A. REKAPITUASI
No. URAIAN BIAYA (Rp)
JUMLAH RP 398,000,000
DIBULATKAN Rp 398,000,000
A BIAYA OPERASIONAL
1 Biaya Transportasi Kendari - Raha/Raha - Kendari
a Ketua Tim 1.0 0rg 8.0 exp x @ 250,000 = 2,000,000
b Anggota/Tenaga Ahli 5.0 0rg 6.0 exp x @ 250,000 = 7,500,000
c Asisten Ahli/Pembantu Peneliti 2.0 0rg 6.0 exp x @ 250,000 = 3,000,000
d Surveyor 5.0 0rg 2.0 exp x @ 250,000 = 2,500,000
2 Biaya Komunikasi + Paket Data Internet
a Ketua Tim 1.0 0rg 4.0 bulan x @ 350,000 = 1,400,000
b Anggota 5.0 0rg 4.0 bulan x @ 350,000 = 7,000,000
c Asisten Ahli/Pembantu Peneliti 2.0 0rg 4.0 bulan x @ 350,000 = 2,800,000
d Pembantu Lapangan (Operator Computer & Drafter) 5.0 Org 4.0 bulan x @ 350,000 = 7,000,000
e Surveyor 5.0 0rg 2.0 bulan x @ 350,000 = 3,500,000
3 Akomodasi TIM
a Ketua Tim 1.0 0rg 4.0 bulan x @ 350,000 = 1,400,000
b Anggota 5.0 0rg 4.0 bulan x @ 350,000 = 7,000,000
c Asisten Ahli/Pembantu Peneliti 2.0 0rg 4.0 bulan x @ 350,000 = 2,800,000
d Surveyor 5.0 0rg 2.0 bulan x @ 350,000 = 3,500,000
B BAHAN HABIS PAKAI (ATK)
1a Belanja ATK (Kertas A4, Materai, Alat Tulis, Map, dll) 1.0 Paket 3,900,000 = 3,900,000
b Penggadaan/Penjilitan Laporan Pendahuluan 10.0 Bh 150,000 = 1,500,000
c Penggadaan/Penjilitan Laporan Antara 10.0 Bh 200,000 2,000,000
d Penggadaan/Penjilitan Laporan Akhir 20.0 Bh 200,000 4,000,000
e Penggadaan/Penjilitan Album Peta Uk. A3 & A1 (Colour) 20.0 Bh 975,000 = 19,500,000
f Dokumen Elektronik ( CD + Caver + Box ) 10.0 Bh 50,000 500,000
C BIAYA SEWA
1 Sewa Kendaraan Roda Empat 3.0 Bln 1.0 Unit x @ 9,500,000 = 28,500,000
2 Sewa Printer A3 4.0 Bln 1.0 Unit x @ 600,000 = 2,400,000
3 Sewa GPS 2.0 Bln 3.0 Unit x @ 750,000 = 4,500,000
4 Sewa Rumah/Tempat Nginap Surveyor & Peneliti 4.0 Bln 1.0 Unit x @ 1,500,000 = 6,000,000
D BIAYA RAPAT, KONSULTASI DAN SEMINAR
a Rapat Persiapan 1.0 Keg x @ 2,400,000 = 2,400,000
b Rapat Teknis Operasional 1.0 keg x @ 2,400,000 = 2,400,000
c Rapat Evaluasi Data 1.0 Keg x @ 2,400,000 = 2,400,000
d Rapat Penyusunan Laporan 1.0 Keg x @ 2,400,000 = 2,400,000
e Konsultasi Publik 1.0 Keg x @ 8,000,000 = 8,000,000
f Seminar & Prosentase di SKPD 2.0 Kali x @ 9,500,000 = 19,000,000
E PENGOLAHAN DATA & PELAPORAN
a Survey Sarana & Prasarana Infrastruktur Existing Kota Raha 45 Hari 5.0 0rg x @ 90,000 = 20,250,000
b Survey Rencana Pengembangan Pemanfaatan Lahan Kota Raha 30 Hari 5.0 0rg x @ 90,000 = 13,500,000
b Pengadaan Peta Dasar, Peta-peta Tematik & Data Sekunder 1.0 Keg x @ 5,350,000 = 5,350,000
c Tabulasi dan Imput Data 1.0 Paket x @ 4,000,000 = 4,000,000
d Analisis dan Finalisasi Data 1.0 Paket x @ 4,000,000 = 4,000,000
e Penyusunan Laporan 1.0 Paket x @ 2,100,000 = 2,100,000
f Penyusunan Dok. Keuangan 1.0 Paket x @ 4,000,000 = 4,000,000
Jumlah Biaya Lansung Non Personil 214,000,000
A BIAYA OPERASIONAL
1 Biaya Transportasi Kendari - Raha/Raha - Kendari
a Ketua Tim 04 & 06/06/20 1.0 0rg 2.0 exp x @ 250,000 = 500,000
08 & 17/06/20 1.0 0rg 2.0 exp x @ 250,000 = 500,000
b Anggota/Tenaga Ahli 08 & 17/06/20 5.0 0rg 2.0 exp x @ 250,000 = 2,500,000
c Asisten Ahli/Pembantu Peneliti 08 & 17/06/20 2.0 0rg 2.0 exp x @ 250,000 = 1,000,000
d Surveyor 08 & 17/06/20 5.0 0rg 2.0 exp x @ 250,000 = 2,500,000
