UK-3 SIKLUS 5
Shrimp Pond Report Agustus - Oktober 2021
Kolam A6 __________________________________________________________________ 2
Plan Pakan A6 ____________________________________________________________ 2
Kolam A7 _________________________________________________________________ 15
Plan Pakan A7 ___________________________________________________________ 15
Kolam A8 _________________________________________________________________ 26
Plan Pakan A8 ___________________________________________________________ 26
Kolam A9 _________________________________________________________________ 38
Plan Pakan A9 ___________________________________________________________ 38
Data Panen
Blok- A UK3
Luas Total Benur Panen Total Total Total SR
Kolam FCR Prod/Ha
Kolam Nett Bruto Tonase Size Tonase Pakan Net Bruto
A1 3250 470400 561232 4674.68 47.39 4674.68 9359 2.00 47.09% 39.47% 14384
A2 3125 445200 531166 3880.82 46.04 3880.82 8189 2.11 40.13% 33.64% 12419
A3 3200 458800 499100 3633.1 60.92 3633.10 7609 2.09 48.24% 44.35% 11353
A4 3225 466200 507150 3495.56 61.77 3495.56 8088 2.31 46.32% 42.58% 10839
A5 3275 469200 457378 3591.9 52.41 3591.90 7784 2.17 40.12% 41.16% 10968
Group
16075 19276.06 41029 2.13 11991
1A
A6 2650 387600 377834 2593.88 57.89 2593.88 5864 2.26 38.74% 39.74% 9788
A7 2710 392200 394002 5379.06 54.94 5379.06 7480 1.39 75.35% 75.01% 19849
A8 2680 392200 394002 2991.78 52.2 2991.78 6604 2.21 39.82% 39.64% 11163
A9 2670 392000 403907 5299.1 48.76 5299.10 7585 1.43 65.91% 63.97% 19847
A10 2800 408000 420393 4381.62 48.81 4381.62 7338 1.67 52.42% 50.87% 15649
Group
13510 20645.44 34871 1.69 15282
2A
TOTAL 29585 4281800 7739417 72163.86 55.655 39921.5 75900 1.90 13494
Hal. 02 Kolam A6
Kolam A6
Plan Pakan A6
Tambak : UKSMA 3
Siklus : 5 Density : 143 Ekor/m2
BLOK/KOLAM : A6 Luas Petak : 2650 m2 43.584906
Teknisi : JFK Bruto : 377.834 Ekor Hitungan LAB
Tanggal Tebar : 06 Agustus 2021 Net. : 387.600 Ekor S. Jalan SR 97 %
pH Vibrio
Tanggal DOC Kec W Sal Alk TOM NH4 NO2 NO3 PO4 Hard Ca Mg Mortal
Pagi Sore TBC Kuning Hijau Lumi
29-Aug 23 40 8.1 8.2 C
30-Aug 24 45 8.1 8.2 C
31-Aug 25 45 8.2 8.4 C 30 134 89 0.5 0.1 10 2.5 5.2.E+06 6.0.E+01 3.0.E+00 80
01-Sep 26 40 8.2 8.4 C 0
02-Sep 27 40 8.3 8.6 C 150
03-Sep 28 30 8.2 8.8 C 29 124 92 1.2 0.05 20 2.5 4700 1300 3400 1.3.E+06 1.2.E+02 9.0.E+00 0
04-Sep 29 30 8.2 8.8 C 80
05-Sep 30 30 8.3 8.8 C 0
06-Sep 31 35 8.2 8.5 C 55
07-Sep 31 35 8.1 8.3 C 29 138 92 0.5 0.25 2 3 5.8.E+06 7.6.E+01 2.1.E+01 0
08-Sep 33 40 8.1 8.2 C 60
09-Sep 34 35 8.1 8.3 C 0
10-Sep 35 30 8.2 8.3 C 28 138 104 3 1.8 5 4 5100 1100 4000 4.7.E+06 1.3.E+02 1.4.E+01 50
