisi TM Sisi TT
(kWh) (kWh) (kWh) (kWh) (kWh) (kWh) (kWh) (kWh)
1 2 3 = 4+5+6 4 5 6 7 = 8+9+10 8 9 10
1 Produksi Sendiri 68,211,650.000 - - 68,211,650.000 136,423,300.000 - - 136,423,300.000
1.1. PLTA 46,258,650.00 - - 46,258,650.00000 92,517,300.000 - - 92,517,300.000
1.2. PLTD Minyak - - - - - - - -
1.3. PLTD Gas Alam - - - - - - - -
1.4. PLTU Batu Bara - - - - - - - -
1.5. PLTU Minyak - - - - - - - -
1.6. PLTU Gas Alam - - - - - - - -
1.7. PLTG Minyak - - - - - - - -
1.8. PLTG Gas Alam - - - - - .0 - - - .0
1.9. PLTGU Minyak - - - - - - - -
1.10. PLTGU Gas Alam - - - - - - - -
1.11. PLTP - - - - - - - -
1.12. PLTS (Surya) - - - - - - - -
1.13. PLT Bayu - - - - - - - -
1.14. Biodiesel - - - - - - - -
1.15. Olein - - - - - - - -
1.16. Biomass - - - - - - - -
1.17. Bio Fame - - - - -
1.18. CPO - - - - -
1.19. PLTMG Minyak - - - - - - - -
1.20. PLTMG Gas 21,953,000.00 - - 21,953,000.00000 43,906,000.00 - - 43,906,000.00
2 Pemakaian Sentral - - - - 1,635,928.00 - - 1,635,928.00
3 Rugi-Rugi Trafo - - - - 1,527,110.00 - - 1,527,110.00
4 Produksi Sendiri Netto (1 - 2 - 3) 68,211,650.00 - - 68,211,650.00 68,211,650.00 - - 68,211,650.00
5 Diterima dari 62,047,331.54 - 47,703,999.54 14,343,332.00 62,047,331.54 - 47,703,999.54 14,343,332.00
5.1. PLN Unit Induk P3B Sumatera 247,870.000 - - 247,870.00000 495,740.00 - - 495,740.00
5.2. PLN Unit Induk Wilayah Sumut - - - - - - - -
5.3. PLN Unit Induk Wilayah Riau Dan Kepulauan Riau - - - - - -
5.4. Luar PLN (dibeli) 61,799,461.540 - 47,703,999.540 14,095,462.000 123,598,923.08 - 95,407,999.08 28,190,924.00
- PLTD SW BELAWAN (PT AKE) (SEWA/RELOKASI DARI UPHK MEDAN) - - - - - - - -
- PLTD SW BELAWAN (PT BBS) (RELOKASI DARI UPHK MEDAN) - - - - - - - -
- PLTG IPP MPP PAYA PASIR (PT PLN BATAM) (RELOKASI DARI UPHK MEDAN) - - - - - - - -
- PLTD SW TELUK DALAM (PT. BGP) (RELOKASI DARI AREA NIAS) - - - - - - - -
- PLTD SW GUNUNG SITOLI (PT. BGP) (RELOKASI DARI AREA NIAS) - - - - - - - -
- PLTD SW GUNUNG SITOLI (PT. ASJ) (RELOKASI DARI AREA NIAS) - - - - - - - -
- PLTG IPP MPP NIAS (PT. PLN BATAM) (RELOKASI DARI AREA NIAS) - - - - - - - -
- PLTGU SW RIAU #01 (GT 1.1) (PT RIAU POWER) - - - - - - - -
- PLTGU SW RIAU #02 (ST 1.0) (PT RIAU POWER) - - - - - - - -
- PLTMG SW TELUK LEMBU I (KSO HUTAN ALAM) 7,620,777.000 - 7,620,777.00000 - 15,241,554.00 - 15,241,554.00 -
- PLTMG SW TELUK LEMBU II (KSO HUTAN ALAM) 21,527,005.000 - 21,527,005.000 - 43,054,010.00 - 43,054,010.00 -
- PLTMG SW TELUK LEMBU I (PT PJBS) 8,556,443.000 - 8,556,443.00000 - 17,112,886.00 - 17,112,886.00 -
- PLTMG SW TELUK LEMBU II (PT PJBS) 7,238,300.000 - - 7,238,300.00000 14,476,600.00 - - 14,476,600.00
- PLTG SW BALAI PUNGUT DURI (PT PJB) - - - - - - - -
- PLTMG SW BALAI PUNGUT (PT MAX POWER) - - - - - - - -
- PLTMG SW SIAK (PT WIKA RAWA MINYAK) 9,999,774.540 - 9,999,774.54000 - 19,999,549.08 - 19,999,549.08 -
- PLTG IPP MPP BALAI PUNGUT (PT PLN BATAM) 6,857,162.000 - - 6,857,162.00000 13,714,324.00 - - 13,714,324.00
6 Produksi Total Netto (4 + 5) 130,258,981.54 - 47,703,999.54 82,554,982.00 130,258,981.54 - 47,703,999.54 82,554,982.00
7 Dikirim ke : 130,258,981.54 - 47,703,999.54 82,554,982.00 130,258,981.54 - 47,703,999.54 82,554,982.00
7.1. PLN Unit Induk Wilayah Sumut : - - - - - - - -
- UPDK Pandan (PLTMH) - - - - - - - -
- UPK Belawan (NIAS) - - - - - - - -

7.2. PLN Unit Induk WRKR : 9,999,774.54 - 9,999,774.54 - 9,999,774.54 - 9,999,774.54 -


- PLTMG SW SIAK (PT WIKA RAWA MINYAK) 9,999,774.54 - 9,999,774.54 - 9,999,774.54 - 9,999,774.54 -
- PLTU TEMBILAHAN - - - - - - -

7.3. PLN Unit Induk P3B Sumatera 120,259,207.00 - 37,704,225.00 82,554,982.00 120,259,207.00 - 37,704,225.00 82,554,982.00
- UPK Nagan Raya - - - - - - - -
- UPK Belawan - - - - - - - -
- UPDK Pekanbaru 120,259,207.00 - 37,704,225.00 82,554,982.00 120,259,207.00 - 37,704,225.00 82,554,982.00
- UPDK Pandan - - - - - - - -
- UPK Labuhan Angin - - - - - - - -
- UPK P. Susu - - - - - - - -
- PLTU P. Susu Unit #01 dan 02 - - - - - - - -
- PLTMG Arun - - - - - - - -
- PLTU Tenayan - - - - - - - -

8 Susut Transmisi - - - - - - - -

BULAN INI S/D BULAN INI


PEMAKAIAN SENDIRI= 0.00% PEMAKAIAN SENDIRI= 1.20%
SUSUT TRAFO= 0.00% SUSUT TRAFO= 1.12%
TOTAL= 0.00% TOTAL= 2.32%
PT PLN (PERSERO) No. Formulir :
PEMBANGKITAN SUMATERA BAGIAN UTARA LAPORAN PEMAKAIAN BAHAN BAKAR No. Revisi :
SEKTOR PEMBANGKITAN PEKANBARU Tanggal :
JUNI 2022
Halaman :
Formulir 13
BIAYA
PEMAKAIAN BAHAN
NO. PRODUKSI ENERGI BAHAN
BAKAR
BAKAR

Jumlah
Pemakai Biaya Harga
Harga Harga
Pusat Listrik/Nama Sentral Jenis Produksi Bruto Sebenarnya Susut Jumlah an Rata- Surveyor/Ong Satuan
Satuan Loco
Rata kos Angkut Total
Sentral

Nilai Kalor
Bahan Bakar (kg, liter, (kg, liter, (Rp/liter, (Rp/liter, (Rp/liter,
KIT (DUAG) Total (kWh) (Kcal/Liter/M (kg, liter, mmbtu) (Rp)
(kWh) mmbtu) mmbtu) mmbtu) mmbtu) mmbtu)
MBTU)
1 2 3 4 5 6 7 8=6+7 9=8/5 10 11 12=10+11 13=8*12
PLTG TELUK LEMBU
1 PLTG TELUK LEMBU #1 G GAS
HSD
2 PLTG TELUK LEMBU #2 G GAS - 252,000.00 - - - -
HSD - 9,060.00 75.00 - 75.00 -
3 PLTG TELUK LEMBU #3 G GAS - 252,000.00 - - - -
HSD - 9,060.00 120.00 - 75.00 -
JUMLAH GAS - - - -
HSD - 150.00 150.00 -
PLTD TELUK LEMBU
4 PLTD SULZER TELUK LEMBU D GAS - 252,000.00 - - - -
HSD - 9,060.00 - - - -
JUMLAH GAS
HSD
PLTA KOTO PANJANG
5 PLTA KOTO PANJANG #1 A AIR 12,686,290.00 - - - -
6 PLTA KOTO PANJANG #2 A AIR 9,657,360.00 - - - -
7 PLTA KOTO PANJANG #3 A AIR 13,963,960.00 - - - -
JUMLAH 36,307,610.00
PLTMG DURI
8 PLTMG BALAI PUNGUT DURI #1 G GAS 3,085,000.00 27,302.06 - 27,302.06 0.01
HSD - 5,676.19 - 5,676.19 -
9 PLTMG BALAI PUNGUT DURI #2 G GAS 1,863,000.00 16,541.04 - 16,541.04 0.01
HSD - 5,165.50 - 5,165.50 -
10 PLTMG BALAI PUNGUT DURI #3 G GAS 2,850,000.00 25,220.35 - 25,220.35 0.01
HSD - 5,160.88 - 5,160.88 -
11 PLTMG BALAI PUNGUT DURI #4 G GAS 2,601,000.00 22,745.05 - 22,745.05 0.01
HSD - 11,344.67 - 11,344.67 -
12 PLTMG BALAI PUNGUT DURI #5 G GAS 3,451,000.00 30,856.32 - 30,856.32 0.01
HSD - 6,393.62 - 6,393.62 -
13 PLTMG BALAI PUNGUT DURI #6 G GAS 3,868,000.00 34,462.82 - 34,462.82 0.01
HSD - 7,342.48 - 7,342.48 -
14 PLTMG BALAI PUNGUT DURI #7 G GAS 2,703,000.00 23,865.20 - 23,865.20 0.01
HSD - 5,545.05 - 5,545.05 -
JUMLAH GAS 20,421,000.00 180,992.84 - 180,992.84 0.01
HSD - 46,628.40 - 46,628.40 -
PLTG
15 PLTG BALAI PUNGUT #2 G GAS
HSD
JUMLAH GAS - - - - -
HSD - - - - -
PLTU TEMBILAHAN
16 PLTU TEMBILAHAN 1 U BBARA
HSD
BIO HSD
BIO FAME
17 PLTU TEMBILAHAN 2 U BBARA
HSD
BIO HSD

JUMLAH BBARA - - - - 0
HSD - - -
BIO HSD - - - 0
BIO FAME - - - - 0
PEMBANGKIT SEWA
1 PLTG SEWA PT RIAU POWER D GAS
HSD
2 ST SEWA PT RIAU POWER D GAS
3 PLTMG SEWA 12 MW KSO HUTAN AL D GAS 4,499,502.00 252,000.00 48,790.96 - 48,790.96 0.01
4 PLTMG 50 MW KSO HUTAN ALAM 2 D GAS 16,597,944.00 252,000.00 148,560.80 - 148,560.80 0.01
5 PLTMG SEWA 30 MW PT PJBS 1 TL. D GAS 6,981,646.00 252,000.00 69,724.83 - 69,724.83 0.01
6 PLTMG SEWA 30 MW PT PJBS 2 TL. D GAS 5,645,300.00 252,000.00 55,231.13 - 55,231.13 0.01
7 PLTG UNIT 1 PJB BALAI PUNGUT D GAS
8 PLTMG SEWA 40 MW PT MAX POWE D GAS
9 PLTMG SEWA 25 MW PT WIKA RAWA D GAS
10 PLTG MPP BATAM 3X25 MW BALAI D GAS 7,050,822.00 252,000.00 78,111.16 78,111.16 0.01
HSD - 9,060.00 50,557.57 - 50,557.57 -

JUMLAH GAS 40,775,214.00 400,418.87 - 400,418.87 0.01


HSD - 50,557.57 - 50,557.57 -
TOTAL GAS 61,196,214.00 252,000.00 581,411.71 - 581,411.71 0.01
HSD - 9,060.00 97,335.97 - 97,335.97 -
BBARA - - - - -
AIR 36,307,610.00
BIO HSD - - -
BIO FAME - - -
PT PLN (PERSERO) No. Formulir :
PEMBANGKITAN SUMATERA BAGIAN UTARA LAPORAN PEMAKAIAN BAHAN BAKAR No. Revisi :
SEKTOR PEMBANGKITAN PEKANBARU SD OKTOBER 2019 Tanggal :
Halaman :
Formulir 13
PRODUKSI ENERGI PEMAKAIAN BAHAN BAKAR TU
Biaya Jumlah Harga Loco
Jenis Produksi Bruto Sebenarnya Susut Jumlah Harga Satuan Surveyor/Ongkos Harga Satuan Total
NO. Pemakaian Rata- Angkut Sentral
Pusat Listrik/Nama Sentral
Rata
KIT
Bahan Bakar Total (kWh) Bahan Bakar (kWh) (kg, liter, mmbtu) (kg, liter, mmbtu) (kg, liter, mmbtu) (Rp/liter, mmbtu) (Rp/liter, mmbtu) (Rp/liter, mmbtu) (Rp)
(DUAG)
1 2 3 4 5 6 7 8=6+7 9=8/5 10 11 12=10+11 13=8*12
PLTG TELUK LEMBU
1 PLTG TELUK LEMBU #1 G GAS - - - - - -
HSD - - - - - -
2 PLTG TELUK LEMBU #2 G GAS 43,921,100 43,921,100 837,644.80 - 837,644.80 0.02
HSD - - 1,750.00 - 1,750 -
3 PLTG TELUK LEMBU #3 G GAS 13,146,000 13,146,000 235,906.74 144,355 380,261 0
HSD - - 525.00 175 700 -
GAS 57,067,100 57,067,100 1,073,551.54 144,355 1,217,906.2 -
JUMLAH
HSD - - 2,275.00 175 2,450 -
PLTD TELUK LEMBU
4 PLTD SULZER TELUK LEMBU D GAS - - - - - - - - - -
HSD - - - - - - - - - -
GAS - - - - - - - - - -
JUMLAH
HSD - - - - - - - - - -
PLTA KOTO PANJANG
5 PLTA KOTO PANJANG #1 A AIR 126,122,970.00
6 PLTA KOTO PANJANG #2 A AIR 151,088,220.00
7 PLTA KOTO PANJANG #3 A AIR 158,032,430.00
JUMLAH AIR 435,243,620.00
PLTMG DURI
8 PLTMG BALAI PUNGUT DURI #1 G GAS 48,004,260.00 439,977.30 - 439,977.30 0.01
48,655,000.00
HSD 650,740.00 125,570.81 - 125,570.81 0.19
9 PLTMG BALAI PUNGUT DURI #2 G GAS 32,937,920.00 309,761.49 - 309,761.49 0.01
33,305,000.00
HSD 367,080.00 78,883.51 - 78,883.51 0.21
10 PLTMG BALAI PUNGUT DURI #3 G GAS 52,899,680.00 484,838.39 - 484,838.39 0.01
53,675,000.00
HSD 775,320.00 149,727.33 - 149,727.33 0.19
11 PLTMG BALAI PUNGUT DURI #4 G GAS 53,455,520.00 500,600.10 - 500,600.10 0.01
54,195,000.00
HSD 739,480.00 143,093.31 - 143,093.31 0.19
12 PLTMG BALAI PUNGUT DURI #5 G GAS 67,789,820.00 636,949.36 - 636,949.36 0.01
68,572,000.00
HSD 782,180.00 172,969.87 - 172,969.87 0.22
13 PLTMG BALAI PUNGUT DURI #6 G GAS 67,276,810.00 630,307.14 - 630,307.14 0.01
68,279,000.00
HSD 1,002,190.00 173,068.06 - 173,068.06 0.17
14 PLTMG BALAI PUNGUT DURI #7 G GAS 72,277,440.00 672,386.72 - 672,386.72 0.01
73,340,000.00
HSD 1,062,560.00 202,590.12 - 202,590.12 0.19
GAS 394,641,450.00 394,641,450.00 3,674,820.49 - 3,674,820.49 0.07
HSD 5,379,550.00 5,379,550.00 1,045,903.00 - 1,045,903.00 1.38
PLTG
15 PLTG BALAI PUNGUT #2 G GAS 12,369,065.00 12,369,065.00 238,268.08 - 238,268.08 0.02
HSD 6,031.97 - 6,031.97 -
GAS 12,369,065.00 238,268.08 - 238,268.08 0.02
JUMLAH 12,369,065.00
HSD - 6,031.97 - 6,031.97 -
PLTU TENAYAN
16 PLTU TEMBILAHAN # 1 U BATUBARA 111,300.00 268,710.00 - 268,710.00 2.41
HSD 111,300.00 - - -
BIO HSD - 1,411.78 1.24 1,413.02 -
BIO FAME 605.05 0.53 605.58
17 PLTU TEMBILAHAN # 2 U BATUBARA 3,639,580.00 5,127,038.00 - 5,127,038.00 1.41
3,639,580.00
HSD - - - - -
BIO HSD 4,256.97 (2.34) 4,254.63
BIO FAME 1,824.42 (1.01) 1,823.41
BATUBARA 3,750,880.00 5,395,748.00 - 5,395,748.00 3.82
JUMLAH 3,750,880.00
HSD - - 1.24 - -
BIO HSD 5,668.75 (1.10) 5,667.65 -
BIO FAME 2,429.46 (0.47) 2,428.99 -
PEMBANGKIT SEWA
1 PLTG SEWA PT RIAU POWER G GAS - - - - - -
2 HSD - - - - -
3 PLTG SW ST RIAU POWER #01 10MW (PT RIAU POW U GAS - - - - - -
4 PLTMG SW TELUK LEMBU #01 12 MW (KSO HUTAN DG GAS 91,018,087.00 91,018,087.00 874,000.08 - 874,000.08 0.01
5 PLTMG SW TELUK LEMBU #02 50 MW (KSO HUTAN DG GAS 285,180,981.00 285,180,981.00 2,559,156.13 - 2,559,156.13 0.01
6 PLTMG SW TELUK LEMBU #01 30MW (PT PJBS) DG GAS 90,255,659.00 90,255,659.00 905,063.38 - 905,063.38 0.01
7 PLTMG SW TELUK LEMBU #02 30MW (PT PJBS) DG GAS 132,146,100.00 132,146,100.00 1,284,104.98 - 1,284,104.98 0.01
8 PLTG SW BALAI PUNGUT DURI 1 #01 20MW (PT PJB) GT GAS 17,167,534.00 17,167,534.00 309,497.30 - 309,497.30 0.02
9 PLTMG SW BALAI PUNGUT #01 40MW (PT MAX POWDG GAS 115,178,350.00 115,178,350.00 1,131,952.03 - 1,131,952.03 0.01
10 PLTMG SW SIAK #01 25MW (PT WIKA RAWA MINYAKDG GAS 102,915,752.64 102,915,752.64 1,018,117.50 - 1,018,117.50 0.01
11 PLTMG SEWA 75 MW MPP PLN BATAM GT GAS 244,288,857.00 244,288,857.00 2,793,488.05 - 2,793,488.05 -
HSD - - - - -

GAS 1,078,151,320.64 1,078,151,320.64 10,875,379.44 - 10,875,379.44 -


JUMLAH
HSD - - - - -
GAS 1,542,228,935.640 1,542,228,935.64 15,862,019.541 144,354.69 16,006,374.23 0.01
HSD 5,379,550.00 5,379,550.00 1,054,209.970 176.24 1,054,386.21 0.20
BIO HSD 5,668.75 (1.10) 5,667.65
TOTAL
BIO FAME 2,429.46 (0.47) 2,428.99
BBARA 3,750,880.00 3,750,880.00 5,395,748.00 - 5,395,748.00 1.44
AIR 435,243,620.00 435,243,620.00 - - - -