2 Biaya Komunikasi + Paket Data Internet
a Ketua Tim 30/06/2020 1.0 0rg 1.0 bulan x @ 350,000 = 350,000
31/07/2020 1.0 0rg 1.0 bulan x @ 350,000 = 350,000
b Anggota 30/06/2020 5.0 0rg 1.0 bulan x @ 350,000 = 1,750,000
31/07/2020 5.0 0rg 1.0 bulan x @ 350,000 = 1,750,000
c Asisten Ahli/Pembantu Peneliti 30/06/2020 2.0 0rg 1.0 bulan x @ 350,000 = 700,000
31/07/2020 2.0 0rg 1.0 bulan x @ 350,000 = 700,000
d Pembantu Lapangan (Operator Computer & Drafter) 30/06/2020 5.0 Org 1.0 bulan x @ 350,000 = 1,750,000
31/07/2020 5.0 Org 1.0 bulan x @ 350,000 = 1,750,000
e Surveyor 30/06/2020 5.0 0rg 1.0 bulan x @ 350,000 = 1,750,000
3 Akomodasi TIM
a Ketua Tim 30/06/2020 1.0 0rg 1.0 bulan x @ 350,000 = 350,000
31/07/2020 1.0 0rg 1.0 bulan x @ 350,000 = 350,000
b Anggota 30/06/2020 5.0 0rg 1.0 bulan x @ 350,000 = 1,750,000
31/07/2020 5.0 0rg 1.0 bulan x @ 350,000 = 1,750,000
c Asisten Ahli/Pembantu Peneliti 30/06/2020 2.0 0rg 1.0 bulan x @ 350,000 = 700,000
31/07/2020 2.0 0rg 1.0 bulan x @ 350,000 = 700,000
d Surveyor 30/06/2020 5.0 0rg 1.0 bulan x @ 350,000 = 1,750,000
B BAHAN HABIS PAKAI (ATK)
1 a Belanja ATK (Kertas A4, Materai, Alat Tulis, Map, dll) 05/06/2020 1.0 Paket 3,900,000 = 3,900,000
b Penggadaan/Penjilitan Laporan Pendahuluan 22/06/2020 10.0 Bh 150,000 = 1,500,000
c Penggadaan/Penjilitan Laporan Antara - Bh 200,000 -
d Penggadaan/Penjilitan Laporan Akhir - Bh 200,000 -
e Penggadaan/Penjilitan Album Peta Uk. A3 & A1 (Colour) - Bh 975,000 = -
f Dokumen Elektronik ( CD + Caver + Box ) - Bh 50,000 -
C BIAYA SEWA
1 Sewa Kendaraan Roda Empat 31/07/2020 1.0 Bln 1.0 Unit x @ 9,500,000 = 9,500,000
2 Sewa Printer A3 31/07/2020 2.0 Bln 1.0 Unit x @ 600,000 = 1,200,000
3 Sewa GPS 31/07/2020 1.0 Bln 3.0 Unit x @ 750,000 = 2,250,000
4 Sewa Rumah/Tempat Nginap Surveyor & Peneliti 31/07/2020 2.0 Bln 1.0 Unit x @ 1,500,000 = 3,000,000
D BIAYA RAPAT, KONSULTASI DAN SEMINAR
a Rapat Persiapan 09/06/2020 1.0 Keg x @ 2,400,000 = 2,400,000
b Rapat Teknis Operasional 10/06/2020 1.0 keg x @ 2,400,000 = 2,400,000
c Rapat Evaluasi Data 0.0 Keg x @ 2,400,000 = -
d Rapat Penyusunan Laporan 0.0 Keg x @ 2,400,000 = -
e Konsultasi Publik 0.0 Keg x @ 8,000,000 = -
f Seminar & Prosentase di SKPD 0.0 Kali x @ 9,500,000 = -
E PENGOLAHAN DATA & PELAPORAN
a Survey Sarana & Prasarana Infrastruktur Existing Kota Raha 31/07/2020 45 Hari 5.0 0rg x @ 90,000 = 20,250,000
Survey Rencana Pengembangan Pemanfaatan Lahan Kota
b 0 Hari 5.0 0rg x @ 90,000 = -
Raha
b Pengadaan Peta Dasar, Peta-peta Tematik & Data Sekunder 08/06/2020 1.0 Keg x @ 5,350,000 = 5,350,000
c Tabulasi dan Imput Data 0.0 Paket x @ 4,000,000 = -
d Analisis dan Finalisasi Data 0.0 Paket x @ 4,000,000 = -
e Penyusunan Laporan 0.0 Paket x @ 2,100,000 = -
f Penyusunan Dok. Keuangan 0.0 Paket x @ 4,000,000 = -
Jumlah Biaya Lansung Non Personil 76,950,000
TOTAL 159,200,000
DIBULATKAN 159,200,000
TERBILANG : SERATUS LIMA PULUH SEMBILAN JUTA DUA RATUS RIBU RUPIAH
A. REKAPITUASI
No. URAIAN BIAYA (Rp)
JUMLAH RP 247,000,000
DIBULATKAN Rp 247,000,000
II Tenaga Penunjang
1 Pembantu Lapangan 1 (Drafter/Operator CAD/CADMap) 27.0 Hari 4.0 Org x @ 80,000 = 8,640,000