11-Sep 36 35 8.2 8.4 C 50
12-Sep 37 40 8.3 8.3 C 60
13-Sep 38 35 8.3 8.3 C 115
14-Sep 39 40 8.2 8.3 C 27 144 86 5 3 5 3.5 2.4.E+07 5.6.E+01 2.1.E+01 100
15-Sep 40 40 8.2 8.3 C 50
16-Sep 41 35 8.2 8.4 C 60
17-Sep 42 35 8.2 8.4 C 26 134 95 3.1 2.5 20 5.3 5000 1100 3900 5.0.E+07 6.6.E+01 1.2.E+01 55
18-Sep 43 30 8.1 8.3 C 60
19-Sep 44 30 8.0 8.2 C 95
20-Sep 45 30 8.0 8.2 C 70
21-Sep 46 35 8.1 8.3 C 25 146 115 0.5 0 30 6 4.1.E+07 4.7.E+01 1.3.E+01 50
Hal. 05 Kolam A6
pH Vibrio
Tanggal DOC Kec W Sal Alk TOM NH4 NO2 NO3 PO4 Hard Ca Mg Mortal
Pagi Sore TBC Kuning Hijau Lumi
22-Sep 47 35 8.2 8.2 C 70
23-Sep 48 35 8.1 8.1 CH 100
24-Sep 49 30 8.1 8.2 HC 26 103 102 3.2 0.2 2.4 4 4800 1000 3800 3.8.E+07 5.8.E+01 1.4.E+01 53
25-Sep 50 30 8.0 8.2 HC 180
26-Sep 51 35 8.1 8.1 HC 250
27-Sep 52 35 8.0 8.1 H 1.000
28-Sep 53 50 8.1 8.3 HC 26 94 94 0.3 0.87 30 1.05 3.8.E+07 5.8.E+01 1.4.E+01 1.527
29-Sep 54 45 8.1 8.4 HC 2.580
30-Sep 55 45 8.0 8.4 HC 4.470
01-Oct 56 40 8.0 8.4 CH 26 88 89 0.42 0.83 25 1.1 4600 1100 3500 1.4.E+07 8.9.E+01 4.2.E+01 1.6.E+1 10.600
02-Oct 57 40 8.1 8.3 HC 9.077
03-Oct 58 30 8.0 8.4 HC 18.125
04-Oct 59 40 8.0 8.6 HC 29.900
05-Oct 60 30 8.1 8.7 H 28 96 97 0.24 0.96 55 1.15 3.3.E+07 9.3.E+01 2.3.E+01 25.900
06-Oct 61 30 8.1 8.8 H 10.500
07-Oct 62 30 8.2 8.7 C 11.640
08-Oct 63 35 8.1 8.4 C 27 92 96 0.07 0.81 25 0.96 4600 1200 3400 4.3.E+07 7.1.E+01 4.1.E+01 10.000
09-Oct 64 45 8.1 8.5 C 9.125
10-Oct 65 35 8.1 8.5 H 48.351
11-Oct 66 35 8.0 8.7 H 22.617
12-Oct 67 35 8.2 8.8 H 28 98 97 0.23 0.74 30 0.94 4.0.E+07 8.2.E+01 3.1.E+01 18.050
13-Oct 68 30 8.2 9.0 H 14.171
14-Oct 69 30 8.2 9.0 H 14.751
Hal. 06 Kolam A6
pH Vibrio
Tanggal DOC Kec W Sal Alk TOM NH4 NO2 NO3 PO4 Hard Ca Mg Mortal
Pagi Sore TBC Kuning Hijau Lumi
15-Oct 70 35 8.2 8.9 H 29 94 102 1.03 0.81 20 0.82 4100 1100 3000 1.6.E+07 1.4.E+02 1.9.E+01 12.115
16-Oct 71 25 8.2 9.1 C 15.500
17-Oct 72 20 8.2 8.9 C 30.940
18-Oct 73 12.420
19-Oct 74 15.434
Hal. 07 Kolam A6
Grafik Pertumbuhan A6
MBW A6 ADG A6
16.00
14.00 14.15
0.39
0.37
12.00
11.40
10.00 0.32
0.30
8.83
MBW
ADG
8.00
6.62
6.00
0.21
4.49
4.00
0.17 3.04
2.00 2.16
1.00 0.13
0.00
20 30 40 50 60 70 80
DOC
Hal. 15 Kolam A7
Kolam A7
Plan Pakan A7
Tambak : UKSMA 3
Siklus : 5 Density : 145 Ekor/m2
BLOK/KOLAM : A7 Luas Petak : 2710 m2
Teknisi : JFK Bruto : 394.002 Ekor Hitungan LAB
Tanggal Tebar : 07 Agustus 2021 Net. : 392.200 Ekor S. Jalan SR 100 %
pH Vibrio
Tanggal DOC Kec W Sal Alka TOM NH4 NO2 NO3 PO4 Hard Ca Mg Mortal
Pagi Sore TBC Kuning Hijau Lumi
29-Aug 22 35 8.4 8.6 C
30-Aug 23 35 8.2 8.6 CM
31-Aug 24 30 8.3 8.7 CM 29 138 87 0.7 0 20 0.7 5.0.E+06 3.8.E+01 6.0.E+00