LAIN-LAIN
LAIN-LAIN

Keterangan:
PT PLN (PERSERO) No. Formulir :
PEMBANGKITAN SUMATERA BAGIAN UTARA LAPORAN PEMAKAIAN BAHAN PELUMAS No. Revisi :
SEKTOR PEMBANGKITAN PEKANBARU BULAN JUNI 2022 Tanggal :
Halaman :
Formulir 14
PEMAKAIAN MINYAK PELUMAS BIAYA MINYAK PELUMAS
NO. Pusat Listrik/Nama Sentral Produksi kWh Pemakaian rata- Harga Dasar Ongkos Angkut Harga Loco Sentral Jumlah Harga Loco
sebenarnya (liter) susut (liter) Jumlah (liter)
rata (cc/kWh) (Rp/liter) (Rp/liter) (Rp/liter) Sentral
1 2 3 4 5 5=4+5 6=5/3*1000 7 8 9 10
PLTG - - - - - - - - -
1 PLTG TELUK LEMBU 1 (ALSTHOM)
2 PLTG TELUK LEMBU 2 (ALSTHOM) - - - - -
3 PLTG TELUK LEMBU 3 (EX GILI TIMUR) - - - - -
4 PLTG BALAI PUNGUT 2 DURI IP
PLTD
5 PLTD TELUK LEMBU SULZER
PLTA 36,307,610.00 418.00 - 418.00 0.04 - - - -
6 PLTA KOTA PANJANG 1 12,686,290.00 - - - -
7 PLTA KOTA PANJANG 2 9,657,360.00 418.00 - 418.0 0.0
8 PLTA KOTA PANJANG 3 13,963,960.00 - - - -
PLTMG 20,421,000.00 3,600.00 - 3,600.00 1.28 - - - -
9 PLTMG BALAI PUNGUT DURI 1 3,085,000.00 - - - -
10 PLTMG BALAI PUNGUT DURI 2 1,863,000.00 600.00 - 600.0 0.3
11 PLTMG BALAI PUNGUT DURI 3 2,850,000.00 600.00 - 600.0 0.2
12 PLTMG BALAI PUNGUT DURI 4 2,601,000.00 600.00 - 600.0 0.2
13 PLTMG BALAI PUNGUT DURI 5 3,451,000.00 1,800.00 - 1,800.0 0.5
14 PLTMG BALAI PUNGUT DURI 6 3,868,000.00 - - - -
15 PLTMG BALAI PUNGUT DURI 7 2,703,000.00 - - - -

TOTAL 56,728,610.00 4,018.00 - 4,018.00 0.00

Keterangan:
LAPORAN PEMAKAIAN PELUMAS
JUNI TAHUN 2022
FORM 14
PEMAKAIAN PELUMAS

PLT
Jumlah
NO UNIT PELAKSANA UNIT LAYANAN Produksi Sebenarnya Susut/Lain2 Jumlah SLC
Unit
kWh liter liter liter liter / kWh
1 2 3 4 5 8 9 10 11
PLTG TELUK LEMBU #01 G 1
PLTG TELUK LEMBU #02 G 1 - 10 - 10.00 -
PLTG TELUK LEMBU #03 G 1 - 50 - 50.00 -
PLTG TELUK LEMBU G 3 - 60 - 60.00 -
PLTA KOTO PANJANG #01 A 1 89,043,360 - - - -
PLTA KOTO PANJANG #02 A 1 75,628,160 418 - 418.00 0.000006
PLTA KOTO PANJANG #03 A 1 82,444,370 - - - -
PLTA KOTO PANJANG A 3 247,115,890 418 - 418.00 0.000002
PLTMG BALAI PUNGUT DURI #01 DG 1 20,289,000 3,300 - 3,300.00 0.000163
PLTMG BALAI PUNGUT DURI #02 DG 1 20,509,000 3,400 - 3,400.00 0.000166
PLTMG BALAI PUNGUT DURI #03 DG 1 19,234,000 4,400 - 4,400.00 0.000229
3 UPDK PEKANBARU PLTMG BALAI PUNGUT DURI #04 DG 1 19,359,000 3,000 - 3,000.00 0.000155
PLTMG BALAI PUNGUT DURI #05 DG 1 24,564,000 9,800 - 9,800.00 0.000399
PLTMG BALAI PUNGUT DURI #06 DG 1 24,497,000 8,100 - 8,100.00 0.000331
PLTMG BALAI PUNGUT DURI #07 DG 1 21,894,000 2,800 - 2,800.00 0.000128
PLTMG DURI DG 7 150,346,000 34,800.00 - 34,800.00 0.000231
PLTG BALAI PUNGUT DURI #02 G 1 50 - 50.00 -
PLTG DURI G 1 - 50.00 - 50.00 -
PLTU TEMBILAHAN #01 U 1
PLTU TEMBILAHAN #02 U 1
PLTU TEMBILAHAN 2

TOTAL UPDK PEKANBARU 14 397,461,890 35,328 - 35,328.00


PT PLN (PERSERO) No. Formulir :
UNIT INDUK PEMBANGKITAN SUMATERA BAGIAN UTARA LAPORAN PEMAKAIAN BAHAN PELUMAS No. Revisi :
UNIT PELAYANAN DALKIT PEKANBARU S/D DESEMBER 2019 Tanggal :
Halaman :
Formulir 14
PEMAKAIAN MINYAK PELUMAS BIAYA MINYAK PELUMAS
NO. Pusat Listrik/Nama Sentral Produksi kWh Pemakaian rata- Harga Dasar Ongkos Angkut Harga Loco Sentral Jumlah Harga Loco
sebenarnya (liter) susut (liter) Jumlah (liter)
rata (cc/kWh) (Rp/liter) (Rp/liter) (Rp/liter) Sentral
1 2 3 4 5 5=4+5 6=5/3*1000 7 8 9 10
PLTG - - - - -
1 PLTG TELUK LEMBU 1 (ALSTHOM) - - - - -
2 PLTG TELUK LEMBU 2 (ALSTHOM) Err:509 Err:509 Err:509 - -
3 PLTG TELUK LEMBU 3 (EX GILI TIMUR) Err:509 Err:509 Err:509 - -
4 PLTG BALAI PUNGUT 2 DURI IP Err:509 Err:509 Err:509 - -
PLTD - - - - -
5 PLTD TELUK LEMBU SULZER - - - - -
PLTA - - - - -
6 PLTA KOTA PANJANG 1 Err:509 Err:509 Err:509 - -
7 PLTA KOTA PANJANG 2 Err:509 Err:509 Err:509 - -
8 PLTA KOTA PANJANG 3 Err:509 Err:509 Err:509 - -
PLTMG - - - - -
9 PLTMG BALAI PUNGUT DURI 1 Err:509 Err:509 Err:509 - -
10 PLTMG BALAI PUNGUT DURI 2 Err:509 Err:509 Err:509 - -
11 PLTMG BALAI PUNGUT DURI 3 Err:509 Err:509 Err:509 - -
12 PLTMG BALAI PUNGUT DURI 4 Err:509 Err:509 Err:509 - -
13 PLTMG BALAI PUNGUT DURI 5 Err:509 Err:509 Err:509 - -
14 PLTMG BALAI PUNGUT DURI 6 Err:509 Err:509 Err:509 - -
15 PLTMG BALAI PUNGUT DURI 7 Err:509 Err:509 Err:509 - -
PLTU - - - - -
16 PLTU TEMBILAHAN #01 Err:509 Err:509 Err:509 - -
17 PLTU TEMBILAHAN #02 Err:509 Err:509 Err:509 - -

- - - -

Keterangan:
PT PLN (persero) SEKTOR PEMBANGKITAN PEKANBARU

PT PLN (persero) SEKTOR PEMBANGKITAN PEKANBARU


SEKTOR PEKANBARU

Pengusahaan Pembangkitan
LAPORAN NOVEMBER 2022

No.

KODE RANTING RANTING KODE SENTRAL

1 227213401 TELUK LEMBU 22721340101


2 227213401 TELUK LEMBU 22721340101
3 227213401 TELUK LEMBU 22721340101
4 227213401 TELUK LEMBU 22721340102
5 227213402 KOTO PANJANG 22721340201
6 227213402 KOTO PANJANG 22721340201
7 227213402 KOTO PANJANG 22721340201
8 227213404 BALAI PUNGUT DURI 22721340104
9 227213404 BALAI PUNGUT DURI 22721340105
10 227213404 BALAI PUNGUT DURI 22721340105
11 227213404 BALAI PUNGUT DURI 22721340105
12 227213404 BALAI PUNGUT DURI 22721340105
13 227213404 BALAI PUNGUT DURI 22721340105
14 227213404 BALAI PUNGUT DURI 22721340105
15 227213404 BALAI PUNGUT DURI 22721340105
18 227213403 TELUK LEMBU 22721340305
19 227213403 TELUK LEMBU 22721340305
20 227213403 TELUK LEMBU 22721340305
21 227213403 TELUK LEMBU 22721340305
22 227213403 RAWA MINYAK SIAK 22721340104
23 227213403 BALAI PUNGUT DURI 22721340104
UNIT MESIN

SENTRAL MESIN KODE MESIN

PLTG TELUK LEMBU #1 PLTG TELUK LEMBU #1 22721340101001


PLTG TELUK LEMBU #2 PLTG TELUK LEMBU #2 22721340101002
PLTG TELUK LEMBU #3 PLTG TELUK LEMBU #3 22721340101003
PLTD SULZER TELUK LEMBU PLTD SULZER TELUK LEMBU 22721340102001
PLTA KOTO PANJANG #1 PLTA KOTO PANJANG #1 22721340201001
PLTA KOTO PANJANG #2 PLTA KOTO PANJANG #2 22721340201002
PLTA KOTO PANJANG #3 PLTA KOTO PANJANG #3 22721340201003
PLTG BALAI PUNGUT #2 PLTG BALAI PUNGUT #2 22721340306001
PLTMG BALAI PUNGUT DURI #1 PLTMG BALAI PUNGUT DURI #1 22721340105001
PLTMG BALAI PUNGUT DURI #2 PLTMG BALAI PUNGUT DURI #2 22721340105002
PLTMG BALAI PUNGUT DURI #3 PLTMG BALAI PUNGUT DURI #3 22721340105003
PLTMG BALAI PUNGUT DURI #4 PLTMG BALAI PUNGUT DURI #4 22721340105004
PLTMG BALAI PUNGUT DURI #5 PLTMG BALAI PUNGUT DURI #5 22721340105005
PLTMG BALAI PUNGUT DURI #6 PLTMG BALAI PUNGUT DURI #6 22721340105006
PLTMG BALAI PUNGUT DURI #7 PLTMG BALAI PUNGUT DURI #7 22721340105007
PLTMG SW TELUK LEMBU I (KSO HUTAN ALAPLTMG SW TELUK LEMBU I (KSO HUTAN 22721340307001
PLTMG SW TELUK LEMBU II (KSO HUTAN ALAPLTMG SW TELUK LEMBU II (KSO HUTAN 22721340310001
PLTMG SW TELUK LEMBU I (PT PJBS) PLTMG SW TELUK LEMBU I (PT PJBS) 22721340308001
PLTMG SW TELUK LEMBU II (PT PJBS) PLTMG SW TELUK LEMBU II (PT PJBS) 22721340308002
PLTMG SEWA (PT WIKA RAWA MINYAK SIAK)PLTMG SEWA (PT WIKA RAWA MINYAK SIAK)
PLTG IPP MPP BALAI PUNGUT (PT PLN BATA PLTG IPP MPP BALAI PUNGUT (PT PLN BATAM)
UNIT MESIN

SISTEM PROVINSI MERK TYPE SERI

Alsthom PG 5341 P 22610-3177


Alsthom PG 5341 P 226103T96
GE MS 5001
Sulzer E12 ZA 40 S
Kaplan KVAERNER 1
Kaplan KVAERNER 2
Kaplan KVAERNER 3
Alsthom PG 5341 P 226103
WARTSILLA 18V50DF PAAE237324
WARTSILLA 18V50DF PAAE237328
WARTSILLA 18V50DF PAAE237328
WARTSILLA 18V50DF PAAE237328
WARTSILLA 18V50DF PAAE237328
WARTSILLA 18V50DF PAAE237328
WARTSILLA 18V50DF PAAE237328
MTU L62 4000 18 V
ROLLS ROYCE B 35:40V20AG2
GE JENBACHER JMS 620 GS-N.L
GE JENBACHER JMS 620 GS-N.L
MWM(JERMAN) MWMPCG2020V
GENERAL ELECTRIK
KODE
KODE
JENIS
JENIS
PEMBANGK
PEMBANG
IT - BHN
KIT
BAKAR

NAMA TRAFO TEGANGA


MERK KAPASITA TAHUN
STEPUP N HV/LV
GENERATOR S (KVA) OPERASI
PEMBANGKIT (KV) 1
Alsthom 0 10.5/150 0 1974 PLTG-GAS PLTG
Alsthom UNINDO 10.5/150 30 1976 PLTG-GAS PLTG
GE PAUWELS 11/150 27 1976 PLTG-GAS PLTG
ALSTHOM 0 0 0 1996 PLTD-HSD PLTD
Elin ELIN 11/150 45 1998 PLTA PLTA
Elin ELIN 11/150 45 1998 PLTA PLTA
Elin ELIN 11/150 45 1998 PLTA PLTA
Alsthom Unindo 11/150 30 1976 PLTG-GAS PLTG
ABB Unindo 15/150 150 2013 PLTD-GAS PLTD
ABB 2013 PLTD-GAS PLTD
ABB 2013 PLTD-GAS PLTD
ABB Unindo 15/150 150 2013 PLTD-GAS PLTD
ABB 2013 PLTD-GAS PLTD
ABB 2013 PLTD-GAS PLTD
ABB 2013 PLTD-GAS PLTD
LEROY SOMMER Schneider 20 2 8/14/2012 PLTD-GAS PLTD
ABB TBEA 20 1.6 12/14/2012 PLTD-GAS PLTD
AVK Trafindo 11 4.7 3/11/2013 PLTD-GAS PLTD
AVK CHINT 150 80 2/6/2015 PLTD-GAS PLTD
MARELLII TRAFINDO 0.4/20 6 1/25/2016 PLTD-GAS PLTD
UNINDO 11.5/150 70 20/12/16 PLTG-GAS PLTG
KODE
KODE JENIS
JENIS BEBAN PUNCAK
STATUS MILIK STATUS TEGANGA DAYA
BAHAN (kW)
MILIK N TERPASANG
BAKAR

(kW)

2 3 4 5
PRODUKSI SENDIRI 0 GAS TT - 21,600
PRODUKSI SENDIRI 0 GAS TT 13,860 21,600
PRODUKSI SENDIRI 0 GAS TT 15,000 20,000
PRODUKSI SENDIRI 0 HSD TM - 7,800
PRODUKSI SENDIRI 0 NON TT 38,000 38,000
PRODUKSI SENDIRI 0 NON TT 38,000 38,000
PRODUKSI SENDIRI 0 NON TT 38,000 38,000
PRODUKSI SENDIRI 0 GAS TT 14,850 20,000
PRODUKSI SENDIRI 0 GAS TT 14,320 16,100
PRODUKSI SENDIRI 0 GAS TT 14,320 16,100
PRODUKSI SENDIRI 0 GAS TT 14,320 16,100
PRODUKSI SENDIRI 0 GAS TT 14,320 16,100
PRODUKSI SENDIRI 0 GAS TT 14,320 16,100
PRODUKSI SENDIRI 0 GAS TT 14,320 16,100
PRODUKSI SENDIRI 0 GAS TT 14,320 16,100
SEWA 0 GAS TM 12,000 12,000
SEWA 0 GAS TM 50,000 50,000
SEWA 0 GAS TM 18,000 30,000
SEWA 0 GAS TT 20,000 30,000
SEWA 0 GAS TM 20,000 25,000
BELI GAS TT 82,500 90,000.00
KINERJA UNIT MESIN

DAYA MAMPU JAM JAM


KODE KODE
KONDISI MUTASI OPERASI HAR
KONDISI MUTASI
(Jam) (Jam)
(kW)

6 7 8 9 10
- RUSAK PERMANEN RP EXISTING 01 - -
13,860 BEROPERASI OP EXISTING 01 - -
15,000 BEROPERASI OP EXISTING 01 - -
- RUSAK PERMANEN RP EXISTING 01 -
38,000 BEROPERASI OP EXISTING 01 571.67 5.13
38,000 BEROPERASI OP EXISTING 01 686.68 7.00
38,000 BEROPERASI OP EXISTING 01 524.90 40.00
14,850 BEROPERASI OP EXISTING 01 - -
14,320 BEROPERASI OP EXISTING 01 219.13 19.97
14,320 BEROPERASI OP EXISTING 01 230.08 14.38
14,320 PEMELIHARAAN OP EXISTING 01 231.47 7.52
14,320 BEROPERASI OP EXISTING 01 208.23 11.00
14,320 BEROPERASI OP EXISTING 01 149.28 3.55
14,320 BEROPERASI OP EXISTING 01 209.10 5.63
14,320 BEROPERASI OP EXISTING 01 260.83 123.30
12,000 BEROPERASI OP EXISTING 01 - -
50,000 BEROPERASI OP EXISTING 01 - -
18,000 BEROPERASI OP EXISTING 01 - -
20,000 BEROPERASI OP EXISTING 01 - -
20,000 BEROPERASI OP EXISTING 1
82,500.00 BEROPERASI OP EXISTING 01
KAPASITAS TANGKI TIMBUN

JAM HSD MFO IDO KONDISI HSD


GANGGU
(Jam)
Terpakai / Tdk
LITER LITER LITER (kWH)
Terpakai

11 12 13 14 15 16
- - - - - -
- 6,000,000 - - TERPAKAI -
- - - - - -
- - - - - -
0.92 - - - - -
3.47 - - - - -
0.15 - - - - -
- 626,000 - - TERPAKAI -
- 2,300,000 - - TERPAKAI 125,590.00
- - - - TERPAKAI 183,290.00
- - - - TERPAKAI 234,760.00
- - - - TERPAKAI 1,229,600.00
- - - - TERPAKAI 27,280.00
- - - - TERPAKAI 51,520.00
- - - - TERPAKAI 279,790.00
- - - - - -
- - - - - -
- - - - - -
- - - - - -

Bruto
68,795,696.31
Export
BA UPT 66,963,406.00

BA KWH 66,963,406.00
BIO
MFO IDO OLEIN
DIESEL

(kWH) (kWH) (kWH) (kWH)

17 18 19 20
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

PS Rugi Trafo Netto


690,791.00 1,491,055.31 66,613,850.00
Import Netto
349,556.00 66,613,850.00

349,556.00 66,613,850.00

SELISIH -
PRODUKSI (KWH)

GAS PANAS
BATUBARA GBB AIR
ALAM BUMI

(kWH) (kWH) (kWH) (kWH) (kWH)

FORM 12
21 22 23 24 25
- - - - -
- - - - -
- - - - -
- - - - -
- - - - 14,146,157
- - - - 17,575,657
- - - - 13,368,828
- - - - -
- 2,632,410.00 - - -
- 2,800,710.00 - - -
- 2,649,240.00 - - -
- 2,534,400.00 - - -
- 1,908,720.00 - - -
- 2,823,480.00 - - -
- 3,147,210.00 - - -
- - - - -
- - - - -
- - - - -
- - - - -
-
3,077,054.00

- 18,496,170 45,090,642

66,613,850.00000 92224479.0000001 630158 1454784 90139537


- 00
LAIN-
SURYA BIOMASS HFO BIO HSD CPO BIO FAME
LAIN

(kWH) (kWH) (kWH) (kWH) (kWH) (kWH) (kWH)