2 Pembantu Lapangan 2 (Drafter/Operator GIS dan Pemetaan) 27.0 Hari 3.0 Org x @ 80,000 = 6,480,000
3 Pembantu Lapangan 3 (Op. Computer pembuat laporan & lap. keuangan) 27.0 Keg 4.0 Org x @ 80,000 = 8,640,000
4 Bendahara/Keuangan/Admistrasi 1.0 Keg 1.0 Org x @ 1,540,000 = 1,540,000
5 Pembantu Lapangan 4 (Surveyor Teknis) 23 Hari 20.0 Org x @ 80,000 = 36,800,000
Jumlah Biaya Lansung Personil 78,900,000
II. BIAYA LANGSUNG NON PERSONIL
A BIAYA OPERASIONAL
1 Biaya Perjalanan/Transportasi Kendari - Raha/Raha - Kendari
a Ketua Tim 1.0 0rg 6.0 exp x @ 250,000 = 1,500,000
b Anggota/Tenaga Ahli 4.0 0rg 4.0 exp x @ 250,000 = 4,000,000
c Surveyor 12.0 0rg 2.0 exp x @ 250,000 = 6,000,000
2 Biaya Komunikasi + Paket Data Internet
a Ketua Tim 1.0 0rg 1.0 bulan x @ 350,000 = 350,000
b Anggota/Tenaga Ahli 4.0 0rg 1.0 bulan x @ 350,000 = 1,400,000
c Surveyor 20.0 0rg 1.0 bulan x @ 200,000 = 4,000,000
3 Biaya Survey, Pengambilan data, Identifikasi dan inventarisasi
a Survey/Penyelusuran data kondisi existing drainase, sungai & pesisir 23 Hari 10.0 0rg x @ 90,000 = 20,700,000
b Survey topografi zona/wilayah terpilih 20 Hari 4.0 0rg x @ 100,000 = 8,000,000
c Survey Inventarisasi & Identufikasi lokasi titik rawan banjir & genangan 3 Hari 1.0 0rg x @ 90,000 = 270,000
d Survey Pengembangan & Penataan sistem drainase 23 Hari 5.0 0rg x @ 90,000 = 10,350,000
e Pengadaan data curah hujan 5 -10 tahun terakhir 1.0 Keg x @ 3,000,000 = 3,000,000
f Pengadaan dokumen peta dasar & dokumen sekunder lainnya 1.0 Keg x @ 1,980,000 = 1,980,000
g Pemasangan Patok Beton Bench Mark (BM), Uk 10 x 10 x 100 cm 10.0 Bh x @ 750,000 = 7,500,000
B BAHAN HABIS PAKAI (ATK)
a Belanja ATK (Kertas A3, Kertas A4 & F4, Kertas Foto, Alat Tulis, Map, Tinta) 1.0 Paket 3,500,000 = 3,500,000
b Penggadaan/Penjilitan Laporan Pendahuluan & Laporan Antara 12.0 Bh 125,000 1,500,000
c Penggadaan/Penjilitan Laporan Akhir & Album Peta 15.0 Bh 250,000 = 3,750,000
d Dokumen Elektronik ( CD + Caver + Box ) 10.0 Bh 50,000 = 500,000
C BIAYA SEWA
1 Sewa Kendaraan Roda Empat 1.0 Bln 2.0 Unit x @ 9,500,000 = 19,000,000
2 Sewa Kendaraan Roda Dua 1.0 Bln 5.0 Unit x @ 3,500,000 = 17,500,000
3 Sewa GPS 1.0 Bln 4.0 Unit x @ 750,000 = 3,000,000
4 Sewa Alat Ukur (waterpass) 10.0 Hari 1.0 Unit x @ 750,000 = 7,500,000
5 Sewa Printer A3 1.0 Bln 1.0 Unit x @ 600,000 = 600,000
6 Sewa Rumah/Tempat Nginap Surveyor & Peneliti 1.0 Bln 1.0 Unit x @ 1,500,000 = 1,500,000
D BIAYA RAPAT, SEMINAR
a Rapat Persiapan 1.0 Keg x @ 2,400,000 = 2,400,000
b Rapat Teknis Operasional 1.0 keg x @ 2,400,000 = 2,400,000
c Rapat Evaluasi Data 1.0 Keg x @ 2,400,000 = 2,400,000
d Seminar Pendahuluan dan Seminar Akhir di SKPD 2.0 Kali x @ 9,500,000 = 19,000,000
E PENGOLAHAN DATA & PELAPORAN
a Tabulasi dan Imput Data 1.0 Paket x @ 3,500,000 = 3,500,000
b Analisis dan Finalisasi Data 1.0 Paket x @ 3,500,000 = 3,500,000
c Penyusunan Laporan 1.0 Paket x @ 3,500,000 = 3,500,000
d Penyusunan Dok. Keuangan 1.0 Paket x @ 4,000,000 = 4,000,000
Jumlah Biaya Lansung Non Personil 168,100,000
Samran, ST
NIP. 19770602 201407 1 001 La Welendo, ST.,MT.
NIP. 196812312005011007
Mengetahui :
Kepala Badan Perencanaan Pembangunan Daerah Kab.