01-Sep 25 30 8.2 8.7 CM 70
02-Sep 26 30 8.3 8.9 CM 100
03-Sep 27 30 8.3 9.0 CM 29 138 94 1.5 0 10 0.7 5200 1100 4100 1.3.E+06 9.3.E+01 1.1.E+01 120
04-Sep 28 30 8.4 8.9 CM 0
05-Sep 29 30 8.3 8.9 CM 350
06-Sep 30 30 8.3 8.7 CM 0
07-Sep 31 30 8.2 8.7 CM 29 130 86 0.2 0.25 5 1.5 4.8.E+06 1.4.E+02 2.2.E+01 340
08-Sep 31 30 8.3 8.8 CM 0
09-Sep 33 30 8.3 8.8 CM 231
10-Sep 34 40 8.2 8.2 CM 29 146 100 0.8 0.05 10 1.5 5100 1100 4000 5.6.E+06 1.9.E+02 1.0.E+01 0
11-Sep 35 60 8.1 8.2 CM 550
12-Sep 36 50 8.2 8.2 CM 350
13-Sep 37 50 8.3 8.3 CM 170
14-Sep 38 60 8.4 8.4 CM 27 140 86 2 0.2 2 3 2.6.E+07 1.6.E+02 1.3.E+01 101
15-Sep 39 60 8.3 8.4 C 100
16-Sep 40 50 8.3 8.4 C 65
17-Sep 41 50 8.3 8.5 C 26 140 94 3.3 0.2 5 4.1 5000 1200 3800 3.5.E+07 1.4.E+02 1.7.E+01 80
18-Sep 42 45 8.3 8.5 C 55
19-Sep 43 40 8.3 8.6 C 110
20-Sep 44 35 8.3 8.5 C 60
21-Sep 45 30 8.3 8.5 C 25 136 112 5 0.2 6 0.75 3.8.E+07 1.6.E+02 4.0.E+00 100
Hal. 18 Kolam A7
pH Vibrio
Tanggal DOC Kec W Sal Alka TOM NH4 NO2 NO3 PO4 Hard Ca Mg Mortal
Pagi Sore TBC Kuning Hijau Lumi
22-Sep 46 40 8.3 8.5 C 100
23-Sep 47 35 8.3 8.4 C 150
24-Sep 48 35 8.3 8.4 C 27 116 101 1.5 0.6 2.2 3.5 5100 1000 4100 2.8.E+07 1.9.E+02 6.0.E+00 150
25-Sep 49 35 8.3 8.4 C 150
26-Sep 50 40 8.2 8.3 C 155
27-Sep 51 40 8.2 8.3 C 150
28-Sep 52 40 8.2 8.6 C 26 111 93 1.71 1.02 10 0.93 2.8.E+07 1.9.E+02 6.0.E+00 300
29-Sep 53 35 8.2 8.5 C 250
30-Sep 54 35 8.1 8.4 C 170
01-Oct 55 35 8.0 8.1 C 27 115 92 0.18 0.98 25 0.91 4700 1000 3700 3.5.E+07 1.3.E+02 2.5.E+01 400
02-Oct 56 35 8.0 8.2 C 270
03-Oct 57 35 8.0 8.4 C 427
04-Oct 58 30 8.0 8.3 C 750
05-Oct 59 30 7.9 8.3 C 28 98 98 0.15 0.83 15 1.05 2.9.E+07 1.5.E+01 1.9.E+02 1.500
06-Oct 60 30 8.0 8.3 CH 4.500
07-Oct 61 30 8.0 8.3 CH 3.500
08-Oct 62 30 8.0 8.2 C 28 90 101 0.06 0.66 30 1.05 4700 1000 3700 4.3.E+07 1.0.E+02 2.4.E+01 2.200
09-Oct 63 30 8.0 8.3 C 3.507
10-Oct 64 30 8.0 8.2 C 6.853
11-Oct 65 30 7.9 8.2 C 6.795
12-Oct 66 30 8.0 8.3 C 27 94 92 0.22 0.88 50 1.28 4.3.E+07 7.6.E+01 4.1.E+01 5.125
13-Oct 67 35 8.0 9.2 C 6.455
14-Oct 68 35 8.0 8.3 C 5.641
15-Oct 69 30 8.0 8.2 C 29 88 107 0.1 0.56 50 1.34 4300 1200 3100 1.4.E+07 6.7.E+01 2.9.E+01 8.000
Hal. 19 Kolam A7
pH Vibrio
Tanggal DOC Kec W Sal Alka TOM NH4 NO2 NO3 PO4 Hard Ca Mg Mortal
Pagi Sore TBC Kuning Hijau Lumi
16-Oct 70 35 7.9 8.4 C 6.420
17-Oct 71 30 7.9 8.2 C 9.751
18-Oct 72 10.250
19-Oct 73 9.563
20-Oct 74 10.121
21-Oct 75 16.571
22-Oct 76 10.221
Hal. 20 Kolam A7
06-Aug
07-Aug 0.0 10 ppm 3 ppm
20 1
08-Aug 1 SA00 3 2 3 8.0 8.0 2 ppm
ppm blong
09-Aug 2 SA00 3.5 2.5 3 9.0 17.0
10-Aug 3 SA00 3.5 3 3.5 10.0 27.0 10 ppm 5 ppm