26 27 28 29 30 31 32
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

63,586,812
NOMINASI/PEMESA

HSD MFO IDO


PS SUSUT TRF
SENTRAL SENTRAL
LITER LITER LITER

33 34 35 36 37
- - - - -
16,720 28,081.00 - - -
5,355 20,422.00 - - -
- - - - -
79,597.59 274,766.38 - - -
98,894.70 226,148.62 - - -
75,223.71 377,107.31 - - -
- 14,094.00 - - -
43,163.69 73,594.26 1,632,000 -
46,700.67 79,624.83 - - -
45,135.64 76,956.44 - - -
87,812.03 100,438.29 1,632,000 - -
45,165.81 51,660.08 - - -
67,072.15 76,716.28 - - -
79,950.01 91,445.81 - - -
- - - - -
- - - - -
- - - - -
- - - - -

690,791 1,491,055
805607 415,000.00 390,607.00
NOMINASI/PEMESANAN BAHAN BAKAR

BIO GAS LAIN-


OLEIN BATUBARA GBB BIOMASS
DIESEL ALAM LAIN

LITER LITER (Kg) MMBTU

38 39 40 41 42 43 44
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - 132,545.00 - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
PEMAKAIAN BAHAN BAKAR

BIO GAS
HSD MFO IDO OLEIN BATUBARA
DIESEL ALAM

LITER LITER LITER LITER LITER (Kg) MMBTU

45 46 47 48 49 50 51
- - - - -
755.00 - - - -
60.00 - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
18,583.39 - - - 24,247.11177
27,121.18 - - - 26,406.24928
34,737.13 - - - 26,074.82161
181,942.31 - - - 23,083.42861
4,036.59 - - - 17,753.61066
7,623.35 - - - 25,742.39401
41,400.16 - - - 29,474.57406
- - - - -
- - - - -
- - - - -
- - - - -
-
- 38,427.81000

316,259 211,210
- -
AHAN BAKAR SUSU

LAIN-
GBB BIOMASS HFO BIO HSD CPO BIO FAME HSD MFO
LAIN

LITER LITER LITER LITER LITER LITER

52 53 54 55 56 57 58 59 60
- - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
BAHAN BAKAR

SUSUT, ALAT BERAT & LAIN - LAIN

BIO BATUBAR GAS LAIN-


IDO OLEIN GBB BIOMASS
DIESEL A ALAM LAIN

LITER LITER LITER (Kg) MMBTU

61 62 63 64 65 66 67 68
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
BAHAN BAKAR

PERSEDIAAN AWAL

BIO GAS
HSD MFO IDO OLEIN BATUBARA
DIESEL ALAM

LITER LITER LITER LITER LITER (Kg) MMBTU

FORM 13
69 70 71 72 73 74 75
- - - - - - -
376,642.00 - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
117,838.90 - - - - - -
795,340.00 - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -

-
SUPPLY/PENERIMAAN BAHAN BAKAR

LAIN- BIO
GBB BIOMASS HSD MFO IDO OLEIN BATUBARA
LAIN DIESEL

LITER LITER LITER LITER LITER (Kg)

FORM 13
76 77 78 79 80 81 82 83 84
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - 1,632,000 - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

-
BAHAN BAKAR HARGA DASAR (BELUM DI KALI PEMA

GAS LAIN- BIO


GBB BIOMASS HSD MFO IDO OLEIN
ALAM LAIN DIESEL

MMBTU LITER LITER LITER LITER LITER

85 86 87 88 89 90 91 92 93
- - - - - - - - -
- - - - 8,228.00 - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
132,545 - - - 8,228.00 - - - -
- - - - 8,228.00 - - - -
- - - - 8,228.00 - - - -
- - - - 8,228.00 - - - -
- - - - 8,228.00 - - - -
- - - - 8,228.00 - - - -
- - - - 8,228.00 - - - -
- - - - 8,228.00 - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

8,228.00
AR (BELUM DI KALI PEMAKAIAN) ONGKOS ANGK

BATUBAR GAS LAIN- BIO


GBB BIOMASS HSD MFO IDO
A ALAM LAIN DIESEL

(Kg) MMBTU PER LITER PER LITER PER LITER PER LITER

94 95 96 97 98 99 100 101 102


- - - - - - - - -
- 4.0000 - - - 94.50 - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- 4.5700 - - - 94.50 - - -
- 4.5700 - - - 94.50 - - -
- 4.5700 - - - 94.50 - - -
- 4.5700 - - - 94.50 - - -
- 4.5700 - - - 94.50 - - -
- 4.5700 - - - 94.50 - - -
- 4.5700 - - - 94.50 - - -
- 4.5700 - - - 94.50 - - -
- 4.0000 - - - - - - -
- 4.0000 - - - - - - -
- 4.0000 - - - - - - -
- 4.0000 - - - - - - -
4.2600
4.5700 94.5
PELUMAS
ONGKOS ANGKUT

PERSEDIA
BATUBAR GAS LAIN-
OLEIN GBB BIOMASS PEMAKAIAN SUSUT AN
A ALAM LAIN
AWAL
PER
PER LITER PER (Kg) LITER LITER LITER
MMBTU

FORM 14
103 104 105 106 107 108 109 110 111
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - 0.47 - - - - - -
- - 0.47 - - - - - -
- - 0.47 - - - - - -
- - 0.47 - - - 600.00 - -
- - 0.47 - - - 600.00 - -
- - 0.47 - - - - - -
- - 0.47 - - - 700.00 - -
- - 0.47 - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

0.47

1,900
-
NILAI KALOR
RATA RATA
PELUMAS

ONGKOS BIO
SUPPLY HARGA HSD MFO IDO OLEIN BATUBARA
ANGKUT DIESEL

LITER PER LITER PER LITER K cal / Liter K cal / Liter K cal / Liter K cal / Liter K cal / Liter K cal / Kg

FORM 14
112 113 114 115 116 117 118 119 120
- - - - - - - - -
- - - 9,060 - - - - -
- - - 9,060 - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - 9,060 - - - - -
- - - 9,060 - - - - -
- - - 9,060 - - - - -
- - - 9,060 - - - - -
- - - 9,060 - - - - -
- - - 9,060 - - - - -
- - - 9,060 - - - - -
- - - 9,060 - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

9060
GAS LAIN-
GBB BIOMASS HFO BIO HSD CPO BIO FAME
ALAM LAIN

Kcal /
Kcal / MMBTU K cal / Liter K cal / Liter K cal / Liter K cal / Liter K cal / Liter
MMBTU

121 122 123 124 125 126 127 128


- - -
252,000 - -
252,000 - -
- - -
- - -
- - -
- - -
252,000 - -
252,000 - -
252,000 - -
252,000 - -
252,000 - -
252,000 - -
252,000 - -
252,000 - -
252,000 - -
252,000 - -
252,000 - -
252,000 - -
252,000
252,000
NAMA & NAMA JENIS JENIS JENIS
NO STATUS KODE CABANG KODE LOKASI PERUSAHAA PEMBANGKI PEMBANGKI BAHAN
CABANG SENTRAL PEMBANGKI T-BAHAN
T N BAKAR T BAKAR

1 S 2272134 CAB. PEKANB22721340103PLTG SW RIAU POWER #01 PLTG-GAS PLTG GAS


2 S 2272134 CAB. PEKANB22721340103PLTG SW ST RIAU POWER # PLTG-GAS PLTG GAS
5 S 2272134 CAB. PEKANB22721340305PLTMG SW TELUK LEMBU # PLTD-GAS PLTD GAS
6 S 2272134 CAB. PEKANB22721340307PLTMG SW TELUK LEMBU # PLTD-GAS PLTD GAS
7 S 2272134 CAB. PEKANB22721340308PLTMG SW TELUK LEMBU #0PLTD-GAS PLTD GAS
8 S 2272134 CAB. PEKANB22721340311PLTMG SW TELUK LEMBU #0PLTD-GAS PLTD GAS
9 S 2272134 CAB. PEKANB22721340310PLTG SW BALAI PUNGUT DURPLTG-GAS PLTG GAS
10 S 2272134 CAB. PEKANB22721340308PLTMG SW BALAI PUNGUT PLTD-GAS PLTD GAS
11 S CAB. PEKANBARU PLTMG SW SIAK #01 25MW PLTD-GAS PLTD GAS
12 S CAB. PEKANBARU PLTG SW MPP BATAM RIAU PLTD-GAS PLTD GAS

PILIHAN
PILIHAN DISALURKA
SKEMA N

PLTG SW RIAU POWER #0120 KV


PLTG SW ST RIAU POWER 20 KV
PLTMG SW TELUK LEMBU #20 kV
PLTMG SW TELUK LEMBU #20 KV
PLTMG SW TELUK LEMBU #20 KV
PLTMG SW TELUK LEMBU #150 kV
PLTG SW BALAI PUNGUT DU
150 kV
PLTMG SW BALAI PUNGUT20 kV
PLTMG SW SIAK #01 25MW20 KV
PLTG SW MPP BATAM RIAU #01 25MW (PT PLN BATAM)
PT PLN (persero) SEKTOR PEMBANGKITAN PEKANBARU
SEKTOR PEKANBARU

Pengusahaan Pembangkitan
LAPORAN FEBRUARI 2017

NAMA & NAMA JENIS JENIS JENIS


NO STATUS KODE CABANG KODE LOKASI PERUSAHAA PEMBANGKI PEMBANGKI BAHAN
CABANG SENTRAL PEMBANGKI T-BAHAN
T N BAKAR T BAKAR

1 S 2272134 CAB. PEKANB22721340103PLTGU SW RIAPLTGU SW RIA PLTG-GAS PLTG GAS


2 S 2272135 CAB. PEKANB22721340103PLTGU SW RIAPLTGU SW RIA PLTG-GAS PLTG GAS
3 S 2272136 CAB. PEKANB22721340305PLTG SW BALAPLTG SW BALA PLTD-GAS PLTD GAS
4 S 2272137 CAB. PEKANB22721340307PLTMG SW BAPLTMG SW BA PLTD-GAS PLTD GAS
5 S 2272138 CAB. PEKANB22721340308PLTMG SW TEPLTMG SW TE PLTD-GAS PLTD GAS
6 S 2272139 CAB. PEKANB22721340311PLTMG SW TEPLTMG SW TE PLTD-GAS PLTD GAS
7 S 2272140 CAB. PEKANB22721340310PLTMG SW TEL
PLTMG SW TELPLTG-GAS PLTG GAS
8 S 2272141 CAB. PEKANB22721340308PLTMG SW TEL
PLTMG SW TEL PLTD-GAS PLTD GAS
9 S 2272142 CAB. PEKANBARU PLTMG SW SI PLTMG SW SI PLTD-GAS PLTD GAS
10 S 2272143 CAB. PEKANBARU PLTG SW MPPPLTG SW MPP PLTG-GAS PLTG HSD/GAS

PILIHAN PILIHAN
SKEMA DISALURKA
N

PLTGU SW
RIAU #01
(GT 1.1) (PT
RIAU
POWER)
20 KV

PLTGU SW
RIAU #02
(ST 1.0) (PT
RIAU
POWER)
20 KV
PLTG SW
BALAI
PUNGUT
DURI (PT
PJB)
150 kV

PLTMG SW
BALAI
PUNGUT (PT
MAX
POWER)
20 KV

PLTMG SW
TELUK
LEMBU I
(KSO HUTAN
ALAM)
20 KV

PLTMG SW
TELUK
LEMBU II
(KSO HUTAN
ALAM)
20 KV
PLTMG SW
TELUK
LEMBU I (PT
PJBS)
20 kV
PLTMG SW
TELUK
LEMBU II (PT
PJBS)
150 kV
PLTMG SW
SIAK (PT
WIKA RAWA
MINYAK)
20 KV
PLTG SW
MPP BALAI
PUNGUT (PT
PLN BATAM)
150 kV

PT PLN (persero) SEKTOR PEMBANGKITAN PEKANBARU


SEKTOR PEKANBARU

Pengusahaan Pembangkitan
LAPORAN MARET 2017

NAMA & NAMA JENIS JENIS JENIS


NO STATUS KODE CABANG KODE LOKASI PERUSAHAA PEMBANGKI PEMBANGKI BAHAN
CABANG SENTRAL PEMBANGKI N T-BAHAN T BAKAR
T BAKAR
1 S 2272134 CAB. PEKANB22721340103Err:509 Err:509 PLTG-GAS PLTG GAS
2 S 2272135 CAB. PEKANB22721340103Err:509 Err:509 PLTG-GAS PLTG GAS
3 S 2272136 CAB. PEKANB22721340305Err:509 Err:509 PLTD-GAS PLTD GAS
4 S 2272137 CAB. PEKANB22721340307Err:509 Err:509 PLTD-GAS PLTD GAS
5 S 2272138 CAB. PEKANB22721340308PLTMG SW TEPLTMG SW TE PLTD-GAS PLTD GAS
6 S 2272139 CAB. PEKANB22721340311PLTMG SW TEPLTMG SW TE PLTD-GAS PLTD GAS
7 S 2272140 CAB. PEKANB22721340310PLTMG SW TEL
PLTMG SW TELPLTG-GAS PLTG GAS
8 S 2272141 CAB. PEKANB22721340308PLTMG SW TEL
PLTMG SW TEL PLTD-GAS PLTD GAS
9 S 2272142 CAB. PEKANBARU PLTMG SEWAPLTMG SEWA PLTD-GAS PLTD GAS
10 S 2272143 CAB. PEKANBARU PLTG IPP MPPPLTG IPP MPP PLTG-GAS PLTG HSD/GAS

PILIHAN PILIHAN
DISALURKA
SKEMA N
0 20 KV
0 20 KV
0 150 kV
0 20 KV

PLTMG SW
TELUK
LEMBU I
(KSO HUTAN
ALAM)
20 KV

PLTMG SW
TELUK
LEMBU II
(KSO HUTAN
ALAM)
20 KV
PLTMG SW
TELUK
LEMBU I (PT
PJBS)
20 kV
PLTMG SW
TELUK
LEMBU II (PT
PJBS)
150 kV
PLTMG
SEWA (PT
WIKA RAWA
MINYAK
SIAK)
20 KV
PLTG IPP
MPP BALAI
PUNGUT (PT
PLN BATAM)
150 kV
DAYA
MAMPU
JUMLAH DAYA DISALURKA SISTEM BERDASARK MULAI KONTRAK
UNIT TERPASANG N SEWA
AN
KONTRAK

AWAL
DD/MM/ NO AKHIR
YYYY) KONTRAK (DD/MM/YY (DD/MM/YYYY)
YY)

(kW) (kW)

1 21,600 20 KV ISOLATED 18,000 7/4/2007 259.PJ/061/ 9/30/2004 7/31/2017


1 10,000 20 KV ISOLATED 8,000 7/9/2013 077.PJ/61/KI 6/7/2010 7/31/2017
14 16,000 20 kV ISOLATED 12,000 12/18/2012 149.PJ/61/KI 8/14/2012 4/16/2017
7 60,000 20 KV ISOLATED 50,000 6/4/2014 212.PJ/61/KI 12/14/2012 6/3/2019
11 33,000 20 KV ISOLATED 24,000 7/12/2013 198.PJ/61/KI 3/11/2013 7/12/2016
11 33,000 150 kV GRID 24,000 3/10/2015 004.PJ/DAN.0 2/6/2015 3/10/2017
1 21,000 150 kV GRID 17,000 7/5/2012 155.PJ/61/KI 8/18/2011 7/5/2016
16 50,000 20 kV ISOLATED 32,000 1/10/2014 210.PJ/61/KI 12/11/2012 7/15/2016
14 25,000 20 kV ISOLATED 20,000 1/25/2016 128.PJ/61/KI 7/20/2012 1/25/2023
14 25,000 20 kV GRID 20,000 12/22/2016 236.PJ/EPI.0 12/22/2016 12/21/2036

PILIHAN HSD MFO IDO BIO DIESEL OLEIN BATUBARA GAS ALAM
SISTEM

ISOLATED -
ISOLATED -
ISOLATED 45,198,778.00
ISOLATED 143,766,671.00
ISOLATED 54,121,128.00
GRID 44,539,100.00
GRID - - -
ISOLATED - - -
ISOLATED 14,527,178.17
(PT PLN BATAM) 91,124,211.00
DAYA
MAMPU
JUMLAH DAYA DISALURKA SISTEM BERDASARK MULAI KONTRAK
UNIT TERPASANG N SEWA
AN
KONTRAK

AWAL
DD/MM/ NO AKHIR
YYYY) KONTRAK (DD/MM/YY (DD/MM/YYYY)
YY)

(kW) (kW)

1 20,000 20 KV ISOLATED 18,000 7/4/2007 259.PJ/061/ 9/30/2004 7/31/2017


1 10,000 20 KV ISOLATED 8,000 7/9/2013 077.PJ/61/KI 6/7/2010 7/31/2017
1 20,000 150 kV GRID 12,000 7/5/2012 155.PJ/61/KI 8/18/2011 7/5/2016
14 40,000 20 KV ISOLATED 50,000 1/10/2014 210.PJ/61/KI 12/11/2012 1/15/2017
16 16,000 20 KV ISOLATED 24,000 12/18/2012 149.PJ/61/KI 8/14/2012 4/16/2017
7 50,000 20 KV ISOLATED 24,000 6/4/2014 212.PJ/61/KI 12/14/2012 6/3/2019
11 30,000 20 kV ISOLATED 17,000 7/12/2013 198.PJ/61/KI 3/11/2013 1/12/2017
11 30,000 150 kV GRID 32,000 3/10/2015 004.PJ/DAN.0 2/6/2015 3/10/2017
24 20,000 20 kV ISOLATED 20,000 1/25/2016 128.PJ/61/KI 7/20/2012 1/25/2023
3 75,000 150 kV GRID 75,000

KWH NETTO

PILIHAN
SISTEM HSD MFO IDO BIO DIESEL OLEIN BATUBARA GAS ALAM

11,231,985.00

ISOLATED

ISOLATED
-

GRID

21,033,638.00

ISOLATED

8,112,718.00

ISOLATED

27,018,440.00

ISOLATED

11,125,604.00

ISOLATED - -

14,822,900.00

GRID - -

370,778.18

ISOLATED

GRID 3,300,704

DAYA
MAMPU
JUMLAH DAYA DISALURKA SISTEM BERDASARK MULAI KONTRAK
UNIT TERPASANG N AN SEWA
KONTRAK
AWAL
DD/MM/ NO (DD/MM/YY AKHIR
YYYY) KONTRAK YY) (DD/MM/YYYY)

(kW) (kW)

1 20,000 20 KV ISOLATED 18,000 7/4/2007 259.PJ/061/ 9/30/2004 7/31/2017


1 10,000 20 KV ISOLATED 8,000 7/9/2013 077.PJ/61/KI 6/7/2010 7/31/2017
1 20,000 150 kV GRID 12,000 7/5/2012 155.PJ/61/KI 8/18/2011 7/5/2016
14 40,000 20 KV ISOLATED 50,000 1/10/2014 210.PJ/61/KI 12/11/2012 1/15/2017
16 16,000 20 KV ISOLATED 24,000 12/18/2012 149.PJ/61/KI 8/14/2012 4/16/2017
7 50,000 20 KV ISOLATED 24,000 6/4/2014 212.PJ/61/KI 12/14/2012 6/3/2019
11 30,000 20 kV ISOLATED 17,000 7/12/2013 198.PJ/61/KI 3/11/2013 1/12/2017
11 30,000 150 kV GRID 32,000 3/10/2015 004.PJ/DAN.0 2/6/2015 3/10/2017
24 20,000 20 kV ISOLATED 20,000 1/25/2016 128.PJ/61/KI 7/20/2012 1/25/2023
3 75,000 150 kV GRID 75,000

KWH NETTO

PILIHAN
HSD MFO IDO BIO DIESEL OLEIN BATUBARA GAS ALAM
SISTEM

ISOLATED -
ISOLATED -
GRID -
ISOLATED -

ISOLATED

ISOLATED

ISOLATED - -

GRID - -
-

ISOLATED

3,077,054.00

GRID -
SKEMA TOTAL PRODUKSI VOLUME KETERANGA
(BOO, BOT) BAHAN BAKAR N

TARA
KALOR
(kKal/kWh)
CF (%) /
SFC
(ltr/kWh)

(LITER, MMBTU,
PILIIH NILAI (kWH)
KG)