Muna
selaku Pengguna Anggaran
II Tenaga Penunjang
1 Pembantu Lapangan 1 (Drafter/Operator CAD/CADMap) 8/9/2020 27.0 Hari 4.0 Org x @ 80,000 = 8,640,000
2 Pembantu Lapangan 2 (Drafter/Operator GIS dan Pemetaan) 8/9/2020 27.0 Hari 3.0 Org x @ 80,000 = 6,480,000
3 Pembantu Lapangan 3 (Op. Comp. pembuat laporan & lap. keua 8/9/2020 27.0 Keg 4.0 Org x @ 80,000 = 8,640,000
4 Bendahara/Keuangan/Admistrasi 8/9/2020 1.0 Keg 1.0 Org x @ 1,540,000 = 1,540,000
5 Pembantu Lapangan 4 (Surveyor Teknis) 8/9/2020 23 Hari 20.0 Org x @ 80,000 = 36,800,000
Jumlah Biaya Langsung Personil 78,900,000
A BIAYA OPERASIONAL
1 Biaya Transportasi Kendari - Raha/Raha - Kendari
a Ketua Tim 12 & 20/8/20 1.0 0rg 6.0 exp x @ 250,000 = 1,500,000
b Anggota/Tenaga Ahli 18 & 26/8/20 4.0 0rg 4.0 exp x @ 250,000 = 4,000,000
c Surveyor 20/8/2020 12.0 0rg 2.0 exp x @ 250,000 = 6,000,000
2 Biaya Komunikasi + Paket Data Internet
a Ketua Tim 20/8/2020 1.0 0rg 1.0 bulan x @ 350,000 = 350,000
b Anggota/Tenaga Ahli 26/8/2020 4.0 0rg 1.0 bulan x @ 350,000 = 1,400,000
c Surveyor 8/9/2020 20.0 0rg 1.0 bulan x @ 200,000 = 4,000,000
3 Akomodasi TIM
a Ketua Tim 20/8/2020 1.0 0rg 1.0 bulan x @ 350,000 = 350,000
b Anggota 26/8/2020 4.0 0rg 1.0 bulan x @ 350,000 = 1,400,000
c Surveyor 8/9/2020 20.0 0rg 1.0 bulan x @ 200,000 = 4,000,000
B BAHAN HABIS PAKAI (ATK)
a Belanja ATK (Kertas A3, Kertas A4 & F4, Kertas Foto, Alat Tulis, Map, Tinta) 18/8/2020 1.0 Paket 1,680,000 = 1,680,000
b Penggadaan/Penjilitan Laporan & Album Peta - - Bh 250,000 = -
c Dokumen Elektronik ( CD + Caver + Box ) - - Bh 50,000 = -
C BIAYA SEWA
1 Sewa Kendaraan Roda Empat 8/9/2020 1.0 Bln 1.0 Unit x @ 9,500,000 = 9,500,000
2 Sewa GPS 8/9/2020 1.0 Bln 2.0 Unit x @ 750,000 = 1,500,000
3 Sewa Printer A3 0.0 Bln 1.0 Unit x @ 600,000 = -
4 Sewa Rumah/Tempat Nginap Surveyor & Peneliti 8/9/2020 1.0 Bln 1.0 Unit x @ 1,500,000 = 1,500,000
NO PROFESI/KEAHLIAN WAKTU VOLUME RINCIAN BIAYA TOTAL BIAYA
TOTAL - 159,980,000
DIBULATKAN - 159,980,000
II Tenaga Penunjang
1 Pembantu Lapangan 1 (Drafter/Operator CAD/CADMap) 0.0 Hari 4.0 Org x @ 80,000 = -
2 Pembantu Lapangan 2 (Drafter/Operator GIS dan Pemetaan) 0.0 Hari 3.0 Org x @ 80,000 = -
3 Pembantu Lapangan 3 (Op. Computer pembuat laporan & lap. keuangan) 0.0 Keg 4.0 Org x @ 80,000 = -
4 Bendahara/Keuangan/Admistrasi 22/12/2020 1.0 Keg 1.0 Org x @ 1,540,000 = 1,540,000
5 Pembantu Lapangan 4 (Surveyor Teknis) 0 Hari 20.0 Org x @ 80,000 = -
Jumlah Biaya Lansung Personil 10,400,000
II. BIAYA LANGSUNG NON PERSONIL
A BIAYA OPERASIONAL
1 Biaya Perjalanan/Transportasi Kendari - Raha/Raha - Kendari
a Ketua Tim 8 & 10/12/20 1.0 0rg 2.0 exp x @ 250,000 = 500,000
17 & 22/12/20 1.0 0rg 2.0 exp x @ 250,000 = 500,000
b Anggota/Tenaga Ahli 17 & 22/12/20 4.0 0rg 2.0 exp x @ 250,000 = 2,000,000
c Surveyor 18/12/2020 12.0 0rg 1.0 exp x @ 250,000 = 3,000,000
2 Biaya Komunikasi + Paket Data Internet
a Ketua Tim 1.0 0rg 0.0 bulan x @ 350,000 = -
b Anggota/Tenaga Ahli 4.0 0rg 0.0 bulan x @ 350,000 = -
c Surveyor 18/12/2020 20.0 0rg 1.0 bulan x @ 200,000 = 4,000,000
3 Biaya Survey, Pengambilan data, Identifikasi dan inventarisasi
a Survey/Penyelusuran data kondisi existing drainase, sungai & pesisir 1/12/2020 23 Hari 10.0 0rg x @ 90,000 = 20,700,000
b Survey topografi zona/wilayah terpilih 1/12/2020 20 Hari 4.0 0rg x @ 100,000 = 8,000,000
c Survey Inventarisasi & Identufikasi lokasi titik rawan banjir & genangan 0 Hari 1.0 0rg x @ 90,000 = -
d Survey Pengembangan & Penataan sistem drainase 1/12/2020 23 Hari 5.0 0rg x @ 90,000 = 10,350,000
e Pengadaan data curah hujan 5 -10 tahun terakhir 0.0 Keg x @ 3,000,000 = -
f Pengadaan dokumen peta dasar & dokumen sekunder lainnya 0.0 Keg x @ 1,980,000 = -
g Pemasangan Patok Beton Bench Mark (BM), Uk 10 x 10 x 100 cm 17/12/2020 10.0 Bh x @ 750,000 = 7,500,000
B BAHAN HABIS PAKAI (ATK)
a Belanja ATK (Kertas A3, Kertas A4 & F4, Kertas Foto, Alat Tulis, Map, Tinta) - Paket 3,500,000 = -
b Penggadaan/Penjilitan Laporan Pendahuluan & Laporan Antara 7/12/2020 12.0 Bh 125,000 1,500,000
c Penggadaan/Penjilitan Laporan Akhir & Album Peta 21/12/2020 15.0 Bh 250,000 = 3,750,000