20 1
11-Aug 4 SA00 4 3 4 11.0 38.0 5 ppm
ppm blong
12-Aug 5 SA00 4.5 3.5 4 12.0 50.0
1
13-Aug 6 SA00 4.5 4 4.5 13.0 63.0 10 ppm 2 ppm
blong
20
14-Aug 7 SA00 5 4 5 14.0 77.0 2 ppm
ppm
15-Aug 8 SA00 4 3.5 4 4 15.5 92.5
16-Aug 9 SA00 4.5 4 4 4.5 17.0 109.5 10 ppm 2 ppm 5 ppm
20
17-Aug 10 SA00 5 4 4.5 5 18.5 128.0 2 ppm
ppm
18-Aug 11 SA00 5.5 4.5 5 5 20.0 148.0
19-Aug 12 SA00 5.5 5 5 5.5 21.0 169.0 10 ppm 2 ppm
20
20-Aug 13 SA00 6.5 5.5 5.5 6 23.5 192.5 2 ppm
ppm
21-Aug 14 SA00 6.5 5.5 6 6.5 24.5 217.0
22-Aug 15 SA00 7 6.5 7 6.5 27.0 244.0 10 ppm 2 ppm
20
23-Aug 16 SA00 8 7 8 7 30.0 274.0 2 ppm
ppm
24-Aug 17 SA00 9 7.5 9 7.5 33.0 307.0
25-Aug 18 SA00 10 8 10 8 36.0 343.0 10 ppm 2 ppm
20
26-Aug 19 SA00 10.5 9.5 10.5 8.5 39.0 382.0 2 ppm 5 ppm
ppm
Hal. 22 Kolam A7
20 2
07-Oct 61 SA02SP 165 165.0 4883.0 5 ppm
ppm ppm
08-Oct 62 SA02SP 175 175.0 5058.0
2
09-Oct 63 SA02SP 175 175.0 5233.0 10 ppm 2%
ppm
20 2
10-Oct 64 SA02SP 175 175.0 5408.0 5 ppm
ppm ppm
2
11-Oct 65 SA02SP 185 185.0 5593.0
ppm
10 ppm 2
12-Oct 66 SA02SP 175 175.0 5768.0
(3x) ppm
20
2
13-Oct 67 SA02SP 180 180.0 5948.0 ppm
ppm
(3x)
2
14-Oct 68 SA02SP 180 180.0 6128.0
ppm
2
15-Oct 69 SA02SP 180 180.0 6308.0
ppm
2
16-Oct 70 SA02SP 185 185.0 6493.0
ppm
10 ppm 2
17-Oct 71 SA02SP 195 195.0 6688.0
(3x) ppm
20
2
18-Oct 72 SA02SP 190 190.0 6878.0 ppm
ppm
(3x)
2
19-Oct 73 SA02SP 190 190.0 7068.0
ppm
20-Oct 74 SA02SP 190 190.0 7258.0
21-Oct 75 SA02SP 122 122.0 7380.0
22-Oct 76 SA02P 100 100.0 7480.0
Hal. 25 Kolam A7
Grafik Pertumbuhan A7
MBW A7 ADG A7
16.00
0.41
14.00 14.00
0.37
12.00
11.43
10.00
0.31 9.45
MBW
ADG
0.28
8.00
6.55
6.00
5.11
0.21
4.00
2.93
2.00 0.15
1.97
0.14
0.94
0.00
20 30 40 50 60 70 80
DOC
Hal. 26 Kolam A8
Kolam A8
Plan Pakan A8
Tambak : UKSMA 3
Siklus : 5 Density : 147 Ekor/m2
BLOK/KOLAM : A8 Luas Petak : 2680 m2
Teknisi : JFK Bruto : 394.002 Ekor Hitungan LAB
Tanggal Tebar : 07 Agustus 2021 Net. : 392.200 Ekor S. Jalan SR 100 %
pH Vibrio
Tanggal DOC Kec W Sal Alka TOM NH4 NO2 NO3 PO4 Hard Ca Mg Mortal
Pagi Sore TBC Kuning Hijau Lumi
29-Aug 22 35 8.1 8.4 C
30-Aug 23 40 8.0 8.4 C
31-Aug 24 45 8.1 8.3 C 28 122 90 0.5 0 12 2 4.6.E+06 1.2.E+02 1.0.E+00
01-Sep 25 40 8.1 8.4 C 30
02-Sep 26 40 8.2 8.6 CH 0
03-Sep 27 45 8.2 8.9 CH 29 130 90 0.7 0 12 1 5100 1200 3900 6.1.E+05 6.0.E+01 2.0.E+00 25
04-Sep 28 45 8.3 8.5 CH 0
05-Sep 29 45 8.1 8.4 CH 30
06-Sep 30 40 8.1 8.4 C 0
07-Sep 31 40 8.1 8.5 C 29 140 95 0.8 0.7 2 2.2 4.2.E+06 4.9.E+01 1.3.E+01 10
08-Sep 31 40 8.2 8.8 C 0
09-Sep 33 30 8.2 9.0 C 100
10-Sep 34 30 8.3 9.0 C 29 134 100 1 0 3 2.5 4800 1000 3800 4.3.E+06 7.2.E+01 3.0.E+01 0
11-Sep 35 30 8.2 9.0 C 30
