Anda di halaman 1dari 1

PENGELUARAN SKKK TIDAR

RINCIAN PENGELUARAN MATERIAL


TANGGAL RINCIAN SAT VOLUME JUMLAH
04 November 2019 Kubut Catut bh 1 17.000,0
Besi 8 Ljr 10 430.000,0
Besi 6 Ljr 6 150.000,0
Koral PU 1/2 190.000,0
05 November 2019
Pasir PU 1/2 150.000,0
Semen Sak 5 245.000,0
Bendrat Kg 1 20.000,0
Bata Ringan 10 cm m3 3 2.175.000,0
MU 40 kg Sak 3 360.000,0
Paku Kg 1 17.000,0
06 November 2019 Papan Cor bh 6 90.000,0
Selang timbang m 5 10.000,0
Talang Seng m 5 150.000,0
Graji Hebel bh 1 35.000,0
Kusen beton bh 1 120.000,0
11 November 2019
Cat Tembok kg 5 50.000,0
Aquprof kg 5 179.500,0
Kuas 4'' bh 1 18.000,0
13 November 2019 Body Kunci bh 1 65.000,0
Mur bh 1 7.000,0
Aplus 1/2 35.000,0
Keramik 40x40 dus 1 50.000,0
Pasir Kali Pickup 1/2 105.000,0
Kalsium Sak 1 41.000,0
Semen Putih Sak 1 105.000,0
14 November 2019 Lem Rajawali dus 1 159.000,0
Kapi bh 2 10.000,0
Plesteran bh 1 10.000,0
Sekrup bh 1 13.000,0
Pisau Keramik bh 1 40.000,0

TOTAL 5.046.500,0
RINCIAN PENGELUARAN BAYAR TENAGA DAN TRANSPOR
TANGGAL RINCIAN JUMLAH
05 November 2019 Air Galon 20.000,0
09 November 2019 Bayar Tenaga 1.140.000,0
11 November 2019 Transpor 50.000,0
13 November 2019 Transpor 50.000,0
15 November 2019 Transpor 15.000,0
16 November 2019 Bayar Tenaga 1.140.000,0
23 November 2019 Bayar Tenaga 450.000,0

TOTAL PENGELUARAN PEKERJAAN 2.865.000,0

TOTAL PENGELUARAN PEKERJAAN SKKK TIDAR 7.911.500,0