d Dokumen Elektronik ( CD + Caver + Box ) 21/12/2020 10.0 Bh 50,000 = 500,000
C BIAYA SEWA
1 Sewa Kendaraan Roda Empat 22/12/2020 1.0 Bln 2.0 Unit x @ 9,500,000 = 19,000,000
2 Sewa Kendaraan Roda Dua 22/12/2020 1.0 Bln 5.0 Unit x @ 3,500,000 = 17,500,000
3 Sewa GPS 22/12/2020 1.0 Bln 4.0 Unit x @ 750,000 = 3,000,000
4 Sewa Alat Ukur (waterpass) 22/12/2020 10.0 Hari 1.0 Unit x @ 750,000 = 7,500,000
5 Sewa Printer A3 22/12/2020 1.0 Bln 1.0 Unit x @ 600,000 = 600,000
6 Sewa Rumah/Tempat Nginap Surveyor & Peneliti 22/12/2020 1.0 Bln 1.0 Unit x @ 1,500,000 = 1,500,000
D BIAYA RAPAT, SEMINAR
a Rapat Persiapan 0.0 Keg x @ 2,400,000 = -
b Rapat Teknis Operasional 0.0 keg x @ 2,400,000 = -
c Rapat Evaluasi Data 14/12/2020 1.0 Keg x @ 2,400,000 = 2,400,000
d Seminar Pendahuluan dan Seminar Akhir di SKPD 18/12/2020 1.0 Kali x @ 9,500,000 = 9,500,000
E PENGOLAHAN DATA & PELAPORAN
a Tabulasi dan Imput Data 12/15/2020 1.0 Paket x @ 3,500,000 = 3,500,000
b Analisis dan Finalisasi Data 12/16/2020 1.0 Paket x @ 3,500,000 = 3,500,000
c Penyusunan Laporan 12/19/2020 1.0 Paket x @ 3,500,000 = 3,500,000
d Penyusunan Dok. Keuangan 21/12/2020 1.0 Paket x @ 4,000,000 = 4,000,000
Jumlah Biaya Lansung Non Personil 137,800,000
TOTAL - 148,200,000
DIBULATKAN - 148,200,000
TERBILANG : SEMBILAN PULUH DELAPAN JUTA DELAPAN RATUS RIBU RUPIAH
LA WELENDO, ST., MT
NIP. 196812312005011007
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
UNIVERSITAS HALU OLEO
LEMBAGA PENELITIAN DAN PENGABDIAN KEPADA MASYARAKAT
( LPPM )
Alamat : Gedung Rektorat Lt . 1 Kampus Hijau Bumi Tridharma, Jln H.E.A. Mokodompit, Kendari 93232
Tlp/Fax (0401) 3193391, email : lppmuho@yahoo.com - lppm@uho.ac.id. Website : lppm.uho.ac.id
DAFTAR : PENERIMA HONORARIUM KETUA TIM DAN TENAGA AHLI TAHAP KEDUA (60%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN MASTERPLAN DRAINASE
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
Jumlah yang
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Pasal 21 Tanda Tanggan
Waktu diterima
(Rp)
Jumlah Biaya
Jumlah yang
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Pasal 21 Tanda Tanggan
Waktu diterima
(Rp)
Bendahara/ Keuangan/
1 Darmawati, S.Pd 1 Keg x 1,540,000 1,540,000 77,000 1,463,000 1
Administrasi
KWITANSI
LA WELENDO, ST. MT
NIP. 196812312005011007
KWITANSI
DARMAWATI, S.Pd
KWITANSI
MARWAN, ST
KWITANSI
KWITANSI
MUHAMMAD SAID, ST
DAFTAR : PENERIMAAN BIAYA TRANSPORTASI TIKET KAPAL KENDARI - RAHA UNTUK KETUA TIM DAN ANGGOTA TIM TAHAP KEDUA
(60%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN MASTERPLAN DRAINASE
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 1,250,000
Terbilang : Satu Juta Dua Ratus Lima Puluh Ribu Rupiah
DAFTAR : PENERIMAAN BIAYA TRANSPORTASI TIKET KAPAL RAHA - KENDARI UNTUK KETUA TIM DAN ANGGOTA TIM TAHAP KEDUA
(60%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN MASTERPLAN DRAINASE
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 1,250,000
Terbilang : Satu Juta Dua Ratus Lima Puluh Ribu Rupiah
DAFTAR : PENERIMAAN BIAYA TRANSPORTASI TIKET KAPAL RAHA - KENDARI UNTUK TENAGA PENUNJANG TAHAP KEDUA (60%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN MASTERPLAN DRAINASE
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 3,000,000
Terbilang : Tiga Juta Rupiah
DAFTAR : PENERIMAAN BIAYA TRANSPORTASI TIKET KAPAL KENDARI - RAHA UNTUK KETUA TIM TAHAP KEDUA (60%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN MASTERPLAN DRAINASE
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 250,000
Terbilang : Dua Ratus Lima Puluh Ribu Rupiah
DAFTAR : PENERIMAAN BIAYA TRANSPORTASI TIKET KAPAL RAHA - KENDARI UNTUK KETUA TIM TAHAP KEDUA (60%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN MASTERPLAN DRAINASE
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 250,000
Terbilang : Dua Ratus Lima Puluh Ribu Rupiah
KWITANSI
LA WELENDO, ST. MT
NIP. 196812312005011007
KWITANSI
LA WELENDO, ST. MT
NIP. 196812312005011007
KWITANSI
AHMAD DJALALUDDIN, ST
KWITANSI
LA WELENDO, ST. MT
NIP. 196812312005011007
KWITANSI
LA WELENDO, ST. MT
NIP. 196812312005011007