12-Sep 36 30 8.1 8.4 CM 35
13-Sep 37 30 8.1 8.5 CM 35
14-Sep 38 30 8.1 8.5 CM 27 136 91 3 0.3 3 3.1 4.8.E+07 6.7.E+01 3.5.E+01 105
15-Sep 39 40 8.1 8.4 C 70
16-Sep 40 30 8.1 8.2 C 75
17-Sep 41 40 8.2 8.2 C 26 132 94 4.1 0.6 15 3.5 5100 1000 4100 3.8.E+07 5.5.E+01 1.9.E+01 60
18-Sep 42 30 8.2 8.3 C 75
19-Sep 43 30 8.1 8.3 C 50
20-Sep 44 30 8.1 8.3 C 75
21-Sep 45 35 8.2 8.4 C 25 138 112 5.2 0.6 6 3.5 2.5.E+07 6.7.E+01 3.9.E+01 67
Hal. 29 Kolam A8
pH Vibrio
Tanggal DOC Kec W Sal Alka TOM NH4 NO2 NO3 PO4 Hard Ca Mg Mortal
Pagi Sore TBC Kuning Hijau Lumi
22-Sep 46 30 8.2 8.3 C 75
23-Sep 47 30 8.1 8.2 CH 70
24-Sep 48 40 8.1 8.2 CH 27 115 96 0.7 0.4 1.5 1 5200 1200 4000 3.0.E+06 9.5.E+01 4.5.E+01 70
25-Sep 49 30 8.0 8.2 CH 100
26-Sep 50 30 8.0 8.2 CH 100
27-Sep 51 30 8.0 8.3 C 150
28-Sep 52 30 8.0 8.6 C 27 84 92 0.15 0.85 30 0.91 3.0.E+07 9.5.E+01 4.5.E+01 130
29-Sep 53 20 8.0 8.9 C 150
30-Sep 54 25 8.0 9.0 C 300
01-Oct 55 30 8.0 8.8 C 27 91 89 0.16 0.95 30 0.79 4600 900 3700 2.6.E+07 6.6.E+01 9.1.E+01 3.077
02-Oct 56 25 8.1 9.1 C 3.888
03-Oct 57 25 8.0 9.2 C 9.950
04-Oct 58 20 8.1 9.2 C 8.700
05-Oct 59 20 8.0 9.2 CM 29 94 100 0.14 0.95 25 0.28 3.6.E+07 7.5.E+01 6.3.E+01 13.000
06-Oct 60 20 8.1 9.1 CM 6.400
07-Oct 61 20 8.1 9.1 C 7.800
08-Oct 62 25 8.1 8.9 C 30 98 90 0.11 1.05 20 0.03 4800 1000 3800 4.4.E+07 8.0.E+01 2.7.E+01 9.700
09-Oct 63 25 8.1 9.3 C 5.010
10-Oct 64 20 8.2 9.3 CM 21.090
11-Oct 65 25 8.1 9.2 CM 26.220
12-Oct 66 25 8.1 9.2 CM 29 111 91 0.37 0.69 8 0.1 4.0.E+07 1.1.E+02 2.3.E+01 12.430
13-Oct 67 25 8.2 9.2 CM 18.531
14-Oct 68 20 8.2 9.2 CM 13.110
15-Oct 69 30 8.3 9.1 CM 30 94 102 0.14 0.47 8 0.22 5000 1200 3800 2.0.E+07 6.8.E+01 2.6.E+01 9.931
Hal. 30 Kolam A8
pH Vibrio
Tanggal DOC Kec W Sal Alka TOM NH4 NO2 NO3 PO4 Hard Ca Mg Mortal
Pagi Sore TBC Kuning Hijau Lumi
16-Oct 70 20 8.3 9.4 CM 11.550
17-Oct 71 20 8.3 9.1 CM 16.776
18-Oct 72 11.645
19-Oct 73 28.000
Hal. 31 Kolam A8
Grafik Pertumbuhan A8
MBW A8 ADG A8
18.00
0.52
16.00 16.00
0.48
14.00
12.67
12.00
0.38
10.00
MBW
ADG
9.05
8.00
0.28
6.39
6.00
4.42
4.00
3.19
0.18 0.18
2.00 1.95
1.11
0.12
0.00
20 30 40 50 60 70 80
DOC
Hal. 38 Kolam A9
Kolam A9
Plan Pakan A9
Tambak : UKSMA 3
Siklus : 5 Density : 151 Ekor/m2
BLOK/KOLAM : A9 Luas Petak : 2670 m2
Teknisi : JFK Bruto : 403.907 Ekor Hitungan LAB
Tanggal Tebar : 08 Agustus 2021 Net. : 392.000 Ekor S. Jalan SR 103 %
pH Vibrio Mortal
Tanggal DOC Kec W Sal Alka TOM NH4 NO2 NO3 PO4 Hard Ca Mg
Pagi Sore TBC Kuning Hijau Lumi
01-Sep 24 55 8.2 8.4 C 30 140 93 0.5 0 12 1.5 5.3.E+06 6.5.E+01 4.0.E+00
02-Sep 25 55 8.2 8.5 C 50
03-Sep 26 65 8.1 8.6 C 0