80 TARA KALOR 252,000.000 - -


80 TARA KALOR 252,000.000 - -
80 TARA KALOR 252,000.000 45,198,778.00 594,628.57
85 TARA KALOR 252,000.000 143,766,671.00 1,875,304.80
80 TARA KALOR 252,000.000 54,121,128.00 606,521.04
80 TARA KALOR 252,000.000 44,539,100.00 832,062.37
80 TARA KALOR 252,000.000 - 222,561.83
80 TARA KALOR 252,000.000 - 735,864.22
80 TARA KALOR 252,000.000 14,527,178.17 601,509.50 -
80 TARA KALOR 252,000.000 91,124,211.00 1,682,032.88 -
- -
PEMAKAIAN BAHAN BAKAR

GBB PANAS BUMI AIR SURYA BIOMASS LAIN- HSD MFO IDO
LAIN

-
-

- -
-
SKEMA TOTAL PRODUKSI VOLUME KETERANGA
(BOO, BOT) BAHAN BAKAR N

TARA
KALOR
(kKal/kWh)
CF (%) /
SFC
(ltr/kWh)

(LITER, MMBTU,
PILIIH NILAI (kWH)
KG)

80 TARA KALOR 252,000.000 11,231,985.00 Err:509


80 TARA KALOR 252,000.000 - Err:509
80 TARA KALOR 252,000.000 - Err:509
65 TARA KALOR 252,000.000 21,033,638.00 Err:509
80 TARA KALOR 252,000.000 8,112,718.00 Err:509
100 TARA KALOR 252,000.000 27,018,440.00 Err:509
60 TARA KALOR 252,000.000 11,125,604.00 Err:509
60 TARA KALOR 252,000.000 14,822,900.00 Err:509
100 TARA KALOR 252,000.000 370,778.18 Err:509 -
100 3,300,704.00 1,029,128.79
-
-
PEMAKAIAN BAHAN BAKAR

LAIN-
GBB PANAS BUMI AIR SURYA BIOMASS LAIN HSD MFO IDO
-

### -
-

SKEMA TOTAL PRODUKSI VOLUME KETERANGA


(BOO, BOT) BAHAN BAKAR N
TARA
KALOR
(kKal/kWh)
CF (%) /
SFC
(ltr/kWh)

PILIIH NILAI (kWH) (LITER, MMBTU,


KG)

80 TARA KALOR Err:509 Err:509 Err:509


80 TARA KALOR Err:509 Err:509 Err:509
80 TARA KALOR Err:509 Err:509 Err:509
65 TARA KALOR Err:509 Err:509 Err:509
80 TARA KALOR 252,000.000 - -
100 TARA KALOR 252,000.000 - -
60 TARA KALOR 252,000.000 - -
60 TARA KALOR 252,000.000 - -
100 TARA KALOR 252,000.000 - - 0
70 TARA KALOR 252,000.000 3,077,054.00 38,427.81 Gas
- - HSD 0
0
PEMAKAIAN BAHAN BAKAR

LAIN-
GBB PANAS BUMI AIR SURYA BIOMASS HSD MFO IDO
LAIN

-
-
Err:509 0
TARA KALOR BOO 20 kV ISOLATED
SFC BOT 70 kV GRID
150 kV

BIO DIESEL OLEIN BATUBARA GAS ALAM GBB BIOMASS LAIN-


LAIN

-
-
594,628.57
###
606,521.04
832,062.37
- 222,561.83
- 735,864.22
601,509.50
###
TARA KALOR BOO 20 kV ISOLATED

SFC BOT 70 kV GRID


150 kV

LAIN-
BIO DIESEL OLEIN BATUBARA GAS ALAM GBB BIOMASS LAIN

-
-

-
TARA KALOR BOO 20 kV ISOLATED

SFC BOT 70 kV GRID


150 kV

LAIN-
BIO DIESEL OLEIN BATUBARA GAS ALAM GBB BIOMASS
LAIN

-
-
-
-

-
-

38,427.81
0 0

0 0

0 0
0 0
0 0
0 0
0 0 0 0

0 0 0 0

0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0

0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0

0 0 0 0

0 0 0 0
0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0
0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0

0 0

0 0
0 0
0 0
0 0
0 0

0 0

0 0
0 0

0 0 0 0
0 0 0 0

0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0

0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0
0 0

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
PT PLN (PERSERO) PEMBANGKITAN SUMBAGUT
SEKTOR PEMBANGKITAN PEKANBARU
Jln. Dr. Tanjung Datuk No 74
LAPORAN KUMULATIF JAM41855/41856
Telp. (0761) KERJA , JAM GANGGUAN, JAM PEMELIHARAAN PEMBANGKIT
PT PLN (PERSERO) UNIT INDUK PEMBANGKITAN SUMBAGUT SEKTOR PEMBANGKITAN PEKANBARU
UNIT PELAKSANA PENGENDALIAN PEMBANGKITAN PEKANBARU
TAHUN 2022
Jln. Dr. Tanjung Datuk No 74
Telp. (0761) 41855/41856
Hal. 8
I. PL KOTA PANJANG
PLTA UNIT 1
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 672.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,760.00
2 Kerja 641.15 641.15 696.08 630.98 489.37 500.55 413.63 540.43 445.87 366.53 477.77 556.12 6,399.63
3 Pemeliharaan 5.90 12.58 9.70 1.75 3.48 4.10 - 6.60 7.33 7.32 6.60 5.13 70.49
4 PO ( Har Terencana ) - - - - - - - - - - - - -
5 MO ( Har Tdk Terencana ) 5.90 12.58 9.70 1.75 3.48 4.10 - 6.60 7.33 7.32 6.60 5.13 70.50
6 Jumlah Jam Standby 23.60 89.27 13.18 111.00 227.15 233.05 279.30 196.20 290.80 343.13 259.63 181.84 2,248.15
7 Standby 23.60 89.27 13.18 111.00 227.15 233.05 279.30 196.20 290.80 343.13 259.63 181.84 2,248.16
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam 1.35 1.00 1.03 0.27 - 6.30 51.07 0.77 - 3.02 - 0.92 65.72
10 Sejak YM/CI/TO (JSYM/CI/TO) 1,629.03 2,247.17 2,943.25 3,574.23 4,063.60 4,564.15 4,977.78 5,518.22 6,409.95 6,330.62 6,808.38 7,364.50
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) 1,629.03 2,247.17 2,943.25 3,574.23 4,063.60 4,564.15 4,977.78 5,518.22 6,409.95 6,330.62 6,808.38 7,364.50
12 Sejak MO/MI (JSMO/MI) 1,629.03 2,247.17 2,943.25 3,574.23 4,063.60 4,564.15 4,977.78 5,518.22 6,409.95 6,330.62 6,808.38 7,364.50
13 Sejak Beroperasi (JSB) 161,996.58 162,614.71 163,310.80 163,941.78 164,431.15 164,931.70 165,345.33 165,885.76 166,777.50 166,698.16 167,175.93 167,732.05
PLTA UNIT 2
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 672.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,760.00
2 Kerja 691.43 691.43 643.07 354.05 340.45 358.43 466.30 474.75 632.82 716.80 651.55 686.68 6,707.77
3 Pemeliharaan 3.78 4.67 24.70 4.18 7.53 6.58 134.52 5.82 6.95 5.08 6.83 7.00 217.64
4 PO ( Har Terencana ) - - - - - - 134.52 - - - - - 134.52
5 MO ( Har Tdk Terencana ) 3.78 4.67 24.70 4.18 7.53 6.58 - 5.82 6.95 5.08 6.83 7.00 83.13
6 Jumlah Jam Standby (23.21) 47.90 52.23 376.85 372.02 378.84 91.63 260.91 95.65 (1.88) 85.62 46.85 1,783.41
7 Standby (23.21) 47.90 52.23 376.85 372.02 378.84 91.63 260.91 95.65 (1.88) 85.62 46.85 1,783.41
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam - - - 8.92 - 0.15 51.55 2.52 8.58 - - 3.47 75.18
10 Sejak YM/CI/TO (JSYM/CI/TO) 4,845.93 5,207.06 5,850.13 6,204.14 6,544.59 6,903.03 466.30 941.05 2,206.68 2,290.67 2,942.22 3,628.90
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) 10,907.82 11,268.95 11,912.02 12,266.03 12,606.48 12,964.92 13,431.22 13,905.97 15,171.60 15,255.58 15,907.13 16,593.82
12 Sejak MO/MI (JSMO/MI) 35,289.85 35,650.98 36,294.05 36,648.07 36,988.52 37,346.95 37,813.25 38,288.00 39,553.63 39,637.62 40,289.17 40,975.85
13 Sejak Beroperasi (JSB) 166,365.98 166,727.11 167,370.18 167,724.20 168,064.65 168,423.08 168,889.38 169,364.13 170,629.76 170,713.75 171,365.30 172,051.98
PLTA UNIT 3
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 672.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,760.00
2 Kerja 221.92 221.92 510.45 330.30 649.27 542.92 461.45 461.25 486.08 450.98 355.92 519.57 5,212.02
3 Pemeliharaan 5.23 5.55 19.00 4.05 38.75 4.03 7.50 7.50 - 4.62 3.92 40.00 140.15
4 PO ( Har Terencana ) - - - - - - - - - - - 40.00 40.00
5 MO ( Har Tdk Terencana ) 5.23 5.55 19.00 4.05 38.75 4.03 7.50 7.50 - 4.62 3.92 - 100.15
6 Jumlah Jam Standby 442.25 506.93 190.12 409.33 30.73 197.05 235.37 235.57 257.73 264.40 383.50 184.28 3,337.26
7 Standby 442.25 506.93 190.12 409.33 30.73 197.05 235.37 235.57 257.73 264.40 383.50 184.28 3,337.27
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam 2.60 9.60 0.43 0.32 1.25 - 39.68 39.68 0.18 - 0.67 0.15 94.57
10 Sejak YM/CI/TO (JSYM/CI/TO) 1,460.37 1,877.94 2,388.39 2,718.69 3,367.95 3,910.87 4,372.32 4,833.57 5,805.74 5,770.64 6,126.55 6,646.12
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) 36,013.15 36,430.72 36,941.17 37,271.47 37,920.74 38,463.65 38,925.10 39,386.35 40,358.52 40,323.42 40,679.34 41,198.90
12 Sejak MO/MI (JSMO/MI) 52,731.70 53,149.27 53,659.72 53,990.02 54,639.29 55,182.20 55,643.65 56,104.90 57,077.07 57,041.97 57,397.89 57,917.45
13 Sejak Beroperasi (JSB) 167,736.17 168,153.74 168,664.19 168,994.49 169,643.76 170,186.67 170,648.12 171,109.37 172,081.54 172,046.44 172,402.36 172,921.92
TOTAL PLTA
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 2,232.00 2,016.00 2,232.00 2,160.00 2,232.00 2,160.00 2,232.00 2,232.00 2,160.00 2,232.00 2,160.00 2,232.00 26,280.00
2 Kerja 1,554.50 1,554.50 1,849.60 1,315.33 1,479.08 1,401.90 1,341.38 1,476.43 1,564.77 1,534.32 1,485.23 1,762.37 18,319.42
3 Pemeliharaan 14.91 22.80 53.40 9.98 49.76 14.71 142.02 19.92 14.28 17.02 17.35 52.13 428.28
4 PO ( Har Terencana ) - - - - - - 134.52 - - - - 40.00 174.52
5 MO ( Har Tdk Terencana ) 14.92 22.80 53.40 9.98 49.77 14.72 7.50 19.92 14.28 17.02 17.35 12.13 253.78
6 Jumlah Jam Standby 442.64 644.10 255.53 897.18 629.90 808.94 606.30 692.68 644.18 605.65 728.75 412.97 7,368.82
7 Standby 442.64 644.10 255.53 897.19 629.91 808.94 606.30 692.68 644.19 605.65 728.75 412.97 7,368.84
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam 3.95 10.60 1.47 9.50 1.25 6.45 142.30 42.97 8.77 3.02 0.67 4.53 235.47
II. PL TELUK LEMBU Hal. 8
PLTG UNIT 2
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 672.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,760.00
2 Kerja - - - - - - - - - - - - -
3 Pemeliharaan - - - - - - - - - - - - -
4 PO ( Har Terencana ) - - - - - - - - - - - - -
5 MO ( Har Tdk Terencana ) - - - - - - - - - - - - -
6 Jumlah Jam Standby 672.00 744.00 720.00 744.00 720.00 744.00 744.00 744.00 744.00 720.00 744.00 744.00 8,784.00
7 Standby - - - - - - - - - - - - -
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam - - - - - - - - - - - - -
10 Sejak YM/CI/TO (JSYM/CI/TO) 5,558.13 5,558.13 5,558.13 5,558.13 5,558.13 5,558.13 5,558.13 5,558.13 5,558.13 5,558.13 5,558.13 5,558.13
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) 166.70 166.70 166.70 166.70 166.70 166.70 166.70 166.70 166.70 166.70 166.70 166.70
12 Sejak MO/MI (JSMO/MI) 8,107.96 8,107.96 8,107.96 8,107.96 8,107.96 8,107.96 8,107.96 8,107.96 8,107.96 8,107.96 8,107.96 8,107.96
13 Sejak Beroperasi (JSB) 81,027.71 81,027.71 81,027.71 81,027.71 81,027.71 81,027.71 81,027.71 81,027.71 81,027.71 81,027.71 81,027.71 81,027.71
PLTG UNIT 3
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 672.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,760.00
2 Kerja - - - - - - - - - - - - -
3 Pemeliharaan - - - - - - - - - - - - -
4 PO ( Har Terencana ) - - - - - - - - - - - - -
5 MO ( Har Tdk Terencana ) - - - - - - - - - - - - -
6 Jumlah Jam Standby 672.00 744.00 720.00 744.00 720.00 744.00 744.00 744.00 744.00 720.00 744.00 744.00 8,784.00
7 Standby - - - - - - - - - - - - -
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam - - - - - - - - - - - - -
10 Sejak YM/CI/TO (JSYM/CI/TO) 92.90 92.90 92.90 92.90 92.90 92.90 92.90 92.90 92.90 92.90 92.90 92.90
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) 5,289.33 5,289.33 5,289.33 5,289.33 5,289.33 5,289.33 5,289.33 5,289.33 5,289.33 5,289.33 5,289.33 5,289.33
12 Sejak MO/MI (JSMO/MI) 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00
13 Sejak Beroperasi (JSB) 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00 18,700.00
TOTAL PLTG
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 1,488.00 1,344.00 1,488.00 1,440.00 1,488.00 1,440.00 1,488.00 1,488.00 1,440.00 1,488.00 1,440.00 1,488.00 17,520.00
2 Kerja - - - - - - - - - - - - -
3 Pemeliharaan - - - - - - - - - - - - -
4 PO ( Har Terencana ) - - - - - - - - - - - - -
5 MO ( Har Tdk Terencana ) - - - - - - - - - - - - -
6 Jumlah Jam Standby 1,344.00 1,488.00 1,440.00 1,488.00 1,440.00 1,488.00 1,488.00 1,488.00 1,488.00 1,440.00 1,488.00 1,488.00 17,568.00
7 Standby - - - - - - - - - - - - -
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam - - - - - - - - - - - - -
III. PL BALAI PUNGUT Hal. 8
PLTG UNIT 2
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 672.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,760.00
2 Kerja - - - - - - - - - - - - -
3 Pemeliharaan - - - - - - - - - - - - -
4 PO ( Har Terencana ) - - - - - - - - - - - - -
5 MO ( Har Tdk Terencana ) - - - - - - - - - - - - -
6 Jumlah Jam Standby 672 744 720 744 720 744 744 744 744 720 744 744 8,784.00
7 Standby 672 744 720 744 720 744 744 744 744 720 744 744 8,784.00
8 Gangguan luar 744.00 672.00 - - - - - - - - - - 1,416.00
9 gangguan dalam - - - - - - - - - - - - -
10 Sejak YM/CI/TO (JSYM/CI/TO) 791.35 791.35 791.35 791.35 791.35 791.35 791.35 791.35 791.35 791.35 791.35 791.35 791.35
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) 9,921.67 9,921.67 9,921.67 9,921.67 9,921.67 9,921.67 9,921.67 9,921.67 9,921.67 9,921.67 9,921.67 9,921.67 9,921.67
12 Sejak MO/MI (JSMO/MI) 34,341.47 34,341.47 34,341.47 34,341.47 34,341.47 34,341.47 34,341.47 34,341.47 34,341.47 34,341.47 34,341.47 34,341.47
13 Sejak Beroperasi (JSB) 124,821.55 124,821.55 124,821.55 124,821.55 124,821.55 124,821.55 124,821.55 124,821.55 124,821.55 124,821.55 124,821.55 124,821.55
PLTMG UNIT 1
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 672.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,760.00
2 Kerja 217.00 217.00 345.00 220.15 417.83 230.93 378.00 461.00 426.00 426.00 316.00 215.00 3,869.92
3 Pemeliharaan 6.10 - 9.18 108.30 10.13 13.00 4.63 16.28 8.28 16.78 4.97 19.97 217.62
4 PO ( Har Terencana ) - - - 105.22 - 13.00 - 7.18 - - - - 125.40
5 MO ( Har Tdk Terencana ) 6.10 - 9.18 3.08 10.13 - 4.63 9.10 8.28 16.78 4.97 19.97 92.22
6 Jumlah Jam Standby 447.03 442.83 356.64 415.55 292.04 499.88 360.04 265.30 305.52 277.22 420.63 509.03 4,591.71
7 Standby 447.03 442.83 356.64 415.55 292.04 499.88 360.04 265.30 305.52 277.22 420.63 509.03 4,591.71
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam 1.87 84.17 9.18 - - 0.18 1.33 1.42 4.20 - 2.40 - 104.75
10 Sejak YM/CI/TO (JSYM/CI/TO) - - - - - - - - - - - - -
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) - - - - - - - - - - - - -
12 Sejak MO/MI (JSMO/MI) - - - - - - - - - - - - -
13 Sejak Beroperasi (JSB) 52,268.00 52,499.00 52,844.00 53,067.00 53,492.00 53,724.00 54,102.00 54,563.00 54,989.00 54,989.00 55,493.00 55,708.00 53,724.00
PLTMG UNIT 2
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 672.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,760.00
2 Kerja 220.00 220.00 327.00 262.03 426.50 153.30 477.00 562.00 349.00 349.00 295.00 232.00 3,872.83
3 Pemeliharaan - 10.05 - 7.88 5.20 1.98 4.57 7.68 - 18.42 11.22 14.38 81.38
4 PO ( Har Terencana ) 34.10 - 14.08 - 136.00 136.67 40.02 - 107.80 - - - 468.67
5 MO ( Har Tdk Terencana ) - 10.05 - 7.88 5.20 1.98 4.57 7.68 - 18.42 11.22 14.38 81.38
6 Jumlah Jam Standby 417.90 511.55 378.92 470.34 151.75 448.48 222.41 171.19 283.13 352.58 432.71 497.62 4,338.58
7 Standby 417.90 511.55 378.92 470.34 151.75 448.48 222.41 171.19 283.13 352.58 432.71 497.62 4,338.58
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam - 2.40 - 3.75 0.55 3.57 - 3.13 4.07 - 5.07 - 22.54
10 Sejak YM/CI/TO (JSYM/CI/TO) - - - - - - - - - - - - -
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) - - - - - - - - - - - - -
12 Sejak MO/MI (JSMO/MI) - - - - - - - - - - - - -
13 Sejak Beroperasi (JSB) 40,513.00 40,826.00 41,153.00 41,411.00 41,818.00 41,966.00 42,443.00 43,005.00 43,354.00 43,354.00 43,874.00 44,106.00 41,818.00
PLTMG UNIT 3
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 672.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,760.00
2 Kerja 208.00 208.00 304.00 245.20 371.10 213.27 376.00 135.00 182.00 182.00 378.00 237.00 2,802.57
3 Pemeliharaan 40.12 3.13 70.10 5.53 8.75 5.40 5.00 527.93 569.73 - 7.40 7.52 1,243.09
4 PO ( Har Terencana ) 40.12 3.13 64.05 - - - - 527.93 569.73 - - - 1,204.96
5 MO ( Har Tdk Terencana ) - - 6.05 5.53 8.75 5.40 5.00 - - - 7.40 7.52 38.13
6 Jumlah Jam Standby 423.88 508.50 345.90 493.27 340.15 525.33 360.75 81.07 (7.73) 538.00 357.55 499.48 3,966.67
7 Standby 423.88 508.50 345.90 493.27 340.15 525.33 360.75 81.07 (7.73) 538.00 357.55 499.48 3,966.67
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam - 24.37 - - - - 2.25 - - - 1.05 - 27.67
10 Sejak YM/CI/TO (JSYM/CI/TO) - - - - - - - - - - - - -
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) - - - - - - - - - - - - -
12 Sejak MO/MI (JSMO/MI) - - - - - - - - - - - - -
13 Sejak Beroperasi (JSB) 47,210.00 47,471.00 47,775.00 48,012.00 48,388.00 48,603.00 48,979.00 49,114.00 49,296.00 49,296.00 49,933.00 50,170.00 48,388.00
PLTMG UNIT 4
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 696.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,784.00
2 Kerja 323.00 323.00 236.00 261.63 431.20 221.70 500.00 568.00 414.00 414.00 362.00 210.00 4,264.53
3 Pemeliharaan 18.23 - 342.90 6.45 6.60 17.08 7.58 9.17 5.73 7.62 7.43 11.00 439.79
4 PO ( Har Terencana ) 14.53 - 342.90 - - 15.25 - - - - 7.43 - 380.11
5 MO ( Har Tdk Terencana ) 3.70 - - 6.45 6.60 1.83 7.58 9.17 5.73 7.62 - 11.00 59.68
6 Jumlah Jam Standby 330.77 421.00 141.10 474.09 280.92 449.38 236.42 166.83 319.02 298.38 371.89 523.00 4,012.80
7 Standby 330.77 421.00 141.10 474.09 280.92 449.38 236.42 166.83 319.02 298.38 371.89 523.00 4,012.80
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam - - - 1.83 1.28 55.84 - - 5.25 - 2.68 - 66.88
10 Sejak YM/CI/TO (JSYM/CI/TO) - - - - - - - - - - - - -
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) - - - - - - - - - - - - -
12 Sejak MO/MI (JSMO/MI) - - - - - - - - - - - - -
13 Sejak Beroperasi (JSB) 53,952.00 54,119.00 54,355.00 54,612.00 55,046.00 55,266.00 55,766.00 56,334.00 56,748.00 56,748.00 57,387.00 57,597.00 55,266.00
PLTMG UNIT 5
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 672.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,760.00
2 Kerja 354.00 354.00 342.00 270.58 475.28 269.08 463.00 472.00 451.00 451.00 337.00 147.00 4,385.95
3 Pemeliharaan 13.17 8.22 2.97 45.55 10.08 2.73 44.60 8.17 8.90 64.78 5.75 3.55 218.47
4 PO ( Har Terencana ) 13.17 - - 40.10 - - 41.60 - - - - - 94.87
5 MO ( Har Tdk Terencana ) - 8.22 2.97 5.45 10.08 2.73 3.00 8.17 8.90 64.78 5.75 3.55 123.60
6 Jumlah Jam Standby 304.53 379.41 375.03 427.87 234.64 472.19 236.40 259.85 282.37 204.22 400.00 593.45 4,169.96
7 Standby 304.53 379.41 375.03 427.87 234.64 472.19 236.40 259.85 282.37 204.22 400.00 593.45 4,169.95
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam 0.30 2.37 - - - - - 3.98 1.73 - 1.25 - 9.63
10 Sejak YM/CI/TO (JSYM/CI/TO) - - - - - - - - - - - - -
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) - - - - - - - - - - - - -
12 Sejak MO/MI (JSMO/MI) - - - - - - - - - - - - -
13 Sejak Beroperasi (JSB) 52,199.00 52,529.00 52,871.00 53,141.00 53,619.00 53,887.00 54,350.00 54,822.00 55,273.00 55,273.00 55,824.00 55,971.00 53,887.00
PLTMG UNIT 6
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 672.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,760.00
2 Kerja 355.00 355.00 354.00 251.73 439.62 294.78 502.00 572.00 488.00 488.00 318.00 217.00 4,635.13
3 Pemeliharaan 4.00 2.38 6.50 45.63 6.25 3.33 1.67 8.13 112.73 6.00 33.50 5.63 235.75
4 PO ( Har Terencana ) - - - 38.75 - - - - 112.73 - 29.47 - 180.95
5 MO ( Har Tdk Terencana ) 4.00 2.38 6.50 6.88 6.25 3.33 1.67 8.13 - 6.00 4.03 5.63 54.80
6 Jumlah Jam Standby 313.00 344.79 359.50 446.64 274.13 445.89 240.33 163.87 141.54 226.00 391.03 521.37 3,868.09
7 Standby 313.00 344.79 359.50 446.64 274.13 445.89 240.33 163.87 141.54 226.00 391.03 521.37 3,868.09
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam - 41.83 - - - - - - 1.73 - 1.47 - 45.03
10 Sejak YM/CI/TO (JSYM/CI/TO) - - - - - - - - - - - - -
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) - - - - - - - - - - - - -
12 Sejak MO/MI (JSMO/MI) - - - - - - - - - - - - -
13 Sejak Beroperasi (JSB) 50,132.00 50,428.00 50,781.00 51,033.00 51,479.00 51,776.00 52,278.00 52,850.00 53,338.00 53,338.00 53,935.00 54,152.00 51,776.00
PLTMG UNIT 7
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 744.00 672.00 744.00 720.00 744.00 720.00 744.00 744.00 720.00 744.00 720.00 744.00 8,760.00
2 Kerja 254.00 254.00 363.00 231.73 373.62 202.70 386.00 495.00 468.00 468.00 108.00 259.00 3,863.05
3 Pemeliharaan 3.73 3.80 19.61 7.22 5.40 4.87 7.35 13.55 3.57 527.90 635.43 123.30 1,355.73
4 PO ( Har Terencana ) - - 16.23 - - - - 5.73 - 527.90 635.43 119.33 1,304.62
5 MO ( Har Tdk Terencana ) 3.73 3.80 3.38 7.22 5.40 4.87 7.35 7.82 3.57 - - 3.97 51.11
6 Jumlah Jam Standby 414.27 409.98 337.39 505.05 340.98 528.11 350.65 234.63 269.30 (275.90) 0.57 361.70 3,476.73
7 Standby 414.27 409.98 337.39 505.05 340.98 528.11 350.65 234.63 269.30 (275.90) 0.57 361.70 3,476.73
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam - 4.22 - - - 8.32 - 0.82 3.13 - - - 16.49
10 Sejak YM/CI/TO (JSYM/CI/TO) - - - - - - - - - - - - -
11 Sejak GI/HGPI/SO (JSGI/HGPI/SO) - - - - - - - - - - - - -
12 Sejak MO/MI (JSMO/MI) - - - - - - - - - - - - -
13 Sejak Beroperasi (JSB) 46,253.00 46,621.00 46,984.00 47,212.00 47,592.00 47,798.00 48,184.00 48,679.00 49,147.00 49,147.00 49,336.00 49,595.00 49,595.00
TOTAL PLTMG
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 Periodik 5,208.00 4,728.00 5,208.00 5,040.00 5,208.00 5,040.00 5,208.00 5,208.00 5,040.00 5,208.00 5,040.00 5,208.00 61,344.00
2 Kerja 1,931.00 1,931.00 2,271.00 1,743.07 2,935.15 1,585.77 3,082.00 3,265.00 2,778.00 2,778.00 2,114.00 1,517.00 27,930.98
3 Pemeliharaan 85.35 27.58 451.26 226.56 52.41 48.39 75.40 590.91 708.94 641.50 705.70 185.35 3,799.35
4 PO ( Har Terencana ) 101.92 3.13 437.26 184.07 136.00 164.92 81.62 540.84 790.26 527.90 672.33 119.33 3,759.58
5 MO ( Har Tdk Terencana ) 17.53 24.45 28.08 42.49 52.41 20.14 33.80 50.07 26.48 113.60 33.37 66.02 508.44
6 Jumlah Jam Standby 2,651.38 3,018.06 2,294.48 3,232.81 1,914.61 3,369.26 2,007.00 1,342.74 1,593.15 1,620.50 2,374.38 3,505.65 28,924.02
7 Standby 2,651.38 3,018.06 2,294.48 3,232.79 1,914.61 3,369.26 2,007.00 1,342.74 1,593.15 1,620.50 2,374.38 3,505.65 28,924.01
8 Gangguan luar - - - - - - - - - - - - -
9 gangguan dalam 2.17 159.36 9.18 5.58 1.83 67.91 3.58 9.35 20.11 - 13.92 - 292.99
LEMBAR DATA REALISASI ( L D R ) DATA PRODUKSI
JUNI 2022
MISIP