DAFTAR : PENERIMAAN BIAYA KOMUNIKASI + PAKET DATA INTERNET UNTUK SURVEYOR TAHAP KEDUA (60%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN MASTERPLAN DRAINASE
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 4,000,000
Terbilang : Empat Juta Rupiah
KWITANSI
MUHAMMAD SAID, ST
DAFTAR : PENERIMAAN BIAYA AKOMODASI UNTUK KETUA TIM (TENAGA AHLI) TAHAP PERTAMA (40%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN MEMORANDUM PROGRAM KOTAKU
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 350,000
Terbilang : Tiga Ratus Lima Puluh Ribu Rupiah
DAFTAR : PENERIMAAN BIAYA AKOMODASI UNTUK ANGGOTA TIM (TENAGA AHLI) TAHAP PERTAMA (40%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN MEMORANDUM PROGRAM KOTAKU
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 1,050,000
Terbilang : Satu Juta Lima Puluh Ribu Rupiah
DAFTAR : PENERIMAAN BIAYA AKOMODASI UNTUK SURVEYOR TEKNIS TAHAP PERTAMA (40%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN MEMORANDUM PROGRAM KOTAKU
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 1,000,000
Terbilang : Satu Juta Rupiah
KWITANSI
LA WELENDO, ST. MT
NIP. 196812312005011007
KWITANSI
KWITANSI
DAFTAR : PENERIMAAN BIAYA AKOMODASI UNTUK KETUA TIM, ANGGOTA TIM TENAGA AHLI DAN ASISTEN AHLI/PEMBANTU PENELITI
TAHAP PERTAMA (40%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN RENCANA DETAIL TATA RUANG (RDTR) KOTA RAHA
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 2,800,000
Terbilang : Dua Juta Delapan Ratus Ribu Rupiah
DAFTAR : PENERIMAAN BIAYA AKOMODASI UNTUK KETUA TIM, ANGGOTA TIM TENAGA AHLI DAN ASISTEN AHLI/PEMBANTU PENELITI
TAHAP PERTAMA (40%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN RENCANA DETAIL TATA RUANG (RDTR) KOTA RAHA
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 2,800,000
Terbilang : Dua Juta Delapan Ratus Ribu Rupiah
DAFTAR : PENERIMAAN BIAYA AKOMODASI UNTUK SURVEYOR TEKNIS TAHAP PERTAMA (40%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN RENCANA DETAIL TATA RUANG (RDTR) KOTA RAHA
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 1,750,000
Terbilang : Satu Juta Tujuh Ratus Lima Puluh Ribu Rupiah
KWITANSI
KWITANSI
KWITANSI
KWITANSI
LA WELENDO, ST. MT
NIP. 196812312005011007
KWITANSI
LA WELENDO, ST. MT
NIP. 196812312005011007
KWITANSI
LA WELENDO, ST. MT
NIP. 196812312005011007
KWITANSI
LA WELENDO, ST. MT
NIP. 196812312005011007
KWITANSI
.......................................
KWITANSI
.......................................
KWITANSI
.......................................
KWITANSI
WILHAM PRAJAB
Pemilik Kendaraan
KWITANSI
ASMIN
Pemilik Kendaraan
KWITANSI
KWITANSI
KWITANSI
KADIR RAMADAN
Pemilik Kendaraan
KWITANSI
ANDRIAWAN
Pemilik Kendaraan
KWITANSI
SAMUEL SAMPANG
Pemilik Kendaraan
KWITANSI
MUHAMMAD SAID, ST
CV. PALETEANG KONSULINDO
KWITANSI
MUHAMMAD SAID, ST
CV. PALETEANG KONSULINDO
KWITANSI
MUHAMMAD SAID, ST
CV. PALETEANG KONSULINDO
KWITANSI
DARMAWATI
Pemilik Rumah
KWITANSI
NIRMAN
UD. ALPHA JAYA
KWITANSI
UNTUK PEMBAYARAN : Biaya Rapat Evaluasi Data dalam Rangka "Penyusunan Dokumen Masterplan
Drainase Kabupaten Muna ”(Daftar terlampir), Tgl 14 Desember 2020, Yaitu :
LA WELENDO, ST. MT
NIP. 196812312005011007
KWITANSI
UNTUK PEMBAYARAN : Biaya Seminar Akhir dalam Rangka "Penyusunan Dokumen Masterplan Drainase
Kabupaten Muna ”(Daftar terlampir), Tgl 18 Desember 2020, Yaitu :
LA WELENDO, ST. MT
NIP. 196812312005011007
KWITANSI
KWITANSI
DAFTAR : PENERIMAAN BIAYA LUMPSUM PENGUMPULAN DATA SEKUNDER KETUA TIM DAN 1 ORANG ANGGOTA TIM TAHAP AWAL
(40%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN KAJIAN LINGKUNGAN HIDUP STRATEGIS (KLHS) REVISI RENCANA TATA RUANG
WILAYAH (RTRW) KABUPATEN MUNA
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 1,800,000
Terbilang : Satu Juta Delapan Ratus Ribu Rupiah
DAFTAR : PENERIMAAN BIAYA LUMPSUM PENGUMPULAN DATA SEKUNDER KETUA TIM DAN 1 ORANG ANGGOTA TIM TAHAP AWAL
(40%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN KAJIAN LINGKUNGAN HIDUP STRATEGIS (KLHS) REVISI RENCANA TATA RUANG
WILAYAH (RTRW) KABUPATEN MUNA
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 1,800,000