04-Sep 27 65 8.3 8.7 C 30 132 91 0.5 0.05 10 2 5200 1200 4000 4.2.E+06 1.7.E+02 2.0.E+00 50
05-Sep 28 65 8.3 8.7 CH 0
06-Sep 29 60 8.2 8.4 C 50
07-Sep 30 80 8.2 8.3 CH 0
08-Sep 31 85 8.2 8.3 C 28 134 92 0.7 0.05 1 1.5 6.5.E+06 1.6.E+02 8.0.E+00 35
09-Sep 31 90 8.2 8.4 C 0
10-Sep 33 80 8.3 8.5 C 60
11-Sep 34 70 8.2 8.5 C 28 144 88 2.3 1 2 3 5100 1200 3900 7.6.E+06 1.3.E+02 5.0.E+00 0
12-Sep 35 70 8.3 8.4 C 125
13-Sep 36 55 8.3 8.4 C 150
14-Sep 37 40 8.3 8.6 CH 115
15-Sep 38 45 8.3 8.6 CH 26 136 93 2 0.2 2 3 3.0.E+07 2.0.E+02 3.0.E+00 65
16-Sep 39 30 8.3 8.6 CH 70
17-Sep 40 35 8.2 8.2 CH 100
18-Sep 41 30 8.2 8.8 CH 26 136 100 1.8 0.5 0.3 3 4900 1100 3800 5.2.E+07 2.1.E+02 1.1.E+01 125
19-Sep 42 30 8.2 8.8 CH 175
20-Sep 43 30 8.1 8.8 CM 270
21-Sep 44 30 8.2 8.7 C 460
22-Sep 45 35 8.2 8.2 C 25 125 114 2 0.2 10 6 2.9.E+07 2.0.E+02 8.2.E+01 515
23-Sep 46 35 8.0 8.2 C 270
24-Sep 47 30 8.2 8.3 C 155
Hal. 41 Kolam A9
pH Vibrio Mortal
Tanggal DOC Kec W Sal Alka TOM NH4 NO2 NO3 PO4 Hard Ca Mg
Pagi Sore TBC Kuning Hijau Lumi
25-Sep 48 35 8.2 8.3 C 27 103 89 2 0.2 25 4 4800 900 3900 2.4.E+07 8.3.E+01 5.3.E+01 150
26-Sep 49 35 8.2 8.3 C 130
27-Sep 50 35 8.1 8.3 C 140
28-Sep 51 35 8.1 8.4 C 125
29-Sep 52 35 8.1 8.6 C 21 111 95 1.36 1.02 30 0.97 2.0.E+07 4.9.E+01 4.0.E+00 75
30-Sep 53 30 8.0 8.6 C 150
01-Oct 54 30 8.0 8.2 C 450
02-Oct 55 30 8.0 8.7 C 29 119 99 0.69 0.88 25 0.74 4500 1000 3500 2.7.E+07 1.4.E+02 3.1.E+01 240
03-Oct 56 25 8.0 9.0 C 410
04-Oct 57 30 8.0 8.9 C 646
05-Oct 58 30 8.0 8.7 C 1.000
06-Oct 59 30 8.0 8.2 C 30 107 100 0.27 1.02 25 0.68 3.2.E+07 2.3.E+01 2.0.E+01 3.200
07-Oct 60 25 8.0 8.2 C 1.550
08-Oct 61 30 7.9 8.2 C 2.000
09-Oct 62 20 8.0 8.4 C 30 88 93 0.27 0.86 25 0.89 4800 1000 3800 4.0.E+07 6.6.E+01 5.3.E+01 1.955
10-Oct 63 25 7.9 8.3 C 3.995
11-Oct 64 30 7.9 8.3 C 4.685
12-Oct 65 25 8.0 8.4 C 3.751
13-Oct 66 30 8.0 8.6 C 30 103 101 0.04 0.89 25 1.04 3.0.E+07 8.7.E+01 3.0.E+00 4.965
14-Oct 67 30 8.0 8.5 C 5.115
15-Oct 68 30 8.0 8.3 C 5.315
16-Oct 69 25 8.0 8.7 C 29 90 103 0.13 0.99 30 1.11 4800 1100 3700 2.7.E+07 8.2.E+01 1.9.E+01 5.615
17-Oct 70 25 8.0 8.3 C 9.307
18-Oct 71 10.571
Hal. 42 Kolam A9
pH Vibrio Mortal
Tanggal DOC Kec W Sal Alka TOM NH4 NO2 NO3 PO4 Hard Ca Mg
Pagi Sore TBC Kuning Hijau Lumi
19-Oct 72 7.210
20-Oct 73 12.355
21-Oct 74 35.210
Hal. 43 Kolam A9
Grafik Pertumbuhan A9
18.00
17.14
16.00 0.62
14.00 14.07
12.00
10.00 0.44
9.70
MBW
ADG
8.00
7.56
0.32
6.00 0.31
5.30
4.00 0.25
3.75 0.22
2.00 2.03
0.15
1.00
0.00
20 30 40 50 60 70 80
0 10 20 30 40 50 60 70
DOC
MBW A9 ADG A9
Hal. 50 Kolam A10
Kolam A10
Plan Pakan A10
Tambak : UKSMA 3
Siklus : 5 Density : 150 Ekor/m2
