Anda di halaman 1dari 1

RENCANA ANGGARAN BIAYA

KEGIATAN MITIGASI RESIKO PENGADAAN TANAH DAN PERIJINAN KEGIATAN DIREKTORAT JENDERAL CIPTA KARYA TAHUN 2022

A. BIAYA LANGSUNG PERSONIL RAB PT/CV. ......................................... HASIL NEGOSIASI

WAKTU SATUAN BIAYA JUMLAH BIAYA WAKTU SATUAN BIAYA JUMLAH BIAYA WAKTU SATUAN BIAYA JUMLAH BIAYA
NO. URAIAN KEGIATAN ORANG VOLUME ORANG VOLUME ORANG VOLUME
BULAN SATUAN (Rp.) BULAN SATUAN (Rp.) BULAN SATUAN (Rp.)
BULAN SATUAN (Rp.) BULAN SATUAN (Rp.) BULAN SATUAN (Rp.)

I TENAGA AHLI
1 Ahli Kebijakan Publik 1 S1 1 MM 25,500,000 25,500,000 1 S1 1 MM 25,750,000 25,750,000 1 S1 1 MM 25,500,000 25,500,000
2 Ahli Perencanaan Wilayah dan Kota 1 S1 1 MM 22,500,000 22,500,000 1 S1 1 MM 22,500,000 22,500,000 1 S1 1 MM 22,500,000 22,500,000
3 Ahli Permukiman 1 S1 1 MM 22,500,000 22,500,000 1 S1 1 MM 22,500,000 22,500,000 1 S1 1 MM 22,500,000 22,500,000

II TENAGA PENUNJANG
1 Asisten Tenaga Ahli PWK 1 S1 1 MM 9,000,000 9,000,000 1 S1 1 MM 9,000,000 9,000,000 1 S1 1 MM 9,000,000 9,000,000
2 Operator Komputer 1 1 MM 5,000,000 5,000,000 1 1 MM 5,000,000 5,000,000 1 1 MM 5,000,000 5,000,000

TOTAL A 84,500,000 84,750,000 84,500,000

B. BIAYA LANGSUNG NON PERSONIL

WAKTU BIAYA JUMLAH BIAYA WAKTU BIAYA JUMLAH BIAYA WAKTU BIAYA JUMLAH BIAYA
NO. URAIAN KEGIATAN ORANG VOLUME SATUAN ORANG VOLUME SATUAN ORANG VOLUME SATUAN
BULAN SATUAN (Rp.) BULAN SATUAN (Rp.) BULAN SATUAN (Rp.)

A Biaya operasional lainnya 1,050,000 1,100,000 1,000,000


1 Supllies Komputer 1 1 bln 550,000 550,000 1 1 bln 600,000 600,000 1 1 bln 550,000 550,000
2 ATK 1 1 bln 500,000 500,000 1 1 bln 500,000 500,000 1 1 bln 450,000 450,000

B LAPORAN 2,100,000 2,400,000 2,100,000


1 Pencetakan Laporan Pendahuluan 3 1 Expl. 350,000 1,050,000 3 1 Expl. 400,000 1,200,000 3 1 Expl. 350,000 1,050,000
2 Pencetakan Laporan Final 3 1 Expl. 350,000 1,050,000 3 1 Expl. 400,000 1,200,000 3 1 Expl. 350,000 1,050,000

TOTAL B 3,150,000 3,500,000 3,100,000


TOTAL A + B Rp. 87,650,000 Rp. 88,250,000 Rp. 87,600,000
PPN 11 % 9,641,500 9,707,500 9,636,000
Total (A+B) + PPN 11 % 97,291,500 97,957,500 97,236,000