Terbilang : Satu Juta Delapan Ratus Ribu Rupiah
DAFTAR : PENERIMAAN BIAYA LUMPSUM PENGUMPULAN DATA SEKUNDER ANGGOTA TIM DAN PEMBANTU PENELITI TAHAP AWAL
(40%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN KAJIAN LINGKUNGAN HIDUP STRATEGIS (KLHS) REVISI RENCANA TATA RUANG
WILAYAH (RTRW) KABUPATEN MUNA
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 2,000,000
Terbilang : Dua Juta Rupiah
DAFTAR : PENERIMAAN BIAYA LUMPSUM PENGUMPULAN DATA SEKUNDER ANGGOTA TIM DAN PEMBANTU PENELITI TAHAP AWAL
(40%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN KAJIAN LINGKUNGAN HIDUP STRATEGIS (KLHS) REVISI RENCANA TATA RUANG
WILAYAH (RTRW) KABUPATEN MUNA
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 2,000,000
Terbilang : Dua Juta Rupiah
DAFTAR : PENERIMAAN BIAYA HONOR TENAGA LAPANGAN UNTUK PENGAMBILAN DATA PRIMER (SURVEY) TAHAP AWAL (40%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN KAJIAN LINGKUNGAN HIDUP STRATEGIS (KLHS) REVISI RENCANA TATA RUANG
WILAYAH (RTRW) KABUPATEN MUNA
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 800,000
Terbilang : Delapan Ratus Ribu Rupiah
DAFTAR : PENERIMAAN BIAYA HONOR TENAGA LAPANGAN UNTUK PENGAMBILAN DATA PRIMER (SURVEY) TAHAP AWAL (40%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN KAJIAN LINGKUNGAN HIDUP STRATEGIS (KLHS) REVISI RENCANA TATA RUANG
WILAYAH (RTRW) KABUPATEN MUNA
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 800,000
Terbilang : Delapan Ratus Ribu Rupiah
DAFTAR : PENERIMAAN BIAYA LUMPSUM TENAGA ADMINISTRASI UNTUK KONSULTASI ADMINISTRASI TAHAP AWAL (40%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN KAJIAN LINGKUNGAN HIDUP STRATEGIS (KLHS) REVISI RENCANA TATA RUANG
WILAYAH (RTRW) KABUPATEN MUNA
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 1,200,000
Terbilang : Satu Juta Dua Ratus Ribu Rupiah
DAFTAR : PENERIMAAN BIAYA LUMPSUM TENAGA ADMINISTRASI UNTUK KONSULTASI ADMINISTRASI TAHAP AWAL (40%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN KAJIAN LINGKUNGAN HIDUP STRATEGIS (KLHS) REVISI RENCANA TATA RUANG
WILAYAH (RTRW) KABUPATEN MUNA
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 1,200,000
Terbilang : Satu Juta Dua Ratus Ribu Rupiah
DAFTAR : PENERIMAAN BIAYA PENGOLAHAN DATA TENAGA ADMINISTRASI TAHAP AWAL (40%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN KAJIAN LINGKUNGAN HIDUP STRATEGIS (KLHS) REVISI RENCANA TATA RUANG
WILAYAH (RTRW) KABUPATEN MUNA
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 1,100,000
Terbilang : Satu Juta Seratus Ribu Rupiah
KWITANSI
KWITANSI
KWITANSI
KWITANSI
KWITANSI
MUH, KASIM
KWITANSI
MUH, KASIM
KWITANSI
KWITANSI
KWITANSI
DAFTAR : PENERIMAAN BIAYA PENGINAPAN UNTUK PENGUMPULAN DATA SEKUNDER KETUA TIM DAN 1 ORANG ANGGOTA TIM
TAHAP AWAL (40%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN KAJIAN LINGKUNGAN HIDUP STRATEGIS (KLHS) REVISI RENCANA TATA RUANG
WILAYAH (RTRW) KABUPATEN MUNA
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 1,200,000
Terbilang : Satu Juta Dua Ratus Ribu Rupiah
DAFTAR : PENERIMAAN BIAYA PENGINAPAN UNTUK PENGUMPULAN DATA SEKUNDER KETUA TIM DAN 1 ORANG ANGGOTA TIM
TAHAP AWAL (40%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN KAJIAN LINGKUNGAN HIDUP STRATEGIS (KLHS) REVISI RENCANA TATA RUANG
WILAYAH (RTRW) KABUPATEN MUNA
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 1,200,000
Terbilang : Satu Juta Dua Ratus Ribu Rupiah
DAFTAR : PENERIMAAN BIAYA PENGINAPAN UNTUK PENGAMBILAN DATA PRIMER ANGGOTA TIM DAN PEMBANTU PENELITI TAHAP
AWAL (40%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN KAJIAN LINGKUNGAN HIDUP STRATEGIS (KLHS) REVISI RENCANA TATA RUANG
WILAYAH (RTRW) KABUPATEN MUNA
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 3,000,000
Terbilang : Tiga Juta Rupiah
DAFTAR : PENERIMAAN BIAYA PENGINAPAN UNTUK PENGAMBILAN DATA PRIMER ANGGOTA TIM DAN PEMBANTU PENELITI TAHAP
AWAL (40%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN KAJIAN LINGKUNGAN HIDUP STRATEGIS (KLHS) REVISI RENCANA TATA RUANG
WILAYAH (RTRW) KABUPATEN MUNA
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 3,000,000
Terbilang : Tiga Juta Rupiah