BLOK/KOLAM : A10 Luas Petak : 2800 m2
Teknisi : JFK Bruto : 420.393 Ekor Hitungan LAB
Tanggal Tebar : 08 Agustus 2021 Net. : 408.000 Ekor S. Jalan SR 103 %
pH W Sal Alka TOM NH4 NO2 NO3 PO4 Hard Ca Mg Vibrio Mortal
Tanggal DOC Kec
Pagi Sore TBC Kuning Hijau Lumi
01-Sep 24 35 8.1 8.5 C 30 130 94 0.2 0 12 2 5.6.E+06 1.5.E+02 1.0.E+00
02-Sep 25 60 8.1 8.2 C 50
03-Sep 26 70 8.1 8.3 C 0
04-Sep 27 70 8.2 8.4 C 30 130 87 0.5 0.05 10 2.2 5100 1100 4000 6.1.E+06 2.1.E+02 1.0.E+01 30
05-Sep 28 70 8.2 8.5 C 0
06-Sep 29 50 8.2 8.4 C 30
07-Sep 30 50 8.2 8.3 C 0
08-Sep 31 50 8.2 8.4 C 28 132 89 0.5 0 2 2.1 5.3.E+06 1.5.E+02 1.7.E+01 6
09-Sep 31 40 8.2 8.6 C 0
10-Sep 33 40 8.2 8.7 C 60
11-Sep 34 35 8.2 8.7 C 28 138 86 3 0.2 2 3 4900 1100 3800 7.4.E+06 1.1.E+02 3.0.E+01 0
12-Sep 35 40 8.2 8.4 C 70
13-Sep 36 40 8.2 8.5 C 65
14-Sep 37 35 8.2 8.5 C 150
15-Sep 38 35 8.2 8.6 C 27 134 91 2.3 0.2 10 3.5 2.4.E+06 2.9.E+02 2.0.E+00 150
16-Sep 39 30 8.2 8.7 C 60
17-Sep 40 30 8.1 8.7 C 65
18-Sep 41 30 8.1 8.3 C 27 140 98 2.3 0.4 1 3.5 4900 1100 3800 4.3.E+07 2.9.E+02 5.0.E+00 90
19-Sep 42 30 8.1 8.2 C 120
20-Sep 43 30 8.1 8.3 CH 90
21-Sep 44 35 8.1 8.3 CH 80
22-Sep 45 35 8.1 8.3 CH 26 131 115 5 0.5 25 6 2.3.E+07 6.3.E+01 1.3.E+01 100
23-Sep 46 35 8.2 8.2 CH 140
24-Sep 47 35 8.0 8.2 CH 60
Hal. 53 Kolam A10
pH W Sal Alka TOM NH4 NO2 NO3 PO4 Hard Ca Mg Vibrio Mortal
Tanggal DOC Kec
Pagi Sore TBC Kuning Hijau Lumi
25-Sep 48 35 8.0 8.2 CH 27 94 87 1.5 0.5 30 4 4900 1000 3900 3.9.E+07 5.5.E+01 4.4.E+01 150
26-Sep 49 35 8.0 8.2 CH 100
27-Sep 50 35 8.0 8.3 HC 135
28-Sep 51 35 8.1 8.4 HC 120
29-Sep 52 35 8.0 8.3 CH 22 86 97 0.12 0.87 25 1.08 2.4.E+07 3.2.E+01 2.6.E+01 115
30-Sep 53 35 7.9 8.3 CH 250
01-Oct 54 30 7.9 8.2 C 1.000
02-Oct 55 30 7.9 8.3 C 28 111 93 0.32 0.8 35 1.14 4400 1100 3300 4.0.E+07 1.2.E+02 4.4.E+01 2.200
03-Oct 56 25 7.9 8.4 C 3.700
04-Oct 57 25 7.9 8.4 C 6.800
05-Oct 58 25 7.9 8.4 C 8.000
06-Oct 59 25 7.9 8.5 C 29 91 97 0.23 0.77 30 1.08 2.4.E+07 1.4.E+02 1.3.E+01 4.000
07-Oct 60 25 8.0 8.6 C 7.400
08-Oct 61 25 8.0 8.5 C 6.700
09-Oct 62 25 8.0 8.9 C 29 90 103 0.08 0.8 30 0.95 4600 900 3700 4.1.E+07 1.3.E+02 1.4.E+01 6.503
10-Oct 63 25 8.0 9.0 C 10.950
11-Oct 64 25 8.0 9.0 C 6.874
12-Oct 65 20 8.0 9.1 C 8.250
13-Oct 66 25 8.0 9.3 C 30 107 93 0.1 0.83 20 0.5 3.6.E+07 9.0.E+01 1.7.E+01 8.960
14-Oct 67 20 8.0 9.2 C 9.945
15-Oct 68 25 8.1 9.0 C 8.965
16-Oct 69 20 8.1 9.3 C 29 94 107 0.21 0.77 45 1.06 4800 1200 3600 2.6.E+07 1.1.E+02 1.7.E+01 10.460
17-Oct 70 20 8.1 8.9 C 15.965
18-Oct 71 10.976
Hal. 54 Kolam A10
pH W Sal Alka TOM NH4 NO2 NO3 PO4 Hard Ca Mg Vibrio Mortal