BULAN LAPORAN KUMULATIF S/D BULAN JUNI


URAIAN SUB - URAIAN SATUAN
REALISASI RENCANA REALISASI RENCANA

Produksi Per - TOTAL kWh 77,155,980 50,641,406 77,155,980 50,641,406


Jenis Pembangkit PLTA kWh 38,939,980.00000 36,340,224.00000 38,939,980.00 ###
PLTU
- Minyak kWh
- Batubara kWh - - - -
- Gas Alam kWh
PLTD
- Minyak kWh - -
14,134,862.00 14,134,862.00
- Gas Alam kWh 38,216,000.00000 38,216,000.00
PLTG
- Minyak kWh
- Gas Alam kWh - 166,320.00000 - 166,320.00
PLTGU
- Minyak kWh
- Gas Alam kWh
Pembelian energi listrik kWh 69,948,622.00 - 69,948,622.00 -
kWh
Kapasitas Ter- PLTA kW 114,000.00 114,000.00 114,000.00 114,000.00
pasang Perjenis PLTU kW - - - -
Pembangkit PLTD kW 101,500.00 112,700.00 101,500.00 112,700.00
PLTG kW 45,850.00 64,800.00 45,850.00 64,800.00
PLTGU kW -
kW
kW
Konsumsi Minyak Residu k liter
Bahan Bakar Minyak Solar k liter - - - -
Dan Pelumas Batubara ton - - - -
Gas Alam MMBtu - - - -
MSCF
Panas Bumi kWh
Pelumas k liter - - - -
Pemeliharaan Mesin Keluar Operasi kW
Mesin Masuk Operasi kW
Umum Kirim Energi Ke Unit Lain kWh - - - -
Susut Transmisi kWh
%
Susut Distribusi kWh
%
Gangguan Di Transmisi
- 70 kV Jumlah
kms
- 150 kV Jumlah
kms
- 500 kV Jumlah
kms
Pemakaian Sendiri kWh - - - -
%
Rugi - rugi Trafo kWh - - - -
Beban Puncak (Sistem) kW
Faktor Beban (LF) %
Faktor Kapasitas (CF) %
Efisiensi Termal :
- Total %
- Batubara %
PT PLN (PERSERO) PEMBANGKITAN SUMBAGUT
SEKTOR PEMBANGKITAN PEKANBARU
Jln. Dr. Tanjung Datuk No 74
PT PLN (PERSERO) UNIT INDUK PEMBANGKITAN SUMBAGUT LAPORAN KUMULATIF KWH
Telp. (0761) (EXPORT, IMPORT, PEMAKAIAN SENDIRI DAN RUGI TRAFO)
41855/41856
UNIT PELAKSANA PENGENDALIAN PEMBANGKITAN PEKANBARU
SEKTOR PEMBANGKITAN PEKANBARU
Jln. Dr. Tanjung Datuk No 74
Telp. (0761) 41855/41856 TAHUN 2022