DAFTAR : PENERIMAAN BIAYA PENGINAPAN UNTUK KONSULTASI ADMINISTRASI TENAGA SEKRETARIAT/ADMINISTRASI/ KOMPUTER
TAHAP AWAL (40%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN KAJIAN LINGKUNGAN HIDUP STRATEGIS (KLHS) REVISI RENCANA TATA RUANG
WILAYAH (RTRW) KABUPATEN MUNA
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 1,200,000
Terbilang : Satu Juta Dua Ratus Ribu Rupiah
DAFTAR : PENERIMAAN BIAYA PENGINAPAN UNTUK KONSULTASI ADMINISTRASI TENAGA SEKRETARIAT/ADMINISTRASI/ KOMPUTER
TAHAP AWAL (40%)
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN KAJIAN LINGKUNGAN HIDUP STRATEGIS (KLHS) REVISI RENCANA TATA RUANG
WILAYAH (RTRW) KABUPATEN MUNA
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Jumlah Yang Diterima Tanda Tanggan
Volume
(Rp)
Jumlah 1,200,000
Terbilang : Satu Juta Dua Ratus Ribu Rupiah
KWITANSI
KWITANSI
KWITANSI
KWITANSI
KWITANSI
KWITANSI
KWITANSI
KWITANSI
KWITANSI
KWITANSI
KWITANSI
LA WELENDO, ST. MT
NIP. 196812312005011007
KWITANSI
LA WELENDO, ST. MT
NIP. 196812312005011007
KWITANSI
LA WELENDO, ST. MT
NIP. 196812312005011007
KWITANSI
LA WELENDO, ST. MT
NIP. 196812312005011007
: PENERIMAAN BIAYA TRANSPORTASI TIKET KAPAL KENDARI-RAHA KETUA TIM, ANGGOTA, ASISTEN PENELITI DAN
DAFTAR SURVEYOR TAHAP AWAL
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN RENC. PENGEMBANGAN KAWASAN PERDESAAN (RPKP)
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah 250,000
Terbilang : Dua Ratus Lima Puluh Ribu Rupiah
DAFTAR : PENERIMAAN BIAYA TRANSPORTASI TIKET KAPAL KENDARI-RAHA KETUA TIM, ANGGOTA, ASISTEN PENELITI
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN RENC. PENGEMBANGAN KAWASAN PERDESAAN (RPKP)
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
: PENERIMAAN BIAYA TRANSPORTASI TIKET KAPAL RAHA-KENDARI KETUA TIM, ANGGOTA, ASISTEN PENELITI
DAFTAR
Jumlah 7,000,000
Terbilang : Tujuh Juta Rupiah
DAFTAR : PENERIMA BIAYA KOMUNIKASI + PAKET DATA INTERNET TIM PETUGAS SURVEYOR TAHAP AWAL
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN RENC. PENGEMBANGAN KAWASAN PERDESAAN (RPKP)
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
Jumlah yang
No. Nama Peneliti Jabatan Dalam Tim Tanda Tanggan
Waktu Billing Rate (Rp) diterima
Jumlah 2,000,000
Terbilang : Dua Juta Rupiah
DAFTAR : PENERIMA DANA AKOMODASI KETUA TIM, ANGGOTA DAN ASISTEN PENELITI TAHAP AWAL
JUDUL KEGIATAN : PENYUSUNAN DOKUMEN RENC. PENGEMBANGAN KAWASAN PERDESAAN (RPKP)
SUMBER DANA : APBD KABUPATEN MUNA TAHUN ANGGARAN 2020
Jumlah Biaya
Jumlah yang
No. Nama Peneliti Jabatan Billing Rate Tanda Tanggan
Waktu diterima
(Rp)
1 La Welendo, ST., MT. Ketua Tim 2 Bln x 350,000 700,000 1
2 Awaludin, SP, M.SC Tenaga Ahli 2 Bln x 350,000 700,000 2
3 Nasrul, ST, MT Tenaga Ahli 2 Bln x 350,000 700,000 3
4 Muriadin, ST.,M.Eng Tenaga Ahli 2 Bln x 350,000 700,000 4
5 Halim, ST.,MT Tenaga Ahli 2 Bln x 350,000 700,000 5
6 Nurgiantoro, ST.,MT Tenaga Ahli 2 Bln x 350,000 700,000 6
7 Dr. Ir. La Ode Muh. Magribi, MT Asisten Tenaga Ahli 2 Bln x 350,000 700,000 7
8 Mappa Nashrun, ST.,MT Asisten Tenaga Ahli 2 Bln x 350,000 700,000 8
9 Ridwan Syah Nuhun, ST.,MT Asisten Tenaga Ahli 2 Bln x 350,000 700,000 9
10 Ainussalbi Al Ikhsan, ST.,M.Sc Asisten Tenaga Ahli 2 Bln x 350,000 700,000 10
Jumlah 7,000,000
Terbilang : Tiga Juta Lima Ratus Ribu Rupiah
Jumlah Biaya
Jumlah yang
No. Nama Peneliti Jabatan Dalam Tim Billing Rate Tanda Tanggan
Waktu diterima
(Rp)
1 Munansar, ST.,MT Petugas Survey 2 Bln x 200,000 400,000 1
2 Anas Masur, ST Petugas Survey 2 Bln x 200,000 400,000 2
3 Marifat Arbain, ST Petugas Survey 2 Bln x 200,000 400,000 3
4 Jukrianto Badaru, A.Md Petugas Survey 2 Bln x 200,000 400,000 4
5 Runtu Wulou, ST Petugas Survey 2 Bln x 200,000 400,000 5
6 Rahmat Albu, ST Petugas Survey 2 Bln x 200,000 400,000 6
7 Dayanu Siswanto Ode, ST Petugas Survey 2 Bln x 200,000 400,000 7
8 Ibrahim, ST Petugas Survey 2 Bln x 200,000 400,000 8
9 Nindya Nur Awalia K, A.Md Petugas Survey 2 Bln x 200,000 400,000 9
10 La Ode Harlisa, A.Md Petugas Survey 2 Bln x 200,000 400,000 10
Jumlah 4,000,000
Terbilang : Empat Juta Rupiah
KWITANSI
KWITANSI
KWITANSI
KWITANSI