Tanggal DOC Kec
Pagi Sore TBC Kuning Hijau Lumi
19-Oct 72 0
20-Oct 73 18.547
Hal. 55 Kolam A10
18.00 0.54
17.36
0.51
16.00
14.00 13.76
12.00
11.15 0.37
MBW
ADG
10.00
8.00
7.34
0.21
4.00 0.20 4.06
2.30
2.00
0.93
0.00
20 30 40 50 60 70 80
DOC
Hal. 62 Data Mortalitas Group 2A
Ekor
160.000
140.000
120.000
100.000
80.000
60.000
40.000
20.000
0
28 35 42 49 56 63 70 77
A6 230 245 490 498 20.607 115.142 139.180 74.294
A7 290 1.471 921 820 1.695 16.384 45.289 66.477
A8 55 170 455 507 7.795 60.560 112.862 56.421
A9 100 270 800 1.950 1.590 14.346 38.753 65.346
A10 80 166 700 720 7.520 50.353 69.419 29.523
DOC
Hal. 66 Evaluasi Group 2A
Evaluasi Group 2A
- Udang kurang rata, atau blantik jika dibandingkan dengan Group lain
- Nafsu udang sangat baik hingga DOC 56, namun karena kondisi udang blantik maka rasio diturunkan
- Saat proses In/Out Water Flow perlu diperhatikan kembali kondisi air tandon. Dikarenakan pada siklus ini, saat UK2 panen dan tandon air sudah kosong
/ isi dari luar, mortalitas keesokan harinya langsung meningkat berkelanjutan. Hal ini terjadi pada tanggal 30 September, dimana kolam-kolam dengan
intensitas pengisian air yang lumayan banyak langsung mengalami dampaknya. Contohnya pada kolam A6 saat di tap malam airnya bercahaya
(Lampiran 1).
- Keberadaan suspense terlarut / Floc harus terus dipantau seiring berjalannya waktu. Pada siklus ke-5 ini ditemukan Floc yang cukup tebal pada kolam
A8, dan setelah kandungan Floc mencapai 3 ppt pada alat ukur Imhoff cone, maka akan sulit untuk mengendalikannya. Hal ini tentunya menggangu
udang dalam mencari pakan yang ada, memicu udang stress, dan menimbulkan kematian.
- Beberapa kolam sempat menjadi hijau (A6, dan A10), diduga karena kandungan C/N Rasio yang berada pada kolam belum tercukupi selama instruksi
masuk air berlangsung.
- Beberapa kolam yang tidak sentral dari awal tebar (A7, A8, dan A10) hingga panen (A10). Hal ini membuat kotoran-kotoran bekas pakan, moltingan, dan
suspen drop tidak dapat keluar secara maksimal. Di lapang ini membuat sebagian pakan di ancho telat dimakan oleh udang akibat terlalu banyaknya
kotoran yang menghalangi kandungan attraktan dari pakan. Pada kolam A7, dan A8 sudah terbantu setelah sedikit perubahan pada kincir dinding dan
sentral, namun untuk A10 masih tersisa hingga panen (Lampiran 2).
Hal. 67 Contact Information
Contact Information
For more info
Jerna Ferda K
Teknisi Muda UK3
087819592296
fkusumato21@gmail.com
Hal. 68 Company Information
Company Information
PT. UJUNG KULON SUKSES MAKMUR ABADI
Kp. Cisaat RT 002/RW 005 Kel. Tamanjaya Kec. Sumur Pandeglang Banten 42283
Tel (0254) 7811905