Hal. 9
I. PL KOTA PANJANG
PLTA KOTO PANJANG UNIT 1
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 18,027,840.00 16,189,696.00 12,808,768.00 12,113,408.00 12,289,696.00 12,113,408.00 15,049,696.00 11,173,408.00 18,087,840.00 12,751,552.00 16,708,768.00 18,027,840.00 175,341,920.00
2 GENERATOR 10,181,680.00 15,460,690.00 20,372,900.00 17,455,780.00 12,886,020.00 12,686,290.00 10,091,520.00 14,504,720.00 12,526,766.23 10,172,345.98 13,105,063.42 14,146,156.97 163,589,932.60
3 EXPORT 9,945,451.00 15,084,167.00 19,892,153.00 17,046,002.00 12,565,545.00 12,382,429.00 9,830,807.00 14,138,784.00 15,309,551.00 6,858,063.00 12,749,409.00 13,817,489.00 159,619,850.00
4 IMPORT 1,183.00 140.00 157.00 309.00 692.00 823.00 2,427.00 14,028.00 66,277.00 13,615.00 34,405.00 25,696.00 159,752.00
5 PS DARI GI - - - - - - - - - - - - -
6 NETTO 9,944,268.00 15,084,027.00 19,891,996.00 17,045,693.00 12,564,853.00 12,381,606.00 9,828,380.00 14,124,756.00 15,243,274.00 6,844,448.00 12,715,004.00 13,791,793.00 159,460,098.00
7 PS UNIT 58,634.19 97,244.16 100,028.52 103,715.53 80,018.45 78,940.40 66,004.64 88,192.41 66,231.23 53,166.47 70,225.03 79,597.59 941,998.63
8 % PEMAKAIAN SENDIRI 0.006 0.006 0.005 0.006 0.006 0.006 0.007 0.006 0.005 0.005 0.005 0.006 0.006
9 RUGI TRAFO 178,777.81 279,418.84 380,875.48 306,371.47 241,148.55 225,743.60 197,135.36 291,771.59 (2,782,739.00) 3,274,731.51 319,834.39 274,766.38 3,187,835.97
PLTA KOTO PANJANG UNIT 2
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 18,027,840.00 16,189,696.00000 12,808,768.00000 12,113,408.00 12,289,696.00 12,113,408.00 7,649,696.00 10,973,408.00 18,087,840.00 19,725,924.00 16,708,768.00 18,027,840.00 174,716,292.00
2 GENERATOR 18,972,460.00 9,204,270.00 18,910,550.00 9,993,490.00 8,890,030.00 9,657,360.00 12,215,770.00 12,236,720.00 17,997,356.60 20,482,435.16 18,458,815.79 17,575,657.32 174,594,914.87
3 EXPORT 18,390,663.00 8,972,032.00 18,465,020.00 9,768,028.00 8,668,875.00 9,449,177.00 11,916,408.00 11,951,617.00 17,635,453.00 20,063,382.00 18,065,745.00 17,269,128.00 170,615,528.00
4 IMPORT 1,070.00 89,845.00 28,261.00 109,198.00 130,667.00 110,864.00 50,738.00 86,737.00 18,212.00 15,501.00 26,510.00 18,514.00 686,117.00
5 PS DARI GI - - - - - - - - - - - - -
6 NETTO 18,389,593.00 8,882,187.00 18,436,759.00 9,658,830.00 8,538,208.00 9,338,313.00 11,865,670.00 11,864,880.00 17,617,241.00 20,047,881.00 18,039,235.00 17,250,614.00 169,929,411.00
7 PS UNIT 109,258.47 57,892.73 92,848.56 59,377.47 55,204.51 60,092.90 79,898.52 74,402.39 95,155.21 107,052.86 98,913.75 98,894.70 988,992.07
8 % PEMAKAIAN SENDIRI 0.006 0.006 0.005 0.006 0.006 0.006 0.007 0.006 0.005 0.005 0.005 0.006 0.006
9 RUGI TRAFO 473,608.53 264,190.27 380,942.44 275,282.53 296,617.49 258,954.10 270,201.48 297,437.61 284,960.39 327,501.30 320,667.04 226,148.62 3,676,511.80
PLTA KOTO PANJANG UNIT 3
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 18,027,840.00 16,189,696.00 12,808,768.00 12,113,408.00 12,289,696.00 12,113,408.00 15,049,696.00 11,173,408.00 - 411,552.00 16,708,768.00 18,027,840.00 144,914,080.00
2 GENERATOR 17,104,510.00 10,043,790.00 15,023,360.00 9,144,820.00 17,163,930.00 13,963,960.00 11,537,290.00 11,811,870.00 13,245,924.64 12,652,787.48 9,548,957.98 13,368,828.02 154,610,028.12
3 EXPORT 17,043,875.00 9,085,446.00 14,468,821.00 8,814,381.00 16,550,336.00 13,434,802.00 11,147,230.00 11,389,909.00 12,835,858.00 12,239,311.00 9,283,833.00 12,958,851.00 149,252,653.00
4 IMPORT 20,084.00 78,543.00 73,921.00 106,423.00 28,390.00 49,342.00 62,548.00 79,111.00 54,836.00 77,302.00 53,779.00 42,354.00 726,633.00
5 PS DARI GI - - - - - - - - - - - - -
6 NETTO 17,023,791.00 9,006,903.00 14,394,900.00 8,707,958.00 16,521,946.00 13,385,460.00 11,084,682.00 11,310,798.00 12,781,022.00 12,162,009.00 9,230,054.00 12,916,497.00 148,526,020.00
7 PS UNIT 98,501.34 63,173.11 73,762.92 54,335.00 106,583.04 86,890.70 75,460.85 71,819.20 70,033.55 66,130.67 51,169.22 75,223.71 893,083.30
8 % PEMAKAIAN SENDIRI 0.006 0.006 0.005 0.006 0.006 0.006 0.007 0.006 0.005 0.005 0.005 0.006 0.006
9 RUGI TRAFO (17,782.34) 973,713.89 554,697.08 382,527.00 535,400.96 491,609.30 377,147.15 429,252.80 394,869.09 424,647.81 267,734.76 377,107.31 5,190,924.82
TOTAL PLTA
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 54,083,520.00000 48,569,088.00000 38,426,304.00 36,340,224.00 36,869,088.00 36,340,224.00 37,749,088.00 33,320,224.00 36,175,680.00 32,889,028.00 50,126,304.00 54,083,520.00 494,972,292.00
2 GENERATOR 46,258,650.00 34,708,750.00 54,306,810.00 36,594,090.00 38,939,980.00 36,307,610.00 33,844,580.00 38,553,310.00 43,770,047.47 43,307,568.62 41,112,837.19 45,090,642.31 492,794,875.59
3 EXPORT 45,379,989.00 33,141,645.00 52,825,994.00 35,628,411.00 37,784,756.00 35,266,408.00 32,894,445.00 37,480,310.00 45,780,862.00 39,160,756.00 40,098,987.00 44,045,468.00 479,488,031.00
4 IMPORT 22,337.00 168,528.00 102,339.00 215,930.00 159,749.00 161,029.00 115,713.00 179,876.00 139,325.00 106,418.00 114,694.00 86,564.00 1,572,502.00
5 PS DARI GI - - - - - - - - - - - - -
6 NETTO 45,357,652.00 32,973,117.00 52,723,655.00 35,412,481.00 37,625,007.00 35,105,379.00 32,778,732.00 37,300,434.00 45,641,537.00 39,054,338.00 39,984,293.00 43,958,904.00 477,915,529.00
7 PS UNIT 266,394.00 218,310.00 266,640.00 217,428.00 241,806.00 225,924.00 221,364.00 234,414.00 231,420.00 226,350.00 220,308.00 253,716.00 2,824,074.00
8 % PEMAKAIAN SENDIRI 0.006 0.006 0.005 0.006 0.006 0.006 0.007 0.006 0.005 0.005 0.005 0.006 0.0057
9 RUGI TRAFO 634,604.00 1,517,323.00 1,316,515.00 964,181.00 1,073,167.00 976,307.00 844,484.00 1,018,462.00 (2,102,909.53) 4,026,880.62 908,236.19 878,022.31 12,055,272.59
II. PL TELUK LEMBU Hal. 9
PLTG TELUK LEMBU UNIT 2
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 83,160 83,160.00000 83,160.00000 83,160.00000 83,160.00000 83,160 83,160 83,160 83,160 83,160 83,160 83,160 997,920.00
2 GENERATOR - - - - - - - - - - - - -
3 - KWHGAS - - - - - - - - - - - - -
4 - KWH HSD - - - - - - - - - - - - -
5 EXPORT - - - - - - - - - - - - -
6 IMPORT 46,573.00000 41,545.00000 45,337.00000 45,648.00000 42,161.00000 43,812.00000 46,536.00000 48,263.00000 48,507.00000 49,301.00000 46,510.00000 44,801.00000 548,994.00
7 PS DARI GI - - - - - - - - - - - - -
8 PS Aux.PLTD di PLTD PL Tel - - - - - - - - - - - - -
9 NETTO (46,573.00000) (41,545.00000) (45,337.00000) (45,648.00000) (42,161.00000) (43,812.00000) (46,536.00000) (48,263.00000) (48,507.00000) (49,301.00000) (46,510.00000) (44,801.00000) (548,994.00)
10 PS UNIT 19,040.00000 17,200.00000 19,760.00000 18,480.00000 18,560.00000 18,992.00000 19,088.00000 17,760.00000 17,600.00000 17,280.00000 16,880.00000 16,720.00000 217,360.00
11 % PEMAKAIAN SENDIRI - - - - - - - - - - - - -
12 RUGI TRAFO 27,533.00000 24,345.00000 25,577.00000 27,168.00000 23,601.00000 24,820.00000 27,448.00000 30,503.00000 30,907.00000 32,021.00000 29,630.00000 28,081.00000 331,634.00
PLTG TELUK LEMBU UNIT 3
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 83,160 83,160.00000 83,160.00000 83,160.00000 83,160 83,160 83,160 83,160 83,160 83,160 83,160 83,160 997,920.00
2 GENERATOR - - - - - - - - - - - - -
3 - KWH GAS - - - - - - - - - - - - -
4 - KWH HSD - - - - - - - - - - - - -
5 EXPORT - - - - - - - - - - - - -
6 IMPORT 5,896 3,041 4,101 4,840 3,285 8,613 23,868 26,625 26,931 29,770 25,577 25,777 188,324.00
7 PS DARI GI - - - - - - - - - - - - -
8 NETTO (5,896) (3,041) (4,101) (4,840) (3,285) (8,613) (23,868) (26,625) (26,931) (29,770) (25,577) (25,777) (188,324.00)
9 PS UNIT 4,429 5,918 5,839 5,183 6,548 3,805 4,885 3,984 4,599 5,259 5,654 5,355 61,458.00
10 % PEMAKAIAN SENDIRI - - - - - - - - - - - - -
11 RUGI TRAFO 1,467 (2,877) (1,738) (343) (3,263) 4,808 18,983 22,641 22,332 24,511 19,923 20,422 126,866.00
TOTAL TELUK LEMBU PLTG
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 166,320.00 166,320.00000000 166,320.00 166,320.00 166,320.00 166,320.00 166,320.00 166,320.00 166,320.00 166,320.00 166,320.00 166,320.00 1,995,840.00
2 GENERATOR - - - - - - - - - - - - -
3 - KWH GAS - - - - - - - - - - - - -
4 - KWH HSD - - - - - - - - - - - - -
5 EXPORT - - - - - - - - - - - - -
6 IMPORT 52,469.00 44,586.00 49,438.00 50,488.00 45,446.00 52,425.00 70,404.00 74,888.00 75,438.00 79,071.00 72,087.00 70,578.00 737,318.00
7 PS DARI GI - - - - - - - - - - - - -
8 PS Aux.PLTD di PLTD PL Tel (5,896.00) (3,041.00) (4,101.00) (4,840.00) (3,285.00) (8,613.00) (23,868.00) (26,625.00) (26,931.00) (29,770.00) (25,577.00) (25,777.00) (188,324.00)
9 NETTO (52,469.00) (44,586.00) (49,438.00) (50,488.00) (45,446.00) (52,425.00) (70,404.00) (74,888.00) (75,438.00) (79,071.00) (72,087.00) (70,578.00) (737,318.00)
10 PS UNIT 23,469.00 23,118.00 25,599.00 23,663.00 25,108.00 22,797.00 23,973.00 21,744.00 22,199.00 22,539.00 22,534.00 22,075.00 278,818.00
11 % PEMAKAIAN SENDIRI - - - - - - - - - - - - -
12 RUGI TRAFO 29,000.00 21,468.00 23,839.00 26,825.00 20,338.00 29,628.00 46,431.00 53,144.00 53,239.00 56,532.00 49,553.00 48,503.00 458,500.00
III. PL BALAI PUNGUT Hal. 9
PLTG BALAI PUNGUT UNIT 2
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI -
2 GENERATOR - - - - - - - - - - - - -
- KWH GAS - - - - - - - - - - - - -
- KWH HSD - - - - - - - - - - - - -
3 EXPORT - - - - - - - - - - - - -
4 IMPORT 13,670.00 - 27,840.00 12,680.00 16,800.00 14,060.00 17,880.00 19,210.00 16,030.00 14,086.00 16,878.00 14,094.00 183,228.00
5 PS DARI GI - - - - - - - - - - - - -
6 NETTO (13,670.00) - (27,840.00) (12,680.00) (16,800.00) (14,060.00) (17,880.00) (19,210.00) (16,030.00) (14,086.00) (16,878.00) (14,094.00) (183,228.00)
7 PS UNIT 101.00 86.00 96.00 92.00 169.00 114.00 401.00 - - - - - 1,059.00
8 % PEMAKAIAN SENDIRI - - - - - - - - - - - - -
9 RUGI TRAFO 13,569.00 (86.00) 27,744.00 12,588.00 16,631.00 13,946.00 17,479.00 19,210.00 16,030.00 14,086.00 16,878.00 14,094.00 182,169.00
PLTMG BALAI PUNGUT UNIT 1
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 2,108,266.00 1,918,266.00000 2,108,266.00000 2,019,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,108,266.00 2,019,266.00 2,019,266.00 2,019,266.00 2,108,266.00 24,664,192.00
2 GENERATOR 2,596,000.00 3,604,000.00 4,158,000.00 2,969,000.00 5,319,000.00 1,863,000.00 5,837,000.00 7,483,000.00 4,809,000.00 3,019,000.00 3,683,000.00 2,984,000.00 48,324,000.00
- KWH GAS 80,070.00 80,070.00 80,070.00 80,070.00 80,070.00 80,070.00 80,070.00 80,070.00 80,070.00 80,070.00 80,070.00 80,070.00 960,840.00
- KWH HSD - - - - - - - - - - - - -
3 EXPORT - - - - - - - - - - - - -
4 IMPORT - - - - - - - - - - - - -
5 PS DARI GI - - - - - - - - - - - - -
6 NETTO - - - - - - - - - - - - -
7 PS UNIT - - - - - - - - - - - - -
8 % PEMAKAIAN SENDIRI 434,000.00 254,000.00 298,000.00 264,000.00 345,000.00 262,000.00 403,000.00 114,000.00 612,000.00 268,000.00 306,000.00 280,000.00 3,840,000.00
9 RUGI TRAFO 9,530.23 5,664.88 (1,679.61) 9,501.22 9,266.47 12,916.18 7,903.98 51,606.00 26,636.06 31,900.91 9,471.25 73,594.26 246,311.84
PLTMG BALAI PUNGUT UNIT 2
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 2,108,266.00 1,918,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,019,266.00 2,108,266.00 24,753,192.00
2 GENERATOR 2,596,000.00 3,604,000.00 4,158,000.00 2,969,000.00 5,319,000.00 1,863,000.00 5,837,000.00 7,483,000.00 4,809,000.00 3,019,000.00 3,683,000.00 2,984,000.00 48,324,000.00
- KWH GAS 2,596,000.00 3,604,000.00 4,158,000.00 2,969,000.00 5,319,000.00 1,863,000.00 5,837,000.00 7,483,000.00 4,530,000.00 103,000.00 995,000.00 2,800,710.00 42,257,710.00
- KWH HSD - - - - - - - - 279,000.00 2,916,000.00 2,688,000.00 183,290.00 6,066,290.00
3 EXPORT 7,259,772.00 8,862,000.00 11,750,208.00 8,128,524.00 15,545,724.00 7,690,488.00 14,881,284.00 14,964,732.00 11,340,828.00 8,575,668.00 13,526,916.00 9,008,784.00 131,534,928.00
4 IMPORT 61,884.00 77,028.00 67,704.00 77,232.00 59,316.00 94,896.00 43,440.00 45,120.00 49,692.00 73,236.00 42,180.00 62,724.00 754,452.00
5 PS DARI GI 33,382.22 82,519.06 86,225.00 65,833.88 94,144.58 43,003.33 87,564.69 128,082.95 92,773.12 51,130.35 45,679.36 46,700.67 857,039.22
6 NETTO - - - - - - - - - - - - -
7 PS UNIT 94,000.00 206,000.00 247,000.00 183,000.00 279,000.00 180,000.00 226,000.00 260,000.00 238,000.00 155,000.00 169,000.00 135,000.00 2,372,000.00
8 % PEMAKAIAN SENDIRI 0.01 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.01 0.02 0.22
9 RUGI TRAFO 10,214.90 8,353.62 (1,656.90) 11,006.29 8,864.81 7,799.95 9,938.71 63,945.64 23,289.60 38,462.00 7,924.27 79,624.83 267,767.72
PLTMG BALAI PUNGUT UNIT 3
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 2,108,266.00 1,918,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,019,266.00 2,108,266.00 - - 2,108,266.00 2,019,266.00 2,108,266.00 20,625,660.00
2 GENERATOR 2,292,000.00 2,949,000.00 3,538,000.00 2,721,000.00 4,884,000.00 2,850,000.00 4,586,000.00 1,668,000.00 2,028,000.00 3,629,000.00 5,541,000.00 2,884,000.00 39,570,000.00
- KWH GAS 2,292,000.00 2,949,000.00 3,538,000.00 2,721,000.00 4,884,000.00 2,850,000.00 4,586,000.00 1,668,000.00 1,721,000.00 1,249,000.00 1,611,000.00 2,649,240.00 32,718,240.00
- KWH HSD - - - - - - - - 307,000.00 2,380,000.00 3,930,000.00 234,760.00 6,851,760.00
3 EXPORT - - - - - - - - - - - - -
4 IMPORT - - - - - - - - - - - - -
5 PS DARI GI 29,473.05 67,521.84 73,367.98 60,334.79 86,445.22 65,786.10 68,797.61 28,550.36 39,123.29 61,461.43 68,723.69 45,135.64 694,720.99
6 NETTO 21,338,618.00 21,654,622.00 27,181,044.00 19,354,322.00 37,528,308.00 19,893,502.00 37,067,704.00 41,854,032.00 34,792,546.00 20,000,448.00 28,516,488.00 19,662,564.00 328,844,198.00
7 PS UNIT - - - - - - - - - - - - -
8 % PEMAKAIAN SENDIRI 21,953,000.00 22,166,000.00 27,715,000.00 19,875,000.00 38,216,000.00 20,421,000.00 37,761,000.00 42,592,000.00 35,816,000.00 20,687,000.00 29,054,000.00 20,628,000.00 336,884,000.00
9 RUGI TRAFO 9,018.70 6,835.41 (1,409.84) 10,086.94 8,139.83 11,932.29 7,808.62 14,253.82 9,821.44 46,233.39 11,921.90 76,956.44 211,598.95
PLTMG BALAI PUNGUT UNIT 4
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI - 1,218,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,019,266.00 2,108,266.00 21,944,926.00
2 GENERATOR 3,633,000.00 1,958,000.00 2,781,000.00 2,865,000.00 5,521,000.00 2,601,000.00 6,200,000.00 7,469,000.00 5,622,000.00 3,774,000.00 4,603,000.00 3,764,000.00 50,791,000.00
- KWH GAS 3,633,000.00 1,958,000.00 2,781,000.00 2,865,000.00 5,521,000.00 2,601,000.00 6,200,000.00 7,469,000.00 5,335,000.00 126,000.00 1,040,000.00 2,534,400.00 42,063,400.00
- KWH HSD - - - - - - - - 287,000.00 3,648,000.00 3,563,000.00 1,229,600.00 8,727,600.00
3 EXPORT - - - - - - - - - - - - -
4 IMPORT - - - - - - - - - - - - -
5 PS DARI GI 107,677.53 37,765.36 52,438.50 65,080.02 84,832.54 53,985.74 110,089.88 31,073.13 146,542.19 87,683.75 91,296.21 87,812.03 956,276.87
6 NETTO - - - - - - - - - - - - -
7 PS UNIT - - - - - - - - - - - - -
8 % PEMAKAIAN SENDIRI - - - - - - - - - - - - -
9 RUGI TRAFO 14,295.35 4,538.40 (1,108.19) 10,620.75 9,201.47 10,889.78 10,556.80 63,826.00 27,226.89 48,080.69 9,903.72 100,438.29 308,469.97
Hal. 9
PLTMG BALAI PUNGUT UNIT 5
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 2,108,266.00 1,918,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,019,266.00 2,108,266.00 24,753,192.00
2 GENERATOR 3,995,000.00 3,684,000.00 4,169,000.00 3,167,000.00 6,098,000.00 3,451,000.00 5,570,000.00 6,023,000.00 5,810,000.00 2,897,000.00 4,645,000.00 1,936,000.00 51,445,000.00
- KWH GAS 3,995,000.00 3,684,000.00 4,169,000.00 3,167,000.00 6,098,000.00 3,451,000.00 5,570,000.00 6,023,000.00 5,608,000.00 149,000.00 1,114,000.00 1,908,720.00 44,936,720.00
- KWH HSD - - - - - - - - 202,000.00 2,748,000.00 3,531,000.00 27,280.00 6,508,280.00
3 EXPORT 14,238,240.00 12,932,690.00 15,559,870.00 11,391,890.00 22,095,710.00 12,392,180.00 22,285,430.00 26,966,080.00 23,544,800.00 11,614,206.00 15,106,464.00 10,832,100.00 198,959,660.00
4 IMPORT 97,510.00 63,040.00 61,330.00 88,860.00 53,810.00 94,270.00 55,570.00 31,660.00 43,390.00 116,190.00 74,712.00 115,596.00 895,938.00
5 PS DARI GI 118,406.75 71,055.96 78,610.60 71,940.11 93,698.39 71,628.14 98,903.33 25,057.37 151,442.57 67,307.85 92,129.25 45,165.81 985,346.12
6 NETTO - - - - - - - - - - - - -
7 PS UNIT 434,000.00 254,000.00 298,000.00 264,000.00 345,000.00 262,000.00 403,000.00 114,000.00 612,000.00 268,000.00 306,000.00 280,000.00 3,840,000.00
8 % PEMAKAIAN SENDIRI 0.04 0.03 0.03 0.03 0.02 0.03 0.02 0.01 0.04 0.03 0.02 0.03 0.31
9 RUGI TRAFO 15,719.77 8,539.05 (1,661.28) 11,740.29 10,163.12 14,448.54 9,484.09 51,469.27 28,137.36 36,907.73 9,994.09 51,660.08 246,602.10
PLTMG BALAI PUNGUT UNIT 6
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 2,108,266.00 1,918,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,019,266.00 2,108,266.00 24,753,192.00
2 GENERATOR 4,061,000.00 3,401,000.00 4,315,000.00 3,003,000.00 5,849,000.00 3,868,000.00 6,185,000.00 7,531,000.00 5,994,000.00 3,762,000.00 4,778,000.00 2,875,000.00 55,622,000.00
- KWH GAS 4,061,000.00 3,401,000.00 4,315,000.00 3,003,000.00 5,849,000.00 3,868,000.00 6,185,000.00 7,531,000.00 5,687,000.00 110,000.00 1,679,000.00 2,823,480.00 48,512,480.00
- KWH HSD - - - - - - - - 307,000.00 3,652,000.00 3,099,000.00 51,520.00 7,109,520.00
3 EXPORT - - - - - - - - - - - - -
4 IMPORT - - - - - - - - - - - - -
5 PS DARI GI 120,362.90 65,597.54 81,363.58 68,214.77 89,872.40 80,283.29 109,823.54 31,331.07 156,238.68 87,404.94 94,767.18 67,072.15 1,052,332.04
6 NETTO - - - - - - - - - - - - -
7 PS UNIT - - - - - - - - - - - - -
8 % PEMAKAIAN SENDIRI - - - - - - - - - - - - -
9 RUGI TRAFO 15,979.47 7,883.09 (1,719.46) 11,132.33 9,748.13 16,194.42 10,531.26 64,355.82 29,028.46 47,927.81 10,280.25 76,716.28 298,057.85
PLTMG BALAI PUNGUT UNIT 7
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 2,108,266.00 1,918,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,108,266.00 2,019,266.00 2,108,266.00 2,019,266.00 388,266.00 23,033,192.00
2 GENERATOR 2,954,000.00 4,126,000.00 4,539,000.00 2,587,000.00 4,985,000.00 2,703,000.00 4,741,000.00 6,379,000.00 6,053,000.00 1,102,000.00 1,402,000.00 3,427,000.00 44,998,000.00
- KWH GAS 2,954,000.00 4,126,000.00 4,539,000.00 2,587,000.00 4,985,000.00 2,703,000.00 4,741,000.00 6,379,000.00 5,770,000.00 10,000.00 1,374,000.00 3,147,210.00 43,315,210.00
- KWH HSD - - - - - - - - 283,000.00 1,092,000.00 28,000.00 279,790.00 1,682,790.00
3 EXPORT - - - - - - - - - - - - -
4 IMPORT - - - - - - - - - - - - -
5 PS DARI GI 87,552.82 79,581.14 85,587.32 58,765.10 76,596.67 56,102.83 84,183.25 26,538.43 157,776.57 25,603.47 27,807.36 79,950.01 846,044.96
6 NETTO - - - - - - - - - - - - -
7 PS UNIT - - - - - - - - - - - - -
8 % PEMAKAIAN SENDIRI - - - - - - - - - - - - -
9 RUGI TRAFO 11,623.58 9,563.55 (1,808.72) 9,590.19 8,308.16 11,316.84 8,072.54 54,511.45 29,314.19 14,039.46 3,016.51 91,445.81 248,993.56
TOTAL BALAI PUNGUT PLTMG
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI 12,649,596.00 12,727,862.00 14,757,862.00 14,134,862.00 14,757,862.00 14,134,862.00 14,757,862.00 12,649,596.00 12,115,596.00 14,668,862.00 14,134,862.00 13,037,862.00 164,527,546.00
2 GENERATOR 22,127,000.00 23,326,000.00 27,658,000.00 20,281,000.00 37,975,000.00 19,199,000.00 38,956,000.00 44,036,000.00 35,125,000.00 21,202,000.00 28,335,000.00 20,854,000.00 339,074,000.00
- KWH GAS 19,611,070.00 19,802,070.00 23,580,070.00 17,392,070.00 32,736,070.00 17,416,070.00 33,199,070.00 36,633,070.00 28,731,070.00 1,827,070.00 7,893,070.00 15,943,830.00 254,764,600.00
- KWH HSD - - - - - - - - 1,665,000.00 16,436,000.00 16,839,000.00 2,006,240.00 36,946,240.00
3 EXPORT 21,498,012.00 21,794,690.00 27,310,078.00 19,520,414.00 37,641,434.00 20,082,668.00 37,166,714.00 41,930,812.00 34,885,628.00 20,189,874.00 28,633,380.00 19,840,884.00 330,494,588.00
4 IMPORT 159,394.00 140,068.00 129,034.00 166,092.00 113,126.00 189,166.00 99,010.00 76,780.00 93,082.00 189,426.00 116,892.00 178,320.00 1,650,390.00
5 PS DARI GI 496,855.27 404,040.90 457,592.98 390,168.67 525,589.80 370,789.43 559,362.30 270,633.31 743,896.41 380,591.78 420,403.05 371,836.31 5,391,760.21
6 NETTO 21,338,618.00 21,654,622.00 27,181,044.00 19,354,322.00 37,528,308.00 19,893,502.00 37,067,704.00 41,854,032.00 34,792,546.00 20,000,448.00 28,516,488.00 19,662,564.00 328,844,198.00
7 PS UNIT 528,000.00 460,000.00 545,000.00 447,000.00 624,000.00 442,000.00 629,000.00 374,000.00 850,000.00 423,000.00 475,000.00 415,000.00 6,212,000.00
8 % PEMAKAIAN SENDIRI 22,387,000.05 22,420,000.05 28,013,000.05 20,139,000.05 38,561,000.04 20,683,000.05 38,164,000.04 42,706,000.02 36,428,000.05 20,955,000.04 29,360,000.03 20,908,000.05 340,724,000.53
9 RUGI TRAFO 86,382.00 51,378.00 (11,044.00) 73,678.00 63,692.00 85,498.00 64,296.00 363,968.00 173,454.00 263,552.00 62,512.00 550,436.00 1,827,802.00
V. PLTU TEMBILAHAN #01
PLTU TEMBILAHAN #01
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI -
2 GENERATOR -
3 EXPORT -
4 IMPORT -
5 PS DARI GI -
6 NETTO -
7 PS UNIT -
8 % PEMAKAIAN SENDIRI -
9 RUGI TRAFO -
PLTU TEMBILAHAN #02
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI -
2 GENERATOR -
3 EXPORT -
4 IMPORT -
5 PS DARI GI -
6 NETTO -
7 PS UNIT -
8 % PEMAKAIAN SENDIRI -
9 RUGI TRAFO -
TOTAL PLTU TEMBILAHAN
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
1 TARGET PRODUKSI -
2 GENERATOR -
3 EXPORT -
4 IMPORT -
5 PS DARI GI -
6 NETTO -
7 PS UNIT -
8 % PEMAKAIAN SENDIRI -
9 RUGI TRAFO -
IV. PEMBANGKIT SEWA PL TELUK LEMBU Hal. 9
PLTG RIAU POWER
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
TARGET PRODUKSI -
EXPORT -
1
IMPORT -
NETTO -
ST RIAU POWER
TARGET PRODUKSI -
2 EXPORT -
IMPORT -
NETTO -
PLTMG KSO HUTAN ALAM 1
TARGET PRODUKSI 6,428,160.00 6,428,160.00 12,856,320.00
3 EXPORT 7,620,777.00 7,744,923.00 7,781,585.00 8,157,270.00 8,429,943.00 4,499,502.00 964,778.00 - - - - - 45,198,778.00
IMPORT 32.00 258.00 1.00 94.00 - 4,028.00 7,034.00 1,674.00 1.00 4.00 7.00 - 13,133.00
NETTO 7,620,745.00 7,744,665.00 7,781,584.00 8,157,176.00 8,429,943.00 4,495,474.00 957,744.00 (1,674.00) (1.00) (4.00) (7.00) - 45,185,645.00
PLTMG KSO HUTAN ALAM 2
TARGET PRODUKSI 25,013,280.00 25,013,280.00 50,026,560.00
4 EXPORT 21,527,005.00 25,290,593.00 25,544,599.00 26,120,463.00 26,723,167.00 16,597,944.00 1,962,900.00 - - - - - 143,766,671.00
IMPORT 86.59 - - - - 5,035.41 7,772.00 2,805.00 503.00 573.00 140.34 - 16,915.34
NETTO 21,526,918.41 25,290,593.00 25,544,599.00 26,120,463.00 26,723,167.00 16,592,908.59 1,955,128.00 (2,805.00) (503.00) (573.00) (140.34) - 143,749,755.66
PLTMG PT PJBS 1
TARGET PRODUKSI 3,571,200.00 3,571,200.00 7,142,400.00
5 EXPORT 8,556,443.00 8,373,566.00 8,798,083.00 9,954,455.00 10,261,631.00 6,981,646.00 1,195,304.00 - - - - - 54,121,128.00
IMPORT 132.00 404.00 176.00 60.00 266.00 3,722.00 7,680.00 240.00 - - - - 12,680.00
NETTO 8,556,311.00 8,373,162.00 8,797,907.00 9,954,395.00 10,261,365.00 6,977,924.00 1,187,624.00 (240.00) - - - - 54,108,448.00
PLTMG PT PJBS 2
TARGET PRODUKSI 8,035,200.00 8,035,200.00 16,070,400.00
6 EXPORT 7,238,300.00 7,042,800.00 6,929,600.00 8,293,100.00 8,213,600.00 5,645,300.00 1,176,400.00 - - - - - 44,539,100.00
IMPORT - 200.00 - - - 13,300.00 27,700.00 23,300.00 - - - - 64,500.00
NETTO 7,238,300.00 7,042,600.00 6,929,600.00 8,293,100.00 8,213,600.00 5,632,000.00 1,148,700.00 (23,300.00) - - - - 44,474,600.00
PLTMG PT WIKA SIAK TRANSFER KE WRKR SIAK
TARGET PRODUKSI 14,880,000.00 14,880,000.00 29,760,000.00
7 EXPORT 9,999,774.54 4,527,403.63 14,527,178.17
IMPORT 21.82 21.82 21.82
NETTO 9,999,752.72 4,527,381.81 9,999,752.72
V. PEMBANGKIT SEWA PL BALAI PUNGUT
PLTG PT PJB UNIT 1
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
TARGET PRODUKSI 948,600.00 948,600.00 1,897,200.00
EXPORT - - -
1
IMPORT - - -
NETTO - - -
PLTMG MAX POWER
TARGET PRODUKSI 7,440,000.00 7,440,000.00 14,880,000.00
2 EXPORT - - -
IMPORT - - -
NETTO - - -
PLTG SEWA MPP BALAI PUNGUT
TARGET PRODUKSI 9,300,000.00 9,300,000.00 9,300,000.00 9,000,000.00 9,300,000.00 9,000,000.00 9,300,000.00 9,300,000.00 9,000,000.00 9,300,000.00 9,000,000.00 9,300,000.00 110,400,000.00
2 EXPORT 6,857,162.00 11,360,603.00 6,090,291.00 4,517,268.00 16,320,281.00 7,050,822.00 8,558,316.00 11,079,169.00 5,317,243.00 7,056,456.00 3,839,546.00 3,077,054.00 91,124,211.00
IMPORT 101,361.00 84,627.00 110,623.00 109,646.00 85,233.00 103,839.00 101,246.00 82,204.00 109,316.00 106,820.00 109,806.00 114,896.00 1,219,617.00
NETTO 6,755,801.00 11,275,976.00 5,979,668.00 4,407,622.00 16,235,048.00 6,946,983.00 8,457,070.00 10,996,965.00 5,207,927.00 6,949,636.00 3,729,740.00 2,962,158.00 89,904,594.00

TOTAL PRODUKSI KWH


NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH
EXPORT 128,677,463 119,276,223.63 135,280,230 112,191,381 145,374,812 96,124,290 83,918,857 90,490,291 85,983,733 66,407,086 72,571,913 66,963,406 1,203,259,685
1 IMPORT 349,503.41 438,692.82 419,451.00 554,990.00 420,620.00 546,604.41 454,439.00 460,977.00 433,695.00 496,398.00 430,504.34 464,452.00 5,470,305.16
NETTO 128,327,959.1 118,837,530.8 134,860,779.0 111,636,391.0 144,954,192.0 95,577,685.6 83,464,418.0 90,029,314.0 85,550,038.0 65,910,688.0 72,141,408.7 66,498,954.0 1,197,789,380.0
PLN UNIT PELAKSANA DALKIT
OPERASI & PEMELIHARAAN
PEKANBARU

DESEMBER

2022
II. OPERASI &
PEMELIHARAAN
PT PLN (PERSERO) PEMBANGKITAN SUMBAGUT
SEKTOR PEMBANGKITAN PEKANBARU
Jln. Dr. Tanjung Datuk No 74
Telp. (0761) 41855/41856
PT PLN (PERSERO) UNIT INDUK PEMBANGKITAN SUMBAGUT LAPORAN KUMULATIF PEMAKAIAN AIR , ELAVASI DAN SWC PLTA KOTA PANJANG
UNIT PELAKSANA PENGENDALIAN PEMBANGKITAN PEKANBARU
Jln. Dr. Tanjung Datuk No 74
SEKTOR PEMBANGKITAN PEKANBARU
Telp. (0761) 41855/41856

TAHUN 2022

Hal. 6

PL KOTA PANJANG
NO
BULAN JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER JUMLAH

1 Produksi Generator 46,258,650.00000 34,708,750.00000 54,306,810.00000 36,594,090.00000 38,939,980.00000 36,307,610.00000 33,844,580.00000 38,553,310.00000 43,770,047.47000 43,307,568.62000 41,112,837.19000 45,090,642.31000 447,704,233.28

2 Jam Periodik 744 672 744 720 744 720 744 744 744 744 744 744 8,808.00

3 Elavasi Awal Bulan 77 79 80 79 80 79 79 78 77 76 76 76 935.25

4 Volume Air Danau Awal Bulan 770,296,070 957,288,680 980,315,530 938,867,200 1,004,787,120 911,892,890 930,314,370 830,969,960 784,594,594 675,766,883 709,924,498 728,194,831 10,223,212,626.01

5 Elevasi Akhir Bulan 79 80 79 80 79 79 78 77 76 76 76 77 934.98

6 Volume Air Danau Akhir Bulan 957,288,680 980,315,530 938,867,200 1,004,787,120 905,971,700 930,314,370 830,969,960 784,594,584 675,766,883 709,924,498 728,194,831 755,997,536 10,202,992,892.01

7 Inflow Rata Rata 258.43 164.63 207.38 178.70 123.14 160.50 111.76 139.64 143.13 189.89 180.19 193.71 2,051.08

8 Out Flow Turbine Rata rata 186.09 155.11 219.83 153.27 158.86 153.39 136.47 158.12 185.11 178.37 173.66 186.66 2,044.95

9 Out Flow Spill Way Rata rata - - - - - - 12.38 - - - - - 12.38

10 Out Flow Total 186 155 220 153 159 153 149 158 185 178 174 187 2,057.33

11 Perubahan Volume Air Danau 186,992,610 23,026,850 (41,448,330) 65,919,920 (98,815,420) 18,421,480 (99,344,410) (46,375,376) (108,827,711) 34,157,615 18,270,333 27,802,705 (20,219,734.00)

12 SWC Air Waduk 10.77 10.81 10.84 10.86 10.93 10.95 10.80 10.99 10.99 11.32 10.95 10.92 131.13

13 Pajak Air ( Rp/Kwh ) 5 5 5 5 5 5 5 5 5 5 5 5 60.00

0
PT PLN (PERSERO) PEMBANGKITAN SUMBAGUT
SEKTOR PEMBANGKITAN PEKANBARU
Jln. Dr. Tanjung Datuk No 74
Telp. (0761) 41855/41856

0
PT PLN (PERSERO) LAPORAN PEMBANGKIT TENAGA LISTRIK No. Formulir :
SEKTOR PEMBANGKITAN SUMATERA BAGIAN UTARA KALORI RATA-RATA BATUBARA No. Revisi :
SEKTOR PEMBANGKITAN PEKANBARU TAHUN 2018 Tanggal :
Halaman :

NO TANGGAL TERIMA PENERIMAAN (kg) PEMASOK PERSEDIAAN AWAL (kg) PEMAKAIAN (kg) PERSEDIAAN AKHIR (kg) NILAI KALOR (Kcal/kg) NILAI KALOR RATA - RATA (Kcal/kg)
1 2 3a 3b 4 5 6 7 8'=((3a'*7')+(6"*8")) - (5'*8")) / 6'
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134

- -
PT PLN (PERSERO) UNIT INDUK PEMBANGKITAN SUMBAGUT
UNIT PELAKSANA PENGENDALIAN PEMBANGKITAN PEKANBARU
PEMANTAUAN WADUK PEMBANGKIT HIDRO
Jln. Dr. Tanjung Datuk No 74
Telp. (0761) 41855/41856 BULAN DESEMBER 2022
Hal. 13
ELEVASI WADUK BEBAN RATA-RATA BEBAN TERTINGGI OUTFLOW
TOTAL OUTFLOW INFLOW WADUK
TANGGAL AWAL AKHIR SELISIH UNIT (MW) UNIT (MW) SPILLWAY TURBINE
(m3/det) (m3/det)
(M) (M) (M) UNIT #1 UNIT #2 UNIT #3 UNIT #1,2,3 UNIT #1 UNIT #2 UNIT #3 (m3/det) (M3/DET)
1 76.17 76.68 0.51 28.05 28.96 29.43 73.48 35.12 35.18 35.54 - 223.33 223.33 692.22
2 76.68 76.82 0.14 24.69 26.05 26.68 61.57 35.96 36.62 36.94 - 190.94 190.94 319.66
3 76.82 76.86 0.04 27.38 27.51 27.96 51.81 34.98 36.76 35.95 - 157.33 157.33 194.11
4 76.86 76.88 0.02 25.82 25.98 22.35 55.87 36.05 36.65 29.77 - 175.10 175.10 193.49
5 76.88 76.93 0.05 25.15 24.49 27.14 57.96 35.66 35.81 35.74 - 177.48 177.48 223.45
6 76.93 76.81 (0.12) 28.44 28.75 28.83 80.10 35.27 35.57 35.87 - 244.85 244.85 134.52
7 76.81 76.71 (0.10) 26.23 28.27 28.55 78.67 35.09 35.86 36.12 - 240.36 240.36 148.42
8 76.71 76.62 (0.09) 27.46 27.13 27.37 78.52 34.97 34.99 35.48 - 235.14 235.14 152.40
9 76.62 76.55 (0.07) 25.98 26.67 27.40 77.77 35.01 34.84 35.36 - 244.09 244.09 179.73
10 76.55 76.49 (0.06) 27.94 25.50 25.46 65.24 35.09 36.23 35.13 - 201.32 201.32 146.16
11 76.49 76.48 (0.01) 22.83 23.98 23.35 52.71 34.52 35.27 35.53 - 170.28 170.28 161.08
12 76.48 76.39 (0.09) 24.71 24.76 24.96 68.22 35.94 34.68 34.91 - 205.78 205.78 123.03
13 76.39 76.39 0.00 23.27 23.12 22.83 52.00 36.11 35.20 35.47 - 159.87 159.87 159.87
14 76.39 76.39 0.00 22.10 20.08 22.42 46.88 35.43 30.16 35.31 - 145.34 145.34 145.34
15 76.39 76.29 (0.10) 24.27 23.54 24.46 63.13 34.36 34.52 34.72 - 200.89 200.89 108.95
16 76.29 76.19 (0.10) 30.10 28.63 29.20 70.69 35.67 35.73 34.72 - 220.58 220.58 128.64
17 76.19 76.26 0.07 20.60 21.23 21.68 43.91 34.38 35.89 34.42 - 137.31 137.31 201.67
18 76.26 76.34 0.08 21.33 22.42 21.75 51.17 29.26 30.16 29.15 - 148.48 148.48 222.03
19 76.34 76.30 (0.04) 26.88 26.27 26.20 69.51 35.81 34.58 34.99 - 215.33 215.33 178.56
20 76.30 76.42 0.12 26.15 26.00 27.12 75.88 34.98 34.67 35.16 - 235.30 235.30 345.62
21 76.42 76.58 0.16 26.88 26.60 27.10 78.33 34.98 35.16 36.06 - 242.07 242.07 389.18
22 76.58 76.59 0.01 26.85 25.82 26.28 71.17 34.83 34.79 35.31 - 215.00 215.00 224.19
23 76.59 76.55 (0.04) 21.97 23.40 22.41 62.24 34.70 36.14 35.05 - 194.51 194.51 157.74
24 76.55 76.50 (0.05) 26.67 26.97 27.02 58.31 34.74 36.63 35.79 - 177.45 177.45 131.48
25 76.50 76.46 (0.04) 23.95 25.86 21.82 50.83 35.62 36.30 35.08 - 153.09 153.09 116.31
26 76.46 76.37 (0.09) 24.43 25.27 25.65 60.84 34.70 35.51 36.08 - 158.37 158.37 75.62
27 76.37 76.29 (0.08) 25.23 25.69 25.51 55.37 34.28 36.20 35.64 - 167.31 167.31 93.76
28 76.29 76.31 0.02 24.82 22.35 21.75 46.07 35.94 34.55 34.79 - 140.79 140.79 159.18
29 76.31 76.33 0.02 23.00 22.57 23.91 40.27 35.90 35.09 34.97 - 122.81 122.81 141.20
30 76.33 76.40 0.07 19.88 20.43 36.17 32.02 29.96 36.17 84.06 - 99.42 99.42 163.78
31 76.40 76.52 0.12 19.68 21.04 36.05 27.60 25.08 36.05 - 87.09 87.09 197.42

RATA2 76.50 76.51 0.01 24.93 25.01 26.09 59.94 34.53 35.22 36.64 0.00 183.45 183.45 193.83
TOTAL - 5,687.02 5,687.02 6,008.81
PT PLN (PERSERO) UNIT INDUK PEMBANGKITAN SUMBAGUT
UNIT PELAKSANA PENGENDALIAN PEMBANGKITAN PEKANBARU REKAPITULASI PENGUSAHAAN WADUK
Jln. Dr. Tanjung Datuk No 74 PLTA KOTAPANJANG
Telp. (0761) 41855/41856
BULAN DESEMBER 2022
Hal. 14
ELEVASI (m) INFLOW WADUK OUTFLOW TURBIN OUTFLOW SPILWAY
BULAN TGL (m3/det) (m3/det) (m3/det) SWC KETERANGAN
IDEAL (M3/DET)
REAL
PUWL PLWL PLWL+1 MAX MIN RATE MAX MIN RATE MAX MIN RATE

1 80.89844 79.37 80.37344 76.70


JANUARI 1,068.04 40.26 258.43 1,068.04 100.94 186.09 - - - 10.77
15 81.25 80.10 81.10000 79.88
1 81.85345 80.78 81.77586 79.48
FEBRUARI 299.89 40.26 164.63 299.89 - 155.11 - - - 10.81
15 82.50 81.50 82.50000 79.79
1 81.85345 80.78 81.77586 79.83
MARET 451.22 67.58 207.38 289.14 119.00 219.83 - - - 10.84
15 82.24 81.50 82.50000 80.40
1 82.77000 81.87 82.87000 79.20
APRIL 337.31 83.06 178.70 297.60 93.56 153.27 - - - 10.86
15 83.00 82.00 83.00000 79.77
1 83.00000 82.20 83.20000 80.12
MEI 240.48 4.23 123.14 232.98 115.91 158.86 - - - 10.93
15 83.00 82.20 83.20000 79.60
1 82.45290 81.66 82.65807 78.79

JUNI 384.59 59.82 160.50 272.94 82.67 153.39 - - - 10.95


15 81.94 81.15 82.15000 78.68

1 81.36094 80.57 81.56563 79.07


JULI 212.90 40.26 111.76 47.29 - 136.47 105.78 - 12.38 10.80
15 80.85 80.05 81.05000 78.39
1 79.52187 78.43 79.42969 77.56
AGUSTUS 540.68 40.26 139.64 540.68 88.71 158.12 - - - 10.99
15 78.35 77.00 78.00000 76.44
1 77.39516 76.07 77.07097 76.88
SEPTEMBER 212.90 40.26 143.13 - - 185.11 - - - 10.99
15 76.50 75.20 76.20000 76.20
1 76.50000 75.20 76.20000 75.51
OKTOBER 516.14 58.29 189.89 277.79 114.66 178.37 - - - 11.32
15 76.50 75.20 76.20000 75.97
1 77.17097 75.20 76.20000 75.94
NOPEMBER 701.80 40.26 180.19 701.80 115.66 173.66 - - - 10.95
15 77.80 75.20 76.20000 76.99
1 79.28000 77.04 78.04000 76.17
DESEMBER 692.22 40.26 193.71 692.22 99.42 186.66 - - - 10.92
15 80.50 78.55 79.55000 76.39

RATA-RATA 80.40 79.24 80.24 78.24 168.85 168.93 1.13


MAKSIMUM 83.00 82.20 83.20 80.40 1,068.04 1068.04 105.78 10.93
MINIMUM 76.50 75.20 76.20 75.51 4.23 0.00 0.00

Pekanbaru, 10 Maret 2015


SPV RENDAL OPHAR

RIDWAN SAPUTRA
DATA BEBAN PEMBANGKIT
BULAN DESEMBER 2022

PLTA KPJ #01 PLTA KPJ #02 PLTA KPJ #03 PLTG T. LEMBU #02 PLTG T. LEMBU #03 PLTG B. PUNGUT #02 PLTMG B. PUNGUT #01 PLTMG B. PUNGUT #02 PLTMG B. PUNGUT #03 PLTMG B. PUNGUT #04 PLTMG B. PUNGUT #05 PLTMG B. PUNGUT #06 PLTMG B. PUNGUT #07

Tgl RATA- RATA- RATA- RATA- RATA- RATA- RATA- RATA- RATA- RATA-
MIN MAX MIN MAX MIN MAX MIN MAX MIN MAX MIN MAX MIN MAX RATA-RATA MIN MAX MIN MAX MIN MAX MIN MAX RATA-RATA MIN MAX RATA-RATA MIN MAX
RATA RATA RATA RATA RATA RATA RATA RATA RATA RATA
Daya (MW)
1 28.05 18.61 35.12 28.96 19.68 35.18 29.43 19.16 35.54 - - - - - - - - - 14.00 10.00 14.50 14.50 14.50 14.50 13.69 4.00 14.50 14.50 14.50 14.50 14.50 14.50 14.50 14.46 14.00 14.50 14.50 14.50 14.50

2 24.69 18.90 35.96 26.05 18.84 36.62 26.68 19.20 36.94 - - - - - - - - - 13.14 10.00 14.50 7.86 14.50 14.50 13.81 4.00 14.50 12.18 14.50 14.50 12.00 14.50 14.50 13.81 14.00 14.50 13.60 14.50 14.50

3 27.38 18.87 34.98 27.51 19.23 36.76 27.96 19.16 35.95 - - - - - - - - - 13.65 10.00 14.50 12.67 14.50 14.50 13.54 4.00 14.50 12.57 14.50 14.50 12.67 14.50 14.50 13.50 14.00 14.50 13.60 14.50 -

4 25.82 18.89 36.05 25.98 19.53 36.65 22.35 19.14 29.77 - - - - - - - - - 13.75 10.00 14.50 13.60 14.50 14.50 13.21 4.00 14.50 13.00 14.50 14.50 13.60 14.50 14.50 13.21 14.00 14.50 13.60 14.50 -

5 25.15 18.73 35.66 24.49 18.95 35.81 27.14 19.02 35.74 - - - - - - - - - 13.93 10.00 14.50 13.91 14.50 14.50 14.16 4.00 14.50 14.03 14.50 14.50 13.98 14.50 14.50 13.42 14.00 14.50 13.25 14.50 14.50

6 28.44 8.59 35.27 28.75 19.75 35.57 28.83 19.95 35.87 - - - - - - - - - 14.48 10.00 14.50 14.50 14.50 14.50 14.08 4.00 14.50 14.46 14.50 14.50 14.00 14.50 14.50 14.00 14.00 14.50 14.42 14.50 14.50

7 26.23 18.76 35.09 28.27 19.45 35.86 28.55 19.74 36.12 - - - - - - - - - 14.50 10.00 14.51 14.50 14.50 14.50 14.50 4.00 14.50 14.50 14.50 14.50 13.00 14.50 14.50 13.00 14.00 14.50 14.50 14.50 14.50

8 27.46 18.90 34.97 27.13 19.75 34.99 27.37 20.10 35.48 - - - - - - - - - 12.50 10.00 14.50 12.50 14.50 14.50 13.68 4.00 14.50 13.05 14.50 14.50 13.86 14.50 14.50 13.38 14.00 14.50 13.68 14.50 14.50

9 25.98 18.54 35.01 26.67 18.74 34.84 27.40 19.04 35.36 - - - - - - - - - 14.40 10.00 14.50 11.60 14.50 14.50 13.45 4.00 14.50 11.60 14.50 14.50 14.50 14.50 14.50 14.50 14.00 14.50 12.58 14.50 14.50

10 27.94 18.53 35.09 25.50 18.33 36.23 25.46 18.07 35.13 - - - - - - - - - 14.50 10.00 14.50 11.83 14.50 14.50 14.25 4.00 14.50 14.29 14.50 14.50 13.20 14.50 14.50 12.42 14.00 14.50 14.50 14.50 14.50

11 22.83 18.47 34.52 23.98 18.29 35.27 23.35 18.28 35.53 - - - - - - - - - 14.50 10.00 14.50 11.63 14.50 14.50 14.10 4.00 14.50 14.50 14.50 14.50 11.63 14.50 14.50 14.50 14.00 14.50 14.50 14.50 14.50

12 24.71 18.74 35.94 24.76 18.92 34.68 24.96 19.01 34.91 - - - - - - - - - 154.64 10.00 1,010.00 13.60 14.50 14.50 13.75 4.00 14.50 13.58 14.50 14.50 13.75 14.50 14.50 13.58 14.00 14.50 13.50 14.50 14.50

13 23.27 18.81 36.11 23.12 18.83 35.20 22.83 19.02 35.47 - - - - - - - - - 13.75 10.00 14.50 13.60 14.50 14.50 13.75 4.00 14.50 14.18 14.50 14.50 13.60 14.50 14.50 13.36 14.00 14.50 14.15 14.50 14.50

14 22.10 18.38 35.43 20.08 18.49 30.16 22.42 18.71 35.31 - - - - - - - - - 12.70 10.00 14.50 10.88 14.50 14.50 12.12 4.00 14.50 12.70 14.50 14.50 13.38 14.50 14.50 12.63 14.00 14.50 11.25 14.50 14.50

15 24.27 18.25 34.36 23.54 18.31 34.52 24.46 18.79 34.72 - - - - - - - - - 10.75 10.00 14.50 11.13 14.50 14.50 10.75 4.00 14.50 10.90 14.50 14.50 10.90 14.50 14.50 11.13 14.00 14.50 10.75 14.50 14.50

16 30.10 18.39 35.67 28.63 18.12 35.73 29.20 18.82 34.72 - - - - - - - - - 213.60 10.00 10.00 14.09 14.50 14.50 13.60 4.00 14.50 13.60 14.50 14.50 13.60 14.50 14.50 13.60 14.00 14.50 14.09 14.50 14.50

17 20.60 18.31 34.38 21.23 18.66 35.89 21.68 18.89 34.42 - - - - - - - - - 11.93 10.00 14.50 12.01 14.50 14.50 13.20 4.00 14.50 11.93 14.50 14.50 12.88 14.50 14.50 11.88 14.00 14.50 12.22 14.50 14.50

18 21.33 18.33 29.26 22.42 18.53 30.16 21.75 18.72 29.15 - - - - - - - - - 12.70 10.00 14.50 13.38 14.50 14.50 12.70 4.00 14.50 13.38 14.50 14.50 13.38 14.50 14.50 13.38 14.00 14.50 12.70 14.50 14.50

19 26.88 18.69 35.81 26.27 18.16 34.58 26.20 18.92 34.99 - - - - - - - - - 13.64 10.00 14.50 13.22 14.50 14.50 13.22 4.00 14.50 13.55 14.50 14.50 14.50 14.50 14.50 13.06 14.00 14.50 14.50 14.50 14.50

20 26.15 18.73 34.98 26.00 18.74 34.67 27.12 18.82 35.16 - - - - - - - - - 14.11 10.00 14.50 13.57 14.50 14.50 13.42 4.00 14.50 14.46 14.50 14.50 13.75 14.50 14.50 13.71 14.00 14.50 13.42 14.50 14.50

21 26.88 18.49 34.98 26.60 19.42 35.16 27.10 19.08 36.06 - - - - - - - - - 13.50 10.00 14.50 14.15 14.50 14.50 13.75 4.00 14.50 14.00 14.50 14.50 14.00 14.50 14.50 14.00 14.00 14.50 13.79 14.50 14.50

22 26.85 18.52 34.83 25.82 19.28 34.79 26.28 19.19 35.31 - - - - - - - - - 13.38 10.00 14.50 13.21 14.50 14.50 13.38 4.00 14.50 13.75 14.50 14.50 13.38 14.50 14.50 13.60 14.00 14.50 13.00 14.50 14.50

23 21.97 18.55 34.70 23.40 19.64 36.14 22.41 19.14 35.05 - - - - - - - - - 10.00 10.00 10.00 11.29 14.50 14.50 10.00 4.00 10.00 10.00 14.50 10.00 10.00 14.50 10.00 8.75 14.00 10.00 11.29 14.50 14.50

24 26.67 18.68 34.74 26.97 19.88 36.63 27.02 19.30 35.79 - - - - - - - - - 13.00 10.00 14.50 14.50 14.50 14.50 13.00 4.00 14.50 12.13 14.50 14.50 12.63 14.50 14.50 12.13 14.00 14.50 14.50 14.50 14.50

25 23.95 18.41 35.62 25.86 19.81 36.30 21.82 19.07 35.08 - - - - - - - - - 11.33 10.00 14.00 10.90 14.50 14.50 10.90 4.00 14.50 10.90 14.50 14.50 11.50 14.50 14.50 11.50 14.00 14.50 10.90 14.50 14.50
26 24.43 18.82 34.70 25.27 19.12 35.51 25.65 19.11 36.08 - - - - - - - - - 13.75 10.00 14.50 13.75 14.50 14.50 13.60 4.00 14.50 13.38 14.50 14.50 13.38 14.50 14.50 13.38 14.00 14.50 13.75 14.50 14.50
27 25.23 18.10 34.28 25.69 18.22 36.20 25.51 18.54 35.64 - - - - - - - - - 13.00 10.00 14.50 13.86 14.50 14.50 13.38 4.00 14.50 11.33 14.50 14.50 13.00 14.50 14.50 14.50 14.00 14.50 13.71 14.50 14.50
28 24.82 18.15 35.94 22.35 20.04 34.55 21.75 18.84 34.79 - - - - - - - - - 13.38 10.00 14.50 14.09 14.50 14.50 13.38 4.00 14.50 13.00 14.50 14.50 13.00 14.50 14.50 14.00 14.00 14.50 14.09 14.50 14.50
29 23.00 18.82 35.90 22.57 18.02 35.09 23.91 18.95 34.97 - - - - - - - - - 13.00 10.00 14.50 14.09 14.50 14.50 9.67 4.00 14.50 14.50 14.50 14.50 14.50 14.50 14.50 13.00 14.00 14.50 11.93 14.50 14.50

30 19.88 18.91 29.96 20.43 18.89 36.17 - - - - - - - - - - - - 10.00 10.00 10.00 14.09 14.50 10.00 10.00 4.00 10.00 10.00 14.50 10.00 10.00 14.50 10.00 10.00 14.00 10.00 11.93 14.50 10.00
31 19.68 18.68 25.08 21.04 18.95 36.05 - - - - - - - - - - - - 10.00 10.00 14.50 11.00 14.50 14.50 10.00 4.00 14.50 10.00 14.50 14.50 11.00 14.50 14.50 13.00 14.00 14.50 11.93 14.50 14.50
PT PLN (PERSERO) LAPORAN PEMBANGKIT TENAGA LISTRIK No. Formulir :
PEMBANGKITAN SUMATERA BAGIAN UTARA JAM KERJA UNIT PEMBANGKIT No. Revisi :
SEKTOR PEMBANGKITAN BELAWAN JUNI 2022 Tanggal :
Halaman :

NO PUSAT LISTRIK MEREK MESIN JAM KERJA JSAI/JSTO/JSCI JSGI/JSSO/JSHGPI JSMI/JSMO JSIB JSYI JSME JSSE JSB
1 PLTG TELUK LEMBU 1 (ALSTHOM) Alsthom
2 PLTG TELUK LEMBU 2 (ALSTHOM) Alsthom - 5,558.13 166.70 8,107.96 - 81,027.71
3 PLTG TELUK LEMBU 3 (EX GILI TIMUR) GE - 92.90 5,289.33 18,700.00 - 18,700.00
4 PLTD TELUK LEMBU SULZER Sulzer
5 PLTA KOTA PANJANG 1 Kaplan 500.55 4,564.15 4,564.15 4,564.15 - - - - 164,931.70
6 PLTA KOTA PANJANG 2 Kaplan 358.43 6,903.03 12,964.92 37,346.95 - - - - 168,423.08
7 PLTA KOTA PANJANG 3 Kaplan 542.92 3,910.87 38,463.65 55,182.20 - - - - 170,186.67
8 PLTG BALAI PUNGUT 2 DURI IP Alsthom - 791.35 9,921.67 34,341.47 - - - - 124,821.55
9 PLTMG BALAI PUNGUT DURI 1 WARTSILLA 230.93 53,724.00
10 PLTMG BALAI PUNGUT DURI 2 WARTSILLA 153.30 41,966.00
11 PLTMG BALAI PUNGUT DURI 3 WARTSILLA 213.27 48,603.00
12 PLTMG BALAI PUNGUT DURI 4 WARTSILLA 221.70 55,266.00
13 PLTMG BALAI PUNGUT DURI 5 WARTSILLA 269.08 53,887.00
14 PLTMG BALAI PUNGUT DURI 6 WARTSILLA 294.78 51,776.00
15 PLTMG BALAI PUNGUT DURI 7 WARTSILLA 202.70 47,798.00
16 PLTU TEMBILAHAN #01
17 PLTU TEMBILAHAN #02
JAM KERJA : Jam Kerja Mesin
JSAI.JSTO/JSCI : Jam Kerja Setelah Annual Insp/Top Ov.haul/Comb.Insp
JSGI/JSSO/JSHGPI : Jam Kerja Setelah General Insp/Semi Ov.haul/HGPI
JSMI/JSMO : Jam Kerja Setelah Major Insp/Major Ov.haul
JSIB : Jam kerja setelah Inspeksi Boiler
JSYI : Jam Kerja Setelah Yearly Inspection
JSME : Jam Kerja Setelah Mean Inspection
JSSE : Jam Kerja Setelah Serious Inspection
JSB : Jam Sejak Beroperasi
PLN UNIT PELAKSANA DALKIT
PEKANBARU
OPERASI & PEMELIHARAAN

DESEMBER

2022
III. EVALUASI DATA
PENGUSAHAAN
LAPORAN INDIKATOR UNJUK KERJA P
BULAN DESEMBER 2022

SEKTOR / DAYA DAYA DMN DERATING KWH JAM

PRODUKSI
PUSAT LISTRIK / TERPASANG MAMPU RENC/SES NON GENERAT PS+TRAFO KERJA
( SH )
OR
UNIT (KW) (KW) (KW) (KW) (KW) (KW) (KW)

PEKANBARU
1. PLTG TELUK LEMBU 516,400 242,228 472,190 - - - ### -

1 PLTG TELU 21,000 16,000 13,860 - ### -


2 PLTG TELU 21,000 16,000 15,000 - 5,355.00 -

2. PLTA KOTA PANJAN 114,000 114 114,000 - ### ### 1,762.37


1 PLTA KOTO 38,000 38.000 38,000 ### ### 556.12
2 PLTA KOTO 38,000 38.000 38,000 ### ### 686.68
3 PLTA KOTO 38,000 38.000 38,000 ### ### 519.57

3. PLTMG BLP 112,700 105,000 100,240 ### ### 1,517.00


1 PLTMG BAL 16,100 15,000 14,320 ### ### 215.00
2 PLTMG BAL 16,100 15,000 14,320 ### ### 232.00
3 PLTMG BAL 16,100 15,000 14,320 ### ### 237.00
4 PLTMG BAL 16,100 15,000 14,320 ### ### 210.00
5 PLTMG BAL 16,100 15,000 14,320 ### ### 147.00
6 PLTMG BAL 16,100 15,000 14,320 ### ### 217.00
7 PLTMG BAL 16,100 15,000 14,320 ### ### 259.00
8 PLTG BALAI 21,000 - 14,850 - - -

4. PLTU TEMBILAHAN - - - - - - - -

1 PLTU TEMB - - - - - -
2 PLTU TEMB - - - - - -

GABUNGAN PEKANBARU 743,100 347,342 686,430 - ### ### 3,279.37


IKATOR UNJUK KERJA PEMBANGKIT
BULAN DESEMBER 2022

KALI INDIKATOR UNJUK KERJA

GGN HAR STB GANGGUAN SdOF


SYNC. PUMP DERATING
EPDH EFDH INT EXT (KALI)

-
- - 1,488.00 - - - - - - -

- - 744.00 - - - -
- - 744.00 - - - -

4.53 52.13 412.97 - - - - - - -


0.92 5.13 181.84 - - - - -
3.47 7.00 46.85 - - - - -
0.15 40.00 184.28 - - - - -

- 185.35 4,249.65 - - - - 1.00 - 1.00


- 19.97 509.03 - 1.00 - 1.00
- 14.38 497.62 - - - -
- 7.52 499.48 - - - -
- 11.00 523.00 - - - -
- 3.55 593.45 - - - -
- 5.63 521.37 - - - -
- 123.30 361.70 - - - -
- - 744.00 - - - -

- - - - - - - - - -

- - - - - - -
- - - - - - -

4.53 237.48 6,150.62 - 1.00 - 1.00


TOR UNJUK KERJA

SOF EFOR

SOHxNMC PHxNMC (%) (FOH+..)xNMC (FOH+SH+...)xNMC (%)

- -
- 21,471,840 0.00% - - 0%

- 10,311,840.00 - - - -
- 11,160,000.00 - - - -

1,980,940.00 84,816,000.00 0.02 172,266.67 67,142,200.00 0.00


194,940.00 28,272,000.00 0.01 34,833.33 21,167,266.67 0.00
266,000.00 28,272,000.00 0.01 131,733.33 26,225,700.00 0.01
1,520,000.00 28,272,000.00 0.05 5,700.00 19,749,233.33 0.00

2,654,212.00 74,578,560.00 0.04 - 21,723,440.00 0.02


285,970.40 10,654,080.00 0.03 - 3,078,800.00 -
205,921.60 10,654,080.00 0.02 - 3,322,240.00 -
107,686.40 10,654,080.00 0.01 - 3,393,840.00 -
157,520.00 10,654,080.00 0.01 - 3,007,200.00 -
50,836.00 10,654,080.00 0.00 - 2,105,040.00 -
80,621.60 10,654,080.00 0.01 - 3,107,440.00 -
1,765,656.00 10,654,080.00 0.17 - 3,708,880.00 -
- 11,048,400.00 - - - -

- - - - - -

- - - - - -
- - - - - -

4,635,152.00 180,866,400.00 2.56% 172,266.67 88,865,640.00 0.1939%


JUMLAH HARI= 31
JAM PERIODE= 744

EAF CF

(AH-EPDH-...)xNMC PHxNMC (%) DT X JP %

20,580,590 21,471,840 100.00 31,248,000 0.00%

10,311,840.00 10,311,840.00 100.00 15,624,000.00 -


10,268,750.00 11,160,000.00 100.00 15,624,000.00 -

82,662,793.33 84,816,000.00 99.02 84,816,000.00 0.53


28,042,353.33 28,272,000.00 98.56 28,272,000.00 0.50
27,874,266.67 28,272,000.00 99.06 28,272,000.00 0.62
26,746,173.33 28,272,000.00 99.44 28,272,000.00 0.47

71,924,348.00 74,578,560.00 95.61 99,472,800.00 0.21


10,368,109.60 10,654,080.00 98.17 11,978,400.00 0.23
10,448,158.40 10,654,080.00 80.25 11,978,400.00 0.25
10,546,393.60 10,654,080.00 99.25 11,978,400.00 0.24
10,496,560.00 10,654,080.00 89.87 11,978,400.00 0.31
10,603,244.00 10,654,080.00 99.62 11,978,400.00 0.16
10,573,458.40 10,654,080.00 99.54 11,978,400.00 0.24
8,888,424.00 10,654,080.00 98.17 11,978,400.00 0.29
11,048,400.00 11,048,400.00 100.00 15,624,000.00 -

- - 6.19 - -

- - - - -
- - - - -

175,167,731.33 180,866,400 97.07 215,536,800 30.49%


PLN UNIT PELAKSANA DALKIT
PEKANBARU
OPERASI & PEMELIHARAAN

DESEMBER

2022
IV. LAMPIRAN

Anda mungkin juga menyukai